Management's
Discussion and Analysis
For the three and nine months
ended
September 30, 2026
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
The following management discussion and analysis ("MD&A") of the consolidated operations and financial position of OR Royalties Inc. ("OR Royalties" or the "Company") and its subsidiaries for the three and nine months ended September 30, 2026 should be read in conjunction with the Company's unaudited condensed interim consolidated financial statements and related notes for the three and nine months ended September 30, 2026 and the Company's audited consolidated financial statements and related notes for the years ended December 31, 2025 and 2024. The unaudited condensed interim consolidated financial statements have been prepared in accordance with IFRS Accounting Standards as issued by the International Accounting Standards Board ("IASB") applicable to the preparation of interim financial statements. Management is responsible for the preparation of the unaudited condensed interim consolidated financial statements and other financial information relating to the Company included in this report. The Board of Directors is responsible for ensuring that management fulfills its responsibilities for financial reporting. In furtherance of the foregoing, the Board of Directors has appointed an Audit and Risk Committee composed of independent directors. The Audit and Risk Committee meets with management and the auditors in order to discuss results of operations and the financial condition of the Company prior to making recommendations and submitting the consolidated financial statements to the Board of Directors for its consideration and approval for issuance to shareholders. The information included in this MD&A is as of November 11, 2026, the date when the Board of Directors has approved the Company's unaudited condensed interim consolidated financial statements for the three and nine months ended September 30, 2026 following the recommendation of the Audit and Risk Committee. All monetary amounts included in this report are expressed in U.S. dollars, the Company's reporting currency, unless otherwise noted. This MD&A contains forward-looking statements and should be read in conjunction with the risk factors described in the "Forward-Looking Statements" section.
Table of Contents
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Description of the Business
OR Royalties is engaged in the business of acquiring and managing royalties, streams and similar interests on precious metals and other commodities that fit the Company's risk/reward objectives. The Company owns a portfolio of royalties, streams, options on royalty/stream financings and exclusive rights to participate in future royalty/stream financings on various projects. The Company's cornerstone asset is a 3-5% net smelter return ("NSR") royalty on the Canadian Malartic Complex, located in Québec, Canada.
OR Royalties is a public company domiciled in the Province of Québec, Canada, whose shares trade on the Toronto Stock Exchange ("TSX") and the New York Stock Exchange ("NYSE") and is constituted under the Business Corporations Act (Québec). The address of its registered office is 1100, avenue des Canadiens-de-Montréal, Suite 300, Montréal, Québec.
Business Model and Strategy
OR Royalties is focused on acquiring high-quality, long-life precious metals royalties and streams on assets located in favourable jurisdictions that are operated by established mining companies. The Company deploys capital through the acquisition of royalty and stream investments on metal mining projects at various stages of operation and development. OR Royalties endeavours to provide investors with lower-risk precious metals exposure via a geographically and operationally diversified asset base. OR Royalties' objective is to deploy capital into new and accretive investment opportunities to further enhance its growth profile.
Highlights
Third Quarter of 2026
1 GEOs are calculated on a quarterly basis and include royalties and streams. Silver ounces and copper tonnes earned from royalty and stream agreements are converted to gold equivalent ounces by multiplying the silver ounces or copper tonnes earned by the average silver price per ounce or copper price per tonne for the period and dividing by the average gold price per ounce for the period. Cash royalties, other metals and commodities are converted into gold equivalent ounces by dividing the associated revenue by the average gold price per ounce for the period. For average metal prices used, refer to the Portfolio of Royalty, Stream and Other Interests section of this MD&A.
2 Three months ended September 30, 2025 ("Q3 2025").
3 "Adjusted earnings" and "Adjusted earnings per basic share" are non-IFRS financial performance measures which have no standard definition under IFRS Accounting Standards and might not be comparable to similar financial measures disclosed by other issuers. Refer to the non-IFRS measures provided under the Non-IFRS Financial Performance Measures section of this MD&A for further information and for a quantitative reconciliation of each non-IFRS financial measure to the most directly comparable IFRS financial measure.
4 "Net cash/(net debt) position" is a non-IFRS financial performance measure which has no standard definition under IFRS Accounting Standards and might not be comparable to similar financial measures disclosed by other issuers. Refer to the non-IFRS measures provided under the Non-IFRS Financial Performance Measures section of this MD&A for further information and for a quantitative reconciliation of each non-IFRS financial measure to the most directly comparable IFRS financial measure.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Subsequent to September 30, 2026
Guidance for 2026 and 5-Year Outlook
2026 Guidance
OR Royalties expects GEOs earned to range between 80,000 to 90,000 in 2026 at an average cash margin5 of approximately 97%. For the 2026 guidance, deliveries of silver, copper, and cash royalties were converted to GEOs using commodity prices based on February 2026 consensus commodity prices and a gold/silver price ratio of 73:1.
The 2026 guidance assumed ramp-ups at both the Dalgaranga and San Gabriel mines, as well as first payments received under the gross revenue ("GR") and NSR royalties from Ramelius Resources Limited ("Ramelius") and Compañía de Minas Buenaventura S.A.A. ("Buenaventura"), respectively. The guidance also assumed increased payments associated with GEOs earned from the Company's 2.0% NSR royalty covering Cardinal Namdini Mining Ltd.'s Namdini mine. In addition, the guidance assumed relatively consistent year-over-year GEO deliveries from Capstone Copper Corp.'s Mantos Blancos mine. In addition, the guidance assumed conservative estimates of GEOs expected to be earned from Harmony Gold Mining Company Limited's ("Harmony") CSA mine, as Harmony's ownership transition continues and the Harmony team continues to condition the asset for optimized performance over the long-term.
OR Royalties' 2026 guidance on royalty and stream interests is largely based on publicly available forecasts from its operating partners. When publicly available forecasts on properties are not available, OR Royalties obtains internal forecasts from the producers, or uses management's best estimate. The 2026 guidance remains unchanged following the recent wall movement at the Barnat open pit at the Canadian Malartic Complex and the potential impacts described by Agnico Eagle Mines Limited ("Agnico Eagle") in their press release from July 2, 2026.
5-Year Outlook
OR Royalties expects its portfolio to generate between 120,000 and 135,000 GEOs in 2030. The outlook assumed the commencement of production at Gold Fields Limited's Windfall, South32 Limited's Hermosa/Taylor, Osisko Gold Group Inc.'s Cariboo, Solidus Resources LLC's Spring Valley, United Gold's Amulsar and Equinox Gold Corp.'s South Railroad projects, respectively. It also assumed increased production from certain other operators that are advancing expansions including Alamos Gold Inc.'s Island Gold District Expansion, amongst others. The 5-year outlook assumed there will be no GEO contribution from the Eagle Gold mine.
Beyond this growth profile, OR Royalties owns several other growth assets, which have not been factored into the 5-year outlook, as their respective development timelines are either longer, or difficult to reasonably forecast at this time. As the Company's operating partners provide additional clarity on these respective assets, OR Royalties will seek to include them in future long-term outlooks.
The 5-year outlook is based on internal judgements of publicly available forecasts and other disclosure by the third-party owners and operators of the Company's assets and could differ materially from actual results. When publicly available forecasts on properties are not available, OR Royalties obtains internal forecasts from the operators or uses management's best estimate. The commodity price assumptions that were used in the 5-year outlook are based on current long-term consensus and a gold/silver price ratio of 82:1.
This 5-year outlook replaces the 5-year outlook previously released in February 2025, the latter of which should be considered as withdrawn. Investors should not use the current 5-year outlook to extrapolate forecast results to any year within the 5-year period (2026-2030).
5 Cash margin is a non-IFRS financial performance measure which has no standard definition under IFRS Accounting Standards and might not be comparable to similar financial measures disclosed by other issuers. It is calculated by deducting the cost of sales (excluding depletion) from the revenues. Please refer to the Non-IFRS Financial Performance Measures section of this MD&A for further information and for a quantitative reconciliation of each non-IFRS financial measure to the most directly comparable IFRS financial measure.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Portfolio of Royalty, Stream and Other Interests
The following table details the GEOs earned by the Company's producing royalty, stream and other interests:
| Three months ended September 30, |
Nine months ended September 30, |
|||||||||||
| 2026 | 2025 | 2026 | 2025 | |||||||||
| Gold | ||||||||||||
| Canadian Malartic Complex royalty | 5,838 | 8,069 | 20,145 | 24,084 | ||||||||
| Namdini royalty (i) | 1,318 | 628 | 3,771 | 758 | ||||||||
| Éléonore royalty | 1,308 | 1,103 | 3,685 | 3,912 | ||||||||
| Island Gold District royalty | 914 | 895 | 2,500 | 2,451 | ||||||||
| Ermitaño royalty | 543 | 500 | 1,590 | 1,490 | ||||||||
| Lamaque Complex royalty | 524 | 461 | 1,443 | 1,404 | ||||||||
| Bald Mountain royalty | 298 | 63 | 1,424 | 468 | ||||||||
| Seabee royalty | 536 | 254 | 1,063 | 1,874 | ||||||||
| Pan royalty | 360 | 313 | 1,039 | 922 | ||||||||
| Tocantinzinho royalty | 298 | 292 | 873 | 797 | ||||||||
| Fruta del Norte royalty | 117 | 129 | 346 | 347 | ||||||||
| Dalgaranga royalty (ii) | 320 | - | 338 | - | ||||||||
| Others | 564 | 284 | 1,203 | 828 | ||||||||
| 12,938 | 12,991 | 39,420 | 39,335 | |||||||||
| Silver | ||||||||||||
| Mantos Blancos stream | 3,231 | 3,344 | 11,974 | 8,147 | ||||||||
| Sasa stream | 1,576 | 1,075 | 4,908 | 3,276 | ||||||||
| CSA stream | 891 | 1,279 | 2,862 | 3,299 | ||||||||
| Gibraltar stream | 795 | 518 | 2,316 | 1,470 | ||||||||
| Canadian Malartic Complex royalty | 55 | 46 | 220 | 130 | ||||||||
| Others | 77 | 53 | 267 | 156 | ||||||||
| 6,625 | 6,315 | 22,547 | 16,478 | |||||||||
| Copper and others | ||||||||||||
| CSA copper stream | 579 | 1,015 | 1,547 | 2,522 | ||||||||
| Renard diamond stream (iii) | - | - | - | 646 | ||||||||
| Others | 95 | 5 | 220 | 59 | ||||||||
| 674 | 1,020 | 1,767 | 3,227 | |||||||||
| Total GEOs | 20,237 | 20,326 | 63,734 | 59,040 | ||||||||
(i) The Company received its first royalty payment on the Namdini mine during the second quarter of 2025. In January 2026, the Company acquired an additional 1% NSR royalty for a total NSR royalty of 2%, effective October 1, 2025. The Namdini mine continues to ramp-up production towards full design capacity.
(ii) The Company received its first royalty payment on the Dalgaranga mine during the second quarter of 2026. The Dalgaranga mine continues to ramp-up production towards full design capacity.
(iii) In October 2023, Stornoway Diamonds (Canada) Inc. ("Stornoway"), the operator of the Renard diamond mine, announced it was suspending operations and placing itself under the protection of the Companies' Creditors Arrangement Act ("CCAA"). In 2025, the Renard mine processed and sold a small number of diamonds as part of the care and maintenance plan.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
GEOs by Product
![]() |
![]() |
![]() |
![]() |
Average Metal Prices and Exchange Rate
| Three months ended September 30, | Nine months ended September 30, | |||||||||||||||||||||||
| 2026 | 2025 | 2026 | 2025 | |||||||||||||||||||||
| Realized | Average | Realized | Average | Realized | Average | Realized | Average | |||||||||||||||||
| Gold (i) | $4,304 | $4,262 | $3,434 | $3,457 | $4,559 | $4,545 | $3,188 | $3,201 | ||||||||||||||||
| Silver (ii) | $64.47 | $62.59 | $40.22 | $39.40 | $71.03 | $73.24 | $35.95 | $35.05 | ||||||||||||||||
| Copper (iii) | $14,200 | $14,104 | $9,897 | $9,797 | $13,543 | $13,434 | $9,867 | $9,556 | ||||||||||||||||
| Exchange rate (C$/US$) (iv) | n/a | 0.7147 | n/a | 0.7261 | n/a | 0.7221 | n/a | 0.7152 | ||||||||||||||||
(i) The average price represents the London Bullion Market Association's PM price in U.S. dollars per ounce.
(ii) The average price represents the London Bullion Market Association's price in U.S. dollars per ounce.
(iii) The average price represents the London Metal Exchange's price in U.S. dollars per tonne.
(iv) Bank of Canada daily rate.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Royalty, Stream and Other Interests Portfolio Overview
As at November 11, 2026, OR Royalties owned a portfolio of 186 royalties, 16 streams and 3 offtakes, as well as 7 royalty options, and included royalties and streams on 23 producing assets.
Portfolio by asset stage
| Asset stage | Royalties | Streams | Offtakes | Total number of assets |
||||||||
| Producing | 18 | 5 | - | 23 | ||||||||
| Development | 18 | 8 | 1 | 27 | ||||||||
| Exploration and evaluation | 150 | 3 | 2 | 155 | ||||||||
| 186 | 16 | 3 | 205 |
Producing assets (i)
| Asset | Operator | Interest (ii) | Commodity | Jurisdiction |
| North America | ||||
| Akasaba West (iii) | Agnico Eagle Mines Limited | 2.5% NSR royalty | Au, Cu | Canada |
| Amalgamated Kirkland (iv) | Agnico Eagle Mines Limited | 2% NSR royalty | Au | Canada |
| Bald Mtn. Alligator Ridge / Duke & Trapper | Kinross Gold Corporation | 1% / 4% GSR (v) royalty | Au | USA |
| Bralorne | Talisker Resources Ltd. | 1.7% NSR royalty | Au | Canada |
| Canadian Malartic Complex | Agnico Eagle Mines Limited | 3 - 5% NSR royalty | Au, Ag | Canada |
| Éléonore | Dhilmar Ltd. | 2.475 - 3.5% NSR royalty | Au | Canada |
| Ermitaño | First Majestic Silver Corp. | 2% NSR royalty | Au, Ag | Mexico |
| Gibraltar | Trekor Metals Limited | 100% stream | Ag | Canada |
| Island Gold District | Alamos Gold Inc. | 1.38 - 3% NSR royalty | Au | Canada |
| Lamaque Complex | Eldorado Gold Corporation | 1% NSR royalty | Au | Canada |
| Macassa TH | Agnico Eagle Mines Limited | 1% NSR royalty | Au | Canada |
| Pan | Mining Americas Inc. | 4% NSR royalty | Au | USA |
| Parral | GoGold Resources Inc. | 2.4% stream | Au, Ag | Mexico |
| Seabee | SSR Mining Inc. | 3% NSR royalty | Au | Canada |
| Outside of North America | ||||
| CSA | Harmony Gold Mining Company Limited | 100% stream 2.25 - 4.875% stream |
Ag Cu |
Australia |
| Dalgaranga (vi) | Ramelius Resources Limited | 1.44% GR (vi) royalty | Au | Australia |
| Dolphin Tungsten | Group 6 Metals Limited | 1.5% GR royalty | Tungsten (W) | Australia |
| Fruta del Norte | Lundin Gold Inc. | 0.1% NSR royalty | Au | Ecuador |
| Mantos Blancos | Capstone Copper Corp. | 100% stream | Ag | Chile |
| Namdini | Cardinal Namdini Mining Ltd. | 2% NSR royalty | Au | Ghana |
| San Gabriel (vii) | Compañía de Minas Buenaventura S.A.A. | 1.5% NSR royalty | Au, Ag | Peru |
| Sasa | Central Asia Metals plc | 100% stream | Ag | North Macedonia |
| Tocantinzinho | G Mining Ventures Corp. | 0.75% NSR royalty | Au | Brazil |
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Key exploration/evaluation and development assets
| Asset | Operator | Interest | Commodities | Jurisdiction |
| Altar | Aldebaran Resources Inc. and Sibanye-Stillwater Ltd. | 1% NSR royalty | Cu, Au | Argentina |
| Amulsar | United Gold (private) | 3.34% Au / 49.22% Ag streams | Au, Ag | Armenia |
| Arctic | South32 Limited / Trilogy Metals Inc. | 1% NSR royalty | Cu | USA |
| AntaKori | Regulus Resources Inc. | 0.75% - 1.5% NSR royalty | Cu, Au | Peru |
| Back Forty (viii) | Goldgroup Mining Inc. | 18.5% Au / 85% Ag streams | Au, Ag | USA |
| Cuiú Cuiú | Cabral Gold Inc. | 1% NSR royalty | Au | Brazil |
| Cariboo | Osisko Gold Group Inc. | 5% NSR royalty | Au | Canada |
| Cascabel | Jiangxi Copper Company Limited | 3% stream 0.6% NSR royalty |
Au Cu, Au |
Ecuador |
| Casino | Western Copper & Gold Corporation | 2.75% NSR royalty | Au, Ag, Cu | Canada |
| Copperwood | Highland Copper Company Inc. | 1.5% NSR royalty 11.5% NSR royalty |
Cu Ag |
USA |
| Eagle Gold (ix) | PricewaterhouseCoopers Inc., LIT (receiver) | 5% NSR royalty | Au | Canada |
| Glenburgh | Benz Mining Corp. | 1.08% GR Royalty | Au | Australia |
| Hammond Reef | Agnico Eagle Mines Limited | 2% NSR royalty | Au | Canada |
| Hermosa (Taylor) | South32 Limited | 1% NSR royalty on sulphide ores | Zn, Pb, Ag | USA |
| Horne 5 | Falco Resources Ltd. | 90% - 100% stream | Ag | Canada |
| Marban | Agnico Eagle Mines Limited | 0.5-2% NSR royalty | Au | Canada |
| Marimaca MOD | Marimaca Copper Corp. | 1% NSR royalty | Cu | Chile |
| Murray Brook | Canadian Copper Inc. | 20% stream | Ag, Au | Canada |
| Pine Point | Pine Point Mining Limited | 3% NSR royalty | Zn, Pb | Canada |
| San Antonio | Axo Metals Corp. | 7.15% stream | Au, Ag | Mexico |
| Shaakichiuwaanaan | PMET Resources Inc. | 2% NSR royalty | Lithium (Li) | Canada |
| South Crofty | Cornish Metals plc. | 1.5% NSR royalty | Sn | United Kingdom |
| South Railroad | Equinox Gold Corp. | 100% stream | Ag | USA |
| Spring Valley (x) | Solidus Resources LLC | 1.0 - 6.0% NSR royalty | Au | USA |
| Upper Beaver | Agnico Eagle Mines Limited | 2% NSR royalty | Au, Cu | Canada |
| West Kenya | Saturn Resources Ltd. | 2% NSR royalty | Au | Kenya |
| Waihi North | OceanaGold Corporation | 2% NSR royalty | Au, Ag | New Zealand |
| White Pine | Kinterra Copper USA LLC | 1.5% NSR royalty | Cu | USA |
| 12.5% NSR royalty | Ag | |||
| Windfall | Gold Fields Limited | 2.0 - 3.0% NSR royalty | Au | Canada |
(i) The Renard diamond stream is excluded from producing assets as deliveries received since 2023 are only related to residual production from the care and maintenance plan.
(ii) Excluding tail royalties and streams reductions, when applicable.
(iii) The royalty covers less than half of the planned open-pit mine surface area.
(iv) On April 30, 2026, Agnico Eagle announced that trucking of ore from the Amalgamated Kirkland deposit to the LZ5 facility commenced in April 2026, with milling beginning later in the second quarter of 2026. Production from the Amalgamated Kirkland deposit is forecast to be approximately 40,000 ounces of gold in 2026. OR Royalties received its first royalty payment in the third quarter of 2026.
(v) Gross smelter return ("GSR").
(vi) On April 7, 2026, Ramelius announced that the Dalgaranga mine production was on budget with first Never Never ore delivered to the Mt Magnet processing plant in March 2026, a month ahead of schedule. The first payment from the Dalgaranga GR royalty was received on April 30, 2026.
(vii) The San Gabriel NSR royalty was acquired from Gold Fields Limited ("Gold Fields") in May 2026. The first royalty payment was received in the third quarter of 2026, for the second quarter production. The San Gabriel mine continues to ramp-up production towards full design capacity.
(viii) In June 2026, the Company agreed to amend the stream agreements to extend the deadline granted to Goldgroup Mining Inc. ("Goldgroup") for obtaining all material permits required to construct and operate the Back Forty project from June 30, 2026 to August 31, 2026. The permitting milestone was not achieved by August 31, 2026, and the Company and Goldgroup have been in discussions for a possible further amendment. If an agreement is not reached, and Goldgroup defaults under the stream agreements, the Company may require Goldgroup to repay the amounts previously advanced, together with applicable interest, and may also be entitled to exercise its rights as a secured party, including by taking possession of the Back Forty assets.
(ix) On June 24, 2024, Victoria Gold Corp. ("Victoria") announced a slope failure of its heap leach facility at the Eagle Gold mine and operations have since been suspended. On August 14, 2024, PricewaterhouseCoopers Inc., LIT was appointed as receiver and manager of Victoria by the Ontario Superior Court of Justice. Please refer to the Portfolio of Royalty, Stream and Other Interests section of this MD&A for more details.
(x) Following the acquisition of additional royalties in April 2026, the Company now owns a 4.0% to 6.0% NSR royalty, which is applicable to the core resource area; a separate 1.0% NSR royalty is applicable on the periphery of the property. The majority of the current pit constrained Mineral Resources sits within OR Royalties' 6.0% NSR royalty area (the "Schmidt Claims"). Royalties on the Schmidt Claims become payable once 500,000 ounces of gold have been recovered from the Schmidt Claims.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Main Producing Assets

Geographical Distribution of Assets

| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Royalty, Stream and Other Interests - Main Transactions
Namdini NSR royalty acquisition
In January 2026, the Company acquired an additional 1.0% NSR royalty covering the producing Namdini gold mine in Ghana, with an effective date of October 1, 2025. OR Royalties has closed the transaction with Savannah Mining Limited ("Savannah"), acquiring Savannah's remaining 50% interest in the 2.0% NSR royalty for total cash consideration of up to $103.5 million (excluding value-added tax and other levies), of which $98.5 million was paid in the first quarter of 2026. The remaining contingent $5.0 million will be payable in two equal installments on the first and second anniversary of the closing date, subject to certain conditions.
In connection with the transaction, value-added tax and other levies (payable to the relevant tax authorities) could be payable on the acquisition price under certain circumstances. In June 2026, it was determined that the criteria for the payment of the relevant taxes and levies had been met, and therefore an amount of $19.7 million was recorded under Royalty, stream and other interests, and paid in July 2026.
In 2023, when the Company acquired the first tranche of the NSR royalty interest on the Namdini gold mine, the acquisition agreement included a clause in favor of the seller, subject to certain conditions, in case value-added tax and/or other levies became payable by the seller at that time. This agreement was governed by a different tax act and no additional value-added tax and/or other levies were triggered under this act. Therefore, the Company does not believe that value-added tax and/or other levies remain applicable to the 2023 transaction. In the event that value-added tax and/or other levies become payable by the seller, the Company may be requested to pay such value-added tax and/or other levies; the maximum amount that might be payable by the Company is estimated to be approximately $7.5 million.
Acquisition of additional NSR royalties on the Spring Valley gold project
In April 2026, OR Royalties acquired all of the common shares of Terraco Gold Corp. ("Terraco"), a wholly-owned subsidiary of Sailfish Royalty Corp. ("Sailfish"), which indirectly owned net smelter return royalty assets, largely consisting of royalties that cover Solidus Resources LLC's ("Solidus") Spring Valley gold project ("Spring Valley") located in Pershing County, Nevada, USA. OR Royalties paid a total cash consideration of $168.0 million to Sailfish. The NSR royalties acquired include an effective 3.0% NSR royalty on the Schmidt Claim Block, which covers the majority of the acres included in Solidus' proposed open-pit at Spring Valley (the NSR royalty is not payable on the first 500,000 ounces of gold recovered from the Schmidt Claim Block). Management has determined that the acquired assets did not constitute a business as defined under IFRS 3, Business Combinations; consequently, the transaction was accounted for as an acquisition of assets and the acquisition price was mainly allocated to the 3.0% NSR royalty on the Schmidt Claim Block.
Acquisition of a portfolio of royalties and deferred payment obligations from Gold Fields Limited
In May 2026, the Company acquired a portfolio of precious metals assets consisting of eight royalties (the "Gold Fields Portfolio") from Gold Fields for a total cash consideration of $115.0 million, anchored by a 1.5% NSR royalty on Buenaventura's producing San Gabriel gold and silver mine located in the Province of General Sánchez Cerro, Peru.
In addition to the Gold Fields Portfolio, the Company paid Gold Fields $52.0 million in exchange for deferred payment obligations totalling $60.0 million payable by Galiano Gold Inc. ("Galiano") ($30.0 million on or before December 31, 2026 and $30.0 million upon production of an aggregate of 100,000 ounces of gold from the Nkran deposit at Galiano's Asanko Gold Mine in Ghana). The first deferred payment of $30.0 million is presented under Deferred consideration receivable on the consolidated balance sheets and is accounted for at amortized cost under IFRS 9, Financial Instruments, while the second deferred payment of $30.0 million is presented under Investments and is accounted for at fair value.
Acquisition of a precious metals stream on Canadian Copper Inc.'s New Brunswick assets
In July 2026, the Company acquired a precious metals stream on Canadian Copper's New Brunswick assets, comprising the Murray Brook properties and the Caribou property, including the Caribou Processing Plant (collectively, the "Caribou Project") for a total cash consideration of $28.0 million. Under the agreement, an amount of $5.0 million was paid by OR Royalties on closing of the transaction, and the remaining balance of $23.0 million will be funded through quarterly payments in accordance with the Caribou Project construction budget (the "Construction Installment(s)"). The funding of the Construction Installment(s) shall be conditional upon customary project milestones, including the receipt of all material environmental permits and necessary First Nations approvals required for the Caribou Project, alongside a formal construction decision by Canadian Copper's board of directors.
Canadian Copper will deliver to OR Royalties refined silver and refined gold equal to 20% of the payable silver and gold in concentrate or any other product for the life of mine at a purchase price equal to 20% of the spot price for each ounce delivered.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Concurrent with the closing of the transaction, OR Royalties purchased $3.9 million (C$5.5 million) in common shares of Canadian Copper at a share price of C$0.75. Canadian Copper granted OR Royalties a right of first refusal in respect of the sale, transfer or buy-back of any royalty, stream or similar interest in the products mined or otherwise extracted from any property owned or acquired by Canadian Copper or an affiliate.
Costa Fuego copper/gold project royalty transaction
In August 2026, the Company closed a transaction with Hot Chili pursuant to which Hot Chili extended the Company's royalties (1.0% of payable copper production and 3.0% of payable gold production) to the La Verde project, which is part of the broader Costa Fuego copper-gold project, for a total cash consideration of $15.0 million paid on closing. The Company holds a right of first offer with respect to the sale of any future royalty, stream, or similar interests by Hot Chili.
Amendments to the San Antonio stream
In January 2026, OR Royalties International, a wholly-owned subsidiary of OR Royalties, and Axo Metals Corp. ("Axo Metals"), formerly Axo Copper Corp., entered into an amended and restated stream agreement on the San Antonio project in Mexico. Under the amended and restated stream agreement, the designated percentage of payable gold and silver ounces was reduced from 15% to 7.15%. In consideration for the amendment, OR Royalties International will be entitled to up to an aggregate of $8.6 million of contingent payments, payable in gold deliveries and subject to a 30% transfer payment, upon achieving certain production milestones. In addition, Axo Metals issued to OR Royalties International a total of 7.7 million common shares, valued at approximately $4.2 million, which represented 4.99% of the issued and outstanding common shares of Axo Metals. The value of the common shares received was booked against the net book value of the stream.
Royalty, Stream and Other Interests - Buy-back and Buy-down Rights
Some royalty, stream and other interests are subject to buy-back and/or buy-down rights held by the operators. The significant buy-back and buy-down rights are described below.
CSA copper stream
OR Royalties International owns separate silver and copper streams on Harmony's CSA mine. Specific to the copper stream agreement, OR Royalties International is entitled to receive refined copper equal to 3.0% of payable copper produced from the CSA mine until the 5th anniversary of the agreement (June 15, 2028), then 4.875% of payable copper produced from the CSA mine until 33,000 metric tonnes have been delivered in aggregate, and thereafter 2.25% of payable copper produced from the CSA mine for the remaining life of the mine.
On the 5th anniversary of the closing date (June 15, 2028), Harmony will have the option to exercise certain buy-down rights by paying a one-time cash payment to OR Royalties International of $20.0 million to $40.0 million. If the option is exercised, OR Royalties International will still be entitled to receive refined copper equal to 3.25% - 4.0625% of payable copper produced from the CSA mine until 23,900 to 28,450 metric tonnes have been delivered in aggregate, and thereafter 1.5% - 1.875% of payable copper produced from the CSA mine for the remaining life of the mine.
Cascabel NSR royalty and gold stream
OR Royalties owns a 0.6% NSR royalty on the Cascabel project, which is subject to a buy-down right. On November 30, 2026, the owner of the Cascabel project may buy-down one third of the NSR royalty in exchange for a one-time cash payment of $35.0 million. OR Royalties has received a notice from the operator that it intends to exercise its buy-down right by November 30, 2026.
OR Royalties International owned a 6.0% gold stream on contained ounces of gold produced from the Cascabel project until 225,000 ounces of gold had been delivered, and 3.6% thereafter for the remaining life of the mine. On December 24, 2025, SolGold plc, the former owner of the Cascabel project, announced it had agreed to be acquired by its largest shareholder, Jiangxi Copper Company Limited ("Jiangxi Copper"). As a result of the change of control, the gold stream was subject to a buy-down right. In March 2026, Jiangxi Copper exercised its buy-down right to repurchase 50% of the gold stream for a one-time payment in gold ounces equal to approximately 50% of the then advanced amount of OR Royalties International's total pre-construction and construction deposits, plus certain adjustments. Consequently, OR Royalties International received 4,290 ounces of gold (not included in the total GEOs earned in the first quarter, and subject to a transfer price of 20%) as a one-time payment for the 50% buy-down of the Cascabel stream, representing a net value of approximately $17.5 million on the delivery date. As a result of the reduction of 50% of the Cascabel stream, the net book value of the asset was reduced by $10.3 million, and the remaining balance of the net payment received was recorded as a gain on the buy-down of a stream interest of $7.2 million. The gold ounces received were subsequently sold and generated a profit of $0.4 million.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Following the exercise of the buy-down right, OR Royalties International owns a 3.0% gold stream on contained ounces of gold produced from the Cascabel project until 112,500 ounces of gold have been delivered, and 1.8% thereafter for the remaining life of the mine. Consequently, the additional stream deposit commitments have been reduced by 50% to $102.5 million ($5.0 million following the achievement of operational milestones, including submission of all final permit applications for the construction and operation of the project, and $97.5 million pro-rata to drawdowns with a construction finance facility).
Principal Producing Assets - Updates
Canadian Malartic Complex Royalty (Agnico Eagle Mines Limited)
The Company holds a 3-5% NSR royalty on the Canadian Malartic mine, which is located in Malartic, Québec and is operated by Agnico Eagle. OR Royalties also holds a 5.0% NSR royalty on the East Gouldie and Odyssey South underground deposits, a 3.0% NSR royalty on the Odyssey North underground deposit and a 3.0-5.0% NSR royalty on the East Malartic underground deposit, which are located adjacent to the Canadian Malartic mine. The Canadian Malartic mine and the Odyssey mine now form the Canadian Malartic Complex. In addition, a C$0.40 per tonne milling fee is payable to OR Royalties on ore processed from any property that was not part of the Canadian Malartic property at the time of the sale of the mine in 2014.
Guidance - 2026 and three-year forecast
On February 12, 2026, Agnico Eagle reported production guidance of 575,000 to 605,000 ounces of gold at Canadian Malartic for the year 2026, compared to 642,612 ounces of gold produced in 2025. The company's gold production was forecast to range between 640,000 to 670,000 ounces in 2027 and 720,000 - 750,000 ounces in 2028. The mass rock movement that occurred at Barnat on July 1, 2026 (see below under Update on operations) is expected to reduce gold production at Canadian Malartic by 60,000 to 80,000 ounces in the second half of 2026, and by up to 150,000 ounces in each of 2027 and 2028.
Agnico Eagle continues to advance the transition to underground mining with the construction of the Odyssey mine. Once the Barnat pit at Canadian Malartic is depleted (originally expected in 2029), annual gold production is expected to be in the range of 550,000 to 600,000 ounces, supported by an underground mining rate of approximately 19,000 tonnes per day ("tpd") from four deposits. At that time, the processing plant is expected to have approximately 40,000 tpd of excess capacity. The Company is advancing three projects to potentially utilize a portion of this excess capacity and position Canadian Malartic to ramp-up toward one million ounces of annual gold production starting in 2033. These projects include (i) a second shaft at Odyssey, (ii) the development of a satellite open pit at Marban and (iii) the development of the Wasamac underground project. Marban and Wasamac are located approximately 12 kilometres and 100 kilometres from the Canadian Malartic mill, respectively. In 2026, Canadian Malartic has planned four-day quarterly shutdowns for regular maintenance at the mill. OR Royalties owns several royalties over Marban that have a blended ~0.9% NSR royalty, and both Marban and Wasamac would be eligible to the C$0.40 toll milling fee for the Canadian Malartic mill.
Update on operations
On July 2, 2026, Agnico Eagle reported that a rock mass movement occurred on July 1, 2026, along the north wall of the Barnat open pit at the Canadian Malartic Complex. On July 29, 2026, Agnico Eagle further reported that the area affected was, at the time, subject to enhanced geotechnical monitoring and no injuries, equipment damage or environmental impacts resulted from the event. As a precautionary measure and prior to the rock mass movement, the company temporarily suspended mining operations in the Barnat open pit, while completing geotechnical assessments and implementing remediation measures to support the safe and orderly resumption of mining activities.
The rock mass movement occurred in a localized area of the final north wall of the open pit and involved approximately one million tonnes of material. While the geotechnical investigation is still ongoing, the event is believed to have been caused by weaker altered rock and structures associated with the Cadillac Fault, with ground conditions further influenced by freshet and recent heavy rainfall. Under the current remediation plan, the moved rock mass material will remain in place and a safety rock catchment area and berm will be constructed along portions of the north wall. A new temporary access ramp alongside the southwest wall, completed in July 2026, will provide access to a redesigned open pit. Remediation work was completed in the third quarter of 2026, including the construction of a rock catchment area and safety berm along portions of the north wall, as well as the development of a new access ramp to the redesigned open pit, and mining operations resumed on September 27, 2026.
As reported by Agnico Eagle on July 2, 2026, the event is expected to reduce gold production at Canadian Malartic by 60,000 to 80,000 ounces in the second half of 2026, and by up to 150,000 ounces in each of 2027 and 2028. Feed to the Canadian Malartic processing plant is being supplemented with low grade ore from existing stockpiles, partially mitigating the production impact. The company continues to assess opportunities to further mitigate the impact on production and costs.
On October 28, 2026, Agnico Eagle reported gold production at the Canadian Malartic Complex of 111,202 ounces in the third quarter of 2026, compared to 156,875 ounces in the third quarter of 2025, reflecting lower throughput and grade.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Update on Odyssey (Shaft #1)
On October 28, 2026, Agnico Eagle announced that mine development advanced by 4,874 metres, with work focused on developing the East Gouldie production levels and advancing the main ramp toward the shaft bottom, which reached a depth of 1,232 metres as of September 30, 2026. Development rates improved through the quarter as the company continued to advance productivity initiatives, including haul truck payload optimization and the expanded use of automated equipment. In the fourth quarter of 2026, the extension of the auxiliary cage will allow for workforce transportation down to level 111. This is expected to further improve productivity by reducing travel times and congestion at the main ramp. The first phase of shaft sinking of Odyssey Shaft #1 was completed on July 9, 2026, reaching a depth of 1,586 metres, and excavation of level 158 was completed in August. Preparations for the headframe changeover to the production hoist continued during the quarter, with structural and mechanical work advancing, including the installation of the production sheaves and the dismantling of the sinking infrastructure.
The second phase of shaft sinking is expected to commence in 2029 and be completed in 2031, extending the shaft to its final planned depth of 1,870 metres, while the third loading station, located between levels 172 and 181, is expected to be commissioned in 2031. At the first loading station between levels 102 and 111, development and construction activities remained focused on advancing underground infrastructure to support the planned start of shaft-hoisted production from East Gouldie in the second quarter of 2027. Excavation of the rock-handling infrastructure is substantially complete, while development of the maintenance shop and service bays progressed as planned. Construction of the crusher room advanced during the quarter, with the completion of the overhead crane installation and coarse ore liner installation in the silo. Mechanical and electrical installation of the crusher and apron feeders continued to progress, while initial concrete work commenced in the loading conveyor area. Construction of key surface infrastructure continued to advance during the quarter. Phase 2 of the paste plant (20,000 tpd capacity) progressed with the completion of the binder silo installation, while electrical work continued ahead of testing in the fourth quarter of 2026 and commissioning in the second quarter of 2027. At the production hoist, lubrication and cooling piping circuits were completed, program testing and simulations were successfully finalized, and electrical and control system installations continued in support of commissioning in the second quarter of 2027.
Update on Odyssey (Shaft #2)
On February 12, 2026, Agnico Eagle reported that the preferred shaft location was now confirmed near Shaft #1 and close to the centre of gravity of the deposit.
On October 28, 2026, Agnico Eagle reported that it was advancing an internal technical evaluation of a potential second shaft at the Odyssey mine. Current work is focused on mine design, planning and geotechnical analysis to determine the optimal mining rate at the East Gouldie deposit, which will inform the size, design and overall scope of the proposed second shaft. Studies supporting the surface layout, headframe design and permitting activities continue to progress and the company expects to submit a decree modification application in the first quarter of 2027, with the permitting process expected to take approximately 18 months.
Marban - Satellite Open Pit
The Company holds a 0.5% - 2% NSR royalty on the Marban Deposit.
As part of Agnico Eagle's "fill-the-mill" strategy at the Canadian Malartic Complex, the Marban property, located immediately northeast of the Canadian Malartic property, was acquired in March 2025 as an advanced exploration project that could potentially support an open pit mining operation similar to the Barnat open pit operation at Canadian Malartic.
In the fourth quarter of 2025, Agnico Eagle completed an internal evaluation on Marban, removing previous property-boundary constraints on the pit design, which resulted in the company's initial declaration of estimated probable mineral reserves of 1.58 million ounces of gold (51.6 million tonnes grading 0.95 g/t Au) at December 31, 2025. Additionally, drilling completed in the quarter confirmed and extended the Marban gold deposit onto the company's adjacent Callahan property to the east. The results of the drilling were not included in the 2025 mineral reserves and mineral resource estimates.
The technical evaluation envisions a 14,000 to 16,000 tpd open pit operation producing between 120,000 to 150,000 ounces of gold annually over a 12-year life of mine. In 2026, Agnico Eagle will integrate new drilling into an optimized pit design and assess opportunities to redeploy mobile equipment from the Barnat pit at Canadian Malartic to minimize capital expenditures for the project. The results of this evaluation, expected at the end of 2026, will support the permitting process which is expected to be completed in 2030. Project construction could begin in 2031, with the potential for initial production as early as 2033.
During the third quarter of 2026, Agnico Eagle initiated a new drilling program targeting the extension of mineralization at depth northwest of the main Marban deposit.
Approximately $11.0 million is budgeted for 2026 for 45,000 metres of drilling to be spent in the Marban area for exploration and condemnation drilling around the Marban deposit under potential mining infrastructure, as well as for the purposes of mineral resource conversion and expansion of the Marban deposit.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Update on exploration
On February 12, 2026, Agnico Eagle noted that it expects to spend approximately $32.6 million for 190,700 metres of drilling at Canadian Malartic in 2026 with up to 20 drill rigs active at surface and underground to further assess the full potential of the Odyssey mine area and throughout the Canadian Malartic property package. The primary exploration targets remain the lateral extensions of the East Gouldie deposit and the Eclipse zone while at the Odyssey South and North zones infill drilling and the investigation of potential lateral extensions will continue. Studies are ongoing at the East Malartic deposit with the objective of converting mineral resources into mineral reserves as part of the Odyssey underground mine.
During the third quarter of 2026, ten surface rigs and seven underground rigs were in operation at the Odyssey mine, drilling a total of 35,100 metres (128,400 metres during the first nine months of 2026). This was supplemented by an additional three surface rigs, completing 15,500 metres (85,700 metres during the first nine months of 2026) of drilling dedicated to regional exploration around Canadian Malartic, including the Marban project. Exploration drilling targeted multiple areas of the Odyssey mine, continuing to return positive results in the deeper areas of the East Gouldie deposit, in the subparallel Eclipse zone and in the Odyssey and East Malartic deposits.
Update on Mineral Reserve and Resource Estimates
Mineral Reserves and Mineral Resources at the Odyssey mine continued to grow in 2025, further demonstrating the high-quality nature of the East Gouldie and Odyssey deposits. In total, the Odyssey mine hosted 6.0 million ounces of gold in Proven and Probable Mineral Reserves (59.7 million tonnes grading 3.14 g/t Au), 3.4 million ounces of gold in Measured and Indicated Mineral Resources (57.8 million tonnes grading 1.85 g/t Au) and 12.7 million ounces of gold in Inferred Mineral Resources (177.7 million tonnes grading 2.21 g/t Au) at December 31, 2025. These substantial Mineral Reserves and Mineral Resources continue to support the company's vision for Canadian Malartic to potentially expand production in the future in combination with the development of satellite orebodies in the surrounding area.
At the Odyssey deposit's Odyssey South zone and Odyssey internal zone, positive reconciliation observed in the underground production and improvements to the Mineral Reserve model contributed to mineral reserves replacement at the Odyssey mine reaching 90%. As a result, the Mineral Reserves of the Odyssey deposit totalled 0.3 million ounces of gold (4.8 million tonnes grading 2.12 g/t Au) at December 31, 2025, similar to the previous year.
At the Canadian Malartic mine, the continued positive reconciliation observed in the open pit and improvements to the Mineral Reserve model contributed to the addition of 115,000 ounces of gold to Mineral Reserves in the open pit during 2025. As a result, the Mineral Reserve decreased by approximately 495,000 ounces of gold while the gold production accounted for 610,000 in-situ ounces of gold.
Exploration drilling during 2025 continued to extend the limits of the East Gouldie Inferred Mineral Resource laterally to the west and to the east. As a result, Inferred Mineral Resources at the East Gouldie deposit (including the sub-parallel Eclipse zone) increased by 62% (2.8 million ounces of gold) year over year to 7.4 million ounces of gold (94.3 million tonnes grading 2.43 g/t Au) at December 31, 2025.
Drilling targeting the Eclipse zone in 2025 resulted in the declaration at year-end of initial Inferred Mineral Resources of 0.6 million ounces of gold (6.7 million tonnes grading 2.74 g/t Au) within close proximity to the planned underground infrastructure.
For additional information, please refer to Agnico Eagle's press release dated February 12, 2026 titled "Agnico Eagle Reports Fourth Quarter And Full Year 2025 Results - Record Quarterly And Annual Free Cash Flow; 2025 Production Guidance Achieved; Total 2025 Shareholder Returns Of $1.4 Billion; Dividend Increased By 12.5%; Updated Three-Year Guidance", Agnico Eagle's press release dated February 12, 2026 titled "Agnico Eagle Provides An Update On 2025 Exploration Results And 2026 Exploration Plans - Year Over Year Mineral Reserves Increase 2% To 55.4 Moz; Indicated Mineral Resources Increase 10% To 47.1 Moz And Inferred Mineral Resources Increase 15% To 41.8 Moz", Agnico Eagle's press release dated July 2, 2026 titled "Agnico Eagle Reports Wall Movement at Barnat Open Pit at Canadian Malartic", and Agnico Eagle's press release dated October 28, 2026 titled "Agnico Eagle Reports Third Quarter 2026 Results - Strong Free Cash Flow Generation Driven by Solid Operational Performance; on Track to Achieve 2026 Production and Cost Guidance", all filed on www.sedarplus.ca.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Mantos Blancos Stream (Capstone Copper Corp.)
OR Royalties, through OR Royalties International, owns a 100% silver stream on the Mantos Blancos mine, an open-pit mine located in the Antofagasta region of Chile. The Mantos Blancos mine is owned and operated by Capstone Copper Corp. ("Capstone").
Under the stream, OR Royalties International will receive refined silver equal to 100% of the payable silver from the Mantos Blancos mine until 19.3 million ounces have been delivered (8.2 million ounces have been delivered as at September 30, 2026), after which the stream percentage will be reduced to 40%. The purchase price for the silver under the Mantos Blancos stream is 8% of the monthly average silver market price for each ounce of refined silver sold and delivered and/or credited by Capstone to OR Royalties International. OR Royalties International receives deliveries from Mantos Blancos production with a two-month lag.
Guidance - 2026
On February 17, 2026, Capstone reported production guidance of 48,000 to 56,000 tonnes of copper for the year 2026. Copper production at Mantos Blancos is forecast to decrease in 2026 when compared to a strong 2025 due to a one-year period of lower copper grades. Due to mine sequencing, sulphide copper grades are expected to approximate 0.70% in 2026, with higher copper grades expected to approximate 0.85% in 2027.
On October 29, 2026, Capstone noted that Mantos Blancos was trending towards the mid-point of production guidance.
Update on operations
On June 21, 2026, Capstone Copper announced that new three-year collective bargaining agreements have been ratified with both unions at the Mantos Blancos Mine in Chile within the legal timeframe established.
On October 29, 2026, Capstone reported copper production of 12,011 tonnes, composed of 10,037 tonnes of copper in concentrate from sulphide operations and 1,974 tonnes of cathodes from oxide operations, which was 22% lower than in the third quarter of 2025. The decline was attributable to lower sulphide feed grades and lower recoveries driven by the planned mine sequence. Sulphide copper feed grades during the third quarter of 2026 were also impacted by heavy rainfall in Chile that caused elevated water levels in the pit, which limited access to planned ore feed and resulted in processing additional lower grade stockpiles. Cathode production was 8% higher compared to the third quarter of 2025 as a result of higher dump grades.
Update on Phase II expansion
Capstone is currently evaluating the next phases of growth for Mantos Blancos, including the potential to increase the concentrator plant throughput and increase cathode production from the underutilized SX-EW plant. During the second quarter of 2026, the Mantos Blancos Phase II project was submitted to the Environmental Impact Assessment ("EIA") process. Following receipt of environmental approvals and sectoral permits, as well as approximately one year of construction, expanded production is expected to commence between 2030 and 2031.
The sulphide concentrator plant expansion is expected to use existing unused or underutilized process equipment, plus additional equipment for concentrate filtration, thickening and filtering of tailings. In addition, the project supports future operations of Mantos Blancos by contemplating the construction and operation of a new in-pit tailings storage facility beyond 2030 while strengthening environmental management of the operation's baseline conditions. The company is also evaluating a potential increase in cathode production based on an opportunity to re-leach spent ore from historical leaching and flotation operations. The increase in cathode production would use existing SX-EW plant capacity, with the addition of a dynamic leach pad, agglomeration and stacking infrastructure. A pre-feasibility study outlining the details of increased throughput from the concentrator plant and increased cathode production via historical tailings re-leaching is expected in the first quarter of 2027.
Update on exploration
On October 29, 2026, Capstone announced that exploration drilling continued in the third quarter of 2026. The consolidated 2026 program for the year includes 7,500 metres of drilling with 2,764 metres (approximately 37%) completed to date. The program is aiming to follow-up the Nora-Quinta, Phase 23, and Barbara areas, as well as the initial drill testing at the south of and below the Phase 22 pit area. The final models from the passive seismic (ambient noise tomography) geophysical survey and reprocessed magnetics were utilized to refine the positioning of the initial Capri area drill holes. Permitting activities are in progress, with the initial Capri drilling anticipated to start in the first quarter of 2027.
For additional information, please refer to Capstone's press release dated February 17, 2026 titled "Capstone Copper Announces 2026 Guidance", Capstone's press release dated June 21, 2026 titled "Capstone Copper Announces Labour Agreements at Mantos Blancos Operation", and Capstone's press release dated October 29, 2026 titled "Capstone Copper Reports Third Quarter 2026 Results", all filed on www.sedarplus.ca.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
CSA Streams (Harmony Gold Mining Company Limited)
In October 2025, Harmony acquired the CSA copper mine from MAC Copper Limited. OR Royalties, through OR Royalties International, holds a silver stream and a copper stream on the CSA copper mine, now operated by Harmony. OR Royalties International will purchase an amount of refined silver equal to 100% of the payable silver produced from CSA for the life of the mine and will make ongoing payments for refined silver delivered equal to 4.0% of the spot silver price at the time of delivery. OR Royalties International will also be entitled to purchase refined copper equal to 3.0% of payable copper produced from CSA until the 5th anniversary of the closing date (June 15, 2028), then 4.875% of payable copper produced from CSA until 33,000 metric tonnes have been delivered in aggregate, and thereafter 2.25% of payable copper produced from CSA for the remaining life of the mine. OR Royalties International will make ongoing payments for refined copper delivered equal to 4.0% of the spot copper price at the time of delivery. On the 5th anniversary of the closing date (June 15, 2028), Harmony will have the option to exercise certain buy-down rights on the copper stream by paying a one-time cash payment to OR Royalties International of $20.0 million to $40.0 million.
As of September 30, 2026, a total of 2,275 tonnes of copper have been delivered to OR Royalties International under the copper stream agreement.
Guidance
On May 18, 2026, Harmony provided financial year 2026 copper production guidance at CSA of 17,500 to 18,500 tonnes of copper.
Harmony provided CSA copper production guidance of 28,000 to 30,000 tonnes of copper for its financial year 2027. Harmony is targeting a production run-rate of 40,000 tonnes of copper per annum by its financial year 2029. An updated Mineral Reserve Estimate increased contained copper inventory when compared to the previous Mineral Reserve Estimate.
Update on operations
On May 18, 2026, Harmony noted that operationally, its focus remained on improving the flexibility of the mining operations at the CSA mine, with full optimization expected to take up to 24 months. Harmony completed the replacement of the shaft steelwork on six levels as previously indicated. This resulted in a one-month planned shutdown in March 2026. Harmony continued to integrate the mine, ensuring alignment with the disciplined and consistent approach applied to all Harmony assets. The optimization phase is underway, supported by targeted investments in ventilation, mine development and critical infrastructure designed to improve operational flexibility, increase access to mining areas and support more consistent production over time.
On November 9, 2026, Harmony reported copper production from its CSA mine of 7,077 tonnes during the three months ended September 30, 2026, in-line with guidance, at a recovered grade of 3.15%. Grades were lower than guidance reflecting the mining sequence rather than orebody quality. Harmony is working on improving stope availability and maintaining development rates to restore production flexibility and lift grades in the coming quarters. Optimization work, together with the ventilation project, is expected to support improved performance and the company’s pathway to about 40,000 tonnes per annum.
The capital ventilation project continues to advance, with good progress made on access development and the project delivery approach refined to support efficient execution. Key development required for the project has largely been completed, while earlier ventilation design challenges have been resolved. The revised contracting and execution approach is progressing through the appropriate approval process, providing a clearer pathway for the next phase of development.
Update on exploration
On November 9, 2026, Harmony announced that underground drilling continued to confirm the very high-grade nature of QTS South Uppers copper system and extend QTS North mineralization beyond the current resource limit. Surface drilling at CSA ramped up to three rigs to advance the QTS Extension program, aimed at testing the main high-grade mineralized zones at depth below the mine. Regional exploration also progressed, including completion of a 7,499 line-km airborne magnetic and radiometric survey to support ongoing target generation.
Update on Mineral Reserve and Resource Estimates
In the financial report released by Harmony for its financial year 2026, the company released its updated Mineral Resources and Mineral Reserves as of June 30, 2026. Mineral Reserves were estimated at 577,000 tonnes of copper and 7.0 million ounces of silver (17.7 million tonnes grading 3.26% Cu and 12.32 g/t Ag) and inclusive Measured and Indicated Mineral Resources were estimated at 0.85 million tonnes of copper and 10.2 million ounces of silver (17.3 million tonnes grading 4.9% Cu and 18.3 g/t Ag). Inferred Mineral Resources were estimated at 232,000 tonnes of copper and 4.2 million ounces of silver (6.2 million tonnes grading 3.76% Cu and 21.94 g/t Ag).
For more information, refer to Harmony's press release dated May 18, 2026 titled "Operational update for the nine months ended 31 March 2026 ("9MFY26")", Harmony’s press release dated November 9, 2026 titled “Operational Update for the Three Months Ended 30 September 2026”, and Harmony’s FY26 Results report for the year ended 30 June 2026, all available on Harmony’s website (www.harmony.co.za).
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Sasa Stream (Central Asia Metals plc)
OR Royalties, through OR Royalties International, owns a 100% silver stream on the Sasa mine, operated by Central Asia Metals plc ("Central Asia") and located in North Macedonia. The Sasa mine is one of the largest zinc, lead and silver mines in Europe. OR Royalties International's entitlement under the Sasa stream applies to 100% of the payable silver production in exchange for $5 per ounce (plus refining costs) of refined silver delivered, increased for inflation annually from 2017 ($6.665 per ounce in 2026).
Guidance - 2026
Sasa's guidance for 2026 is forecast at 800,000 to 820,000 tonnes of ore mined and processed, and metal-in-concentrate production is estimated at 18,000 to 20,000 tonnes of zinc and 26,000 to 28,000 tonnes of lead.
Update on operations
On October 7, 2026, Central Asia reported deliveries of 100,562 ounces of silver to OR Royalties International in the third quarter of 2026, for a total of 310,421 ounces in the first nine months of 2026. Building on the improved performance in the first half of 2026, Sasa's production in the third quarter of 2026 showed further significant progress compared with the corresponding period in 2025 in each of the key performance measures, with ore tonnes mined and milled 3.0% and 3.4% higher, respectively.
The site team at Sasa is implementing a structured continuous improvement program focused on sustainable operational improvements across the operation. The program, building on the outcomes from last year's comprehensive review, covers all operational, technical and supporting functions.
Update on Reserve and Resource Estimates
On March 3, 2026, Central Asia reported an updated Mineral Resource and Ore Reserve statement for the Sasa mine. As mining has progressed deeper at Sasa, the geology has presented increasing challenges. In particular, the orebody has become narrower, and the transition to the new mining methods of cut-and-fill and long-hole stoping (from the bulk mining method of sub-level caving) has been designed to provide flexibility and to control dilution.
The changes in geology with depth and the business review have prompted a re-evaluation of Sasa's life-of-mine plan, which now envisages mining up to approximately 830,000 tonnes annually over the next eight years, followed by a reduction in the final year of 2034 (previously 2039). The reduction in reserve tonnage was due principally to revisions to the mine design; the application of higher net smelter return cut-off values in response to increased assumptions for operating costs; revised assumptions for metals prices and concentrate treatment charges; and normal mining depletion.
For more information on the Sasa mine, refer to Central Asia's press release dated March 3, 2026 titled "Sasa Mineral Resource and Ore Reserve Statement" and Central Asia's press release dated October 7, 2026 titled "Q3 2026 Operations Update", both available on their website at www.centralasiametals.com.
Éléonore Royalty (Dhilmar Ltd.)
OR Royalties owns a sliding scale 1.8% to 3.5% NSR royalty on the Éléonore gold mine ("Éléonore") located in the Province of Québec and operated by Dhilmar Ltd. ("Dhilmar", a private company that acquired Éléonore from Newmont Corporation ("Newmont")) in 2025. OR Royalties received a NSR royalty of 2.2% on production at the Éléonore mine in the second quarter of 2026. In June 2026, cumulative gold production at Éléonore reached the 3.0 million ounces threshold, which resulted in an increase in the royalty rate payable to 2.475% (which was reflected in the monthly royalties payable starting in July 2026, considering the one-month lag in payments). The royalty rate will increase by 25 basis points (27.5 basis points, reflecting a 10% increase when the gold price is above $500 per ounce) for every additional million ounces of cumulative gold production, up to a maximum of 3.50%.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Update on Reserve and Resource Estimates
On February 20, 2025, Newmont reported Proven and Probable Mineral Reserves at Éléonore comprising 10.1 million tonnes grading 5.05 g/t Au for 1.6 million ounces of gold as at December 31, 2024.
Dhilmar is a private company, and therefore they have not publicly released updated Mineral Reserve and Resources estimates since it acquired the mine in 2025.
For additional information, please refer to Newmont's press release dated February 20, 2025 titled "Newmont Reports 2024 Mineral Reserves of 134.1 Million Gold Ounces and 13.5 Million Tonnes of Copper", filed on www.sedarplus.ca.
Island Gold District Royalty (Alamos Gold Inc.)
OR Royalties owns NSR royalties ranging from 1.38% to 3.00% on the Island Gold mine property (nearly all current underground Island Gold Mineral Reserves and Resources are covered by the royalties), which is now included in the Island Gold District (grouping the Island Gold and Magino properties), operated by Alamos Gold Inc. ("Alamos") and located in Ontario, Canada. OR Royalties also owns a 3% NSR over a small fraction at the eastern limit of the Magino open pit mine.
On February 3, 2026, Alamos reported that at Island Gold, the total effective NSR royalty averages approximately 2.6% over the life of mine, based on ounces produced, with approximately 90% of this royalty paid in-kind (the latter representing the royalty held by the Company). This implies that the royalties owned by OR Royalties over the Island Gold underground mine have a weighted average of 2.34% NSR royalty coverage over the new life of mine.
Guidance - 2026-2028
On February 4, 2026, Alamos released its three-year guidance. Gold production at the Island Gold District is expected to range between 290,000 and 330,000 ounces in 2026, down 9% from the previous guidance of 330,000 to 355,000 ounces, reflecting decreased milling rates from the Magino mill and a slightly slower ramp-up of underground mining rates at Island Gold to 2,400 tpd. Mining rates are now expected to ramp-up to planned rates of 2,400 tpd early in 2027, compared to the fourth quarter of 2026 previously announced.
On July 29, 2026, Alamos revised its 2026 gold production guidance for the Island Gold District at 290,000 to 310,000 ounces.
Forecast gold production for the Island Gold District in 2027 is currently 380,000 - 420,000. A gold production guidance was also released for 2028 of 470,000 - 510,000 ounces. The guidance data has not been provided separately for the Island Gold and the Magino mines and has not been revised following the revised schedule of shaft commissioning.
Update on operations
On October 28, 2026, Alamos reported record production at the Island Gold District of 68,700 ounces of gold in the third quarter of 2026, 3% higher than the prior year period and a 12% increase compared to the second quarter. With higher underground mining rates and grades expected to drive increasing production in the fourth quarter, the Island Gold District remains on track to achieve its full year revised production guidance of between 290,000 and 310,000 ounces.
Underground mining rates increased to average a record 1,790 tpd in the third quarter, 35% higher than the prior year's period and a 15% increase from the previous quarter. Mining rates are expected to increase further during the fourth quarter and remain on track to reach 2,000 tpd by the end of 2026. Underground mining rates are expected to continue increasing above 2,000 tpd in the first half of 2027; however, the ramp up to 2,400 tpd is not expected until the second half of the year. As a result, underground mining rates are expected to be lower than previously guided during the first half of 2027.
Underground grades mined averaged 8.69 g/t Au during the third quarter, slightly below the second quarter and guidance due to higher than expected dilution within certain higher-grade stopes mined in August. Dilution performance was in line with expectations in September. Grades are expected to improve to near the top end of the annual guidance range of 11.5 g/t Au in the fourth quarter.
Update on Island Gold District Expansion
In 2022, Alamos announced the Phase 3+ Shaft Expansion at Island Gold from 1,200 tpd to 2,400 tpd. The expansion includes the construction of a shaft and paste plant, as well as accelerated development to support the higher mining rates. With the commissioning of the shaft expected to be completed in early 2027, the operation will transition from trucking ore and waste up the ramp to skipping ore and waste to surface, driving production higher and costs significantly lower.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
On February 3, 2026, Alamos announced the Island Gold District Expansion Study outlining a larger, long-life, low-cost mine with an average annual gold production of 534,000 ounces over the initial 10 years (starting in 2028). The Island Gold District Expansion growth capital of $542.0 million will be spent on the expansion of the Magino mill to 20,000 tpd, accelerated underground development, and mobile equipment to support higher underground and open pit mining rates of 3,000 tpd and 17,000 tpd, respectively.
As outlined in the Island Gold District Expansion Study, the Island Gold mill will continue operating and will be dedicated to processing approximately 1,265 tpd of higher-grade underground ore until the expected completion of the Magino mill expansion in the first quarter of 2028. The remaining underground ore mined beyond the Island Gold mill capacity will be blended at increasing rates with open pit ore and processed within the Magino mill. Following the expected completion of the Magino mill expansion to 20,000 tpd in the first quarter of 2028, the Island Gold mill will be shut down and all underground and open pit ore will be processed within the larger and more cost-effective Magino mill. As of September 30, 2026, 45% of growth capital related to the Island Gold District Expansion has been spent and committed, with the majority of spending focused on the Magino mill expansion.
Update on Reserve and Resource Estimates
On February 3, 2026, Alamos reported Proven and Probable Mineral Reserve of 5.1 million ounces of gold at Island Gold underground (15.1 million tonnes grading 10.61 g/t Au), representing a 25% increase from the 4.1 million ounces contained in the June 2025 update (11.8 million tonnes grading 10.85 g/t Au). The increase was driven by a successful delineation drilling program with the focus on converting a large portion of Mineral Resource base into Mineral Reserves. Measured and Indicated Mineral Resources decreased by 44% compared to the June 2025 update at Island Gold, to 0.6 million ounces of gold (2.1 million tonnes grading 8.77 g/t Au), as a result of the conversion to Mineral Reserves. Inferred Mineral Resources also decreased by 45% to 1.4 million ounces (16.9 million tonnes grading 2.57 g/t Au), also as a result of the conversion program.
Update on Exploration
A total of $43.0 million has been budgeted for exploration at the Island Gold District in 2026, up from $24.0 million spent in 2025. On April 29, 2026, Alamos reported that the exploration program will continue to build on the success from 2025 with high-grade gold mineralization extended across the Island Gold deposit, as well as within multiple structures within the hanging wall and footwall.
A total of 50,000 metres of underground exploration drilling is planned in 2026 with a focus on defining new Mineral Reserves and Resources in proximity to existing production horizons and infrastructure. This includes drilling across the strike extent of the main Island Gold deposit (E1E and C-Zones), as well as within a growing number of newly defined hanging-wall and footwall zones.
These potential high-grade Mineral Reserve and Resource additions would be low cost to develop, given their proximity to existing infrastructure, and provide increased operational flexibility as mining rates increase. To support the underground exploration program, 1,090 metres of underground exploration drift development is planned to extend drill platforms on the multiple levels. Additionally, 48,000 metres of surface exploration drilling has been budgeted targeting the area between the Island Gold and Magino deposits, as well as the down-plunge extension of the Island Gold deposit, below a depth of 1,500 metres.
On June 22, 2026, Alamos reported new results from underground and surface exploration drilling at the Island Gold Mine. Exploration drilling has defined high-grade mineralization across multiple areas which are being targeted as sources of additional higher-grade mill feed within the expanded Magino mill. This includes defining a new zone of high-grade mineralization 250 metres west of underground Mineral Reserves and Mineral Resources (Island Gold West Extension), and continuing to extend mineralization within the Island West up-plunge area. Given its proximity to surface, Island West up-plunge can be mined utilizing the ramp, providing further upside potential in terms of combined underground mining rates.
During the third quarter of 2026, 12,660 metres of underground exploration drilling was completed in 60 holes, and 10,099 metres of underground delineation drilling across 44 holes. Additionally, 13,063 metres of surface exploration drilling was completed in 20 holes. Year to date, 33,615 metres of underground exploration drilling was completed in 133 holes, or 67% of the budgeted metres, and 22,609 metres of underground delineation drilling across 95 holes. Additionally, 30,207 metres of surface exploration drilling was completed in 30 holes, representing 63% of the budget for the year.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
For more information, refer to Alamos' press release dated February 3, 2026 titled "Alamos Gold Announces Island Gold District Expansion to 20,000 TPD, Creating One of Canada's Largest and Lowest Cost Gold Mines with Attractive Economics, including 69% After-Tax IRR and $12.2 Billion NPV at $4,500/oz Gold", Alamos' press release dated February 4, 2026 titled "Alamos Gold Provides Three-Year Operating Guidance Outlining 46% Production Growth by 2028 at Significantly Lower Costs", Alamos' press release dated April 29, 2026 titled "Alamos Gold Reports First Quarter 2026 Results", Alamos' press release dated June 18, 2026 titled "Alamos Gold Provides Operational Update Across Canadian Operations", Alamos' press release dated June 22, 2026 titled "Alamos Gold Extends High-Grade Mineralization Across Multiple Targets within the Island Gold District which Represent Upside as Potential Sources of Additional Higher-Grade Mill Feed", Alamos' press release dated July 29, 2026 titled "Alamos Gold Reports Second Quarter 2026 Results", and Alamos' press release dated October 28, 2026 titled "Alamos Gold Reports Third Quarter 2026 Results", all filed on www.sedarplus.ca.
Ermitaño Royalty (First Majestic Silver Corp.)
OR Royalties holds a 2% NSR royalty on the Ermitaño underground gold and silver mine ("Ermitaño") operated by First Majestic Silver Corp. ("First Majestic") and located in Sonora State, Mexico.
Guidance - 2026
On January 15, 2026, First Majestic reported its annual production guidance for Santa Elena of 1.3 million to 1.5 million ounces of silver and 64,000 to 71,000 ounces of gold.
On July 8, 2026, First Majestic increased its guidance for gold production at Santa Elena to 72,000 to 76,000 ounces, an increase of 10% (midpoint) compared to the original guidance, primarily due to higher gold grades and slightly increased gold recoveries. Silver production is expected to be 1.4 million to 1.5 million ounces, toward the high-end of the original guidance. This production should be mostly from ore covered by the royalty held by OR Royalties on Ermitaño.
One of First Majestic's key initiatives for 2026 is the expansion of the Santa Elena processing plant, increasing capacity from 3,200 tpd to 3,500 tpd.
Update on operations
On October 8, 2026, First Majestic announced production of 368,333 ounces of silver and 18,489 ounces of gold in the third quarter of 2026 at Santa Elena, a decrease of 11% and 12% year-over-year, respectively. The decline in production was primarily attributable to lower silver and gold grades, partially offset by increased mill throughput and improved metallurgical recoveries, compared to the prior year period.
During the third quarter, the mill processed 286,382 tonnes of ore, 3% higher than the same period last year, and down 6% from the record throughput of 305,369 tonnes in the second quarter of 2026, as the company continues advancing its 3,500 tpd expansion project with planned downtime related to equipment installation for the project. A record milling month was achieved in August, with 104,000 tonnes processed and daily throughput rates frequently exceeding 3,600 tonnes per operating day. Silver and gold head grades averaged 58 g/t and 2.14 g/t, respectively. Silver and gold recoveries during the quarter improved to 69% and 94%, respectively, compared to 65% and 92% in the same period last year.
Update on exploration
On July 30, 2024, First Majestic announced the discovery of a significant new, vein-hosted gold and silver mineralized system at its Santa Elena property. This new high-grade discovery, the Navidad vein system ("Navidad"), was made at depth adjacent to the company's producing Ermitaño mine and is within OR Royalties' royalty boundaries. This is the most promising discovery at the Santa Elena property since Ermitaño was discovered in 2016.
At Santa Elena, approximately 78,000 metres of drilling is planned in 2026. Drilling at Santa Elena will focus on converting Inferred to Indicated Resources at the Santo Niño Discovery (not covered by the royalty held by OR Royalties), continuing to drill test extensions of Navidad (covered by the royalty held by OR Royalties) and testing several greenfield targets within a 10-kilometre radius around the processing plant where a new geologic understanding of district geology has highlighted the presence of large areas with exploration upside.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
On June 25, 2026, First Majestic announced that it is advancing Santo Niño (not covered by the Ermitaño royalty) and Navidad from resource definition toward underground development, supported by recently received portal construction permits and an additional $12.0 million investment planned for 2026. This next phase of work is expected to establish dedicated underground access to both areas, support decline and ramp development, and position higher-grade mineralization from Santo Niño and Navidad to contribute to the future Santa Elena district production profile. A recently completed scoping-level study indicates that development of an additional portal, the Navidad portal, located approximately 300 metres from the Santa Elena processing facilities, together with ramp development from the lower levels of Ermitaño to provide secondary egress and ventilation, is expected to provide an efficient route to Navidad mineralization and support future haulage of mineralized material from the Navidad area. Part of the additional 2026 funding is planned to support construction of the Navidad portals, advance hydrogeological studies and complete an additional 1,300 metres of development in the Ermitaño-to-Navidad ramp and from the Navidad portal.
Update on Mineral Reserve and Resource Estimates
On March 31, 2026, First Majestic released updated 2025 Mineral Reserve and Mineral Resource estimates for the Ermitaño underground mine. Ermitaño's Proven Mineral Reserves are estimated at 1.3 million ounces of silver and 0.05 million ounces of gold (0.68 million tonnes grading 59 g/t Ag and 2.29 g/t Au) and Probable Mineral Reserve are estimated at 3.15 million ounces of silver and 0.13 million ounces of gold (3.39 million tonnes grading 29 g/t Ag and 1.16 g/t Au).
For more information, refer to First Majestic's press release dated July 30, 2024 titled "First Majestic Announces New High-Grade Gold and Silver Discovery at Santa Elena", First Majestic's press release dated January 15, 2026 titled "First Majestic Reports 2025 Production and 2026 Outlook; Increases Dividend", First Majestic's press release dated March 31, 2026 titled "First Majestic Announces 2025 Mineral Reserve and Mineral Resource Estimates", First Majestic's press release dated June 25, 2026 titled "First Majestic Receives Construction Permits for Santo Niño and Navidad; Advances Development Across the Santa Elena District", and First Majestic's press release dated October 8, 2026 titled "First Majestic Reports Q3 2026 Production Results; Announces Q3 Conference Call Details and Renewal of Share Repurchase Program", all filed on www.sedarplus.ca.
Gibraltar Stream (Trekor Metals Limited)
OR Royalties owns a silver stream referenced to 100% of Gibraltar copper mine's production, operated by Trekor Metals Limited (formerly "Taseko Mines Limited") ("Trekor") and located in British Columbia, Canada, until a total of 6.8 million ounces of silver has been delivered, after which the refined silver to be delivered will be reduced to 35% of the payable silver produced. There is no cash transfer price payable by OR Royalties at the time of delivery for the silver ounces delivered. As of September 30, 2026, a total of 1.8 million ounces of silver have been delivered under the stream agreement.
Guidance - 2026
On February 18, 2026, Trekor indicated that mining activity over the last 18 months had been focused in the Connector Pit, which was the primary source of mill feed in 2025, and will continue to be the primary source of ore for the next three years (2026 through 2028). In the first quarter, head grades in the Connector Pit had been 5% to 10% lower than originally expected due to the impact of small higher-grade zones that have not been realized through mining to date. In addition, oxide copper and metallurgically challenging supergene ore has been more abundant in the Connector Pit than previously estimated, and recoveries in 2026 were expected to average between 75% to 80% (similar to the second half of 2025). Taking all of these factors into account, total copper production at Gibraltar for 2026 was expected to be in the range of 110 to 115 million pounds and expected to continue at similar levels (± 5%) until completion of mining in the Connector pit in mid-2029.
On October 8, 2026, Trekor noted that, based on production through three quarters, the company now expects Gibraltar to produce 115 to 120 million pounds of copper, an increase over the original guidance of 110 to 115 million pounds.
Update on operations
On October 8, 2026, Trekor reported production for the third quarter of 2026 of 34 million pounds of copper and 380,000 pounds of molybdenum. The Connector Pit continued to deliver strong grades which, in addition to an increase in mill throughput and improved SX/EW plant performance, drove a 12% increase in quarterly production. Copper sales from Gibraltar totalled 31 million pounds in the period. The transition back into more complex ore began later in the third quarter and impacted recoveries, as expected. In the fourth quarter, Trekor expects lower grades and recoveries as mining transitions back to the upper benches of the Connector Pit.
For more information, refer to Trekor's press release dated February 18, 2026 titled "Taseko Announces Strong Fourth Quarter Financial Results and Commencement of Copper Production at Florence Copper" and Trekor's press release dated October 8, 2026 titled "Trekor Announces 41 Million Pounds of Copper Production from Gibraltar and Florence Copper in the Third Quarter", both filed on www.sedarplus.ca.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Namdini Royalty (Cardinal Namdini Mining Ltd.)
In January 2026, the Company acquired an additional 1.0% NSR royalty covering the producing Namdini gold mine in Ghana, with an effective date of October 1, 2025. Following this transaction, OR Royalties now owns a 2% NSR royalty on the Namdini gold mine, which is operated by Shandong Gold Co Ltd., a private company, through its subsidiary Cardinal Namdini Mining Limited, which is owned in partnership with a subsidiary of China Railway Construction Group Corp Ltd.
Gold production at Namdini commenced in the first half of 2025, with the mine in the final phases of a ramp-up towards peak production of approximately 360,000 ounces of gold per year over the first three years (when operating at the expected design capacity of 9.5 million tonnes per annum), as well as an expected average of 287,000 ounces of gold per year over an initial 15-year life of mine.
Shandong Gold Co Ltd. has not released production results or Reserve and Resources estimates specific to the Namdini mine.
Lamaque Complex Royalty (Eldorado Gold Corporation)
OR Royalties owns a 1% NSR royalty on the producing Triangle deposit as well as the prospective Ormaque, Plug #4, and Parallel deposits of the Lamaque Complex. The Lamaque Complex, which includes the Triangle mine (upper and lower zones), the Ormaque mine, the Parallel deposit, the Plug #4 deposit, and the Sigma Mill, is operated by Eldorado Gold Corporation ("Eldorado") and is located in Québec, Canada. OR Royalties also holds a 2.5% NSR royalty on the Bourlamaque property.
Guidance - 2026
On February 19, 2026, Eldorado indicated production guidance for 2026 at the Lamaque Complex is expected to be between 185,000 and 200,000 ounces of gold, reflecting a wider range to account for the potential early start of Ormaque, contingent on receiving the operating permit. In 2026, the focus will remain on the development of Ormaque and further resource conversion drilling at both Triangle and Ormaque. Production for the years 2027 and 2028 is expected to be between 190,000 to 210,000 ounces of gold annually.
Growth capital for 2026 is expected to range between $180.0 and $190.0 million, and primarily covers development, infrastructure and the fleet for Ormaque; construction of the paste plant; capital development for the Triangle ramp; construction of the North Basin, and the purchase of additional battery electric vehicles (for the Triangle mine).
Update on operations
On October 29, 2026, Eldorado announced production at the Lamaque Complex of 52,748 ounces of gold in the third quarter of 2026, a 13% increase from 46,823 ounces in the third quarter of 2025. The increase was due to higher throughput, head grade and recoveries, benefiting from strong mill performance and ore from Ormaque following receipt of the operating authorization in March.
Update on Mineral Reserve and Resource Estimates
On November 26, 2025, Eldorado released its updated Mineral Reserves and Mineral Resources as of September 30, 2025. Proven and Probable Mineral Reserves included 1.285 million tonnes of 5.78 g/t Au and 5.588 million tonnes of 7.53 g/t Au, respectively, for a total of 1.591 million ounces of gold. Measured and Indicated Resources included 2.185 million tonnes of 6.73 g/t Au and 8.605 million tonnes of 7.97 g/t Au, respectively, for a total of 2.677 million ounces of gold. Inferred Resources included 8.087 million tonnes of 7.69 g/t Au for 2.0 million ounces. The updated technical report outlines a Reserve Case with an 8-year mine life.
Mineral Reserves increased 25% at Lamaque, driven by conversion at Ormaque and Triangle, in addition to declaring initial Mineral Reserves at Plug #4. The increase in total Measured and Indicated Mineral Resources was primarily driven by conversion from Inferred Mineral Resources.
Update on exploration
On January 26, 2026, Eldorado announced the discovery of four new high-grade zones at the Lamaque Complex and the commencement of studies aimed at unlocking a potential expansion. Recent results confirmed high-grade mineralization across multiple deposits on the property, with Ormaque adding flexibility near existing infrastructure. These results, along with emerging targets on the wider Bourlamaque property highlight a compelling opportunity for low-risk, capital efficient organic growth and mine life extension. As a result of recent exploration success and the potential for additional resources in close proximity to the Sigma mill, Eldorado has commenced studies to expand throughput from its current capacity of approximately 2,500 tpd towards its fully permitted capacity of 5,000 tpd.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
For more information, refer to Eldorado's press release dated November 26, 2025 titled "Eldorado Gold Releases Updated Mineral Reserve and Mineral Resource Statement; Offsetting Depletion and Increasing Mineral Reserves at Key Operations", Eldorado's press release dated January 26, 2026 titled "Eldorado Announces Strong Exploration Results of Multiple New High-Grade Zones in Canada and Greece and Increases 2026 Exploration Investment, Reinforcing Confidence in Discovery Strategy", Eldorado's press release dated February 19, 2026 titled "Eldorado Gold Provides 2026 Guidance; Three-Year Outlook Targets 40% Gold Production Growth; Skouries Construction Update" and Eldorado's press release dated October 29, 2026 titled "Eldorado Gold Reports Q3 2026 Financial and Operational Results and Updates 2026 Guidance; Skouries and McIlvenna Bay Advancing Toward Commercial Production", all filed on www.sedarplus.ca.
Eagle Gold Royalty - Update
OR Royalties owns a 5% NSR royalty on the Dublin Gulch property, situated in central Yukon Territory, Canada, which hosts the Eagle Gold mine ("Eagle Gold"), on all metals until 97,500 ounces of gold have been delivered to OR Royalties and a 3% NSR royalty thereafter. A total of 32,667 ounces of gold has been delivered under the royalty agreement.
Heap leach facility failure
On June 24, 2024, Victoria announced that the heap leach facility at the Eagle Gold mine experienced a failure. Operations were suspended while the site operations team, along with management and the Yukon government officials continued to assess the situation and gathered information. Victoria confirmed that there had been some damage to infrastructure and a portion of the failure had left containment. Subsequently, on July 4, 2024, Victoria advised that it had received notices of default from its lenders under the credit agreement dated December 18, 2020. A default under the Eagle Royalty Agreement dated April 13, 2018 was also triggered and, consequently, OR Royalties provided a notice of default to Victoria on July 4, 2024. On July 12, 2024 and July 30, 2024, Victoria reported that there can be no assurance that the company will have the financial resources necessary to repair the damage to the equipment and facilities, to remediate the impacts caused by the incident or to restart production.
On August 14, 2024, the Ontario Superior Court of Justice appointed PricewaterhouseCoopers Inc. as receiver and manager (the "Receiver"), at the direction of the Yukon Government and under the supervision of the court, of all assets, undertakings and properties of Victoria, which properties include but is not limited to the Eagle Gold mine. A copy of the appointment order (the "Appointment Order") is available on the receivership website provided below.
An independent review board ("IRB") was created to identify the causes of the failure by performing an independent review of the design, construction, operation, maintenance and monitoring of the heap leach facility. The IRB released its report on July 2, 2025, which concluded that the cause of failure was the accumulation of a series of adverse conditions and events, starting with a local failure in the oversteepened area of the south slope. The report also includes recommendations for improved practices by industry and the regulators to help reduce the likelihood of a reoccurrence of similar events. For more information, please refer to the receivership website for the full report: https://www.pwc.com/ca/en/services/insolvency-assignments/victoriagold/independent-review-board-report.html.
Sale process
As part of the receivership, BMO Nesbitt Burns Inc. was appointed as the Receiver's financial advisor to assist in the development and implementation of a sale process for the Eagle Gold mine. The sale process for the Eagle Gold mine began in June 2025. After completing the first phase in September 2025, the Receiver selected a shortlist of qualified buyers to move into a more intensive second phase, which included additional due diligence and a site visit to the mine in Yukon. Those qualified buyers were then asked to submit updated proposals in early December 2025. After reviewing those proposals, the Receiver, on the advice of its financial advisor, invited certain qualified buyers to meet with the Government of Yukon (in its role as regulator) and non-technical representatives of the First Nation of Na-Cho Nyäk Dun. On April 23, 2026, the Receiver, with input from its financial advisor and the consent of the Yukon Government, entered into an exclusivity agreement with Boroo Pte Ltd. ("Boroo"), a Singapore-based private mining company that operates, develops, and acquires mining assets around the world, and is recognized as a specialist in operational turnarounds and responsible mine development. Under this agreement, Boroo was the sole party negotiating a potential purchase of the Eagle Gold Mine and related assets.
On October 22, 2026, Boroo announced that it has entered into a subscription agreement (the "Subscription Agreement") with the Receiver, pursuant to which Boroo's wholly-owned subsidiary, Gatsuurt Mining Inc., would become the sole shareholder of Victoria (the "Victoria Transaction"). The Receiver intends to seek Court approval of the Victoria Transaction in early December 2026, with a view to closing the Victoria Transaction on or about December 31, 2026. The total consideration for the Victoria Transaction is C$140 million, which includes C$40 million in upfront cash and a further C$100 million, in cash, to be paid in staged milestones tied to permitting and commercial production of the Eagle Gold mine. Boroo will also assume certain ongoing remediation obligations and provide interim financial assurance and security to the Government of Yukon on closing of the transaction, to secure reclamation obligations related to the Eagle Gold mine.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
The Subscription Agreement contains a number of other closing conditions, including regulatory clearance under the Competition Act and consent of the Government of Yukon as Receivership Lender.
Subject to the closing conditions, Boroo will acquire the Eagle Gold mine, certain subsidiaries of Victoria, a portfolio of mineral tenures comprising the Dublin Gulch and Victoria Block West quartz and placer mining claims, as well as the Olive Crown Grant, and certain essential contracts which will be retained. Certain pre-closing liabilities of Victoria would be assumed by Victoria on a go-forward basis, while other pre-closing liabilities would be vested out of, and discharged as against, Victoria and assumed by a newly formed corporation, which entity would remain subject to the receivership proceedings.
In addition to the Victoria Transaction consideration of up to C$140 million, the acquisition unlocks a planned capital deployment of approximately C$800 million between 2027 and 2029 dedicated to comprehensive environmental rehabilitation, advanced water treatment infrastructure, geotechnical stabilization, and phased restart activities. In addition, follow-on commitments of over C$600 million are expected over the initial life-of-mine to support and extend mining operations.
Boroo will also execute an engineering overhaul covering open pit and waste rock geotechnical stability, mineral resource and reserve validation, mobile fleet rehabilitation, and the recommissioning of the crushing circuit and ADR plant. To prevent future instability, the plan enforces strict ore characterization and blending controls, an upgraded operations management system, and operational protocols aligned with the International Cyanide Management Code.
More information is available on the receiver's website at https://www.pwc.com/ca/en/services/insolvency-assignments/victoriagold/sale-process.html.
For additional information, please refer to Victoria's press release dated June 24, 2024 titled "Victoria Gold: Eagle Gold Mine Heap Leach Pad Incident", Victoria's press release dated July 4, 2024 titled "Victoria Gold Provides Update on Eagle Gold Mine Incident", Victoria's press release dated July 12, 2024, titled "Victoria Gold: Update on Eagle Gold Mine" and Victoria's press release dated July 30, 2024, titled "Victoria Gold: Update on HLF Incident Management", all filed on www.sedarplus.ca, refer to the receivership website: www.pwc.com/ca/victoriagold, the press release issued by the Government of Yukon dated July 27, 2026 titled "Government of Yukon provides an update on the sale process of Eagle Gold Mine" available on www.yukon.ca, and Boroo's press release dated October 22, 2026 titled "Boroo Announces Agreement to Acquire Victoria Gold Corp. and Expects to Commit Over $1.5 Billion to the Yukon-Based Eagle Gold Mine", available on https://boroomc.com.sg/.
Equity Investments
The Company's assets include a portfolio of shares, mainly of publicly traded companies involved in the mining industry. In certain instances, OR Royalties may invest in equity of companies concurrently with the acquisition of royalty, stream or other similar interests or with the objective of improving its ability to acquire future royalties, streams or similar interests. Certain investment positions may be considered as associates under IFRS Accounting Standards as a result of the ownership held, nomination rights to the investee's board of directors and/or other facts and circumstances.
OR Royalties may, from time to time, and without further notice except as required by law or regulations, increase or decrease its investments at its discretion.
In the first nine months of 2026, OR Royalties acquired equity investments for $17.4 million, including $3.9 million (C$5.5 million) in common shares of Canadian Copper, concurrently with the closing of the precious metals stream on the Caribou Project.
In addition, as part of the amendments to the San Antonio stream, OR Royalties International received common shares of Axo Metals having a value of approximately $4.2 million, and subsequently received additional common shares as a result of an anti-dilution clause having a value of approximately $0.8 million.
In the second quarter of 2026, OR Royalties sold its non-core equity investment in Osisko Metals Incorporated for net proceeds of $34.7 million.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Fair value of marketable securities
As at September 30, 2026, the Company had investments in marketable securities (common shares of publicly-traded companies) having a carrying value6 and a fair value7 of $148.3 million.
Osisko Gold Group Inc. (formerly Osisko Development Corp.)
The Company's principal equity investment is Osisko Gold Group Inc. ("Osisko Gold"). Osisko Gold is a Canadian gold mineral exploration and development company focused on the acquisition, exploration and development of precious metals resource properties in North America. The main projects held by Osisko Gold are the Cariboo gold project ("Cariboo") in British Columbia, Canada and the Tintic property ("Tintic") in Utah, United States. OR Royalties owns a 5% NSR royalty on Cariboo and OR Royalties International owns a 2.5% metals stream on Tintic.
As at September 30, 2026, the Company held 33,333,366 common shares (having a fair value of $94.0 million) representing a 10.9% interest in Osisko Gold (13.1% as at December 31, 2025). The decrease in the percentage of ownership is due mostly to a bought-deal financing that was completed by Osisko Gold in the first quarter of 2026, in which the Company did not participate, as well as the exercise of warrants.
For more information, please refer to Osisko Gold's press releases and other public documents available on www.sedarplus.ca and on their website (www.osiskogold.ca).
Sustainability Activities
As a capital provider to the mining industry, OR Royalties seeks to invest in assets that align with its Environmental, Social and Governance ("ESG") objectives. While the Company does not operate the mining assets, it aims to partner with operators who demonstrate a commitment to responsible mining practices.
In the second quarter of 2026, OR Royalties released the sixth edition of its sustainability report, Growing Responsibly, highlighting the Company's ESG initiatives and key performance metrics for the calendar year 2025.
The following list outlines select sustainability highlights for OR Royalties in 2025:
The full 2025 Growing Responsibly report, informed by the Global Reporting Initiative, Sustainability Accounting Standards Board standards and recommendations of the Task Force on Climate-related Financial Disclosures, is available on the Company's website at: www.ORroyalties.com.
6 The carrying value corresponds to the amount recorded on the consolidated balance sheet, which is the equity method for investments in associates and the fair value for other investments, as per IAS 28 Investment in Associates and Joint Ventures and IFRS 9 Financial Instruments. The Company does not currently have any investments in associates.
7 The fair value corresponds to the quoted price of the investments in a recognized stock exchange as at September 30, 2026.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Dividends and Normal Course Issuer Bid
The following table provides details on the dividends declared by the Company for the first nine months of 2026 and the year ended December 31, 2025:
| Declaration date | Dividend per share |
Record date |
Payment date |
Dividends declared |
|||||||||
| $ | $ | ||||||||||||
| February 18, 2026 | 0.055 | March 31, 2026 | April 15, 2026 | 10,484,000 | |||||||||
| May 6, 2026 | 0.065 | June 30, 2026 | July 15, 2026 | 12,499,000 | |||||||||
| August 5, 2026 | 0.065 | September 30, 2026 | October 15, 2026 | 12,285,000 | |||||||||
| 0.185 | 35,268,000 | ||||||||||||
| February 19, 2025 (i) | 0.046 | March 31, 2025 | April 15, 2025 | 8,475,000 | |||||||||
| May 7, 2025 | 0.055 | June 30, 2025 | July 15, 2025 | 10,201,000 | |||||||||
| August 5, 2025 | 0.055 | September 30, 2025 | October 15, 2025 | 10,492,000 | |||||||||
| November 5, 2025 | 0.055 | December 31, 2025 | January 15, 2026 | 10,116,000 | |||||||||
| 0.211 | 39,284,000 |
(i) Prior to May 2025, the dividends were declared in Canadian dollars. From May 2025, the quarterly dividend is declared in United States dollars. On February 19, 2025, the Board of Directors declared a quarterly dividend of C$0.065 to shareholders of record as of the close of business on March 31, 2025. Based on the foreign currency rate (C$/US$) on the declaration date, the corresponding dividend per share in U.S. dollars was $0.046.
Dividend Reinvestment Plan
The Company offers a dividend reinvestment plan ("DRIP") that allows Canadian and U.S. shareholders to reinvest their cash dividends into additional common shares either purchased on the open market through the facilities of the TSX or the NYSE, or issued directly from treasury by the Company, or acquired by a combination thereof. In the case of a treasury issuance, the price will be the weighted average price of the common shares on the TSX or the NYSE during the five trading days immediately preceding the dividend payment date, less a discount, if any, of up to 5%, at the Company's sole election.
As at September 30, 2026, the holders of 13.8 million common shares had elected to participate in the DRIP, representing dividends payable of $0.9 million. Therefore, 27,017 common shares were issued on October 15, 2026 at a discount rate of 3%.
Normal Course Issuer Bid
In December 2025, OR Royalties renewed its normal course issuer bid ("NCIB") program. Under the terms of the NCIB program, OR Royalties may acquire up to 9,399,294 of its common shares from time to time in accordance with the normal course issuer bid procedures of the TSX. Repurchases under the 2025 NCIB program are authorized from December 12, 2025 until December 11, 2026. Daily purchases are limited to 107,496 common shares, other than block purchase exemptions.
During the nine months ended September 30, 2026, the Company purchased for cancellation a total of 1.6 million common shares for $50.0 million (C$69.7 million; average acquisition price per share of C$44.79).
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Gold Market and Currency
Gold Market
The gold market posted solid gains in the first quarter of 2026, despite increased volatility, and gold prices rose $240 per ounce during that period. During the second quarter of 2026, prices decreased by 13%, its worst quarter since 2013 for a decrease of 7.8% in the first half of 2026. During the third quarter of 2026, gold prices fluctuated between $4,000 and $4,500 per ounce. Despite the decrease in 2026, the drivers supporting gold remain intact with continued central banks diversification, persistent fiscal deficits, and rising sovereign debt.
The gold price averaged $4,873 in the first quarter of 2026, $4,506 in the second quarter of 2026 and $4,262 in the third quarter of 2026, compared to $4,135 in the fourth quarter of 2025. The gold price closed the third quarter of 2026 at $4,176, compared to $4,368 per ounce at the end of 2025.
The historical price is as follows:
| (per ounce of gold) | High | Low | Average | Close | ||||||||
| 2026 (YTD) | $5,405 | $3,994 | $4,545 | $4,176 | ||||||||
| 2025 | 4,449 | 2,633 | 3,432 | 4,368 | ||||||||
| 2024 | 2,778 | 1,985 | 2,386 | 2,609 | ||||||||
| 2023 | 2,078 | 1,811 | 1,941 | 2,078 | ||||||||
| 2022 | 2,039 | 1,629 | 1,800 | 1,812 |
Currency
The exchange rates for the Canadian/U.S. dollar are outlined below:
| High | Low | Average | Close | |||||||||
| 2026 (YTD) | 0.7399 | 0.7025 | 0.7221 | 0.7048 | ||||||||
| 2025 | 0.7376 | 0.6848 | 0.7157 | 0.7296 | ||||||||
| 2024 | 0.7510 | 0.6937 | 0.7302 | 0.6950 | ||||||||
| 2023 | 0.7617 | 0.7207 | 0.7410 | 0.7561 | ||||||||
| 2022 | 0.8031 | 0.7217 | 0.7692 | 0.7383 |
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Selected Financial Information
(in thousands of dollars, except figures for ounces and amounts per ounce and per share) (1)
| Three months ended September 30, |
Nine months ended September 30, |
|||||||||||
| 2026 | 2025 | 2026 | 2025 | |||||||||
| $ | $ | $ | $ | |||||||||
| Revenues | 90,205 | 71,625 | 290,857 | 186,905 | ||||||||
| Cost of sales | (2,917 | ) | (2,367 | ) | (9,349 | ) | (6,546 | ) | ||||
| Depletion | (12,085 | ) | (10,159 | ) | (35,248 | ) | (25,516 | ) | ||||
| Gross profit | 75,203 | 59,099 | 246,260 | 154,843 | ||||||||
| Impairment of royalty, stream and other interests | - | (5,495 | ) | - | (5,495 | ) | ||||||
| Operating income | 67,569 | 46,687 | 230,713 | 126,629 | ||||||||
| Net earnings | 55,367 | 82,845 | 190,341 | 140,843 | ||||||||
| Net earnings per share - basic | 0.30 | 0.44 | 1.02 | 0.75 | ||||||||
| Net earnings per share - diluted | 0.30 | 0.44 | 1.01 | 0.74 | ||||||||
| Total assets | 1,891,381 | 1,516,753 | 1,891,381 | 1,516,753 | ||||||||
| Total long-term debt | 228,189 | - | 228,189 | - | ||||||||
| Operating cash flows | 77,564 | 64,604 | 232,596 | 162,058 | ||||||||
| Dividend per common share (2) | $0.065 | $0.055 | $0.185 | $0.156 | ||||||||
| Weighted average shares outstanding (in thousands) | ||||||||||||
| Basic | 186,641 | 188,312 | 187,268 | 187,685 | ||||||||
| Diluted | 187,514 | 189,519 | 188,230 | 189,063 | ||||||||
| Average realized price of gold sold (per ounce) | 4,304 | 3,434 | 4,559 | 3,188 | ||||||||
(1) Unless otherwise noted, financial information is in United States dollars and prepared in accordance with IFRS Accounting Standards.
(2) Prior to May 2025, the dividends were declared in Canadian dollars. From May 2025, the quarterly dividend is declared in United States dollars. On February 19, 2025, the Board of Directors declared a quarterly dividend of C$0.065 to shareholders of record as of the close of business on March 31, 2025. Based on the foreign currency rate (C$/US$) on the declaration date, the corresponding dividend per share in U.S. dollars was $0.046.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Overview of Financial Results
Financial Summary - Third quarter of 2026
Revenues from royalties and streams increased to $90.2 million in the third quarter of 2026, compared to $71.6 million in the third quarter of 2025, mainly as a result of higher metal prices. The lower deliveries from the Canadian Malartic Complex, as a result of the wall movement at Barnat, were partly offset by the increased royalty payments from other assets, including from Namdini and the first significant royalty payment from Dalgaranga.
Gross profit amounted to $75.2 million in the third quarter of 2026, compared to $59.1 million in the third quarter of 2025. Cost of sales increased, mainly due to higher metal prices, and depletion increased mostly as a result of the increased royalty payments from Namdini, the new royalty payment from Dalgaranga and the mix of sales.
General and administrative ("G&A") expenses amounted to $4.5 million in the third quarter of 2026, compared to $4.9 million in the third quarter of 2025. The lower expenses in the third quarter of 2026 were mainly the result of lower professional fees.
Business development expenses amounted to $3.1 million in the third quarter of 2026, compared to $2.0 million in the third quarter of 2025. The higher business development expenses in the third quarter of 2026 were primarily the result of higher professional fees.
In the third quarter of 2026, operating income reached $67.6 million, compared to $46.7 million in the third quarter of 2025. The increase was mainly the result of a higher gross profit and an impairment charge of $5.5 million recorded on certain royalty interests in the third quarter of 2025.
Net earnings in the third quarter of 2026 were $55.4 million, compared to $82.8 million in the third quarter of 2025. The decrease was mainly the result of a gain on investments of $53.2 million recorded in the third quarter of 2025 (including a non-cash gain on deemed disposal of an associate of $54.4 million), as well as higher finance costs and a higher income tax expense in the third quarter of 2026, partially offset by a higher operating income and the absence of a share of loss of associates (share of loss of associates of $8.3 million in the third quarter of 2025).
Adjusted earnings reached $53.9 million in the third quarter of 2026, compared to $42.3 million in the third quarter of 2025, mainly as a result of a higher gross profit, partially offset by higher finance costs and a higher income tax expense. A reconciliation of adjusted earnings is provided in the Non-IFRS Financial Performance Measures section of this MD&A.
Cash flows provided by operating activities in the third quarter of 2026 increased to $77.6 million from $64.6 million in the third quarter of 2025. The increase was mainly the result of higher revenues, partially offset by increased payments of income taxes and interest on long-term debt.
8 "Adjusted earnings" and "Adjusted earnings per basic share" are non-IFRS financial performance measures which have no standard definition under IFRS Accounting Standards and might not be comparable to similar financial measures disclosed by other issuers. Refer to the non-IFRS measures provided under the Non-IFRS Financial Performance Measures section of this MD&A for further information and for a quantitative reconciliation of each non-IFRS financial measure to the most directly comparable IFRS financial measure.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Financial Summary - First nine months of 2026
Revenues from royalties and streams increased to $290.9 million in the first nine months of 2026, compared to $186.9 million in the first nine months of 2025, mainly as a result of higher metal prices.
Gross profit amounted to $246.3 million in the first nine months of 2026, compared to $154.8 million in the first nine months of 2025. Cost of sales increased, mainly due to higher metal prices, and depletion increased mostly as a result of the increased royalty payments from Namdini and the new royalty payment from Dalgaranga, as well as the mix of sales.
General and administrative ("G&A") expenses were relatively stable at $15.5 million in the first nine months of 2026, compared to $15.8 million in the first nine months of 2025.
Business development expenses amounted to $7.6 million in the first nine months of 2026, compared to $6.9 million in the first nine months of 2025. The higher business development expenses in 2026 were primarily the result of higher professional fees.
In the first nine months of 2026, operating income reached $230.7 million, compared to $126.6 million in the first nine months of 2025. The increase was mainly the result of a higher gross profit, a gain on the buy-down of the Cascabel stream of $7.2 million and impairment charges of $5.5 million recorded on certain royalty interests in 2025.
Net earnings in the first nine months of 2026 were $190.3 million, compared to $140.8 million in the first nine months of 2025. The increase was mainly the result of a higher operating income, partially offset by a lower gain on investments (the first nine months of 2025 included a non-cash gain on deemed disposal of an associate of $54.4 million), a higher income tax expense, higher finance costs and a foreign exchange loss (compared to a foreign exchange gain in 2025). The net earnings for the first nine months of 2025 were also reduced by a share of loss of associates of $14.2 million.
Adjusted earnings reached $189.5 million in the first nine months of 2026, compared to $105.9 million in the first nine months of 2025, mainly as a result of a higher gross profit and a gain on the buy-down of a stream interest, partially offset by a higher income tax expense and higher finance costs. A reconciliation of adjusted earnings is provided in the Non-IFRS Financial Performance Measures section of this MD&A.
Cash flows provided by operating activities in the first nine months of 2026 increased to $232.6 million from $162.1 million in the first nine months of 2025. The increase was mainly the result of higher revenues, partially offset by increased payments of income taxes (including an amount of $13.7 million related to the payment of the income taxes for the fiscal year 2025) and interest on long-term debt.
9 "Adjusted earnings" and "Adjusted earnings per basic share" are non-IFRS financial performance measures which have no standard definition under IFRS Accounting Standards and might not be comparable to similar financial measures disclosed by other issuers. Refer to the non-IFRS measures provided under the Non-IFRS Financial Performance Measures section of this MD&A for further information and for a quantitative reconciliation of each non-IFRS financial measure to the most directly comparable IFRS financial measure.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Consolidated Statements of Income
The following table presents summarized consolidated statements of income for the three and nine months ended September 30, 2026 and 2025 (in thousands of dollars):
| Three months ended September 30, |
Nine months ended September 30, |
||||||||||||
| 2026 | 2025 | 2026 | 2025 | ||||||||||
| $ | $ | $ | $ | ||||||||||
| Revenues | (a) | 90,205 | 71,625 | 290,857 | 186,905 | ||||||||
| Cost of sales | (b) | (2,917 | ) | (2,367 | ) | (9,349 | ) | (6,546 | ) | ||||
| Depletion | (c) | (12,085 | ) | (10,159 | ) | (35,248 | ) | (25,516 | ) | ||||
| Gross profit | (d) | 75,203 | 59,099 | 246,260 | 154,843 | ||||||||
| Other operating expenses | |||||||||||||
| General and administrative | (e) | (4,534 | ) | (4,902 | ) | (15,503 | ) | (15,799 | ) | ||||
| Business development | (f) | (3,100 | ) | (2,015 | ) | (7,624 | ) | (6,920 | ) | ||||
| Impairment of royalty, stream and other interests | (g) | - | (5,495 | ) | - | (5,495 | ) | ||||||
| Gain on the buy-down of a stream interest | (h) | - | - | 7,161 | - | ||||||||
| Gain on sale of gold bullion | (h) | - | - | 419 | - | ||||||||
| Operating income | 67,569 | 46,687 | 230,713 | 126,629 | |||||||||
| Other (expenses) income, net | (i) | (593 | ) | 45,399 | (1,638 | ) | 38,411 | ||||||
| Earnings before income taxes | 66,976 | 92,086 | 229,075 | 165,040 | |||||||||
| Income tax expense | (j) | (11,609 | ) | (9,241 | ) | (38,734 | ) | (24,197 | ) | ||||
| Net earnings | 55,367 | 82,845 | 190,341 | 140,843 | |||||||||
(a) Revenues are comprised of the following:
| Three months ended September 30, | ||||||||||||||||||
| 2026 | 2025 | |||||||||||||||||
| Average realized price per ounce / tonne ($) |
Ounces / tonnes sold |
Total revenues ($000's) |
Average realized price per ounce / tonne ($) |
Ounces / tonnes sold |
Total revenues ($000's) |
|||||||||||||
| Gold sold | 4,304 | 9,145 | 39,359 | 3,434 | 10,044 | 34,485 | ||||||||||||
| Silver sold | 64.47 | 476,379 | 30,714 | 40.22 | 553,785 | 22,275 | ||||||||||||
| Copper sold | 14,200 | 175 | 2,485 | 9,897 | 624 | 6,177 | ||||||||||||
| Other (paid in cash) | - | - | 17,647 | - | - | 8,688 | ||||||||||||
| 90,205 | 71,625 | |||||||||||||||||
| Nine months ended September 30, | ||||||||||||||||||
| 2026 | 2025 | |||||||||||||||||
| Average realized price per ounce / tonne ($) |
Ounces / tonnes sold |
Total revenues ($000's) |
Average realized price per ounce / tonne ($) |
Ounces / tonnes sold |
Total revenues ($000's) |
|||||||||||||
| Gold sold | 4,559 | 28,594 | 130,348 | 3,188 | 31,693 | 101,047 | ||||||||||||
| Silver sold | 71.03 | 1,419,740 | 100,846 | 35.95 | 1,502,349 | 54,010 | ||||||||||||
| Copper sold | 13,543 | 527 | 7,136 | 9,867 | 848 | 8,369 | ||||||||||||
| Other (paid in cash) | - | - | 52,527 | - | - | 23,479 | ||||||||||||
| 290,857 | 186,905 | |||||||||||||||||
The decrease in gold and silver ounces sold in 2026 is mostly due to lower in-kind deliveries from certain assets. The copper tonnes earned in the second quarter of 2025 were sold in the third quarter of 2025. The increase in the royalties paid in cash is mostly the result of the increased Namdini royalty and the new Dalgaranga royalty payments, as well as the general increase in metal prices.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
(b) Cost of sales mainly represents the acquisition price of the metals under the stream agreements, as well as deductions (when applicable) for governmental royalties, refining, insurance, transportation and other costs related to the metals received under royalty agreements. For the three and nine months ended September 30, 2026, cost of sales amounted to $2.9 million and $9.3 million, respectively, compared to $2.4 million and $6.5 million in the corresponding periods of 2025. The increase in 2026 is mainly due to higher metal prices.
(c) The royalties, streams and other interests are depleted using the units-of-production method over the estimated life of the properties or the life of the related agreements. The depletion expense for the three and nine months ended September 30, 2026 amounted to $12.1 million and $35.2 million, respectively, compared to $10.2 million and $25.5 million in the corresponding periods of 2025. Depletion increased in 2026 mostly as a result of the increased Namdini royalty payments and the new Dalgaranga royalty payments, as well as the mix of sales.
(d) The breakdown of cash margin10 and gross profit per type of interest is as follows (in thousands of dollars):
| Three months ended September 30, |
Nine months ended September 30, |
|||||||||||
| 2026 | 2025 | 2026 | 2025 | |||||||||
| $ | $ | $ | $ | |||||||||
| Royalty interests | ||||||||||||
| Revenues | 55,964 | 42,734 | 181,140 | 121,709 | ||||||||
| Less: cost of sales (excluding depletion) | (371 | ) | (251 | ) | (1,100 | ) | (567 | ) | ||||
| Cash margin (in dollars) | 55,593 | 42,483 | 180,040 | 121,142 | ||||||||
| Depletion | (6,558 | ) | (2,697 | ) | (19,985 | ) | (8,815 | ) | ||||
| Gross profit | 49,035 | 39,786 | 160,055 | 112,327 | ||||||||
| Stream interests | ||||||||||||
| Revenues | 34,241 | 28,891 | 109,717 | 65,196 | ||||||||
| Less: cost of sales (excluding depletion) | (2,546 | ) | (2,116 | ) | (8,249 | ) | (5,979 | ) | ||||
| Cash margin (in dollars) | 31,695 | 26,775 | 101,468 | 59,217 | ||||||||
| Depletion | (5,527 | ) | (7,462 | ) | (15,263 | ) | (16,701 | ) | ||||
| Gross profit | 26,168 | 19,313 | 86,205 | 42,516 | ||||||||
| Royalty and stream interests Total cash margin (in dollars) |
87,288 | 69,258 | 281,508 | 180,359 | ||||||||
| Divided by: total revenues | 90,205 | 71,625 | 290,857 | 186,905 | ||||||||
| Cash margin (in percentage of revenues) | 96.8% | 96.7% | 96.8% | 96.5% | ||||||||
| Total - Gross profit | 75,203 | 59,099 | 246,260 | 154,843 | ||||||||
(e) G&A expenses decreased in the third quarter of 2026 to $4.5 million, compared to $4.9 million in the third quarter of 2025. The lower expenses in the third quarter of 2026 were mainly the result of lower professional fees.
G&A expenses were relatively stable at $15.5 million in the first nine months of 2026, compared to $15.8 million in the first nine months of 2025.
(f) Business development expenses amounted to $3.1 million and $7.6 million in the three and nine months ended September 30, 2026, respectively, compared to $2.0 million and $6.9 million in the three and nine months ended September 30, 2025. The higher business development expenses in 2026 were primarily the result of higher professional fees.
(g) In the third quarter of 2025, the Company recorded impairment charges on certain royalty interests totaling $5.5 million, which resulted from the revision of certain operating parameters and the loss of royalty rights following the abandonment of properties by the respective operators.
(h) In the first quarter of 2026, the Company realized a gain on the buy-down of the Cascabel stream by the operator and a gain on the sale of gold bullion. Refer to the Portfolio of Royalty, Stream and Other Interests section of this MD&A for more information.
10 Cash margin is a non-IFRS financial performance measure which has no standard definition under IFRS Accounting Standards and might not be comparable to similar financial measures disclosed by other issuers. It is calculated by deducting the cost of sales (excluding depletion) from the revenues. Please refer to the Non-IFRS Financial Performance Measures section of this MD&A for further information and for a quantitative reconciliation of each non-IFRS financial measure to the most directly comparable IFRS financial measure.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
(i) Other expenses, net of $0.6 million in the third quarter of 2026 include finance costs of $3.6 million, partially offset by interest income of $1.4 million, a net gain on investments of $1.1 million and a foreign exchange gain of $0.6 million.
Other income, net of $45.4 million in the third quarter of 2025 include a gain on investments of $53.2 million (including a gain on deemed disposal of an associate of $54.4 million, partially offset by the reclassification to the statement of income of accumulated other comprehensive loss on the deemed disposal of an associate of $1.1 million), interest income of $1.1 million and a foreign exchange gain of $0.3 million, partially offset by a share of loss of associates of $8.3 million and finance costs of $0.9 million.
Other expenses, net of $1.6 million in the first nine months of 2026 include finance costs of $7.6 million and a foreign exchange loss of $2.8 million, partially offset by interest income of $4.8 million and a net gain on investments of $3.9 million.
Other income, net of $38.4 million in the first nine months of 2025 include a gain on investments of $52.9 million (including a gain on deemed disposal of an associate of $54.4 million, partially offset by the reclassification to the statement of income of accumulated other comprehensive loss on the deemed disposal of an associate of $1.1 million), interest income of $2.3 million and a foreign exchange gain of $1.1 million, partially offset by a share of loss of associates of $14.2 million and finance costs of $3.7 million.
(j) The effective income tax rates in the third quarter and first nine months of 2026 were 17.3% and 16.9%, respectively, compared to 10.0% and 14.7% in the third quarter and first nine months of 2025. The statutory tax rate was 26.5% in 2026 and 2025. The elements that impacted the effective income tax rates are revenues not taxable and permanent differences on share-based compensation.
Current income taxes of $9.0 million and $30.1 million were recognized in the third quarter and first nine months of 2026, compared to $3.6 million and $10.3 million in the third quarter and first nine months of 2025, respectively. Income taxes of $4.4 million and $28.3 million were paid in the third quarter and the first nine months of 2026 (including $13.7 million related to the fiscal year 2025), compared to $1.0 million and $2.2 million in the third quarter and first nine months of 2025, respectively. Since the first quarter of 2026, the Company is required to make monthly tax installments to the federal and provincial governments in Canada.
Liquidity and Capital Resources
As at September 30, 2026, the Company's cash position amounted to $76.7 million compared to $75.6 million as at June 30, 2026 and $142.1 million as at December 31, 2025. While the Company reported a net debt position11 of $151.5 million at September 30, 2026 (calculated as $228.2 million in long-term debt less $76.7 million in cash), management views near-term liquidity as further supported by a short-term deferred consideration receivable of $30.0 million from Galiano (due on or before December 31, 2026) that is expected to generate near-term cash flow. The potential exercise by SolGold Finance AG of its buy-back option right to repurchase one third of the Company's 0.6% NSR royalty on the Cascabel project for US$35.0 million by the end of November 2026 could also generate additional near-term cash flows.
Significant variations in the liquidity and capital resources for the three and nine months ended September 30, 2026 are summarized below (in thousands of dollars) and explained under the Cash Flows section of this MD&A.

11 "Net cash/(net debt) position" is a non-IFRS financial performance measure which has no standard definition under IFRS Accounting Standards and might not be comparable to similar financial measures disclosed by other issuers. Refer to the non-IFRS measures provided under the Non-IFRS Financial Performance Measures section of this MD&A for further information and for a quantitative reconciliation of each non-IFRS financial measure to the most directly comparable IFRS financial measure.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |

Revolving credit facility
In August 2026, the Company amended its existing revolving credit facility (the "Facility"). Under the amended agreement, the Company has access to a Facility of $850.0 million with an additional uncommitted accordion of up to $350.0 million (subject to acceptance by the lenders). The previous credit facility agreement had a maximum amount of $650.0 million with an uncommitted accordion of up to $200.0 million.
The maturity date of the Facility was extended from May 30, 2029 to August 4, 2030. The Facility is to be used for general corporate purposes and investments in the mineral industry, including the acquisition of royalties, streams and other interests, and is secured by the Company's assets.
The Facility is subject to standby fees. Funds drawn bear interest based on the base rate, prime rate, Canadian Overnight Repo Rate Average ("CORRA") or Secured Overnight Financing Rate ("SOFR"), plus an applicable margin depending on the Company's leverage ratio. As at September 30, 2026, the average effective interest rate on the drawn balance was 5.0%, including the applicable margins.
The Facility includes quarterly covenants that require the Company to maintain certain financial ratios, including leverage ratios, and to meet certain non-financial requirements. As at September 30, 2026, all such ratios and requirements were met.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Cash Flows
The following table summarizes the cash flows for the three and nine months ended September 30, 2026 and 2025 (in thousands of dollars):
| Three months ended September 30, |
Nine months ended September 30, |
|||||||||||
| 2026 | 2025 | 2026 | 2025 | |||||||||
| $ | $ | $ | $ | |||||||||
| Cash flows | ||||||||||||
| Operations | 70,199 | 61,199 | 230,556 | 153,271 | ||||||||
| Working capital items | 7,365 | 3,405 | 2,040 | 8,787 | ||||||||
| Operating activities | 77,564 | 64,604 | 232,596 | 162,058 | ||||||||
| Investing activities | (47,685 | ) | (11,170 | ) | (438,573 | ) | (47,216 | ) | ||||
| Financing activities | (28,512 | ) | (45,395 | ) | 140,478 | (116,884 | ) | |||||
| Effects of exchange rate changes on cash | (254 | ) | (623 | ) | 86 | (12 | ) | |||||
| Net increase (decrease) in cash | 1,113 | 7,416 | (65,413 | ) | (2,054 | ) | ||||||
| Cash - beginning of period | 75,605 | 49,626 | 142,131 | 59,096 | ||||||||
| Cash - end of period | 76,718 | 57,042 | 76,718 | 57,042 | ||||||||
Operating Activities
Third quarter of 2026
In the third quarter of 2026, cash flows provided by operating activities amounted to $77.6 million compared to $64.6 million in the third quarter of 2025. The increase was mainly the result of higher revenues, partially offset by increased payments of income taxes and interest on long-term debt.
First nine months of 2026
In the first nine months of 2026, cash flows provided by operating activities amounted to $232.6 million compared to $162.1 million in the first nine months of 2025. The increase was mainly the result of higher revenues, partially offset by increased payments of income taxes (including an amount of $13.7 million related to the payment of the income taxes for the fiscal year 2025) and interest on long-term debt.
Investing Activities
Third quarter of 2026
During the third quarter of 2026, cash flows used in investing activities amounted to $47.7 million compared to $11.2 million in the third quarter of 2025.
In the third quarter of 2026, the Company invested $40.2 million in royalty and stream interests, including a payment of $19.7 million for the value-added tax and other levies related to the acquisition of the additional NSR royalty on the Namdini mine, $15.0 million for the extension of its royalties to Hot Chili's La Verde project and $5.0 million paid on closing of the precious metals stream on Canadian Copper's Caribou Project, and acquired equity investments for $7.4 million (including $3.9 million in Canadian Copper).
In the third quarter of 2025, OR Royalties invested a total of $13.7 million in royalty and stream interests, including the payment by OR Royalties International of the second installment of $10.0 million on the Cascabel gold stream. During the same period, the Company received $2.1 million following the exercise of a buy-down option on a royalty interest by an operator and sold equity investments for proceeds of $0.8 million.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
First nine months of 2026
In the first nine months of 2026, cash flows used in investing activities amounted to $438.6 million compared to $47.2 million in the first nine months of 2025.
In the first nine months of 2026, the Company acquired equity investments for $17.4 million, sold equity investments for net proceeds of $34.7 million, and invested a total of $421.6 million in royalty and stream interests, including $98.5 million for the acquisition of an additional royalty on the Namdini mine (and $19.7 million for the related value-added tax and other levies), $168.0 million to acquire additional royalties covering Solidus' Spring Valley gold project, $115.0 million to acquire a portfolio of precious metals assets from Gold Fields (anchored by a 1.5% NSR royalty on the San Gabriel mine), $15.0 million for the extension of its royalties to the La Verde project and $5.0 million for the Canadian Copper stream. The Company also paid $52.0 million in exchange for deferred payment obligations totaling $60.0 million payable by Galiano. During the same period, the Company generated net proceeds of $17.9 million from the sale of gold bullion received as payment for the exercise of the buy-down right on the Cascabel stream held by the new owner of the project.
In the first nine months of 2025, OR Royalties invested a total of $36.9 million in royalty and stream interests, including $13.0 million invested by OR Royalties International to acquire a silver stream on the South Railroad project and the payment of the second installment of $10.0 million on the Cascabel gold stream, acquired equity investments for $10.8 million and other investments for $1.6 million. During the same period, the Company received $2.1 million following the exercise of a buy-down option on a royalty interest by an operator and sold equity investments for proceeds of $0.8 million.
Financing Activities
Third quarter of 2026
During the third quarter of 2026, cash flows used in financing activities amounted to $28.5 million compared to $45.4 million in the third quarter of 2025.
In the third quarter of 2026, the Company drew a net amount of $13.5 million on its revolving credit facility, acquired common shares under the NCIB program for $29.1 million and paid $11.3 million in dividends.
In the third quarter of 2025, OR Royalties repaid an amount of $35.4 million under its revolving credit facility and paid $9.7 million in dividends.
First nine months of 2026
In the first nine months of 2026, cash flows provided by financing activities amounted to $140.5 million compared to cash flows used in financing activities of $116.9 million in the first nine months of 2025.
In the first nine months of 2026, the Company drew a net amount of $228.5 million on its revolving credit facility, acquired common shares under the NCIB program for $50.0 million, paid $30.5 million in dividends and $10.1 million in withholding taxes on the settlement of restricted and deferred share units, and received proceeds from the exercise of share options and the share purchase plan for $4.8 million.
In the first nine months of 2025, OR Royalties repaid a net amount of $94.9 million under its revolving credit facility, paid $25.2 million in dividends and $6.5 million in withholding taxes on the settlement of restricted and deferred share units. OR Royalties received proceeds from the exercise of share options and the share purchase plan for $11.5 million during the same period.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Quarterly Information
The selected quarterly financial information (1) for the past eight financial quarters is outlined below:
(in thousands of dollars, except for amounts per share)
| 2026 | 2025 | 2024 | ||||||||||||||||||||||
| Q3 | Q2 | Q1 | Q4 | Q3 | Q2 | Q1 | Q4 | |||||||||||||||||
| GEOs | 20,237 | 20,757 | 22,740 | 21,735 | 20,326 | 19,700 | 19,014 | 20,005 | ||||||||||||||||
| Cash | 76,718 | 75,605 | 94,941 | 142,131 | 57,042 | 49,626 | 63,070 | 59,096 | ||||||||||||||||
| Total assets | 1,891,381 | 1,855,828 | 1,604,684 | 1,566,479 | 1,516,753 | 1,442,191 | 1,388,729 | 1,377,634 | ||||||||||||||||
| Total long-term debt | 228,189 | 215,000 | - | - | - | 35,655 | 74,346 | 93,900 | ||||||||||||||||
| Equity | 1,518,200 | 1,483,908 | 1,473,166 | 1,432,041 | 1,396,189 | 1,290,360 | 1,213,894 | 1,188,953 | ||||||||||||||||
| Revenues | 90,205 | 97,820 | 102,832 | 90,465 | 71,625 | 60,364 | 54,916 | 56,742 | ||||||||||||||||
| Net cash flows from operating activities | 77,564 | 83,169 | 71,863 | 83,538 | 64,604 | 51,375 | 46,079 | 49,765 | ||||||||||||||||
| Impairment of assets, net of income taxes | - | - | - | - | 4,834 | - | - | - | ||||||||||||||||
| Net earnings | 55,367 | 61,392 | 73,582 | 65,245 | 82,845 | 32,358 | 25,640 | 7,105 | ||||||||||||||||
| Net earnings per share | ||||||||||||||||||||||||
| - Basic | 0.30 | 0.33 | 0.39 | 0.35 | 0.44 | 0.17 | 0.14 | 0.04 | ||||||||||||||||
| - Diluted | 0.30 | 0.33 | 0.39 | 0.34 | 0.44 | 0.17 | 0.14 | 0.04 | ||||||||||||||||
| Weighted average shares outstanding (000's) | ||||||||||||||||||||||||
| - Basic | 186,641 | 187,714 | 187,607 | 188,050 | 188,312 | 187,746 | 186,979 | 186,747 | ||||||||||||||||
| - Diluted | 187,514 | 188,638 | 188,681 | 189,310 | 189,519 | 189,081 | 188,425 | 188,180 | ||||||||||||||||
| Share price - TSX - closing (C$) | 48.80 | 44.91 | 52.97 | 48.62 | 55.78 | 35.00 | 30.37 | 26.03 | ||||||||||||||||
| Share price - NYSE - closing | 34.34 | 31.63 | 38.02 | 35.39 | 40.08 | 25.71 | 21.12 | 18.10 | ||||||||||||||||
| Price of gold (average) | 4,262 | 4,506 | 4,873 | 4,135 | 3,457 | 3,280 | 2,860 | 2,663 | ||||||||||||||||
| Closing exchange rate (2) (C$/US$) | 0.7048 | 0.7037 | 0.7174 | 0.7296 | 0.7183 | 0.7330 | 0.6956 | 0.6950 | ||||||||||||||||
(1) Unless otherwise noted, financial information is in U.S. dollars and prepared in accordance with IFRS Accounting Standards.
(2) Bank of Canada Daily Rate.
During the third quarter of 2026, the Company completed the acquisition of the precious metals stream on the Caribou Project for a total cash consideration of $28.0 million ($5.0 million was paid on closing), extended the Company's royalties on the Costa Fuego copper-gold project to the La Verde project for a total cash consideration of $15.0 million, paid the value-added tax and other levies of $19.7 million related to the acquisition of the Namdini royalty, and acquired common shares for cancellation under its NCIB program for $29.1 million.
In the second quarter of 2026, the Company completed the acquisition of Terraco for $168.0 million and acquired a portfolio of royalties from Gold Fields, as well as deferred payments, for $167.0 million. The transactions were partly financed by drawdowns on the revolving credit facility.
In the first quarter of 2026, the Company paid $98.5 million to acquire an additional NSR royalty on the Namdini mine.
In the first, second and third quarters of 2025, the Company repaid net amounts of $19.6 million, $40.0 million and $35.4 million on its revolving credit facility, respectively.
During the fourth quarter of 2024, the Company drew $35.0 million on its revolving credit facility to finance the acquisition of royalty and stream interests.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Segment Disclosure
The President and Chief Executive Officer (chief operating decision-maker) organizes and manages the business under a single operating segment, consisting of acquiring and managing precious metals and other royalties, streams and other interests. All of the Company's assets, liabilities, revenues, expenses and cash flows are attributable to this single operating segment. The following tables present segmented information for this single segment.
Geographic revenues
Geographic revenues, including revenues derived from the sale of metals and diamonds received or acquired from in-kind royalties, streams and other interests, are determined by the location of the mining operations giving rise to the royalty, stream or other interest. For the nine months ended September 30, 2026 and 2025, royalty, stream and other interest revenues were earned from the following jurisdictions (in thousands of dollars):
| North America (i) | South America | Australia | Africa | Europe | Total | |||||||||||||
| $ | $ | $ | $ | $ | $ | |||||||||||||
| 2026 | ||||||||||||||||||
| Royalties | 155,669 | 5,703 | 2,737 | 17,031 | - | 181,140 | ||||||||||||
| Streams | 13,655 | 52,943 | 21,991 | - | 21,128 | 109,717 | ||||||||||||
| 169,324 | 58,646 | 24,728 | 17,031 | 21,128 | 290,857 | |||||||||||||
| 2025 | ||||||||||||||||||
| Royalties | 115,039 | 3,760 | 314 | 2,596 | - | 121,709 | ||||||||||||
| Streams | 8,012 | 26,599 | 19,870 | - | 10,715 | 65,196 | ||||||||||||
| 123,051 | 30,359 | 20,184 | 2,596 | 10,715 | 186,905 | |||||||||||||
|
(i) For the nine months ended September 30, 2026, revenues generated from Canada amounted to $147.5 million ($111.5 million for the nine months ended September 30, 2025). |
||||||||||||||||||
For the nine months ended September 30, 2026, two royalty and stream interests generated revenues of $148.5 million ($100.7 million for the nine months ended September 30, 2025), which represented 51% of revenues (54% of revenues for the nine months ended September 30, 2025), including one royalty interest that generated revenues of $95.5 million ($74.1 million for the nine months ended September 30, 2025).
For the nine months ended September 30, 2026, revenues generated from precious metals represented 97% of total revenues (94% for the nine months ended September 30, 2025).
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Geographic net assets
The following table summarizes the royalty, stream and other interests by jurisdiction, as at September 30, 2026 and December 31, 2025, which is based on the location of the properties related to the royalty, stream or other interests (in thousands of dollars):
| North America (i) |
South America |
Australia | Africa |
Asia |
Europe |
Total | |||||||||||||||
| $ | $ | $ | $ | $ | $ | $ | |||||||||||||||
| September 30, 2026 | |||||||||||||||||||||
| Royalties | 566,646 | 209,657 | 79,308 | 164,775 | 5,069 | 10,479 | 1,035,934 | ||||||||||||||
| Streams | 157,473 | 112,856 | 122,470 | - | 22,300 | 27,603 | 442,702 | ||||||||||||||
| Offtakes | - | - | 7,067 | - | 3,704 | - | 10,771 | ||||||||||||||
| 724,119 | 322,513 | 208,845 | 164,775 | 31,073 | 38,082 | 1,489,407 | |||||||||||||||
| December 31, 2025 | |||||||||||||||||||||
| Royalties | 404,599 | 131,823 | 58,078 | 48,841 | 5,248 | 10,847 | 659,436 | ||||||||||||||
| Streams | 161,176 | 128,907 | 127,252 | - | 22,300 | 30,184 | 469,819 | ||||||||||||||
| Offtakes | - | - | 7,067 | - | 3,704 | - | 10,771 | ||||||||||||||
| 565,775 | 260,730 | 192,397 | 48,841 | 31,252 | 41,031 | 1,140,026 | |||||||||||||||
|
(i) As at September 30, 2026, the carrying value of the net interests located in Canada amounted to $359.3 million ($355.7 million as at December 31, 2025). |
|||||||||||||||||||||
Contractual Obligations and Commitments
Investments in royalty and stream interests
As at September 30, 2026, significant commitments related to the acquisition of royalties and streams are detailed in the following table. Commitments related to transactions entered into or closed after September 30, 2026 are detailed in the Subsequent events to September 30, 2026 section below. The Company intends to meet its commitments by using its cash balance, from its expected operating cash flows to be generated from its operations and/or by drawdowns on its revolving credit facility.
| Company | Project (asset) | Installments | Triggering events |
| Goldgroup Mining Inc. | Back Forty project (gold stream) |
$5.0 million | Receipt of all material permits for the construction and operation of the project. |
| $25.0 million | Pro-rata to drawdowns with construction finance facility. | ||
| Jiangxi Copper Company Limited | Cascabel project (gold stream) |
$5.0 million | Achievement of operational milestones, including submission of all final permit applications for the construction and operation of the project. |
| $97.5 million | Pro-rata to drawdowns with construction finance facility. | ||
| Falco Resources Ltd. | Horne 5 project (silver stream) |
C$45.0 million | Receipt of all necessary material third-party approvals, licenses, rights of way, surface rights on the property and all material construction permits, positive construction decision, and raising a minimum of C$135.0 million in non-debt financing and demonstrating that the financial assurance required to allow Falco to proceed with the commencement of mining activities can be satisfied, as applicable. |
| C$60.0 million | Upon total projected capital expenditure having been demonstrated to be financed. | ||
| C$40.0 million (optional) |
Payable with fourth installment, at sole election of OR Royalties, to increase the silver stream to 100% of payable silver (from 90%). | ||
| Canadian Copper Inc. | Caribou Project | $23.0 million | In accordance with the Caribou Project construction budget, conditional upon the receipt of all material environmental permits and necessary First Nations approvals, alongside a formal construction decision by Canadian Copper's board of directors. |
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Stream purchase agreements
The following table summarizes the significant commitments related to producing assets and assets in advanced stage of development to pay for metals and other commodities to which OR Royalties has the contractual right pursuant to the associated purchase agreements:
| Attributable payable production to be purchased |
Per ounce/tonne cash payment |
Term of agreement |
Date of contract |
|||
| Interest | Silver | Other | Silver | Other | ||
| CSA streams (1) | 100% | 2.25 - 4.875% (Copper) |
4% | 4% | Life of mine | June 2023 |
| Gibraltar stream (2) | 100% | nil | Life of mine | March 2018 Amended Dec. 2024 |
||
| Mantos Blancos stream (3) | 100% | 8% spot | Life of mine | September 2015 Amended Aug. 2019 |
||
| Sasa stream (4) | 100% | $6.665 | 40 years | November 2015 | ||
(1) OR Royalties International will receive refined silver equal to 100% of the payable silver produced from the CSA mine for the life of the mine, and will be entitled to receive refined copper equal to 3.0% of payable copper produced from the CSA mine until the 5th anniversary of the agreements (June 15, 2028), then 4.875% of payable copper produced from the CSA mine until 33,000 metric tonnes have been delivered in aggregate, and thereafter 2.25% of payable copper produced from the CSA mine for the remaining life of the mine. On the 5th anniversary of the closing date (June 15, 2028), the owner will have the option to exercise certain buy-down rights by paying a one-time cash payment to OR Royalties International of $20.0 million to $40.0 million. If the option is exercised, OR Royalties International will still be entitled to receive refined copper equal to 3.25% - 4.0625% of payable copper produced from the CSA mine until 23,900 to 28,450 metric tonnes have been delivered in aggregate, and thereafter 1.5% - 1.875% of payable copper produced from the CSA mine for the remaining life of the mine. As of September 30, 2026, 2,275 tonnes of copper have been delivered to OR Royalties International under the stream agreement.
(2) OR Royalties will receive from Trekor an amount of silver production equal to 100% of Gibraltar mine's production, until reaching the delivery to OR Royalties of 6.8 million ounces of silver, and 35% of production thereafter. As of September 30, 2026, a total of 1.8 million ounces of silver have been delivered under the stream agreement.
(3) The stream percentage shall be payable on 100% of silver until 19.3 million ounces have been delivered, after which the stream percentage will be 40%. As of September 30, 2026, a total of 8.2 million ounces of silver have been delivered to OR Royalties International under the stream agreement.
(4) Price subject to the lesser of 3% or inflation over the previous calendar year measured by the consumer price index (CPI) per ounce price escalation after 2016.
Related Party Transactions
There were no material transactions with related parties during the nine months ended September 30, 2026.
Off-Balance Sheet Items
There are no significant off-balance sheet arrangements, other than the contractual obligations and commitments disclosed above.
Outstanding Share Data
As of November 11, 2026, 186,404,619 common shares and 872,166 share options were issued and outstanding.
Subsequent Events to September 30, 2026
Acquisition of investments
In October 2026, OR Royalties International acquired equity investments for $15.0 million.
Dividend
On November 11, 2026, the Board of Directors declared a quarterly dividend of $0.065 per common share payable on January 15, 2027 to shareholders of record as of the close of business on December 31, 2026.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Risks and Uncertainties
The Company is a royalty, stream, and similar interests holder and investor that operates in an industry that is subject to a number of risk factors that include environmental, legal and political risks, the discovery of economically recoverable resources and the conversion of these mineral resources to mineral reserves and the ability of third-party partners to maintain an economic production. An investment in the Company's securities is subject to a number of risks and uncertainties. An investor should carefully consider the risks described in OR Royalties' most recent Annual Information Form, and the other information filed with the Canadian securities regulators and the U.S. Securities and Exchange Commission ("SEC"). If any of such described risks occur, or if others occur, the Company's business, operating results and financial condition could be seriously harmed and investors may lose a significant proportion of their investment.
There are important risks which management believes could impact the Company's business. For information on risks and uncertainties, please refer to the Risk Factors section of OR Royalties' most recent Annual Information Form other information filed with the Canadian securities regulators and the SEC on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.
Disclosure Controls and Procedures and Internal Control over Financial Reporting
Disclosure Controls and Procedures
The Chief Executive Officer (the "CEO") and the Chief Financial Officer (the "CFO") of the Company are responsible for establishing and maintaining the Company's disclosure controls and procedures ("DCP") including adherence to the Disclosure Policy adopted by the Company. The Disclosure Policy requires all staff to keep senior management fully appraised of all material information affecting the Company so that they may evaluate and discuss this information and determine the appropriateness and timing for public disclosure.
The Company maintains DCP designed to ensure that information required to be disclosed in reports filed under applicable Canadian securities laws and the U.S. Securities Exchange Act of 1934, as amended, is recorded, processed, summarized and reported within the appropriate time periods and that such information is accumulated and communicated to the Company's management, including the CEO and CFO, to allow for timely decisions regarding required disclosure.
In designing and evaluating DCP, the Company recognizes that any disclosure controls and procedures, no matter how well conceived or operated, can only provide reasonable, not absolute, assurance that the objectives of the control system are met, and management is required to exercise its judgement in evaluating the cost-benefit relationship of possible controls and procedures.
The CEO and CFO have evaluated whether there were changes to the DCP during the three and nine months ended September 30, 2026 that have materially affected, or are reasonably likely to materially affect, the DCP. No such changes were identified through their evaluation.
Internal Control over Financial Reporting
The Company's management, including the CEO and the CFO, are responsible for establishing and maintaining adequate internal control over financial reporting ("ICFR") for the Company to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS Accounting Standards. The fundamental issue is ensuring all transactions are properly authorized and identified and entered into a well-designed, robust and clearly understood accounting system on a timely basis to minimize risk of inaccuracy, failure to fairly reflect transactions, failure to fairly record transactions necessary to present financial statements in accordance with IFRS Accounting Standards, unauthorized receipts and expenditures, or the inability to provide assurance that unauthorized acquisitions or dispositions of assets can be detected.
The Company's ICFR may not prevent or detect all misstatements because of inherent limitations. Additionally, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because changes in conditions or deterioration in the degree of compliance with the Company's policies and procedures.
The CEO and CFO have evaluated whether there were changes to the ICFR during the three and nine months ended September 30, 2026 that have materially affected, or are reasonably likely to materially affect, the ICFR. No such changes were identified through their evaluation.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Basis of Presentation of Consolidated Financial Statements
These unaudited condensed interim consolidated financial statements have been prepared in accordance with IFRS Accounting Standards as issued by the IASB applicable to the preparation of interim financial statements, including IAS 34, Interim Financial Reporting. The condensed interim consolidated financial statements should be read in conjunction with the Company's annual consolidated financial statements for the years ended December 31, 2025 and 2024, which have been prepared in accordance with IFRS Accounting Standards as issued by the IASB, and are available on SEDAR+ at www.sedarplus.ca, EDGAR at www.sec.gov and on OR Royalties' website at www.ORroyalties.com. The accounting policies, methods of computation and presentation applied in these unaudited condensed interim consolidated financial statements are consistent with those of the previous financial year, except as indicated below for new standards and amendments.
The financial statements included herein reflect all adjustments, consisting only of normal recurring adjustments which, in the opinion of management, are necessary for a fair presentation of the results for the interim periods presented. The results of operations for the three and nine months ended September 30, 2026 are not necessarily indicative of the results to be expected for the full year. Taxes on income in the interim period have been accrued using the tax rates that would be applicable to expected total annual income.
New accounting standards and amendments
Certain new accounting standards and interpretations have been published that are currently effective requirements or forthcoming requirements. These standards are not expected to have a material impact on the Company's current or future reporting periods and are therefore not discussed herein, with the exception of the amendments to IFRS 9, Financial Instruments and IFRS 7, Financial Instruments: Disclosures, and IFRS 18, Presentation and Disclosure in Financial Statements, which are discussed below.
Amendments - IFRS 9 Financial Instruments and IFRS 7 Financial Instruments: Disclosures
On May 30, 2024, the IASB issued targeted amendments to IFRS 9 and IFRS 7, which respond to recent questions arising in practice. The amendments were notably issued to:
The amendments were adopted on January 1, 2026 and were applied retrospectively in accordance with IAS 8, Accounting Policies, Changes in Accounting Estimates and Errors, with no restatement of comparatives per the initial transition requirements of these amendments. For financial liabilities settled in cash using an electronic cash transfer system, the Company applied the election to deem these financial liabilities to be discharged before the settlement date.
The amendments did not have an impact on the Company's condensed interim consolidated financial statements for the three and nine months ended September 30, 2026.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
IFRS 18 Presentation and Disclosure in Financial Statements
In April 2024, the IASB issued IFRS 18, the new standard on presentation and disclosure in financial statements, with a focus on updates to the statement of profit or loss. IFRS 18 was issued in response to investors' concerns about the comparability and transparency of entities' performance reporting. The new requirements introduced in IFRS 18 will help to achieve comparability of the financial performance of similar entities, especially related to how 'operating profit or loss' is defined. The new disclosures required for some management-defined performance measures will also enhance transparency. The key new concepts introduced in IFRS 18 relate to:
IFRS 18 will replace IAS 1; many of the other existing principles in IAS 1 are retained, with limited changes. IFRS 18 will not impact the recognition or measurement of items in the financial statements, but it might change what an entity reports as its 'operating profit or loss'.
IFRS 18 will apply for reporting periods beginning on or after January 1, 2027 and shall be applied retrospectively. Management is continuing to assess the impact of the new standard on its consolidated financial statements.
Critical Accounting Estimates and Significant Judgements
The preparation of consolidated financial statements in conformity with IFRS Accounting Standards requires the Company to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. The Company also makes estimates and assumptions concerning the future. The critical accounting estimates and assumptions as well as significant judgements in applying the Company's accounting policies are detailed in the notes to the audited consolidated financial statements for the years ended December 31, 2025 and 2024, filed on SEDAR+ at www.sedarplus.ca, EDGAR at www.sec.gov and on OR Royalties' website at www.ORroyalties.com.
Financial Instruments
All financial instruments are required to be measured at fair value on initial recognition. The fair value is based on quoted market prices, unless the financial instruments are not traded in an active market. In this case, the fair value is determined by using valuation techniques like discounted cash flows, the Black-Scholes option pricing model or other valuation techniques. Measurement in subsequent periods depends on the classification of the financial instrument. A description of financial instruments and their fair value is included in the notes to the audited consolidated financial statements for the years ended December 31, 2025 and 2024, and in the interim unaudited consolidated financial statements for the three and nine months ended September 30, 2026 and 2025, both filed on SEDAR+ at www.sedarplus.ca, EDGAR at www.sec.gov and on OR Royalties' website at www.ORroyalties.com.
Technical Information
The scientific and technical information contained in this MD&A has been reviewed and approved by Mr. Guy Desharnais, Ph.D., P.Geo, Vice President, Project Evaluation at OR Royalties, who is a "Qualified Person" ("QP") as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Non-IFRS Financial Performance Measures
Cash margin (in dollars and in percentage of revenues)
Cash margin in dollars and in percentage of revenues are non-IFRS financial measures. Cash margin (in dollars) is defined by OR Royalties as revenues less cost of sales (excluding depletion). Cash margin (in percentage of revenues) is obtained from the cash margin (in dollars) divided by revenues.
Management uses cash margin in dollars and in percentage of revenues to evaluate OR Royalties' ability to generate positive cash flow from its royalty, stream and other interests. Management and certain investors also use this information, together with measures determined in accordance with IFRS Accounting Standards such as gross profit and operating cash flows, to evaluate OR Royalties' performance relative to peers in the mining industry who present these measures on a similar basis. Cash margin in dollars and in percentage of revenues are only intended to provide additional information to investors and analysts and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS Accounting Standards. They do not have any standardized meaning under IFRS Accounting Standards and may not be comparable to similar measures presented by other issuers.
Reconciliations of the cash margin per type of interests (in dollars and in percentage of revenues) are presented under the Overview of Financial Results section of this MD&A.
Net cash/(net debt) position
Net cash/(net debt) position is a non-IFRS financial measure and is defined by OR Royalties by the cash balance minus the long-term debt balance at the end of a period.
Management uses the net cash/(net debt) position to evaluate OR Royalties' current net liquidity position (i.e. total cash less total long-term debt). Management and certain investors also use this information, together with measures determined in accordance with IFRS Accounting Standards such as operating cash flows and undrawn balances available under credit facilities, to evaluate OR Royalties' investment capacity. Net cash/(net debt) position is only intended to provide additional information to investors and analysts and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS Accounting Standards. It does not have any standardized meaning under IFRS Accounting Standards and may not be comparable to similar measures presented by other issuers.
A reconciliation of the net cash/(net debt) position is presented below:
| September 30, 2026 |
December 31, 2025 |
|||||
| (in thousands of dollars) | $ | $ | ||||
| Cash | 76,718 | 142,131 | ||||
| Long-term debt | (228,189 | ) | - | |||
| Net (debt)/cash position | (151,471 | ) | 142,131 |
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Adjusted earnings and adjusted earnings per basic share
Adjusted earnings and adjusted earnings per basic share are non-IFRS financial measures and are defined by OR Royalties by excluding the following items from net earnings (loss) and net earnings (loss) per share: foreign exchange gains (losses), impairment charges and reversals related to royalty, stream and other interests, changes in allowance for expected credit losses, write-offs and impairments of investments, gains (losses) on disposal of royalty, stream and other interests (excluding gains (losses) on buy-down and buy-back of royalty, stream and other interests), gains (losses) on investments, share of income (loss) of associates, transaction costs and certain other items such as non-cash gains (losses), as well as the impact of income taxes on these items. Adjusted earnings per basic share is obtained from the adjusted earnings divided by the weighted average number of common shares outstanding for the period.
Management uses adjusted earnings and adjusted earnings per basic share to evaluate the underlying operating performance of OR Royalties as a whole for the reporting periods presented, to assist with the planning and forecasting of future operating results, and to supplement information in its consolidated financial statements. Management believes that in addition to measures prepared in accordance with IFRS Accounting Standards such as net earnings (loss) and net earnings (loss) per basic share, investors and analysts use adjusted earnings and adjusted earnings per basic share to evaluate the results of the underlying business of OR Royalties, particularly since the excluded items are typically not included in OR Royalties' annual guidance. While the adjustments to net earnings (loss) and net earnings (loss) per basic share in these measures include items that are both recurring and non-recurring, management believes that adjusted earnings and adjusted net earnings per basic share are useful measures of OR Royalties' performance because they adjust for items which may not relate to or have a disproportionate effect on the period in which they are recognized, impact the comparability of the core operating results from period to period, are not always reflective of the underlying operating performance of the business and/or are not necessarily indicative of future operating results. Adjusted net earnings and adjusted net earnings per basic share are intended to provide additional information to investors and analysts and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS Accounting Standards. They do not have any standardized meaning under IFRS Accounting Standards and may not be comparable to similar measures presented by other issuers.
A reconciliation of net earnings to adjusted earnings is presented below:
| Three months ended September 30, |
Nine months ended September 30, |
|||||||||||
| 2026 | 2025 | 2026 | 2025 | |||||||||
| (in thousands of dollars, except per share amounts) |
$ | $ | $ | $ | ||||||||
| Net earnings | 55,367 | 82,845 | 190,341 | 140,843 | ||||||||
| Adjustments: | ||||||||||||
| Foreign exchange (gain) loss | (599 | ) | (300 | ) | 2,757 | (1,125 | ) | |||||
| Share of loss of associates | - | 8,313 | - | 14,178 | ||||||||
| Net (gain) loss on investments | (1,064 | ) | 56 | (3,907 | ) | 366 | ||||||
| Impairment of royalty, stream and other interests | - | 5,495 | - | 5,495 | ||||||||
| Gain on deemed disposal of an associate | - | (54,439 | ) | - | (54,439 | ) | ||||||
| Reclassification of accumulated other comprehensive loss to the statement of income on the deemed disposal of an associate | - | 1,147 | - | 1,147 | ||||||||
| Tax impact of adjustments | 236 | (850 | ) | 273 | (586 | ) | ||||||
| Adjusted earnings | 53,940 | 42,267 | 189,464 | 105,879 | ||||||||
| Basic weighted average number of common shares outstanding (000's) | 186,641 | 188,312 | 187,268 | 187,685 | ||||||||
| Adjusted earnings per basic share | 0.29 | 0.22 | 1.01 | 0.56 | ||||||||
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Forward-Looking Statements
Certain statements contained in this MD&A may be deemed "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995, as amended, and "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking statements are statements other than statements of historical fact, that address, without limitation, future events, production estimates of OR Royalties' assets (including increase of production), the 2026 guidance on GEOs and cash margin and the 5-year outlook on GEOs included under "Guidance for 2026 and 5-Year Outlook" and other guidance based on disclosure from operators, OR Royalties' ability to continue to promote environmental stewardship, to support employees and communities and to achieve excellence in governance and oversight, timely developments of mining properties over which OR Royalties has royalties, streams, offtakes and investments, management's expectations regarding OR Royalties' growth, results of operations, estimated future revenues, production costs, carrying value of assets, ability to continue to pay dividend, requirements for additional capital, business prospects and opportunities, future demand for and fluctuation of prices of commodities (including outlook on gold, silver, diamonds, other commodities) currency, markets and general market conditions. In addition, statements and estimates (including data in tables) relating to mineral reserves and resources and statements and guidance as to gold equivalent ounces are forward-looking statements, as they involve implied assessment, based on certain estimates and assumptions, including the assumptions set out under "Guidance for 2026 and 5-Year Outlook", and no assurance can be given that the estimates or related guidance will be realized. Forward-looking statements are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential", "scheduled" and similar expressions or variations (including negative variations), or by statements that events or conditions "will", "would", "may", "could" or "should" occur. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors, most of which are beyond the control of OR Royalties, and actual results may accordingly differ materially from those in forward-looking statements. Such risk factors include, without limitation, (i) with respect to properties in which OR Royalties holds a royalty, stream or other interest; risks related to: (a) the operators of the properties, (b) timely development, permitting, construction, commencement of production, ramp-up (including operating and technical challenges), (c) differences in rate and timing of production from resource estimates or production forecasts by operators, (d) differences in conversion rate from resources to reserves and ability to replace resources, (e) the unfavorable outcome of any challenges or litigation relating to title, permit or license, (f) hazards and uncertainty associated with the business of exploring, development and mining including, but not limited to unusual or unexpected geological and metallurgical conditions, slope failures or cave-ins, flooding and other natural disasters or civil unrest or other uninsured risks; (ii) with respect to other external factors: (a) fluctuations in the prices of the commodities that drive royalties, streams, offtakes and investments held by OR Royalties, (b) a trade war or new tariff barriers, (c) fluctuations in the value of the Canadian dollar relative to the U.S. dollar, (d) regulatory changes by national and local governments, including permitting and licensing regimes and taxation policies, regulations and political or economic developments in any of the countries where properties in which OR Royalties holds a royalty, stream or other interest are located or through which they are held, (e) continued availability of capital and financing to OR Royalties or the operators of properties, and general economic, market or business conditions, and (f) responses of relevant governments to infectious diseases outbreaks and the effectiveness of such response and the potential impact of such outbreaks on OR Royalties' business, operations and financial condition; (g) impact related to climate changes or technologies which may affect the implementation of OR Royalties' climate strategy and achievement of carbon neutrality, that criteria will continue to be met to achieve improved ESG ratings, that actual facts may significantly differ from hypothesis used in any assessment scenario analysis; (h) geopolitical instability; (iii) with respect to internal factors: (a) business opportunities that may or not become available to, or are pursued by OR Royalties, (b) the integration of acquired assets (c) the determination of OR Royalties' Passive Foreign Investment Company ("PFIC") status (d) OR Royalties' ability to deliver on its climate strategy, that OR Royalties' efforts in maintaining carbon neutrality will be achieved and that any efforts toward reducing OR Royalties' carbon emission or to support decarbonization efforts of OR Royalties' partners will be successful, or (e) the availability of funds to finance community investments. The forward-looking statements contained in this MD&A are based upon assumptions management believes to be reasonable, including, without limitation: the absence of significant change in the Company's ongoing income and assets relating to determination of its PFIC status; the absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended, OR Royalties' continued commitment toward improving sustainability goals, the continued validity of science and reasonableness of hypothesis relating to climate change and assessment scenario analysis, the absence of material changes to the regulatory framework relating to climate and climate related disclosure, the compliance by directors and employees to the corporate policies, the availability of funds to continue to support community investments and, with respect to properties in which OR Royalties holds a royalty, stream or other interest, (i) the ongoing operation of the properties by the owners or operators of such properties in a manner consistent with past practice and with public disclosure (including forecast of production), (ii) the accuracy of public statements and disclosures made by the owners or operators of such underlying properties (including expectations for the development of underlying properties that are not yet in production), (iii) no adverse development in respect of any significant property, (iv) that statements and estimates relating to mineral reserves and resources by owners and operators are accurate and (v) the implementation of an adequate plan for integration of acquired assets. All forward-looking statements contained in this MD&A are expressly qualified in their entirety by the cautionary statements contained or referred to in this section.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
For additional information on risks, uncertainties and assumptions, please refer to the most recent Annual Information Form of OR Royalties filed on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov which also provides additional general assumptions in connection with these statements. OR Royalties cautions that the foregoing list of risk and uncertainties is not exhaustive. Investors and others should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. OR Royalties believes that the assumptions reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be accurate as actual results and prospective events could materially differ from those anticipated and such forward-looking statements included in this MD&A are not guarantee of future performance and should not be unduly relied upon. In this MD&A, OR Royalties relies on information publicly disclosed by other issuers and third-parties pertaining to its assets and, therefore, assumes no liability for such third-party public disclosure. This MD&A includes website addresses and references to additional materials found on those websites. These websites and information contained on or accessible through these websites are not incorporated by reference into, and do not form a part of, this MD&A or any other report or document filed by OR Royalties with the Canadian securities regulators or the SEC, and any references to any websites are intended to be inactive textual references only. These statements speak only as of the date of this MD&A. OR Royalties undertakes no obligation to publicly update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, other than as required by applicable law.
Cautionary Note to U.S. Investors Regarding the Use of Mineral Reserve and Mineral Resource Estimates
OR Royalties is subject to the reporting requirements of the applicable Canadian securities laws, and as a result, reports its mineral resources and reserves according to Canadian standards. Canadian reporting requirements for disclosure of mineral properties are governed by National Instrument 43-101 ("NI 43-101"). The definitions of NI 43-101 are adopted from those described by the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM"). In a number of cases OR Royalties has disclosed resource and reserve estimates covering properties related to the mining assets that are not based on CIM definitions, but instead have been prepared in reliance upon JORC and S-K 1300 (collectively, the "Acceptable Foreign Codes"). Estimates based on Acceptable Foreign Codes are recognized under NI 43-101 in certain circumstances. New mining disclosure rules under Subpart 1300 of Regulation S-K ("S-K 1300") became mandatory for U.S. reporting companies beginning with the first fiscal year commencing on or after January 1, 2021. CIM definitions are not identical to those of the Acceptable Foreign Codes, the resource and reserve definitions and categories are substantively the same as the CIM definitions mandated in NI 43-101 and will typically result in reporting of substantially similar reserve and resource estimates. Nonetheless, readers are cautioned that there are differences between the terms and definitions of the CIM and the Acceptable Foreign Codes, and there is no assurance that mineral reserves or mineral resources would be identical had the owner or operator prepared the reserve or resource estimates under another code. As such, certain information contained in this MD&A concerning descriptions of mineralization and estimates of mineral reserves and mineral resources under Canadian standards is not comparable to similar information made public by United States companies subject to the S-K 1300. Readers are cautioned not to assume that all or any part of Measured Mineral Resources or Indicated Mineral Resources will ever be converted into Mineral Reserves. Readers are also cautioned not to assume that all or any part of an Inferred Mineral Resource exists, or is economically or legally mineable. Further, an "Inferred Mineral Resource" has a great amount of uncertainty as to its existence and as to its economic and legal feasibility, and a reader cannot assume that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or other economic studies.
| OR Royalties Inc. | Management’s Discussion and Analysis |
| 2026 – Third Quarter Report |
Corporate Information
| OR Royalties Inc. - Head Office | OR Royalties International Ltd. |
| 1100 av. des Canadiens-de-Montréal | Cumberland House |
| Suite 300 | 1 Victoria Street |
| Montréal, Québec, Canada H3B 2S2 | Hamilton HM11 |
| Tel.: (514) 940-0670 | Bermuda |
| Fax: (514) 940-0669 | Tel.: (441) 824-7474 |
| Email: info@ORroyalties.com | Fax: (441) 292-6140 |
| Web site: www.ORroyalties.com | Michael Spencer, President Brendan Pidcock, Vice President, Technical Services |
| OR Royalties Inc. - Toronto Office | |
| 100 King Street West | |
| Suite 5710 | |
| Toronto, Ontario, Canada M5X 1K1 | |
| Directors | Officers |
| Norman MacDonald, Chair | Jason Attew, President and Chief Executive Officer |
| Jason Attew, President and Chief Executive Officer | Guy Desharnais, Vice President, Project Evaluation |
| Patrick Godin | Iain Farmer, Vice President, Corporate Development |
| Pierre Labbé | André Le Bel, Vice President, Legal Affairs and |
| Wendy Louie | Corporate Secretary |
| Candace MacGibbon | Grant Moenting, Vice President, Capital Markets |
| Kevin Thomson | Frédéric Ruel, Vice President, Finance and Chief |
| Financial Officer | |
| Heather Taylor, Vice President, Sustainability | |
| and Communications |
Qualified Person (as defined by NI 43-101)
Guy Desharnais, Ph.D., P.Geo, Vice President, Project Evaluation
Exchange listings - common shares
Toronto Stock Exchange: OR
New York Stock Exchange: OR
Dividend Reinvestment Plan
Information available at https://ORroyalties.com/dividends/drip/
Transfer Agents
Canada: TSX Trust Company (Canada)
United States of America: American Stock Transfer & Trust Company, LLC
Auditor
PricewaterhouseCoopers LLP