IMPORTANT NOTICE This Technical Report Summary (“TRS”) has been prepared for Harmony Gold Mining Company Limited in support of disclosure and filing requirements with the United States Securities and Exchange Commission (“SEC”) under Subpart 1300 of Regulation S-K and Section 229.601(b)(96) of Regulation S-K. The quality of information, estimates, and conclusions contained in this Technical Report Summary apply as of the effective date of this report. Subsequent events that may have occurred since that date may have resulted in material changes to such information, estimates and conclusions in this summary. |
1Executive Summary ...................................................................................................................................... | |
2Introduction ................................................................................................................................................... | |
3Property Description and Location ............................................................................................................... | |
3.1Mineral Tenure ............................................................................................................................... | |
3.2Property Permitting Requirements ................................................................................................ | |
4Accessibility, Climate, Local Resources, Infrastructure and Physiography ................................................... | |
4.1Accessibility .................................................................................................................................... | |
4.2Physiography and Climate .............................................................................................................. | |
4.3Local Resources and Infrastructure ................................................................................................ | |
5.1Historical Ownership and Development ........................................................................................ | |
5.2Historical Exploration ..................................................................................................................... | |
5.3Previous Mineral Resource and Mineral Reserve Estimates .......................................................... | |
5.4Past Production .............................................................................................................................. | |
6Geological Setting, Mineralization and Deposit ............................................................................................ | |
6.1Regional Geology ............................................................................................................................ | |
6.2Local Geology .................................................................................................................................. | |
6.3Property Geology ............................................................................................................................ | |
6.3.1Basal Reef Lithology ......................................................................................................... | |
6.3.2B Reef Lithology ............................................................................................................... | |
6.4Mineralization ................................................................................................................................. | |
6.4.1Basal Reef ........................................................................................................................ | |
6.4.3Alteration ......................................................................................................................... | |
6.5Deposit Type ................................................................................................................................... | |
6.6Commentary on Geological Setting, Mineralization and Deposit .................................................. | |
7Exploration .................................................................................................................................................... | |
7.1Geophysical Surveys ....................................................................................................................... | |
7.2Topographic Surveys ...................................................................................................................... | |
7.3Underground Mapping ................................................................................................................... | |
7.4Channel Sampling Methods and Sample Quality ........................................................................... | |
7.5Surface Drilling Campaigns, Procedures, Sampling, Recoveries and Results ................................. | |
7.5.1Drilling Methods .............................................................................................................. | |
7.5.2Collar and Downhole Surveys .......................................................................................... | |
7.5.3Logging Procedures .......................................................................................................... | |
7.5.4Drilling Results ................................................................................................................. | |
7.5.5Core Recovery .................................................................................................................. | |
7.5.6Sample Length and True Thickness ................................................................................. | |
7.6Underground Drilling Campaigns, Procedures and Sampling ........................................................ | |
7.6.1Drilling Methods .............................................................................................................. | |
7.6.2Collar and Downhole Surveys .......................................................................................... | |
7.6.3Logging Procedures .......................................................................................................... | |
7.6.4Drilling Results ................................................................................................................. | |
7.6.5Core Recovery .................................................................................................................. | |
7.6.6Sample Length and True Thickness ................................................................................. | |
7.7Hydrogeology .................................................................................................................................. | |
7.8Geotechnical Data .......................................................................................................................... | |
7.9Commentary on Exploration .......................................................................................................... | |
8Sample Preparation, Analyses and Security .................................................................................................. |
8.1Sampling Method and Approach .................................................................................................... | |
8.1.1Channel Samples .............................................................................................................. | |
8.1.2Core Samples ................................................................................................................... | |
8.2Density Determination ................................................................................................................... | |
8.3Sample Security .............................................................................................................................. | |
8.4Sample Storage ............................................................................................................................... | |
8.5Laboratories Used ........................................................................................................................... | |
8.6Laboratory Sample Preparation ..................................................................................................... | |
8.7Assaying Methods and Analytical Procedures................................................................................ | |
8.8.1Certified Reference Material ........................................................................................... | |
8.8.3Duplicates ........................................................................................................................ | |
8.9Comment on Sample Preparation, Analyses and Security .............................................. | |
9Data verification ........................................................................................................................................... | |
9.2Data Verification Procedures .......................................................................................................... | |
9.3Limitations to the Data Verification ............................................................................................... | |
9.4Comment on Data Verification ....................................................................................................... | |
10Mineral Processing and Metallurgical Testing .............................................................................................. | |
10.1Introduction .................................................................................................................................... | |
10.2Sampling and Testing Methodologies ............................................................................................ | |
10.2.1Systematic and Continuous Sampling .............................................................................. | |
10.2.2Composite Sampling ........................................................................................................ | |
10.2.3Calibration and Verification of Equipment ...................................................................... | |
10.2.4Specific Testing Procedures ............................................................................................. | |
10.2.5Analytical Laboratories .................................................................................................... | |
10.3Data Validation and Quality Control .............................................................................................. | |
10.3.1Statistical Analysis ............................................................................................................ | |
10.3.2Continuous Improvement ................................................................................................ | |
10.4Recovery Estimates and Processing Factors ................................................................................... | |
10.4.1Detailed Calculation of Recovery Estimates .................................................................... | |
10.4.2Head Grade and Residue Grade ...................................................................................... | |
10.4.3Adjustments for Solution and Carbon Adsorption .......................................................... | |
10.4.4Integration of Bottle Roll Tests for Baseline Recovery Rates .......................................... | |
10.4.5Processing Factors Affecting Recovery ............................................................................ | |
10.4.6Gold Inventory Management and Accountability ........................................................... | |
10.5Conclusion ...................................................................................................................................... | |
11Mineral Resource Estimate ........................................................................................................................... | |
11.1Geological Database ....................................................................................................................... | |
11.2Global Statistics .............................................................................................................................. | |
11.3Geological Interpretation ............................................................................................................... | |
11.4Structural Wireframe Model .......................................................................................................... | |
11.5Compositing .................................................................................................................................... | |
11.7Variography .................................................................................................................................... | |
11.8Mineral Resource Estimation Methods and Parameters ............................................................... | |
11.9Density Assignment ........................................................................................................................ | |
11.10Model Validation ............................................................................................................................ | |
11.11Mineral Resource Evaluation .......................................................................................................... | |
11.12Mineral Resource Classification and Uncertainties ........................................................................ |
11.13Mineral Resource Estimate ............................................................................................................ | |
11.14Mineral Resource Reconciliation .................................................................................................... | |
11.15Comment on Mineral Resource Estimates ..................................................................................... | |
12Mineral Reserve Estimate ............................................................................................................................. | |
12.1Tshepong South .............................................................................................................................. | |
12.1.2Modifying Factors ........................................................................................................................... | |
12.1.3Mineral Reserve Estimate ............................................................................................................... | |
12.1.4Mineral Reserve Reconciliation ..................................................................................................... | |
12.2Commentary on Mineral Reserve Estimate ................................................................................... | |
13Mining Methods ............................................................................................................................................ | |
13.1Mining Operations .......................................................................................................................... | |
13.1.1Tshepong South ............................................................................................................... | |
13.1.2Scattered Mining Method ................................................................................................ | |
13.1.3Open Stoping and Undercut Stoping ............................................................................... | |
13.1.4Integrated Approach ........................................................................................................ | |
13.2Mine Design .................................................................................................................................... | |
13.2.1Mine Design Parameters ................................................................................................. | |
13.3Geotechnical Considerations and Seismic Monitoring ................................................................... | |
13.4Geotechnical Geohydrological Considerations .............................................................................. | |
13.5Mine Plan Development and Reserve Schedule ............................................................................ | |
13.6Mining Rates ................................................................................................................................... | |
13.7Grade and Dilution Control ............................................................................................................ | |
13.8Mining Equipment and Machinery ................................................................................................. | |
13.9Ore transport .................................................................................................................................. | |
13.10Mining Personnel ............................................................................................................................ | |
13.11Commentary on Mining Methods .................................................................................................. | |
14Processing and Recovery Methods ............................................................................................................... | |
14.1Mineral Processing Description ...................................................................................................... | |
14.2Plant Throughput, Design, Equipment Characteristics and Specifications .................................... | |
14.3Energy, Water, Process Material and Personnel Requirements .................................................... | |
14.3.3Process Material .............................................................................................................. | |
14.4Commentary on the Processing and Recovery Methods ............................................................... | |
15Infrastructure ................................................................................................................................................ | |
15.1Surface Infrastructure ..................................................................................................................... | |
15.1.1Ore and Waste Rock Storage Facilities ............................................................................ | |
15.1.2Tailings Storage Facilities ................................................................................................. | |
15.2Underground Infrastructure and Shafts ......................................................................................... | |
15.2.1RailVeyorTM ..................................................................................................................... | |
15.3Power and Electrical ....................................................................................................................... | |
15.4Water Usage ................................................................................................................................... | |
15.5Logistics and Supply ........................................................................................................................ | |
15.6Commentary on Infrastructure ...................................................................................................... | |
16Market Studies .............................................................................................................................................. | |
16.1Market Overview ............................................................................................................................ | |
16.2Global Production and Supply ........................................................................................................ | |
16.2.1New Mine Production ...................................................................................................... |
16.3Global Consumption and Demand ................................................................................................. | |
16.3.2Investment ....................................................................................................................... | |
16.3.3The USD Currency and Gold............................................................................................. | |
16.4Gold Price ........................................................................................................................................ | |
16.4.1Historical Gold Price ......................................................................................................... | |
16.4.2Forecast Gold Price .......................................................................................................... | |
16.4.3Harmony Group Gold Hedging Policy .............................................................................. | |
16.5Commentary on Market Studies .................................................................................................... | |
16.6Material Contracts .......................................................................................................................... | |
17Environmental Studies, Permitting and Plans, Negotiations, or Agreements with Local Individuals or Groups ........................................................................................................................................................... | |
17.1Results of Environmental Studies ................................................................................................... | |
17.2Waste and Tailings Disposal, Monitoring & Water Management .................................................. | |
17.3Permitting and Licenses .................................................................................................................. | |
17.4Local Stakeholder Plans and Agreements ...................................................................................... | |
17.5Mine Closure Plans ......................................................................................................................... | |
Groups ............................................................................................................................................ | |
17.7Local Procurement and Hiring ........................................................................................................ | |
with Local Individuals or Groups .................................................................................................... | |
18Capital and Operating Costs .......................................................................................................................... | |
18.1Capital Costs ................................................................................................................................... | |
18.2Operating Costs .............................................................................................................................. | |
18.3Comment on Capital and Operating Costs ..................................................................................... | |
19Economic Analysis ........................................................................................................................................ | |
19.1Key Economic Assumptions and Parameters ................................................................................. | |
19.1.1Gold Price ......................................................................................................................... | |
19.1.2Exchange Rate .................................................................................................................. | |
19.1.5Closure Cost and Salvage Value ....................................................................................... | |
19.2Economic Analysis ......................................................................................................................... | |
19.3Sensitivity Analysis .......................................................................................................................... | |
20Adjacent properties ....................................................................................................................................... | |
21Other Relevant Data and Information .......................................................................................................... | |
22Interpretation and Conclusions ..................................................................................................................... | |
23Recommendations ....................................................................................................................................... | |
24References ..................................................................................................................................................... | |
25Reliance on Information Provided by the Registrant .................................................................................... |
Figure 3-1: Location of Tshepong South in the Free State Goldfield ............................................................................ | |
Figure 3-2: Mineral Tenure for Tshepong South .......................................................................................................... | |
Figure 5-1: Graph of past production – Tonnes and grade ........................................................................................... | |
Figure 5-2: Graph of past metal production ................................................................................................................ | |
Figure 6-1: Regional geology of the Witwatersrand Basin ........................................................................................... | |
Figure 6-2: Simplified stratigraphy of the Free State Goldfield .................................................................................... | |
Figure 6-3: Structural geology of the Free State Goldfields ......................................................................................... | |
Figure 6-4: Tshepong South Cross Section .................................................................................................................... | |
Figure 7-1: Location of channel samples collected from the Basal Reef ..................................................................... | |
Figure 7-2: Location of channel samples collected from the B Reef ............................................................................ | |
Figure 7-3: Location of surface and underground drill holes on the Basal Reef ........................................................... | |
Figure 7-4: Location of surface and underground drill holes on the B Reef ................................................................. | |
Figure 11-1: Tshepong operations Basal and B Reef Geozones .................................................................................... | |
Figure 11-2: Tshepong operations Basal Reef and B Reef estimation results .............................................................. | |
Reef .............................................................................................................................................................. | |
B Reef ........................................................................................................................................................... | |
Figure 13-1: Schematic representation of the scattered mining sequence ................................................................. | |
Figure 13-1A: Schematic representation of the sequential mining method. ............................................................... | |
Figure 13-2 Tshepong South mine Mineral Reserves plan ........................................................................................... | |
Figure 13-3: Graph of Tshepong South mine Mineral Reserves plan – Tonnes and grade .......................................... | |
Figure 13-4: Graph of Tshepong South mine Mineral Reserves plan – Gold produced (oz) ........................................ | |
Figure 13-5: Tshepong South shaft and underground infrastructure ........................................................................... | |
Figure 14-1: Schematic flow diagram of the metallurgical process .............................................................................. | |
Figure 14-2: Graph of historical recovery factor (18 month actual) ............................................................................. | |
Figure 15-1: Tshepong South surface layout and infrastructure .................................................................................. | |
Figure 15-2: Tshepong South detailed surface infrastructure ...................................................................................... | |
Figure 15-3: Nyala detailed surface infrastructure ....................................................................................................... | |
Figure 15-4: Harmony One Plant detailed surface infrastructure ................................................................................ | |
Figure 16-2 World Gold Council: Total Gold Supply & Demand ................................................................................... | |
Figure 16-3: World Gold Council: Daily Gold Price (ZAR/oz & USD/oz) ........................................................................ | |
Figure 19-1: Annual Calendar Year Exchange Rates and ETSA Forecast ....................................................................... |
Table 1-2: Summary of Tshepong South Mineral Reserves as at 30 June 2026 ........................................................... | |
Table 1-3: Summary of capital cost estimate for Tshepong South ............................................................................... | |
Table 1-4: Summary of operating cost estimate for Tshepong South .......................................................................... | |
Table 1-5: Status of environmental permits and licenses ............................................................................................. | |
Table 2-1: QP qualification, section responsibilities and personal inspections ............................................................ | |
Table 3-1: Summary of mining rights for Tshepong South ........................................................................................... | |
Table 5-1: Summary of historical ownership changes and activities of Tshepong South ............................................. | |
Reserves) ...................................................................................................................................................... | |
Table 5-3: Summary of the previous Tshepong South Mineral Reserves as at 30 June 2025 ...................................... | |
Table 7-1: Summary of surface and underground drilling intersecting reef for Tshepong South ................................ | |
Table 7-2: Drill hole acceptance criteria ....................................................................................................................... | |
Table 7-3: Summary of recent Tshepong South underground drill holes intersecting the Basal Reef ........................ | |
Table 7-4: Summary of recent Tshepong South underground drill holes intersecting the B Reef ............................... | |
Table 7-5: Summary of surface boreholes for Tshepong South and North .................................................................. | |
Table 8-1: Summary of Harmony Assay Laboratory CRM performance for Tshepong South ...................................... | |
Table 8-2: Summary of Type of CRM used .................................................................................................................... | |
Table 11-1: Global statistics for Basal and B Reef ......................................................................................................... | |
Table 11-2: Capping values by reef and geozone ......................................................................................................... | |
Table 11-3: Harmony economic assumptions (30 June 2026) ...................................................................................... | |
Table 11-4: Percentage fault discounts by area ............................................................................................................ | |
Table 12-1: Tshepong South modifying factors used for Mineral Reserve determination .......................................... | |
Table 12-2: Summary of Tshepong South Mineral Reserves as at 30 June 2026 ......................................................... | |
Table 13-1: Tshepong South mine design parameters ................................................................................................. | |
Table 13-2: Tshepong South mine mining personnel ................................................................................................... | |
Table 14-1: Key design parameters and equipment specifications ............................................................................. | |
Table 14-2: Harmony One Plant consumables .............................................................................................................. | |
Table 14-3: Harmony One Plant personnel ................................................................................................................... | |
Table 16-1 Consensus view of forecast gold price US$/Oz ........................................................................................... | |
Table 16-2: Material contracts ...................................................................................................................................... | |
Table 17-1: Status of environmental permits and licenses ........................................................................................... | |
Table 17-2: Mine closure liability .................................................................................................................................. | |
Table 17-3: Rehabilitation assurance ............................................................................................................................ | |
Table 18-1: Summary of capital cost estimate for Tshepong South ............................................................................ | |
Table 18-2: Summary of operating cost estimate for Tshepong South ........................................................................ | |
Table 19-1: Conversions used in gold price calculations .............................................................................................. | |
Table 19-2: Consensus View of Forecast Exchange Rate (ZAR:USD) ............................................................................ | |
Table 19-3: ZAR:USD Exchange Rate Performance (June 2023 – June 2026) ............................................................... | |
Table 19-4: Key economic assumptions and parameters for Tshepong South cash flow ............................................ | |
Table 19-5: Tshepong South cash flow (Mineral Reserves) .......................................................................................... | |
Table 19-6: Gold price sensitivity analysis .................................................................................................................... | |
Table 19-7: Total operating cost sensitivity analysis .................................................................................................... | |
Table 19-8: Total production sensitivity analysis .......................................................................................................... | |
Table 25-1: Specialists ................................................................................................................................................... |
Unit / Abbreviation | Description or Definition |
°C | degrees Celsius |
µm | Micrometers |
2D | Two-dimensional |
3D | Three-dimensional |
AE | Abnormal expenditure |
Ag | Silver |
AngloGold Ashanti | AngloGold Ashanti Limited |
ARM | African Rainbow Minerals Limited |
ARMGold | ARM Gold Division |
Au | Gold |
AuBIS | Harmony electronic database |
Ave. | Average |
BLR | Black Reef |
BMD | Below mine datum |
Bn | Billion |
c. | Approximately |
CIP | Carbon-In-Pulp |
CLR | Carbon Leader Reef |
cm | Centimetre |
cmg/t | Centimetre-grams per tonne |
CODM | Chief Operating Decision-Maker |
Company | Harmony Gold Mining Company Limited |
COP | Code of Practice |
CRG | Central Rand Group |
CRM | Certified Reference Material |
CV | Coefficient of Variation |
DBH | Dewatering borehole |
DMPR | Department of Mineral and Petroleum Resources |
DWS | Department of Water and Sanitation |
EIA | Environmental Impact Assessment |
EMPR | Environmental Management Program |
EMS | Environmental Management System |
EMTS | Electric Monorail Transport System |
ESG | Environmental Social and Governance |
ETF | Exchange traded fund |
FAG | Fully autogenous |
FX | Foreign Exchange rate |
g | Gram |
g/t | Grams per metric tonne |
GBH | Groundwater boreholes |
GDARD | Gauteng Department of Agriculture and Rural Development |
GHG | Greenhouse gas |
GISTM | Global Industry Standard on Tailings Management |
ha | Hectare |
Harmony | Harmony Gold Mining Company Limited |
HLS | Heavy liquid separation |
HPE | Hydro-powered |
kg | Kilogram |
km | Kilometre |
Unit / Abbreviation | Description or Definition |
km2 | Square kilometre |
kWh | Kilowatt-hour |
LBMA | London Bullion Market Association |
LIB | Long Inclined Borehole |
LOM | Life of Mine |
LOI | Loss on ignition |
Ltd | Limited |
m | Metre |
M | Million |
m3/hr | Cubic meters per hour |
MCC | Mining Charter Compliance |
MCF | Mine Call Factor |
Moz | Million troy ounces |
MPRDA | Mineral and Petroleum Resources Development Act, 28 of 2002 |
Mst | Million short tons |
Mt | Million tonnes |
Mtpa | Million tonnes per annum |
Mtpm | Million tonnes per month |
NEMA | National Environmental Management Act, 107 of 1998 |
No. | Number |
NPV | Net present value |
OK | Ordinary Kriging |
oz | Troy ounce |
OTC | Over the counter |
Tshepong South | Tshepong South Mine |
Pty | Proprietary |
QA/QC | Quality Assurance/Quality Control |
QEMSCAN | Scanning electron microscope |
QP | Qualified Person |
RAW’s | Return Airways |
ROM | Run-of-Mine |
SACNASP | South African Council for Natural Scientific Professions |
SAMREC | The South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves |
SD | Standard Deviation |
SEC | Securities and Exchange Commission |
SGM | Sequential Grid Mining |
SLP | Social Labour Plan |
SMK | Simple Macro Kriging |
st | Short ton |
t | Metric tonne |
t/m3 | Tonne per cubic meter |
Target | Target Mine |
TCFD | Task Force on Climate-Related Financial Disclosure |
TMS | Trace mineral search |
TRS | Technical Report Summary |
TSF | Tailings Storage Facility |
Tshepong | Tshepong Mine |
USD or US$ | United States Dollars |
USD/oz or US$/oz | United States Dollar per troy ounce |
WBLQ | Waxy Brown Leader Quartzite |
Unit / Abbreviation | Description or Definition |
WRG | West Rand Group |
WUL(s) | Water Use License(s) |
X/C’s | Cross-cuts |
XRD | X-ray diffraction |
ZAR or R | South African Rand |
ZAR/kg or R/kg | South African Rand per kilogram |
Term | Definition |
Co-kriging | A method that is used to predict the value of the point at unobserved locations by sample points that are known to be spatially interconnected by adding other variables that have a correlation with the main variable or can also be used to predict 2 or more variables simultaneously. |
Cut-off grade | Cut-off grade is the grade (i.e., the concentration of metal or mineral in rock) that determines the destination of the material during mining. For purposes of establishing “prospects of economic extraction,” the cut-off grade is the grade that distinguishes material deemed to have no economic value (it will not be mined in underground mining or if mined in surface mining, its destination will be the waste dump) from material deemed to have economic value (its ultimate destination during mining will be a processing facility). Other terms used in similar fashion as cut-off grade include net smelter return, pay limit, and break-even stripping ratio. |
Dilution | Unmineralized rock that is by necessity, removed along with ore during the mining process that effectively lowers the overall grade of the ore. |
Head grade | The average grade of ore fed into the mill. |
Economically viable | Economically viable, when used in the context of Mineral Reserve determination, means that the qualified person has determined, using a discounted cash flow analysis, or has otherwise analytically determined, that extraction of the Mineral Reserve is economically viable under reasonable investment and market assumptions. |
Indicated Mineral Resource | Indicated Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence and sampling. The level of geological certainty associated with an Indicated Mineral Resource is sufficient to allow a qualified person to apply modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an Indicated Mineral Resource has a lower level of confidence than the level of confidence of a Measured Mineral Resource, an Indicated Mineral Resource may only be converted to a probable Mineral Reserve. |
Inferred Mineral Resource | Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The level of geological uncertainty associated with an Inferred Mineral Resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an Inferred Mineral Resource has the lowest level of geological confidence of all Mineral Resources, which prevents the application of the modifying factors in a manner useful for evaluation of economic viability, an Inferred Mineral Resource may not be considered when assessing the economic viability of a mining project and may not be converted to a Mineral Reserve. |
Kriging | A method of interpolation based on Gaussian process governed by prior covariances. It uses a limited set of sampled data points to estimate the value of a variable over a continuous spatial field |
Mine Call Factor | The ratio, expressed as a percentage, of the total quantity of recovered and unrecovered mineral product after processing with the amount estimated in the ore based on sampling. |
Measured Mineral Resource | Measured Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence and sampling. The level of geological certainty associated with a Measured Mineral Resource is sufficient to allow a qualified person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a Measured Mineral Resource has a higher level of confidence than the level of confidence of either an Indicated Mineral Resource or an Inferred Mineral Resource, a Measured Mineral Resource may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve. |
Mineral Reserve | Mineral Reserve is an estimate of tonnage and grade or quality of Indicated and Measured Mineral Resources that, in the opinion of the qualified person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a Measured or Indicated Mineral Resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. |
Mineral Resource | Mineral Resource is a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that there are reasonable prospects for eventual economic extraction. A Mineral Resource is a reasonable estimate of mineralization, taking into account relevant factors such as cut- off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralisation drilled or sampled. |
Term | Definition |
Modifying Factors | Modifying factors are the factors that a qualified person must apply to Indicated and Measured Mineral Resources and then evaluate in order to establish the economic viability of Mineral Reserves. A qualified person must apply and evaluate modifying factors to convert Measured and Indicated Mineral Resources to Proven and Probable Mineral Reserves. These factors include but are not restricted to; mining; processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations, or agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics of the modifying factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project. |
Pre-Feasibility Study | A pre-feasibility study (or preliminary feasibility study) is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a qualified person has determined (in the case of underground mining) a preferred mining method, or (in the case of surface mining) a pit configuration, and in all cases has determined an effective method of mineral processing and an effective plan to sell the product. (1) A pre-feasibility study includes a financial analysis based on reasonable assumptions, based on appropriate testing, about the modifying factors and the evaluation of any other relevant factors that are sufficient for a qualified person to determine if all or part of the Indicated and Measured Mineral Resources may be converted to Mineral Reserves at the time of reporting. The financial analysis must have the level of detail necessary to demonstrate, at the time of reporting, that extraction is economically viable. (2) A pre-feasibility study is less comprehensive and results in a lower confidence level than a feasibility study. A pre-feasibility study is more comprehensive and results in a higher confidence level than an initial assessment. |
Probable Mineral Reserve | Probable Mineral Reserve is the economically mineable part of an Indicated and, in some cases, a Measured Mineral Resource. |
Proven Mineral Reserve | Proven Mineral Reserve is the economically mineable part of a Measured Mineral Resource and can only result from conversion of a Measured Mineral Resource. |
Qualified Person | A qualified person is: (1) A mineral industry professional with at least five years of relevant experience in the type of mineralization and type of deposit under consideration and in the specific type of activity that person is undertaking on behalf of the registrant; and (2) An eligible member or licensee in good standing of a recognized professional organization at the time the technical report is prepared. For an organization to be a recognized professional organization, it must: (i) Be either: (A) An organization recognized within the mining industry as a reputable professional association; or (B) A board authorized by U.S. federal, state or foreign statute to regulate professionals in the mining, geoscience or related field; (ii) Admit eligible members primarily on the basis of their academic qualifications and experience; (iii) Establish and require compliance with professional standards of competence and ethics; (iv) Require or encourage continuing professional development; (v) Have and apply disciplinary powers, including the power to suspend or expel a member regardless of where the member practices or resides; and (vi) Provide a public list of members in good standing. |
Tailings | Finely ground rock of low residual value from which valuable minerals have been extracted is discarded and stored in a designed dam facility. |
METRIC | |||
Mineral Resource Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Measured | 6.402 | 12.34 | 79,001 |
Indicated | 9.460 | 11.02 | 104,209 |
Total / Ave. Measured + Indicated | 15.862 | 11.55 | 183,210 |
Inferred | 22.970 | 11.24 | 258,074 |
IMPERIAL | |||
Mineral Resource Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Measured | 7.057 | 0.360 | 2.540 |
Indicated | 10.428 | 0.321 | 3.350 |
Total / Ave. Measured + Indicated | 17.485 | 0.337 | 5.890 |
Inferred | 25.320 | 0.328 | 8.297 |
METRIC | |||
Mineral Reserve Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Proved | 1.404 | 5.75 | 8,071 |
Probable | 0.511 | 3.43 | 1,753 |
Total (Proved + Probable) | 1.915 | 5.13 | 9,824 |
IMPERIAL | |||
Mineral Reserve Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Proved | 1.547 | 0.168 | 0.259 |
Probable | 0.563 | 0.100 | 0.056 |
Total (Proved + Probable) | 2.111 | 0.150 | 0.316 |
Capital Cost Element (ZAR'000s) | Total Reserve plan (FY2027-FY2031) |
OCD | 1,050,616 |
AE | 138,641 |
Shaft Projects | 129,312 |
Major Projects | 16,973 |
MCC | 37,462 |
Total | 1,373,004 |
Operating Cost Element (ZAR'000) | Total Reserve Plan (FY2027-FY2031) |
Mining | 5,352,295 |
Services | 1,346,927 |
Medical Hub / Station | 323,387 |
Engineering | 5,320,034 |
Total Direct Costs | 12,342,643 |
Mine Overheads | 698,980 |
Total Cost | 13,041,624 |
Permit / License | Reference No. | Issued By | Date Granted | Validity |
Environmental Management Programme | FS 30/5/1/2/3/2/1(84)EM | DMPR | December 11, 2007 | December 10, 2029 |
Water Permit 936B. Harmony. Free State Geduld Mines. Discharge of untreated effluents | B33/2/340/31 | DWS | April 2, 1981 | LOM |
Water Permit 870B. Harmony. Discharge of untreated effluents. | B33/2/340/25 | DWS | May 27, 1991 | LOM |
Water Permit 1214N. Free State Consolidated Gold Mine. Tshepong, Freddie’s and Phakisa shafts. | B33/2/340/12 | DWS | Not indicated. | LOM |
Water Permit 1214N. Free State Consolidated Gold Mine. Tshepong, Freddie’s and Phakisa shafts. | B33/2/340/12 | DWS | Not indicated. | LOM |
Qualified Person | Professional Organization | Qualification | TRS Section Responsibility | Personal Insp. |
Mr J.P. van Deventer | SACNASP Reg nr 118515 | B.Sc Hons (Geology) | All Sections (Phakisa) | Full Time |
License Holder | License Type | Reference No. | Effective Date | Expiry Date | Area (ha) |
Freegold (Harmony) (PTY) LTD | Mining Right | FS30/5/1/84MR | 11-Dec-2007 | 10-Dec-2029 | 10798.74 |


Year | Asset History Highlights |
Tshepong South | |
1994 | Shaft sinking began. |
2002 | Harmony (as part of a 50:50 joint venture with ARMGold) acquired Phakisa from AngloGold Ashanti. |
2003 | The Phakisa Shaft Project began development. ARMGold and Harmony merged. |
2005 | Phakisa shaft completed and shaft equipping underway. |
2008 | Phakisa started production with full-scale production planned by June 2011. |
2009 | Five ice plants commissioned, improving ventilation and cooling. |
2011 | Phakisa reached full production. |
2017 | Tshepong and Phakisa merged into Tshepong operations |
2022 | Tshepong and Phakisa operations split into separate operations. |
2026 | An additional 400t KTI Ice Plant was commissioned, improving cooling capacity and redundancy. |
METRIC | |||
Mineral Resource Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Measured | 5.507 | 12.80 | 70,514 |
Indicated | 8.892 | 11.35 | 100,964 |
Total / Ave. Measured + Indicated | 14.399 | 11.91 | 171,478 |
Inferred | 22.729 | 11.33 | 257,508 |
IMPERIAL | |||
Mineral Resource Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Measured | 6.070 | 0.373 | 2.267 |
Indicated | 9.802 | 0.331 | 3.246 |
Total / Ave. Measured + Indicated | 15.873 | 0.347 | 5.513 |
Inferred | 25.055 | 0.330 | 8.279 |
METRIC | |||
Mineral Reserve Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Proven | 2.159 | 6.53 | 14,102 |
Probable | 0.423 | 3.22 | 1,362 |
Total / Ave. Proven + Probable | 2.582 | 5.99 | 15,464 |
IMPERIAL | |||
Mineral Reserve Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Proven | 2.379 | 0.191 | 0.453 |
Probable | 0.467 | 0.094 | 0.044 |
Total / Ave. Proven + Probable | 2.846 | 0.175 | 0.497 |










Year | Company | No. Drill Holes | Surface (m) | Underground (m) |
2020 | Harmony | 58 | — | 4,265 |
2021 | Harmony | 113 | — | 7,190 |
2022 | Harmony | 32 | — | 2,132 |
2023 | Harmony | 108 | — | 8,145 |
2024 | Harmony | 93 | — | 7,809 |
2025 | Harmony | 132 | — | 11,285 |
2026 | Harmony | 128 | — | 13,883 |
Total | 664 | — | 54,709 | |
Category | Comment |
Acceptable | 100% core recovery in the reef zone, or very minor loss due to reef chipping. No evidence of faulting within the reef horizon or at either contact with hanging wall or footwall lithologies. |
Minimum value | Light to moderate disking of core in the core barrel due to drilling and/or ground conditions. Visual observations indicate that the conglomerate portion of the reef is usually more prone to disking, resulting in possible gold loss. |
Faulted minimum value | If the fault loss is considered to be minor, this term may be used if the geologist is certain that only low-value internal quartzite is missing from the intersection. |
Not acceptable | Heavy disking of core which may indicate core loss, partial known core loss due to grinding. Also faulting of any description within the reef zone. |
Year | Drill Hole ID | Gold Value (cmg/t) | Ave. Channel Width (cm) | Year | Drill Hole ID | Gold Value (cmg/t) | Ave. Channel Width (cm) | Year | Drill Hole ID | Gold Value (cmg/t) | Ave. Channel Width (cm) | ||
2023 | CDD2647 | 575 | 75 | 2024 | GDD 2818 | 799 | 32 | 2025 | CDD 2930 | 898 | 51 | ||
2023 | GDD2670 | 263 | 78 | 2024 | GDD 2820 | 424 | 45 | 2025 | CDD 2931A | 715 | 58 | ||
2023 | GDD2645 | 659 | 60 | 2024 | GDD 2839 | 610 | 111 | 2025 | GDD 2958 | 1,102 | 64 | ||
2023 | GDD2646 | 3,612 | 40 | 2024 | GDD 2812 | 1,137 | 64 | 2025 | GDD 2934 | 253 | 110 | ||
2023 | GDD2668 | 25 | 39 | 2024 | GDD 2842 | 759 | 61 | 2025 | GDD 2966 | 494 | 32 | ||
2023 | GDD2682 | 733 | 71 | 2024 | GDD 2762 | 1,189 | 52 | 2025 | GDD 2907A | 110 | 62 | ||
2023 | GDD2677 | 1,014 | 107 | 2024 | GDD 2795 | 51 | 51 | 2025 | GDD 2933 | 155 | 99 | ||
2023 | GDD2652 | 1,113 | 31 | 2024 | GDD 2843 | 749 | 41 | 2025 | GDD 2985 | 435 | 117 | ||
2023 | GDD2674 | 511 | 63 | 2024 | GDD 2827 | 7,895 | 39 | 2025 | GDD 2942 | 401 | 40 | ||
2024 | GDD2675 | 347 | 46 | 2024 | GDD 2857 | 1,245 | 32 | 2025 | CDD 2960 | 1,721 | 26 | ||
2024 | GDD2673 | 361 | 46 | 2024 | GDD 2851 | 802 | 46 | 2025 | GDD 2981 | 313 | 31 | ||
2024 | GDD2719 | 481 | 43 | 2024 | GDD 2828 | 1,129 | 38 | 2025 | GDD 3011 | 551 | 54 | ||
2024 | CDD2714 | 26 | 73 | 2024 | GDD 2865 | 2,985 | 45 | 2025 | GDD 2984 | 728 | 100 | ||
2024 | GDD2710 | 15 | 31 | 2024 | CDD 2845 | 2,756 | 38 | 2025 | GDD 2991 | 942 | 66 | ||
2024 | GDD2717 | 716 | 72 | 2024 | GDD 2847 | 1,087 | 110 | 2025 | GDD 2990 | 1,877 | 53 | ||
2024 | GDD2730 | 2,109 | 143 | 2024 | GDD 2860 | 410 | 36 | 2025 | GDD 3015 | 568 | 59 | ||
2024 | GDD2742 | 1,311 | 148 | 2024 | GDD 2870 | 3,867 | 43 | 2025 | GDD 2998 | 2,014 | 80 | ||
2024 | GDD2743 | 802 | 52 | 2024 | GDD 2866 | 8 | 19 | 2025 | GDD 2993 | 890 | 61 | ||
2024 | GDD 2744 | 51 | 45 | 2024 | GDD 2825 | 793 | 6 | 2025 | GDD 3023 | 1,724 | 61 | ||
2024 | GDD 2768 | 269 | 43 | 2024 | CDD 2875 | 444 | 78 | 2025 | GDD 3020 | 1,065 | 75 | ||
2024 | GDD 2723 | 95 | 39 | 2024 | CDD 2874 | 31 | 166 | 2025 | GDD 3013 | 347 | 109 | ||
2024 | GDD 2747 | 342 | 50 | 2024 | GDD 2849 | 4,688 | 41 | 2025 | GDD 2996 | 362 | 82 | ||
2024 | GDD 2759 | 218 | 120 | 2024 | GDD 2871 | 650 | 43 | 2025 | GDD 3027 | 1,939 | 48 | ||
2024 | GDD 2774 | 4,161 | 44 | 2024 | GDD 2859 | 2,222 | 42 | 2025 | GDD 3033 | 2,623 | 65 | ||
2024 | GDD 2764 | 84 | 36 | 2024 | GDD 2822 | 679 | 36 | 2025 | GDD 3017 | 1,622 | 87 | ||
2024 | CDD 2713 | 1,023 | 40 | 2024 | GDD 2765 | 356 | 23 | 2025 | GDD 2981A | 266 | 65 | ||
2024 | GDD 2773 | 121 | 80 | 2024 | GDD 2881 | 1,131 | 97 | 2025 | GDD 3047 | 231 | 61 | ||
2024 | CDD 2755 | 62 | 29 | 2024 | GDD 2889 | 751 | 29 | 2025 | GDD 2988 | 1,874 | 41 | ||
2024 | CDD 2749 | 571 | 47 | 2024 | GDD 2892 | 1,362 | 38 | 2025 | GDD 2987 | 4,690 | 51 | ||
2024 | GDD 2772 | 918 | 59 | 2024 | GDD 2873 | 8 | 2 | 2025 | GDD 3036 | 102 | 126 | ||
2024 | GDD 2780 | 1,247 | 48 | 2024 | GDD 2887 | 1,046 | 36 | 2025 | GDD 3014 | 1,325 | 71 | ||
2024 | GDD 2781 | 606 | 44 | 2025 | GDD 2890 | 1,097 | 46 | 2025 | GDD 3046 | 1,422 | 71 | ||
2024 | GDD 2788 | 555 | 38 | 2025 | GDD 2902 | 1,166 | 56 | 2025 | GDD 3059 | 44 | 45 | ||
2024 | GDD 2790 | 841 | 87 | 2025 | GDD 2900 | 269 | 39 | 2025 | GDD3066 | 1,454 | 49 | ||
2024 | GDD 2798 | 1,532 | 39 | 2025 | GDD 2910 | 3,921 | 43 | 2025 | GDD3054 | 390 | 51 |
2024 | GDD 2784 | 149 | 16 | 2025 | GDD 2893 | 3,027 | 107 | 2025 | GDD 3037 | 1,320 | 106 | ||
2024 | GDD 2797 | 453 | 103 | 2025 | GDD 2894 | 854 | 36 | 2025 | GDD 3003 | 484 | 88 | ||
2024 | GDD 2782 | 1,661 | 28 | 2025 | GDD 2908 | 965 | 36 | 2025 | GDD 3058 | 4,441 | 55 | ||
2024 | GDD 2785 | 733 | 63 | 2025 | GDD 2891 | 32 | 45 | 2025 | GDD 3070 | 1,033 | 44 | ||
2024 | GDD 2804 | 1,216 | 70 | 2025 | GDD 2898 | 13 | 57 | 2025 | GDD 3067 | 1,166 | 64 | ||
2024 | GDD 2803 | 161 | 45 | 2025 | GDD 2852 | 868 | 37 | 2025 | GDD3077 | 929 | 48 | ||
2024 | CDD 2800 | 2,061 | 60 | 2025 | GDD 2911 | 14 | 54 | 2025 | GDD 3080 | 557 | 53 | ||
2024 | GDD 2808 | 1,049 | 44 | 2025 | GDD 2921 | 545 | 68 | 2025 | GDD 3086 | 643 | 56 | ||
2024 | GDD 2789 | 1,620 | 36 | 2025 | GDD 2872 | 590 | 57 | 2026 | GDD 3087 | 6,952 | 48 | ||
2024 | GDD 2802 | 6,634 | 45 | 2025 | CDD 2896 | 1,068 | 38 | 2026 | GDD 3089 | 2,368 | 63 | ||
2024 | GDD 2810 | 89 | 44 | 2025 | GDD 2937 | 56 | 44 | 2026 | GDD 3103 | 4,376 | 42 | ||
2024 | GDD 2817 | 195 | 71 | 2025 | GDD 2917 | 226 | 46 | 2026 | GDD 3107 | 330 | 54 | ||
2024 | GDD 2796 | 3,563 | 42 | 2025 | GDD 2944 | 290 | 39 | 2026 | GDD 3133 | 454 | 16 | ||
2024 | GDD 2794 | 4,886 | 54 | 2025 | GDD 2938 | 538 | 4 | 2026 | GDD 3156 | 1,247 | 38 | ||
2024 | GDD 2811 | 1,112 | 180 | 2025 | GDD 2941 | 800 | 36 | 2026 | GDD 3142 | 5,816 | 46 | ||
2024 | GDD 2816 | 901 | 67 | 2025 | GDD 2939 | 651 | 48 | 2026 | GDD 3135 | 365 | 74 |
Year | Drill Hole ID | Gold Value (cmg/t) | Ave. Channel Width (cm) | Year | Drill Hole ID | Gold Value (cmg/t) | Ave. Channel Width (cm) | Year | Drill Hole ID | Gold Value (cmg/t) | Ave. Channel Width (cm) | ||
2025 | GDD 3041 | 1500 | 143 | 2026 | GDD3111 | 663 | 160 | 2026 | GDD 3129 | 83 | 236 | ||
2025 | GDD3079 | 95 | 71 | 2026 | GDD 3115 | 692 | 142 | 2026 | GDD 3130 | 2379 | 162 | ||
2025 | GDD3072 | 353 | 153 | 2026 | GDD3110 | 88 | 224 | 2026 | GDD 3143 | 53 | 61 | ||
2025 | GDD3077 | 100 | 222 | 2026 | GDD 3103 | 11 | 47 | 2026 | GDD 3010 | 972 | 200 | ||
2025 | GDD 3005 | 51 | 92 | 2026 | GDD 3131 | 5666 | 276 | 2026 | GDD 3124 | 469 | 97 | ||
2025 | GDD 3080 | 124 | 101 | 2026 | GDD 3137 | 717 | 288 | 2026 | GDD 3133 | 258 | 180 | ||
2025 | GDD 3088 | 674 | 152 | 2026 | GDD 3093 | 2499 | 276 | 2026 | GDD 3151 | 627 | 301 | ||
2025 | GDD 3076 | 180 | 161 | 2026 | GDD3140 | 263 | 79 | 2026 | GDD 3155 | 122 | 64 | ||
2026 | GDD 3087 | 1356 | 68 | 2026 | GDD3000 | 584 | 308 | 2026 | GDD 3154 | 101 | 173 | ||
2026 | GDD 3099 | 450 | 168 | 2026 | GDD3120 | 2219 | 146 | 2026 | GDD 3150 | 87 | 173 | ||
2026 | GDD 3089 | 94 | 102 | 2026 | GDD3119 | 76 | 91 | 2026 | GDD 3160 | 172 | 91 | ||
2026 | GDD 3095 | 77 | 73 | 2026 | GDD 3007 | 164 | 223 | 2026 | GDD 3122 | 691 | 60 | ||
2026 | GDD 3100 | 378 | 164 | 2026 | GDD3127 | 483 | 394 | 2026 | GDD 3122 | 799 | 49 | ||
2026 | GDD 3091 | 72 | 118 | 2026 | GDD 3128 | 497 | 167 | 2026 | GDD 3164 | 448 | 95 | ||
2026 | GDD 3105 | 86 | 159 | 2026 | GDD 3107 | 1216 | 85 | 2026 | GDD 3162 | 1333 | 180 | ||
2026 | GDD 3108 | 50 | 48 | 2026 | GDD 3141 | 219 | 37 | 2026 | GDD 3168 | 228 | 74 | ||
2026 | GDD 3101 | 12 | 28 | 2026 | GDD 3008 | 173 | 278 | 2026 | GDD 3163 | 477 | 181 | ||
2026 | GDD 3112 | 97 | 16 | 2026 | GDD 3009 | 150 | 108 |
Summary of Surface Boreholes for Tshepong South and North | ||||
Drill Hole ID | Reef Type | Gold Value (cmg/t) | Reef Type | Gold Value (cmg/t) |
UT1 | Basal | 1720 | B Reef | Tr |
UT2 | Basal | 224 | B Reef | 514 |
UT3 | Basal | 1696 | B Reef | 845 |
UT4 | Basal | 605 | B Reef | 216 |
AR5A | Basal | 630 | B Reef | |
AL5 | Basal | 479 | B Reef | 159 |
ELD3 | Basal | 1228 | B Reef | 731 |
LB5 | Basal | 763 | B Reef | 2427 |
NK2 | Basal | 652 | B Reef | Tr |
EV10 | Basal | B Reef | 1429 | |
Quality Control Material Type | No. of Samples Submitted | No. of Failed Samples | Action Taken |
CRM 0887 | 490 | 37 | Re-assays were requested, if a sample failed the 2nd time the sample sheet was deleted from the system. |
CRM 0785 | 131 | 4 | Re-assays were requested, if a sample failed the 2nd time the sample sheet was deleted from the system. |
CRM 0466 | 361 | 37 | Re-assays were requested, if a sample failed the 2nd time the sample sheet was deleted from the system. |
Coarse Blanks 19mm | 1,581 | 59 | Re-assays were requested, if a sample failed the 2nd time the sample sheet was deleted from the system. |
Coarse Blanks 4mm | 460 | 13 | Re-assays were requested, if a sample failed the 2nd time the sample sheet was deleted from the system. |
Total | 3,023 | 150 |
Quality Control Material Type | Certified Value (Au g/t) | 2 Std Deviations | Harmony Assay Lab | ||
UL | LL | Analysis | Outliers / Failures | ||
AMIS 0785 | 5.53 | 6.325 | 4.735 | 131 | 4 |
AMIS 0887 | 17.41 | 18.625 | 16.195 | 490 | 37 |
AMIS 0466 | 42.4 | 45.1 | 39.7 | 361 | 37 |
Quality Control Material Type | Expected Value (Au g/t) | 2x Detection Limit | Harmony Assay Lab | ||
UL | LL | Analysis | Outliers / Failures | ||
Coarse Blanks 19mm | 0.063 | 0.189 | 0.063 | 1581 | 59 |
Coarse Blanks 4mm | 0.063 | 0.189 | 0.063 | 460 | 13 |
Recovery | = | (Head Grade – Residual Grade) | × | 100% |
Head Grade |
Recovery | = | Gold Produced |
GAF |
GAF | = | Gold Produced + Residue Gold |
GCF | = | Gold Delivered + ΔTotal Plant Inventory |
PCF | = | GAF | × | 100% |
GCF |
Pulp Call | = | Pulp Head Gold + ΔTreatment Inventory – Residue Gold |
Reef / Geozone | No. Samples | Minimum (cmg/t Au) | Maximum (cmg/t Au) | Mean (cmg/t Au) | Variance | SD (cmg/t Au) | COV |
Basal Reef | |||||||
1 | 3,167 | — | 7,377 | 643 | 360,753 | 600 | 0.001 |
2 | 59,700 | — | 32,511 | 982 | 1,166,133 | 1,080 | 0.001 |
3 | 128,341 | — | 62,313 | 1,598 | 2,684,434 | 1,638 | 0.001 |
4 | 13,850 | — | 13,066 | 694 | 490,522 | 700 | 0.001 |
5 | 137,444 | — | 65,195 | 1,218 | 1,350,853 | 1,162 | 0.001 |
6 | 44,836 | — | 32,215 | 867 | 803,918 | 897 | 0.001 |
7 | 29 | 0.02 | 1,528 | 252 | 88,330 | 297 | 0.001 |
8 | 34,757 | — | 5,140 | 1,939 | 2,400,199 | 1,549 | 0.001 |
9 | 22,028 | — | 33,943 | 943 | 947,616 | 973 | 0.001 |
10 | 47,368 | — | 263,632 | 2,292 | 5,351,445 | 2,313 | 0.001 |
11 | 3,862 | — | 3,956 | 1,303 | 853,670 | 924 | 0.001 |
12 | 46,557 | — | 11,386 | 1,028 | 1,075,541 | 1,037 | 0.001 |
13 | 4 | 0.53 | 1,218 | 967 | 70,256 | 265 | — |
B Reef | |||||||
1 | 761 | 1.00 | 26,112 | 900 | 3,830,141 | 1,957 | 0.002 |
2 | 1,594 | 1.00 | 10,437 | 1,091 | 1,364,556 | 1,168 | 0.001 |
3 | 7,189 | 0.40 | 61,987 | 848 | 4,397,611 | 2,097 | 0.002 |
4 | 43,692 | 0.44 | 188,462 | 1,784 | 18,638,538 | 4,317 | 0.002 |
5 | 5,923 | 0.80 | 132,958 | 1,485 | 22,357,658 | 4,728 | 0.003 |
6 | 4,835 | 0.32 | 367,721 | 2,125 | 21,385,991 | 14,623 | 0.007 |
7 | 4,136 | 0.91 | 127,457 | 4,828 | 57,162,731 | 7,560 | 0.002 |
Total | 610,073 | ||||||

Geozone | Gold Cut (cmg/t) (Max) | CW Cut (cm) (Max) | Geozone | Gold Cut (cmg/t) (Max) | CW Cut (cm) (Max) | |
Basal Reef | B Reef | |||||
1 | 2,272 | 20 | 1 | 8,002 | 170 | |
2 | 4,023 | 123 | 2 | 4,474 | 218 | |
3 | 6,194 | 137 | 3 | 5,201 | 217 | |
4 | 2,511 | 20 | 4 | 11,378 | 210 | |
5 | 4,427 | 37 | 5 | 10,510 | 199 | |
6 | 3,279 | 27 | 6 | 15,433 | 171 | |
7 | 1,528 | 33 | 7 | 26,112 | 227 | |
8 | 5,073 | 77 | ||||
9 | 3,408 | 98 | ||||
10 | 7,762 | 65 | ||||
11 | 3,956 | 58 | ||||
12 | 4,893 | 40 | ||||
13 | 1,218 | 46 | ||||

Tshepong South | ||
Description | Unit | Value |
Gold price | USD/oz | 3,061 |
FX rate | ZAR:USD | 17.60 |
Gold price | ZAR/kg | 1,730,000 |
Plant recovery factor | % | 95.32 |
Unit cost | ZAR/t | 6,482 |
Area | P | Q | I |
PN1 | 4.2 | 7.3 | 10.5 |
PDN | 4.2 | 7.3 | 10.5 |
PDS | 4.2 | 8.8 | 13.3 |
PS1 | 4.2 | 8.8 | 13.3 |
PS2 | 4.2 | 8.8 | 13.3 |
PS3 | 4.2 | 8.8 | 13.3 |
PS4 | 4.2 | 4.1 | 4.0 |
PS5 | 5.0 | 7.3 | 10.5 |
PS6 | 5.0 | 7.3 | 10.5 |
PN1BR | 4.2 | 7 | 60.0 |
PS2BR | 4.2 | 7 | 60.0 |
PS3BR | 4.2 | 7 | 60.0 |
PS5BR | 4.2 | 7 | 60.0 |


METRIC | |||
Mineral Resource Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Measured | 6.402 | 12.34 | 79,001 |
Indicated | 9.460 | 11.02 | 104,209 |
Total / Ave. Measured + Indicated | 15.862 | 11.55 | 183,210 |
Inferred | 22.970 | 11.24 | 258,074 |
IMPERIAL | |||
Mineral Resource Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Measured | 7.057 | 0.360 | 2.540 |
Indicated | 10.428 | 0.321 | 3.350 |
Total / Ave. Measured + Indicated | 17.485 | 0.337 | 5.890 |
Inferred | 25.320 | 0.328 | 8.297 |
Modifying Factor | Unit | Value |
Relative Density | t/m3 | 2.72 |
Stoping Width | cm | 143 |
Gully | % | 6.92 |
Off Reef | % | 5.24 |
Waste to Reef | % | 0.23 |
Flushing tonnes | % | — |
Discrepancy | % | 12.73 |
Mine Call Factor | % | 80.00 |
Plant Recover Factor | % | 95.32 |
Mine Recover Factor | % | 76.26 |
Plant Call Factor | % | 100.00 |
Mineral Reserve cut-off | cmg/t | 752 |
METRIC | |||
Mineral Reserve Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Proved | 1.404 | 5.75 | 8,071 |
Probable | 0.511 | 3.43 | 1,753 |
Total (Proved + Probable) | 1.915 | 5.13 | 9,824 |
IMPERIAL | |||
Mineral Reserve Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Proved | 1.547 | 0.168 | 0.259 |
Probable | 0.563 | 0.100 | 0.056 |
Total (Proved + Probable) | 2.111 | 0.150 | 0.316 |


Parameter | Unit | Value |
Regional Stability | ||
Dip stabilizing pillar dimensions | ||
Strike span | m | 160 |
Dip span | m | N/A |
Strike stability pillar spacing¹ | m | N/A |
Access haulages middling to reef | m | 90 |
Primary Development | ||
Advance | m/month | 30 |
Crosscut spacing | m | 160 |
Secondary Development | ||
Advance | m/month | 16 |
Stoping Parameters | ||
CW < 80cm (Basal Reef) | m | 132 |
CW > 80cm (B Reef) | m | 150 |
Economic Parameters | ||
Cut-off grade (planning) | cmg/t | 752 |
RD | 2.72 | |



Equipment description | Application | Number in use |
Compressed air hand held drills | Development | 157 |
Compressed air hand held drills | Stoping | 310 |
Drop raise S36 compressed air machine | Development - Orepasses | 4 |
Battery charged Locomotives | Tramming of Hopper with ore | 53 |
Salzgitter Loaders | Loading of Broken ore | 38 |
Labour Requirement | No. of Employees |
Services | 319 |
Engineering | 757 |
Mining | 1,969 |
Contractors | 429 |
Total Employees | 3,474 |


Process | Parameter | Unit | Value |
Overall Plant | Recovery | % | 94 |
Availability | % | 100 | |
Milling | Throughput ROM | t/hr | 90 -100 |
Densification | Desired pH | pH | >10.5 |
Desired Density | g/cm3 | 1.45 - 1.50 | |
Leaching | Residence Time | hr | 27 |
Acid wash and elution | Elution Temperature | °C | 130 (Ambient) |
Equipment | Unit | Value |
Lime | tpm | 882.00 |
Flocculant | tpm | 43.00 |
Cyanide | tpm | 9.89 |
Carbon | tpm | 789.00 |
Personnel | No. |
Services | 57 |
Engineering | 77 |
Metallurgy | 137 |
Contractors | 245 |
Total | 517 |








Institutions | 2026 | 2027 | 2028 |
World Bank: Development | 4,700 | 4,300 | — |
BMO Capital Markets | 5,000 | 4,700 | — |
Scotiabank | 4,500 | 4,050 | — |
Nedbank | 4,646 | 4,540 | 4,490 |
Fitch Solutions | 4,500 | 3,800 | 3,300 |
S&P Global | 4,747 | 4,752 | 4,427 |
Australian Government | 4,049 | 3,788 | — |
Average | 4,592 | 4,276 | 4,073 |
Vendor Name | Nature of Service / Supply |
Axis Mining & Construction cc | Underground Support services |
Genflo Mine Vacuum Systems SA (Pty) Ltd | Shaft Bottom Cleaning at Nyala Shaft |
Transnet Limited (t/a Spoornet) | Rail transportation of ore and waste |
Lesedi Drilling & Mining Company (Pty) Limited | Underground diamond drilling at Tshepong South operations |
Bidvest Protea Coin (Pty) Ltd | Security services |
Permit / License | Reference No. | Issued By | Date Granted | Validity |
Environmental Management Programme | FS 30/5/1/2/3/2/1(84)EM | DMPR | December 11, 2007 | December 10, 2029 |
Water Permit 936B. Harmony. Free State Geduld Mines. Discharge of untreated effluents | B33/2/340/31 | DWS | April 2, 1981 | LOM |
Water Permit 870B. Harmony. Discharge of untreated effluents. | B33/2/340/25 | DWS | May 27, 1991 | LOM |
Water Permit 1214N. Free State Consolidated Gold Mine. Tshepong, Freddie’s and Phakisa shafts. | B33/2/340/12 | DWS | Not indicated. | LOM |
Water Permit 1214N. Free State Consolidated Gold Mine. Tshepong, Freddie’s and Phakisa shafts. | B33/2/340/12 | DWS | Not indicated. | LOM |
Area | Total Closure Cost (ZAR) |
Western Holdings 5 Shaft | R11,192,698 |
Eland Shaft and Freddies 6 | R19,459,481 |
Nyala Shaft | R88,394,451 |
Tailings Dams - North | R332,265,102 |
Tshepong South (Phakisa) | R22,625,202 |
North Shaft/Tshepong | R46,969,482 |
Sable Shaft | R6,364,800 |
Kudu Shaft | R9,641,039 |
Sewage Treatment Plant | R5,699,864 |
Flotation Plant | R8,263,062 |
Grand Total | R550,875,181 |
Area | Trust Fund (ZAR) | Bank Guarantee (ZAR) | Total (ZAR) |
Tshepong and Matjhabeng Operation | 1,569,773,993 | 0 | 1,569,773,993 |
Tshepong South (Phakisa) | Included in above | ||
Total | 1,569,773,993 | 0 | 1,569,773,993 |
Capital Cost Element (ZAR'000s) | Total Reserve plan (FY2027-FY2031) |
OCD | 1,050,616 |
AE | 138,641 |
Shaft Projects | 129,312 |
Major Projects | 16,973 |
MCC | 37,462 |
Total | 1,373,004 |
Operating Cost Element (ZAR'000) | Total Reserve Plan (FY2027-FY2031) |
Mining | 5,352,295 |
Services | 1,346,927 |
Medical Hub / Station | 323,387 |
Engineering | 5,320,034 |
Total Direct Costs | 12,342,643 |
Mine Overheads | 698,980 |
Total Cost | 13,041,624 |
Economic Factors | Gold Price (US$/oz) | Conversion Factor (oz/kg) | Exchange Rate (ZAR:USD) | Gold Price (ZAR/kg) |
2026 Mineral Resource | 3,061 | 32.15 | 17.60 | 1,730,000 |
2026 Mineral Reserve | 2,915 | 32.15 | 17.60 | 1,650,000 |

Institutions | 2026 | 2027 | 2028 |
Nedbank | 16.60 | 16.40 | 16.40 |
Investec | 16.29 | 15.81 | 15.85 |
FNB | 16.90 | 17.90 | 18.80 |
IDC | 16.64 | 16.87 | 17.01 |
AVERAGE | 16.61 | 16.75 | 17.02 |
Period | Average Exchange Rate (ZAR:USD) |
July 2023 to June 2024 | 18.70 |
July 2024 to June 2025 | 18.15 |
July 2025 to June 2026 | 16.89 |
3-Year Ave. (not weighted) | 17.91 |
Parameter | Unit | Value |
Production Rate (milled) | ktpm | 39,890 |
Gold Recovery | % | 95.32 |
Royalty | % | Formula |
Tax Rate | % | Formula |
Gold Price | ZAR/kg | 1,650,000 |
Exchange Rate | USD:ZAR | 17.60 |
Discount Rate | % | 9.00 |
Item | Units | Total Reserve Plan | 2027 | 2028 | 2029 | 2030 |
Milled Tonnes | t'000 | 1,915 | 463 | 535 | 453 | 465 |
Yield | g/t | 4.89 | 5.61 | 5.20 | 4.45 | 4.24 |
Gold Recovered | kg | 9,364 | 2,596 | 2,780 | 2,016 | 1,972 |
Gold Price | R/kg | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 |
Revenue | ZAR'000 | 15,450,416 | 4,282,768 | 4,587,192 | 3,326,080 | 3,254,376 |
Total Operating cost | ZAR'000 | 13,188,144 | 3,283,155 | 3,501,673 | 3,189,720 | 3,213,596 |
Total Capital including MCC | ZAR'000 | 1,373,004 | 502,645 | 517,975 | 343,098 | 9,285 |
Royalty | ZAR'000 | 77,252 | 21,414 | 22,936 | 16,630 | 16,272 |
Total Cost | ZAR'000 | 14,638,400 | 3,807,215 | 4,042,584 | 3,549,449 | 3,239,152 |
Cash flow before tax | ZAR'000 | 812,016 | 475,553 | 544,609 | (223,369) | 15,224 |
Taxation Payable | ZAR'000 | (190,299) | (86,267) | (104,032) | — | — |
Net cash flow after tax | ZAR'000 | 621,717 | 389,286 | 440,577 | (223,369) | 15,224 |
Discounted NPV (ZAR’000) | Rate | NPV after tax | ||||
NPV - (Harmony Preferred) | @9% | 566,271 | ||||
NPV - (medium discount rate) | @12% | 549,487 | ||||
NPV - (high discount rate) | @15% | 533,484 |
Sensitivity (%) | Production (kg) | Gold Price (ZAR/kg) | Revenue (ZAR’000) | Total cost including tax (ZAR'000) | Net cash flow after tax (ZAR'000) | After tax NPV (ZAR’000) |
10% | 9,364 | 1,815,000 | 16,995,458 | 15,160,123 | 1,835,334 | 1,550,648 |
5% | 9,364 | 1,732,500 | 16,222,937 | 14,967,736 | 1,255,201 | 1,077,357 |
Reserve plan | 9,364 | 1,650,000 | 15,450,416 | 14,828,699 | 621,717 | 566,271 |
-5% | 9,364 | 1,567,500 | 14,677,895 | 14,689,662 | (11,767) | 55,184 |
-10% | 9,364 | 1,485,000 | 13,905,375 | 14,638,400 | (733,025) | (533,415) |
Sensitivity (%) | Production (kg) | Gold Price (ZAR/kg) | Revenue (ZAR’000) | Total cost including tax (ZAR'000) | Net cash flow after tax (ZAR'000) | After tax NPV (ZAR’000) |
10% | 9,364 | 1,650,000 | 15,450,416 | 16,102,240 | (651,824) | (460,118) |
5% | 9,364 | 1,650,000 | 15,450,416 | 15,431,097 | 19,319 | 83,498 |
Reserve plan | 9,364 | 1,650,000 | 15,450,416 | 14,828,699 | 621,717 | 566,271 |
-5% | 9,364 | 1,650,000 | 15,450,416 | 14,226,301 | 1,224,116 | 1,049,043 |
-10% | 9,364 | 1,650,000 | 15,450,416 | 13,682,121 | 1,768,295 | 1,490,573 |
Sensitivity (%) | Production (kg) | Gold Price (ZAR/kg) | Revenue (ZAR’000) | Total cost including tax (ZAR'000) | Net cash flow after tax (ZAR'000) | After tax NPV (ZAR’000) |
10% | 10,300 | 1,650,000 | 16,995,458 | 15,160,123 | 1,835,334 | 1,550,648 |
5% | 9,832 | 1,650,000 | 16,222,937 | 14,967,736 | 1,255,201 | 1,077,357 |
Reserve plan | 9,364 | 1,650,000 | 15,450,416 | 14,828,699 | 621,717 | 566,271 |
-5% | 8,896 | 1,650,000 | 14,677,895 | 14,689,662 | (11,767) | 55,184 |
-10% | 8,427 | 1,650,000 | 13,905,375 | 14,638,400 | (733,025) | (533,415) |
Name | Specialist | Area of Responsibility | Association / Company |
Tshepo Moloto | Mining Rights and surface rights | Sections 3.1, 3.2 | Harmony |
Karlito Kosa | Geotechnical Tailings Engineer | Sections 15.1.2 | Harmony |
Heinrich Venter | Metallurgical | Sections 10 and 14 | Harmony |
John van Wyk | Environmental permits and liabilities | Sections 3.2, 17 | Harmony |
Tilana Viljoen | Economist | Section 16 and 19 | ETSA Group |
Sabelo Mgotywa | Community Relations | Sections 17.4 | Harmony |
Hugo le Roux | Taxation and Hedging | Sections 19.1.3 and 19.1.4 | Harmony |
B Reinders | Senior Valuator | Sections 8,9 and 11 | Tshepong South |
R du Toit | Section Valuator | Sections 6, 7 and 8 | Tshepong Nth / Sth |
R du Bruyn | Section Planner | Section 13 | Tshepong South |
B Erasmus | Financial Manager | Section 19 | Tshepong South |
J Powell | Geostatistician | Sections 8,9 and 11 | Central |
J van Heerden | Engineering Manager | Sections 13.8,13.9 and 15 | Tshepong South |
T Boke | Rock Engineering Manager | Section 7.8, 12.1 and 13 | Tshepong South |
C Pienaar | HOD Geology | Sections 6, 7 and 8 | Tshepong South |