IMPORTANT NOTICE This Technical Report Summary (“TRS”) has been prepared for Harmony Gold Mining Company Limited in support of disclosure and filing requirements with the United States Securities and Exchange Commission (“SEC”) under Subpart 1300 of Regulation S-K and Section 229.601(b)(96) of Regulation S-K. The quality of information, estimates, and conclusions contained in this Technical Report Summary apply as of the effective date of this report. Subsequent events that may have occurred since that date may have resulted in material changes to such information, estimates and conclusions in this summary. |
1Executive Summary ...................................................................................................................................... | |
2Introduction ................................................................................................................................................... | |
3Property Description ..................................................................................................................................... | |
3.1Mineral Tenure ............................................................................................................................... | |
3.2Property Permitting Requirements ................................................................................................ | |
4Accessibility, Climate, Local Resources, Infrastructure and Physiography ................................................... | |
4.1Accessibility .................................................................................................................................... | |
4.2Physiology and Climate ................................................................................................................... | |
4.3Local Resources and Infrastructure ................................................................................................ | |
5.1Historical Ownership and Development ........................................................................................ | |
5.2Historical Exploration ..................................................................................................................... | |
5.3Previous Mineral Resource and Mineral Reserve Estimates .......................................................... | |
5.4Past Production .............................................................................................................................. | |
6Geological Setting, Mineralisation and Deposit ............................................................................................ | |
6.1Regional Geology ............................................................................................................................ | |
6.2Local Geology .................................................................................................................................. | |
6.3 Property Geology ........................................................................................................................... | |
6.3.1Kimberley Reefs Lithology ............................................................................................... | |
6.3.2South Reef Lithology ........................................................................................................ | |
6.4Mineralisation ................................................................................................................................. | |
6.4.1Kimberley Reef Mineralisation ........................................................................................ | |
6.4.2South Reef Mineralisation ............................................................................................... | |
6.4.3Alteration ......................................................................................................................... | |
6.5Deposit Type ................................................................................................................................... | |
6.6Commentary on Geological Setting, Mineralisation and Deposit .................................................. | |
7Exploration .................................................................................................................................................... | |
7.1Geophysical Survey ......................................................................................................................... | |
7.2Topographical Survey ..................................................................................................................... | |
7.3Underground Mapping ................................................................................................................... | |
7.4Channel Sampling Methods and Results ........................................................................................ | |
7.4.1Channel Sample Collection Method ................................................................................ | |
7.5Surface Drilling Campaigns, Procedures, Sampling, Recoveries and Results ................................. | |
7.5.1Drilling Methods .............................................................................................................. | |
7.5.2Collar and Downhole Surveys .......................................................................................... | |
7.5.3Logging Procedure ........................................................................................................... | |
7.5.4Drilling Results ................................................................................................................. | |
7.5.5Core Recovery .................................................................................................................. | |
7.5.6Sample Length and True Thickness ................................................................................. | |
7.6Underground Drilling Campaigns, Procedures, Sampling, Recoveries and Results ....................... | |
7.6.1Drilling Methods .............................................................................................................. | |
7.6.2Collar and Downhole Surveys .......................................................................................... | |
7.6.3Logging Procedure ........................................................................................................... | |
7.6.4Drilling Results ................................................................................................................. | |
7.6.5Core Recovery .................................................................................................................. | |
7.6.6Sample Length and True Thickness ................................................................................. | |
7.7Hydrogeology .................................................................................................................................. | |
7.8Geotechnical Data .......................................................................................................................... |
7.9Commentary on Exploration .......................................................................................................... | |
8Sample Preparation, Analyses and Security .................................................................................................. | |
8.1Sampling Method and Approach .................................................................................................... | |
8.1.1Channel Samples .............................................................................................................. | |
8.1.2Core Samples ................................................................................................................... | |
8.2Density Determination ................................................................................................................... | |
8.3Sample Security .............................................................................................................................. | |
8.4Laboratory Sample Preparation ..................................................................................................... | |
8.5Assaying Methods and Analytical Procedures................................................................................ | |
8.6.1Field QAQC ....................................................................................................................... | |
8.6.2Laboratory QAQC ............................................................................................................. | |
8.7Comment on Sample Preparation, Analyses and Security ............................................................. | |
9Data verification ........................................................................................................................................... | |
9.1Data Verification Procedures .......................................................................................................... | |
9.2Limitations to the Data Verification ............................................................................................... | |
9.3Comment on Data Verification ....................................................................................................... | |
10Mineral Processing and Metallurgical Testing .............................................................................................. | |
10.1Introduction .................................................................................................................................... | |
10.2Sampling and Testing Methodologies ............................................................................................ | |
10.2.1Systematic and Continuous Sampling .............................................................................. | |
10.2.2Composite Sampling ........................................................................................................ | |
10.2.3Calibration and Verification of Equipment ...................................................................... | |
10.2.4Specific Testing Procedures ............................................................................................. | |
10.2.5Analytical Laboratories .................................................................................................... | |
10.3Data Validation and Quality Control .............................................................................................. | |
10.3.1Statistical Analysis ............................................................................................................ | |
10.3.2Continuous Improvement ................................................................................................ | |
10.4Recovery Estimates and Processing Factors ................................................................................... | |
10.4.1Detailed Calculation of Recovery Estimates .................................................................... | |
10.4.2Head Grade and Residue Grade ...................................................................................... | |
10.4.3Adjustments for Solution and Carbon Adsorption .......................................................... | |
10.4.4Integration of Bottle Roll Tests for Baseline Recovery Rates .......................................... | |
10.4.5Processing Factors Affecting Recovery ............................................................................ | |
10.4.6Gold Inventory Management and Accountability ........................................................... | |
10.5Conclusion ...................................................................................................................................... | |
11Mineral Resource Estimate ........................................................................................................................... | |
11.1Geological Database ....................................................................................................................... | |
11.2Global Statistics .............................................................................................................................. | |
11.3Geological Interpretation ............................................................................................................... | |
11.4Structural Wireframe Model .......................................................................................................... | |
11.5Compositing .................................................................................................................................... | |
11.7Variography .................................................................................................................................... | |
11.8Mineral Resource Estimation Methods .......................................................................................... | |
11.8.1Estimation Parameters .................................................................................................... | |
11.8.2Relative Density and Tonnage Calculation ...................................................................... | |
11.8.3Model Validation ............................................................................................................. | |
11.9Mineral Resource Evaluation .......................................................................................................... | |
11.10Mineral Resource Classification and Uncertainties ........................................................................ |
11.11Mineral Resource Estimate ............................................................................................................ | |
11.12Mineral Resource Reconciliation .................................................................................................... | |
11.13Comment on Mineral Resource Estimates ..................................................................................... | |
12Mineral Reserve Estimate ............................................................................................................................. | |
12.2Modifying Factors ........................................................................................................................... | |
12.3Mineral Reserve Estimate ............................................................................................................... | |
12.4Mineral Reserve Reconciliation ..................................................................................................... | |
12.5Commentary on Mineral Reserve Estimate ................................................................................... | |
13Mining Methods ............................................................................................................................................ | |
13.1Sequential Grid Mining ................................................................................................................... | |
13.2Mine Design .................................................................................................................................... | |
13.3Mine Design Parameters ................................................................................................................ | |
13.4Mine Plan Development and Life of Mine Schedule ...................................................................... | |
13.5Geotechnical and Geohydrological Considerations ....................................................................... | |
13.6Mining Operations .......................................................................................................................... | |
13.7Mining Rates ................................................................................................................................... | |
13.8Mining Equipment and Machinery ................................................................................................. | |
13.9Grade and Dilution Control ............................................................................................................ | |
13.10Ore transport .................................................................................................................................. | |
13.11Mining Personnel ............................................................................................................................ | |
13.12Commentary on Mining Method .................................................................................................... | |
14Processing and Recovery Methods ............................................................................................................... | |
14.1Mineral Processing Description ...................................................................................................... | |
14.2Plant Throughput, Design, Equipment Characteristics and Specifications .................................... | |
14.3Energy, Water, Process Material and Personnel Requirements .................................................... | |
14.4Commentary on the Processing and Recovery Methods ............................................................... | |
15Infrastructure ................................................................................................................................................ | |
15.1Surface Infrastructure ..................................................................................................................... | |
15.1.1Ore and Waste Rock Storage Facilities ............................................................................ | |
15.1.2Tailings Storage Facilities ................................................................................................. | |
15.1.3Power and Electrical ........................................................................................................ | |
15.1.4Water Usage .................................................................................................................... | |
15.1.5Logistics and Supplies ...................................................................................................... | |
15.2Shaft and underground infrastructure .......................................................................................... | |
15.3Commentary on Infrastructure ...................................................................................................... | |
16Market Studies .............................................................................................................................................. | |
16.1Market Overview ............................................................................................................................ | |
16.2Global Production and Supply ........................................................................................................ | |
16.2.1New Mine Production ...................................................................................................... | |
16.3Global Consumption and Demand ................................................................................................. | |
16.3.2Investment ....................................................................................................................... | |
16.3.3The USD Currency and Gold............................................................................................. | |
16.4Gold Price ........................................................................................................................................ | |
16.4.1Historical Gold Price ......................................................................................................... | |
16.4.2Forecast Gold Price .......................................................................................................... | |
16.4.3Harmony Group Gold Hedging Policy .............................................................................. | |
16.5Commentary on Market Studies .................................................................................................... | |
16.6Material Contracts .......................................................................................................................... |
17Environmental Studies, Permitting and Plans, Negotiations, or Agreements with Local Individuals or Groups ........................................................................................................................................................... | |
17.1Results of Environmental Studies ................................................................................................... | |
17.2Waste and Tailings Disposal, Monitoring & Water Management .................................................. | |
17.3Permitting and Licences ................................................................................................................. | |
17.4Local Stakeholder Plans and Agreements ...................................................................................... | |
17.5Mine Closure Plans ......................................................................................................................... | |
Groups ............................................................................................................................................ | |
17.7Local Procurement and Hiring ........................................................................................................ | |
with Local Individuals or Groups .................................................................................................... | |
18Capital and Operating Costs .......................................................................................................................... | |
18.1Capital Costs ................................................................................................................................... | |
18.2Operating Costs .............................................................................................................................. | |
18.3Comment on Capital and Operating Costs ..................................................................................... | |
19Economic Analysis ........................................................................................................................................ | |
19.1Key Economic Assumptions and Parameters ................................................................................. | |
19.1.1Metallurgical Recoveries .................................................................................................. | |
19.1.2Gold Price ......................................................................................................................... | |
19.1.3Exchange Rate .................................................................................................................. | |
19.1.5Capital Expenditure .......................................................................................................... | |
19.1.6Operating Expenditure .................................................................................................... | |
19.1.7Working Capital ............................................................................................................... | |
19.1.9Closure Cost and Salvage Value ....................................................................................... | |
19.2Economic Analysis .......................................................................................................................... | |
19.3Sensitivity Analysis .......................................................................................................................... | |
20Adjacent properties ....................................................................................................................................... | |
21Other Relevant Data and Information .......................................................................................................... | |
22Interpretation and Conclusions ..................................................................................................................... | |
23Recommendations ....................................................................................................................................... | |
23.1LIB drilling ...................................................................................................................................... | |
23.2South Reef Exploration ................................................................................................................... | |
24References ..................................................................................................................................................... | |
25Reliance on Information Provided by the Registrant .................................................................................... |
Figure 3-1: Location of Doornkop ................................................................................................................................. | |
Figure 3-2: Mineral Tenure of Doornkop ...................................................................................................................... | |
Figure 5-1: Graph of Past Production– Tonnes and Grade .......................................................................................... | |
Figure 5-2: Graph of Past Metal Production ................................................................................................................. | |
Figure 6-1: Regional Geology of the Witwatersrand Basin ........................................................................................... | |
Figure 6-2: Stratigraphy of the CRG in the Witwatersrand Supergroup ....................................................................... | |
Figure 6-3: Simplified stratigraphy of the CRG in the Witwatersrand Supergroup ...................................................... | |
Figure 6-4: Doornkop Cross Section (South – North) ................................................................................................... | |
Figure 6 5: Doornkop South Reef Geological Structure Plan (N.T.S) ............................................................................ | |
Figure 7-1: Location Channel Samples collected from the Kimberley Reef (Pre 2014) ................................................ | |
Figure 7-2: Location of Channel Samples collected from the South Reef (2021 to 2025) ............................................ | |
Figure 7-3: Location of Surface Drill Holes Intersecting the Kimberley Reef ................................................................ | |
Figure 7-4: Location of Surface Drill Holes Intersecting the South Reef ....................................................................... | |
Figure 7-5: Location of Underground Drill Holes Intersecting the Kimberly Reef ........................................................ | |
Figure 7-6: Location of Underground Drill Holes Intersecting the South Reef ............................................................. | |
Figure 11-1: Kimberley Reef Geozones ......................................................................................................................... | |
Figure 11-2: South Reef Geozones ................................................................................................................................ | |
Figure 11-3: Distribution of Kimberley Reef cmg/t Estimates ...................................................................................... | |
Figure 11-4: Distribution of South Reef cmg/t Estimates ............................................................................................. | |
Figure 11-5: Location of Doornkop Kimberley Reef Mineral Resources and Reserves ................................................ | |
Figure 11-6: Location of Doornkop South Reef Mineral Resources and Reserves ....................................................... | |
Figure 13-1: Plan Showing the SGM Sequence at Doornkop ........................................................................................ | |
Figure 13-2: Plan view of a Typical Footwall Crosscut at Doornkop ............................................................................. | |
Figure 13-3: Section of a Typical Footwall Crosscut and Raise Layout at Doornkop .................................................... | |
Figure 13-4: Doornkop LOM Plan .................................................................................................................................. | |
Figure 13-5: Graph of Doornkop Mineral Reserves - Tonnes and Grade...................................................................... | |
Figure 13-6: Graph of Doornkop Mineral Reserves – Gold Produced (kg) ................................................................... | |
Figure 14-1: Schematic Flow Diagram of the Metallurgical Process ............................................................................. | |
Figure 14-2: South Reef Historical Plant Recovery ....................................................................................................... | |
Figure 15-1: Doornkop Surface Mine Layout and Infrastructure ................................................................................. | |
Figure 15-2: Doornkop Surface Infrastructure ............................................................................................................. | |
Figure 15-3: Doornkop Processing Plant ....................................................................................................................... | |
Figure 15-4: Doornkop Schematic of Mine Shaft and Underground Infrastructure ..................................................... | |
Figure 16-2 World Gold Council: Total Gold Supply & Demand ................................................................................... | |
Figure 16-3: World Gold Council: Daily Gold Price (ZAR/oz & US$/oz) ........................................................................ | |
Figure 19-1: Annual Calendar Year Exchange Rates and ETSA Forecast ....................................................................... |
Reserves) ...................................................................................................................................................... | |
Table 1-2: Summary of the Doornkop Mineral Reserve Estimate as at 30 June 2026 ................................................. | |
Table 1-3: Summary of Capital Cost Estimate for Doornkop ........................................................................................ | |
Table 1-4: Summary of Operating Cost Estimate for Doornkop ................................................................................... | |
Table 1-5: Status of Environmental Permits and Licences ............................................................................................ | |
Table 2-1: List of Responsible and Contributing Authors ............................................................................................. | |
Table 3-1: Summary of Mineral Rights for Doornkop .................................................................................................. | |
Table 3-2: Surface Permits held by Doornkop .............................................................................................................. | |
Table 5-1: Summary of Historical Ownership Changes and Activities of Doornkop .................................................... | |
Reserves) ...................................................................................................................................................... | |
Table 5-3: Summary of the Previous Doornkop Mineral Reserves as at 30 June 2025 ................................................ | |
Table 7-1: Summary of Surface Drilling ......................................................................................................................... | |
Table 7-2: Drill Hole Acceptance Criteria ...................................................................................................................... | |
Table 7-3: Summary of Underground Drilling ............................................................................................................... | |
Table 8-1: Summary of QA/QC Field Samples ............................................................................................................... | |
Table 8-2: Summary of Analytical Quality Control Data ............................................................................................... | |
Table 8-3: Summary of CRM performance ................................................................................................................... | |
Table 11-1: Summary of the Gold Assay Descriptive Statistics for the Kimberley Reef ............................................... | |
Table 11-2: Summary of the Gold Assay Descriptive Statistics for the South Reef ...................................................... | |
Table 11-3: Harmony Economic Parameters (30 June 2026) ........................................................................................ | |
Reserves) ...................................................................................................................................................... | |
Table 12-1: Doornkop Mineral Reserves Modifying Factors (30 June 2026) ................................................................ | |
Table 12-2: Summary of the Doornkop Mineral Reserve Estimate as at 30 June 2026 ............................................... | |
Table 13-1: Key Mine Design Parameters ..................................................................................................................... | |
Table 14-1: Key Equipment Specifications at Doornkop Gold Plant ............................................................................. | |
Table 14-2: Design Throughput Versus Actual Throughput at Doornkop Gold Plant ................................................... | |
Table 14-3: Leaching process material and properties ................................................................................................. | |
Table 14-4: Reagent consumption ................................................................................................................................ | |
Table 16-1 Consensus View of Forecast Gold Price US$/Oz ......................................................................................... | |
Table 16‑1: Material Contracts ..................................................................................................................................... | |
Table 17-1: Status of Environmental Permits and Licences .......................................................................................... | |
Table 17-2 Mine closure liability ................................................................................................................................... | |
Table 17-3: Rehabilitation Assurance ........................................................................................................................... | |
Table 18-1: Summary of Capital Cost Estimate for Doornkop ...................................................................................... | |
Table 18-2: Summary of Operating Cost Estimate for Doornkop ................................................................................. | |
Table 19-1: Conversions Used in Gold Price Calculations ............................................................................................. | |
Table 19-2: Consensus View of Forecast Exchange Rate (ZAR:USD) ............................................................................ | |
Table 19-3: ZAR:USD Exchange Rate Performance (June 2023 – June 2026) ............................................................... | |
Table 19-3: Summary of Key Assumptions used in the Economic Analysis .................................................................. | |
Table 19-4: Doornkop Cash Flow .................................................................................................................................. | |
Table 19-5: Gold Price Sensitivity Analysis .................................................................................................................... | |
Table 19-6: Total Operating Cost Sensitivity Analysis ................................................................................................... | |
Table 19-7: Production Sensitivity Analysis .................................................................................................................. | |
Table 25-1: Specialists ................................................................................................................................................... |
Unit / Abbreviation | Description or Definition |
°C | degrees Celsius |
µm | Micrometres |
2D | Two-dimensional |
3D | Three-dimensional |
AE | Abnormal expenditure |
Ag | Silver |
AMIS | African Mineral Standards |
Au | Gold |
AuBIS | Harmony electronic database |
Ave. | Average |
BLR | Black Reef |
BMD | Below mine datum |
Bn | Billion |
BP | Business plan |
BSI | British Standard Institute |
c. | Approximately |
CIP | Carbon-In-Pulp |
CLR | Carbon Leader Reef |
cm | Centimetre |
cmg/t | Centimetre-grams per tonne |
CODM | Chief Operating Decision-Maker |
Company | Harmony Gold Mining Company Limited |
COP | Code of Practice |
CRG | Central Rand Group |
CRM | Certified Reference Material |
CV | Coefficient of Variation |
DMPR | Department of Mineral and Petroleum Resources |
Doornkop | Doornkop Mine |
DWS | Department of Water and Sanitation |
EIA | Environmental Impact Assessment |
EMPR | Environmental Management Programme |
EMS | Environmental Management System |
EMTS | Electric Monorail Transport System |
ESG | Environmental Social and Governance |
ETF | Exchange traded fund |
EW-SX | Electro-wining solvent extraction |
FX | Foreign Exchange rate |
g | Gram |
g/t | Grams per metric tonne |
GDARD | Gauteng Department of Agriculture and Rural Development |
GHG | Greenhouse gas |
GISTM | Global Industry Standard on Tailings Management |
Harmony | Harmony Gold Mining Company Limited |
HPE | Hydro-powered |
ICMC | International Cyanide Management Code |
kg | Kilogram |
km | Kilometre |
km2 | Square kilometre |
Kusasalethu | Kusasalethu Gold Mine |
kWh | Kilowatt-hour |
LMBA | London Bullion Market Association |
LDL | Lower detection limit |
LIB | Long inclined borehole |
LOM | Life of Mine |
Ltd | Limited |
Unit / Abbreviation | Description or Definition |
m | Metre |
M | Million |
m3/hr | Cubic metres per hour |
masl | Metres above sea level |
MCC | Mining Charter Compliance |
MCF | Mine Call Factor |
Mintek | Mintek SA, South Africa's national mineral research organisation |
Moz | Million troy ounces |
Mponeng | Mponeng Gold Mine |
MPRDA | Mineral and Petroleum Resources Development Act, 28 of 2002 |
Mst | Million short tons |
Mt | Million tonnes |
Mtpa | Million tonnes per annum |
Mtpm | Million tonnes per month |
NEMA | National Environmental Management Act, 107 of 1998 |
No. | Number |
NPV | Net present value |
OTC | Over the counter |
oz | Troy ounce |
PFZ | Pretorius Fault Zone |
PSD | Particle Size Distribution |
Pty | Proprietary |
QA/QC | Quality Assurance/Quality Control |
QP | Qualified Person |
REGM | Randfontein Estates Gold Mining Company Limited |
ROM | Run-of-Mine |
SACNASP | South African Council for Natural Scientific Professions |
SAG | Semi-autogenous |
SAMREC | The South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves |
SANAS | South African National Accreditation System |
Savuka | Savuka Gold Mine |
SD | Standard Deviation |
SEC | Securities and Exchange Commission |
SGM | Sequential Grid Mining |
SGS | SGS South Africa (Pty) Limited |
Sibanye-Stillwater | Sibanye Stillwater Limited |
SLP | Social Labour Plan |
st | Short ton |
t | Metric tonne |
t/m3 | Tonne per cubic metre |
TauTona | TauTona Gold Mine |
TRS | Technical Report Summary |
TSF | Tailings Storage Facility |
USD or US$ | United States Dollars |
USD/oz or US$/oz | United States Dollar per troy ounce |
VCR | Ventersdorp Contact Reef |
West Wits | Harmony's West Rand operations |
WRG | West Rand Group |
WUL | Water Use Licence |
ZAR or R | South African Rand |
ZAR/kg or R/kg | South African Rand per kilogram |
Term | Definition |
Co-kriging | A method that is used to predict the value of the point at unobserved locations by sample points that are known to be spatially interconnected by adding other variables that have a correlation with the main variable or can also be used to predict 2 or more variables simultaneously. |
Cut-off grade | Cut-off grade is the grade (i.e. the concentration of metal or mineral in rock) that determines the destination of the material during mining. For purposes of establishing “prospects of economic extraction,” the cut-off grade is the grade that distinguishes material deemed to have no economic value (it will not be mined in underground mining or if mined in surface mining, its destination will be the waste dump) from material deemed to have economic value (its ultimate destination during mining will be a processing facility). Other terms used in similar fashion as cut-off grade include net smelter return, pay limit, and break-even stripping ratio. |
Dilution | Unmineralized rock that is by necessity, removed along with ore during the mining process that effectively lowers the overall grade of the ore. |
Head grade | The average grade of ore fed into the mill. |
Economically viable | Economically viable, when used in the context of Mineral Reserve determination, means that the qualified person has determined, using a discounted cash flow analysis, or has otherwise analytically determined, that extraction of the Mineral Reserve is economically viable under reasonable investment and market assumptions. |
Indicated Mineral Resource | Indicated Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence and sampling. The level of geological certainty associated with an Indicated Mineral Resource is sufficient to allow a qualified person to apply modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an Indicated Mineral Resource has a lower level of confidence than the level of confidence of a Measured Mineral Resource, an Indicated Mineral Resource may only be converted to a probable Mineral Reserve. |
Inferred Mineral Resource | Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The level of geological uncertainty associated with an Inferred Mineral Resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an Inferred Mineral Resource has the lowest level of geological confidence of all Mineral Resources, which prevents the application of the modifying factors in a manner useful for evaluation of economic viability, an Inferred Mineral Resource may not be considered when assessing the economic viability of a mining project and may not be converted to a Mineral Reserve. |
Kriging | A method of interpolation based on Gaussian process governed by prior covariances. It uses a limited set of sampled data points to estimate the value of a variable over a continuous spatial field |
Mine Call Factor | The ratio, expressed as a percentage, of the total quantity of recovered and unrecovered mineral product after processing with the amount estimated in the ore based on sampling. |
Measured Mineral Resource | Measured Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence and sampling. The level of geological certainty associated with a Measured Mineral Resource is sufficient to allow a qualified person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a Measured Mineral Resource has a higher level of confidence than the level of confidence of either an Indicated Mineral Resource or an Inferred Mineral Resource, a Measured Mineral Resource may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve. |
Mineral Reserve | Mineral Reserve is an estimate of tonnage and grade or quality of Indicated and Measured Mineral Resources that, in the opinion of the qualified person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a Measured or Indicated Mineral Resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. |
Mineral Resource | Mineral Resource is a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that there are reasonable prospects for eventual economic extraction. A Mineral Resource is a reasonable estimate of mineralization, taking into account relevant factors such as cut- off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralization drilled or sampled. |
Modifying Factors | Modifying factors are the factors that a qualified person must apply to Indicated and Measured Mineral Resources and then evaluate in order to establish the economic viability of Mineral Reserves. A qualified person must apply and evaluate modifying factors to convert Measured and Indicated Mineral Resources to Proven and Probable Mineral Reserves. These factors include but are not restricted to: mining; processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations, or agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics of the modifying factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project. |
Pre-Feasibility Study | A pre-feasibility study (or preliminary feasibility study) is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a qualified person has determined (in the case of underground mining) a preferred mining method, or (in the case of surface mining) a pit configuration, and in all cases has determined an effective method of mineral processing and an effective plan to sell the product. (1) A pre-feasibility study includes a financial analysis based on reasonable assumptions, based on appropriate testing, about the modifying factors and the evaluation of any other relevant factors that are sufficient for a qualified person to determine if all or part of the Indicated and Measured Mineral Resources may be converted to Mineral Reserves at the time of reporting. The financial analysis must have the level of detail necessary to demonstrate, at the time of reporting, that extraction is economically viable. (2) A pre-feasibility study is less comprehensive and results in a lower confidence level than a feasibility study. A pre-feasibility study is more comprehensive and results in a higher confidence level than an initial assessment. |
Probable Mineral Reserve | Probable Mineral Reserve is the economically mineable part of an Indicated and, in some cases, a Measured Mineral Resource. |
Proven Mineral Reserve | Proven Mineral Reserve is the economically mineable part of a Measured Mineral Resource and can only result from conversion of a Measured Mineral Resource. |
Qualified Person | A qualified person is: (1) A mineral industry professional with at least five years of relevant experience in the type of mineralization and type of deposit under consideration and in the specific type of activity that person is undertaking on behalf of the registrant; and (2) An eligible member or licensee in good standing of a recognized professional organization at the time the technical report is prepared. For an organization to be a recognized professional organization, it must: (i) Be either: (A) An organization recognized within the mining industry as a reputable professional association; or (B) A board authorized by U.S. federal, state or foreign statute to regulate professionals in the mining, geoscience or related field; (ii) Admit eligible members primarily on the basis of their academic qualifications and experience; (iii) Establish and require compliance with professional standards of competence and ethics; (iv) Require or encourage continuing professional development; (v) Have and apply disciplinary powers, including the power to suspend or expel a member regardless of where the member practices or resides; and (vi) Provide a public list of members in good standing. |
Tailings | Finely ground rock of low residual value from which valuable minerals have been extracted is discarded and stored in a designed dam facility. |
Tailings Freeboard | The vertical height between the beached tailings against the embankment crest and the crest itself. |
METRIC | |||
Mineral Resource Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Measured | 19.653 | 3.66 | 71,938 |
Indicated | 16.634 | 3.74 | 62,196 |
Total / Ave. Measured + Indicated | 36.287 | 3.70 | 134,134 |
Inferred | 11.844 | 3.73 | 44,235 |
IMPERIAL | |||
Mineral Resource Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Measured | 21.664 | 0.107 | 2.313 |
Indicated | 18.336 | 0.109 | 2.000 |
Total / Ave. Measured + Indicated | 39.999 | 0.108 | 4.313 |
Inferred | 13.056 | 0.109 | 1.422 |
METRIC | |||
Mineral Reserve Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Proved | 5.626 | 3.65 | 20,536 |
Probable | 5.531 | 4.22 | 23,356 |
Total (Proved + Probable) | 11.158 | 3.93 | 43,892 |
IMPERIAL | |||
Mineral Reserve Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Proved | 6.202 | 0.106 | 0.660 |
Probable | 6.097 | 0.123 | 0.751 |
Total (Proved + Probable) | 12.299 | 0.115 | 1.411 |
Capital Cost Element (R'000) | Total Mineral Reserves (FY2027- FY2041) |
OCD | 4,114,164 |
AE | 516,580 |
Shaft Capital | 577,099 |
Major Capital | 1,401,258 |
Total capital | 6,609,101 |
MCC | 289,135 |
Total | 6,898,235 |
Operating Cost Element (R'000) | Total Mineral Reserves(FY2027 - FY2041) |
Mining | 19,382,323 |
Services | 7,456,503 |
Medical Hub / Station | 1,008,695 |
Engineering | 18,605,026 |
Total Costs By Process | 46,452,546 |
Mine Overheads | 2,736,714 |
Total Cost | 49,189,260 |
Permit / Licence | Reference No. | Issued By | Date Granted | Validity |
Environmental Management Programme Report (“EMPR”) | GP30/5/1/2/2/(09) EM | DMPR | 7 June 2010 | LOM |
Certificate of Registration (Nuclear) | 01/0025/06 | National Nuclear Regulator | 31 May 2003 | LOM |
Water Use Permit | 33/2/323/24 | DWS | 1 December 1977 | LOM |
ISO 14001 Certification | 40604803 UM15 | DQS Group | 6 November 2024 | 05-Nov-27 |
Cyanide Management Certification | N/A | ICMC | 19 April 2024 | 18-April-27 |
Precious Metal Refining Licence | 1889/000251/66 | SADMPR | 29 June 2011 | 26-Jun-2041 |
Environmental Authorisation for Water Treatment Plant | GP30/5/1/2/2/(09) EM | DMPR | 23 August 2016 | LOM |
License to impound water in a dam with Safety risk | 12/2/C221/69 | DWS | 17 July 2009 | LOM |
Salvage yard registration | HWSD/24-25/0020 | GDARD | 18 June 2024 | LOM |
Qualified Person | Professional Organisation | Qualification | TRS Section Responsibility | Personal Insp. |
Mr H Chirambadare | SACNASP (400204) | BSc (Geol, Math), BSc. (Hons) Geol, GDE, MENG, MBA | All | Full time |
Licence Holder | Licence Type | Reference No. | Effective Date | Expiry Date | Area (ha) |
Randfontein Estates Gold Mining Company Limited | Mining Right | GP30/5/1/2/2/09MR | 7 October 2008 | 6 October 2038 | 2,941.02 |
Randfontein Estates Gold Mining Company Limited | Mining Right | GP30/5/1/2/2/174MR | 23-May-2014 | 22-May-2030 | 1,518.23 |
Total | 4,459.25 | ||||
Permit Holder | Farm Name | Portion No. | Title Deed No. | Area (ha) |
Randfontein Estates Ltd | Doornkop 239 IQ | 130 | T14868/1985 | 228.900 |
131 | T35158/1986 | 125.453 | ||
Vlakfontein 238 IQ | 4 | T55420/2019 | 558.417 | |
912.770 | ||||


Year | Asset History Highlights |
1983 | JCI commenced construction of the Main and Ventilation Shafts. |
1985 | The vertical twin shaft system and the gold plant was commissioned. |
1989 | Planned production rates on Kimberley Reef achieved. |
1991 | Selective mining approach adopted on Kimberley Reef. |
1991 | A sub-vertical shaft was commissioned that enabled development and production of the South Reef. |
1999 | Deepening project stopped with Main Shaft at 1,953m and Sub-vertical Shaft at 1,340m below surface. |
2000 | Harmony acquires control of Doornkop when they take control of Randfontein Estates. |
2003 | South Reef mining commenced. |
2020 | 207/212 Project commenced |
2025 | 207 Reef mining commenced |
METRIC | |||
Mineral Resource Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Measured | 19.944 | 3.74 | 74,506 |
Indicated | 13.987 | 3.77 | 52,764 |
Total / Ave. Measured + Indicated | 33.931 | 3.75 | 127,270 |
Inferred | 11.643 | 3.91 | 45,480 |
IMPERIAL | |||
Mineral Resource Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Measured | 21.984 | 0.109 | 2.395 |
Indicated | 15.419 | 0.110 | 1.696 |
Total / Ave. Measured + Indicated | 37.403 | 0.109 | 4.092 |
Inferred | 12.834 | 0.114 | 1.462 |
METRIC | |||
Mineral Reserve Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Proved | 4.294 | 3.74 | 16,075 |
Probable | 9.378 | 4.11 | 38,545 |
Total / Ave. Proven + Probable | 13.672 | 4.00 | 54,621 |
IMPERIAL | |||
Mineral Reserve Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Proved | 4.734 | 0.109 | 0.517 |
Probable | 10.337 | 0.120 | 1.239 |
Total / Ave. Proven + Probable | 15.071 | 0.117 | 1.756 |









YEAR | Companies | No. Drill Holes | Comments |
1935 - 1987 | Tudor Gold Mining Limited, Durban Roodepoort Deep, General Mining, JCI, West Rand Holdings, New Union Goldfields and others. | 139 | Utilised for stratigraphy and structure only - not for grade modelling. |
1937 - 1985 | JCI, Randfontein Estates, South Roodepoort Main Reef | 31 | Utilised for stratigraphy and structure only - not for grade modelling. |
Uncertain | Not recorded | 5 | Utilised for regional stratigraphy - no reef intersections. |
1950 - 1989 | JCI, Durban Roodepoort Deep Ltd, Rio Tinto, South Roodepoort Main Reef | 65 | Utilised for stratigraphy and structure only - not for grade modelling. |
Total | 240 | ||
Category | Comment |
Acceptable | 100% core recovery in the reef zone, or very minor loss due to reef chipping. No evidence of faulting within the reef horizon or at either contact with hanging wall or footwall lithologies. |
Minimum value | Light to moderate disking of core in the core barrel due to drilling and/or ground conditions. Visual observations indicate that the conglomerate portion of the reef is usually more prone to disking, resulting in possible gold loss. |
Faulted minimum value | If the fault loss is considered to be minor, this term may be used if the geologist is certain that only low-value internal quartzite is missing from the intersection. |
Not acceptable | Heavy disking of core which may indicate core loss, partial known core loss due to grinding. Also faulting of any description within the reef zone. |




Year | Companies | No. Drill Holes | No. Reef Intercepts | Comments |
Pre-2022 | Harmony & others pre-Harmony | 1,583 | 900 | Underground drilling for South Reef |
2022 | Harmony | 153 | 44 | Underground drilling for South Reef |
2023 | Harmony | 169 | 76 | Underground drilling for South Reef |
2024 | Harmony | 186 | 101 | Underground drilling for South Reef |
2025 | Harmony | 165 | 61 | Underground drilling for South Reef |
Total | 2,256 | 1,182 | ||
Type | Total No. |
Primary Samples | 45,329 |
Blanks | 249 |
CRM | 1,020 |
Duplicates | 445 |
Quality Control Material Type | No. of Samples Submitted | No. of Failed Samples | Action Taken |
CRMs / standards | 1,020 | 10 | Sent for re-assay. |
Coarse blanks | 249 | 0 | |
Pulp duplicates | 445 | 21 | Sent for re-assay |
Standard | Certified Value (g/t Au) | Doornkop (±2 STD) | SGS Randfontein | |||
Upper Limit (g/ t Au) | Lower Limit (g/ t Au) | Ave. (g/t) | Outliers & Failures | Bias (%) | ||
AMIS0785 | 5.530 | 6.330 | 4.740 | 5.420 | 1 | 1% |
AMIS0799 | 4.820 | 5.450 | 4.190 | 4.930 | — | —% |
AMIS0779 | 12.540 | 14.340 | 10.740 | 11.850 | — | —% |
AMIS0455 | 52.240 | 56.980 | 47.500 | 50.780 | 2 | —% |
AMIS0773 | 13.600 | 17.050 | 10.150 | 13.560 | 7 | — |
Recovery | = | (Head Grade – Residual Grade) | × | 100% |
Head Grade |
Recovery | = | Gold Produced |
GAF |
GAF | = | Gold Produced + Residue Gold |
GCF | = | Gold Delivered + ΔTotal Plant Inventory |
PCF | = | GAF | × | 100% |
GCF |
Pulp Call | = | Pulp Head Gold + ΔTreatment Inventory – Residue Gold |
Geozone | No. Samples | Minimum (cmg/t Au) | Maximum (cmg/t Au) | Mean (cmg/t Au) | Variance | SD (cmg/t Au) | COV |
1 | 2,417 | 2.00 | 4,521 | 706 | N/A | 564 | 0.80 |
2 | 422 | 3.00 | 4,541 | 1,086 | N/A | 787 | 0.72 |
3 | 5,087 | 6.00 | 4,723 | 1,116 | N/A | 754 | 0.67 |
4 | 520 | 14.00 | 3,981 | 601 | N/A | 543 | 0.90 |
5 | 2,038 | 1.00 | 7,051 | 1,018 | N/A | 976 | 0.95 |
Total | 10,484 |
Geozone | No. Samples | Minimum (cmg/t Au) | Maximum (cmg/t Au) | Mean (cmg/t Au) | Variance | SD (cmg/t Au) | COV |
1 | 2,895 | 0.01 | 9,513 | 539 | 357,301 | 598 | 1.10 |
2 | 41,847 | 0.01 | 22,091 | 851 | 778,095 | 882 | 1.03 |
3 | 19,056 | 0.01 | 40,324 | 1,061 | 1,369,509 | 1,170 | 1.10 |
4 | 21,846 | 0.01 | 43,517 | 1,110 | 1,845,356 | 1,358 | 1.22 |
Total | 85,644 |


Description | Unit | Value |
Gold price | US$/oz | 3,061 |
FX rate | ZAR:USD | 17.60 |
Gold price | ZAR/kg | 1,730,000 |
Plant recovery factor | % | 96.65 |
Unit cost | R/t | 4,390 |


METRIC | |||
Mineral Resource Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Measured | 19.653 | 3.66 | 71,938 |
Indicated | 16.634 | 3.74 | 62,196 |
Total / Ave. Measured + Indicated | 36.287 | 3.70 | 134,134 |
Inferred | 11.844 | 3.73 | 44,235 |
IMPERIAL | |||
Mineral Resource Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Measured | 21.664 | 0.107 | 2.313 |
Indicated | 18.336 | 0.109 | 2.000 |
Total / Ave. Measured + Indicated | 39.999 | 0.108 | 4.313 |
Inferred | 13.056 | 0.109 | 1.422 |


Modifying Factor | Unit | Value |
Relative Density | t/mᶟ | 2.77 |
Stoping width | cm | 124.00 |
Gully (dilution) | % | 6.73 |
Off Reef | % | 4.83 |
Waste to Reef | % | 0.33 |
Flushing tonnes | % | — |
Discrepancy | % | 18.75 |
Mine Call Factor | % | 82.00 |
Plant Recovery Factor | % | 96.65 |
Mine Recovery Factor | % | 79.25 |
Plant Call Factor | % | 100.00 |
Mineral Reserve cut-off | cmg/t | 500.00 |
METRIC | |||
Mineral Reserve Category | Tonnes (Mt) | Gold Grade (g/t) | Gold Content (kg) |
Proved | 5.626 | 3.65 | 20,536 |
Probable | 5.531 | 4.22 | 23,356 |
Total (Proved + Probable) | 11.158 | 3.93 | 43,892 |
IMPERIAL | |||
Mineral Reserve Category | Tons (Mst) | Gold Grade (oz/st) | Gold Content (Moz) |
Proved | 6.202 | 0.106 | 0.660 |
Probable | 6.097 | 0.123 | 0.751 |
Total (Proved + Probable) | 12.299 | 0.115 | 1.411 |



Parameter | Unit | South Reef |
Regional Stability | ||
Dip stabilizing pillar dimensions | ||
Strike span | m | 15 |
Dip span | m | 150-380 |
Strike stability pillar spacing¹ | m | 130-180 |
Access haulages middling to reef | m | 50-75 |
Primary Development | ||
Advance | m/month | 30-35 |
Secondary Development | ||
Advance | m/month | 18-20 |
Economic Parameters | ||
cmg/t | 500 | |



Equipment | Unit | Capacity |
Mill Silo (per silo – x no. silos) | Volume / silo (m3) | 1,875 |
Tonnes | 3,000 | |
ROM Mill (per mill – 5 mills) | Volume / mill (m3) | 143 |
Leach (10 leach tanks) | Dry tonnes / tank | 1,045 |
CIP (13 tanks) | Volume / tank (m3) | 213 |
Dry tonnes / tank (t) | 150 | |
Elution (2 tanks) | Volume / tank (m3) | 7 |
Carbon (t) | 3 | |
Cycle time (hr) | AARL Process | |
Thickener (x thickeners) | ID (m) | 60 |
Dry tonnes (tpm) | 200,000 |
Throughput | ||
Equipment | Design (t/hr) | Actual (t/hr) |
Mill | 70 | 70 |
Leach | 340 | 180 |
CIP | 340 | 180 |
Thickener | 340 | 180 |

Process Requirements | Properties |
pH | 10.5 - 11.5 (controlled by lime addition) |
Cyanide | 180 - 250ppm as 100% NaCN |
Leaching Time | 24 - 40 hours |
Oxygen | Air sparged |
Cyanide Relative Density | 1.00-1.10, 28-34% by mass |
Equipment | Unit | Value |
Steel Balls | tpm | 45.0 |
Lime | tpm | 120.0 |
Flocculant | tpm | 0.3 |
Cyanide | tpm | 36.0 |
Carbon | tpm | 4.4 |








Institutions | 2026 | 2027 | 2028 |
World Bank: Development | 4,700 | 4,300 | — |
BMO Capital Markets | 5,000 | 4,700 | — |
Scotiabank | 4,500 | 4,050 | — |
Nedbank | 4,646 | 4,540 | 4,490 |
Fitch Solutions | 4,500 | 3,800 | 3,300 |
S&P Global | 4,747 | 4,752 | 4,427 |
Australian Government | 4,049 | 3,788 | — |
Average | 4,592 | 4,276 | 4,073 |
Vendor Name | Nature of Service / Supply | Contract Number | Annual Value (R million) | Duration | Price Adjustment Mechanism | Termination Mechanism |
Tychoflash | Underground secondary support services | REL/25/10/0045 | 50.90 | 12 months | Annually | 30 Days |
Tychoflash | Rail Upgrade & Maintenance | REL/22/03/0053-2 | 37.30 | 6 months | Annually | 30 Days |
Bidvest Protea Coin Security | Asset Protection | CS/17/11/0001-2 | 39.60 | 3 Yrs | Annually | 30 Days |
Gilberts Cables | Semi trackless and trackless development | REL/23/12/0022 | 98.00 | 18 months | Annually | 60 Days |
Rosond | Exploration Drilling | REL/19/08/0011-2 | 69.67 | 2 Yrs | Annually | 30 Days |
Permit / Licence | Reference No. | Issued By | Date Granted | Validity |
Environmental Management Programme Report (“EMPr”) | GP30/5/1/2/2/(09) EM | DMPR | June 7, 2010 | LOM |
Certificate of Registration (Nuclear) | 01/0025/06 | National Nuclear Regulator | May 31, 2003 | LOM |
Water Use Permit | 33/2/323/24 | DWS | December 1, 1977 | LOM |
ISO 14001 Certification | 40604803 UM15 | DQS Group | 06-Nov-2024 | 5 November, 2027 |
Cyanide Management Certification | N/A | ICMC | April 19, 2024 | April 18, 2027 |
Precious Metal Refining Licence | 1889/000251/66 | SADMPR | June 29, 2011 | June 26, 2041 |
Environmental Authorisation for Water Treatment Plant | GP30/5/1/2/2/(09) EM | DMPR | August 23, 2016 | LOM |
License to impound water in a dam with Safety risk | 12/2/C221/69 | DWS | 17-Jul-2009 | LOM |
Salvage yard registration | HWSD/24-25/0020 | GDARD | 18-Jun-2024 | LOM |
Area | Total Closure Cost (R'000) |
Shaft Areas | |
Sub Total Shaft Areas | 29,852 |
Hostels | |
Sub Total Hostels | 8,829 |
Other | |
Sub Total Other | 825 |
Plants | |
Sub Total Plants | 11,673 |
TSFs | |
Sub Total TSFs | 42,916 |
WRDs | |
Sub Total WRDs | 1,730 |
Water dams | |
Sub Total Water dams | 5,481 |
Monitoring and Maintenance | |
Sub Total Monitoring and Maintenance | 12,288 |
Additional Allowances | |
Sub Total Additional Allowances | 17,158 |
Grand Total | 130,752 |
Area | Trust Fund (R) | Bank Guarantee (R) | Total (R) |
Doornkop | 118,270,658 | 56,619,530 | 174,890,188 |
Total | — | — | 174,890,188 |
Capital Cost Element (R'000) | Total Mineral Reserves (FY2027- FY2041) |
OCD | 4,114,164 |
AE | 516,580 |
Shaft Capital | 577,099 |
Major Capital | 1,401,258 |
Total capital | 6,609,101 |
MCC | 289,135 |
Total | 6,898,235 |
Operating Cost Element (R'000) | Total Mineral Reserves(FY2027 - FY2041) |
Mining | 19,382,323 |
Services | 7,456,503 |
Medical Hub / Station | 1,008,695 |
Engineering | 18,605,026 |
Total Costs By Process | 46,452,546 |
Mine Overheads | 2,736,714 |
Total Cost | 49,189,260 |
Economic Factors | Gold Price (US$/oz) | Conversion Factor (oz/kg) | Exchange Rate (ZAR:USD) | Gold Price (ZAR/kg) |
2026 Mineral Resource | 3,061 | 32.15 | 17.60 | 1,730,000 |
2026 Mineral Reserve | 2,915 | 32.15 | 17.60 | 1,650,000 |

Institutions | 2026 | 2027 | 2028 |
Nedbank | 16.60 | 16.40 | 16.40 |
Investec | 16.29 | 15.81 | 15.85 |
FNB | 16.90 | 17.90 | 18.80 |
IDC | 16.64 | 16.87 | 17.01 |
AVERAGE | 16.61 | 16.75 | 17.02 |
Period | Average Exchange Rate (ZAR:USD) |
July 2023 to June 2024 | 18.70 |
July 2024 to June 2025 | 18.15 |
July 2025 to June 2026 | 16.89 |
3-Year Ave. (not weighted) | 17.91 |
Parameter | Unit | Value |
Production Rate | tpm | 67,488 |
Gold Recovery | % | 96.65 |
Royalty | % of xx | Formula |
Tax Rate | % | Formula |
Gold Price | ZAR/kg | 1,650,000 |
Exchange Rate | USD:ZAR | 17.60 |
Discount Rate | % | 9.0 |
Item | Units | Total Reserve Plan | FY2027 | FY2028 | FY2029 | FY2030 | FY2031 | FY2032 | FY2033 | FY2034 | FY2035 | FY2036 | FY2037 | FY2038 | FY2039 | FY2040 | FY2041 |
Milled Tonnes | t'000 | 11,158 | 741 | 742 | 757 | 849 | 844 | 839 | 834 | 836 | 846 | 824 | 787 | 770 | 683 | 499 | 304 |
Yield | g/t | 3.80 | 3.50 | 3.30 | 3.29 | 3.45 | 3.69 | 3.59 | 3.84 | 3.79 | 3.93 | 4.09 | 4.09 | 4.20 | 4.23 | 4.26 | 4.26 |
Gold Recovered | kg | 42,421 | 2592 | 2448 | 2491 | 2929 | 3113 | 3011 | 3204 | 3172 | 3328 | 3372 | 3221 | 3233 | 2890 | 2124 | 1295 |
Gold Price | R/kg | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 | 1,650,000 |
Revenue | R'000 | 69,995,133 | 4,276,939 | 4,038,448 | 4,109,867 | 4,832,856 | 5,135,674 | 4,968,727 | 5,286,423 | 5,233,495 | 5,490,665 | 5,563,319 | 5,313,971 | 5,334,421 | 4,768,598 | 3,505,193 | 2,136,537 |
Total Operating cost | R'000 | 49,189,258 | 3,272,855 | 3,309,417 | 3,362,760 | 3,583,097 | 3,577,042 | 3,584,256 | 3,581,704 | 3,588,695 | 3,609,640 | 3,575,067 | 3,493,419 | 3,471,507 | 3,178,500 | 2,404,927 | 1,596,372 |
Total Capital including MCC | R'000 | 6,898,236 | 1,289,459 | 1,017,399 | 745,112 | 910,178 | 558,864 | 494,787 | 495,291 | 454,023 | 323,531 | 218,415 | 163,772 | 113,405 | 58,000 | 38,000 | 18,000 |
Royalty | R'000 | 1,538,969 | 51,867 | 20,192 | 20,709 | 51,331 | 105,660 | 96,018 | 123,186 | 121,430 | 152,053 | 169,404 | 159,112 | 166,633 | 146,411 | 102,507 | 52,456 |
Total Cost | R'000 | 57,626,463 | 4,614,181 | 4,347,008 | 4,128,581 | 4,544,606 | 4,241,566 | 4,175,061 | 4,200,181 | 4,164,148 | 4,085,224 | 3,962,886 | 3,816,303 | 3,751,545 | 3,382,911 | 2,545,434 | 1,666,828 |
Cash flow before tax | R'000 | 12,368,670 | (337,242) | (308,560) | (18,714) | 288,250 | 894,108 | 793,666 | 1,086,242 | 1,069,347 | 1,405,441 | 1,600,433 | 1,497,668 | 1,582,876 | 1,385,687 | 959,759 | 469,709 |
Taxation Payable | R'000 | (3,211,500) | — | — | — | — | (86,149) | (179,926) | (271,234) | (266,532) | (373,200) | (436,348) | (406,550) | (434,331) | (378,595) | (258,885) | (119,751) |
Net cash flow after tax | R'000 | 9,157,170 | (337,242) | (308,560) | (18,714) | 288,250 | 807,959 | 613,740 | 815,008 | 802,815 | 1,032,241 | 1,164,085 | 1,091,118 | 1,148,545 | 1,007,092 | 700,874 | 349,958 |
Discounted NPV (R’000) | Rate | NPV after tax | |||||||||||||||
NPV - (Harmony Preferred) | @9% | 3,792,951 | |||||||||||||||
NPV - (medium discount rate) | @12% | 2,878,748 | |||||||||||||||
NPV - (high discount rate) | @15% | 2,197,915 |
Sensitivity (%) | Production (kg) | Gold Price (ZAR/kg) | Revenue (R’000) | Total cost including tax (R'000) | Net cash flow after tax (R'000) | After tax NPV (R’000) |
10% | 42,421 | 1,815,000 | 76,994,646 | 62,837,183 | 14,157,463 | 6,580,553 |
5% | 42,421 | 1,732,500 | 73,494,890 | 61,865,646 | 11,629,244 | 5,172,245 |
Reserve plan | 42,421 | 1,650,000 | 69,995,133 | 60,837,963 | 9,157,171 | 3,792,951 |
-5% | 42,421 | 1,567,500 | 66,495,376 | 59,884,938 | 6,610,438 | 2,353,241 |
-10% | 42,421 | 1,485,000 | 62,995,620 | 58,921,411 | 4,074,209 | 887,746 |
Sensitivity (%) | Production (kg) | Gold Price (ZAR/kg) | Revenue (R’000) | Total cost including tax (R'000) | Net cash flow after tax (R'000) | After tax NPV (R’000) |
10% | 42,421 | 1,650,000 | 69,995,133 | 65,030,801 | 4,964,332 | 1,262,787 |
5% | 42,421 | 1,650,000 | 69,995,133 | 62,932,216 | 7,062,917 | 2,540,831 |
Reserve plan | 42,421 | 1,650,000 | 69,995,133 | 60,837,963 | 9,157,171 | 3,792,951 |
-5% | 42,421 | 1,650,000 | 69,995,133 | 58,827,735 | 11,167,398 | 4,979,410 |
-10% | 42,421 | 1,650,000 | 69,995,133 | 56,746,831 | 13,248,302 | 6,204,704 |
Sensitivity (%) | Production (kg) | Gold Price (ZAR/kg) | Revenue (R’000) | Total cost including tax (R'000) | Net cash flow after tax (R'000) | After tax NPV (R’000) |
10% | 46,663 | 1,650,000 | 76,994,623 | 62,837,181 | 14,157,443 | 6,580,536 |
5% | 44,542 | 1,650,000 | 73,494,868 | 61,865,639 | 11,629,229 | 5,172,233 |
Reserve plan | 42,421 | 1,650,000 | 69,995,133 | 60,837,963 | 9,157,171 | 3,792,951 |
-5% | 40,300 | 1,650,000 | 66,495,356 | 59,884,932 | 6,610,425 | 2,353,229 |
-10% | 38,179 | 1,650,000 | 62,995,601 | 58,921,405 | 4,074,196 | 887,734 |
Name | Specialist | Area of Responsibility | Association / Company |
Tshepo Moloto | Mining Rights and surface rights | Sections 3.1, 3.2 | Harmony |
Karlito Kosa | Geotechnical Tailings Engineer | Sections 15.1.2 | Harmony |
Heinrich Venter | Metallurgical | Sections 10 and 14 | Harmony |
John van Wyk | Environmental permits and liabilities | Sections 3.2, 17 | Harmony |
Tilana Viljoen | Economist | Section 16 and 19 | ETSA Group |
Morwesi Lekaota | Community Relations | Sections 17.4 | Harmony |
Hugo le Roux | Taxation and Hedging | Sections 19.1.3 and 19.1.4 | Harmony |
C Laas | Mine design and scheduling | Section 13 | Doornkop |
D Mhlanga | Geotechnical Designs | Section 7.8, 12.1 and 13 | Doornkop |
T Thubatsi | Mine design and scheduling | Section 13 | Doornkop |
T Nchodu | Reserve Reconciliation and Reporting | Section 12 | Doornkop |
B Mc Nally | Mineral Resources | Sections 6, 7 and 8 | Doornkop |
H Nkosi | Cash Flow Analysis | Section 19 | Doornkop |
S Rapapadi | Cash Flow Analysis | Section 19 | Doornkop |
T Lala | Cash flow analysis | Section 19 | Doornkop |
M de Noon | Valuation | Sections 8,9 and 11 | Doornkop |
T Sithole | Environmental management | Sections 3.2, 17 | Doornkop |
M Ellis | Mine Closure and Rehabilitation | Sections 3.2, 17 | Harmony Central |
J Roos | Recovery and process costs | Sections 10 and 14 | Doornkop |
T Nthejane | Technical Studies | Sections 19.1.3 and 19.1.4 | Doornkop |
J Jackson | Tax | Sections 19.1.3 and 19.1.4 | Harmony Central |
J Powell | Mineral Resources | Sections 8,9 and 11 | Harmony Central |
E Malaola | Mineral Resources & Reserves Audit | Sections 1 to 25 | Harmony Central |
B Freese | Mineral Resources & Reserves Audit | Sections 1 to 25 | Harmony Central |
T v Dyk | Mineral Resources & Reserves Audit | Sections 1 to 25 | Harmony Central |