False00010235142026FYxbrli:sharesiso4217:ZARiso4217:ZARxbrli:sharesxbrli:pureiso4217:USDutr:oziso4217:USDhmy:Ounceutr:kgiso4217:ZARiso4217:USDiso4217:ZARutr:kgutr:oziso4217:USDiso4217:USDxbrli:sharesiso4217:USDutr:lbhmy:uSDollarPerAustralianDollarhmy:ZAR_per_AUDutr:tiso4217:AUDutr:MWhmy:Basis_pointshmy:Ratiohmy:numberOfEmployeeshmy:yearhmy:papuaNewGuineanKinaPerAustralianDollarhmy:southAfricanRandPerUSDollarhmy:australianDollarPerPapuaNewGuineanKinahmy:australianDollarPerUSDollariso4217:USDutr:tiso4217:USDhmy:Tonnehmy:product00010235142025-07-012026-06-300001023514dei:BusinessContactMember2025-07-012026-06-300001023514exch:XNYS2025-07-012026-06-300001023514sic:Z8880exch:XNYS2025-07-012026-06-3000010235142026-06-3000010235142024-07-012025-06-3000010235142023-07-012024-06-3000010235142025-06-3000010235142024-06-300001023514ifrs-full:IssuedCapitalMemberifrs-full:PreviouslyStatedMember2023-06-300001023514ifrs-full:RetainedEarningsMemberifrs-full:PreviouslyStatedMember2023-06-300001023514ifrs-full:OtherReservesMemberifrs-full:PreviouslyStatedMember2023-06-300001023514ifrs-full:NoncontrollingInterestsMemberifrs-full:PreviouslyStatedMember2023-06-300001023514ifrs-full:PreviouslyStatedMember2023-06-300001023514ifrs-full:RetainedEarningsMemberifrs-full:IncreaseDecreaseDueToChangesInAccountingPolicyAndCorrectionsOfPriorPeriodErrorsMember2023-06-300001023514ifrs-full:IncreaseDecreaseDueToChangesInAccountingPolicyAndCorrectionsOfPriorPeriodErrorsMember2023-06-300001023514ifrs-full:IssuedCapitalMember2023-06-300001023514ifrs-full:RetainedEarningsMember2023-06-300001023514ifrs-full:OtherReservesMember2023-06-300001023514ifrs-full:NoncontrollingInterestsMember2023-06-3000010235142023-06-300001023514hmy:ManagementdeferredshareplanMemberifrs-full:IssuedCapitalMember2023-07-012024-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberifrs-full:IssuedCapitalMember2023-07-012024-06-300001023514ifrs-full:OtherReservesMember2023-07-012024-06-300001023514ifrs-full:NoncontrollingInterestsMember2023-07-012024-06-300001023514ifrs-full:RetainedEarningsMember2023-07-012024-06-300001023514ifrs-full:IssuedCapitalMember2024-06-300001023514ifrs-full:RetainedEarningsMember2024-06-300001023514ifrs-full:OtherReservesMember2024-06-300001023514ifrs-full:NoncontrollingInterestsMember2024-06-300001023514hmy:ManagementdeferredshareplanMemberifrs-full:IssuedCapitalMember2024-07-012025-06-300001023514ifrs-full:OtherReservesMember2024-07-012025-06-300001023514ifrs-full:RetainedEarningsMember2024-07-012025-06-300001023514ifrs-full:NoncontrollingInterestsMember2024-07-012025-06-300001023514ifrs-full:IssuedCapitalMember2025-06-300001023514ifrs-full:RetainedEarningsMember2025-06-300001023514ifrs-full:OtherReservesMember2025-06-300001023514ifrs-full:NoncontrollingInterestsMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberifrs-full:IssuedCapitalMember2025-07-012026-06-300001023514ifrs-full:OtherReservesMember2025-07-012026-06-300001023514ifrs-full:RetainedEarningsMember2025-07-012026-06-300001023514ifrs-full:NoncontrollingInterestsMember2025-07-012026-06-300001023514ifrs-full:IssuedCapitalMember2026-06-300001023514ifrs-full:RetainedEarningsMember2026-06-300001023514ifrs-full:OtherReservesMember2026-06-300001023514ifrs-full:NoncontrollingInterestsMember2026-06-300001023514hmy:GoldMember2025-07-012026-06-300001023514hmy:GoldMember2024-07-012025-06-300001023514hmy:GoldMember2023-07-012024-06-300001023514hmy:CopperMember2025-07-012026-06-300001023514hmy:CopperMember2024-07-012025-06-300001023514hmy:CopperMember2023-07-012024-06-300001023514hmy:SilverMember2025-07-012026-06-300001023514hmy:SilverMember2024-07-012025-06-300001023514hmy:SilverMember2023-07-012024-06-300001023514hmy:UraniumMember2025-07-012026-06-300001023514hmy:UraniumMember2024-07-012025-06-300001023514hmy:UraniumMember2023-07-012024-06-300001023514hmy:CommoditiesMember2025-07-012026-06-300001023514hmy:CommoditiesMember2024-07-012025-06-300001023514hmy:CommoditiesMember2023-07-012024-06-300001023514hmy:TollTreatmentsMember2025-07-012026-06-300001023514hmy:TollTreatmentsMember2024-07-012025-06-300001023514hmy:TollTreatmentsMember2023-07-012024-06-300001023514hmy:CopperProvisionalPricingAdjustmentsMember2025-07-012026-06-300001023514hmy:CopperProvisionalPricingAdjustmentsMember2024-07-012025-06-300001023514hmy:CopperProvisionalPricingAdjustmentsMember2023-07-012024-06-300001023514hmy:SilverProvisionalPricingAdjustmentsMember2025-07-012026-06-300001023514hmy:SilverProvisionalPricingAdjustmentsMember2024-07-012025-06-300001023514hmy:SilverProvisionalPricingAdjustmentsMember2023-07-012024-06-300001023514hmy:DoornkopMemberhmy:TollTreatmentsMember2025-07-012026-06-300001023514hmy:DoornkopMemberhmy:TollTreatmentsMember2024-07-012025-06-300001023514hmy:DoornkopMemberhmy:TollTreatmentsMember2023-07-012024-06-300001023514hmy:MoabKhotsongMemberhmy:TollTreatmentsMember2025-07-012026-06-300001023514hmy:MoabKhotsongMemberhmy:TollTreatmentsMember2024-07-012025-06-300001023514hmy:MoabKhotsongMemberhmy:TollTreatmentsMember2023-07-012024-06-300001023514hmy:CSAMember2025-07-012026-06-300001023514hmy:MACCopperMember2025-07-012026-06-300001023514hmy:HiddenValleyMember2024-07-012025-06-300001023514hmy:MineWasteSolutionsMember2024-07-012025-06-300001023514hmy:MponengMember2024-07-012025-06-300001023514hmy:TargetNorthMember2023-07-012024-06-300001023514hmy:ResourceBaseMemberhmy:TargetNorthMember2024-06-300001023514hmy:TshepongNorthMember2025-12-312025-12-310001023514hmy:TshepongNorthMember2025-12-310001023514hmy:TshepongNorthMember2026-06-302026-06-300001023514hmy:TshepongNorthMember2026-06-300001023514hmy:TshepongSouthMember2026-06-302026-06-300001023514hmy:TshepongSouthMember2026-06-300001023514hmy:KusasalethuMember2026-06-302026-06-300001023514hmy:KusasalethuMember2026-06-300001023514hmy:DoornkopMember2026-06-302026-06-300001023514hmy:DoornkopMember2026-06-300001023514ifrs-full:CountryOfDomicileMemberhmy:MiningProductsMember2025-07-012026-06-300001023514ifrs-full:CountryOfDomicileMemberhmy:MiningProductsMember2024-07-012025-06-300001023514ifrs-full:CountryOfDomicileMemberhmy:MiningProductsMember2023-07-012024-06-300001023514ifrs-full:CountryOfDomicileMemberhmy:NonMiningProductsMember2025-07-012026-06-300001023514ifrs-full:CountryOfDomicileMemberhmy:NonMiningProductsMember2024-07-012025-06-300001023514ifrs-full:CountryOfDomicileMemberhmy:NonMiningProductsMember2023-07-012024-06-300001023514ifrs-full:CountryOfDomicileMember2025-07-012026-06-300001023514ifrs-full:CountryOfDomicileMember2024-07-012025-06-300001023514ifrs-full:CountryOfDomicileMember2023-07-012024-06-300001023514ifrs-full:ForeignCountriesMemberhmy:IncomeTaxMember2025-07-012026-06-300001023514ifrs-full:ForeignCountriesMemberhmy:IncomeTaxMember2024-07-012025-06-300001023514ifrs-full:ForeignCountriesMemberhmy:IncomeTaxMember2023-07-012024-06-300001023514ifrs-full:ForeignCountriesMember2025-07-012026-06-300001023514ifrs-full:ForeignCountriesMember2024-07-012025-06-300001023514ifrs-full:ForeignCountriesMember2023-07-012024-06-300001023514hmy:MponengMemberhmy:MiningProductsMember2025-07-012026-06-300001023514hmy:MponengMemberhmy:MiningProductsMember2024-07-012025-06-300001023514hmy:MponengMemberhmy:MiningProductsMember2023-07-012024-06-300001023514hmy:FreegoldMemberhmy:MiningProductsMember2025-07-012026-06-300001023514hmy:FreegoldMemberhmy:MiningProductsMember2024-07-012025-06-300001023514hmy:FreegoldMemberhmy:MiningProductsMember2023-07-012024-06-300001023514ifrs-full:ParentMemberhmy:MiningProductsMember2025-07-012026-06-300001023514ifrs-full:ParentMemberhmy:MiningProductsMember2024-07-012025-06-300001023514ifrs-full:ParentMemberhmy:MiningProductsMember2023-07-012024-06-300001023514hmy:MoabKhotsongMemberhmy:MiningProductsMember2025-07-012026-06-300001023514hmy:MoabKhotsongMemberhmy:MiningProductsMember2024-07-012025-06-300001023514hmy:MoabKhotsongMemberhmy:MiningProductsMember2023-07-012024-06-300001023514hmy:ChemwesProprietaryLimitedMemberhmy:MiningProductsMember2025-07-012026-06-300001023514hmy:ChemwesProprietaryLimitedMemberhmy:MiningProductsMember2024-07-012025-06-300001023514hmy:ChemwesProprietaryLimitedMemberhmy:MiningProductsMember2023-07-012024-06-300001023514hmy:RandfonteinEstatesLimitedMemberhmy:MiningProductsMember2025-07-012026-06-300001023514hmy:RandfonteinEstatesLimitedMemberhmy:MiningProductsMember2024-07-012025-06-300001023514hmy:RandfonteinEstatesLimitedMemberhmy:MiningProductsMember2023-07-012024-06-300001023514hmy:TswelopeleBeneficiationOperationProprietaryLimitedMemberhmy:MiningProductsMember2025-07-012026-06-300001023514hmy:TswelopeleBeneficiationOperationProprietaryLimitedMemberhmy:MiningProductsMember2024-07-012025-06-300001023514hmy:TswelopeleBeneficiationOperationProprietaryLimitedMemberhmy:MiningProductsMember2023-07-012024-06-300001023514hmy:KalgoldMemberhmy:MiningProductsMember2025-07-012026-06-300001023514hmy:KalgoldMemberhmy:MiningProductsMember2024-07-012025-06-300001023514hmy:KalgoldMemberhmy:MiningProductsMember2023-07-012024-06-300001023514hmy:AustralianEntitiesAndPNGOperationMember2024-07-012025-06-300001023514hmy:AustralianEntitiesAndPNGOperationMember2025-07-012026-06-300001023514hmy:AustralianEntitiesAndPNGOperationMember2023-07-012024-06-300001023514ifrs-full:ParentMember2025-07-012026-06-300001023514ifrs-full:ParentMember2024-07-012025-06-300001023514ifrs-full:ParentMember2023-07-012024-06-300001023514hmy:FreegoldMember2025-07-012026-06-300001023514hmy:FreegoldMember2024-07-012025-06-300001023514hmy:FreegoldMember2023-07-012024-06-300001023514hmy:MoabKhotsongMember2025-07-012026-06-300001023514hmy:MoabKhotsongMember2024-07-012025-06-300001023514hmy:MoabKhotsongMember2023-07-012024-06-300001023514hmy:MponengMember2025-07-012026-06-300001023514hmy:MponengMember2024-07-012025-06-300001023514hmy:MponengMember2023-07-012024-06-300001023514hmy:RandfonteinEstatesLimitedMember2025-07-012026-06-300001023514hmy:RandfonteinEstatesLimitedMember2024-07-012025-06-300001023514hmy:RandfonteinEstatesLimitedMember2023-07-012024-06-300001023514hmy:KalgoldMember2025-07-012026-06-300001023514hmy:KalgoldMember2024-07-012025-06-300001023514hmy:KalgoldMember2023-07-012024-06-300001023514hmy:ChemwesProprietaryLimitedMember2025-07-012026-06-300001023514hmy:ChemwesProprietaryLimitedMember2024-07-012025-06-300001023514hmy:ChemwesProprietaryLimitedMember2023-07-012024-06-300001023514ifrs-full:PropertyPlantAndEquipmentMember2025-07-012026-06-300001023514ifrs-full:PropertyPlantAndEquipmentMember2024-07-012025-06-300001023514ifrs-full:PropertyPlantAndEquipmentMember2023-07-012024-06-300001023514hmy:MCGMember2025-07-012026-06-300001023514hmy:HarmonyGoldAustraliaMember2025-07-012026-06-300001023514hmy:LegalEntitiesMemberhmy:TemporaryDifferencesExcludingHedgeAccountedDerivativesMember2025-07-012026-06-300001023514hmy:LegalEntitiesMemberhmy:TemporaryDifferencesExcludingHedgeAccountedDerivativesMember2024-07-012025-06-300001023514hmy:LegalEntitiesMemberhmy:TemporaryDifferencesExcludingHedgeAccountedDerivativesMember2023-07-012024-06-300001023514hmy:MCGMemberhmy:IncomeTaxMember2025-07-012026-06-300001023514hmy:GlobalMinimumTaxRateMember2025-07-012026-06-3000010235142025-10-240001023514hmy:AvgoldLimitedMember2025-07-012026-06-300001023514hmy:AvgoldLimitedMember2023-07-012024-06-300001023514hmy:AvgoldLimitedMember2024-07-012025-06-300001023514hmy:DeferredTaxAssetsGrossMember2026-06-300001023514hmy:DeferredTaxAssetsGrossMember2025-06-300001023514hmy:DeferredTaxAssetToBeRecoveredAfterMoreThan12MonthsGrossMember2026-06-300001023514hmy:DeferredTaxAssetToBeRecoveredAfterMoreThan12MonthsGrossMember2025-06-300001023514hmy:DeferredTaxAssetToBeRecoveredWithin12MonthsGrossMember2026-06-300001023514hmy:DeferredTaxAssetToBeRecoveredWithin12MonthsGrossMember2025-06-300001023514hmy:DeferredTaxLiabilitiesGrossMember2026-06-300001023514hmy:DeferredTaxLiabilitiesGrossMember2025-06-300001023514hmy:DeferredTaxLiabilityToBeRecoveredAfterMoreThan12MonthsGrossMember2026-06-300001023514hmy:DeferredTaxLiabilityToBeRecoveredAfterMoreThan12MonthsGrossMember2025-06-300001023514hmy:DeferredTaxLiabilityToBeRecoveredWithin12MonthsGrossMember2026-06-300001023514hmy:DeferredTaxLiabilityToBeRecoveredWithin12MonthsGrossMember2025-06-300001023514hmy:AmortisationAndDepreciationOfDeferredTaxMember2026-06-300001023514hmy:AmortisationAndDepreciationOfDeferredTaxMember2025-06-300001023514hmy:DerivativeFinancialInstrumentsTemporaryDifferencesMember2026-06-300001023514hmy:DerivativeFinancialInstrumentsTemporaryDifferencesMember2025-06-300001023514ifrs-full:OtherTemporaryDifferencesMember2026-06-300001023514ifrs-full:OtherTemporaryDifferencesMember2025-06-300001023514hmy:UnredeemedCapitalExpendituresRelatedToTemporaryDifferencesDeferredTaxMember2026-06-300001023514hmy:UnredeemedCapitalExpendituresRelatedToTemporaryDifferencesDeferredTaxMember2025-06-300001023514hmy:ExpenseProvisionsRelatedToTemporaryDifferencesDeferredTaxMember2026-06-300001023514hmy:ExpenseProvisionsRelatedToTemporaryDifferencesDeferredTaxMember2025-06-300001023514hmy:ContingentConsiderationLiabilityMember2026-06-300001023514hmy:ContingentConsiderationLiabilityMember2025-06-300001023514hmy:StreamingContractLiabilityMember2026-06-300001023514hmy:StreamingContractLiabilityMember2025-06-300001023514hmy:OtherDeferredTaxAssetsMember2026-06-300001023514hmy:OtherDeferredTaxAssetsMember2025-06-300001023514ifrs-full:UnusedTaxLossesMember2026-06-300001023514ifrs-full:UnusedTaxLossesMember2025-06-300001023514hmy:DeferredTaxAssetNotRecognisedRelatedTemporaryDifferencesMember2026-06-300001023514hmy:DeferredTaxAssetNotRecognisedRelatedTemporaryDifferencesMember2025-06-300001023514hmy:HiddenValleyMemberhmy:UnredeemedCapitalExpendituresRelatedToTemporaryDifferencesDeferredTaxMember2026-06-300001023514hmy:HiddenValleyMemberhmy:UnredeemedCapitalExpendituresRelatedToTemporaryDifferencesDeferredTaxMember2025-06-300001023514hmy:AustralianEntitiesMemberifrs-full:UnusedTaxLossesMember2026-06-300001023514hmy:AustralianEntitiesMemberifrs-full:UnusedTaxLossesMember2025-06-300001023514ifrs-full:ParentMember2026-06-300001023514hmy:CGTLossesRelatedToTemporaryDifferencesMember2026-06-300001023514hmy:CGTLossesRelatedToTemporaryDifferencesMember2025-06-300001023514hmy:AvgoldLimitedMemberhmy:UnredeemedCapitalExpendituresRelatedToTemporaryDifferencesDeferredTaxMember2026-06-300001023514hmy:AvgoldLimitedMemberhmy:UnredeemedCapitalExpendituresRelatedToTemporaryDifferencesDeferredTaxMember2025-06-300001023514hmy:MoabKhotsongMemberhmy:UnredeemedCapitalExpendituresRelatedToTemporaryDifferencesDeferredTaxMember2026-06-300001023514hmy:MoabKhotsongMemberhmy:UnredeemedCapitalExpendituresRelatedToTemporaryDifferencesDeferredTaxMember2025-06-300001023514hmy:MponengMemberhmy:UnredeemedCapitalExpendituresRelatedToTemporaryDifferencesDeferredTaxMember2026-06-300001023514hmy:MponengMemberhmy:UnredeemedCapitalExpendituresRelatedToTemporaryDifferencesDeferredTaxMember2025-06-300001023514hmy:PNGOperationsMemberifrs-full:UnusedTaxLossesMember2026-06-300001023514hmy:PNGOperationsMemberifrs-full:UnusedTaxLossesMember2025-06-300001023514hmy:AvgoldLimitedMemberifrs-full:UnusedTaxLossesMember2026-06-300001023514hmy:AvgoldLimitedMemberifrs-full:UnusedTaxLossesMember2025-06-300001023514ifrs-full:OrdinarySharesMemberhmy:ShareTrustControlledByTheEntityMemberhmy:HarmonyGoldESOPTrustMember2024-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMember2025-07-012026-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMember2024-07-012025-06-3000010235142026-04-282026-04-2800010235142025-04-142025-04-1400010235142024-04-152024-04-1500010235142025-10-132025-10-1300010235142024-10-142024-10-1400010235142026-10-122026-10-1200010235142026-09-102026-09-1000010235142025-09-152025-09-1500010235142024-09-172024-09-170001023514hmy:TswelopeleBeneficiationOperationProprietaryLimitedMember2025-07-012026-06-300001023514hmy:TswelopeleBeneficiationOperationProprietaryLimitedMember2024-07-012025-06-300001023514hmy:TswelopeleBeneficiationOperationProprietaryLimitedMember2023-07-012024-06-300001023514hmy:MACCopperMember2025-07-012026-06-300001023514hmy:MACCopperMemberhmy:ORRoyaltiesInc.Member2025-07-012026-06-300001023514hmy:MACCopperMemberhmy:ORRoyaltiesInc.Memberifrs-full:BottomOfRangeMember2025-07-012026-06-300001023514hmy:MACCopperMemberhmy:ORRoyaltiesInc.Memberifrs-full:TopOfRangeMember2025-07-012026-06-300001023514hmy:MACCopperMemberhmy:GlencoreOperationsAustraliaPtyLimitedMember2025-07-012026-06-300001023514hmy:MACCopperMemberhmy:GlencoreOperationsAustraliaPtyLimitedMemberhmy:TheCopperPriceAveragesMoreThanUS4.50lbFor24ContinuousMonthsDuringTheLifeOfTheCSAMineMember2025-07-012026-06-300001023514hmy:MACCopperMemberhmy:GlencoreOperationsAustraliaPtyLimitedMemberhmy:TheCopperPriceAveragesMoreThanUS4.25lbFor18ContinuousMonthsAtAnyStageDuringTheLifeOfTheCSAMineMember2025-07-012026-06-300001023514hmy:MACCopperMember2025-10-232025-10-230001023514hmy:MACCopperMember2025-10-230001023514hmy:MACCopperMember2025-10-240001023514hmy:MACCopperMember2025-10-242025-10-240001023514hmy:CSAMemberifrs-full:BottomOfRangeMember2025-10-240001023514hmy:CSAMemberifrs-full:TopOfRangeMember2025-10-240001023514hmy:CSAMember2025-10-240001023514hmy:AustralianEntitiesMember2025-10-242025-10-240001023514hmy:MACCopperMemberhmy:ProvisionalFairValueMember2025-10-240001023514hmy:MACCopperMemberhmy:MeasurementPeriodAdjustmentsMember2025-10-240001023514hmy:MACCopperMemberhmy:FinalFairValueMember2025-10-240001023514hmy:CSAMember2026-06-300001023514hmy:CSAMember2025-06-300001023514hmy:MACCopperMember2025-10-252026-06-300001023514ifrs-full:BottomOfRangeMember2025-07-012025-10-240001023514ifrs-full:TopOfRangeMember2025-10-252026-06-300001023514ifrs-full:MiningAssetsMember2026-06-300001023514ifrs-full:MiningAssetsMember2025-06-300001023514ifrs-full:ConstructionInProgressMember2026-06-300001023514ifrs-full:ConstructionInProgressMember2025-06-300001023514hmy:UndevelopedPropertiesMember2026-06-300001023514hmy:UndevelopedPropertiesMember2025-06-300001023514hmy:OtherNonMiningAssetsMember2026-06-300001023514hmy:OtherNonMiningAssetsMember2025-06-300001023514ifrs-full:NotLaterThanOneYearMember2026-06-300001023514ifrs-full:NotLaterThanOneYearMember2025-06-300001023514ifrs-full:NotLaterThanOneYearMember2024-06-300001023514ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-06-300001023514ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-06-300001023514ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2024-06-300001023514ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2026-06-300001023514ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-06-300001023514ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2024-06-300001023514ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2026-06-300001023514ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2025-06-300001023514ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2024-06-300001023514hmy:LaterThanFourYearsMember2026-06-300001023514hmy:LaterThanFourYearsMember2025-06-300001023514hmy:LaterThanFourYearsMember2024-06-300001023514hmy:SouthAfricanOperationsMemberhmy:UndergroundResourcesMember2026-06-300001023514hmy:SouthAfricanOperationsMemberhmy:UndergroundResourcesMember2024-06-300001023514hmy:SouthAfricanOperationsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:SouthAfricanOperationsMemberifrs-full:BottomOfRangeMember2025-06-300001023514hmy:SouthAfricanOperationsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:SouthAfricanOperationsMemberifrs-full:TopOfRangeMember2025-06-300001023514hmy:EvaCopperMember2026-06-300001023514hmy:DoornkopMemberifrs-full:MiningAssetsMember2024-06-300001023514hmy:Target1Memberifrs-full:MiningAssetsMember2024-06-300001023514hmy:GoldMember2026-06-300001023514hmy:GoldMember2025-06-300001023514hmy:CopperMember2026-06-300001023514hmy:Target1Member2025-06-300001023514hmy:TshepongSouthMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:MiningAssetsMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:MiningAssetsMember2024-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:MiningAssetsMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:MiningAssetsMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:MiningAssetsMemberhmy:MACCopperMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:MiningAssetsMember2026-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberifrs-full:MiningAssetsMember2025-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberifrs-full:MiningAssetsMember2024-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberifrs-full:MiningAssetsMember2025-07-012026-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberifrs-full:MiningAssetsMember2024-07-012025-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberifrs-full:MiningAssetsMember2026-06-300001023514hmy:HiddenValleyMemberifrs-full:MiningAssetsMember2025-07-012026-06-300001023514hmy:HiddenValleyMemberifrs-full:MiningAssetsMember2024-07-012025-06-300001023514hmy:Doornkop207LevelMemberifrs-full:MiningAssetsMember2025-07-012026-06-300001023514hmy:MineWasteSolutionsKareerandTSFExpansionProjectMemberifrs-full:MiningAssetsMember2025-07-012026-06-300001023514hmy:KalgoldMemberifrs-full:MiningAssetsMember2026-06-300001023514hmy:KalgoldMemberifrs-full:MiningAssetsMember2025-06-300001023514hmy:HiddenValleyMemberifrs-full:MiningAssetsMember2026-06-300001023514hmy:HiddenValleyMemberifrs-full:MiningAssetsMember2025-06-300001023514hmy:KalgoldMemberifrs-full:MiningAssetsMember2025-07-012026-06-300001023514hmy:KalgoldMemberifrs-full:MiningAssetsMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMember2024-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMember2026-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberifrs-full:ConstructionInProgressMember2025-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberifrs-full:ConstructionInProgressMember2024-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberifrs-full:ConstructionInProgressMember2025-07-012026-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberifrs-full:ConstructionInProgressMember2024-07-012025-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberifrs-full:ConstructionInProgressMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:HiddenValleyMemberifrs-full:ConstructionInProgressMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:HiddenValleyMemberifrs-full:ConstructionInProgressMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:MoabKhotsongZaaiplaatsMemberifrs-full:ConstructionInProgressMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:MoabKhotsongZaaiplaatsMemberifrs-full:ConstructionInProgressMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:Doornkop212LevelMemberifrs-full:ConstructionInProgressMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:Doornkop212LevelMemberifrs-full:ConstructionInProgressMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:CSAMemberifrs-full:ConstructionInProgressMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:CSAMemberifrs-full:ConstructionInProgressMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:MponengMemberifrs-full:ConstructionInProgressMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:MponengMemberifrs-full:ConstructionInProgressMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:EvaCopperMemberifrs-full:ConstructionInProgressMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:EvaCopperMemberifrs-full:ConstructionInProgressMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:MoabKhotsongSungazer2Memberifrs-full:ConstructionInProgressMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:MoabKhotsongSungazer2Memberifrs-full:ConstructionInProgressMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:MispahPumpStationMemberifrs-full:ConstructionInProgressMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:MispahPumpStationMemberifrs-full:ConstructionInProgressMember2024-07-012025-06-300001023514hmy:WafiGolpuJointOperationMember2025-07-012026-06-300001023514hmy:WafiGolpuJointOperationMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:UndevelopedPropertiesMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:UndevelopedPropertiesMember2024-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:UndevelopedPropertiesMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:UndevelopedPropertiesMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:UndevelopedPropertiesMember2026-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberhmy:UndevelopedPropertiesMember2025-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberhmy:UndevelopedPropertiesMember2024-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberhmy:UndevelopedPropertiesMember2025-07-012026-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberhmy:UndevelopedPropertiesMember2024-07-012025-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberhmy:UndevelopedPropertiesMember2026-06-300001023514hmy:TargetNorthMemberhmy:UndevelopedPropertiesMember2026-06-300001023514hmy:TargetNorthMemberhmy:UndevelopedPropertiesMember2025-06-300001023514hmy:UndevelopedPropertiesMemberhmy:WafiGolpuJointOperationMember2026-06-300001023514hmy:UndevelopedPropertiesMemberhmy:WafiGolpuJointOperationMember2025-06-300001023514hmy:EvaCopperMemberhmy:UndevelopedPropertiesMember2026-06-300001023514hmy:EvaCopperMemberhmy:UndevelopedPropertiesMember2025-06-300001023514ifrs-full:VehiclesMember2025-07-012026-06-300001023514ifrs-full:ComputerEquipmentMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:OtherNonMiningAssetsMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:OtherNonMiningAssetsMember2024-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:OtherNonMiningAssetsMember2025-07-012026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:OtherNonMiningAssetsMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:OtherNonMiningAssetsMember2026-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberhmy:OtherNonMiningAssetsMember2025-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberhmy:OtherNonMiningAssetsMember2024-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberhmy:OtherNonMiningAssetsMember2025-07-012026-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberhmy:OtherNonMiningAssetsMember2024-07-012025-06-300001023514ifrs-full:AccumulatedDepreciationAmortisationAndImpairmentMemberhmy:OtherNonMiningAssetsMember2026-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsMember2026-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsMember2025-06-300001023514hmy:RestrictedInvestmentsHeldBySocialTrustFundsMember2026-06-300001023514hmy:RestrictedInvestmentsHeldBySocialTrustFundsMember2025-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsFixedDepositsMember2026-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsFixedDepositsMember2025-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsCashAndCashEquivalentsMember2026-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsCashAndCashEquivalentsMember2025-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsEquitylinkedDepositsMember2026-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsEquitylinkedDepositsMember2025-06-300001023514hmy:RestrictedInvestmentsGovernmentBondsMember2026-06-300001023514hmy:RestrictedInvestmentsGovernmentBondsMember2025-06-300001023514ifrs-full:EquityInvestmentsMember2026-06-300001023514ifrs-full:EquityInvestmentsMember2025-06-300001023514hmy:RestrictedInvestmentsCollectiveInvestmentSchemeUnitTrustMember2026-06-300001023514hmy:RestrictedInvestmentsCollectiveInvestmentSchemeUnitTrustMember2025-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsMember2024-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsMember2025-07-012026-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsMember2024-07-012025-06-300001023514hmy:ARMBBEETrustMember2026-06-300001023514hmy:ARMBBEETrustMember2025-06-300001023514hmy:DebtInstrumentMember2026-06-300001023514hmy:DebtInstrumentMember2025-06-300001023514hmy:RandMutualAssuranceMember2026-06-300001023514hmy:RandMutualAssuranceMember2025-06-300001023514hmy:OtherInvestmentsEquityInstrumentsMember2026-06-300001023514hmy:OtherInvestmentsEquityInstrumentsMember2025-06-300001023514hmy:PamodziMember2026-06-300001023514hmy:PamodziMember2025-06-300001023514hmy:ARMBBEETrustMember2020-07-012021-06-300001023514hmy:ARMMember2025-07-012026-06-300001023514hmy:ARMBBEETrustMember2025-07-012026-06-300001023514hmy:ARMBBEETrustMember2024-07-012025-06-300001023514hmy:PolymetalsResourcesLimitedMember2025-07-012026-06-300001023514hmy:RandGoldForwardContractsMember2026-06-300001023514hmy:USGoldForwardContractsMember2026-06-300001023514hmy:RandGoldCollarsContractsMember2026-06-300001023514hmy:USGoldCollarsContractsMember2026-06-300001023514hmy:USCopperSwapsMember2026-06-300001023514hmy:USsilvercontractsMember2026-06-300001023514hmy:ForeignExchangeContractsMember2026-06-300001023514hmy:RandGoldForwardContractsMember2025-07-012026-06-300001023514hmy:USGoldForwardContractsMember2025-07-012026-06-300001023514hmy:RandGoldCollarsContractsMember2025-07-012026-06-300001023514hmy:USGoldCollarsContractsMember2025-07-012026-06-300001023514hmy:USCopperSwapsMember2025-07-012026-06-300001023514hmy:USsilvercontractsMember2025-07-012026-06-300001023514hmy:ForeignExchangeContractsMember2025-07-012026-06-300001023514hmy:RandGoldForwardContractsMember2025-06-300001023514hmy:USGoldForwardContractsMember2025-06-300001023514hmy:RandGoldCollarsContractsMember2025-06-300001023514hmy:USGoldCollarsContractsMember2025-06-300001023514hmy:USsilvercontractsMember2025-06-300001023514hmy:ForeignExchangeContractsMember2025-06-300001023514hmy:RandGoldForwardContractsMember2024-07-012025-06-300001023514hmy:USGoldForwardContractsMember2024-07-012025-06-300001023514hmy:RandGoldCollarsContractsMember2024-07-012025-06-300001023514hmy:USGoldCollarsContractsMember2024-07-012025-06-300001023514hmy:USsilvercontractsMember2024-07-012025-06-300001023514hmy:ForeignExchangeContractsMember2024-07-012025-06-300001023514hmy:RandGoldForwardContractsMember2023-07-012024-06-300001023514hmy:USGoldForwardContractsMember2023-07-012024-06-300001023514hmy:RandGoldCollarsContractsMember2023-07-012024-06-300001023514hmy:USGoldCollarsContractsMember2023-07-012024-06-300001023514hmy:USsilvercontractsMember2023-07-012024-06-300001023514hmy:ForeignExchangeContractsMember2023-07-012024-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:NotLaterThanSixMonthsMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMember2026-06-300001023514hmy:ZeroCostCollarsMemberMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:NotLaterThanSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:NotLaterThanSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:ZeroCostCollarsMemberMemberifrs-full:TopOfRangeMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMemberhmy:NotLaterThanSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMember2026-06-300001023514hmy:RandGoldForwardContractsMemberhmy:NotLaterThanSixMonthsMember2026-06-300001023514hmy:RandGoldForwardContractsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-06-300001023514hmy:RandGoldForwardContractsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMember2026-06-300001023514hmy:RandGoldForwardContractsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMember2026-06-300001023514hmy:RandGoldForwardContractsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMember2026-06-300001023514hmy:RandGoldForwardContractsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMember2026-06-300001023514hmy:RandGoldForwardContractsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMemberhmy:NotLaterThanSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMember2026-06-300001023514hmy:USGoldForwardContractsMemberhmy:NotLaterThanSixMonthsMember2026-06-300001023514hmy:USGoldForwardContractsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-06-300001023514hmy:USGoldForwardContractsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMember2026-06-300001023514hmy:USGoldForwardContractsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMember2026-06-300001023514hmy:USGoldForwardContractsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMember2026-06-300001023514hmy:USGoldForwardContractsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMember2026-06-300001023514hmy:USGoldForwardContractsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldZeroCostCollarsMemberhmy:NotLaterThanSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldZeroCostCollarsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldZeroCostCollarsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldZeroCostCollarsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldZeroCostCollarsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldZeroCostCollarsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:RandGoldZeroCostCollarsMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberhmy:NotLaterThanSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberhmy:NotLaterThanSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:RandGoldZeroCostCollarsMemberifrs-full:TopOfRangeMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldZeroCostCollarsMemberhmy:NotLaterThanSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldZeroCostCollarsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldZeroCostCollarsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldZeroCostCollarsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldZeroCostCollarsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldZeroCostCollarsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMember2026-06-300001023514ifrs-full:CashFlowHedgesMemberhmy:USGoldZeroCostCollarsMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberhmy:NotLaterThanSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberhmy:NotLaterThanSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USGoldZeroCostCollarsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:GoldMemberhmy:NotLaterThanSixMonthsMember2026-06-300001023514hmy:GoldMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-06-300001023514hmy:GoldMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMember2026-06-300001023514hmy:GoldMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMember2026-06-300001023514hmy:GoldMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMember2026-06-300001023514hmy:GoldMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMember2026-06-300001023514hmy:GoldMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:NotLaterThanSixMonthsMember2026-06-300001023514hmy:USsilvercontractsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:NotLaterThanSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:NotLaterThanSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanOneYearNotLaterThanOneYearSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanOneYearSixMonthsNotLaterThanTwoYearsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanTwoYearsNotLaterThanTwoYearsSixMonthsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberhmy:LaterThanTwoYearSixMonthsNotLaterThanThreeYearsMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:USsilvercontractsMemberifrs-full:TopOfRangeMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:TradeReceivablesMetalsAtAmortisedCostMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:TradeReceivablesMetalsAtAmortisedCostMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:TradeReceivablesCopperConcentrateAtFVTPLMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:TradeReceivablesCopperConcentrateAtFVTPLMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:OtherTradeReceivablesMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberhmy:OtherTradeReceivablesMember2025-06-300001023514ifrs-full:TradeReceivablesMember2026-06-300001023514ifrs-full:TradeReceivablesMember2025-06-300001023514ifrs-full:TradeReceivablesMember2024-06-300001023514ifrs-full:TradeReceivablesMember2025-07-012026-06-300001023514ifrs-full:TradeReceivablesMember2024-07-012025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:FinancialAssetsIndividuallyAssessedForCreditLossesMemberifrs-full:TradeReceivablesMemberhmy:NeitherPastDueNorImpairedMember2026-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:FinancialAssetsIndividuallyAssessedForCreditLossesMemberifrs-full:TradeReceivablesMemberhmy:NeitherPastDueNorImpairedMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMemberifrs-full:CurrentMember2026-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMemberifrs-full:CurrentMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanOneMonthAndNotLaterThanTwoMonthsMember2026-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanOneMonthAndNotLaterThanTwoMonthsMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanTwoMonthsAndNotLaterThanThreeMonthsMember2026-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanTwoMonthsAndNotLaterThanThreeMonthsMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanThreeMonthsMember2026-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanThreeMonthsMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanOneYearMember2026-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanOneYearMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMember2026-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMember2026-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:FinancialAssetsIndividuallyAssessedForCreditLossesMemberifrs-full:TradeReceivablesMemberhmy:NeitherPastDueNorImpairedMember2025-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:FinancialAssetsIndividuallyAssessedForCreditLossesMemberifrs-full:TradeReceivablesMemberhmy:NeitherPastDueNorImpairedMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMemberifrs-full:CurrentMember2025-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMemberifrs-full:CurrentMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanOneMonthAndNotLaterThanTwoMonthsMember2025-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanOneMonthAndNotLaterThanTwoMonthsMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanTwoMonthsAndNotLaterThanThreeMonthsMember2025-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanTwoMonthsAndNotLaterThanThreeMonthsMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanThreeMonthsMember2025-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanThreeMonthsMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanOneYearMember2025-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMemberifrs-full:LaterThanOneYearMember2025-06-300001023514ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMember2025-06-300001023514ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMember2025-06-300001023514hmy:PamodziMember2008-02-272008-02-270001023514hmy:PamodziMember2008-02-270001023514hmy:RandRefineryMember2025-07-012026-06-300001023514hmy:RandRefineryMember2024-07-012025-06-300001023514hmy:RandRefineryMember2024-12-312024-12-310001023514hmy:RandRefineryMember2026-06-302026-06-300001023514hmy:WafiGolpuJointOperationMemberhmy:NewmontCorporationMember2025-07-012026-06-300001023514hmy:PGStateMember2025-07-012026-06-300001023514hmy:WafiGolpuJointOperationMember2026-06-300001023514hmy:WafiGolpuJointOperationMember2025-06-300001023514ifrs-full:OrdinarySharesMember2026-06-300001023514ifrs-full:OrdinarySharesMember2025-06-300001023514ifrs-full:PreferenceSharesMember2026-06-300001023514ifrs-full:PreferenceSharesMember2025-06-300001023514ifrs-full:OrdinarySharesMemberhmy:ShareTrustControlledByTheEntityMemberhmy:HarmonyESOPTrustMember2024-04-040001023514ifrs-full:PreferenceSharesMemberhmy:ShareTrustControlledByTheEntityMemberhmy:HarmonyGoldCommunityTrustMember2026-06-300001023514hmy:ShareTrustControlledByTheEntityMemberhmy:HarmonyGoldCommunityTrustMember2025-07-012026-06-300001023514ifrs-full:OrdinarySharesMemberifrs-full:SubsidiariesMemberhmy:LydenburgExplorationLimitedMember2026-06-300001023514ifrs-full:OrdinarySharesMemberifrs-full:SubsidiariesMemberhmy:LydenburgExplorationLimitedMember2025-06-300001023514ifrs-full:OrdinarySharesMemberhmy:ShareTrustControlledByTheEntityMemberhmy:KalgoldShareTrustMember2026-06-300001023514ifrs-full:OrdinarySharesMemberhmy:ShareTrustControlledByTheEntityMemberhmy:KalgoldShareTrustMember2025-06-300001023514ifrs-full:OrdinarySharesMemberhmy:ShareTrustControlledByTheEntityMemberhmy:HarmonyGoldESOPTrustMember2026-06-300001023514ifrs-full:OrdinarySharesMemberhmy:ShareTrustControlledByTheEntityMemberhmy:HarmonyGoldESOPTrustMember2025-06-300001023514ifrs-full:PreferenceSharesMemberhmy:ShareTrustControlledByTheEntityMemberhmy:HarmonyGoldCommunityTrustMember2025-06-300001023514hmy:RandGoldHedgingContractsMember2026-06-300001023514hmy:USGoldHedgingContractsMember2026-06-300001023514hmy:RandGoldHedgingContractsMember2025-06-300001023514hmy:USGoldHedgingContractsMember2025-06-300001023514hmy:AbelleLimitedMember2004-03-152004-03-150001023514hmy:AbelleLimitedMember2004-03-150001023514hmy:DoornkopSouthReefMemberhmy:AfricanVanguardResourcesProprietaryLimitedMember2010-03-192010-03-190001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:NotLaterThanOneYearMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:NotLaterThanOneYearMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:NotLaterThanOneYearMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:LaterThanFourYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:LaterThanFourYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:LaterThanFourYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:LaterThanTwoYearsAndNotLaterThanFourYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:LaterThanTwoYearsAndNotLaterThanFourYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:LaterThanTwoYearsAndNotLaterThanFourYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanFiveYearsAndNotLaterThanSevenYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanFiveYearsAndNotLaterThanSevenYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanFiveYearsAndNotLaterThanSevenYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanTenYearsAndNotLaterThanFifteenYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanTenYearsAndNotLaterThanFifteenYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanTenYearsAndNotLaterThanFifteenYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanFifteenYearsAndNotLaterThanTwentyYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanFifteenYearsAndNotLaterThanTwentyYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberifrs-full:LaterThanFifteenYearsAndNotLaterThanTwentyYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:LaterThanTwentyYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:LaterThanTwentyYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:LaterThanTwentyYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:TwoYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:TwoYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:TwoYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:ThreeYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:ThreeYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:ThreeYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FourYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FourYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FourYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FiveYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FiveYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FiveYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:SixYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:SixYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:SixYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:SevenYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:SevenYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:SevenYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:NineYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:NineYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:NineYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:ElevenYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:ElevenYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:ElevenYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:TwelveYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:TwelveYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:TwelveYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:ThirteenYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:ThirteenYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:ThirteenYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FourteenYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FourteenYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FourteenYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FifteenYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FifteenYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:FifteenYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:SeventeenYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:SeventeenYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:SeventeenYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:EighteenYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:EighteenYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:EighteenYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:NineteenYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:NineteenYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:NineteenYearsMember2023-07-012024-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:TwentyYearsMember2025-07-012026-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:TwentyYearsMember2024-07-012025-06-300001023514country:ZAifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMemberhmy:TwentyYearsMember2023-07-012024-06-300001023514hmy:PNGMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2025-07-012026-06-300001023514hmy:PNGMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2024-07-012025-06-300001023514hmy:PNGMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2023-07-012024-06-300001023514hmy:AustralianMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2025-07-012026-06-300001023514hmy:AustralianMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2024-07-012025-06-300001023514hmy:AustralianMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2023-07-012024-06-300001023514ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2025-06-300001023514ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2024-06-300001023514ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2025-07-012026-06-300001023514ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2024-07-012025-06-300001023514ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2026-06-300001023514hmy:SouthAfricanOperationsMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2026-06-300001023514hmy:SouthAfricanOperationsMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2025-06-300001023514hmy:PNGMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2026-06-300001023514hmy:PNGMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2025-06-300001023514hmy:AustralianMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2026-06-300001023514hmy:AustralianMemberifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2025-06-300001023514ifrs-full:LegalProceedingsProvisionMember2025-07-012026-06-300001023514ifrs-full:LegalProceedingsProvisionMember2024-07-012025-06-300001023514ifrs-full:LegalProceedingsProvisionMember2023-07-012024-06-300001023514ifrs-full:LegalProceedingsProvisionMember2026-06-300001023514hmy:RMALifeAssuranceCompanyLimitedMember2024-07-012025-06-300001023514ifrs-full:PresentValueOfDefinedBenefitObligationMember2025-07-012026-06-300001023514ifrs-full:PresentValueOfDefinedBenefitObligationMember2024-07-012025-06-300001023514hmy:RMALifeAssuranceCompanyLimitedMember2025-07-012026-06-300001023514hmy:RMALifeAssuranceCompanyLimitedMember2024-09-0100010235142025-10-242025-10-240001023514ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember2026-06-300001023514ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember2025-06-300001023514ifrs-full:LaterThanFiveYearsMember2026-06-300001023514ifrs-full:LaterThanFiveYearsMember2025-06-300001023514ifrs-full:LeaseLiabilitiesMember2025-07-012026-06-300001023514ifrs-full:LeaseLiabilitiesMember2024-07-012025-06-300001023514hmy:ShorttermleasepaymentsMember2025-07-012026-06-300001023514hmy:ShorttermleasepaymentsMember2024-07-012025-06-300001023514hmy:LeasepaymentsoflowvalueassetsleasedMember2025-07-012026-06-300001023514hmy:LeasepaymentsoflowvalueassetsleasedMember2024-07-012025-06-300001023514hmy:VariableleasepaymentsMember2025-07-012026-06-300001023514hmy:VariableleasepaymentsMember2024-07-012025-06-300001023514hmy:TotalleasesMember2025-07-012026-06-300001023514hmy:TotalleasesMember2024-07-012025-06-300001023514hmy:Phase1PowerPurchaseAgreementsMember2025-07-012026-06-300001023514hmy:Phase1PowerPurchaseAgreementsMember2024-07-012025-06-300001023514hmy:MponengMember2026-06-300001023514hmy:MponengMember2025-06-300001023514hmy:EvaCopperMember2026-06-300001023514hmy:EvaCopperMember2025-06-300001023514hmy:CSAMember2026-06-300001023514hmy:CSACopperLinkedMemberhmy:FirstContingentCopperPaymentMember2025-07-012026-06-300001023514hmy:CSACopperLinkedMemberhmy:SecondContingentCopperPaymentMember2025-07-012026-06-300001023514hmy:CSAMember2025-06-300001023514hmy:MponengOperationsAndRelatedAssetsMember2025-07-012026-06-300001023514hmy:MponengMember2025-07-012026-06-300001023514hmy:MponengMember2024-07-012025-06-300001023514hmy:EvaCopperMemberifrs-full:TopOfRangeMember2022-10-060001023514hmy:EvaCopperMember2025-07-012026-06-300001023514hmy:EvaCopperMember2024-07-012025-06-300001023514hmy:CSACopperLinkedMemberhmy:FirstContingentCopperPaymentMember2025-10-012025-10-310001023514hmy:CSACopperLinkedMemberhmy:SecondContingentCopperPaymentMember2026-03-012026-03-310001023514hmy:CSACopperLinkedMember2025-07-012026-06-300001023514hmy:CSACopperLinkedMember2024-07-012025-06-300001023514hmy:CSANSRMember2025-07-012026-06-300001023514hmy:CSANSRMember2024-07-012025-06-300001023514hmy:FrancoNevadaMember2020-10-010001023514hmy:CopperHostContractFinancialLiabilitiesMemberhmy:ORRoyaltiesInc.Member2025-10-240001023514hmy:SilverHostContractFinancialLiabilitiesMemberhmy:ORRoyaltiesInc.Member2025-10-240001023514hmy:CopperCompoundDerivativeMemberhmy:ORRoyaltiesInc.Member2025-10-240001023514hmy:SilverDerivativeMemberhmy:ORRoyaltiesInc.Member2025-10-240001023514ifrs-full:ParentMember2020-10-010001023514hmy:FrancoNevadaMember2024-07-012025-06-300001023514hmy:FrancoNevadaMemberifrs-full:TopOfRangeMember2008-12-172008-12-170001023514hmy:FrancoNevadaMember2024-06-300001023514hmy:FrancoNevadaMember2023-07-012023-12-160001023514hmy:FrancoNevadaMember2023-12-172024-10-230001023514hmy:CopperStreamMember2026-06-300001023514hmy:CopperStreamMember2025-06-300001023514hmy:CopperStreamMemberhmy:CopperHostContractFinancialLiabilitiesMember2026-06-300001023514hmy:CopperStreamMemberhmy:CopperHostContractFinancialLiabilitiesMember2025-06-300001023514hmy:CopperStreamMemberhmy:CopperCompoundDerivativeMember2026-06-300001023514hmy:CopperStreamMemberhmy:CopperCompoundDerivativeMember2025-06-300001023514hmy:SilverStreamMember2026-06-300001023514hmy:SilverStreamMember2025-06-300001023514hmy:SilverStreamMemberhmy:SilverHostContractFinancialLiabilitiesMember2026-06-300001023514hmy:SilverStreamMemberhmy:SilverHostContractFinancialLiabilitiesMember2025-06-300001023514hmy:SilverStreamMemberhmy:SilverDerivativeMember2026-06-300001023514hmy:SilverStreamMemberhmy:SilverDerivativeMember2025-06-300001023514hmy:ORRoyaltiesInc.Member2026-06-300001023514hmy:CopperStreamMemberhmy:ORRoyaltiesInc.Member2028-06-162028-06-160001023514hmy:ORRoyaltiesInc.Member2028-06-170001023514hmy:CopperStreamMemberhmy:ORRoyaltiesInc.Member2028-06-172028-06-170001023514hmy:CopperStreamMemberhmy:ORRoyaltiesInc.Member2028-06-182028-06-180001023514hmy:CopperStreamMemberhmy:CopperHostContractFinancialLiabilitiesMember2024-06-300001023514hmy:CopperStreamMemberhmy:MACCopperMemberhmy:CopperHostContractFinancialLiabilitiesMember2025-10-242025-10-240001023514hmy:CopperStreamMemberhmy:CopperHostContractFinancialLiabilitiesMember2025-07-012026-06-300001023514hmy:CopperStreamMemberhmy:CopperHostContractFinancialLiabilitiesMember2024-07-012025-06-300001023514hmy:CopperStreamMemberhmy:CopperCompoundDerivativeMember2024-06-300001023514hmy:CopperStreamMemberhmy:MACCopperMemberhmy:CopperCompoundDerivativeMember2025-10-242025-10-240001023514hmy:CopperStreamMemberhmy:CopperCompoundDerivativeMember2025-07-012026-06-300001023514hmy:CopperStreamMemberhmy:CopperCompoundDerivativeMember2024-07-012025-06-300001023514hmy:SilverStreamMemberhmy:SilverHostContractFinancialLiabilitiesMember2024-06-300001023514hmy:SilverStreamMemberhmy:MACCopperMemberhmy:SilverHostContractFinancialLiabilitiesMember2025-10-242025-10-240001023514hmy:SilverStreamMemberhmy:SilverHostContractFinancialLiabilitiesMember2025-07-012026-06-300001023514hmy:SilverStreamMemberhmy:SilverHostContractFinancialLiabilitiesMember2024-07-012025-06-300001023514hmy:SilverStreamMemberhmy:SilverDerivativeMember2024-06-300001023514hmy:SilverStreamMemberhmy:SilverDerivativeMember2025-07-012026-06-300001023514hmy:SilverStreamMemberhmy:SilverDerivativeMember2024-07-012025-06-300001023514hmy:R25BillionFacilitySustainabilityLinkedMember2022-05-300001023514hmy:R25BillionFacilitySustainabilityLinkedMember2022-05-012022-05-300001023514hmy:R25BillionFacilitySustainabilityLinkedMemberhmy:JohannesburgInterbankAgreedRateJIBARMember2022-05-300001023514hmy:US400MillionFacilitySustainabilityLinkedMember2022-05-300001023514hmy:US400MillionFacilitySustainabilityLinkedMember2022-05-012022-05-300001023514hmy:US400MillionFacilitySustainabilityLinkedMemberhmy:TermLoanMember2022-05-300001023514hmy:US400MillionFacilitySustainabilityLinkedMemberhmy:TermLoanMemberhmy:SecuredOvernightFinancingRateSOFRMember2022-05-300001023514hmy:US400MillionFacilitySustainabilityLinkedMemberhmy:RCFMember2022-05-300001023514hmy:US400MillionFacilitySustainabilityLinkedMemberhmy:RCFMemberhmy:SecuredOvernightFinancingRateSOFRMember2022-05-300001023514hmy:R15BillionFacilityGreenTermLoanMember2022-05-300001023514hmy:R15BillionFacilityGreenTermLoanMember2022-05-012022-05-300001023514hmy:R15BillionFacilityGreenTermLoanMemberhmy:JohannesburgInterbankAgreedRateJIBARMember2022-05-300001023514hmy:US1.25BillionFacilityBridgeFacilityMember2025-05-300001023514hmy:US1.25BillionFacilityBridgeFacilityMember2025-05-012025-05-300001023514hmy:US1.25BillionFacilityBridgeFacilityMemberhmy:TermLoanMemberhmy:SecuredOvernightFinancingRateSOFRMemberhmy:NotLaterThanSixMonthsMember2025-05-300001023514hmy:US1.25BillionFacilityBridgeFacilityMemberhmy:TermLoanMemberhmy:SecuredOvernightFinancingRateSOFRMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2025-05-300001023514hmy:US1.25BillionFacilityBridgeFacilityMemberhmy:TermLoanMemberhmy:SecuredOvernightFinancingRateSOFRMemberhmy:LaterThanOneYearAndNotLaterThanOneYearSixMonthsMember2025-05-300001023514hmy:SeniorSyndicatedFacilityMemberhmy:TermLoanMember2023-02-280001023514hmy:SeniorSyndicatedFacilityMember2023-02-012023-02-280001023514hmy:SeniorSyndicatedFacilityMemberhmy:TermLoanMemberhmy:SecuredOvernightFinancingRateSOFRMemberifrs-full:BottomOfRangeMember2023-02-280001023514hmy:SeniorSyndicatedFacilityMemberhmy:TermLoanMemberhmy:SecuredOvernightFinancingRateSOFRMemberifrs-full:TopOfRangeMember2023-02-280001023514hmy:SeniorSyndicatedFacilityMemberhmy:RCFMember2023-02-280001023514hmy:SeniorSyndicatedFacilityMemberhmy:RCFMemberhmy:SecuredOvernightFinancingRateSOFRMemberifrs-full:BottomOfRangeMember2023-02-280001023514hmy:SeniorSyndicatedFacilityMemberhmy:RCFMemberhmy:SecuredOvernightFinancingRateSOFRMemberifrs-full:TopOfRangeMember2023-02-280001023514hmy:US500MillionRCFMember2026-06-250001023514hmy:US500MillionRCFMember2026-06-012026-06-300001023514hmy:US500MillionRCFMemberhmy:RCFMemberhmy:SecuredOvernightFinancingRateSOFRMember2026-06-250001023514hmy:AUD500MillionFacilityMember2026-06-250001023514hmy:AUD500MillionFacilityMember2026-06-012026-06-300001023514hmy:AUD500MillionFacilityMemberhmy:RCFMemberhmy:BankBillSwapRateBBSYMember2026-06-250001023514hmy:AUD500MillionFacilityMemberhmy:TermLoanMemberhmy:BankBillSwapRateBBSYMember2026-06-250001023514hmy:R4BillionRCFMember2026-06-250001023514hmy:R4BillionRCFMember2026-06-012026-06-300001023514hmy:R4BillionRCFMemberhmy:RCFMemberhmy:SouthAfricanRandOvernightIndexAverageZARONIAMember2026-06-250001023514hmy:R3BillionGreenTermLoanMember2026-06-250001023514hmy:R3BillionGreenTermLoanMember2026-06-012026-06-300001023514hmy:R3BillionGreenTermLoanMemberhmy:TermLoanMemberhmy:SouthAfricanRandOvernightIndexAverageZARONIAMember2026-06-250001023514hmy:USRCFRandRCFMember2026-07-012027-06-300001023514hmy:USRCFRandRCFMember2027-07-012028-06-300001023514hmy:USRCFRandRCFMember2028-07-012029-06-300001023514hmy:US1.25BillionFacilityBridgeFacilityMember2026-06-300001023514hmy:US400MillionFacilitySustainabilityLinkedMember2026-06-300001023514hmy:US400MillionFacilitySustainabilityLinkedMember2025-06-300001023514hmy:US400MillionFacilitySustainabilityLinkedMember2024-06-300001023514hmy:US400MillionFacilitySustainabilityLinkedMember2025-07-012026-06-300001023514hmy:US400MillionFacilitySustainabilityLinkedMember2024-07-012025-06-300001023514hmy:R15BillionFacilityGreenTermLoanMember2026-06-300001023514hmy:R15BillionFacilityGreenTermLoanMember2025-06-300001023514hmy:R15BillionFacilityGreenTermLoanMember2024-06-300001023514hmy:R15BillionFacilityGreenTermLoanMember2025-07-012026-06-300001023514hmy:R15BillionFacilityGreenTermLoanMember2024-07-012025-06-300001023514hmy:SeniorSyndicatedFacilityMember2026-06-300001023514hmy:SeniorSyndicatedFacilityMember2025-06-300001023514hmy:SeniorSyndicatedFacilityMember2024-06-300001023514hmy:SeniorSyndicatedFacilityMember2025-10-240001023514hmy:SeniorSyndicatedFacilityMember2025-07-012026-06-300001023514hmy:SeniorSyndicatedFacilityMember2024-07-012025-06-300001023514hmy:US1.25BillionFacilityBridgeFacilityMember2025-06-300001023514hmy:US1.25BillionFacilityBridgeFacilityMember2024-06-300001023514hmy:US1.25BillionFacilityBridgeFacilityMember2025-07-012026-06-300001023514hmy:US1.25BillionFacilityBridgeFacilityMember2024-07-012025-06-300001023514ifrs-full:LaterThanOneYearMember2026-06-300001023514ifrs-full:LaterThanOneYearMember2025-06-300001023514hmy:US400MillionFacilitySustainabilityLinkedMemberhmy:TermLoanMemberhmy:EffectiveInterestRateMember2026-06-300001023514hmy:US400MillionFacilitySustainabilityLinkedMemberhmy:TermLoanMemberhmy:EffectiveInterestRateMember2025-06-300001023514hmy:US400MillionFacilitySustainabilityLinkedMemberhmy:RCFMemberhmy:EffectiveInterestRateMember2026-06-300001023514hmy:US400MillionFacilitySustainabilityLinkedMemberhmy:RCFMemberhmy:EffectiveInterestRateMember2025-06-300001023514hmy:R15BillionFacilityGreenTermLoanMemberhmy:EffectiveInterestRateMember2026-06-300001023514hmy:R15BillionFacilityGreenTermLoanMemberhmy:EffectiveInterestRateMember2025-06-300001023514hmy:US1.25BillionFacilityBridgeFacilityMemberhmy:US250MillionTermFacilityMemberhmy:EffectiveInterestRateMember2026-06-300001023514hmy:US1.25BillionFacilityBridgeFacilityMemberhmy:US250MillionTermFacilityMemberhmy:EffectiveInterestRateMember2025-06-300001023514hmy:US1.25BillionFacilityBridgeFacilityMemberhmy:US1BillionTermFacilityMemberhmy:EffectiveInterestRateMember2026-06-300001023514hmy:US1.25BillionFacilityBridgeFacilityMemberhmy:US1BillionTermFacilityMemberhmy:EffectiveInterestRateMember2025-06-300001023514hmy:MACCopperMemberhmy:LeaveLiabilityMember2026-06-300001023514hmy:RestrictedInvestmentsHeldByEnvironmentalTrustFundsMember2023-07-012024-06-300001023514hmy:MponengMember2025-07-012026-06-300001023514hmy:MponengMember2024-07-012025-06-300001023514hmy:MponengMember2023-07-012024-06-300001023514hmy:EvaCopperMember2025-07-012026-06-300001023514hmy:EvaCopperMember2024-07-012025-06-300001023514hmy:EvaCopperMember2023-07-012024-06-300001023514hmy:CSACopperLinkedMember2025-07-012026-06-300001023514hmy:CSACopperLinkedMember2024-07-012025-06-300001023514hmy:CSACopperLinkedMember2023-07-012024-06-300001023514hmy:CSANSRMember2025-07-012026-06-300001023514hmy:CSANSRMember2024-07-012025-06-300001023514hmy:CSANSRMember2023-07-012024-06-300001023514hmy:NewBorrowingsFacilitiesMember2026-06-300001023514ifrs-full:CountryOfDomicileMember2026-06-300001023514ifrs-full:CountryOfDomicileMember2025-06-300001023514ifrs-full:ForeignCountriesMember2026-06-300001023514ifrs-full:ForeignCountriesMember2025-06-300001023514hmy:TswelopeleBeneficiationOperationProprietaryLimitedMember2026-06-300001023514hmy:MargaretWaterCompanyNPCMember2026-06-300001023514hmy:MargaretWaterCompanyNPCMember2025-07-012026-06-300001023514hmy:HarmonyESOPTrustMember2023-07-012024-06-3000010235142023-12-080001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMember2023-07-012024-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMember2024-04-042024-06-300001023514hmy:ManagementdeferredshareplanMemberifrs-full:BottomOfRangeMember2019-09-182019-09-180001023514hmy:ManagementdeferredshareplanMemberifrs-full:TopOfRangeMember2019-09-182019-09-180001023514hmy:ManagementdeferredshareplanMember2020-09-182020-09-180001023514hmy:ManagementdeferredshareplanMemberifrs-full:BottomOfRangeMember2021-09-202021-09-200001023514hmy:ManagementdeferredshareplanMemberifrs-full:TopOfRangeMember2021-09-202021-09-200001023514hmy:ManagementdeferredshareplanMemberifrs-full:BottomOfRangeMember2022-09-192022-09-190001023514hmy:ManagementdeferredshareplanMemberifrs-full:TopOfRangeMember2022-09-192022-09-190001023514hmy:ManagementdeferredshareplanMemberifrs-full:BottomOfRangeMember2023-09-182023-09-180001023514hmy:ManagementdeferredshareplanMemberifrs-full:TopOfRangeMember2023-09-182023-09-180001023514hmy:ManagementdeferredshareplanMemberifrs-full:BottomOfRangeMember2024-09-182024-09-180001023514hmy:ManagementdeferredshareplanMemberifrs-full:TopOfRangeMember2024-09-182024-09-180001023514hmy:ManagementdeferredshareplanMemberifrs-full:BottomOfRangeMember2025-09-182025-09-180001023514hmy:ManagementdeferredshareplanMemberifrs-full:TopOfRangeMember2025-09-182025-09-180001023514hmy:ManagementdeferredshareplanMemberhmy:September182025Memberifrs-full:BottomOfRangeMember2025-09-182025-09-180001023514hmy:ManagementdeferredshareplanMemberhmy:September182025Memberifrs-full:TopOfRangeMember2025-09-182025-09-180001023514hmy:ManagementdeferredshareplanMemberhmy:September182025Memberifrs-full:BottomOfRangeMember2025-09-180001023514hmy:ManagementdeferredshareplanMemberhmy:September182025Memberifrs-full:TopOfRangeMember2025-09-180001023514hmy:ManagementdeferredshareplanMemberhmy:September182025Memberhmy:OverthreeyearsMember2025-09-182025-09-180001023514hmy:ManagementdeferredshareplanMemberhmy:September182025Memberhmy:OverfiveyearsMember2025-09-182025-09-180001023514hmy:ManagementdeferredshareplanMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMember2023-07-012024-06-300001023514ifrs-full:OrdinarySharesMemberhmy:ManagementdeferredshareplanMember2026-06-300001023514ifrs-full:OrdinarySharesMemberhmy:ManagementdeferredshareplanMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:DSMemberhmy:ShareBasedPaymentArrangementTrancheThreeMemberhmy:ExecutiveDirectorsAndPrescribedOfficersMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:DSMemberhmy:ShareBasedPaymentArrangementTrancheFiveMemberhmy:ExecutiveDirectorsAndPrescribedOfficersMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:DSMemberhmy:ShareBasedPaymentArrangementTrancheTwoMemberhmy:ExecutiveDirectorsAndPrescribedOfficersMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:DSMemberhmy:ShareBasedPaymentArrangementTrancheFourMemberhmy:ExecutiveDirectorsAndPrescribedOfficersMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:DSMemberhmy:ShareBasedPaymentArrangementTrancheOneMemberhmy:ExecutiveDirectorsAndPrescribedOfficersMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:DSMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:DSMember2024-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:DSMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:DSMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:DSMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182019Memberhmy:DSMemberhmy:OverfiveyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182020Memberhmy:DSMemberhmy:OverfiveyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September202021Memberhmy:DSMemberhmy:OverfiveyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September192022Memberhmy:DSMemberhmy:OverfiveyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182023Memberhmy:DSMemberhmy:OverthreeyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182023Memberhmy:DSMemberhmy:OverfiveyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182024Memberhmy:DSMemberhmy:OverthreeyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182024Memberhmy:DSMemberhmy:OverfiveyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182025Memberhmy:DSMemberhmy:OverthreeyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182025Memberhmy:DSMemberhmy:OverfiveyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182019Memberhmy:DSMemberhmy:OverfiveyearsMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182019Memberhmy:DSMemberhmy:OverfiveyearsMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182019Memberhmy:DSMemberhmy:OverfiveyearsMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182020Memberhmy:DSMemberhmy:OverfiveyearsMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182020Memberhmy:DSMemberhmy:OverfiveyearsMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182020Memberhmy:DSMemberhmy:OverfiveyearsMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September202021Memberhmy:DSMemberhmy:OverthreeyearsMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September202021Memberhmy:DSMemberhmy:OverthreeyearsMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September202021Memberhmy:DSMemberhmy:OverthreeyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September202021Memberhmy:DSMemberhmy:OverthreeyearsMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September202021Memberhmy:DSMemberhmy:OverfiveyearsMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September202021Memberhmy:DSMemberhmy:OverfiveyearsMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September202021Memberhmy:DSMemberhmy:OverfiveyearsMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September192022Memberhmy:DSMemberhmy:OverthreeyearsMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September192022Memberhmy:DSMemberhmy:OverthreeyearsMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September192022Memberhmy:DSMemberhmy:OverthreeyearsMember2026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September192022Memberhmy:DSMemberhmy:OverthreeyearsMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September192022Memberhmy:DSMemberhmy:OverfiveyearsMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September192022Memberhmy:DSMemberhmy:OverfiveyearsMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September192022Memberhmy:DSMemberhmy:OverfiveyearsMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182023Memberhmy:DSMemberhmy:OverthreeyearsMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182023Memberhmy:DSMemberhmy:OverthreeyearsMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182023Memberhmy:DSMemberhmy:OverthreeyearsMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182023Memberhmy:DSMemberhmy:OverfiveyearsMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182023Memberhmy:DSMemberhmy:OverfiveyearsMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182023Memberhmy:DSMemberhmy:OverfiveyearsMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182024Memberhmy:DSMemberhmy:OverthreeyearsMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182024Memberhmy:DSMemberhmy:OverthreeyearsMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182024Memberhmy:DSMemberhmy:OverthreeyearsMember2025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182024Memberhmy:DSMemberhmy:OverfiveyearsMember2025-07-012026-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182024Memberhmy:DSMemberhmy:OverfiveyearsMember2024-07-012025-06-300001023514hmy:ManagementdeferredshareplanMemberhmy:September182024Memberhmy:DSMemberhmy:OverfiveyearsMember2025-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:ParticipationUnitsMember2024-07-012024-07-010001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:ParticipationUnitsMember2024-04-042024-04-040001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:ESOPMember2025-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:ESOPMember2024-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:ESOPMember2025-07-012026-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:ESOPMember2024-07-012025-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:ESOPMember2026-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:April42024Memberhmy:ESOPMember2025-07-012026-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:April42024Memberhmy:ESOPMember2024-07-012025-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:April42024Memberhmy:ESOPMember2026-06-300001023514hmy:KatlehoYaMoruoEmployeeShareOwnershipPlanMemberhmy:April42024Memberhmy:ESOPMember2025-06-300001023514hmy:ExecutiveDirectorMember2025-07-012026-06-300001023514hmy:NonExecutiveDirectorMember2025-07-012026-06-300001023514hmy:ExecutiveDirectorMember2024-07-012025-06-300001023514hmy:NonExecutiveDirectorMember2024-07-012025-06-300001023514hmy:BeyersNelDirectorMemberhmy:Director1Member2026-06-300001023514hmy:BeyersNelDirectorMemberhmy:Director1Member2025-06-300001023514hmy:BoipeloLekuboDirectorMemberhmy:Director1Member2026-06-300001023514hmy:BoipeloLekuboDirectorMemberhmy:Director1Member2025-06-300001023514hmy:HarryMashegoDirectorMemberhmy:Director1Member2026-06-300001023514hmy:HarryMashegoDirectorMemberhmy:Director1Member2025-06-300001023514hmy:AntonButheleziPrescribedOfficerMemberhmy:Officer1Member2026-06-300001023514hmy:AntonButheleziPrescribedOfficerMemberhmy:Officer1Member2025-06-300001023514hmy:MarianVanDerWaltPrescribedOfficerMemberhmy:Officer1Member2026-06-300001023514hmy:MarianVanDerWaltPrescribedOfficerMemberhmy:Officer1Member2025-06-300001023514hmy:JohannesVanHeerdenPrescribedOfficerMemberhmy:Officer1Member2026-06-300001023514hmy:JohannesVanHeerdenPrescribedOfficerMemberhmy:Officer1Member2025-06-300001023514hmy:UrishanieGovenderPrescribedOfficerMemberhmy:Officer1Member2026-06-300001023514hmy:UrishanieGovenderPrescribedOfficerMemberhmy:Officer1Member2025-06-300001023514hmy:FloydMasemulaPrescribedOfficerMemberhmy:Officer1Member2026-06-300001023514hmy:FloydMasemulaPrescribedOfficerMemberhmy:Officer1Member2025-06-300001023514hmy:JacoBoshoffPrescribedOfficerMemberhmy:Officer1Member2026-06-300001023514hmy:JacoBoshoffPrescribedOfficerMemberhmy:Officer1Member2025-06-300001023514ifrs-full:JointControlOrSignificantInfluenceMember2025-07-012026-06-300001023514ifrs-full:JointControlOrSignificantInfluenceMember2024-07-012025-06-300001023514ifrs-full:AssociatesMember2025-07-012026-06-300001023514ifrs-full:AssociatesMember2024-07-012025-06-300001023514hmy:EvaCopperMember2026-06-300001023514hmy:ReclamationAndDepositionProjectsMember2026-06-300001023514hmy:SolarProjectsMember2026-06-300001023514hmy:TheNooitgedachtTSFConstructionProjectMember2026-06-300001023514hmy:SolarProjectsMember2026-06-300001023514hmy:ContingentLiabilityForGuaranteesAndSuretyshipsMember2026-06-300001023514hmy:ContingentLiabilityForGuaranteesAndSuretyshipsMember2025-06-300001023514hmy:ContingentLiabilityForEnvironmentalGuaranteesMember2026-06-300001023514hmy:ContingentLiabilityForEnvironmentalGuaranteesMember2025-06-300001023514ifrs-full:ContingentLiabilityForGuaranteesMember2026-06-300001023514ifrs-full:ContingentLiabilityForGuaranteesMember2025-06-300001023514hmy:RioTintoLimitedMember2008-12-012008-12-010001023514hmy:RioTintoLimitedMember2008-12-0100010235142008-12-010001023514hmy:WafiGolpuJointOperationMember2008-12-010001023514hmy:ContingentLiabilityForDecommissioningRestorationAndRehabilitationCostsPriorToEffectiveDateOfSaleMember2026-06-300001023514hmy:ContingentLiabilityForDecommissioningRestorationAndRehabilitationCostsPriorToEffectiveDateOfSaleMemberhmy:RandUraniumMember2026-06-300001023514hmy:ContingentLiabilityForRatesPayableMerafongMemberhmy:MerafongMunicipalityMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:ContingentLiabilityForRatesPayableMerafongMemberhmy:MerafongMunicipalityMemberifrs-full:TopOfRangeMember2026-06-300001023514hmy:ContingentLiabilityPayableForRatesHarmonyMemberhmy:MerafongMunicipalityMemberifrs-full:BottomOfRangeMember2026-06-300001023514hmy:ContingentLiabilityPayableForRatesHarmonyMemberhmy:MerafongMunicipalityMemberifrs-full:TopOfRangeMember2026-06-300001023514ifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberhmy:RestrictedCashAndInvestmentsMember2026-06-300001023514ifrs-full:InvestmentsInEquityInstrumentsMeasuredAtFairValueThroughOtherComprehensiveIncomeMemberhmy:RestrictedCashAndInvestmentsMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:RestrictedCashAndInvestmentsMember2026-06-300001023514ifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberhmy:OtherNonCurrentAssetsMember2026-06-300001023514ifrs-full:InvestmentsInEquityInstrumentsMeasuredAtFairValueThroughOtherComprehensiveIncomeMemberhmy:OtherNonCurrentAssetsMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:OtherNonCurrentAssetsMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:Nondesignated1Member2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:RandGoldCollarsContractsMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:USGoldCollarsContractsMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:USsilvercontractsMemberhmy:Nondesignated1Member2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:Nondesignated1Member2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:RandGoldCollarsContractsMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:USGoldCollarsContractsMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:ForeignExchangeContractsMemberhmy:Nondesignated1Member2026-06-300001023514ifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:TradeReceivablesMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberifrs-full:TradeReceivablesMember2026-06-300001023514ifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberhmy:CashandCashEquivalents1Member2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:NoncurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:Nondesignated1Memberhmy:NoncurrentDerivativeLiabilitiesMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:NoncurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:NoncurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:NoncurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:RandGoldCollarsContractsMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:NoncurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:USGoldCollarsContractsMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:Nondesignated1Memberhmy:NoncurrentDerivativeLiabilitiesMemberhmy:USsilvercontractsMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:CurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:Nondesignated1Memberhmy:CurrentDerivativeLiabilitiesMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:CurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:CurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:CurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:RandGoldCollarsContractsMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:CurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:USGoldCollarsContractsMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:Nondesignated1Memberhmy:CurrentDerivativeLiabilitiesMemberhmy:USsilvercontractsMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberhmy:Borrowings1Member2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:ContingentConsiderationLiabilityMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:Nondesignated1Memberhmy:StreamingContractLiabilityMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberhmy:StreamingContractLiabilityMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberhmy:OtherNoncurrentPayablesMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberhmy:TradeAndOtherPayablesMember2026-06-300001023514ifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberhmy:RestrictedCashAndInvestmentsMember2025-06-300001023514ifrs-full:InvestmentsInEquityInstrumentsMeasuredAtFairValueThroughOtherComprehensiveIncomeMemberhmy:RestrictedCashAndInvestmentsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:RestrictedCashAndInvestmentsMember2025-06-300001023514ifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberhmy:OtherNonCurrentAssetsMember2025-06-300001023514ifrs-full:InvestmentsInEquityInstrumentsMeasuredAtFairValueThroughOtherComprehensiveIncomeMemberhmy:OtherNonCurrentAssetsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:OtherNonCurrentAssetsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:Nondesignated1Member2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:RandGoldCollarsContractsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:USGoldCollarsContractsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:USsilvercontractsMemberhmy:Nondesignated1Member2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:NoncurrentDerivativeAssetsMemberhmy:ForeignExchangeContractsMemberhmy:Nondesignated1Member2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:Nondesignated1Member2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:RandGoldCollarsContractsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:DesignatedAsHedgingInstrument1Memberifrs-full:CashFlowHedgesMemberhmy:USGoldCollarsContractsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:CurrentDerivativeAssetsMemberhmy:ForeignExchangeContractsMemberhmy:Nondesignated1Member2025-06-300001023514ifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberifrs-full:TradeReceivablesMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberifrs-full:TradeReceivablesMember2025-06-300001023514ifrs-full:FinancialAssetsAtAmortisedCostCategoryMemberhmy:CashandCashEquivalents1Member2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:NoncurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:Nondesignated1Memberhmy:NoncurrentDerivativeLiabilitiesMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:NoncurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:NoncurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:NoncurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:RandGoldCollarsContractsMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:NoncurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:USGoldCollarsContractsMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:Nondesignated1Memberhmy:NoncurrentDerivativeLiabilitiesMemberhmy:USsilvercontractsMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:CurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:Nondesignated1Memberhmy:CurrentDerivativeLiabilitiesMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:CurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:RandGoldForwardContractsMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:CurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:USGoldForwardContractsMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:CurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:RandGoldCollarsContractsMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:DesignatedAsHedgingInstrument1Memberhmy:CurrentDerivativeLiabilitiesMemberifrs-full:CashFlowHedgesMemberhmy:USGoldCollarsContractsMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:Nondesignated1Memberhmy:CurrentDerivativeLiabilitiesMemberhmy:USsilvercontractsMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberhmy:Borrowings1Member2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:ContingentConsiderationLiabilityMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberhmy:OtherNoncurrentPayablesMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtAmortisedCostCategoryMemberhmy:TradeAndOtherPayablesMember2025-06-300001023514ifrs-full:BottomOfRangeMember2025-07-012026-06-300001023514ifrs-full:TopOfRangeMember2025-07-012026-06-300001023514ifrs-full:BottomOfRangeMember2024-07-012025-06-300001023514ifrs-full:TopOfRangeMember2024-07-012025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:Borrowings1Memberhmy:RandAgainstUSDMember2025-07-012026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:Borrowings1Memberhmy:RandAgainstUSDMember2024-07-012025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:ContingentConsiderationLiabilityMemberhmy:RandAgainstAUDMember2025-07-012026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:ContingentConsiderationLiabilityMemberhmy:RandAgainstAUDMember2024-07-012025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:ContingentConsiderationLiabilityAustraliaMemberhmy:AUDAgainstUSDMember2025-07-012026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:ContingentConsiderationLiabilityAustraliaMemberhmy:AUDAgainstUSDMember2024-07-012025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:Borrowings1Memberhmy:RandAgainstUSDMember2026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:Borrowings1Memberhmy:RandAgainstUSDMember2025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:Borrowings1Memberhmy:AUDAgainstUSDMember2026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:Borrowings1Memberhmy:AUDAgainstUSDMember2025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:Borrowings1Memberhmy:AUDAgainstUSDMember2025-07-012026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:Borrowings1Memberhmy:AUDAgainstUSDMember2024-07-012025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:ContingentConsiderationLiabilityMponengMemberhmy:RandAgainstUSDMember2026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:ContingentConsiderationLiabilityMponengMemberhmy:RandAgainstUSDMember2025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:ContingentConsiderationLiabilityMponengMemberhmy:RandAgainstUSDMember2025-07-012026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:ContingentConsiderationLiabilityMponengMemberhmy:RandAgainstUSDMember2024-07-012025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:ContingentConsiderationLiabilityAustraliaMemberhmy:AUDAgainstUSDMember2026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:ContingentConsiderationLiabilityAustraliaMemberhmy:AUDAgainstUSDMember2025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:StreamingArrangementsMACCopperMemberhmy:AUDAgainstUSDMember2026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:StreamingArrangementsMACCopperMemberhmy:AUDAgainstUSDMember2025-06-300001023514ifrs-full:CurrencyRiskMemberhmy:StreamingArrangementsMACCopperMemberhmy:AUDAgainstUSDMember2025-07-012026-06-300001023514ifrs-full:CurrencyRiskMemberhmy:StreamingArrangementsMACCopperMemberhmy:AUDAgainstUSDMember2024-07-012025-06-300001023514hmy:DerivativeFinancialInstrumentsMemberifrs-full:CurrencyRiskMemberhmy:RandAgainstUSDMember2026-06-300001023514hmy:DerivativeFinancialInstrumentsMemberifrs-full:CurrencyRiskMemberhmy:RandAgainstUSDMember2025-06-300001023514hmy:DerivativeFinancialInstrumentsMemberifrs-full:CurrencyRiskMemberhmy:RandAgainstUSDMember2025-07-012026-06-300001023514hmy:DerivativeFinancialInstrumentsMemberifrs-full:CurrencyRiskMemberhmy:RandAgainstUSDMember2024-07-012025-06-300001023514hmy:FinancialAssetMemberifrs-full:CurrencyRiskMemberhmy:AUDAgainstUSDMember2026-06-300001023514hmy:FinancialAssetMemberifrs-full:CurrencyRiskMemberhmy:AUDAgainstUSDMember2025-06-300001023514hmy:FinancialAssetMemberifrs-full:CurrencyRiskMemberhmy:AUDAgainstUSDMember2025-07-012026-06-300001023514hmy:FinancialAssetMemberifrs-full:CurrencyRiskMemberhmy:AUDAgainstUSDMember2024-07-012025-06-300001023514hmy:FinancialAssetMemberifrs-full:CurrencyRiskMemberhmy:AUDAgainstUSDMember2025-07-012026-06-300001023514hmy:FinancialAssetMemberifrs-full:CurrencyRiskMemberhmy:AUDAgainstUSDMember2024-07-012025-06-300001023514hmy:FinancialAssetMemberifrs-full:CurrencyRiskMemberhmy:RandAgainstAUDMember2026-06-300001023514hmy:FinancialAssetMemberifrs-full:CurrencyRiskMemberhmy:RandAgainstAUDMember2025-06-300001023514hmy:FinancialAssetMemberifrs-full:CurrencyRiskMemberhmy:RandAgainstAUDMember2025-07-012026-06-300001023514hmy:FinancialAssetMemberifrs-full:CurrencyRiskMemberhmy:RandAgainstAUDMember2024-07-012025-06-300001023514ifrs-full:NotLaterThanOneYearMember2025-07-012026-06-300001023514ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-07-012026-06-300001023514ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-07-012026-06-300001023514hmy:NotLaterThanTwoYearsMember2025-07-012026-06-300001023514hmy:NotLaterThanFiveYearsMember2025-07-012026-06-300001023514ifrs-full:CommodityPriceRiskMemberifrs-full:CashFlowHedgesMemberhmy:RandGoldDerivativeContractsMember2025-07-012026-06-300001023514ifrs-full:CommodityPriceRiskMemberifrs-full:CashFlowHedgesMemberhmy:RandGoldDerivativeContractsMember2024-07-012025-06-300001023514ifrs-full:CommodityPriceRiskMemberifrs-full:CashFlowHedgesMemberhmy:USsilvercontractsMember2025-07-012026-06-300001023514ifrs-full:CommodityPriceRiskMemberifrs-full:CashFlowHedgesMemberhmy:USGoldDerivativeContractsMember2025-07-012026-06-300001023514ifrs-full:CommodityPriceRiskMemberifrs-full:CashFlowHedgesMemberhmy:USGoldDerivativeContractsMember2024-07-012025-06-300001023514ifrs-full:CommodityPriceRiskMemberifrs-full:CashFlowHedgesMemberhmy:USsilvercontractsMember2024-07-012025-06-300001023514hmy:RestrictedInvestmentsCollectiveInvestmentSchemeCombinedUnitTrustMember2026-06-300001023514hmy:RestrictedInvestmentsCollectiveInvestmentSchemeCombinedUnitTrustMember2025-06-300001023514hmy:CashandCashEquivalents1Memberhmy:CreditRatingAAPlusMember2026-06-300001023514hmy:CashandCashEquivalents1Memberhmy:CreditRatingAAPlusMember2025-06-300001023514hmy:CashandCashEquivalents1Memberhmy:CreditRatingAAMember2026-06-300001023514hmy:CashandCashEquivalents1Memberhmy:CreditRatingAAMember2025-06-300001023514hmy:CashandCashEquivalents1Memberhmy:CreditRatingAAMinusMember2026-06-300001023514hmy:CashandCashEquivalents1Memberhmy:CreditRatingAAMinusMember2025-06-300001023514hmy:CashandCashEquivalents1Memberhmy:CreditRatingAPlusMember2026-06-300001023514hmy:CashandCashEquivalents1Memberhmy:CreditRatingAPlusMember2025-06-300001023514hmy:CashandCashEquivalents1Member2026-06-300001023514hmy:CashandCashEquivalents1Member2025-06-300001023514hmy:RestrictedCashAndInvestmentsMemberhmy:CreditRatingAAPlusMember2026-06-300001023514hmy:RestrictedCashAndInvestmentsMemberhmy:CreditRatingAAPlusMember2025-06-300001023514hmy:RestrictedCashAndInvestmentsMemberhmy:CreditRatingAAMinusMember2026-06-300001023514hmy:RestrictedCashAndInvestmentsMemberhmy:CreditRatingAAMinusMember2025-06-300001023514hmy:RestrictedCashAndInvestmentsMember2026-06-300001023514hmy:RestrictedCashAndInvestmentsMember2025-06-300001023514ifrs-full:DerivativesMemberhmy:CreditRatingAAPlusMember2026-06-300001023514ifrs-full:DerivativesMemberhmy:CreditRatingAAPlusMember2025-06-300001023514ifrs-full:DerivativesMemberhmy:CreditRatingAAMember2026-06-300001023514ifrs-full:DerivativesMemberhmy:CreditRatingAAMember2025-06-300001023514ifrs-full:DerivativesMemberhmy:CreditRatingAAMinusMember2026-06-300001023514ifrs-full:DerivativesMemberhmy:CreditRatingAAMinusMember2025-06-300001023514ifrs-full:DerivativesMemberhmy:CreditRatingAPlusMember2026-06-300001023514ifrs-full:DerivativesMemberhmy:CreditRatingAPlusMember2025-06-300001023514ifrs-full:DerivativesMember2026-06-300001023514ifrs-full:DerivativesMember2025-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2026-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember2026-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2025-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember2025-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanFiveYearsAndNotLaterThanTenYearsMember2026-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanFiveYearsAndNotLaterThanTenYearsMember2025-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTenYearsAndNotLaterThanFifteenYearsMember2026-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTenYearsAndNotLaterThanFifteenYearsMember2025-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanFifteenYearsAndNotLaterThanTwentyYearsMember2026-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanFifteenYearsAndNotLaterThanTwentyYearsMember2025-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearMember2026-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearMember2025-06-300001023514ifrs-full:LiquidityRiskMemberhmy:NotLaterThanSixMonthsMember2026-06-300001023514ifrs-full:LiquidityRiskMemberhmy:NotLaterThanSixMonthsMember2025-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2025-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2026-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-06-300001023514ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMemberhmy:OtherNonCurrentAssetsMemberifrs-full:Level1OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMemberhmy:OtherNonCurrentAssetsMemberifrs-full:Level3OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMemberhmy:OtherNonCurrentAssetsMemberifrs-full:Level3OfFairValueHierarchyMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMemberhmy:RestrictedCashAndInvestmentsMemberifrs-full:Level1OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughOtherComprehensiveIncomeCategoryMemberhmy:RestrictedCashAndInvestmentsMemberifrs-full:Level1OfFairValueHierarchyMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:RestrictedCashAndInvestmentsMemberifrs-full:Level2OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:RestrictedCashAndInvestmentsMemberifrs-full:Level2OfFairValueHierarchyMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberifrs-full:DerivativesMemberifrs-full:Level2OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberifrs-full:DerivativesMemberifrs-full:Level2OfFairValueHierarchyMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberifrs-full:DerivativesMemberifrs-full:Level2OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberifrs-full:DerivativesMemberifrs-full:Level2OfFairValueHierarchyMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberifrs-full:TradeReceivablesMemberifrs-full:Level2OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberifrs-full:TradeReceivablesMemberifrs-full:Level2OfFairValueHierarchyMember2025-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:OtherNonCurrentAssetsMemberifrs-full:Level3OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:OtherNonCurrentAssetsMemberifrs-full:Level3OfFairValueHierarchyMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:ContingentConsiderationLiabilityMemberifrs-full:Level3OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:ContingentConsiderationLiabilityMemberifrs-full:Level3OfFairValueHierarchyMember2025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:StreamingContractLiabilityMemberifrs-full:Level3OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:OtherNonCurrentAssetsMemberhmy:ARMBBEETrustMemberifrs-full:Level3OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMemberhmy:OtherNonCurrentAssetsMemberhmy:ARMBBEETrustMemberifrs-full:Level3OfFairValueHierarchyMember2025-06-300001023514hmy:OtherNonCurrentAssetsMemberifrs-full:FairValueModelMemberhmy:ARMBBEETrustMemberifrs-full:Level3OfFairValueHierarchyMember2025-07-012026-06-300001023514hmy:OtherNonCurrentAssetsMemberifrs-full:FairValueModelMemberhmy:ARMBBEETrustMemberifrs-full:Level3OfFairValueHierarchyMember2024-07-012025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:MponengOperationsAndRelatedAssetsMemberhmy:ContingentConsiderationLiabilityMemberifrs-full:Level3OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:MponengOperationsAndRelatedAssetsMemberhmy:ContingentConsiderationLiabilityMemberifrs-full:Level3OfFairValueHierarchyMember2025-06-300001023514hmy:MponengMemberifrs-full:FairValueModelMemberhmy:ContingentConsiderationLiabilityMember2025-07-012026-06-300001023514hmy:MponengMemberifrs-full:FairValueModelMemberhmy:ContingentConsiderationLiabilityMember2024-07-012025-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:EvaCopperMemberhmy:ContingentConsiderationLiabilityMemberifrs-full:Level3OfFairValueHierarchyMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:EvaCopperMemberhmy:ContingentConsiderationLiabilityMemberifrs-full:Level3OfFairValueHierarchyMember2025-06-300001023514hmy:EvaCopperMemberifrs-full:FairValueModelMemberhmy:ContingentConsiderationLiabilityMember2025-07-012026-06-300001023514hmy:EvaCopperMemberifrs-full:FairValueModelMemberhmy:ContingentConsiderationLiabilityMember2024-07-012025-06-300001023514hmy:CSANSRMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:CSANSRMemberhmy:ContingentConsiderationLiabilityMemberifrs-full:Level3OfFairValueHierarchyMember2026-06-300001023514hmy:CSANSRMemberifrs-full:FairValueModelMemberhmy:ContingentConsiderationLiabilityMember2025-07-012026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:CopperCompoundMember2026-06-300001023514ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMemberhmy:SilverEmbeddedDerivativeMember2026-06-3000010235142026-06-302026-06-300001023514hmy:CopperCompoundMemberifrs-full:CreditSpreadMeasurementInputMember2026-06-302026-06-300001023514hmy:CopperMemberifrs-full:FairValueModelMemberhmy:StreamingContractLiabilityMember2026-06-302026-06-300001023514hmy:SilverEmbeddedDerivativeMemberifrs-full:CreditSpreadMeasurementInputMember2026-06-302026-06-300001023514hmy:SilverMemberifrs-full:FairValueModelMemberhmy:StreamingContractLiabilityMember2026-06-302026-06-300001023514ifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMemberhmy:DoornkopMember2025-07-012026-06-300001023514ifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMemberhmy:TshepongSouthMember2025-07-012026-06-300001023514ifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMemberhmy:TshepongNorthMember2025-07-012026-06-300001023514ifrs-full:PreviouslyStatedMemberifrs-full:ParentMember2024-07-012025-06-300001023514ifrs-full:PreviouslyStatedMemberhmy:RandfonteinEstatesLimitedMember2024-07-012025-06-300001023514ifrs-full:PreviouslyStatedMemberhmy:FreegoldMember2024-07-012025-06-300001023514ifrs-full:PreviouslyStatedMemberifrs-full:ParentMember2023-07-012024-06-300001023514ifrs-full:PreviouslyStatedMemberhmy:RandfonteinEstatesLimitedMember2023-07-012024-06-300001023514ifrs-full:PreviouslyStatedMemberhmy:FreegoldMember2023-07-012024-06-300001023514hmy:MisalignmentOfAlgorithmParametersOfMinePlanningSoftwareMemberifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2025-06-300001023514hmy:MisalignmentOfAlgorithmParametersOfMinePlanningSoftwareMemberifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2024-06-300001023514hmy:MisalignmentOfAlgorithmParametersOfMinePlanningSoftwareMemberifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2024-07-012025-06-300001023514hmy:MisalignmentOfAlgorithmParametersOfMinePlanningSoftwareMemberifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2023-07-012024-06-300001023514hmy:ConstructiveObligationsOfPayrollProvisionsAndAccrualsMemberifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2025-06-300001023514hmy:ConstructiveObligationsOfPayrollProvisionsAndAccrualsMemberifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2024-06-300001023514hmy:ConstructiveObligationsOfPayrollProvisionsAndAccrualsMemberifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2024-07-012025-06-300001023514hmy:ConstructiveObligationsOfPayrollProvisionsAndAccrualsMemberifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2023-07-012024-06-300001023514ifrs-full:PreviouslyStatedMember2024-07-012025-06-300001023514ifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2024-07-012025-06-300001023514ifrs-full:PreviouslyStatedMember2023-07-012024-06-300001023514ifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2023-07-012024-06-300001023514ifrs-full:PreviouslyStatedMember2025-06-300001023514ifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2025-06-300001023514ifrs-full:PreviouslyStatedMember2024-06-300001023514ifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2024-06-300001023514ifrs-full:FinancialEffectOfCorrectionsOfAccountingErrorsMember2023-06-300001023514hmy:US500MillionRCFMember2026-07-022026-07-020001023514hmy:AUD500MillionFacilityMember2026-07-022026-07-020001023514hmy:US400MillionFacilitySustainabilityLinkedMemberhmy:RCFMember2026-07-022026-07-020001023514hmy:US400MillionFacilitySustainabilityLinkedMemberhmy:TermLoanMember2026-07-022026-07-020001023514hmy:US1.25BillionFacilityBridgeFacilityMember2026-07-022026-07-020001023514hmy:AS250MillionRCFMember2026-09-182026-09-180001023514hmy:US500MillionRCFMemberhmy:RCFMember2026-09-282026-09-280001023514hmy:US500MillionRCFMemberhmy:RCFMember2026-10-022026-10-0200010235142026-08-262026-08-260001023514hmy:US500MillionGuaranteedSeniorUnsecuredConvertibleBondsMember2026-09-290001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MoabKhotsongMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MoabKhotsongMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MoabKhotsongMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MoabKhotsongMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MoabKhotsongMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MoabKhotsongMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MponengMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MponengMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MponengMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MponengMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MponengMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MponengMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongNorthMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongNorthMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongNorthMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongNorthMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongNorthMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongNorthMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongSouthMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongSouthMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongSouthMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongSouthMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongSouthMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:TshepongSouthMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:DoornkopMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:DoornkopMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:DoornkopMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:DoornkopMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:DoornkopMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:DoornkopMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:JoelMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:JoelMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:JoelMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:JoelMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:JoelMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:JoelMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:Target1Memberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:Target1Memberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:Target1Memberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:Target1Memberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:Target1Memberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:Target1Memberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:KusasalethuMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:KusasalethuMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:KusasalethuMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:KusasalethuMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:KusasalethuMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:KusasalethuMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MasimongMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MasimongMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MasimongMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MasimongMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MasimongMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MasimongMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MineWasteSolutionsMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MineWasteSolutionsMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MineWasteSolutionsMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MineWasteSolutionsMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MineWasteSolutionsMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:MineWasteSolutionsMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberifrs-full:AllOtherSegmentsMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberifrs-full:AllOtherSegmentsMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberifrs-full:AllOtherSegmentsMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberifrs-full:AllOtherSegmentsMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberifrs-full:AllOtherSegmentsMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberifrs-full:AllOtherSegmentsMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:CountryOfDomicileMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:HiddenValleyMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:HiddenValleyMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:HiddenValleyMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:HiddenValleyMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:HiddenValleyMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:HiddenValleyMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:GoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:GoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:GoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:GoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:GoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:GoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalGoldMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalGoldMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalGoldMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalGoldMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalGoldMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalGoldMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CSAMemberhmy:CopperMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CSAMemberhmy:CopperMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CSAMemberhmy:CopperMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CSAMemberhmy:CopperMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CSAMemberhmy:CopperMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CSAMemberhmy:CopperMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CopperMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CopperMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CopperMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CopperMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CopperMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberifrs-full:ForeignCountriesMemberhmy:CopperMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalCopperMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalCopperMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalCopperMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalCopperMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalCopperMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalCopperMember2024-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalOperationsMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalOperationsMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalOperationsMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalOperationsMember2026-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalOperationsMember2025-06-300001023514ifrs-full:OperatingSegmentsMemberhmy:TotalOperationsMember2024-06-300001023514ifrs-full:MaterialReconcilingItemsMember2025-07-012026-06-300001023514ifrs-full:MaterialReconcilingItemsMember2024-07-012025-06-300001023514ifrs-full:MaterialReconcilingItemsMember2023-07-012024-06-300001023514ifrs-full:UnallocatedAmountsMember2026-06-300001023514ifrs-full:UnallocatedAmountsMember2025-06-300001023514ifrs-full:UnallocatedAmountsMember2024-06-300001023514ifrs-full:ForeignCountriesMemberhmy:EvaCopperMemberhmy:WafiGolpuJointOperationMember2025-07-012026-06-300001023514ifrs-full:ForeignCountriesMemberhmy:EvaCopperMemberhmy:WafiGolpuJointOperationMember2024-07-012025-06-300001023514ifrs-full:ForeignCountriesMemberhmy:EvaCopperMemberhmy:WafiGolpuJointOperationMember2023-07-012024-06-300001023514ifrs-full:OperatingSegmentsMember2025-07-012026-06-300001023514ifrs-full:OperatingSegmentsMember2024-07-012025-06-300001023514ifrs-full:OperatingSegmentsMember2023-07-012024-06-300001023514ifrs-full:MaterialReconcilingItemsMemberhmy:SilverAndUraniumSalesMember2025-07-012026-06-300001023514ifrs-full:MaterialReconcilingItemsMemberhmy:SilverAndUraniumSalesMember2024-07-012025-06-300001023514ifrs-full:MaterialReconcilingItemsMemberhmy:SilverAndUraniumSalesMember2023-07-012024-06-300001023514ifrs-full:MaterialReconcilingItemsMemberhmy:TollTreatmentsMember2025-07-012026-06-300001023514ifrs-full:MaterialReconcilingItemsMemberhmy:TollTreatmentsMember2024-07-012025-06-300001023514ifrs-full:MaterialReconcilingItemsMemberhmy:TollTreatmentsMember2023-07-012024-06-300001023514ifrs-full:UnallocatedAmountsMemberhmy:TollTreatmentsMember2025-07-012026-06-300001023514ifrs-full:UnallocatedAmountsMemberhmy:TollTreatmentsMember2024-07-012025-06-300001023514ifrs-full:UnallocatedAmountsMemberhmy:TollTreatmentsMember2023-07-012024-06-300001023514ifrs-full:UnallocatedAmountsMember2025-07-012026-06-300001023514ifrs-full:UnallocatedAmountsMember2024-07-012025-06-300001023514ifrs-full:UnallocatedAmountsMember2023-07-012024-06-300001023514ifrs-full:UnallocatedAmountsMemberifrs-full:MiningAssetsMember2026-06-300001023514ifrs-full:UnallocatedAmountsMemberifrs-full:MiningAssetsMember2025-06-300001023514ifrs-full:UnallocatedAmountsMemberifrs-full:MiningAssetsMember2024-06-300001023514ifrs-full:UnallocatedAmountsMemberhmy:UndevelopedPropertiesMember2026-06-300001023514ifrs-full:UnallocatedAmountsMemberhmy:UndevelopedPropertiesMember2025-06-300001023514ifrs-full:UnallocatedAmountsMemberhmy:UndevelopedPropertiesMember2024-06-300001023514ifrs-full:UnallocatedAmountsMemberhmy:OtherNonMiningAssetsMember2026-06-300001023514ifrs-full:UnallocatedAmountsMemberhmy:OtherNonMiningAssetsMember2025-06-300001023514ifrs-full:UnallocatedAmountsMemberhmy:OtherNonMiningAssetsMember2024-06-300001023514ifrs-full:UnallocatedAmountsMemberifrs-full:ConstructionInProgressMember2026-06-300001023514ifrs-full:UnallocatedAmountsMemberifrs-full:ConstructionInProgressMember2025-06-300001023514ifrs-full:UnallocatedAmountsMemberifrs-full:ConstructionInProgressMember2024-06-300001023514ifrs-full:ConstructionInProgressMemberhmy:EvaCopperMember2025-11-24
Table of contents
As filed with the Securities and Exchange Commission on 30 October 2026
UNITED STATES SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
_______________________________
FORM 20-F
☐
REGISTRATION STATEMENT PURSUANT TO SECTION 12(b) OR (g) OF THE SECURITIES EXCHANGE ACT OF 1934
OR
☑
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended 30 June 2026
OR
☐
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
OR
☐
SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
Date of event requiring this shell company report
For the transition period from___ to___
Commission file number: 001-31545
HARMONY GOLD MINING COMPANY LIMITED
(Exact name of registrant as specified in its charter)
Republic of South Africa
(Jurisdiction of incorporation or organisation)
RANDFONTEIN OFFICE PARK, CNR WARD AVENUE AND MAIN REEF ROAD,
RANDFONTEIN, South Africa, 1759
(Address of principal executive offices)
Shela Mohatla, Group Company Secretary
Tel: +27 11 411 2359, shela.mohatla@harmony.co.za, fax: +27 11 696 9734,
Randfontein Office Park, CNR Ward Avenue and Main Reef Road, Randfontein, South Africa, 1759
(Name, Telephone, E-mail and/or Facsimile number and Address of Company Contact Person)
Securities registered or to be registered pursuant to Section 12(b) of the Act:
Title of each class
Trading Symbol(s)
Name of Each Exchange on Which Registered
Ordinary shares, with no par value per share*
No*
New York Stock Exchange*
American Depositary Shares (as evidenced by American
Depositary Receipts), each representing one ordinary share
HMY
New York Stock Exchange
* Not for trading, but only in connection with the registration of American Depositary Shares, pursuant to the requirements of the Securities and Exchange Commission.
Securities registered or to be registered pursuant to Section 12(g) of the Act:
None
Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act:
None
The number of outstanding shares of each of the issuer’s classes of capital or common stock as of the close of the period covered by this Annual Report
was 636,798,966 ordinary shares, with no par value per share
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☑  No ☐
If this report is an annual or transition report, indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Securities
Exchange Act of 1934.   Yes ☐  No ☑
Note – Checking the box above will not relieve any registrant required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 from their
obligations under those Sections.
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the
preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past
90 days.   Yes ☑  No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-
T during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).    Yes ☑  No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or an emerging growth company. See definition
of “large accelerated filer," "accelerated filer,” and "emerging growth company" in Rule 12b-2 of the Exchange Act.
Large Accelerated Filer ☑
Accelerated filer ☐
Non-accelerated filer ☐
Emerging growth company ☐
If an emerging growth company that prepares its financial statements in accordance with US GAAP, indicate by check mark if the registrant has elected not to use
the extended transition period for complying with any new or revised financial accounting standards† provided pursuant to Section 13(a) of the Exchange Act. ☐
† The term “new or revised financial accounting standard” refers to any update issued by the Financial Accounting Standards Board to its Accounting
Standards Codification after 5 April 2012.
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over
financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit
report.   ☑
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect
the correction of an error to previously issued financial statements.  ☑
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any
of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b).  ☑
Indicate by check mark which basis of accounting the registrant has used to prepare the financial statements included in this filing:
US GAAP  ☐
International Financial Reporting Standards as issued by the International Accounting Standards Board ☑
Other ☐
If “Other” has been checked in response to the previous question, indicate by check mark which financial statement item the registrant has elected to follow:
Item 17 ☐  Item 18 ☐
If this is an annual report, indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).Yes ☐  No ☑
(APPLICABLE ONLY TO ISSUERS INVOLVED IN BANKRUPTCY PROCEEDINGS DURING THE PAST FIVE YEARS)
Indicate by check mark whether the registrant has filed all documents and reports required to be filed by Sections 12, 13 or 15(d) of the Securities Exchange Act of
1934 subsequent to the distribution of securities under a plan confirmed by a court.    Yes ☐  No ☐
Table of contents
EXPLANATORY NOTE
This annual report includes a restatement of our consolidated financial statements for the fiscal years ended 30 June 2025
and 30 June 2024, which were included in our annual reports on Form 20-F for the fiscal years ended 30 June 2025 and
30 June 2024, filed with the U.S. Securities and Exchange Commission, or the SEC, on 31 October 2025 and 31 October 2024,
respectively. The restatement relates to the correction of errors. The first error related to the misstated alignment in algorithm
parameters in the mine planning and scheduling programme used at the Tshepong North, Tshepong South and Doornkop
operations, which affected the information used in the calculation of unit-of-production depreciation and related deferred
taxation, while the second error relates to the timing of recognition of payroll provisions and accruals.
Investors and other readers should rely only on the financial information and other related disclosures regarding the fiscal
year ended 30 June 2025 and 30 June 2024 in this annual report and in any future filings with the SEC (as applicable) and
should not rely on any previously issued or filed reports, press releases, presentations or similar communications containing
financial information and related disclosures regarding those reporting periods.
Accordingly, management has restated the group balance sheet, group income statement, group statement of
comprehensive income and group statement of changes in shareholders' equity for the fiscal years ended 30 June 2025 and
30 June 2024. The restatement had no impact on the group cash flow statement. However, the note reconciling cash generated
by operations has been updated to reflect the restated amounts for depreciation and movements in working capital relating to
trade and other payables.
As a result of the errors described above and the related restatement, management has identified a material weakness in
the Company’s internal control over financial reporting. In addition, management identified three other material weaknesses in
the Company’s internal control over financial reporting. Accordingly, management has concluded that the Company’s internal
control over financial reporting was not effective as of 30 June 2026 and that its disclosure controls and procedures were
likewise not effective as of 30 June 2026. Management has developed remediation plans to address each of the identified
material weaknesses.   
See Note 38 "Restatement of comparative information" to the consolidated financial statements set forth beginning on
page F-1 for details regarding the nature and impact of the identified errors and related restatement. See Item 15 "Controls and
Procedures” for further information regarding the identified material weaknesses and the remediation measures implemented, or
being implemented, to address those material weaknesses.
- i -
Table of contents
TABLE OF CONTENTS
ITEM 4A.
DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT
INSPECTIONS
INSIDER TRADING POLICIES
CYBERSECURITY
This document comprises the annual report on Form 20-F for the year ended 30 June 2026 (“Harmony 2026 Form 20-F”)
of Harmony Gold Mining Company Limited (“Harmony” or the “Company”; together with its subsidiaries, the "Group"). Certain
of the information in Harmony's 2026 suite of reports, including from its Integrated report 2026 as well as the Sustainability
report 2026, included in Exhibit 15.1 (“Integrated Annual Report for the 20-F 2026”) is incorporated by reference into the
Harmony 2026 Form 20-F, as specified elsewhere in this report, in accordance with Rule 12b-23(a) of the Securities Exchange
Act of 1934, as amended (the “Exchange Act”). With the exception of the items so specified, the Integrated Annual Report for
the 20-F 2026 is not deemed to be filed as part of the Harmony 2026 Form 20-F. References to the "Securities Act" are to the
Securities Act of 1933, as amended. References to the "Sarbanes-Oxley Act" are to the Sarbanes-Oxley Act of 2002.
Only (i) the information included in the Harmony 2026 Form 20-F, (ii) the information in the Integrated Annual Report for the
20-F 2026 that is expressly incorporated by reference in the Harmony 2026 Form 20-F and (iii) the exhibits to the Harmony 2026
Form 20-F that are required to be filed pursuant to the Form 20-F (the “Exhibits”), shall be deemed to be filed with the
Securities and Exchange Commission (“SEC”) for any purpose. Any information in the Integrated Annual Report for the
20-F 2026 which is not referenced in the Harmony 2026 Form 20-F or filed as an Exhibit, shall not be deemed to be so
incorporated by reference.
Financial and other material information regarding Harmony is routinely posted on and accessible at the Harmony website,
www.harmony.co.za. No material referred to in this annual report as being available on our website is incorporated by reference
into, or forms any part of, this annual report. References herein to our website shall not be deemed to cause such incorporation.
- ii -
Table of contents
USE OF TERMS AND CONVENTIONS IN THIS ANNUAL REPORT
Harmony Gold Mining Company Limited is a corporation organised under the laws of the Republic of South Africa. As used
in this Harmony 2026 Form 20-F, unless the context otherwise requires, the terms “Harmony” and “Company” refer to Harmony
Gold Mining Company Limited; the term “South Africa” refers to the Republic of South Africa; the term "Papua New Guinea" or
"PNG" refers to the Independent State of Papua New Guinea; the term "Australia" refers to the Commonwealth of Australia; the
terms “we”, “us” and “our” refer to Harmony and, as applicable, its direct and indirect subsidiaries, collectively, the “Group”.
In this annual report, references to “R”, “Rand” and “c”, “cents” are to the South African Rand, the lawful currency of South
Africa, “A$” and “Australian dollars” refers to Australian dollars, “K” or “Kina” refers to Papua New Guinean Kina and
references to “$”, “US$” and “US dollars” are to United States dollars.
Unless otherwise indicated, “t” means metric tonnes; “kt” means thousand metric tonnes; “Mt” means million metric
tonnes; “g/t” means grams per metric tonne; “oz” means troy ounces; “koz” means thousand troy ounces; “Moz” means million
troy ounces; “lb” means pounds; and “Mlb” means million pounds. References to gold ounces are to troy ounces.
References to a financial year are to the 12-month period ended 30 June of the year indicated.
This annual report contains information concerning our Mineral Reserves. It also contains information concerning our
Mineral Resources. While this annual report has been prepared in accordance with subpart 1300 of Regulation S-K promulgated
by the SEC ("Regulation S-K 1300"), estimates of our Mineral Resources and Mineral Reserves are based on assumptions that
may prove to be incorrect, including assumptions relating to mining and processing, metallurgical recovery, operating and capital
costs, commodity prices, exchange rates, legal and regulatory matters and other modifying factors. See Item 3D: “Key
Information – Risk Factors – Risks Related to Mineral Resources, Mineral Reserves, Growth Projects and Portfolio
Transformation – Mineral Resource and Mineral Reserve estimates may prove inaccurate”.
Certain of our mining properties and projects in South Africa, PNG and Australia are subject to country-, state- or project-
specific laws, regulations, permits, licences, mineral rights, tenure arrangements, royalties, environmental obligations and other
conditions. References in this annual report to mining titles, licences, leases, concessions, permits, development agreements
and similar rights are to the relevant rights or arrangements applicable to the relevant property and jurisdiction, unless the
context otherwise requires.
This annual report contains descriptions of gold and copper mining and the gold and copper mining industries, including
descriptions of geological formations and mining processes. We have explained some of these terms in Item 16: "Glossary of
Mining Terms" included in this annual report. This glossary may assist you in understanding these terms. Terms used in relation
to a particular mining property should be read together with the disclosure relating to that property and, where applicable, the
relevant Technical Report Summary ("TRS").
All references to websites in this annual report are inactive textual reference for information only and information contained
in or accessible through any such website does not form a part of this annual report.
PRESENTATION OF FINANCIAL INFORMATION
Harmony is a South African company and the majority of the Group's operations are located in South Africa. Accordingly,
our books of account are maintained in South African Rand and our annual financial statements are prepared in accordance
with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”).
This annual report includes our consolidated financial statements prepared in accordance with IFRS presented in the functional
currency of the Company, being South African Rand. All financial information, except as otherwise noted, is stated in accordance
with IFRS.
In this annual report, we also present “cash costs”, “cash costs per ounce”, “cash costs per kilogram”, “all-in sustaining
costs”, “all-in sustaining costs per ounce”, “all-in sustaining costs per kilogram”, "cash operating costs per tonne", "C1 cash
costs per tonne" and "adjusted free cash flows", which are non-GAAP measures. An investor should not consider these
measures in isolation or as alternatives to production costs, cost of sales, cash generated by operating activities or any other
measure of financial performance or liquidity calculated in accordance with IFRS. The calculation of cash costs, cash costs per
ounce/kilogram, all-in sustaining costs, all-in sustaining costs per ounce/kilogram, cash operating costs per tonne, C1 cash
costs per tonne and adjusted free cash flows, may vary significantly among gold and copper mining companies and, by
themselves, do not necessarily provide a basis for comparison with other gold and copper mining companies. Nevertheless,
Harmony believes that cash costs, cash costs per ounce/kilogram, all-in sustaining costs and all-in sustaining costs per ounce/
kilogram (for gold operations), cash operating costs per tonne and C1 cash costs per tonne (for copper operations) and adjusted
free cash flows (for the Group) are useful indicators to investors and management as they provide an indication of efficiency,
profitability, cash flows, the trend in costs as the mining operations mature over time on a consistent basis and an internal
benchmark of performance to allow for comparison against other mines, both within the Group and at other gold and copper
mining companies. For further information, see Item 5: “Operating and Financial Review and Prospects – Operating Results –
Key factors affecting our results – Costs" and "– Reconciliation of Non-GAAP Measures”.
We have included the US dollar equivalent amounts of certain information and transactions in Rand, Kina and A$. Unless
otherwise stated, we have translated assets and liabilities at the spot rate for the day, while the US$ equivalents of income
statement line items as well as cash costs and all-in sustaining costs have been translated at the average rate for the year
(R16.89 per US$1.00 for fiscal 2026 and R18.15 per US$1.00 for fiscal 2025). By including these US dollar equivalents in this
annual report, we are not representing that the Rand, Kina and A$ amounts actually represent the US dollar amounts, as the
case may be, or that these amounts could be converted at the rates indicated.
- iii -
Table of contents
CAUTIONARY STATEMENT ABOUT FORWARD-LOOKING STATEMENTS
This annual report contains forward-looking statements within the meaning of the safe harbour provided by Section 21E of
the Exchange Act and Section 27A of the Securities Act, with respect to our financial condition, results of operations, business
strategies, operating efficiencies, competitive positions, growth opportunities for existing services, plans and objectives of
management, markets for stock and other matters.
These forward-looking statements, including, among others, those relating to our future business prospects, revenues, and
the potential benefit of acquisitions (including statements regarding growth and cost savings) wherever they may occur in this
annual report and the exhibits to this annual report, and including any climate change-related statements, targets and metrics,
are necessarily estimates reflecting the best judgment of our senior management and involve a number of risks and
uncertainties that could cause actual results to differ materially from those suggested by the forward-looking statements. As a
consequence, these forward-looking statements should be considered in light of various important factors, including those set
forth in this annual report. All statements other than statements of historical facts included in this report may be forward-looking
statements. Forward-looking statements also often use words such as “will”, “forecast”, “potential”, “estimate”, “expect” and
words of similar meaning. By their nature, forward-looking statements involve risk and uncertainty because they relate to future
events and circumstances and should be considered in light of various important factors, including those set forth in this
disclaimer. Readers are cautioned not to place undue reliance on such statements. Important factors that could cause actual
results to differ materially from estimates or projections contained in the forward-looking statements include, without limitation:
•overall economic and business conditions in South Africa, PNG, Australia and elsewhere;
•the impact of, and measures taken to address infectious, communicable and other diseases, such as HIV, tuberculosis and
silicosis;
•high and rising inflation, supply chain issues, volatile commodity costs and other inflationary pressures exacerbated by the
Russian invasion of Ukraine and subsequent sanctions;
•estimates of future earnings, and the sensitivity of earnings to gold and other metals prices;
•estimates of future gold and other metals production and sales;
•estimates of future cash costs;
•estimates of future cash flows, and the sensitivity of cash flows to gold and other metals prices;
•estimates of provision for silicosis settlement;
•increasing regulation of environmental and sustainability matters such as greenhouse gas ("GHG") emission and climate
change, and the impact of climate change on our operations;
•estimates of future tax liabilities under the Carbon Tax Act (as defined below);
•statements regarding future debt repayments;
•estimates of future capital expenditures;
•the success of our business strategy, exploration and development activities and other initiatives;
•future financial position, plans, strategies, objectives, capital expenditures, projected costs and anticipated cost savings
and financing plans;
•estimates of reserves, statements regarding future exploration results and the replacement of reserves;
•the ability to achieve anticipated efficiencies and other cost savings in connection with past and future acquisitions, as well
as at existing operations;
•fluctuations in the market price of gold and other metals;
•the occurrence of hazards associated with underground and surface gold mining;
•the occurrence of labour disruptions related to industrial action or health and safety incidents;
•ageing infrastructure, unplanned breakdowns and stoppages that may delay production, increase costs and industrial
accidents;
•power cost increases as well as power stoppages, fluctuations and usage constraints;
•supply chain shortages and increases in the prices of production imports and the availability, terms and deployment of
capital;
•our ability to hire and retain senior management, sufficiently technically skilled employees, as well as our ability to achieve
sufficient representation of historically disadvantaged persons ("HDPs") in management positions or sufficient gender
diversity in management positions or at board level;
•our ability to comply with requirements that we operate in a sustainable manner and provide benefits to affected
communities;
•potential liabilities related to occupational health diseases;
•changes in government regulation and the political environment, particularly tax and royalties, mining rights, health, safety,
environmental regulation and business ownership including any interpretation thereof;
- iv -
Table of contents
•court decisions affecting the mining industry, including, without limitation, regarding the interpretation of mining rights;
•our ability to protect our information technology ("IT") and communication systems and the personal data we retain;
•risks related to the failure of internal controls;
•the outcome of pending or future litigation or regulatory proceedings;
•fluctuations in exchange rates and currency devaluations and other macroeconomic monetary policies, as well as the
impact of South Africa exchange control regulations;
•the adequacy of the Group’s insurance coverage;
•any further downgrade of South Africa's credit rating;
•socio-economic or political instability in South Africa, Australia, PNG and other countries in which we operate;
•changes in technical and economic assumptions underlying our mineral reserves estimates;
•geotechnical challenges due to the ageing of certain mines and a trend toward mining deeper pits and more complex, often
deeper underground, deposits; and
•actual or alleged breach or breaches in governance processes, fraud, bribery or corruption at our operations that leads to
censure, penalties or negative reputational impacts.
The foregoing factors and others described under “Risk Factors” should not be construed as exhaustive.
We undertake no obligation to update publicly or release any revisions to these forward-looking statements to reflect
events or circumstances after the date of this annual report or to reflect the occurrence of unanticipated events, except as
required by law. All subsequent written or oral forward-looking statements attributable to Harmony or any person acting on its
behalf are qualified by the cautionary statements herein.
1
Table of contents
PART I
ITEM 1. IDENTITY OF DIRECTORS, SENIOR MANAGEMENT AND ADVISERS
Not applicable.
ITEM 2. OFFER STATISTICS AND EXPECTED TIMETABLE
Not applicable.
ITEM 3. KEY INFORMATION
A. [Reserved]
B. CAPITALISATION AND INDEBTEDNESS
Not applicable.
C. REASONS FOR THE OFFER AND USE OF PROCEEDS
Not applicable.
D. RISK FACTORS
In addition to the other information included in this annual report and the exhibits, you should also carefully consider the
following factors related to our ordinary shares and American Depositary Shares ("ADSs"). There may be additional risks that
we do not currently know of or that we currently deem immaterial based on information currently available to us. Although we
have a formal risk policy framework in place, the maintenance and development of which is undertaken on an ongoing basis so
as to help management address systematic categories of risk associated with our business operations, any of these risks could
have a material adverse effect on our business, financial condition or results of operations, leading to a decline in the trading
price of our ordinary shares or our ADSs. The risks described below may, in retrospect, turn out to be incomplete and therefore
may not be the only risks to which we are exposed. Additional risks and uncertainties not presently known to us or that we now
believe are immaterial (and have therefore not been included), could also adversely affect our business, results of operations or
financial condition. The order of presentation of the risk factors below does not indicate the likelihood of their occurrence or the
magnitude or the significance of the individual risks.
Summary of Risk Factors
Risks Related to Commodity Prices, Cash Flow and Financial Performance
1Our profitability, cash flows, Mineral Reserve estimates and shareholder returns are highly dependent on
commodity prices
2Foreign exchange volatility may materially affect margins, earnings and project returns
3Inflationary pressures and escalating input costs may erode profitability and reduce future returns
4Our future growth strategy depends on sustained cash generation, continued access to capital and our ability
to service our debt and comply with financial covenants
5Certain factors may affect our ability to support the carrying value of our property, plant and equipment and
other assets, resulting in impairments
6Our financial flexibility could be constrained by exchange control regulations in the jurisdictions in which we
operate
7Sovereign, political, regulatory and macroeconomic developments in the jurisdictions in which we operate
may adversely affect our business
8We are subject to mining taxes, royalties and other regulatory imposts, and to policies and legislation relating
to greater state intervention in the mining sector
Risks Related to Operations and Business Resilience
1Safety incidents and loss of life may result in production losses, regulatory intervention and reputational
damage
2Exposure to mining-related health hazards may result in occupational disease and significant long-term
liabilities and costs
3Infectious disease outbreaks and endemic disease may disrupt our workforce and operations, and increase
costs
4Production is dependent on reliable energy supply and increasing energy costs may materially affect
profitability
5Water ingress, pumping obligations at adjacent closed mines, flooding and decant risk could interrupt
operations and create long-term liabilities
6Infrastructure constraints and ageing infrastructure could adversely affect our operations
7Illegal mining and organised criminal activity pose growing operational and safety risks
8Disruptions in critical supply chains may affect production, project execution and profitability
9Reliance on trackless mobile machinery ("TMM") exposes us to equipment-related production interruptions
10The use of contractors may expose us to delays or suspensions in mining activities and increases in mining
costs
2
Table of contents
11Our insurance coverage may be insufficient or unavailable to cover future losses
Risks Related to People, Labour and Organisational Capability
1Labour instability may materially affect production and costs
2We may be unable to attract and retain the critical skills and organisational capability required to execute our
strategy
Risks Related to Mineral Resources, Mineral Reserves, Growth Projects and Portfolio Transformation
1Mineral Resource and Mineral Reserve estimates may prove inaccurate
2Failure to replace depleted Mineral Reserves could undermine long-term production and value creation
3Strategic projects may not achieve expected returns
4Acquisitions, portfolio transformation initiatives and joint ventures may expose Harmony to integration and
execution risks
5Intense industry competition and consolidation may adversely affect our ability to acquire assets, equipment
and skilled personnel
Risks Related to Climate, Environment and Social Licence
1Climate change presents material physical risks to our operations and long-term value creation
2Decarbonisation, carbon pricing and emerging climate regulation may increase costs and capital requirements
3Environmental liabilities, rehabilitation obligations, biodiversity requirements and closure costs may be
materially higher than expected
4We may have exposure to rehabilitate groundwater and land pollution, and financial provisioning requirements
may require additional provisions
5Our operations depend on water use licences and other environmental authorisations
6A tailings facility failure could have far-reaching consequences, and adverse developments concerning the
proposed deep-sea tailings placement ("DSTP") at Wafi-Golpu could materially adversely affect the project and
our business
7Failure to maintain our social licence to operate could affect current and future operations
8We may fail to meet environmental, social and governance ("ESG") performance expectations and published
targets, which could affect reputation, stakeholder confidence and access to capital
Risks Related to Technology, Cybersecurity and Digital Resilience
1Technology failures could disrupt mining operations and business continuity
2Cybersecurity incidents may materially disrupt operations and expose Harmony to financial and reputational
harm
3Failures of our IT security processes and violations of data protection laws may result in regulatory penalties,
fines and reputational damage
4Emerging technologies, including artificial intelligence ("AI"), may introduce new operational, legal and
governance risks
Risks Related to Regulation, Compliance, Governance and Legal Matters
1Laws governing mineral rights affect our business and our mining rights could be altered, suspended or
cancelled
2Laws governing health and safety affect our business and could impose significant costs and burdens
3Changes to mining, environmental, safety, water and other resource-related laws could materially increase our
costs and liabilities
4Litigation, regulatory proceedings and other legal disputes may result in material losses and operational
disruption
5We have identified material weaknesses in internal control over financial reporting, which may adversely affect
investor confidence
6Compliance with new and changing corporate governance and public disclosure requirements increases our
costs of compliance
7Corruption, bribery, fraud and other compliance failures may result in penalties, operational restrictions and
reputational damage
8Increased audit and compliance requirements could result in higher costs, increased management demands,
and delays in financial reporting
9Future restatements or corrections could adversely affect investor confidence and expose us to additional
costs and liability
3
Table of contents
Risks Related to Our Ordinary Shares and ADSs
1We may not pay dividends or make similar payments to our shareholders in the future
2Our ordinary shares are subject to dilution as a result of our employee share schemes
3Fluctuations in exchange rates may reduce the market value of our securities and of any dividends or
distributions paid by us
4Investors may face liquidity risk in trading our ordinary shares on the JSE Limited ("JSE")
5Shareholders outside South Africa may not be able to participate in future issues of securities
6Investors in the United States may have difficulty bringing actions and enforcing judgments against us, our
directors and our executive officers
7US securities laws do not require us to disclose as much information as a US company, and investors may
receive less information about us
Risks Related to Commodity Prices, Cash Flow and Financial Performance
Our profitability, cash flows, Mineral Reserve estimates and shareholder returns are highly dependent on commodity
prices
Harmony derives substantially all of its revenue from sales of gold, and is increasing its exposure to copper through the
Cornish, Scottish and Australian Copper Mine ("CSA"), the Eva Copper Project and the Wafi-Golpu Project. Silver is also
produced as a by-product of gold and copper mining. As a rule, we sell our commodities at the prevailing market price. We
maintain a commodity hedging programme for a portion of our future production; our remaining unhedged future production is
not protected against price decreases. Due to their significance, our operating performance, cash generation, asset values and
long-term growth prospects are significantly dependent on prevailing and future gold and copper prices. See Item 4: “Information
on the Company – Business Overview – Gold and Copper Price Volatility”.
Gold and copper prices are inherently volatile and are affected by numerous factors beyond our control, including global
economic conditions, inflation, interest rates, geopolitical developments, changes in investor sentiment, exchange-rate
movements, central bank activities and fluctuations in global supply and demand. Commodity prices may experience significant
short-term volatility as well as sustained periods of weakness.
A decline in gold or copper prices may materially reduce revenue, operating margins and cash flows generated from our
operations. Lower commodity prices may also reduce the economic viability of certain mining areas and development projects,
require revisions to mine plans, increase cut-off grades and result in reductions to Mineral Resources and Mineral Reserves. A
fall in the gold and/or copper price below our cash cost of production and the capital expenditure required to maintain
production, for any sustained period, may lead to losses and require us to curtail or suspend certain operations. In addition,
lower price assumptions may result in asset impairment charges and reduce the expected returns of strategic growth projects.
The economics of our development pipeline, capital allocation decisions and long-term growth strategy are highly
dependent on assumptions regarding future commodity prices. If gold or copper prices decline significantly or remain depressed
for an extended period, we may defer, modify or cancel development, exploration or expansion activities. Reduced cash
generation may also constrain our ability to fund sustaining capital expenditure, growth projects, acquisitions and dividend
distributions.
Because commodity prices directly influence investor expectations regarding earnings, free cash flow, Mineral Reserves,
project economics and future growth, significant adverse movements in gold or copper prices may negatively affect the market
value of our ordinary shares and ADSs.
Accordingly, fluctuations in gold and/or copper prices could materially adversely affect Harmony's revenue, profitability,
cash flows, Mineral Resources and Mineral Reserves, growth prospects, results of operations, financial condition and
shareholder value. In addition, while commodity prices have increased significantly in recent periods, there can be no assurance
that those price levels will continue or be sustained for any particular period. See Item 5: "Operating and Financial Review and
Prospects – Operating Results – Key factors affecting our results – Gold and Copper Prices" and Item 11: "Quantitative and
Qualitative Disclosures about Market Risk".
Foreign exchange volatility may materially affect margins, earnings and project returns
Harmony operates across multiple jurisdictions and is exposed to fluctuations in exchange rates between the US dollar,
South African rand, Australian dollar and Papua New Guinea Kina. Gold is priced throughout the world in US dollars and, as a
result, our revenue is realised in US dollars, while a substantial portion of our operating costs, capital expenditure, labour costs
and contractor expenses are incurred in rand and other non-US currencies. As a result, exchange rate movements have a direct
impact on our profitability, cash flows and investment returns.
From time to time, we may implement currency hedges intended to reduce exposure to foreign currency risk, which we
began doing in fiscal 2016 and will continue for as long as it remains part of our risk management policy. This hedging strategy
is currently implemented up to 25% of our estimated exposure, and our unhedged foreign exchange exposure will continue to be
subject to market fluctuations.
Foreign exchange rates are influenced by a range of factors beyond our control, including global economic conditions,
inflation, interest rate movements, monetary policy decisions, geopolitical events, commodity price fluctuations, sovereign credit
developments and changes in investor confidence. Exchange rate volatility may occur rapidly and with little warning.
4
Table of contents
Any significant and sustained appreciation of the rand, Australian dollar or Kina against the US dollar will materially reduce
our revenues and overall net income and increase our operating and capital costs when translated into US dollar terms.
Conversely, significant depreciation of local currencies may contribute to inflationary pressures, increase wage and contractor
cost demands, raise the cost of imported equipment and consumables and create broader economic instability in the
jurisdictions in which we operate. Foreign exchange movements may also affect the valuation of assets and liabilities, influence
Mineral Reserve and Mineral Resource assumptions, impact impairment assessments and alter the economics of existing
operations and development projects.
The returns expected from major growth projects are based on long-term assumptions regarding exchange rates as well as
commodity prices and operating costs. Significant or sustained adverse currency movements may increase project costs,
reduce forecast returns, delay investment decisions or affect the economic viability of expansion and development opportunities.
Accordingly, foreign exchange volatility could materially adversely affect Harmony's operating margins, earnings, cash
flows, project returns, results of operations, financial condition, growth prospects and shareholder value, and may adversely
affect the market value of our ordinary shares and ADSs. See Item 11: "Quantitative and Qualitative Disclosures about Market
Risk".
Inflationary pressures and escalating input costs may erode profitability and reduce future returns
Mining operations require significant expenditure on labour, electricity, fuel, explosives, reagents, mining equipment,
contractor services and other production inputs. Harmony's operations in South Africa, PNG and Australia are exposed to
inflationary pressures affecting both operating costs and capital expenditure.
Prolonged periods of inflation may reduce profitability by increasing our fixed and variable costs and expenses, including
raw material, transportation and labour costs. If these increased costs are not offset by an increase in the gold price or by
devaluation in our operating currencies, they could have a material adverse effect on our business, operating results and
financial condition.
There is considerable uncertainty regarding the medium-term trajectory of input costs. Leading forecasting agencies and
market participants maintain divergent views on future energy demand and supply dynamics. Supply chain pressures, including
international logistics costs and producer investment cycles, continue to influence the pricing of mining consumables across all
categories of inputs we require.
Significant risks to input costs persist from multiple sources. Geopolitical tensions and conflicts in major producing and
consuming regions, including the ongoing conflict in the Middle East involving Iran and the disruption to commercial shipping
through the Strait of Hormuz, have disrupted global fuel and freight markets and have caused general global economic
conditions to deteriorate. Russia’s invasion of Ukraine led to economic sanctions and other measures, which had a significant
impact on commodity prices, including increased oil, gas and gold prices. The oil price is a driver of a number of input costs,
including diesel and transport costs, while gas prices affect power costs and other commodity prices drive direct mining and
processing costs. International sanctions on major commodity producers, trade restrictions and regional conflicts may disrupt
supply chains, restrict access to equipment or materials, or create shipping and logistics bottlenecks. Weather-related
disruptions to mining equipment supply, energy generation capacity and production processes across our operational
jurisdictions could create localised cost pressures. These inflationary pressures could also cause interest rates and the cost of
borrowings to increase.
Significant and sustained increases in input costs could materially affect project economics and the financial viability of
new mining developments, expansions or marginal operations, and may reduce the cash available to fund operations,
exploration activities, growth projects, acquisitions and dividend distributions.
Accordingly, inflationary pressures and escalating input costs could materially adversely affect Harmony's cost structure,
operating margins, project returns, cash flows, results of operations and financial condition, and may magnify the impact of other
risks described in this annual report.
Our future growth strategy depends on sustained cash generation, continued access to capital and our ability to
service our debt and comply with financial covenants
Harmony's growth strategy, sustaining capital programme, exploration activities and shareholder returns depend on our
ability to generate sufficient cash from operations and to access debt and equity capital on acceptable terms. Our ability to
service our debt and maintain compliance with financial covenants depends on our financial performance, which in turn is
affected by our operating performance and by financial and other factors, in particular the gold price, certain of which are beyond
our control.
In June 2026, we entered into a US$500 million sustainability-linked syndicated revolving credit facility (the “US$500
Million Syndicated Facility”), a A$500 million sustainability-linked syndicated loan facility (the “A$500 Million Syndicated
Facility”), a R4 billion sustainability-linked revolving credit facility (the “R4 Billion Syndicated Revolving Credit Facility”) and
a R3 billion six- and a- half-year term green loan facility (the "R3 Billion Green Term Loan"). On 2 July 2026, US$400 million
was drawn under the US$500 Million Syndicated Facility and A$250 million was drawn under the A$500 Million Syndicated
Facility. See note 39 "Subsequent events" to our consolidated financial statements set forth beginning on page F-1 and Item 5:
“Operating and Financial Review and Prospects – Liquidity and Capital Resources – Outstanding Credit Facilities, Refinancing
and Other Borrowings”.
5
Table of contents
Various financial and other factors may result in an increase in our indebtedness, which could adversely affect us in several
respects, including by: limiting our ability to access the capital markets; hindering our flexibility to plan for or react to changing
market, industry or economic conditions; limiting the amount of cash flow available for future operations, acquisitions, dividends
or other uses; making us more vulnerable to economic or industry downturns, including interest rate increases; increasing the
risk that we will need to sell assets, possibly on unfavourable terms, to meet payment obligations; or increasing the risk that we
may not meet the financial covenants contained in our debt agreements or make all required debt payments when due.
In the near term, we expect to manage our liquidity needs from cash generated by our operations, cash on hand,
committed and unutilised facilities and additional funding opportunities. However, if our cost of debt were to increase, or if we
were to encounter difficulties in obtaining financing in the future, our sources of funding may not match our financing needs.
A reduction in financial flexibility may also affect our ability to pursue strategic opportunities, replenish Mineral Resources
and Mineral Reserves through exploration and development activities, meet financial obligations, maintain dividend payments or
respond effectively to changing market conditions. As investors often assess mining companies on their ability to fund growth
while maintaining financial discipline and shareholder returns, constraints on cash generation or capital availability may
adversely affect market perceptions of Harmony's future growth prospects and long-term value.
Accordingly, insufficient cash generation, restricted access to capital, an inability to service our debt or comply with
financial covenants, or a downgrade of Harmony's or a relevant sovereign's credit rating that increases our financing costs could
materially adversely affect Harmony's growth strategy, project development pipeline, cash flows, results of operations, financial
condition, dividend-paying capacity, prospects and shareholder value. See Item 5: "Operating and Financial Review and
Prospects – Liquidity and Capital Resources – Cash flows from financing activities" and "– Outstanding Credit Facilities,
Refinancing and Other Borrowings".
Certain factors may affect our ability to support the carrying value of our property, plant and equipment and other
assets, resulting in impairments
We review and test the carrying values of our assets when events or changes in circumstances suggest that the carrying
amount may not be recoverable, and impairments may be recorded as a result of the testing performed.
At least annually for goodwill, and whenever there are indications that impairment of property, plant and equipment and
other non-financial assets may have occurred, estimates of expected future cash flows for each group of assets are prepared in
order to determine recoverable amounts. These estimates are prepared at the lowest level at which identifiable cash flows are
considered to be independent of the cash flows of other mining assets and liabilities. Expected future cash flows are inherently
uncertain and could change materially over time. Such cash flows are significantly affected by Mineral Reserve and production
estimates, together with economic factors such as spot and forward gold prices, discount rates, currency exchange rates,
estimates of the costs to produce Mineral Reserves and future capital expenditure.
Our market capitalisation on any reporting date is calculated on the basis of the price of our shares and ADSs on that date,
which may trade in a wide range through the fiscal year depending on market conditions and sentiment, including in relation to
the gold price. Where our market capitalisation is less than our net asset or book value, this could indicate a potential
impairment and we may be required to record an impairment charge in the relevant period.
As at 30 June 2026, we had substantial amounts of property, plant and equipment and other assets on our consolidated
balance sheet. No impairment charges relating to property, plant and equipment and other assets were recorded in fiscal 2025.
An impairment reversal of R2.8 billion was recorded for fiscal 2026, which increased the carrying amounts of the relevant assets
and, consequently, the amounts subject to potential impairment in future periods. Future changes in the assumptions used to
determine recoverable amounts could result in material impairment charges.
Accordingly, if management is required to recognise impairment charges in the future, this could materially adversely affect
Harmony's reported earnings, results of operations, financial condition and the market value of our ordinary shares and ADSs.
See Item 5: "Operating and Financial Review and Prospects" and the related notes to our consolidated financial statements.
Our financial flexibility could be constrained by exchange control regulations in the jurisdictions in which we operate
South Africa's Exchange Control Regulations restrict the export of capital from South Africa. Transactions between South
African residents (including companies) and non-residents, excluding residents of the Common Monetary Area, comprising the
Republic of Namibia and the Kingdoms of Lesotho and Eswatini, are subject to exchange controls enforced by the South African
Reserve Bank ("SARB"). South African companies remain subject to restrictions on their ability to deploy capital outside South
Africa.
These restrictions could hinder our financial and strategic flexibility, particularly our ability to raise funds outside South
Africa, deploy capital for international acquisitions or projects and repatriate earnings. Given the increasing proportion of our
asset base (including CSA) and growth pipeline located outside South Africa, namely, the Eva Copper Project and the Wafi-
Golpu Project, constraints of this nature may become more significant to the execution of our strategy.
Our operations in PNG, including the export of gold and the operation of approved offshore foreign currency accounts, are
subject to the foreign exchange control and other directives of the Bank of PNG. PNG is presently subject to shortages of
foreign currency. The withdrawal of existing approvals or the imposition of further restrictions could hinder our financial and
strategic flexibility and limit our ability to make offshore payments.
Accordingly, exchange control restrictions could materially adversely affect Harmony's financial flexibility, ability to fund and
execute international growth projects, cash flows, results of operations and financial condition.
6
Table of contents
Sovereign, political, regulatory and macroeconomic developments in the jurisdictions in which we operate may
adversely affect our business
Harmony's operations, projects and growth pipeline are located in South Africa, Australia and PNG. Our performance is
therefore exposed to sovereign, political, fiscal, regulatory, security and macroeconomic conditions in those jurisdictions, as well
as to global economic conditions more broadly. A significant proportion of our operations, assets and cash flows remains
concentrated in South Africa, and adverse developments there may therefore have a disproportionate effect on the Group. A
global economic downturn may have follow-on effects on our business, including reduced availability of credit, increased
counterparty risk and reduced demand.
South Africa's sovereign credit is currently rated BB by Fitch and S&P Global, and Ba2 by Moody's, placing the country two
notches below investment grade. On 22 May 2026, Moody’s affirmed South Africa's rating at Ba2 and changed the outlook to
positive; on 25 May 2026, S&P affirmed South Africa's rating at BB with a positive outlook following a credit upgrade from BB- in
November 2025; and on 5 June 2026, Fitch upgraded South Africa's rating to BB from BB- with a stable outlook.
S&P reaffirmed Australia's AAA rating with a stable outlook on 30 September 2025, and again on 6 August 2026. S&P
revised PNG's outlook to positive from stable on 19 June 2026, while affirming the B-/B ratings. While our exposure is currently
driven primarily by South Africa's sovereign risk rating, the integration of CSA (through the acquisition of MAC Copper Limited
("MAC Copper")) and the development of the Eva Copper Project in Australia have increased the geographic diversification of
our activities. Management anticipates that the Group's relative exposure to sovereign risk will continue to evolve as our portfolio
develops, including through the progression of projects such as Wafi-Golpu.
On 24 October 2025, South Africa was removed from the Financial Action Task Force ("FATF") grey list, having been
placed on it in February 2023. The initial grey listing subjected the country to enhanced monitoring due to strategic deficiencies
in its anti-money laundering and counter-financing of terrorism ("AML/CFT") regime. Any future re-grey-listing or perceived
backsliding in AML/CFT effectiveness could adversely affect our business, operating results and financial condition.
Accordingly, adverse sovereign, political, regulatory, economic or macroeconomic developments in South Africa, Australia,
PNG or any other jurisdiction in which we operate could materially adversely affect our production, operating costs, cost of
capital, access to financing, cash flows, growth strategy, results of operations, financial condition, prospects and the market
value of our ordinary shares and ADSs.
Broader geopolitical developments, including tensions between South Africa and the United States relating to foreign
policy, trade, sanctions and security matters, may adversely affect South Africa’s bilateral relationships, access to international
markets and capital and international investor sentiment. Actual or threatened tariffs or other trade measures, restrictions on
financial flows or shifts in foreign policy could increase procurement costs, weaken South Africa’s macroeconomic environment,
raise our cost of capital or restrict our access to financing, which could materially adversely affect our business, cash flows,
results of operations and financial condition.
We are subject to mining taxes, royalties and other regulatory imposts, and to policies and legislation relating to
greater state intervention in the mining sector
With increasing resource nationalism in recent years, governments, communities, non-governmental organisations
("NGOs") and trade unions in several jurisdictions have sought, and in some cases imposed, greater participatory imposts on
the mining industry. In PNG, draft legislation has been proposed that envisages greater state intervention in the mining industry,
including the revision of existing royalties, the imposition of new taxes, and an increase in government holdings in mining
companies. In South Africa, the Expropriation Act 13 of 2024 (the "Expropriation Act") has been enacted but, as at the date of
this annual report, has not commenced. The Expropriation Act provides a framework for the expropriation of property for a public
purpose or in the public interest and identifies limited circumstances in which nil compensation may be just and equitable. The
timing of its commencement and the manner in which it may be applied remain uncertain. Such imposts, whether in the form of
taxes, royalties and levies, interference in project management, mandatory social investment requirements, local content
requirements or creeping expropriation, are an increasing feature of the global mining industry. Changes in tax laws, their
interpretation or enforcement, or challenges to our tax positions, could also increase our tax liabilities, result in penalties or
disputes and adversely affect project returns and cash flows. 
Since 2009, the mining regime in PNG has been the subject of a comprehensive ongoing review involving various PNG
Government agencies. Several draft revisions of the Papua New Guinea Mining Act 1992 (the "PNG Mining Act") have been
released for industry and public comment, most notably in 2018 and 2020, with the most recent draft, "the PNG Draft Mining
Bill 2025", released for consultation in February 2025. The PNG Draft Mining Bill 2025 proposes substantial reforms, including
empowering the State to acquire up to 30% equity, with deferred payments, in mining projects; adjusting royalties to 5% with
state equity or 10% without; and expanding compensation mechanisms and environmental protections, including banning
riverine tailings and requiring stronger mine-closure planning and financial provisioning. If enacted and applied to our operations
and projects in PNG, these revisions could have a material adverse effect on our business, operating results and financial
condition. We continue to engage with the PNG Government and relevant regulators, indirectly through the Papua New Guinea
Chamber of Resources and Energy ("PNG CORE") and directly with the Papua New Guinea Mineral Resources Authority ("PNG
MRA") and the Conservation and Environment Protection Authority ("CEPA").
In addition, further financial provision may be required in future for rehabilitation purposes, with restrictions on when such
funds may be accessed. Concurrent rehabilitation must be funded from operational budgets without recourse to rehabilitation
funds. The Carbon Tax Act, 15 of 2019 (the "Carbon Tax Act") provides for several allowances aimed at reducing the overall tax
liability; these allowances are expected to be reduced over time, meaning that if operational measures are not implemented to
reduce GHG emissions, carbon tax obligations will increase.
7
Table of contents
Accordingly, the imposition of additional restrictions, obligations, operating costs, taxes or royalty payments, or measures
relating to state intervention or expropriation, could materially adversely affect Harmony's business, cash flows, project
economics, operating results and financial condition. See Item 4: "Information on the Company – Business Overview – Land
expropriation", "– Taxation - Base erosion and profit shifting" and "– Renewable energy".
Risks Related to Operations and Business Resilience
Safety incidents and loss of life may result in production losses, regulatory intervention and reputational damage
Mining is inherently complex and hazardous, with safety risks arising from geological conditions, underground working
environments, equipment, infrastructure and human factors. Harmony operates a number of deep-level and technically
challenging mining operations, including some of the deepest underground mines in the world, as well as the underground CSA
in Australia and the Hidden Valley mine in PNG. These operations are exposed to hazards such as seismicity, fall-of-ground
events, heat, fire and machinery-related incidents.
In each of the jurisdictions in which we operate, regulators have broad powers to suspend or close operations that are
considered unsafe or hazardous and to require corrective action. In South Africa, the Mine Health and Safety Inspectorate
("MHSI") may halt operations pending investigation and remediation; in Australia, mining safety is regulated at state level, and
the relevant state regulators may direct the suspension of mining activities; and in PNG, mining safety inspectors may order the
cessation of operations for such period as they consider necessary. Such stoppages may occur at short notice and for
indeterminate periods, and may affect production volumes, operating costs and the achievement of mine plans, whether or not
an injury has occurred.
Safety incidents may also give rise to regulatory investigations, prosecutions, fines, civil claims and compensation
obligations, and may damage relationships with employees, organised labour, regulators, host communities and investors.
Because safety performance is a principal measure by which mining companies are assessed by regulators, employees and
providers of capital, significant or repeated incidents may adversely affect our reputation, our licence to operate and our access
to capital.
Accordingly, safety incidents and loss of life could materially adversely affect Harmony's production, operating costs, cash
flows, results of operations, financial condition, reputation and shareholder value. See Item 4: "Information on the Company –
Business Overview – Regulation – Health and Safety" and "Integrated Annual Report for the 20-F 2026 – Sustainability
performance – Safety".
Exposure to mining-related health hazards may result in occupational disease and significant long-term liabilities and
costs
Our operations are subject to health and safety legislation and regulations, which could impose significant cost burdens on
us. The nature and extent of these obligations vary across the jurisdictions in which we operate and may include requirements
relating to occupational exposure management, occupational hygiene monitoring, health surveillance, medical services and
other measures intended to protect worker health.
Our employees and contractors may be exposed to occupational health hazards associated with underground and surface
mining and related activities. Depending on the operation and work performed, these may include respirable dust and crystalline
silica, diesel particulate matter, noise, heat and other airborne and chemical contaminants. Prolonged or significant exposure to
these hazards may result in occupational disease, including silicosis and other occupational lung diseases, noise-induced
hearing loss and other exposure-related conditions. Employees and former employees may contract occupational diseases
arising from exposure at our operations. Because such diseases may develop only after prolonged latency periods, claims may
be brought many years after the exposure occurred, including in respect of operations we no longer own, and may give rise to
liabilities that were not previously identified or provided for.
In South Africa, the Mine Health and Safety Act, 29 of 1996 ("MHSA") imposes various duties on mines and grants the
MHSI broad powers to, among others, close mines which are unsafe or hazardous to the health of persons and order corrective
action on health and safety matters.
There is a risk that the cost of providing measures prescribed by the MHSA and regulations for the protection of health and
safety at mines, including the provision of health services and compliance with applicable regulations, including the
Compensation for Occupational Injuries and Diseases Act, 130 of 1993 ("COIDA"), and the Occupational Diseases in Mines and
Works Act, 78 of 1973 ("ODMWA"), could increase in future, depending on changes to underlying legislation, legal claims and
the profile of our employees. This increased cost, should it transpire, could be substantial, but is currently indeterminate.
The Occupational Lung Disease Working Group ("Working Group"), was formed in fiscal 2014 to address issues relating
to compensation and medical care for occupational lung disease in the South African gold mining industry. The Working Group,
made up of various gold mining companies has had extensive engagements with a wide range of stakeholders, including
government, organised labour and the legal representatives of claimants.
We have been subject to numerous claims, including class actions or similar group claims relating to silicosis and other
occupational lung diseases, and could be subject to similar claims in the future. For instance, in May 2016, the High Court of
South Africa (Gauteng Division) certified a class action by current and former mine workers against gold mining companies in
South Africa, including us.
8
Table of contents
The matter was subsequently settled in May 2018. The terms of the settlement are available on our website. Accordingly,
the Tshiamiso Trust was created for the purpose of administering the settlement funds. On 31 January 2020, the Working Group
commenced the payment of its quarterly administration and benefit contributions to the Tshiamiso Trust to enable the trustees to
settle benefits of eligible claimants. See Item 8: "Financial Information – Consolidated Statements and Other Financial
Information – Legal Proceedings" and "Integrated Annual Report for the 20-F 2026 – Sustainability performance – Health and
wellbeing" on pages 86 to 102 for further information. See note 25 "Other Provisions – Provision for silicosis settlement" to our
consolidated financial statements set forth beginning on page F-1.
At 30 June 2026, the provision in our statement of financial position was R252 million. We believe that this remains a
reasonable estimate of our share of the estimated cost in relation to the Working Group of the settlement of the class action
claims and related costs. The final settlement costs and related expenditure may, however, be higher than the recorded
provision depending on various factors, such as, among other things, differences in the number and profile of eligible claimants
actually compensated compared to current estimates.
It is possible that additional class actions or individual claims relating to silicosis or other occupational health diseases will
be filed against us in future. We will defend any such claims on their merits. Should we be unsuccessful in defending such
claims, or in otherwise favourably resolving perceived deficiencies in the national occupational disease compensation framework
identified in the earlier decision of the Constitutional Court, such matters would have an adverse effect on our financial position,
which could be material.
Occupational diseases may have long latency periods, and claims may arise many years after the relevant exposure
occurred. Accordingly, we may also be exposed to liabilities arising from historical occupational exposures, including exposures
that occurred before an operation was acquired by us.
We are not aware of current or legacy occupational exposure-related claims in relation to our operations in Australia or
PNG, but as a mining operator there is a risk that such claims could be brought in future.
Occupational health liabilities may require significant cash payments over extended periods and may increase operating
costs, insurance costs and compliance requirements, reducing funds available for sustaining capital expenditure, growth
projects, exploration, acquisitions and dividend distributions. Because these liabilities may persist long after mining activities
have occurred and involve substantial estimation uncertainty, they represent a significant long-term business risk.
Accordingly, occupational health risks, including risks relating to silicosis, tuberculosis and other occupational diseases,
could materially adversely affect Harmony's cash flows, results of operations, financial condition, reputation, growth prospects
and shareholder value. See Item 8: "Financial Information – Consolidated Statements and Other Financial Information – Legal
Proceedings", note 25 "Other Provisions – Provision for silicosis settlement" to our consolidated financial statements, and
"Integrated Annual Report for the 20-F 2026 – Sustainability performance – Health and wellbeing".
Infectious disease outbreaks and endemic disease may disrupt our workforce and operations, and increase costs
At certain of our operations, employees and contractors may be exposed to infectious diseases through person-to-person
or vector-borne transmission or other environmental pathways. Close working environments, shared accommodation, workforce
mobility, local disease prevalence and exposure to disease vectors may increase the likelihood of infection and the potential for
workforce disruption.
In South Africa, the prevalence of HIV within Harmony remains high, owing to the repercussions of historical migrant labour
practices and other factors. A high proportion of affected employees have been identified and placed in treatment; however, the
status of a significant population remains unknown, potentially creating labour availability and cash flow uncertainty.
Tuberculosis within Harmony, and in the gold mining industry generally, also remains high. Although the tuberculosis incidence
rate is declining, it remains subject to close monitoring, as it is influenced both by HIV and by exposure to silica dust.
In PNG, endemic infectious diseases, including malaria and tuberculosis, together with the increasing national burden of
HIV, remain risks to workforce health and to operational continuity.
In Australia, the endemic disease burden differs materially from that of our other operations: HIV and tuberculosis occur at
comparatively low levels and malaria is not endemic. Infectious disease outbreaks and other public health events may still affect
workforce availability and operational continuity, particularly where workforce mobility increases transmission risk.
Preventative, surveillance, treatment, vaccination, health promotion and response measures may increase our operating
costs and may interfere with management and employee productivity, and may not prevent workforce disruption or other impacts
arising from infectious disease or public health emergencies. Our property and business interruption insurance and liability cover
may not cover, or may be insufficient to cover, losses resulting from public health emergencies and other events that disrupt our
operations.
The extent to which infectious diseases may affect our operational and financial performance will depend on future
developments that are uncertain and difficult to predict. Accordingly, absenteeism, loss of skills, production disruption or
healthcare costs arising from infectious disease could materially adversely affect our productivity, business continuity, operating
results, cash flows and financial condition.
Production is dependent on reliable energy supply and increasing energy costs may materially affect profitability
South Africa's mining sector, including our operations, is heavily dependent on electricity supplied by Eskom Holdings SOC
Limited ("Eskom"), the state-owned utility, which relies primarily on fossil fuels. Over the past decade Eskom has faced
significant challenges, and our South African operations remain exposed to risks associated with electricity supply instability and
escalating power costs. Systemic risks persist as a result of Eskom's ageing infrastructure, financial constraints and limited
capacity for sustained maintenance and upgrades, posing ongoing threats to electricity reliability.
9
Table of contents
Unstable power supply can damage equipment, disrupt production, compromise the safe transport of employees
underground and reduce recovery rates. Deep-level underground operations are particularly sensitive to interruptions affecting
hoisting, ventilation, refrigeration and pumping. Rising electricity costs continue to erode free cash flow margins, potentially
affecting mine life, project viability and overall financial performance.
Our Australasian operations have differing energy profiles, and each carries a distinct exposure. CSA in New South Wales
draws its power from the electricity grid. Grid supply has been reliable and back-up generation has not been considered
necessary or critical, with the result that the mine has limited alternative supply and a sustained outage or curtailment of grid
power would interrupt production. The Eva Copper Project in Queensland is located in a remote region that is not connected to
the National Electricity Market. Power for the project is to be supplied under a long-term power purchase agreement through a
dedicated off-grid hybrid facility combining solar generation, battery storage and thermal generation. While this arrangement is
intended to provide reliable, lower-emission power, the project remains exposed to reliance on a third-party power provider, to
the performance and availability of off-grid generation infrastructure, to fuel supply for the thermal component and to the cost of
energy, each of which could affect operating and development costs and project economics.
In PNG, our Hidden Valley mine relies on power from the state utility, Papua New Guinea Power Limited ("PNG Power")
which cannot be relied upon for security of power. The amount of power imported from PNG Power has increased marginally
over the last three years, with approximately 67% of the mine's daily power demand met by PNG Power and the remaining 33%
self-generated using the mine's diesel power station. Risks associated with self-generation include exposure to diesel price
increases, danger to road users and pedestrians in the transport of fuel to site, and potentially higher associated GHG
emissions.
Accordingly, disruptions to electricity supply and rising power costs could materially adversely affect Harmony's production,
operating costs, recovery rates, project viability, cash flows, results of operations and financial condition. See Item 5: "Operating
and Financial Review and Prospects – Operating Results – Key factors affecting our results – Electricity in South Africa" and
"Integrated Annual Report for the 20-F 2026 – Sustainability performance – Climate and energy".
Water ingress, pumping obligations at adjacent closed mines, flooding and decant risk could interrupt operations and
create long-term liabilities
Certain of our mining operations in South Africa are adjacent to the mining operations of other companies. A mine closure
can affect continued operations at an adjacent mine if appropriate preventative steps are not taken. In particular, this could
include the ingress of underground water when pumping operations at the closed mine are suspended. This can result in
damage to property, operational disruptions and additional pumping costs, which could adversely affect any one of our adjacent
mining operations and, in turn could adversely affect our business, operating results and financial condition.
In connection with our acquisition in 2018 of the Moab Khotsong and Great Noligwa mines from AngloGold Ashanti Limited
("AngloGold"), together with other assets and related infrastructure, we acquired a two-thirds interest in the Margaret Water
Company NPC ("Margaret Water") for all pumping and water-related infrastructure at its Margaret shaft. The shaft operates for
the purpose of de-watering the Klerksdorp, Orkney, Stilfontein, Hartbeesfontein basin groundwater. This is to allow Moab
Khotsong operations and the mine operated by Kopanang Gold Mining Company Proprietary Limited (the mining company
holding the remaining one-third interest in Margaret Water and the only other mining company continuing to operate in the area)
to remain dry and to prevent flooding of operational areas. Therefore, it remains imperative for the shaft to continue pumping
water.
Flooding and potential decant in the future resulting from a failure in pumping and water-related infrastructure could pose
an unpredicted "force majeure" type event, which could result in financial liability for us, and could have an adverse impact on
our operations and financial condition. Due to interconnectivity with adjacent mines, the Doornkop and Kusasalethu operations
experience a flooding risk if adjacent mines stop pumping underground water. In some instances, we are engaged in
discussions regarding long-term water management solutions to develop a regional strategy co-created with these neighbouring
and inter-connected mines. Although we have installed water treatment plants at both sites for current treatment needs, which
could serve as water plants for final decant should the situation arise, there can be no assurance that such plants will be
sufficient to address such risks.
There is also a flooding risk at the Mponeng mine, requiring the continuous pumping arrangement with Covalent Water
Company (Pty) Limited (a wholly-owned subsidiary) to stay in place.
Water availability presents a further risk. Our operations require reliable access to water for mining and processing, and
altered rainfall patterns, drought and competing demand from communities and other users may constrain supply. In Australia,
CSA and the Eva Copper Project are located in water-stressed regions and may be exposed to risks associated with drought,
reduced water availability, competing water demands and changing climatic conditions. These factors could affect operational
continuity, increase operating costs, constrain future production or development activities and adversely affect project
economics.
Obligations in respect of the pumping and treatment of extraneous water must also be addressed in connection with our
final closure plans for each of our operations. We remain responsible for these liabilities until a closure certificate is issued
pursuant to the Mineral and Petroleum Resources Development Act, 28 of 2002 ("MPRDA"), and possibly thereafter under the
National Environmental Management Act, 107 of 1998 ("NEMA").
Accordingly, water ingress, pumping failures, flooding, decant and long-term water management obligations could
materially adversely affect Harmony's production, operating costs, closure liabilities, cash flows, results of operations and
financial condition. See Item 4: "Information on the Company – Business Overview – Regulation – Laws and Regulations
Pertaining to Environmental Protection – South Africa – The NEMA".
10
Table of contents
Infrastructure constraints and ageing infrastructure could adversely affect our operations
Mining, processing, development and exploration activities depend on adequate infrastructure. Reliable rail, ports, roads,
bridges, power sources, power transmission facilities and water supply are critical to our business operations and affect both
capital and operating costs. Much of this infrastructure and the related services are provided by third parties whose operational
activities are outside our control.
Interference with the maintenance or provision of infrastructure, including as a result of extreme weather conditions,
scarcity of equipment, sabotage or social unrest, could impede our ability to deliver product on time. Port congestion at South
African facilities, particularly Durban, has affected clearance times for imported items and continues to create supply chain
bottlenecks.
In some instances, the remaining economic life of an operation may affect the timing, scope or economic viability of major
infrastructure refurbishment or replacement. Once a shaft or processing plant has reached the end of its intended lifespan,
higher than normal maintenance and care is required. The same applies to terrestrial tailings and waste storage facilities.
Maintaining this infrastructure requires skilled human resources, capital allocation, management and planning. Although we
have implemented a comprehensive maintenance strategy, incidents resulting in production delays, increased costs or industrial
accidents may occur.
Accordingly, infrastructure constraints, third-party infrastructure failures and the demands of maintaining ageing
infrastructure could materially adversely affect Harmony's production, capital and operating costs, results of operations and
financial condition.
Illegal mining and organised criminal activity pose growing operational and safety risks
The activities of illegal and artisanal miners, which include theft, have increased over the years, have become more violent,
and threaten both the safety of employees and the sustainability of the mining industry.
In South Africa, artisanal and illegal miners are active on, or adjacent to, several of our properties. Their activities may
interfere with our operations and result in conflict presenting a security threat to property and human life. Illegal mining can
cause damage to our properties, including through pollution, copper cable theft, underground fires, damage to critical
infrastructure, operational disruption, project delays and personal injury or death, for which we could potentially be held
responsible. It may also contribute to the depletion of mineral deposits, potentially rendering future mining of those deposits
uneconomic. Most illegal miners are found at abandoned shafts or old workplaces.
Illegal and artisanal mining, which may involve employees or third parties, is associated with a range of negative impacts
including environmental degradation and human rights abuses such as forced labour, human trafficking and child labour, as well
as corruption, money laundering and other violent crimes in communities and at mines. Effective local government
administration is often lacking where illegal and artisanal miners operate, creating a complex and unstable social environment.
The disbandment of specialised South African Police Service units has left a significant gap in the apprehension of high-ranking
criminals in the illicit gold trade; without the assistance of such units, combating illegal and artisanal mining is extremely difficult.
The environmental, social, safety and health impacts of artisanal mining are frequently attributed to formal mining activity,
and it is often assumed that artisanally mined gold is channelled through large-scale mining operators, even though artisanal
and large-scale miners have distinct supply chains. These misconceptions affect the reputation of the industry.
In PNG, illegal and artisanal mining poses challenges to various mines. The presence of illegal miners could lead to project
delays and disputes regarding the development or operation of commercial gold deposits, and could increase the level of
organisation and funding of criminal activity around some of our operations. Criminal activities such as trespassing, illegal and
artisanal mining and related sabotage, theft and vandalism could lead to damage and disruption at our operations and pose
safety risks to our employees.
Rising gold and copper prices may result in an increase in gold and copper theft, and incidences of illegal mining may
escalate as a result of social and economic conditions. In August 2026 the South African Government published the draft
General (Mining) Laws Amendment Bill, 2026 (the "General Mining Laws Amendment Bill") for public comment, which is
intended to strengthen the legislative framework applicable to illegal mining and is described under "– Laws governing mineral
rights affect our business and our mining rights could be altered, suspended or cancelled" below. While the proposed reforms
may improve enforcement over time, there is no assurance that they will be enacted or that they will reduce the incidence of
illegal mining at or adjacent to our operations.
Accordingly, illegal mining and organised criminal activity could materially adversely affect Harmony's safety performance,
production, security and remediation costs, reputation, results of operations and financial condition.
Disruptions in critical supply chains may affect production, project execution and profitability
Our operational results may be affected by the availability and pricing of consumables such as fuel, chemical reagents,
explosives, tyres, steel and other essential production inputs. Issues regarding the availability of consumables may result from
shortages, long lead times and supply chain disruptions, which could result in production delays and shortfalls. We expect cost
increases and longer lead times to continue in fiscal 2027 across our operations, including as a result of factors such as the
price of oil, inflationary increases and labour costs.
Shortages can be attributed to geopolitical uncertainty, including the potential impact of global trade policy shifts. In South
Africa, the consequences of intermittent power outages and unplanned breakdowns have resulted in rising input costs and
longer lead times. The steel and chemical industries have experienced periodic labour action related to wage negotiations,
affecting major local steelmakers and creating supply constraints that have affected numerous engineering companies within our
extensive supply chain network.
11
Table of contents
Our operations are dependent on the timely and cost-effective supply of internationally sourced consumables, equipment,
spare parts, fuel and other critical inputs. Global geopolitical tensions, armed conflicts, trade disputes, sanctions, tariffs,
protectionist policies, trade fragmentation, cyber incidents affecting logistics networks, and disruptions to key maritime routes
and transportation corridors may adversely affect global supply chains and increase volatility in freight, fuel, energy, insurance
and procurement costs.
While certain supply chain disruptions experienced in recent years have moderated, global logistics networks remain
vulnerable to disruption and cost escalation. Restrictions affecting major shipping routes, ports, transportation infrastructure or
strategic trade chokepoints may reduce the availability of critical supplies, extend delivery lead times, increase transportation
costs or require us to source materials and equipment from alternative suppliers on less favourable commercial terms.
In addition, our operations are exposed to energy supply and cost risks. Our South African operations may be affected by
electricity supply constraints and tariff increases, while our PNG operations depend significantly on the availability and
transportation of diesel and other fuels. Any disruption to energy supplies, fuel logistics or transportation infrastructure could
adversely impact our ability to operate efficiently.
Prolonged or significant disruptions to global supply chains, transportation networks or energy supply could result in
production interruptions, delays to capital projects and growth initiatives, increased operating and capital costs, reduced
operational flexibility and lower profitability. Any such events could have a material adverse effect on our business, financial
condition, results of operations and cash flows.
The pricing of consumables could continue to be affected by these challenges, particularly if shortages become more
prevalent. Factors such as global supply and demand dynamics, governmental regulation, including import parities on steel and
chemical-related products, and industrial action may contribute to price fluctuations. A sustained interruption in the supply of
these consumables would necessitate swift identification of alternative suppliers, potentially at higher cost, and could adversely
affect our ability to pursue our development projects. Our copper business may also depend on a limited number of customers,
offtakers, smelters, refiners, ports or logistics providers. The loss or interruption of a material arrangement, or a counterparty
failure, could delay sales, increase treatment or transport charges, or interrupt production.
Accordingly, supply chain disruptions and input shortages could materially adversely affect Harmony's production, project
execution, operating costs, profitability, results of operations and financial condition.
Reliance on TMM exposes us to equipment-related production interruptions
Certain of our operations, and the execution of certain of our capital projects, are dependent on TMM, which is critical to
mechanised mining. These operations face elevated risks associated with the reliability and availability of TMM fleets.
Adverse underground conditions, supply chain constraints affecting the availability of equipment and spare parts, and
shortages of the artisan and operator skills required to maintain and operate the fleet all contribute to equipment downtime and
operational inefficiency. TMM also presents specific safety exposures, including machinery-related incidents involving
employees working in proximity to mobile equipment underground.
These challenges pose potential threats to production continuity, cost control and the timely delivery of capital projects.
Accordingly, reliance on TMM could materially adversely affect Harmony's production volumes, unit costs, project delivery
timelines, results of operations and financial condition.
The use of contractors may expose us to delays or suspensions in mining activities and increases in mining costs
We use contractors at certain of our operations to mine and deliver ore to processing plants, as well as for other purposes.
At mines employing mining contractors, contracting costs represent a significant proportion of total operating costs, and we do
not own all of the mining equipment used.
Our operations could be disrupted, resulting in additional costs and liabilities, if mining contractors at affected mines
experience financial difficulties, if a dispute arises in renegotiating a contract, or if there is a delay in replacing an existing
contractor and its operating equipment to meet business needs at expected cost levels. Increases in contract mining rates, in
the absence of associated productivity increases, will also adversely affect our results.
Contractors may adversely affect our reputation, results of operations and financial condition through our reduced control
over those aspects of operations that are the responsibility of contractors, through the safety performance and regulatory
compliance of contractor employees, who in South Africa are regarded as employees of the mine for purposes of the MHSA,
and through the risk that contractors do not maintain the standards, systems and controls that we apply to our own operations.
Accordingly, our reliance on contractors could materially adversely affect Harmony's production continuity, operating costs,
safety and regulatory performance, results of operations and financial condition.
Our insurance coverage may be insufficient or unavailable to cover future losses
Fluctuations in insurance costs and availability can significantly affect our operating results, and our current insurance
coverage may not fully address future claims. We maintain global insurance policies covering general liability, directors' and
officers' liability, cybersecurity, accidental loss, and material damage to our property including resultant business interruption.
However, the cost of sustaining adequate insurance coverage continues to rise and may continue to do so.
We also maintain comprehensive third-party liability coverage, which includes unforeseen sudden and accidental
environmental liabilities. Despite this, we may face liability for pollution or other hazards that are not insured or not insurable,
including those relating to past mining activities. Our property and liability insurance is aligned with industry practice but, like all
insurance policies, contains exclusions and limitations.
12
Table of contents
There is no guarantee that insurance will always be available at economically feasible premiums. In addition, insurance
markets may become more restrictive over time, particularly in relation to natural catastrophe and severe weather exposures,
resulting in higher premiums, increased deductibles, reduced policy limits, narrower coverage terms or reduced availability of
insurance coverage for certain risks. The global insurance market for mining risk has tightened in recent years, and cover for
certain exposures, including tailings storage facilities ("TSFs"), deep-level underground operations and cyber risk, has become
more difficult and more expensive to place. Consequently, our insurance coverage might not protect against certain claims
relating to environmental or industrial accidents, pollution, public health emergencies, data protection and cybersecurity
breaches, tailings incidents, or other events that could disrupt our operations, such as a national grid collapse.
Accordingly, insufficient, unavailable or increasingly costly insurance coverage could materially adversely affect Harmony's
ability to recover losses, its cost base, results of operations and financial condition.
Risks Related to People, Labour and Organisational Capability
Labour instability may materially affect production and costs
Our labour force in South Africa has substantial trade union participation, and we engage in periodic collective bargaining
over wages and conditions of employment. We face the risk of disruption from labour disputes, strikes, work stoppages, go-
slows and other industrial action, which may result in loss of production and increased labour costs.
Wage settlements above inflation, in the absence of corresponding productivity improvements, increase unit costs and may
reduce the economic viability of marginal operations and shorten mine life. Labour relations in the South African mining sector
may also be affected by inter-union rivalry, community-based grievances and broader socio-economic conditions, which may
result in disruption that is not directly related to our own employment practices. Restructuring, mechanisation or the closure of
unprofitable operations may give rise to disputes, retrenchment obligations and consultation processes under applicable labour
legislation, which may delay implementation and increase costs.
Industrial action, whether protected or unprotected, may interrupt production, damage infrastructure, threaten the safety of
employees who continue to work, and affect our relationships with organised labour, government and host communities.
Wage and benefit demands may be heightened during periods of elevated gold prices, even where increases in operating
costs or other factors continue to place pressure on the economic viability of particular operations.
Accordingly, labour instability could materially adversely affect Harmony's production, unit costs, operational flexibility, cash
flows, results of operations and financial condition. See Item 4: "Information on the Company – Business Overview – Regulation
– Labour Relations".
We may be unable to attract and retain the critical skills and organisational capability required to execute our strategy
The risk of losing senior management, or of being unable to hire and retain sufficient technically skilled employees, of
failing to achieve sufficient representation by HDPs in management positions, or of failing to achieve sufficient gender diversity
in management or at board level, may materially affect our ability to achieve our objectives.
We compete with mining and other companies globally to attract and retain key human resources at all levels with the
technical skills and operating and managerial experience necessary to operate our business. The global shortage of key mining
specialists, including geologists, mining engineers, mechanical and electrical engineers, metallurgists and skilled artisans, has
been exacerbated by increased mining activity across the globe. The often remote locations of mining operations may make the
industry unattractive to potential employees.
The regions in which we operate impose specific requirements affecting recruitment and retention. In South Africa, the
need to recruit, develop and retain skilled employees is particularly critical in relation to HDPs and women in mining.
In August 2024, the PNG Department of Commerce and Industry launched the PNG "National Content Policy for Resource
Sectors 2023". While it is presently uncertain to what extent and how the policy will be applied to our current operations and
projects in PNG, if the workforce localisation provisions are introduced we believe they would severely restrict the use of
offshore-based fly-in, fly-out expatriate employees, and potentially result in a tightening of legislation around the granting of work
permits and visas to foreign skilled employees. This would adversely affect our ability to engage and retain appropriately skilled
human resources in PNG, and could require additional resources for the construction or provision of housing for residential
employees and for the recruitment and training of local landholders and landholder businesses.
Our transition towards a more diversified, international and increasingly copper-weighted portfolio, including CSA, the Eva
Copper Project and the Wafi-Golpu Project, requires organisational capability and specialised expertise that differ in important
respects from those required by our established South African underground gold operations. Failure to build, acquire or retain
that capability may affect the pace and quality of project delivery and integration.
Accordingly, an inability to attract and retain critical skills and to maintain the organisational capability required to execute
our strategy could materially adversely affect Harmony's operational performance, project delivery, growth prospects, results of
operations and financial condition. See "Integrated Annual Report for the 20-F 2026 – Sustainability performance – Engaged
workforce".
13
Table of contents
Risks Related to Mineral Resources, Mineral Reserves, Growth Projects and Portfolio Transformation
Mineral Resource and Mineral Reserve estimates may prove inaccurate
Estimates of our Mineral Resources and Mineral Reserves are based on a number of assumptions made at a specific point
in time, including mining and recovery factors, future cash costs of production, exchange rates and relevant commodity prices.
As a result, the metal actually produced in future may differ from current estimates.
Mineral Reserve estimates are prepared using geological interpretation, sampling and modelling techniques that are
inherently uncertain. Actual grades, tonnages, mining widths, dilution, recovery rates and geotechnical conditions encountered
during mining may differ materially from those assumed. Deep-level underground orebodies of the kind mined at several of our
South African operations present particular estimation challenges arising from structural complexity, seismicity and variable
grade distribution.
Changes in the gold or copper price, exchange rates, operating costs, capital expenditure requirements, cut-off grades,
mine plans, regulatory requirements or the assumptions applied in estimating Mineral Reserves may require a downward
revision of our reported Mineral Resources and Mineral Reserves. Such revisions may in turn shorten the expected life of our
mines, trigger impairment assessments, affect mine planning and capital allocation decisions, and reduce the expected
economic returns of our operations and projects.
Accordingly, inaccuracies in Mineral Resource and Mineral Reserve estimates could materially adversely affect Harmony's
production profile, actual Mineral Reserves, project economics, asset carrying values, results of operations, financial condition
and shareholder value. See Item 4: "Information on the Company – Property, Plant and Equipment".
Failure to replace depleted Mineral Reserves could undermine long-term production and value creation
Our operations have limited Proved and Probable Mineral Reserves, and mining depletes those Mineral Reserves.
Exploration for additional Mineral Resources and Mineral Reserves is speculative in nature, may be unsuccessful and involves
many risks, including locating orebodies; the geological nature of orebodies; identifying metallurgical properties; estimating the
economic feasibility of mining orebodies; developing appropriate metallurgical processes; obtaining necessary governmental
permits; and constructing mining and processing facilities at any site chosen for mining.
Our exploration efforts might not result in the discovery of mineralisation, and any mineralisation discovered might not
result in an increase in Mineral Resources or in Proved and Probable Mineral Reserves. To access additional Mineral Resources
and Mineral Reserves we will need to complete development projects successfully, including extensions to existing mines and,
possibly, the establishment of new mines.
We typically use feasibility studies to determine whether to undertake significant development projects. These studies often
require substantial expenditure and include estimates of expected economic returns based on assumptions about future gold
and other metal prices; anticipated tonnage, grades and metallurgical characteristics of ore to be mined and processed;
anticipated recovery rates; and anticipated total project costs, including capital expenditure and cash costs. All projects are
subject to project study risk, and there is no certainty that a feasibility study will be successfully concluded or that the project that
is its subject will satisfy our economic, technical, risk and other criteria in order to progress to development.
Our long-term growth strategy depends on successfully developing and advancing future sources of production, including
Mineral Reserves replacement opportunities across our operations and growth projects such as the Eva Copper Project and, in
the longer term, the Wafi-Golpu Project. Failure to replace depleted Mineral Reserves may reduce future production, limit growth
opportunities and constrain our ability to maintain or expand cash flow generation over time. It may also affect our ability to
support long-term capital investment decisions, dividend distributions and portfolio optimisation initiatives.
Accordingly, a failure to discover new Mineral Resources and Mineral Reserves, to enhance existing Mineral Resources
and Mineral Reserves, or to develop new operations in sufficient quantities to maintain or grow our current Mineral Reserve
base could materially adversely affect Harmony's long-term production, growth prospects, results of operations, financial
condition and shareholder value.
Strategic projects may not achieve expected returns
The successful implementation of our business strategy and projects depends on many factors, including factors outside
our control. The ability to grow our business depends on the successful implementation of our existing and proposed projects
and continued exploration success, as well as on the availability of attractive acquisition opportunities.
It can take a number of years from the initial feasibility study until development and construction of a project is completed,
and during that time the economic feasibility of production may change. There are a number of inherent uncertainties in project
development and construction, including: the time required to secure necessary governmental and third-party permits, licences
and permissions; the timing and cost of constructing mining and processing facilities; the availability and cost of skilled labour,
power, water, fuel, mining equipment and other materials; the accessibility of transportation and other infrastructure, particularly
in remote locations; the availability and cost of smelting and refining arrangements; the availability of funds to finance
construction and development activities; and spot and expected future prices of gold, silver, copper, uranium and molybdenum.
Our principal growth projects carry project-specific exposures. The Wafi-Golpu Project in PNG remains subject to the finalisation
of fiscal and regulatory arrangements with the PNG Government, to the outcome of proceedings concerning its environmental
permit ("EP") and proposed tailings management method, and to the sovereign, security and infrastructure conditions prevailing
in that country. Construction of the Eva Copper Project in Queensland commenced following the final investment decision in
November 2025 and remains subject to permitting, capital-cost, construction, commissioning, schedule and copper-price
exposures, as well as our ability to build capability in a jurisdiction and commodity in which we have limited operating history.
14
Table of contents
Delays or cost escalation at any of these projects may defer expected cash flows, increase funding requirements and reduce
project net present value.
All of these factors could result in our actual cash costs, capital expenditure, production and economic returns differing
materially from those anticipated by feasibility studies. There is no assurance that any future development project will extend the
life of our existing mining operations or result in new commercial mining operations.
Accordingly, unforeseen difficulties, delays or costs in implementing our strategy and projects could materially adversely
affect Harmony's growth pipeline, capital allocation, project value, results of operations, financial condition and prospects.
Acquisitions, portfolio transformation initiatives and joint ventures may expose Harmony to integration and execution
risks
In order to maintain or expand our operations and Mineral Reserve base, we have sought, and may continue to seek, to
enter into joint ventures or other business combination transactions, or to make acquisitions of selected precious and base
metal producing companies or assets.
On 24 October 2025, following its announcement on 27 May 2025, our acquisition of MAC Copper became effective,
adding the operating CSA in New South Wales to our portfolio. This represented a significant step in Harmony's portfolio
transformation, materially increasing our exposure to copper and establishing an operating presence in the Australian mining
sector. CSA has since been integrated into our operations and reporting, and now contributes to the Group's production,
financial results and consolidated disclosures. The integration of an established, producing copper mine in a new operating
jurisdiction has increased the scale, geographic diversity and commodity diversification of our business.
While the integration of CSA has progressed, acquisitions of this nature involve inherent execution and integration risks,
including the alignment of operating standards, systems, controls, governance and reporting frameworks; the retention of skills
and organisational capability; and the management of new geographic, regulatory, commodity and operational exposures. The
benefits anticipated from an acquisition may not be fully realised, or may take longer or cost more to achieve than expected.
Acquiring new mining operations or entering into other business combination transactions involves a number of risks,
including: our ability to identify appropriate assets and to negotiate an acquisition or combination on favourable terms; obtaining
the financing necessary to complete future acquisitions; difficulties in assimilating the operations of the acquired business; the
changing regulatory environment and general policy uncertainty in the countries in which these operations are situated;
difficulties in maintaining our financial and strategic focus while integrating an acquired business; problems in implementing
uniform quality, standards, controls, procedures and policies; management capacity and skills necessary to integrate new assets
and operations; increasing pressure on existing management to oversee an expanding company; and, to the extent we acquire
operations outside South Africa, Australia or PNG, difficulties relating to operating in countries in which we have not previously
operated.
Any such acquisition or joint venture may change the scale of our business and operations and may expose us to new
geographic, geological, political, social, operating, financial, legal, regulatory and contractual risks. Where we participate in the
development of a project through a joint venture or other multi-party commercial structure, there could be disagreements, legal
or otherwise, or divergent interests or goals among the parties, which could jeopardise the success of the project, particularly
where we do not have full management control over the joint venture. There can be no assurance that any joint venture will
achieve its intended results.
Accordingly, difficulties or delays in identifying, financing, integrating or managing acquisitions and joint ventures could
materially adversely affect Harmony's revenue, cash flows, operating costs, growth strategy, results of operations and financial
condition. See Item 5: "Operating and Financial Review and Prospects – Liquidity and Capital Resources – Cash flows from
investing activities".
Intense industry competition and consolidation may adversely affect our ability to acquire assets, equipment and
skilled personnel
The mining industry is competitive in all of its phases. We compete with other mining companies and individuals for
specialised equipment, components and supplies necessary for exploration and development; for mining claims and leases on
exploration properties; and for the acquisition of mining assets. Certain of these competitors have greater financial resources,
operational experience and technical capabilities than we do. Competition may increase our cost of acquiring suitable claims,
properties and assets.
Further, industry consolidation may lead to increased competition as a result of reduced availability of mining and
exploration assets. Consolidation in the form of acquisitions, business combinations, joint ventures, partnerships or other
strategic relationships may continue in future. The companies or alliances resulting from these transactions may benefit from
greater economies of scale and from significantly larger and more diversified asset bases than ours, which may place us at a
disadvantage in competing for assets, capital, equipment and skilled personnel. A favourable metal-price environment may
strengthen the financial position of industry participants, attract new entrants and accelerate industry consolidation, thereby
increasing competition for assets, equipment, supplies and skilled personnel and increasing acquisition valuations.
Accordingly, competition and industry consolidation could materially adversely affect Harmony's ability to replace Mineral
Reserves and grow its portfolio on economic terms, its cost base, results of operations and financial condition.
15
Table of contents
Risks Related to Climate, Environment and Social Licence
Climate change presents material physical risks to our operations and long-term value creation
Harmony's operations and development projects are exposed to the physical effects of climate change across South Africa,
PNG and Australia. Mining operations depend on reliable infrastructure, secure water resources, stable operating conditions and
safe access to mining and processing facilities. Changes in climate patterns may increase the frequency, severity or duration of
physical hazards, which may adversely affect operational performance, project development, business continuity and long-term
asset values.
Physical climate-related hazards may include extreme rainfall, flooding, drought, water scarcity, rising temperatures,
heatwaves, storms, changing groundwater conditions and other severe weather events. The nature and extent of these hazards
vary across Harmony's portfolio, with some operations potentially more exposed to flooding, extreme rainfall and associated
infrastructure disruptions, while others may be more exposed to drought, water scarcity and heat-related impacts. Our
operations in PNG are particularly exposed to high-intensity rainfall, landslide and access-route disruption, while our South
African operations are exposed to water scarcity, heat stress, extreme rainfall, surface flooding and water ingress risks in
specific geological settings. These hazards may increase the likelihood or severity of operational, infrastructure, water
management, energy supply, transportation and other business risks affecting our operations and development projects.
Climate-related physical hazards may disrupt mining and processing activities, damage infrastructure, restrict site access,
reduce workforce productivity and constrain the availability of critical resources, including water and energy. Such hazards may
also affect our suppliers and the transport and logistics networks on which we depend, interrupting the delivery of critical goods
and services to our operations. Severe weather events and changing environmental conditions may also increase maintenance
requirements, accelerate asset deterioration and reduce operational flexibility. In addition, climate-related impacts may affect
project development schedules, capital requirements and the efficient operation of existing assets.
The physical impacts of climate change may increase operating costs through higher maintenance expenditures,
infrastructure upgrades, water management requirements, rehabilitation obligations, insurance costs and business interruption
losses. They may also adversely affect production levels, project economics, asset lives and long-term investment decisions. In
certain circumstances, severe weather events or chronic changes in climatic conditions could result in production interruptions,
damage to infrastructure, reduced operational performance or the impairment of assets and mining operations.
Mining and development projects require long-term capital allocation decisions based on assumptions regarding future
environmental and operating conditions. As climate-related physical hazards continue to evolve, they may create additional
uncertainty regarding operational performance, resource availability, infrastructure resilience, project economics and long-term
asset values. While Harmony continues to assess and manage physical climate-related risks, future conditions may differ
materially from current assumptions and planning expectations. Accordingly, climate-related physical risks could materially
adversely affect Harmony's production, operating costs, cash flows, project economics, results of operations, financial condition,
growth prospects and shareholder value.
Decarbonisation, carbon pricing and emerging climate regulation may increase costs and capital requirements
Governments, regulators, investors, lenders, customers and other stakeholders are increasingly focused on reducing GHG
emissions and supporting the transition to a lower-carbon economy. Harmony's operations in South Africa, PNG and Australia
are subject to existing and evolving climate-related laws, regulations, standards and disclosure requirements. As a result,
climate-related policy developments, carbon-pricing mechanisms, emissions-reduction requirements, market expectations and
stakeholder demands may increase operating costs, capital expenditure requirements and compliance obligations across our
business.
Climate-related regulation continues to evolve in the jurisdictions in which we operate and may include more stringent
emissions reporting requirements, carbon taxes, carbon budgets, emissions reduction targets, environmental permitting
obligations and climate-related disclosure standards. Future regulatory and policy developments may be broader, more
prescriptive or more costly than currently anticipated. In addition, investors, lenders and other stakeholders are increasingly
incorporating climate-related considerations into investment decisions, financing assessments and capital allocation processes.
Managing transition-related risks and responding to evolving regulatory and market expectations may require significant
investment in renewable energy projects, energy infrastructure, emissions-reduction initiatives, lower-carbon technologies, fleet
replacement, operational redesign, reporting systems and other capital-intensive measures. The costs of compliance and
transition may increase over time as regulations become more stringent, carbon-pricing mechanisms expand, technologies
evolve and stakeholder expectations continue to develop. There can be no assurance that such investments will achieve
anticipated operational, economic or environmental outcomes within expected timeframes.
Increasing carbon-related costs, including taxes, levies, compliance expenditures and indirect costs passed through by
suppliers, contractors and energy providers, may increase operating costs and reduce profitability. Climate-related regulatory
requirements and market developments may also influence project economics, mine planning decisions, Mineral Reserve
assumptions and the expected returns from existing operations and future development projects. In addition, the availability,
terms and cost of financing may increasingly depend on climate-related performance, risk management practices and disclosure
outcomes.
The transition to a lower-carbon economy may also create uncertainty regarding future technologies, energy markets,
stakeholder expectations and regulatory requirements. If Harmony is unable to respond effectively to evolving transition-related
risks and opportunities, its competitiveness, reputation, access to capital and long-term growth prospects may be adversely
affected.
16
Table of contents
Our South African operations are registered emitters under the National Greenhouse Gas Emission Reporting Regulations,
2016 and are liable for carbon tax under the Carbon Tax Act. The statutory carbon tax rate is currently R308 per tonne of carbon
dioxide equivalent ("CO2-e") and is scheduled to increase to R462 per tonne by 2030. Allowances currently available under the
Carbon Tax Act reduce our effective rate, and we expect those allowances to be reduced over time. The pending alignment of
carbon budgets under the Climate Change Act 22 of 2024 (the "Climate Change Act") with the Carbon Tax Act creates further
uncertainty as to our future effective rate of tax on emissions.
We have provisionally estimated our carbon tax liability to 2030 and beyond. However, the full impact of the Carbon Tax Act
remains uncertain. Internally, we have aligned our South African carbon price with the official tax rate. In the short term we may
face pass-through costs from suppliers due to increased fuel prices.
Alongside the carbon tax, a carbon fuel levy is imposed under the Customs and Excise Act 91 of 1964 (the "Customs and
Excise Act") as part of the national fuel levy regime. From 1 April 2026, the carbon fuel levy on liquid fuels increased fuel prices
by R0.19/litre for petrol and R0.23/litre for diesel, increasing our operational expenses.
The carbon tax has historically represented a relatively low cost. However, we expect available allowances to be reduced
and tax rates to increase. Carbon taxes may also apply to electricity generated from fossil fuels. The scheduled increase in the
statutory carbon tax rate from R308 per tonne to R462 per tonne represents a 50% increase, although our effective cost could
increase by a different amount as allowances are reduced. These rates and longer-term assumptions have been incorporated
into our business plans, but we expect the resulting increase in carbon costs to place significant pressure on our business.
Electricity-related GHG emissions represent our largest emission source. Electricity accounts for approximately 22% of our
cash costs in South Africa. While cost management is clearly a strategic issue for us, the delivery of a stable and reliable energy
supply is even more critical due to its direct impact on both production and health and safety. Additional energy taxes and
regulations (such as emission measurement and reduction, audit processes and human resource costs) will significantly affect
our operations. We have initiated several renewable energy projects to supplement our energy supply needs and reduce our
reliance on electricity supplied by Eskom which is predominantly generated by coal-fired power stations.
The European Union ("EU") began applying the definitive phase of its carbon border adjustment mechanism ("CBAM") on
1 January 2026. CBAM does not currently apply to precious metals. However, CBAMs could be extended to other products
(including precious metals), or adopted in other jurisdictions in the future. While any charge would generally be imposed on the
importer and may be reduced to reflect carbon taxes already paid in South Africa, it could affect our competitiveness and impose
reporting and disclosure obligations regarding GHG emissions generated in producing our products. We continue to monitor the
jurisdictions imposing such mechanisms and the industries and products to which they apply.
Accordingly, decarbonisation requirements, carbon pricing and emerging climate regulation could materially adversely
affect Harmony's compliance costs, capital expenditure requirements, operating costs, access to capital, results of operations
and financial condition. See "Integrated Annual Report for the 20-F 2026 – Sustainability performance – Climate and energy".
Environmental liabilities, rehabilitation obligations, biodiversity requirements and closure costs may be materially
higher than expected
We are subject to extensive environmental regulation in South Africa, Australia and PNG. Compliance costs, regulatory
changes and potential non-compliance could have a material adverse effect on our business, operating results and financial
condition.
Given the nature of mining and the type of mines we operate, we face a material risk of liability, delays and increased cash
costs of production arising from environmental and industrial accidents, pollution and compliance breaches. Our operations
generate waste rock, tailings, dust and process water, and involve the handling of hazardous substances. Incidents involving
spillage, seepage, air emissions or uncontrolled discharge may result in remediation obligations, regulatory directives, fines,
prosecution, civil claims and the suspension of operations.
We are required to rehabilitate land disturbed by our operations and to provide financially for eventual mine closure.
Estimates of rehabilitation and closure costs are inherently uncertain and are affected by changes in environmental legislation
and standards, the timing of closure, the discount rates and inflation assumptions applied, the scope of work ultimately required
and the outcome of regulatory review. Actual costs may be materially higher than provided for. Additional financial provision may
be required in future for rehabilitation purposes, with restrictions on when such money may be accessed; concurrent
rehabilitation must be funded from operational budgets without recourse to rehabilitation funds.
Biodiversity requirements are becoming more stringent in the jurisdictions in which we operate. In PNG, mineral policy and
sector-specific policies under review include a biodiversity offsets policy, a national oceans policy, a sustainable development
policy, an involuntary relocation policy, a national content policy and a mine closure policy and rehabilitation guideline. Offset,
protection and monitoring obligations arising from these frameworks may increase project capital and operating costs and affect
permitting timelines. In Australia, our operations and projects are subject to Commonwealth and state-based environmental
regulation governing approvals, rehabilitation, water management, biodiversity and mine closure. CSA in New South Wales, as
an operating underground mine, is subject to ongoing environmental compliance, rehabilitation and closure obligations, while the
Eva Copper Project in Queensland must obtain and maintain the environmental approvals, permits and conditions required to
progress the project through development and into operation. Compliance with these requirements, changes in applicable
standards, or delays in obtaining or renewing approvals, could increase costs, affect project timelines and adversely affect the
economics of our Australian operations and projects.
The National Appeal Regulations, 2025 introduced a category of complex appeals under NEMA and related environmental
laws. A complex appeal may take longer to determine because the appeal authority may appoint an advisory appeal panel or
expert, undertake a site inspection or use more than one appeal administrator. Delays in resolving appeals concerning
environmental authorisations could delay project development or disrupt operations and increase costs.
17
Table of contents
Accordingly, environmental liabilities, rehabilitation obligations, biodiversity requirements and closure costs could materially
adversely affect Harmony's provisions, cash flows, capital allocation, results of operations, financial condition and reputation.
See Item 4: "Information on the Company – Business Overview – Regulation – Laws and Regulations Pertaining to
Environmental Protection".
We may have exposure to rehabilitate groundwater and land pollution, and financial provisioning requirements may
require additional provisions
We may have exposure to rehabilitate potential groundwater and land pollution, which may include salination and radiation
contamination, that may exist where we have operated or continue to operate.
Due to the interconnected nature of mining operations at Doornkop, Kusasalethu, Mponeng, Mine Waste Solutions and
Moab Khotsong, any proposed solution to the potential flooding and decant risk posed by deep groundwater needs to comprise
a regional solution supported by all mines located in the goldfields and by government in the event of legacy issues. As a result,
the Department of Mineral and Petroleum Resources ("DMPR") and affected mining companies are involved in developing a
regional mine closure strategy.
Under South African law, mining right holders remain responsible for environmental liabilities, pollution, ecological
degradation, water treatment and sustainable mine closure until the DMPR issues a closure certificate, and under NEMA this
responsibility may continue indefinitely even after closure certification. We are required to annually assess environmental
liabilities and provide financial security for rehabilitation, closure and post-decommissioning management.
The Financial Provision Regulations, 2015 impose significantly more stringent obligations than previous guidelines,
including mandatory inclusion of preliminary costs, imposition of value added tax ("VAT") at 15%, prohibition on withdrawal of
trust funds for concurrent rehabilitation, and ceding of funds to the Minister of Mineral and Petroleum Resources (“Mining
Minister”) for latent liabilities. While the compliance deadline for existing rights has been indefinitely delayed pending new
regulations, the ultimate requirements remain uncertain. There are concerns about the ambiguity of current and proposed
provisions, which may result in misinterpretation, mis-application and disputes with the Department of Forestry, Fisheries and
Environment (the "DFFE"), any of which could have a material adverse effect on our business, operating results and financial
condition.
Under the National Environmental Management Laws Amendment Act, 2 of 2022 ("NEMLAA"), financial provision retained
by the Mining Minister must be transferred to government-controlled accounts. We will not control how these funds are used but
will remain liable for environmental impacts. If anticipated liabilities do not materialise, there is no mechanism for recovering the
funds, creating potential for permanent loss of capital.
Proposed amendments to the MPRDA and NEMA seek to bring pre-2004 processing residue stockpiles and deposits
within the regulatory framework, which may require us to provide substantial additional financial provision for rehabilitation of
these facilities. We may also face increased environmental costs if neighbouring mines fail to meet their water management
obligations. The adoption of additional or more stringent requirements, particularly for hazardous waste management,
groundwater protection and rehabilitation of closed mines, may result in material additional costs and liabilities.
Groundwater and land pollution rehabilitation exposures and changes in financial provisioning requirements could
materially adversely affect Harmony's provisions, cash flows, results of operations and financial condition.
Our operations depend on water use licences and other environmental authorisations
Our operations are subject to water use and other regulatory licences, which may impose significant compliance costs and
operational constraints.
Our South African operations are regulated under the National Water Act, 36 of 1998 ("NWA"). Government Notice 7408
required unregistered water users to register specified water uses by July 2026. Any failure by us to have registered applicable
water uses or updated required information within the prescribed period could result in additional compliance requirements,
penalties or restrictions on the relevant water use.
Our South African operations are predominantly regulated under water permits issued pursuant to the Water Act, 54 of
1956 (the "Water Act"). Notwithstanding this, we have elected to convert all prior existing water uses into water use licences
under the NWA to ensure these operations are carried out in accordance with current best practice and water quality standards.
Submissions were made as early as 2003 and we have been working closely with the regional directors in the review process.
Some operations have received draft licences for review and comment before finalisation by the regional directors at the
Department of Water and Sanitation ("DWS"). Kusasalethu, Moab, Mponeng, Mine Waste Solutions, Kareerand and Kalgold
received their final water use licences. We have applied to amend certain conditions that are impracticable to implement in their
current form. New licences or amendments may require significant expenditure or changes to water-management practices.
An appeal has been filed by a third party against the Mponeng water use licence. We are of the view that the appellant
does not have the necessary standing to bring such an appeal. Harmony disputes the validity of the appeal and is opposing it
through the appropriate legal and administrative processes. While the appeal automatically suspends our water use licence, the
suspension has been lifted by the Minister of Water and Sanitation. The appeal has been provisionally suspended pending
settlement discussions with the appellant. An adverse outcome could affect Mponeng’s water use authorisation and operations.
When future water use licences are issued, we may be required to implement alternative water-management measures
that result in significant costs. Failure to obtain licences on favourable terms could have a material adverse effect on our results
of operations and financial condition.
18
Table of contents
Failure to comply with the conditions of a water use licence may result in the competent authority issuing a compliance
notice or directive instructing us to take measures to correct the non-compliance and, in some instances, to cease operations
pending its resolution. Failure to comply with a water use licence is an offence that may result in prosecution. Upon conviction, a
court may impose fines, damages, director and employee liability or imprisonment, which could have a material adverse effect
on our business, operating results and financial condition.
The NWA also imposes a duty of care on us to prevent pollution or contamination of water resources; failure to implement
reasonable measures could result in a directive, prosecution, or the authority implementing remedial measures and recouping
the cost from us.
Acid mine drainage at any of our mines could increase pumping and treatment obligations, require additional expenditure
and affect our ability to comply with water use licence requirements, which could have a material adverse effect on our business,
operating results and financial condition.
Obligations to pump and treat extraneous water must be addressed in our final closure plans. We are responsible for these
liabilities until a closure certificate is issued pursuant to the MPRDA and potentially thereafter under NEMA. This liability is
discussed in more detail in Item 4: "Information on the Company – Business Overview – Regulation – Laws and Regulations
Pertaining to Environmental Protection – South Africa – The NEMA". See also Item 3D: "Risk Factors – Risks Related to
Operations and Business Resilience – Water ingress, pumping obligations at adjacent closed mines, flooding and decant risk
could interrupt operations and create long-term liabilities".
The National Water Amendment Bill, 2026 (the "NWA Bill") was introduced in Parliament on 21 January 2026, and the
Portfolio Committee on Water and Sanitation adopted a motion of desirability on 2 June 2026, allowing the NWA Bill to proceed
through the parliamentary process, including public participation. The NWA Bill proposes several changes that could affect our
operations, including empowering the Minister of Water and Sanitation to declare Strategic Water Source Areas ("SWSA") within
which new mining-related water use licences may be restricted or refused, introducing "fit and proper" requirements that could
allow non-compliance at one Harmony operation to affect licensing decisions at others, permitting curtailment of existing lawful
water use entitlements, and increasing penalties for offences under the NWA to up to R10 million and 10 years' imprisonment.
The NWA Bill has not been enacted, and its final form remains uncertain.
In Queensland, a water licence is required to authorise the take of groundwater from a bore or borefield only where the
bore is in an area where groundwater is managed, being within an identified groundwater unit of a relevant water plan. The
Queensland Government has confirmed that this is not applicable to the Eva Copper target groundwater sources.
In New South Wales, water extraction is regulated under the Water Management Act 2000 ("NSW") through licences,
associated works and use approvals. The operation is also subject to development consent, mining leases and an environment
protection licence, which impose enforceable operational and environmental conditions. Failure to comply with licence
conditions may result in a stop order, licence cancellation or civil penalties. CSA owns two groundwater water access licences to
support extraction from its borefields and also holds water entitlements associated with the regulated Macquarie River system.
In PNG, a single project-comprehensive EP is issued by the Managing Director of CEPA under the Papua New Guinea
Environment Act 2000 ("PNG Environment Act"). The permit includes provisions for both water extraction and treated waste
water discharge, and an annual administration fee is payable.
Should we breach any obligation in complying with the provisions of any permit or licence, or with any law or regulation
under which it was issued, the permit or licence could be suspended or cancelled, or we could be subject to fines or other
sanctions.
Accordingly, delays in obtaining, or the amendment, suspension or cancellation of, water use licences and other
environmental authorisations could materially adversely affect Harmony's ability to operate, its compliance costs, results of
operations and financial condition. See "Integrated Annual Report for the 20-F 2026 – Sustainability performance – Water
stewardship".
A tailings facility failure could have far-reaching consequences, and adverse developments concerning the proposed
DSTP at Wafi-Golpu could materially adversely affect the project and our business
Harmony faces inherent risks in managing uneconomic milled-ore residue, often mixed with water and known as tailings,
including through the operation of TSFs and the use of other tailings-management methods such as DSTP. TSFs are
engineered structures built to contain tailings; DSTP systems use engineered pipelines and mixing infrastructure to place tailings
at depth below the sea surface. At our existing operations, tailings are managed only through TSFs and related infrastructure,
while DSTP is the tailings-management method authorised under the existing EP for the proposed Wafi-Golpu Project.
Most of our TSFs are located in South Africa, where many are dormant or are being reclaimed through re-mining, and
active deposition is concentrated at a smaller number of facilities. We also operate TSFs in Australia and PNG. Our active South
African TSFs are predominantly upstream-constructed, and their stability depends on the management of phreatic levels,
freeboard and the rate of rise.
The safe design, construction, operation, monitoring and closure of TSFs and related infrastructure are critical to the
sustainability and continuity of our operations. Our TSFs are exposed to risks including extreme rainfall and flooding,
overtopping, internal erosion or piping, seepage, slope, foundation or other geotechnical instability, seismic activity (including
mining-induced seismicity), design or construction deficiencies, equipment malfunction, operational failure and human error.
These risks may change during a facility’s lifecycle and may be exacerbated by changing climatic, environmental or operating
conditions. Conditions requiring remediation, such as seepage or elevated phreatic levels, are identified at our TSFs from time
to time.
19
Table of contents
We manage our TSFs in accordance with applicable laws and engineering standards and through governance, monitoring
and assurance processes informed by selected elements of the Global Industry Standard on Tailings Management ("GISTM"),
where applicable. However, these measures cannot guarantee that a failure or other significant incident will not occur, or that a
developing condition will be identified sufficiently in advance to prevent or mitigate its consequences.
A dam failure or other significant failure at one of our TSFs, including a failure involving a release of tailings, could lead to
loss of life, serious injury, damage to communities, property and infrastructure, and extensive or permanent environmental harm.
These impacts may be more severe where communities or infrastructure are located near a facility. Such a failure could also
result in the interruption of mining or processing activities and the suspension or curtailment of operations by regulatory
authorities. It could require significant emergency-response, remediation, rehabilitation and community-recovery expenditure,
and could give rise to investigations, prosecutions, civil proceedings, compensation claims, significant fines, penalties and
damages, increased closure obligations and other material liabilities. Our insurance may not cover all losses arising from a
failure at our active TSFs, and certain dormant and re-mining TSFs are not insured, in which case we would bear the full cost of
an incident.
Our existing and proposed TSFs are subject to jurisdiction-specific dam-safety, mining, environmental and other
requirements, including the National Water Act and applicable mine-residue standards in South Africa, and relevant Australian
and PNG requirements. Failure to comply with these requirements could result in fines, operating restrictions, suspension of
deposition or other activities, increased expenditure and other legal or regulatory consequences.
Tailings facility failures globally, including in South Africa during 2026, have prompted increased regulatory and stakeholder
scrutiny across the industry, which may result in amended or new environmental, social, health and safety legislative
frameworks, more stringent conditions for the construction and operation of tailings facilities, changes in project permitting
processes, additional monitoring, emergency-preparedness or financial assurance requirements, and increased criminal and
civil liability for companies, officers and contractors. Compliance with evolving laws, technical standards and stakeholder
expectations may require additional capital and operating expenditure, remediation or facility upgrades and could limit or delay
the use, expansion or construction of TSFs.
Actual or perceived environmental, marine, livelihood or human-rights impacts associated with DSTP could intensify
community or stakeholder opposition and may result in additional legal claims, regulatory proceedings or financing constraints.
Adverse outcomes in existing or future proceedings, the imposition of additional permit conditions, or a requirement to adopt an
alternative tailings management method could delay development, increase capital and operating costs, affect project
economics or reduce the value of the project. Should we breach any obligation under our EP or the PNG Environment Act, the
permit could be suspended or cancelled, or we could be subject to fines or other sanctions.
Accordingly, a TSF failure or another significant TSF-related incident, or adverse developments concerning the proposed
use of DSTP at Wafi-Golpu, could materially adversely affect our production, operating and capital costs, cash flows, results of
operations, financial condition, project value, growth prospects, reputation, social licence to operate and the market price of our
securities. See Item 8: "Financial Information – Consolidated Statements and Other Financial Information – Legal Proceedings"
and "Integrated Annual Report for the 20-F 2026 – Sustainability performance – Tailings management".
Failure to maintain our social licence to operate could affect current and future operations
Mining companies are increasingly expected to provide benefits to affected communities. Failure to comply with, and in
some cases to go beyond, our legal obligations could result in lawsuits, additional operational costs, investor divestment and
loss of our social licence to operate. We face increasing expectations to provide social investment beyond our legal obligations,
particularly as communities demand services and basic infrastructure from companies such as Harmony where gaps in local
government service delivery are perceived or experienced.
The socio-economic landscape in the regions in which we operate, including high unemployment, inequality, service
delivery shortfalls and, in certain areas, elevated levels of crime and social instability, may adversely affect our operations and
profits. Stakeholder pressure takes many forms, including the loss of licence to operate, lawsuits and investor withdrawal, with
potential consequences including reputational damage and increased social spending obligations. There is also increasing
action by members of the financial and investment communities, including asset managers, sovereign wealth funds, public
pension funds and universities, to promote improvements in ESG performance.
Existing and proposed mining operations are often located at or near towns, villages, other infrastructure or natural
watercourses. The impacts of dust generation, waste storage, and water quality or shortages may be immediate and directly
adverse to those communities. Poor environmental management practices, in particular adverse changes in the supply or
quality of water, can result in community protest, regulatory sanction or ultimately the withdrawal of community and government
support.
In South Africa, the Broad-Based Socio-Economic Empowerment Charter for the Mining and Minerals Industry, 2018
(“Mining Charter III”), imposes obligations regarding increased participation by HDPs in ownership, procurement of goods and
services, enterprise and supplier development, human resource development and employment equity, together with mine
community development commitments recorded in social and labour plans ("SLPs"). Failure to meet these commitments may
result in regulatory action affecting our mining rights.
20
Table of contents
In Australia, mining is subject to the Native Title Act 1993 (Cth). Any "future act" on land or waters that will affect native title
rights and cultural heritage interests is subject to native title processes intended to protect those rights and interests through a
right to negotiate, enabling affected parties to reach agreement on the terms of consent concerning proposed future acts,
including monetary compensation, employment and training, contracting opportunities and cultural heritage. These
arrangements may be documented in Indigenous Land Use Agreements registered with the National Native Title Tribunal.
Changes to native title legislation, evolving interpretations of native title rights, or failure to maintain positive relationships with
native title holders could result in challenges to our agreements, delays in obtaining necessary consents for future exploration
and mining activities, increased costs or restrictions on our ability to conduct operations.
In PNG there is no native title or similar regime, but the majority of land is held under customary ownership. We are
required under the PNG Mining Act and the PNG Environment Act to pay landholders compensation for loss or damage
sustained arising from our exploration or mining activities. In certain prescribed instances the quantum of these payments is
regulated; otherwise it is negotiated, with determination by a mine warden in the event of disagreement. It is practice under the
PNG mining regime for mining lease and special mining lease holders to enter into a negotiated Community Development
Agreement ("CDA") (previously referred to as a Memorandum of Agreement ("MOA")), with the PNG Government, affected
provincial and local level governments, affected landholders and other stakeholder organisations regarding the sharing of
benefits derived from mining operations. These benefits generally include participation in royalties payable to the PNG
Government and may extend to local infrastructure projects and other social performance objectives.
Disruptions to operations or delays in projects attributable to a lack of community support or to community action can
translate directly into loss of production, increased operational costs, a decrease in the value of a project, or an inability to bring
a project to, or maintain, production. Our PNG operations have on occasion been disrupted by the blockading of access routes
by landholders and occupants of the land the subject of those operations. These disruptions arise from a range of operational
and non-operational grievances, including non-distribution by the PNG Government to local communities of mine-derived
royalties and other benefits, inter-community land ownership disputes, dissatisfaction with local or regional infrastructure or
service delivery, and local business rivalries regarding the provision of goods and services to the operations.
Accordingly, the loss or erosion of our social licence to operate, and the cost of implementing measures to support
sustainable development, could materially adversely affect Harmony's production, capital and operating costs, project delivery,
reputation, results of operations and financial condition. See "Integrated Annual Report for the 20-F 2026 – Sustainability
performance – Empowering communities".
We may fail to meet ESG performance expectations and published targets, which could affect reputation, stakeholder
confidence and access to capital
Harmony operates in an environment of increasing scrutiny regarding ESG performance from multiple stakeholder groups,
including investors, lenders, local communities, regulatory authorities and NGOs. Investment capital allocation decisions,
lending decisions and stakeholder engagement are increasingly driven by assessments of ESG performance, particularly
regarding the safe operation of mines, mitigation of local environmental and community impacts, reduction of GHG emissions,
ethical standards, workplace culture, human rights protections, regulatory compliance and supply chain credibility.
Failure to meet internally or externally adopted ESG standards, or to satisfy stakeholder expectations regardless of legal
obligation, could result in significant reputational damage, loss of social licence to operate, litigation and constrained access to
capital from investors and lenders who may reallocate or decline to commit capital based on their assessment of our ESG
practices. Certain financial institutions from which we borrow may require compliance with internationally recognised
environmental, health, safety and social standards and benchmarks, and deviation from such standards could adversely affect
our existing financing arrangements and our ability to secure future financing.
Beyond local regulatory compliance, our operations are subject to increasingly stringent internationally recognised
standards and benchmarks. Companies registered in Organisation for Economic Co-operation and Development ("OECD")
member countries are subject to OECD complaint processes regarding alleged breaches of the OECD Guidelines occurring
anywhere in the world. Harmony Gold Australia Proprietary Limited ("HGA") has been the subject of such a complaint, and of an
adverse Examiner finding, as described under "A tailings facility failure could have far-reaching consequences, and adverse
developments concerning the proposed DSTP at Wafi-Golpu could materially adversely affect the project and our business"
above.
Harmony has published quantitative targets and metrics relating to ESG aspects including GHG emissions, energy use
and water management, which are subject to regular public reporting and external scrutiny. Our ability to meet these targets
depends on our own operational actions, on regulatory policy frameworks and government actions in the countries where we
operate, on clear and timely regulatory guidance, and on the actions of participants in our value chain and broader society.
Unforeseen factors beyond our control, including changes in regulatory regimes, unavailability of requisite technologies,
economic constraints, supply chain disruptions or slower-than-anticipated societal transitions, could impede our progress toward
these targets. Failure to meet published targets could expose us to reputational damage, litigation risk from stakeholders and
loss of investor confidence.
ESG-related matters, including climate change, diversity, human rights and responsible business conduct, have become
increasingly subject to political, regulatory and stakeholder scrutiny in certain jurisdictions, including the United States. Our
policies and practices regarding these and other ESG-related matters, including previously established goals and initiatives and
any disclosures mandated by non-US laws, may expose us to legal and reputational risks, including orders, investigations,
litigation, media scrutiny, boycotts and negative publicity. Jurisdictional differences and evolving regulatory landscapes create
conflicting expectations among stakeholder groups, and we may be unable to satisfy the divergent expectations of all
stakeholders.
21
Table of contents
Accordingly, the cumulative effect of ESG stakeholder expectations, regulatory developments, published targets and
political controversy could materially adversely affect Harmony's reputation, social licence to operate, stakeholder relationships,
compliance costs, access to capital, results of operations, financial condition and the market value of our ordinary shares and
ADSs.
Risks Related to Technology, Cybersecurity and Digital Resilience
Technology failures could disrupt mining operations and business continuity
We are dependent on a number of highly integrated communication, IT and operating technology ("OT") systems across
multiple international jurisdictions to support our business operations. These systems support hoisting, ventilation, pumping,
processing, fleet management, planning, financial reporting, payroll and stakeholder communications.
Damage to or interruption of our IT or OT systems, whether due to incidents, human error, natural events or malicious acts,
may result in important data being irretrievably lost, exposed or damaged, and may disrupt production, delay reporting and
impair decision-making. As part of our ongoing efforts to enhance operational efficiency, we are migrating aspects of our IT
infrastructure to the cloud. This could give rise to several risks, including higher than projected initial migration and ongoing
operational costs, increased exposure to cybersecurity threats, difficulty complying with various data protection regimes, and
operational impacts due to unstable or insufficient internet infrastructure where operations are located in remote areas.
We outsource several digital technology functions and applications to third-party vendors, including cloud infrastructure,
data centre management, server and personal computing support, enterprise resource planning, business applications, email
and digital documents. These engagements may affect our overall technology resilience, and a failure at a key vendor may
disrupt our operations.
Accordingly, major disruption to our IT or OT systems could materially adversely affect Harmony's production, business
continuity, reporting integrity, operating results and financial condition.
Cybersecurity incidents may materially disrupt operations and expose Harmony to financial and reputational harm
The mining industry has become increasingly reliant on digital technologies, which enable us to conduct day-to-day
operations, improve safety and efficiency and reduce costs. However, as reliance on technology increases, we become more
susceptible to the persistent threat of cybersecurity breaches such as cybercrime, ransomware and cyber-activist attacks.
The sophistication and magnitude of cybersecurity incidents are increasing. Such incidents include malicious software,
ransomware, unauthorised attempts to access data, and breaches involving electronically stored or otherwise protected
information. They could lead to production downtime, operational delays, safety incidents, compromise of confidential or
otherwise protected information, destruction or corruption of data, and manipulation or other improper use of our systems and
networks. Cybersecurity breaches through third-party solutions have also become increasingly frequent.
Ransomware-related threats increased significantly across the mining industry during fiscal 2026 and the preceding year,
with several high-profile organisations experiencing disruption over the last 12 to 24 months. The information security
management system protecting our IT and OT systems may not prevent future malicious action, including denial-of-service
attacks, ransomware attacks or fraud by individuals, groups or organisations, resulting in the unavailability of IT systems and
data and the theft of commercially sensitive data. Such sensitive data may include commercial price outlooks and information
concerning mergers, acquisitions and divestment transactions, and incidents may result in the misappropriation of funds and
disruption to our business operations.
We undertake various measures to follow established best practice in relation to cybersecurity. However, the increasing
sophistication and evolving nature of cybersecurity threats may lead to future breaches and sophisticated attacks, such as
phishing and ransomware, despite our efforts. This is particularly the case with new and evolving technologies such as AI,
including generative AI; as these technologies improve and gain widespread use, we may experience attacks created using
them that are difficult to detect and defend against.
While our insurance programme includes limited coverage for cyber-related crimes and incidents, there can be no
assurance that any cybersecurity incident will be adequately covered by insurance, if at all.
Accordingly, cybersecurity incidents could materially adversely affect Harmony's operational continuity, data integrity,
remediation and insurance costs, reputation, results of operations and financial condition. See Item 16K: "Cybersecurity".
Failures of our IT security processes and violations of data protection laws may result in regulatory penalties, fines
and reputational damage
We consider and mitigate regulatory and legal risks arising from cybersecurity and data protection requirements across the
jurisdictions in which we operate. Breaches of IT security processes or violations of privacy laws could result in operational
disruption, regulatory penalties, sanctions, reputational damage and financial loss, and may lead to public and private censure.
South Africa's comprehensive privacy law, the Protection of Personal Information Act, 4 of 2013 ("POPIA"), became
effective on 1 July 2020. Harmony employs approximately 45,000 staff. Failure to protect their data and to comply with POPIA
may lead to penalties and fines of between R1 million and R10 million and/or imprisonment. We may also have insufficient
insurance coverage for any data protection breaches, including in respect of POPIA.
22
Table of contents
In Australia, our data practices must comply with the Privacy Act 1988 (Cth) (the "Privacy Act") and state-based
surveillance laws. The Privacy Act regulates the manner in which individuals' personal information is handled and includes a
mandatory scheme requiring entities to report data breaches to the Office of the Australian Information Commissioner ("OAIC")
and to affected individuals where the breach is likely to result in serious harm. Following a series of high-profile data breaches in
2022 involving both government agencies and public companies, the Australian Parliament passed the Privacy Legislation
Amendment (Enforcement and Other Measures) Act 2022, which introduced significantly increased penalties for serious or
repeated privacy breaches and increased the OAIC's ability to resolve breaches.
Harmony maintains records of its international shareholders. The General Data Protection Regulation ("GDPR") became
applicable on 25 May 2018, as an EU-wide framework for protecting personal data processed in or outside the EU based on
certain application criteria. Failure to comply with the GDPR may lead to a fine of up to 4% of a company's worldwide turnover or
up to €20 million. The GDPR was retained in UK domestic law under the European Union (Withdrawal) Act 2018 and amended
by regulations made under that Act to form the UK General Data Protection Regulation (the “UK GDPR”). Failure to comply with
the UK GDPR may lead to a fine of up to £17,500,000 or 4% of total worldwide annual turnover of the preceding financial year,
whichever is higher. Both the GDPR and the UK GDPR have a scope extending beyond the borders of the EU and the United
Kingdom respectively.
We are also subject to data and consumer protection laws in other jurisdictions, including the United States and PNG,
where such laws continue to evolve. Non-compliance may result in substantial costs, require changes to business practices and
result in adverse operational and financial consequences.
Accordingly, failures of our IT security processes and violations of data protection laws could materially adversely affect
Harmony's regulatory standing, compliance and remediation costs, reputation, results of operations and financial condition.
Emerging technologies, including AI, may introduce new operational, legal and governance risks
Harmony is adopting AI and other emerging technologies within its IT systems, and leverages AI embedded within third-
party solutions used in its mining operations. AI tools may also be used by our contractors and by third parties with whom we
conduct business.
The use of AI may not meet existing and rapidly evolving regulatory standards and could introduce security risks that may
expose confidential data, lead to the loss of competitive information and result in operational failures. Outputs generated by AI
systems may be inaccurate, biased or unexplainable, and reliance on such outputs in operational, geological, financial or human
resources decision-making may lead to poor outcomes for which we remain accountable. The regulatory framework governing
AI is developing rapidly and inconsistently across the jurisdictions in which we operate, creating compliance uncertainty.
Limited expertise and skills shortages could prevent Harmony from effectively using or promptly implementing AI and other
emerging technologies, which may in turn place us at a competitive disadvantage relative to peers who deploy them more
successfully.
Accordingly, the adoption of emerging technologies, including AI, could materially adversely affect Harmony's data security,
regulatory compliance, decision-making quality, competitive position, results of operations and financial condition.
Risks Related to Regulation, Compliance, Governance and Legal Matters
Laws governing mineral rights affect our business and our mining rights could be altered, suspended or cancelled
Laws governing mineral rights affect our business and could impose significant costs and obligations. Mineral rights in the
countries in which we operate could be altered, suspended or cancelled for a variety of reasons, including breaches of our
obligations in respect of those rights.
Our operations in South Africa, Australia and PNG are subject to legislation regulating mineral rights. Certain of our
properties may be subject to the rights or asserted rights of community stakeholders, including indigenous peoples. Our ability to
develop and operate mining interests also depends on maintaining valid mineral titles, leases, surface rights, access
arrangements and related consents. Defects in, disputes concerning, or the loss or non-renewal of those rights or arrangements
could delay, restrict or prevent development or operations and increase our costs.
South Africa
In South Africa, we are governed by the MPRDA. See Item 4: "Information on the Company – Business Overview –
Regulation – Mineral Rights – South Africa – MPRDA" for a description of the principal objectives set out in the MPRDA.
The South African Government published the draft Mineral Resources Development Bill of 2025 (the "MPRD Bill") for
public comment and, as at the date of this annual report on Form 20-F, the MPRD Bill has not been enacted and remains under
consideration following completion of the public consultation process.
There is a large degree of uncertainty regarding the changes that will be brought about in the event that the MPRD Bill is
made law in its current form.
In August 2026, the South African Government published the draft General Mining Laws Amendment Bill for public
comment. The General Mining Laws Amendment Bill is intended to strengthen the legislative framework applicable to illegal
mining, and proposes amendments to four statutes, the creation of specific criminal offences relating to illegal mining, expanded
enforcement powers, and materially increased penalties of up to R100 million or 30 years' imprisonment for certain offences.
As of the date of this annual report on Form 20-F, the General Mining Laws Amendment Bill remains subject to the public
consultation process and has not been enacted.
The Mining Charter
23
Table of contents
Mining Charter III imposes obligations and increased participation by HDPs in relation to a mining company's ownership,
procurement of goods and services, enterprise and supplier development, human resource development and employment
equity requirements.
While the ownership requirement for HDPs in relation to existing mining rights has not increased (provided that we met the
26.0% requirement under the 2010 amendment to the Mining Charter (the "Amended Charter")), we may be required to comply
with new HDP ownership requirements in relation to any renewals, consolidations and transfers of our existing rights and any
applications for new mining rights. The increased HDP requirements in relation to employment equity, procurement of goods and
services and enterprise and supplier development may result in additional costs being incurred by us, which could have a
material adverse effect on our results of operations and financial condition.
We cannot guarantee that we will meet all the targets set out by Mining Charter III. Should we breach any obligations in
complying with the MPRDA or Mining Charter III, our existing mining rights in South Africa could be suspended or cancelled by
the Mining Minister in accordance with the provisions of the MPRDA. Any such breach may also influence our ability to obtain
any new mining rights. Any such suspension or cancellation could have a material adverse effect on our results of operations
and financial condition.
Laws governing health and safety affect our business and could impose significant costs and burdens
In South Africa, the MHSA requires the employer to implement various measures to ensure, as far as reasonably
practicable, the safety and health of persons working at a mine. Although the employer may allocate certain health and safety
responsibilities to independent contractors by agreement, contractor employees working at the mine are regarded as the
employees of the employer for purposes of the MHSA, and such agreements do not relieve the employer of its statutory duties.
The obligations of the employer include the identification and assessment of risk, implementation of codes of practice and
standards setting out safe work procedures, proper and appropriate training, supervision, medical surveillance for employees
exposed to health hazards and the provision of safe equipment, machinery and personal protective equipment. Further,
pursuant to the MHSA we must ensure compliance with various licences, permissions or consents that have been issued to us
pursuant to the various provisions of applicable legislation.
In June 2022, the then Minister of Mineral Resources and Energy released a draft Mine Health and Safety Amendment Bill,
2022 (the "MHSA Amendment Bill") for public comment which closed 29 July 2022. In October 2024, the Mining Minister
published in the Government Gazette an explanatory summary and notice of intended introduction of an updated draft bill (the
"MHSA Amendment Bill, 2024"). The MHSA Amendment Bill, 2024 was formally introduced in the National Assembly as the
Mine Health and Safety Amendment Bill and referred to the Portfolio Committee on Mineral and Petroleum Resources on 7 April
2026. In July 2026, the Portfolio Committee issued a notice inviting interested individuals and relevant stakeholders to submit
written comments and to indicate an interest in making an oral submission. The MHSA Amendment Bill, 2024 remains before the
Portfolio Committee and has not been enacted.
If enacted, the MHSA Amendment Bill, 2024 would amend certain provisions of the MHSA. The MHSA Amendment Bill,
2024 contains a number of provisions which, if enacted in their present form, could have a material adverse effect on our
business, operating results and financial condition. The MHSA Amendment Bill, 2024 provides for (among other things) an
increase in the monetary value of the fines that may be imposed in respect of instances of non-compliance, more direct
involvement of executives (particularly chief executive officers), stricter liability in instances of non-compliance, and changes to
the obligations relating to training and the formulation of training programmes. The MHSA Amendment Bill, 2024 also proposes
a criminal liability provision, sometimes referred to as “corporate manslaughter” under which an employer commits an offence if
it contravenes or fails to comply with a duty in terms of Chapter 2 of the MHSA and that contravention or failure results in a
person's death, serious injury or serious illness, or a health-threatening occurrence. These provisions could limit the defences
available to an employer and increase our compliance costs and potential liability.
Our operation in Queensland is governed by mine-specific laws, primarily the Mining and Quarrying Safety and Health Act
1999 (Qld) (the "MQSH Act") and the Mining and Quarrying Safety and Health Regulation 2017 (Qld) (the "MQSH
Regulations"). Other Queensland health and safety legislation, including the Work Health and Safety Act 2011 (Qld) and the
Work Health and Safety Regulation 2011 (Qld), may apply to workplaces or activities falling outside the scope of the mine-
specific legislation.
Our operation in New South Wales is governed by mine-specific laws, primarily the Work Health and Safety (Mines and
Petroleum Sites) Act 2013 (NSW) and associated regulations, codes of practice and guidelines.
Operations in PNG are subject to the PNG Mining (Safety) Act 1977 (the "PNG Mining (Safety) Act"), the PNG Mining
Safety Regulation 1935, as updated, the PNG Mining Act, the PNG Industrial Safety, Health and Welfare Act 1961 and its
regulations. In June 2021, the PNG Ministry of Mining released the draft Mine & Works (Safety & Health) Bill 2021 which, if
enacted, would repeal and replace the PNG Mining (Safety) Act. The Mine & Works (Safety & Health) Bill has not yet been
enacted, and its future remains uncertain.
There is a risk that the cost of providing the measures prescribed by health and safety legislation across our jurisdictions
could increase in future depending on changes to underlying legislation, legal claims and the profile of our employees. Any such
increase could be substantial but is currently indeterminate.
Accordingly, health and safety legislation, regulatory intervention and changes in applicable standards could materially
adversely affect Harmony's production continuity, compliance costs, results of operations and financial condition.
24
Table of contents
Changes to mining, environmental, safety, water and other resource-related laws could materially increase our costs
and liabilities
Harmony operates in three jurisdictions with active and evolving legislative agendas affecting mining, environmental
protection, safety, water use, community development, taxation and closure. Legislative and regulatory change may occur with
limited notice, may be subject to varying interpretation, and may apply retrospectively to existing operations, permits and
provisions.
New or amended requirements may increase compliance costs, require additional capital expenditure, extend permitting
timelines, impose more stringent conditions on existing authorisations, increase rehabilitation and closure provisioning, expand
the scope of matters for which directors and officers may bear personal liability, or restrict our operational flexibility. Where
requirements lack specificity or are untested, we may incur cost and delay in establishing compliance positions, and we may be
exposed to enforcement action notwithstanding good-faith efforts to comply.
The Australian Government has commenced the 2026–27 review of the Safeguard Mechanism, which is considering
post-2030 baseline decline rates and other scheme settings. To the extent that CSA, the Eva Copper Project or any related
facility is or becomes subject to the Safeguard Mechanism, more stringent settings could require us to reduce emissions,
surrender Australian Carbon Credit Units or Safeguard Mechanism Credits, or incur additional capital and operating costs, which
could adversely affect the economics of our Australian operations and projects and our results of operations and financial
condition.
Accordingly, changes to mining, environmental, safety, water and other resource-related laws and regulatory requirements
could materially increase Harmony's costs and liabilities and could materially adversely affect its operations, cash flows, results
of operations and financial condition.
Litigation, regulatory proceedings and other legal disputes may result in material losses and operational disruption
We are subject to litigation, arbitration and other legal proceedings arising in the normal course of business, and we may
become involved in disputes that result in litigation. Potential future litigation may arise from a variety of causes, including
business activities, environmental, health and safety matters, share price volatility, unlawful community protest action and failure
to comply with disclosure obligations. The results of litigation, arbitration and other legal proceedings cannot be predicted with
certainty, but could include costly damage awards or settlements, fines, and the loss of licences, concessions or rights.
In the event of a dispute, we may be subject to the exclusive jurisdiction of foreign courts, or may not be successful in
subjecting foreign persons to the jurisdiction of courts in South Africa. An adverse or arbitrary decision of a foreign court could
have a material adverse impact on our financial performance, cash flow and results of operations. Should we be unable to
resolve disputes favourably or to enforce our rights, this may have a material adverse impact on our financial performance, cash
flow and results of operations.
Our most significant identified legal exposures concern the silicosis and tuberculosis class action settlement and related
provision, described above under "– Exposure to mining-related health hazards may result in occupational disease and
significant long-term liabilities and costs", and the judicial review proceedings and OECD complaint concerning the EP and
proposed DSTP method for the Wafi-Golpu Project, described above under "A tailings facility failure could have far-reaching
consequences, and adverse developments concerning the proposed DSTP at Wafi-Golpu could materially adversely affect the
project and our business".
Accordingly, litigation, regulatory proceedings and other legal disputes could materially adversely affect Harmony's cash
flows, provisions, project development, reputation, results of operations and financial condition. See Item 8: "Financial
Information – Consolidated Statements and Other Financial Information – Legal Proceedings".
We have identified material weaknesses in internal control over financial reporting, which may adversely affect
investor confidence
Internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of
financial reporting and the preparation of our financial statements for external purposes in accordance with IFRS as issued by
the IASB. Disclosure controls and procedures are designed to ensure that information required to be disclosed in reports we file
or submit under the Exchange Act is recorded, processed, summarised and reported within the time periods specified in the
rules and forms of the SEC. We have invested in resources to manage the documentation and assessment of our system of
disclosure controls and our internal control over financial reporting. However, a control system, no matter how well designed and
operated, can provide only reasonable, not absolute, assurance.
In connection with the preparation of our consolidated financial statements for the year ended 30 June 2026, management
concluded that our internal control over financial reporting was not effective as of that date due to four material weaknesses.
One was newly identified during the year, and three were previously identified material weaknesses that had not been fully
remediated. Certain underlying control deficiencies resulted in errors in payroll provisions and accruals and material errors in
depreciation and deferred taxation, which have been corrected through the restatement of comparative information in our
consolidated financial statements. Management continues to implement remediation measures. The material weaknesses will
not be considered remediated until the relevant remedial actions have operated for a sufficient period and management has
concluded, through testing, that they are effective. See Item 15 for further information regarding the material weaknesses and
the status of the remediation measures as at 30 June 2026.
25
Table of contents
If we are unable to successfully remediate the identified material weaknesses, or if we experience additional material
weaknesses in future, we may be required to revise or restate previously issued financial statements or other public disclosures.
We may also incur additional audit, assurance and compliance costs, devote significant management resources to remediation
activities, or experience delays in the preparation and filing of financial reports. Investors may lose confidence in the reliability of
our financial statements, and we could become subject to SEC investigation, enforcement action, civil monetary penalties or
other sanctions, which could result in significant costs and reputational damage.
Investors, lenders, analysts and other stakeholders rely on the accuracy and integrity of our reported information when
assessing our financial condition, operating performance, capital allocation, decisions and future prospects. Actual or perceived
weaknesses in governance, risk management, internal controls or disclosure procedures may increase our cost of capital, affect
financing flexibility and divert management attention from operational and strategic priorities.
Accordingly, the identified material weaknesses, any failure to remediate them, and any future control deficiencies could
materially adversely affect Harmony's financial reporting integrity, reputation, access to capital, share price, results of operations
and financial condition. See Item 15: "Controls and Procedures".
Compliance with new and changing corporate governance and public disclosure requirements increases our costs of
compliance
Laws, regulations and standards relating to accounting, corporate governance and public disclosure, "conflict minerals"
and "responsible" gold, SEC regulations and other listing requirements applicable to us are subject to change and can create
uncertainty for companies such as ours. New or changed laws, regulations, codes and standards could lack specificity or be
subject to varying interpretation, and their application in practice may evolve over time as new guidance is provided by
regulatory and governing bodies. This could result in continuing uncertainty on compliance matters and higher compliance costs
as a result of ongoing revisions to governance standards.
As a company with a primary listing on the JSE and a listing on the New York Stock Exchange Inc. ("NYSE"), we are
subject to the requirements of two regulatory regimes, including the King V Code on corporate governance and the JSE Listings
Requirements in South Africa and the requirements of the SEC and the NYSE in the United States. Divergence or change in
these requirements may increase the complexity and cost of compliance.
We are committed to maintaining high standards of corporate governance and public disclosure, and our efforts to comply
with evolving laws, regulations, codes and standards have resulted in, and are likely to continue to result in, increased general
and administrative expenses.
Accordingly, compliance with new and changing corporate governance and public disclosure requirements could materially
adversely affect Harmony's compliance costs, management capacity, results of operations and financial condition.
Corruption, bribery, fraud and other compliance failures may result in penalties, operational restrictions and
reputational damage
Harmony operates across multiple jurisdictions, including those with less developed political and regulatory environments,
and is subject to a broad range of anti-corruption, anti-bribery, anti-money laundering, sanctions, competition, data protection,
securities, mining, environmental, labour and other compliance requirements. Our business involves interactions with
governments, regulators, state-owned entities, suppliers, contractors, joint venture partners, customers, local communities,
traditional authorities and other stakeholders. As a result, we are exposed to the risk that employees, contractors, agents,
business partners or other third parties may engage in conduct that violates applicable legal requirements, internal policies,
codes of conduct or contractual obligations.
Our governance and compliance processes may not prevent potential breaches of law, accounting principles or other
governance practices. Our Code of Conduct and Behavioural Code, among other policies, procedures, standards, guidance and
related training, may not prevent instances of unethical or unlawful behaviour, including bribery or corruption, nor do they
guarantee compliance with legal and regulatory requirements, and breaches may not be detected by management.
The mining industry may be exposed to heightened corruption, fraud and governance risks due to factors such as licensing
and permitting processes, procurement activities, customs procedures, land access arrangements, community engagement
obligations, local participation requirements and interactions with public officials. The increasing scale and geographic diversity
of Harmony's operations, projects and business relationships may also increase the complexity of monitoring compliance and
enforcing consistent standards across the organisation and its value chain.
To the extent that we suffer any actual or alleged breach of relevant laws, including anti-bribery and corruption legislation in
the countries we operate in or the US Foreign Corrupt Practices Act of 1977, this may lead to investigations and examinations,
fines, penalties, imprisonment of officers, litigation, loss of operating licences or permits, suspension of operations, debarment
from business opportunities and negative effects on our reported financial results. Compliance failures involving third parties
may present similar risks where Harmony is alleged to have failed to exercise adequate oversight, or where misconduct is
attributed to activities undertaken on our behalf.
Significant compliance failures or allegations of misconduct may damage our reputation, weaken stakeholder trust and
adversely affect our social licence to operate. Such events may also restrict access to capital, increase financing costs and
reduce our ability to pursue acquisitions, partnerships, permits, licences and strategic growth opportunities.
Accordingly, corruption, bribery, fraud and other compliance failures could materially adversely affect Harmony's reputation,
operating activities, project development, cash flows, results of operations, financial condition, growth prospects and
shareholder value.
26
Table of contents
Increased audit and compliance requirements could result in higher costs, increased management demands, and
delays in financial reporting
The Company's external audit and financial reporting processes require significant management time and resources. The
complexity of the Company's global mining operations, financial reporting environment and internal control framework may result
in a higher level of audit effort and increased audit and other compliance-related costs.
Changes in regulatory requirements, accounting standards, audit procedures or auditor expectations may require
management to devote additional resources to assessing, documenting, implementing and monitoring financial reporting
processes and controls. These activities may divert management attention from other business priorities and could increase
administrative and compliance costs.
If the Company is unable to effectively manage these demands, the preparation and completion of periodic financial
reporting and other regulatory filings could be delayed, which may adversely affect the Company's reputation, compliance
obligations and relationships with investors and regulators.
Future restatements or corrections could adversely affect investor confidence and expose us to additional costs and
liability
As part of the audit of our financial statements, certain accounting positions relating to prior periods were reconsidered,
resulting in the identification and correction of errors in previously issued financial statements.
Two errors relating to prior periods were identified and corrected through the restatement of the comparative financial
information presented in the current-period financial statements. The restatement reflects the correction of these errors and the
resulting revisions to the affected comparative amounts and related disclosures.
As a result of the restatement, we may face increased scrutiny from investors, analysts, regulators and other stakeholders
regarding the reliability of our financial reporting, which could affect investor confidence in our financial disclosures and could
contribute to volatility in the market price of our securities. We may also be subject to litigation, regulatory inquiry or other claims
arising from the restatement, the costs and outcomes of which cannot be predicted with certainty. In addition, management
resources continue to be committed to remediating the material weaknesses in internal control over financial reporting described
elsewhere in this risk factors section, which may divert attention and resources from other aspects of our business.
Accordingly, the restatement of our previously issued financial statements, and any future restatement, correction or other
adjustment to our financial statements, could adversely affect investor confidence, our reputation, our compliance costs and our
results of operations and financial condition. See note 38 "Restatement of comparative information" to our consolidated financial
statements set forth beginning on page F-1, Item 5: "Operating results – Restatement of prior-year comparatives" and Item 15:
"Controls and Procedures".
Risks Related to Our Ordinary Shares and ADSs
We may not pay dividends or make similar payments to our shareholders in the future
Harmony has amended its dividend policy to allow for up to 50% of operating free cash flow after capital, interest, tax and
corporate and other expenditure ("net free cash") to be returned to shareholders, subject to the discretion of the board and
leverage levels measured by the ratio of net debt to earnings before interest, taxes, depreciation and amortisation ("EBITDA").
The revised policy now includes an improved base dividend, which has been increased from 20% to 30% of net free cash. In
addition, an upside dividend may be paid, based on leverage levels. When leverage is equal to or above 0.5x and below 1x,
only a base dividend of 30% of net free cash is payable. As leverage improves, the board may at its sole discretion consider an
upside dividend of up to 20% of net free cash.
Under South African law, we may only pay a dividend or similar payment to shareholders if we meet the solvency and
liquidity tests set out in the Companies Act, 71 of 2008 (as amended), including its regulations, and in our Memorandum of
Incorporation. Cash dividends or other similar payments may therefore not be paid in future. There is currently a 20%
withholding tax on dividends declared by South African resident companies to non-resident shareholders and non-resident
holders of ADSs.
Our capital allocation priorities include funding the development of our growth projects, including the Eva Copper Project
and the Wafi-Golpu Project, and servicing indebtedness incurred in connection with the acquisition of MAC Copper. The
application of cash to these priorities may reduce the amount available for distribution to shareholders in any given period.
As dividends are considered by many investors to be an important investment criterion, and given the importance of
external investment for the continued stability of the Company and potential future cash flows, any reduction in or suspension of
dividends may adversely affect future investment in the Company.
Accordingly, our inability or decision not to declare or pay dividends could adversely affect the market price, liquidity and
value of our ordinary shares and ADSs, and the returns realised by holders of those securities.
Our ordinary shares are subject to dilution as a result of our employee share schemes
We have a Deferred Share Plan, forming part of our Total Incentive Plan, which came into effect in 2020. Our shareholders
have authorised up to 25,000,000 shares of the issued share capital to be used for this plan. A new employee share ownership
plan ("ESOP") was implemented in 2024 and shares have been issued under it.
As a result, shareholders' equity interests in us are subject to dilution to the extent of potential future issues and exercises
under these share plans. Any future issue of ordinary shares, whether under employee share schemes or to fund acquisitions or
capital requirements, may further dilute the proportionate interests of existing holders of ordinary shares and ADSs.
27
Table of contents
In addition, sales of large quantities of our ordinary shares or ADSs, or the perception that such sales may occur, could
adversely affect the prevailing market price of those securities.
Accordingly, dilution arising from our employee share schemes and other share issues could adversely affect the market
price, liquidity and value of our ordinary shares and ADSs and the proportionate interests of existing holders.
Fluctuations in exchange rates may reduce the market value of our securities and of any dividends or distributions
paid by us
We have historically declared all dividends in South African rand. As a result, exchange rate movements may have affected
the US dollar value of these dividends, as well as of any other distributions paid by the Depositary to holders of ADSs.
Our Memorandum of Incorporation allows for dividends and distributions to be declared in any currency at the discretion of
the board of directors, or of shareholders at a general meeting. If, and to the extent that, we opt to declare dividends and
distributions in US dollars, exchange rate movements will not affect the US dollar value of those dividends or distributions;
nevertheless, the value of any dividend or distribution in Australian dollars, Kina or rand will continue to be affected. If, and to the
extent that, dividends and distributions are declared in rand in future, exchange rate movements will continue to affect the
Australian dollar, Kina and US dollar value of those dividends and distributions.
Additionally, the market value of our securities as expressed in Australian dollars, Kina, US dollars and rand will continue to
fluctuate in part as a result of foreign exchange movements. Our foreign shareholders therefore face investment risk from
currency exchange rate fluctuations affecting both the market value of our securities and the value of any dividends or
distributions paid by us.
Accordingly, exchange rate fluctuations could reduce the market price, value and effective yield of our ordinary shares and
ADSs for holders whose reference currency is not the currency of declaration.
Investors may face liquidity risk in trading our ordinary shares on the JSE
The primary listing of our ordinary shares is on the JSE. Historically, the trading volumes and liquidity of shares listed on
the JSE have been low relative to other major markets.
The ability of a holder to sell a substantial number of our ordinary shares on the JSE in a timely manner, particularly in a
large block trade, may be restricted by this limited liquidity. Limited liquidity may also increase the volatility of the price at which
our ordinary shares trade and may widen the spread between bid and offer prices, with the result that a holder may realise less
on a disposal than the prevailing quoted price would suggest.
Accordingly, limited liquidity on the JSE could adversely affect the market price, liquidity and value of our ordinary shares,
and the ability of holders to dispose of their holdings at the time and price they seek. See Item 9: "The Offer and Listing –
Markets – The Securities Exchange in South Africa".
Shareholders outside South Africa may not be able to participate in future issues of securities
The securities laws of certain jurisdictions may restrict our ability to allow participation by certain shareholders in future
issues of securities, including ordinary shares, carried out by us or by an affiliate.
In particular, holders of our securities who are located in the United States, including those who hold ordinary shares or
ADSs, may not be able to participate in securities offerings by or on behalf of us unless a registration statement under the
Securities Act is effective with respect to such securities, or an exemption from the registration requirements of the Securities
Act is available. The securities laws of certain other jurisdictions may also restrict our ability to allow the participation of all
holders in those jurisdictions in future issues of securities.
Where affected holders are unable to participate in a rights offering or other pre-emptive issue, their proportionate interest
in the Company will be diluted, and they may not receive value in respect of the rights they are unable to exercise.
Accordingly, restrictions on participation in future issues of securities could dilute the interests of affected holders and
adversely affect the value of their ordinary shares and ADSs.
Investors in the United States may have difficulty bringing actions and enforcing judgments against us, our directors
and our executive officers
We are incorporated in South Africa. Each of our directors and executive officers, and our independent registered public
accounting firm, resides outside the United States. Substantially all of the assets of these persons, and substantially all of our
assets, are located outside the United States.
As a result, it may not be possible for investors to effect service of process within the United States upon these persons or
upon us, or to enforce against them or us, in a court of the United States, a judgment predicated upon the civil liability provisions
of the federal securities laws or other laws of the United States or of any state. A foreign judgment is not directly enforceable in
South Africa, but constitutes a cause of action which may be enforced by South African courts in certain circumstances.
Accordingly, holders of our ordinary shares and ADSs may have limited practical recourse in respect of claims arising
under United States securities laws, which may adversely affect the value of, and the protections available to holders of, those
securities.
28
Table of contents
US securities laws do not require us to disclose as much information as a US company, and investors may receive less
information about us
We are subject to the periodic reporting requirements of the SEC and the NYSE that apply to "foreign private issuers". The
periodic disclosure required of foreign private issuers under applicable rules is more limited than the periodic disclosure required
of US domestic issuers. Among other things, we are not required to file quarterly reports on Form 10-Q or current reports on
Form 8-K. Our officers and directors are, however, subject to the reporting requirements of Section 16(a) of the Exchange Act,
including filings on Forms 3, 4 and 5. Principal shareholders who are not also officers or directors remain exempt from those
reporting requirements.
Investors may therefore receive less information about us, and receive it less frequently or less promptly, than they
otherwise might from a comparable US company or from certain of our peers in the industry. This may adversely affect investors'
ability to make timely and fully informed decisions about their investment in us.
Accordingly, the more limited disclosure regime applicable to us as a foreign private issuer may adversely affect the
information available to holders of our ordinary shares and ADSs and the market price, liquidity and value of those securities.
ITEM 4. INFORMATION ON THE COMPANY
A. HISTORY AND DEVELOPMENT OF THE COMPANY
Harmony is a public limited company incorporated in South Africa, with its registered office at Randfontein Office Park,
Corner Main Reef Road and Ward Avenue, Randfontein, 1759, telephone number +27 11 411 2000. Harmony was incorporated
and registered as a public limited company in South Africa under registration number 1950/038232/06 on 25 August 1950.
Harmony is the ultimate holding company of the Group.
The information set forth under the headings:
◦“– Harmony – Harmony in focus” on pages 3 to 4;
◦“– Harmony – Business model” on pages 7 to 11;
◦“– Delivering profitable ounces – Performance by operation" on pages 29 to 67; and
◦“– Delivering profitable ounces – Exploration and projects” on pages 68 to 71
of the Integrated Annual Report for the 20-F 2026 is incorporated herein by reference. Also see note 19 “Investments in
Associates” and note 20 “Investment in Joint Operations” of our consolidated financial statements, set forth beginning on
page F-1.
For information concerning our principal capital expenditures currently in progress, including the distribution of these
investments geographically and the method of financing, refer to Item 4: "Information on the Company – Business Overview –
Capital Expenditures” and Item 5: “Operating and Financial Review and Prospects – Liquidity and Capital Resources”.
In fiscal 2026, we did not receive any public takeover offers by third parties or make any public takeover offers in respect of
other companies’ shares.
The SEC maintains an internet site that contains reports, proxy and information statements, and other information
regarding issuers that file electronically with the SEC (www.sec.gov). As a foreign private issuer, we are exempt from the rules
under the Exchange Act that prescribe the furnishing and content of proxy statements to shareholders. Our corporate website is
www.harmony.co.za.
Recent Developments
Developments since 30 June 2026
•On 2 July 2026, we drew down US$400 million under the US$500 Million Syndicated Facility and A$250 million under the
A$500 Million Syndicated Facility. These funds were utilised to settle US$300 million outstanding under the US$400 million
sustainability-linked syndicated term loan facility (the "US$400 Million Syndicated Facility") and US$275 million
outstanding under the US$1.25 billion bridge facility (the "US$1.25 Billion Bridge Facility"), completing the refinancing
and extending the Group's debt maturity profile. Subsequently, on 18 September 2026, a drawdown of A$125 million was
made. Principal repayments of US$150 million and US$250 million were made on the US$500 Million Syndicated Facility
on 28 September 2026 and 2 October 2026, respectively.
•On 14 August 2026, Mr Frans (“Faan”) Lombard was appointed as Lead Independent Director and chair of the nominations
committee in addition to his membership of the audit and risk committee.
•On 26 August 2026, a final dividend of 750 SA cents per ordinary share was declared, which was paid on 12 October 2026.
•On 22 September 2026, the Company priced a convertible bond offering for US$500 million. On 29 September 2026 the
bonds were issued and the funds were received.
•On 15 October 2026, Mr Alwyn Pretorius and Mr James Boardman were appointed to the board of directors of Harmony as
independent non-executive directors.
29
Table of contents
B. BUSINESS OVERVIEW
The information set forth under the headings:
•“– Harmony – Harmony in focus” on pages 3 to 4;
•“– Harmony – Strategy” on pages 21 to 28;
•“– Harmony – Business model” on pages 7 to 11;
•“– Harmony – Operating context” on pages 12 to 14;
•“– Harmony – Risk and opportunity management” on page 15;
•“– Harmony – Key matters affecting our business and strategy” on pages 16 to 20;
•“– Delivering profitable ounces – Performance by operation” on pages 29 to 67;
•“– Delivering profitable ounces – Exploration and projects” on pages 68 to 71; and
•“– Sustainability performance” on pages 72 to 194
of the Integrated Annual Report for the 20-F 2026 is incorporated herein by reference.
Gold and Copper Price Volatility
The profitability of the Group’s operations, and the cash flows generated by those operations, are affected mainly by
changes in the market price of gold, copper, and in the case of Hidden Valley, silver as well. Revenue for fiscal 2026 amounted
to R99,238 million of which R101,582 million, excluding hedging, was from the sale of gold, compared with revenue of
R73,896 million in fiscal 2025 of which R75,240 million, excluding hedging, related to the sale of gold. The increase in gold
revenue was mainly driven by a 45.5% increase in the average dollar gold price received, increasing from US$2,620/oz in fiscal
2025 to US$3,811/oz in fiscal 2026.
Offsetting the above was a hedging loss of R9,649 million in fiscal 2026, compared to a loss of R4,594 million in fiscal
2025. The increase in the hedging loss is directly linked to the increase in gold prices seen throughout fiscal 2026. Harmony
entered into derivative contracts to manage the variability in cash flows from the Group’s production, in order to create cash
certainty and protect the Group against lower commodity prices.
Current demand and supply affect the price of gold, but not necessarily in the same manner as current demand and supply
affect the prices of other commodities. Historically, gold has retained its value in relative terms against basic goods in times of
inflation and monetary crisis. As a result, central banks, financial institutions and individuals hold large amounts of gold as a
store of value, and production in any given year constitutes a very small portion of the total potential supply of gold. However, as
gold has historically been used as a hedge against unstable or lower economic performance, improved economic performance
may have a negative impact on the price for gold. Since the potential supply of gold is large relative to mine production in any
given year, normal variations in current production will not necessarily have a significant effect on the supply of gold or its price.
Uncertainty in global economic conditions has impacted the price of gold significantly in the past and continued to do so in fiscal
2026. These factors include high inflation and interest rates, as well as increasing geopolitical tensions which are currently
creating increased demand for gold by central banks, amongst others, which may continue to result in increased volatility.
The volatility of gold prices is illustrated in the table, which shows the annual high, low and average of the afternoon
London bullion market fixing price of gold in US dollars for each of the past ten years:
Annual gold price: 2017 – 2026
Price per ounce (US$)
Calendar year*
High
Low
Average
2017 ..............................................................................................................................................
1,346
1,151
1,253
2018 ..............................................................................................................................................
1,355
1,178
1,268
2019 ..............................................................................................................................................
1,546
1,270
1,393
2020 ..............................................................................................................................................
2,067
1,474
1,770
2021 ..............................................................................................................................................
1,943
1,684
1,799
2022 ..............................................................................................................................................
2,039
1,629
1,800
2023 ..............................................................................................................................................
2,135
1,804
1,953
2024 ..............................................................................................................................................
2,786
1,992
2,389
2025 ..............................................................................................................................................
4,357
2,636
3,284
2026 (up to and including 23 October 2026) ..........................................................................
5,595
3,943
4,509
* These prices are based on calendar years and differ from Harmony's fiscal-year realised prices.
On 23 October 2026, the afternoon fixing price of gold on the London bullion market was US$3,996/oz.
30
Table of contents
In fiscal 2026, Harmony also benefited from eight months of copper revenue following the acquisition and integration of
MAC Copper. Copper sales contributed a total of R3,501 million in revenue consisting of R3,375 million of revenue from
contracts with customers and R126 million relating to favourable provisional pricing adjustment during fiscal 2026. As Harmony
expands its exposure to copper, the Group’s future financial performance, cash flows and results of operations may also be
affected by fluctuations in copper prices. Copper prices are influenced by factors including global industrial demand, economic
growth, supply disruptions, inventory levels, electrification and energy-transition activity. See Item 5: "Operating and Financial
Review and Prospects – Operating results – Key factors affecting our results – Copper Concentrate Price, Provisional Pricing
and Streaming Arrangements".
Capital Expenditures
Capital expenditures incurred across all operations in fiscal 2026 amounted to R13,167 million which includes R716 million
towards phase 2A of our renewable energy programme, compared with R10,998 million in fiscal 2025. Expenditure for fiscal
2026 includes R1,049 million directed towards the newly acquired CSA. During fiscal 2026, capital expenditures at Moab
Khotsong and Hidden Valley accounted for 18% of the total, with Mponeng accounting for 16% whilst Doornkop and CSA each
accounted for 8%. During fiscal 2025, capital expenditures at Moab Khotsong accounted for 22% of the total, with Mponeng
accounting for 19%, Hidden Valley for 15%, Mine Waste Solutions for 10% and Doornkop for 8%.
The focus of our capital expenditures in recent years has been on underground development, major projects such as
Zaaiplaats, the Mponeng life-of-mine ("LOM") extension project and Kareerand, as well as plant improvement and upgrades.
During fiscal 2026, capital expenditure was funded from Harmony's cash generated by operations. See Item 5: “Operating and
Financial Review and Prospects – Liquidity and Capital Resources”.
We have budgeted approximately R16,484 million for operational capital expenditures in fiscal 2027, excluding capital
allocated for renewables, other international projects, Eva Copper and Wafi-Golpu. We currently expect that our planned
operational capital expenditures will be financed from cash generated by operations and new borrowings as needed. Details
regarding the anticipated capital expenditure for each operation are included in the table below.
Capital
expenditure
budgeted for
fiscal 2027
(R’million)
South Africa
Moab Khotsong1 ..................................................................................................................................................................................................
1,997
Mponeng2 .............................................................................................................................................................................................................
3,122
Tshepong North2 .................................................................................................................................................................................................
1,195
Tshepong South ..................................................................................................................................................................................................
585
Doornkop ..............................................................................................................................................................................................................
1,413
Joel ........................................................................................................................................................................................................................
343
Target 1 .................................................................................................................................................................................................................
458
Kusasalethu .........................................................................................................................................................................................................
626
Masimong .............................................................................................................................................................................................................
322
Mine Waste Solutions .........................................................................................................................................................................................
215
Other - surface ....................................................................................................................................................................................................
627
International
Hidden Valley3 .....................................................................................................................................................................................................
3,472
CSA .......................................................................................................................................................................................................................
2,109
Total operational capital expenditure .........................................................................................................................................................
16,484
1Includes capital expenditure for Zaaiplaats.
2Includes capital expenditure for the LOM extension projects.
3Includes capitalised stripping costs.
Regulation
Mineral Rights – South Africa
MPRDA
The MPRDA was promulgated as effective legislation on 1 May 2004 and is the primary legislation regulating the mining
industry in South Africa. Pursuant to the MPRDA, the South African government is the custodian of South Africa’s mineral and
petroleum resources and has a duty to administer these resources for the benefit of all South Africans. As a consequence, an
owner of the surface rights has no claim to the minerals found in, on or under the surface of his or her land. The MPRDA
extinguished private ownership of minerals. The DMPR, formerly the Department of Mineral Resources and Energy (“DMRE”)
and, before that, the Department of Mineral Resources (“DMR”), administers and implements the MPRDA through its regional
offices. References in this annual report on Form 20-F to the “Minister” are to the minister responsible for mineral resources at
the relevant time.
31
Table of contents
Any person (including the owner of the surface rights) who wishes to exploit mineral resources in South Africa is required
to first apply for and obtain the appropriate right under the MPRDA. The Minister is authorised to grant or refuse applications for
rights under the MPRDA. Provided that an applicant meets all of the requirements relating to the right for which the applicant
has applied, the Minister is obliged to grant the right. Once the right is granted in terms of the MPRDA and registered in terms of
the Mining Titles Registration Act, 16 of 1967, the holder holds a limited real right in respect of the mineral and the land to which
such right relates.
In accordance with the MPRDA, the holder of a mining right must comply with the terms of the right, the provisions of the
MPRDA, the environmental authorisation (issued under the NEMA), the mining work programme and the SLP approved as part
of the right. The SLP relates to the obligations placed on the mining right holder to, among other things, train employees of the
mine in accordance with prescribed training methodologies, achieve employment equity and human resource development in
the mining company, improve housing and living conditions of employees and set up local economic development ("LED")
projects.
Compliance with each of the provisions of the MPRDA, environmental authorisation, mining work programme and SLP is
monitored by submission of monthly, bi-annual and annual returns and reports by the holder of the right to the DMPR in
accordance with the provisions of the MPRDA and the right. A prospecting or mining right can be suspended or cancelled if the
holder conducts mining operations in breach of the MPRDA, a term or condition of the right or an Environmental Management
Programme ("EMPr"), or if the holder of the right submits false, incorrect or misleading information to the DMPR. The MPRDA
sets out a process which must be followed before the Minister is entitled to suspend or cancel the prospecting or mining right.
Following the commencement of the MPRDA, we secured the conversion of all our “old order” mining rights into “new
order” mining rights and validated our existing mining authorisations. All our mining operations in South Africa have valid mining
rights under the MPRDA, and we actively carry out mining and exploration activities in all our material mineral rights areas. We
continue to comply with the applicable monthly, annual and bi-annual reporting obligations to the DMPR.
On 20 May 2025, the South African Government published the MPRD Bill for public comment and a subsequent correction
was published on 9 June 2025. It invited interested and affected parties to submit their comments on the MPRD Bill on or before
13 August 2025. As of 30 June 2026, the public consultation process has concluded and the MPRD Bill remains under
consideration by the South African government.
Among other things, the MPRD Bill, if promulgated, would achieve the following. In relation to black economic
empowerment ("BEE"), the MPRD Bill proposes to regulate empowerment in terms of regulations to be published pursuant to
the MPRD Bill. It is unclear what requirements will be contained in those regulations and the extent to which they will be based
on, or replace, Mining Charter III. In relation to historic tailings created before 1 May 2004, which are not regulated under the
MPRDA, the MPRD Bill purports to amend the MPRDA so as to render historic tailings subject to regulation under it, resulting in
the South African government gaining custodianship of historic tailings. The current owners of these historic tailings would be
afforded an opportunity to apply for amendments to existing rights, or for new rights over the historic tailings, within two years of
the MPRD Bill being introduced as law.
In relation to transfers of interests in companies, the MPRD Bill proposes amendments which are unclear but could
suggest that a transfer of any interest in an unlisted company, where such company holds a prospecting right or mining right,
requires the prior consent of the Minister. In relation to mineral beneficiation, the MPRD Bill seeks to make it mandatory for the
Minister to initiate or promote the beneficiation of minerals and petroleum resources in South Africa, and affords broad discretion
over beneficiation without providing criteria under which that discretion should be exercised. In relation to strategic minerals, the
Minister may, in consultation with other relevant ministers, declare certain minerals or a class of minerals to be strategic to
advancing government imperatives and accordingly restrict their prospecting or mining. The MPRD Bill does not elaborate on
what minerals could be declared "strategic".
In relation to penalties, the MPRD Bill proposes to introduce fines of up to 10% of the offender's annual turnover in South
Africa, and exports from South Africa, during the preceding financial year for contraventions of the MPRDA. In relation to the
issue of a closure certificate, the MPRD Bill envisages that a rights holder will remain liable for any latent or residual
environmental and associated damage caused by prospecting and mining operations even after, and notwithstanding, the issue
of a closure certificate by the Minister, with the result that a rights holder will no longer be indemnified from liability after its issue.
The definition of “this Act” would also be amended to elevate the status of the Codes of Good Practice for the South African
Minerals Industry and the Housing and Living Conditions Standard for the Minerals Industry, 2019 (the "Housing and Living
Conditions Standard") from policy documents to law.
32
Table of contents
Regulations under the MPRDA
On 27 March 2020 the Minister published for implementation amendments to the regulations promulgated pursuant to the
MPRDA in 2004 (the "MPRDA Regulations" and, as amended, the "Amended Regulations"). The Amended Regulations
include the following notable changes.
Mining right applicants must meaningfully consult with landowners, lawful occupiers and interested and affected parties in
accordance with the procedures contemplated under the Environmental Impact Assessment Regulations, 2014 (the "EIA
Regulations"). The office of the Regional Manager is permitted to participate as an observer in these processes.
Mining right holders must, pursuant to their SLPs, contribute to the socio-economic development of the areas in which they
operate and of labour sending areas, being a local municipality which a majority of mine workers consider to be their primary
residence. This requirement may impose obligations on mining right holders to effect measures in communities that are located
far from the mine.
Although most of the provisions regulating environmental matters have been deleted from the Amended Regulations, those
dealing with mine closure have been retained and amended to state that mine closure must be regulated pursuant to the NEMA,
the EIA Regulations and the Financial Provisioning Regulations, 2015. The Financial Provisioning Regulations, 2015 remain in
force. Although the DFFE has published draft replacement financial provisioning regulations and engaged extensively with
industry stakeholders regarding a revised financial provisioning regime, no replacement regulations have been promulgated as
at 30 June 2026. The existing Financial Provisioning Regulations, 2015 continue to apply, subject to amendments to their
transitional arrangements.
The appeal process in the MPRDA Regulations has been replaced with a more comprehensive procedure that includes
specific time periods within which appellants, respondents and the competent authority must submit appeals, submit responses
or consider appeals, as the case may be. Although there is no guarantee that the parties will comply with these time periods,
they are intended to hold the parties accountable and to ensure that appeals are resolved in a timely manner.
General Mining Laws Amendment Bill
In August 2026, the South African Government published the General Mining Laws Amendment Bill for public comment.
The General Mining Laws Amendment Bill is intended to strengthen the legislative framework applicable to illegal mining. The
General Mining Laws Amendment Bill proposes the creation of specific criminal offences relating to illegal mining and materially
increased penalties for certain offences.
The General Mining Laws Amendment Bill proposes amendments to four statutes, namely the Criminal Procedure Act, 51
of 1977 (the "Criminal Procedure Act"), the Diamonds Act, 56 of 1986 (the "Diamonds Act"), the MPRDA, and the Precious
Metals Act, 37 of 2005 (the "Precious Metals Act"). In relation to the MPRDA, the General Mining Laws Amendment Bill
proposes the introduction of statutory definitions for “artisanal mining”, “artisanal mining permit”, and “small-scale mining permit”,
reflecting the South African government's broader efforts to formalise and regulate artisanal and small-scale mining activities.
The General Mining Laws Amendment Bill expressly distinguishes lawful artisanal and small-scale mining conducted under the
requisite permits from unlawful mining activities and is not intended to criminalise duly authorised artisanal miners.
The General Mining Laws Amendment Bill further proposes the creation of specific criminal offences relating to illegal
mining, including the carrying out of prospecting or mining activities without the requisite mining rights, permits and
environmental authorisations. It also introduces a new offence prohibiting any person from assisting, facilitating or providing
services that enable illegal prospecting or mining activities. In addition, the General Mining Laws Amendment Bill proposes
expanded enforcement powers, including granting members of the South African Police Service certain compliance and
enforcement powers under the MPRDA.
The General Mining Laws Amendment Bill would materially increase penalties for certain offences. Under the proposed
amendments, contraventions of the MPRDA, Diamonds Act and Precious Metals Act may attract fines of up to R100 million and
imprisonment for periods of up to 30 years in certain circumstances, representing a substantial increase from existing penalty
provisions. The General Mining Laws Amendment Bill also proposes that offences relating to illegal prospecting, mining and
assisting such activities be included in Schedule 1 to the Criminal Procedure Act, thereby strengthening law enforcement and
prosecutorial measures available to combat illegal mining.
As of the date of this annual report on Form 20-F, the General Mining Laws Amendment Bill remains subject to the public
consultation process and has not been enacted.
Mining Charter
The South African government has identified the South African mining industry as a sector in which significant participation
by HDPs is required. One of the objects of the MPRDA is to substantially and meaningfully encourage HDPs to enter the mineral
and petroleum industries and to benefit from the exploitation of the nation’s mineral and petroleum resources. In terms of section
100 of the MPRDA, the Minister was empowered to develop a broad-based socio-economic charter in order to set the
framework for targets and time periods for giving effect to these objectives.
Among other things, the original Mining Charter negotiated in 2002 and gazetted in 2004 (the "Original Charter") stated
that mining companies agreed to achieve 26% HDP ownership of South African mining industry assets within ten years (i.e. by
the end of 2014). Ownership could comprise active involvement, through HDP-controlled companies (where HDPs own at least
50% plus one share of the company and have management control), strategic joint ventures or partnerships (where HDPs own
at least 25% plus one vote of the joint venture or partnership interest and there is joint management and control), collective
investment vehicles, the majority ownership of which is HDP based, or passive involvement, particularly through broad-based
vehicles such as employee stock option plans.
33
Table of contents
The Original Charter was subsequently amended by the Amended Charter which included targets and timelines for HDP
participation in procurement and enterprise development, beneficiation, employment equity, human resources development,
mine community development, housing and living conditions, sustainable development and growth of the mining industry and
reporting (monitoring and evaluation). It required mining companies to achieve the following, among other things, by no later
than 13 December 2014:
•have a minimum effective HDP ownership of 26%;
•procure a minimum of 40% of capital goods, 70% of services and 50% of consumer goods from HDP suppliers (i.e.
suppliers in which a minimum of 25% + one vote of their share capital must be owned by HDPs) by 2014 (exclusive of non-
discretionary procurement expenditure);
•ensure that multinational suppliers of capital goods contribute a minimum of 0.5% of their annual income generated from
South African mining companies into a social development fund from 2010 towards the socio-economic development of
South African communities;
•achieve a minimum of 40% HDP demographic representation at executive management (board) level, senior management
(executive committee) level, core and critical skills, middle management level and junior management level;
•invest up to 5% of annual payroll in essential skills development activities; and
•implement measures to improve the standards of housing and living conditions for mineworkers by converting or upgrading
mineworkers’ hostels into family units, attaining an occupancy rate of one person per room and facilitating home ownership
options for all mineworkers in consultation with organised labour.
In addition, mining companies were required to monitor and evaluate their compliance with the Amended Charter and
submit annual compliance reports to the DMR (as it was then). The "scorecard" attached to the Amended Charter made
provision for a phased-in approach for compliance with the above targets over the five-year period ending on 13 December
2014. For measurement purposes, the scorecard allocated various weightings to the different elements of the Amended Charter.
Failure to comply with the provisions of the Amended Charter would, according to its provisions, ostensibly amount to a breach
of the MPRDA and could have resulted in the cancellation or suspension of a mining company’s mining rights.
In March 2015, the DMR prepared an interim report of consolidated results of the self-assessment by reporting companies
of compliance with the Amended Charter, reporting relatively broad compliance with the non-ownership requirements of the
Amended Charter. However, the DMR did not report the results of compliance with the HDP ownership guidelines of the
Amended Charter and noted that there was no consensus on certain principles applicable to the interpretation of the ownership
element.
On 31 March 2015, the Minerals Council South Africa ("MCSA"), then known as the Chamber of Mines of South Africa, and
the DMR jointly agreed to approach the High Court of South Africa (Gauteng Division) to seek a declaratory order that would
provide a ruling on the relevant legislation and the status of the Original Charter and the Amended Charter, including clarity on
the status of previous empowerment (i.e., HDP ownership) transactions concluded by mining companies and a determination on
whether the ownership element of the Original Charter and the Amended Charter should be a continuous compliance
requirement for the duration of the mining right as argued by the DMR, or a once-off requirement as argued by the MCSA, on
the “once empowered always empowered” principle. The MCSA and the DMR filed papers in court (the "Main Application") and
the matter was placed on the roll to be heard on 15 March 2016. On 16 February 2017, the High Court of South Africa (Gauteng
Division) postponed the hearing of the application indefinitely to allow the MCSA and the South African government to engage in
further discussion on this matter.
The Minister subsequently published the Broad-Based Black Socio-Economic Empowerment Charter for the South African
Mining and Minerals Industry, 2017 ("2017 Mining Charter") which came into effect on 15 June 2017. The MCSA launched an
urgent application in the High Court of South Africa (Gauteng Division) to interdict the implementation of the 2017 Mining Charter
(the "Interdict Application") pending a judicial review application on the basis that it was unilaterally developed and imposed on
the industry and that the process that was followed by the DMR in developing the 2017 Mining Charter had been seriously
flawed (the "2017 Review Application"). However, the Minister and the MCSA reached an agreement on 13 September 2017
under which the Interdict Application did not proceed as the Minister undertook to suspend the 2017 Mining Charter pending the
outcome of the 2017 Review Application by the MCSA. The 2017 Review Application was subsequently indefinitely postponed
by agreement between the DMR and the MCSA on the basis that the MCSA had entered into a new round of discussions with
the President of South Africa, Cyril Ramaphosa, and the Minister. On 19 February 2018, the High Court of South Africa
(Gauteng Division) ordered that the DMR and the MCSA also involve communities affected by mining activities in these new
discussions relating to the 2017 Mining Charter.
When the 2017 Mining Charter was published, the MCSA re-enrolled the Main Application for hearing and the High Court
of South Africa (Gauteng Division) hearing was held in December 2017.
On 4 April 2018, the High Court of South Africa (Gauteng Division) delivered its judgment (the "2018 Judgement"). The
effect of the 2018 Judgement is that mining companies are not required to re-empower themselves after their HDP shareholders
have sold out and that the DMR cannot rely on the provisions of the MPRDA to enforce compliance with the Amended Charter,
unless the provisions which the DMR seeks to enforce were made a term or condition of the mining right. The High Court of
South Africa (Gauteng Division) also held that the Minister's promulgation of the Amended Charter did not occur in terms of or in
compliance with the duty imposed under section 100(2) of the MPRDA and, as such, the terms of the Amended Charter can
have legal consequences or significance only insofar as they are, by any means, reflected in the terms or conditions subject to
which the Minister grants a mining right. It also brings the validity and enforceability of any subsequent mining charter into
question unless it is legislatively authorised. On 19 April 2018, the DMR filed a notice of intention to appeal the judgment of the
High Court of South Africa (Gauteng Division), but later withdrew its appeal in August 2020.
34
Table of contents
On 27 September 2018, the Minister published the Mining Charter III on which date it also became effective, as amended
by the notice published in the Government Gazette on 19 December 2018 and read with the Implementation Guidelines. It
replaces, in their entirety, the Original Charter and the Amended Charter. Mining Charter III imposes obligations and increased
participation by HDPs in relation to a mining company's ownership, procurement of goods and services, enterprise and supplier
development, human resource development and employment equity requirements. The first annual reporting for compliance with
Mining Charter III was on or before 31 March 2020, although on 11 April 2020, the Minister gazetted Directions under the
regulations of the Disaster Management Act, 57 of 2002 as part of the measures to address, prevent and combat the spread of
Covid-19, which extended the date for submission of the first annual report to 1 June 2020. Harmony submitted its first report
under Mining Charter III within the specified deadline, and has timely submitted subsequent reports.
Some of the material changes introduced by Mining Charter III include:
•in relation to existing mining rights, the continuing consequences of historical BEE transactions will be recognised and
existing right holders will not be required to increase their HDP shareholding for the duration of their mining right in
circumstances where they either achieved and maintained 26% HDP ownership or where they achieved the 26% HDP
ownership but their HDP shareholder has since exited;
•in relation to the renewal and transfer of existing mining rights, historical BEE credentials will not be recognised and mining
companies will be required to comply with the ownership requirements in relation to new mining rights (see below);
•in relation to new mining rights (granted after 27 September 2018) mining companies must have a minimum of 30% BEE
shareholding distributed as follows: a minimum of 5% non-transferable carried interest to qualifying employees; a minimum
of 5% non-transferable carried interest to host communities, or a minimum 5% equity equivalent benefit; and a minimum of
20% to a BEE entrepreneur, 5% of which must preferably be for women; "carried interest" is defined as "shares issued to
qualifying employees and host communities at no cost to them and free of any encumbrances. The cost for the carried
interest shall be recovered by a right holder from the development of the asset";
•applications for mining rights lodged and accepted prior to 27 September 2018, will be processed in terms of the Amended
Charter (i.e. with a 26% HDP ownership requirement) but with a further obligation to increase their HDP shareholding to
30% within five years of the granting of the right;
•BEE shareholding may be concluded at holding company level, mining right level, on units of production, shares or assets
and where it is concluded at any level other than mining right level, the flow-through principle will apply;
•the permitted beneficiation off-set of up to 11% against the HDP ownership requirement contained in the Original Charter
and Amended Charter has been reduced to 5% unless it was "claimed" prior to 27 September 2018;
•a minimum of 70% of total mining goods procurement spend (including non-discretionary expenditure) must be on South
African manufactured goods, allocated amongst HDP owned and controlled companies, women and youth owned and
controlled companies and BEE compliant companies;
•a minimum of 80% of the total spend on services (including non-discretionary expenditure) must be sourced from South
African companies, allocated among HDP owned and controlled companies, women and youth owned and controlled
companies and BEE compliant companies;
•mining companies must achieve a minimum representation of HDPs in the following management positions: 50% on the
board of directors (20% of which must be women), 50% in executive (20% of which must be women), 60% in senior
management (25% of which must be women); 60% in middle level (25% of which must be women); 70% in junior level
(30% of which must be women) and 60% in core and critical skills. In addition; HDPs with disabilities must constitute 1.5%
of all employees;
•the Minister may, by notice in the Government Gazette, review Mining Charter III;
•the ownership and mine community development elements are ring-fenced and require 100% compliance at all times; and
•a mining rights holder that has not complied with the ownership element and falls between levels 6 and 8 of the Mining
Charter scorecard shall be in breach of the MPRDA and its mining right may be suspended or cancelled in accordance with
the provisions of the MPRDA.
While Mining Charter III is now effective, there are transitional arrangements in relation to compliance with the procurement
and the employment equity element targets.
On 26 March 2019, the MCSA instituted judicial review proceedings in High Court of South Africa (Gauteng Division) for an
order reviewing and setting aside certain provisions of Mining Charter III. The provisions challenged by the MCSA relate to those
which, among other things:
•provide that mining rights holders must at all times comply with the ownership requirements imposed under Mining
Charter III;
•stipulate that the continuing consequences of historic empowerment transactions will not be recognised if existing mining
rights are renewed or transferred to third parties;
•impose the procurement thresholds for goods and services; and
•indicate that the Minister may invoke the sanctions prescribed under the MPRDA, if a mineral right holder fails to comply
with the threshold requirements imposed under the Mining Charter III.
35
Table of contents
The application aligns with the MCSA’s previously stated view that most aspects of the Mining Charter III represent a
reasonable and workable framework. However, the MCSA’s application contended that Mining Charter III does not fully
recognise the continuing consequences of previous empowerment transactions, particularly in relation to mining right renewals
and transfers of such rights. According to the MCSA, this constitutes a breach of the declaratory order on the matter issued by
the High Court of South Africa (Gauteng Division) in April 2018. On 30 June 2020, the High Court of South Africa (Gauteng
Division) ordered that various mine-affected communities and trade unions be joined as parties to the MCSA's application. The
MCSA's application was heard before a full bench of judges in May 2021. The 2021 Judgement was handed down on
21 September 2021, setting aside certain of the problematic provisions, while providing that the remainder of Mining Charter III
should continue in force. In November 2021, the DMPR informed the National Assembly's Portfolio Committee on Mineral
Resources and Energy that it does not intend to appeal the outcome of the 2021 Judgment, but instead will consider steps to
achieve the empowerment objectives through legislative amendments to the MPRDA.
The 2021 Judgment was discussed at the Parliamentary Portfolio Committee on Mineral Resources and Energy in 2022,
with various stakeholders, including organised labour and the MCSA, presenting their views on the implications of the judgment.
Subsequently, the South African government commenced a review of the MPRDA and as mentioned above published the MPRD
Bill for public comment. As of 30 June 2026, the MPRD Bill has not been enacted and remains under consideration following
completion of the public consultation process. It is not yet possible to determine the extent to which any future amendments may
address the matters considered in the 2021 Judgment.
For details of our compliance in this regard, see “Integrated Annual Report for the 20-F 2026 – Governance – Mining
Charter III – compliance scorecard” on pages 242 to 243.
The Royalty Act
The Mineral and Petroleum Royalty Act, 28 of 2008, and the Mineral and Petroleum Royalty Administration Act, 29 of 2008,
were assented to on 21 November 2008 with the commencement date set as 1 May 2009; the date on which royalties became
payable was deferred to 1 March 2010. Royalties are payable by the holders of mining rights to the government according to a
formula based on a defined earnings before interest and tax. This rate is then applied to a defined gross sales leviable amount
to calculate the royalty amount due, with a minimum of 0.5% and a maximum of 5% for gold. For 2026, the average royalty rate
for our South African operations was 3.7% of the gross sales leviable amount.
The BBBEE Act and the BBBEE Amendment Act
The Broad-Based Black Economic Empowerment Act, 53 of 2003 (the "BBBEE Act"), which came into effect on
21 April 2004, established a national policy on broad-based black economic empowerment with the objective to (i) remedy
historical racial imbalances in the South African economy and (ii) achieve economic transformation, by increasing the number of
black people who participate in the mainstream South African economy. The BBBEE Act provides for various measures to
promote BEE participation, including empowering the Minister of Trade and Industry to issue Codes of Good Practice (the
"BBBEE Codes"), with which organs of state and public entities and parties interacting with them or obtaining rights and
licences from them would be required to comply. The BBBEE Codes were first published in 2007, and were revised in 2013
(although the revisions only came into effect in 2015). The BBBEE Codes sought to provide a standard framework, in the form of
a "generic scorecard", for the measurement of BBBEE across all sectors and industries operating within the South African
economy and sought to regularise such sectors and industries by providing clear and comprehensive criteria for the
measurement of BBBEE.
On 24 October 2014, the Broad-Based Black Economic Empowerment Amendment Act, 46 of 2013 (the "BBBEE
Amendment Act"), came into effect. The BBBEE Amendment Act inserted a new provision in the BBBEE Act, whereby the
BBBEE Act would trump the provisions of any other law in South Africa which conflicts with the provisions of the BBBEE Act,
provided such conflicting law was in force immediately prior to the effective date of the BBBEE Amendment Act. The BBBEE
Amendment Act also stipulates that this provision would only be effective one year after the BBBEE Amendment Act is brought
into effect, on 24 October 2015. On 27 October 2015, the Minister of Trade and Industry published a government gazette notice
declaring an exemption in favour of the DMR from applying the requirements contained in section 10(1) of the BBBEE Act for a
period of 12 months.
There has been some debate as to whether or to what extent the mining industry was subject to the BBBEE Act and the
policies and codes provided for thereunder. The BBBEE Codes apply in the absence of sector specific codes which have been
agreed to by interested and affected parties active within a specific sector. By way of background, various sectors within the
South African economy may negotiate and agree Codes of Good Practice which would govern transformation in that specific
sector. In addition, certain codes fall outside of the regulatory framework established by the BBBEE Act and BBBEE Codes
promulgated by the Minister of Trade and Industry thereunder. One such sector is the mining industry, where the Original
Charter, the Amended Charter and Mining Charter III (which we refer to generally in this section as the "Mining Charter"),
govern the implementation of BBBEE, among other things, within the mining industry.
For purposes of the BBBEE Act, the Mining Charter is not a "sector code". It is not clear at this stage how the Mining
Charter and BBBEE Codes relate to each other. The South African Government may designate the Mining Charter as a sector
code, in which case it will be under the auspices of the BBBEE Act. On the other hand, the Mining Charter may remain a stand-
alone document under the auspices of the MPRDA and may be subject to the trumping provision, discussed above, to the extent
that there is a conflict between the two. This uncertainty may be resolved through either government clarification or judicial
attention. The exemption by the Minister of Trade and Industry can be read as confirmation that the Department of Trade and
Industry regards the BBBEE Codes as “applicable” to the mining industry after the exemption was lifted on 27 October 2016.
36
Table of contents
The mining sector has historically been regulated through the Mining Charter and the MPRDA, rather than through a sector
code issued under the BBBEE Act. In September 2021, the Gauteng Division of the High Court held that Mining Charter III
constitutes a policy instrument and not subordinate legislation, and set aside certain provisions of the Charter III. The DMRE
subsequently indicated that it would seek to advance transformation objectives through legislative amendments to the MPRDA
rather than appealing the judgment. As mentioned above, in May 2025, the South African Government published the MPRD Bill 
for public comment, which among other things proposes that broad-based socio-economic empowerment requirements
applicable to the mining sector be regulated through the MPRDA and regulations contemplated thereunder. As of 30 June 2026,
the MPRD Bill has not been enacted and remains under consideration following completion of the public consultation process
and the future interaction between the mining sector empowerment framework and the broader BBBEE regime remains subject
to further legislative developments.
Housing and Living Standards
Mining right holders are required to develop, in consultation with organised labour, relevant municipalities and the DWS, a
housing and living conditions plan taking into account various principles in giving effect to the above objectives including,
engaging with all relevant stakeholders, ensuring equity in the implementation and administration of the housing of employees,
providing employees with a range of housing options (such as subsidised rental, private ownership, living out allowances and
government-subsidised ownership) and ensuring that all housing facilities are developed or redeveloped with access to
electricity, water and ablutions in accordance with the requisite norms and standards.
Resettlement Guidelines
On 11 December 2019, the Minister published the Housing and Living Conditions Standard. The purpose of the Housing
and Living Conditions Standard is to ensure that mine employees are provided with adequate housing, healthcare services,
balanced nutrition and water. The Housing and Living Conditions Standard applies to existing and new mining right holders. The
underlying purpose of the Housing and Living Conditions Standard is to develop decent single and family housing units for mine
employees and their families. The MPRD Bill proposes to incorporate the Housing and Living Conditions Standard into the
statutory framework of the MPRDA, which, if enacted, may enhance their legal status and enforceability.
The Minister published the final Mine Community Resettlement Guidelines, 2022 ("Resettlement Guidelines") for
implementation on 30 March 2022, on which date they also became effective. The Resettlement Guidelines apply to applicants
and holders of mining rights, prospecting rights and mining permits pursuant to the MPRDA, where the proposed activities would
result in the displacement of parties. Resettlement is guided by several fundamental principles including meaningful
consultation, gender equality, the avoidance of resettlement, where possible, rules concerning meetings and the protection of
existing rights.
Pursuant to the Resettlement Guidelines, applicants and holders of mining rights will need to make provision for a
Resettlement Plan, Resettlement Action Plan and a Resettlement Agreement. The Resettlement Plan sets out the nature of the
project, its expected impacts, the manner in which consultation will be implemented and the various cost implications for the
resettlement. The Resettlement Action Plan sets out the specific steps that the holder will need to meet to implement the
Resettlement Plan and the Resettlement Agreement records the commitments made by the holder. There are no specific
requirements in the Resettlement Guidelines regarding the content of these agreements. However, all stakeholders should be
engaged and commit to their respective obligations.
No mining activities may commence until such time as the Resettlement Agreement has been concluded. This includes
agreement on the compensation that should be paid to affected parties. Any disputes between the parties regarding the
Resettlement Agreement or associated plans, should be resolved between the parties. To the extent that the parties are unable
to reach an amicable solution, only then should the Regional Manager-led process in section 54 of the MPRDA be invoked.
Geoscience Regulations
On 30 March 2022, the Minister published the final version of the Geoscience Act Regulations, 2022 (the "Geoscience
Regulations"), on which date they also became effective. The Geoscience Regulations mandate the lodgement of geoscience
data and information in respect of reconnaissance and prospecting with the Council for Geoscience ("CG"). The Geoscience
Regulations require that the owners of onshore and offshore geoscience data and geoscience information must submit this
information to the CG.
The Geoscience Regulations state that the lodgement of geoscience data and information should include several
categories of information such as geology, geochemistry, borehole profile logs and physical borehole core, and geophysical
data. The requirement to submit physical borehole material has been qualified to only be necessary upon a specific request by
the CG as well the fact that physical core materials drilled for research purposes may only be discarded after obtaining consent
from the CG. All physical materials recovered from boreholes drilled for infrastructure and development purposes may only be
discarded after consultation with the CG.
In terms of the Geoscience Regulations, entities which hold historical information relating to onshore and offshore
geoscience data and information are obliged to notify the CG that such data and information is in their possession. Following
such notification, the CG, at its expense, must arrange to collect the data and/or information. The Geoscience Regulations
classify all geoscience data and information predating the commencement of the Geoscience Regulations and not related to
prospecting or reconnaissance, as historical data, and the same provisions and time periods described above will apply.
37
Table of contents
The Geoscience Regulations provide for the disclosure and accessibility of geoscience data, geoscience information, and
prescribed services through digital and non-digital media as well as data requests that may be made directly to the CG. The
Geoscience Regulations contain confidentiality provisions relating to geoscience data and information, which are consistent with
the confidentiality provisions found in the MPRDA. However, the confidentiality provisions are subject to the provision that
geoscience data or information relating to a prospecting permit or reconnaissance permit may not be disclosed until the permit
has lapsed or been abandoned in line with section 30(5) of the MPRDA. Additionally, the Geoscience Regulations state that
geoscience data and information not relating to reconnaissance or prospecting are considered confidential and will only be
disclosed in limited circumstances.
Mineral Rights – Australia
In Australia, mining is regulated by the laws of the state in which the deposit is situated and the mining activity occurs. In
fiscal year 2026, Harmony's activities included the Eva Copper Project in Queensland and, following the acquisition of MAC
Copper on 24 October 2025, CSA in New South Wales.
Mining in Queensland is regulated primarily by the Mineral Resources Act 1989 (Qld), the Mineral and Energy Resources
(Common Provisions) Act 2014 (Qld), the MQSH Act, the MQSH Regulations and associated regulations, policies and
guidelines. Other Queensland health and safety legislation, including the Work Health and Safety Act 2011 (Qld) and the Work
Health and Safety Regulation 2011 (Qld), may apply to workplaces or activities falling outside the scope of the mine-specific
legislation. Mining in New South Wales is regulated principally by the Mining Act 1992 (NSW), the WHSMPS Act and associated
regulations, codes of practice and guidelines.
In both jurisdictions, exploration and mining activities require the grant of appropriate statutory authorities. These may
include exploration licences or permits, mineral development or assessment authorities, and mining leases. Exploration
authorities generally provide the right to undertake exploration activities within a defined area, subject to prescribed work
programmes, reporting, land access, environmental and financial assurance requirements. Where a mineral resource is
identified and development is proposed, a mining lease and any required planning, environmental and other regulatory
approvals must be obtained before mining operations can commence.
Mining authorities are subject to statutory conditions and obligations, and non-compliance may result in enforcement
action, including fines, suspension or cancellation of the relevant authority.
Mining in Australia is also subject to the Native Title Act 1993 (Cth). The Act establishes processes to recognise and
protect native title rights and interests, where proposed activities constitute a "future act" affecting those rights and interests.
These processes include the "right to negotiate" process or the negotiation of an Indigenous Land Use Agreement, depending
on the circumstances. Either process may address matters such as benefit sharing, employment, training, contracting
opportunities and cultural heritage management.
Mineral Rights – Papua New Guinea
Mineral rights in PNG are regulated principally by the PNG Mining Act. The PNG Mining Act stipulates that all minerals
existing on, in or below the surface of any land in PNG are the property of PNG. Subject to the PNG Mining Act and the grant of
existing tenements, land may be available for exploration and mining. Operations in PNG are also subject to the PNG Mining
Safety Regulation 1935, as updated, the PNG Industrial Safety, Health and Welfare Act 1961 and its regulations.
The grant and administration of mining tenements are undertaken by the PNG MRA which is established under the Mineral
Resources Authority Act 2018. The PNG MRA is the principal regulator of the PNG mining sector and administers exploration
licences, mining leases, special mining leases and related tenements. The PNG MRA is also responsible for advising on and
administering mineral policy following a government restructuring which merged the Department of Mineral Policy and
Geohazard Management into the PNG MRA.
Mine health and safety matters are administered under the PNG Mining (Safety) Act through the office of the Chief
Inspector of Mines.
The permitting process can be very time consuming, and (subject to the applicable legislation) there can be no assurance
that an application for a mining tenement will be granted, renewed or extended. Mining tenements include:
•exploration licences, issued for an initial term of up to two years and may be renewed for further a period of up to two years
on application, subject to compliance with the PNG Mining Act including expenditure, work programme and reporting
requirements;
•mining leases, issued for an initial term of up to 20 years and may be extended on application for further periods up to ten
years, subject to compliance with the PNG Mining Act and approval by the Minister for Mining, having regard to the
recommendation of the PNG Mining Advisory Council;
•special mining leases, issued for an initial term of up to 40 years and may be extended on application for further periods up
to 20 years, subject to ministerial approval, compliance with the PNG Mining Act and, where applicable, the terms of any
mining development contract entered into between the PNG Government and the tenement holder; and
•mining easements or leases for mining purposes, being ancillary tenements granted in support of mining activities
conducted under a mining lease or a special mining lease.
These tenements generally confer exclusive rights on the holder to undertake the activities authorised by the relevant
tenement within the tenement area, subject to the PNG Mining Act and the conditions of the tenement. However, in PNG,
citizens have the right to carry out non-mechanised mining of alluvial minerals on land owned by them, provided they hold an
alluvial mining lease. An alluvial mining lease cannot be granted over land that is already subject to an existing mining lease or
special mining lease.
38
Table of contents
PNG exploration licences are subject to a statutory provision allowing the PNG State to acquire a participating interest of
up to 30% in a mineral discovery before the commencement of mining. If exercised, the PNG State must pay an amount equal
to its pro-rata share of exploration expenditure incurred in relation to the discovery. Once this interest is acquired, the PNG State
must contribute its proportionate share of future project costs unless otherwise agreed.
In addition, PNG mining legislation and mining tenement conditions impose a range of obligations on tenement holders. 
Breaches of these obligations may result in regulatory action, including the imposition of a fine, cancellation of the tenement
and, in certain circumstances, criminal liability that may include imprisonment.
Approximately 97% of land in PNG is held under customary ownership by tribes, clans and other traditional landholding
groups and is generally not subject to formal registered title. The customary owners of some land have been formally identified
through decisions of the Land Titles Commission and other processes. However, there is often considerable difficulty in
identifying the customary owners of a particular area of land because land ownership can be complex and may arise from local
customs, lineage, inheritance, and other traditional arrangements and because of the absence of a formal written registration
system.
Prior to conducting exploration or mining activities, arrangements generally need to be made with affected landholders
regarding access to land and compensation for loss or damage. Prior to commencing mining on a mining lease or special mining
lease, compensation and land access agreements are typically entered into with affected landholders. In addition, following a
development forum process convened under the PNG Mining Act, the State, the developer, relevant provincial and local level
governments, and affected landholders commonly enter into agreements covering the distribution of royalties and other project
benefits and other commitments of the parties in relation to the mining project. Historically, these arrangements are documented
in a MOA (more recently known as a CDA).
The Hidden Valley Mine MOA, which was executed in 2005, has recently been superseded by a CDA. Under the CDA, a
portion of the royalties derived from the project is allocated among the Morobe Provincial Government, local level governments
and affected landholder groups. In addition, the CDA includes commitments relating to national content, localisation,
procurement, business development, employment and training and community development and addresses other social
performance obligations associated with the project.
A Wafi-Golpu CDA is expected to be entered into as part of the permitting process of the Wafi-Golpu Project following a
development forum convened by the PNG Government at which affected landholder groups and other relevant stakeholders will
have the opportunity to participate.
In addition to corporate income tax and other applicable taxes, duties, fees and levies, mining companies in PNG are
generally required to pay mineral royalties to the PNG Government and a production levy to the PNG MRA in accordance with
applicable legislation.
Since 2009, the mining regime in PNG has been the subject of various reviews, policy initiatives and proposed legislative
reforms involving a range of PNG Government agencies. In addition, various mineral, mining, and resource-sector policies have
been developed, proposed or released for consultation including initiatives relating to biodiversity offsets, management of
marine environments, sustainable development, involuntary relocation, national content, and mine closure and rehabilitation.
The pace and scope of mining law and policy reform increased following the appointment of the Honourable James
Marape MP as Prime Minister of PNG in May 2019. Since that time, the PNG Government has publicly advocated policies
aimed at increasing the benefits derived by PNG from the development of its natural resources including through potential
reforms to resource-sector legislation involving enhanced PNG State participation rights, higher mining royalties, new levies and
fees, increased local content requirements, restrictions on foreign labour practices, and support for downstream mineral
processing. As a result, the future direction and ultimate form of the PNG mining regime remains uncertain pending the outcome
of current and future reform initiatives.
Key developments include:
•2020 Mining Act reform proposals which included increases to royalty rates, changes to the PNG State’s option to
acquire interests in mineral discoveries, the introduction of development levies and waste fees, requirements to maintain
production above minimum prescribed levels, a prohibition on non-local “fly-in, fly-out” employment practices, and
obligations relating to downstream processing of minerals (including a national gold refinery and bullion bank).
•Mining (Amendment) Act 2020 which introduced real-time reporting requirements for production and mineral sales data
and gave PNG-owned entities, including PNG State-owned enterprises, priority rights to apply for tenements over certain
reserved land.
•Proposed Organic Law on Ownership and Development of Hydrocarbons and Minerals and the Commercialisation
of State Businesses (2020) which contemplated a fundamental restructuring of the mining sector including the transfer of
ownership of minerals from the PNG State to a PNG State-owned entity and replacing the traditional concession regime
with a production sharing model. The proposal was not progressed and its future remains uncertain.
•National Gold Corporation Bill (2021) which sought to establish a statutory monopoly over gold refining and require
producers to supply all gold production to a designated national refinery. These provisions would have material commercial
and legal implications for all producers. Following significant industry and public opposition, the Bill was withdrawn in June
2024, although similar proposals could be revisited in the future.
•Mine and Works (Safety and Health) Bill 2021 which would have introduced a risk-based mine safety regime replacing
the Mining (Safety) Act 1977. The Bill would have expanded safety obligations and regulatory powers and imposed
significant additional compliance and financial assurance requirements on mining operations, including in relation to major
facilities such as TSFs. The Bill has not yet been enacted and its future remains uncertain.
39
Table of contents
•The PNG National Content Policy for Resource Sectors 2023, officially launched in May 2025, is an overarching
government policy framework that seeks to increase PNG participation in resource projects through greater local
procurement, employment, workforce development, business participation, equity ownership and community development.
The policy is not itself legislation and contemplates further legislation and regulation to implement and enforce national-
content requirement.
•Mining (Amendment) Bill 2024 which proposed significant reforms to PNG's mining framework, including higher royalties
(from the current 2% to a negotiated rate of between 5% and 10%), increased PNG State equity participation, and new
mechanisms for PNG State involvement including mining refinery leases, and a land reservation and competitive tender
process with priority rights for PNG State-owned entities. It also provided for stricter project financing requirements with
applicants for a mining lease to have funds equal to at least 50% of projected capital costs readily available at the time of
application. The draft legislation contained some potentially beneficial reforms such as extending exploration licence terms
from two to five years, allowing expansion of mining lease boundaries and enabling online lodgement of applications. The
Mining (Amendment) Bill 2024 has not been enacted with many of the proposed amendments incorporated into the PNG
Draft Mining Bill 2025.
•Papua New Guinea Draft Mining Bill 2025 which proposed a comprehensive replacement of the PNG Mining Act,
introducing increased PNG State participation rights, higher royalty obligations, waste discharge fees, development levies,
and pre-commencement financial security and mine closure assurance requirements. The Bill also introduced a number of
potentially onerous operational requirements, including extensive land ownership and community studies, a prohibition on
international fly-in/fly-out employment arrangements, and enhanced local processing obligations requiring producers to
make available up to 50% of mine production for domestic downstream processing. The Bill contains transitional provisions
intended to preserve regulatory stability for existing mining operations by allowing them to continue to be governed by the
current PNG Mining Act for the term of their existing mining leases. The provisions specifically refer to projects such as
Wafi-Golpu and existing mining operations, although some aspects of the drafting are unclear. The PNG Income Tax Act
was passed on 20 March 2025, which was subsequently certified on 20 October 2025 and came into effect on
1 January 2026. The PNG Income Tax Act does not include specific provisions for mining capital or exploration
expenditure, but provides a transitional carve-out for legacy mining-specific rules, including special mining capital and
exploration expenses. Resource projects that commenced before this date, including the Hidden Valley mine, remain
subject to the resource company provisions of the previous Income Tax Act 1959 under grandfathering arrangements. The
PNG Income Tax Act now applies non-mining industry-specific taxation matters not covered by the grandfathering
provisions, including the taxation of employees and contractors.
It remains uncertain whether, when and in what form the proposed reforms will be implemented, or the extent to which they
may affect our current operations and development projects in PNG. We continue to monitor developments and engage with the
PNG Government and relevant regulatory authorities, both through PNG CORE and directly with the PNG MRA.
Health and Safety
Health and Safety – South Africa
Health and safety at mining operations in South Africa is governed by the MHSA, as well as the binding regulations
thereunder. The objectives of the MHSA are listed in section 1 of the MHSA and include among other things, the protection of
the health and safety of persons at mines, effective monitoring of health and safety conditions, promotion of a culture of health
and safety at mines, provision for enforcement of health and safety measures and provision of investigations and inquiries.
The MHSA and its regulations place upon an employer the duty to protect, as far as reasonably practicable, the health and
safety of both employees (which includes employees of independent contractors) performing work at a mine and non-employees
(such as visitors to a mine and the public who live in close proximity to the mine). "Employer” is defined in section 102 of the
MHSA as the “owner of a mine”, and in turn, an “owner“ includes the holder of the prospecting permit or mining authorisation
issued under the MPRDA.
The employer is ultimately responsible for ensuring that applicable provisions of the MHSA and binding regulations thereof
are complied with to ensure the health and safety of persons, as far as reasonably practicable and to prevent damage to
property.
Importantly, the MHSA prescribes, among other things, general and specific duties for employers and other persons,
determines penalties for non-compliance with the MHSA and relevant binding regulations thereunder, and provides for employee
participation by requiring the appointment of health and safety representatives and the establishment of health and safety
committees. The MHSA also codifies the right of employees to refuse to work in dangerous conditions and the MHSA further
places an obligation on employees to protect their own health and safety, as well as the health and safety of other persons.
See Integrated Annual Report for the 20-F 2026 "– Sustainability performance – Engaged workforce – Engaged workforce”
on pages 103 to 118 and "– Sustainability performance – Health and wellbeing – Health and wellbeing” on pages 86 to 102.
The MHSI of the DMPR is responsible for the enforcement of the MHSA and relevant binding regulations thereunder. The
DMPR also plays an important role in the promotion of health and safety at mines. The MHSI comprises a Chief Inspector of
Mines, Deputy Chief Inspector of Mines, Principal Inspectors of Mines for each region and various Senior Inspectors and
Inspectors of Mines for each region. Should employers or employees fail to comply with their obligations under the MHSA, the
MHSI may take a number of enforcement measures which may include the following:
•the issuing of statutory instructions (for example notices in terms of section 54 or section 55 of the MHSA) if an Inspector of
Mines has reason to believe that any occurrence, practice or condition at a mine endangers the health and safety of any
person at a mine, or alternatively if an Inspector of Mines has reason to believe that a provision of the MHSA has not been
complied with. A notice in terms of section 54 of the MHSA, may halt all mining operations undertaken at a mine or part
thereof. If a mine receives notices in terms of section 54 of the MHSA regularly, the production stoppages and the
40
Table of contents
additional costs incurred as a result thereof will not only affect the production results of a mine but also the reputation and
business of a mine. If, however, a notice in terms of section 54 of the MHSA has been issued unlawfully, the mine may
appeal the said notice to the Chief Inspector of Mines. The aforesaid appeal does not suspend the operation of the notice
issued in terms of section 54 of the MHSA. To suspend the operation of the notice in the above instance, a mine must
lodge an urgent application to the Labour Court (being the court with jurisdiction) requesting the suspension of the
operation of the notice issued in terms of section 54 of the MHSA;
•the suspension or cancellation of certificates of competency – the Chief Inspector of Mines may suspend or cancel
certificates of competency issued in terms of the MHSA if the holder of that certificate is guilty of gross negligence or
misconduct or has not complied with the MHSA or relevant binding regulations thereunder; and
•the imposition of administrative fines – a Principal Inspector of Mines may, after considering the recommendation of an
Inspector of Mines and the written representations of the employer, impose an administrative fine for the failure to comply
with, amongst other things, the provisions of the MHSA and the relevant binding regulations thereunder. In terms of Table 2
of Schedule 8 to the MHSA, the maximum administrative fine which may be imposed on an employer is R1 million per
transgression. If a mine receives an administrative fine which has been issued unlawfully, the mine may lodge an
application in the Labour Court (being the court with jurisdiction) to review the decision to impose an administrative fine.
In addition to the above, the MHSI also institute investigation and/or inquiry proceedings in terms of the MHSA following an
accident or occurrence at a mine, which results in the serious injury, serious illness or death of a person.
Any person convicted of an offence in terms of the MHSA, may be issued with a fine or sentenced to imprisonment as may
be prescribed.
To address issues relating to occupational illnesses, injuries and compensation for such injuries or illnesses, South Africa
has established two statutory systems for the payment of compensation for occupationally related injuries and certain
occupationally related diseases, namely, COIDA and ODMWA. COIDA applies to the compensation of all occupational injuries
(including payment of compensation in the event of the death of the injured employee), whether or not it occurs in or outside the
mining industry. ODMWA applies to diseases which are defined as “compensatable diseases”, being primarily occupationally
related lung diseases like silicosis.
Notably, COIDA indemnifies the employer against claims by the employee or his/her dependents for damages incurred as
a result of occupational injuries and diseases. However, the Constitutional Court held in Mankayi v AngloGold Ashanti Limited
2011 (3) SA 237 (CC) that although COIDA applies to occupational diseases in general, COIDA does not apply in instances
where the disease in question is a compensatable disease in terms of ODMWA and which was contracted as a result of the
performance of “risk work” at a “controlled mine”. The Court further held that if an employee contracts a compensatable disease
as defined in ODMWA, the employee would still be entitled to claim common law damages from the employer. It should also be
noted that COIDA does not indemnify an employer against claims lodged by persons other than employees (i.e. claims lodged
by independent contractors or other persons affected by mining operations) for damages incurred as a result of occupational
injuries or diseases.
In June 2022, the Minister released the draft MHSA Amendment Bill for public comment, with the comment period closing
on 29 July 2022. In October 2024, the Minister published an explanatory summary and notice of intended introduction of the
MHSA Amendment Bill, 2024. The MHSA Amendment Bill, 2024 was formally introduced in the National Assembly on
7 April, 2026. In July 2026, the Portfolio Committee issued a notice inviting interested individuals and relevant stakeholders to
submit written comments and to indicate an interest in making an oral submission. The MHSA Amendment Bill, 2024 remains
before the Portfolio Committee and has not been enacted.
If enacted, the MHSA Amendment Bill, 2024 would amend certain provisions of the MHSA and if enacted in their present
form, could have a material adverse effect on our business, operating results and financial condition. The MHSA Amendment
Bill, 2024 provides for (among other things): an increase in the monetary value of the fines that may be imposed in respect of
instances of non-compliance, more direct involvement of executives (particularly chief executive officers), stricter liability in
instances of non-compliance, and changes to the obligations relating to training and the formulation of training programmes. The
MHSA Amendment Bill, 2024 also proposes a criminal liability provision, sometimes referred to as “corporate manslaughter”
under which an employer commits an offence if it contravenes or fails to comply with a duty in terms of Chapter 2 of the MHSA
and that contravention or failure results in a person's death, serious injury or serious illness, or a health-threatening occurrence.
These provisions could limit the defences available to an employer and increase our compliance costs and potential liability.
Health and Safety – Australia
In Queensland, where our Eva Copper Project is situated, the safety of employees, contractors and third parties
concerning mining operations is regulated by the MQSH Act as amended and the MQSH Regulations. Risk is effectively
managed when all persons individually and as part of their respective workgroups and organisations take action to keep risk at
an acceptable level, by conducting operations so that the level of risk from the operations is within acceptable limits and as low
as reasonably achievable, taking into account the likelihood of injury and the severity of the injury.
Workers or other persons at mines or persons who may affect safety and health at mines or as a result of operations, have
“safety and health obligations” under Division 2 of the MQSH Act. Persons including (a) the mining tenement holder; (b) the
operator; (c) the site senior executive; (d) the contractor; (e) the designer, manufacturer, importer and supplier of plant for use at
a mine; (f) the erector and installer of plant at a mine; (g) the manufacturer, importer and supplier of substances for use at a
mine; and (h) the person who supplies a service at a mine. Their “safety and health obligations” are specified under Division 3 of
the MQSH Act.
41
Table of contents
The objects of the MQSH Act are to protect the safety and health of persons at mines and persons who may be affected by
operations and to require that the risk of injury or illness to any person resulting from operations is at an acceptable level. Risk is
considered effectively managed when all persons individually, or as part of their respective workgroups and organisations, take
action to keep risk to an acceptable level; that is, by conducting operations so that the level of risk from the operations is within
acceptable limits and as low as reasonably achievable, taking into account the likelihood of injury or illness to the person, and
the severity of injury or illness. In some cases this is demonstrated by following applicable regulations and guidelines and
adopting stated measures, or where no regulations or guidelines are in place, by taking reasonable precautions and exercising
proper due diligence.
The Resources Safety & Health Queensland ("RSHQ") is the independent regulator responsible for administering,
monitoring and enforcing compliance with the MQSH Act. Responsibility for prosecution of “serious offences” under the MQSH
Act fall with the Workplace Health and Safety Prosecutor ("WHS Prosecutor"). A “serious offence” is committed where a person
who has a safety and health obligation breaches it in circumstances where the breach:
•causes death or bodily harm, or the breach involves exposure of a person to a substance likely to cause death or grievous
bodily harm; or
•is an offence under the Industrial Manslaughter provisions of the MQSH Act; or
•amounts to an offence that may be prescribed by a regulation under the MQSH Act.
Other offences (i.e., non-serious offences) may be prosecuted by either the WHS Prosecutor or the chief executive officer
("CEO") of RSHQ. Queensland legislation also allows any person to request that the WHS Prosecutor commence a prosecution
against another person in certain circumstances, i.e., when the person reasonably considers the other person has committed a
“serious offence" and no prosecution has been brought in relation to the alleged offence, in which case the WHS Prosecutor has
three months to investigate and respond.
Where a person holds a safety and health obligation under the MQSH Act and fails to discharge this obligation, the
maximum penalty where the contravention leads to multiple deaths is 30,000 penalty units for a corporation; or 6,000 penalty
units or three years imprisonment for an offence committed by an officer of a corporation. Civil penalties may also be imposed
under the MQSH Act where a corporation or an officer/employee or agent of the corporation contravenes a civil penalty
obligation.
Other persons who have specific obligations under the MQSH Act include health and safety representatives (elected by the
workers in Queensland mines), district worker representatives, inspectors and other officers. Where an appointee to these
positions reasonably believes a risk from operations may reach an unacceptable level, they may give a directive to any person
to take stated corrective or preventative action, or to suspend all or partial operations. Failure to comply with a directive may
lead to a penalty (up to 800 penalty units or two years imprisonment.
The legislation places obligations on the operator of a mine, the site senior executive and others to ensure that, among
other things, the risk to persons from operations is at an acceptable level and that safety and health management systems are
developed and implemented. The legislation contemplates that operators and site senior executives will be assisted by site
safety and health representatives elected by the workers at the mine site, site safety and health committees, district workers’
representatives and appointed inspectors, inspection officers and authorised officers with powers including site access,
inspection and seizure.
In the New South Wales, the safety of employees, contractors and third parties concerning mining operations at CSA is
regulated by the WHSMPS Act and regulations thereunder.
The WHSMPS Act complements the general Work Health and Safety Act 2011 (NSW) by imposing additional requirements
tailored to the unique hazards of mining and petroleum operations. It applies to all NSW mines, quarries, exploration activities
and petroleum sites and establishes a single legislative framework for managing health and safety risks across the mining
industry.
A central obligation of the WHSMPS Act is that the mine operator must ensure, so far as is reasonably practicable, the
health and safety of workers and others affected by mining activities. This includes identifying hazards, assessing and
controlling risks, implementing effective safety management systems, maintaining adequate supervision and competency, and
ensuring critical risks such as ground instability, mobile equipment, ventilation, hazardous substances and emergency events
are effectively managed.
The legislation also places strong emphasis on consultation, competency and governance. Mine operators must consult
with workers and contractors on safety matters, ensure people performing statutory functions are appropriately qualified, and
maintain key safety documentation, records and plans. Company officers and senior leaders must exercise due diligence by
ensuring adequate resources, systems and verification processes are in place to manage risks and comply with legislative
requirements.
The WHSMPS Act further requires the reporting of notifiable incidents to the NSW Resources Regulator, preservation of
incident scenes, and cooperation with regulatory inspections and investigations. In practice, the legislation is focused on
ensuring mines proactively identify and manage critical hazards, maintain effective controls, involve workers in safety decision-
making, and demonstrate that risks are being continuously monitored and controlled throughout the life of the operation.
Significant penalties may be imposed if safety and health obligations under the relevant work health and safety legislation are
not appropriately discharged.
42
Table of contents
Health and Safety – Papua New Guinea
PNG has a significant mining industry, and a developing system of occupational health and safety. The PNG Mining
(Safety) Act is the principal legislation, which addresses a range of issues such as working hours, minimum safety and reporting
requirements. Other legislation and regulations also apply.
The PNG Mining (Safety) Act and the relevant binding regulations issued thereunder are currently the subject of
comprehensive ongoing review, which may result in changes which will affect our operations and projects in PNG. In 2021, the
PNG MRA released the MWSH Bill and has subsequently proposed various other amendments to the PNG Mining (Safety) Act;
however neither the MWSH Bill nor those other amendments have been enacted.
The MWSH Bill deals (among other matters) with the increase in monetary value of the fines which may be imposed in
respect of instances of non-compliance, the more direct involvement of executives (particularly chief executive officers), the
imposition of stricter liability in respect of obligations under the PNG Mining (Safety) Act, and changes to obligations relating to
training and formulation of training programmes. If enacted in its present form, the MWSH Bill will repeal and replace the PNG
Mining (Safety) Act.
See above under "– Regulation – Mineral Rights – Papua New Guinea".
See Integrated Annual Report for the 20-F 2026 "– Sustainability performance – Engaged workforce – Engaged workforce”
on pages 103 to 118 and "– Sustainability performance – Health and wellbeing – Health and wellbeing” on pages 86 to 102.
Laws and Regulations Pertaining to Environmental Protection – South Africa
In South Africa, environmental matters are regulated by national, provincial and municipal laws in line with each level of
government under South Africa's Constitution and relevant legislation. Key legislation includes the NEMA, the NWA, the Air
Quality Act, the National Environmental Management: Waste Act, 59 of 2008 ("Waste Act") the National Nuclear Regulator Act,
47 of 1999, the National Environmental Management: Biodiversity Act, 10 of 2004, the National Heritage Resources Act, 25 of
1999, the Carbon Tax Act, the Climate Change Act and the MPRDA.
This legislation commonly requires businesses whose operations may affect the environment to obtain permits,
authorisations and other necessary approvals. Businesses and authorities must also monitor compliance with the conditions of
these permits, authorisations and approvals. In addition, the legislation may impose standards or limits that do not require
authorisation and duties of care requiring businesses to take reasonable measures to prevent pollution or environmental
degradation from occurring, continuing or recurring.
The NEMA
Section 24 of South Africa's Constitution is the cornerstone of South African environmental law. It affords every person the
right to an environment that promotes their health and well-being and places an obligation on the state to create legislation and
other instruments to give effect to this right taking into consideration the principles of sustainable development.
In accordance with this obligation, the Minister of Environmental Affairs and Tourism (as he was then) introduced the
NEMA. The NEMA is “framework legislation”; which provides the core principles and structures in terms of which all
environmental legislation and decisions are interpreted, administered and applied. These principles include the principles of
inter-generational equity, the polluter pays principle, the cradle to grave principle and the principle of sustainable development
(the "Section 2 Principles").
The South African mining sector is regulated through the One Environmental System, which integrates environmental
authorisation requirements under the NEMA with mining regulation under the MPRDA and allocates regulatory responsibilities
amongst the DMPR, the DFFE, and other competent authorities.
Listed Activities and competent authorities
The NEMA introduces environmental management tools aimed at ensuring that the Section 2 Principles are incorporated
into all decisions that may have an effect on the environment. Chief among these tools is the environmental authorisation
process. Under section 24(1) of the NEMA, the minister responsible for environmental affairs (the "Environment Minister") may
identify activities that may not commence without an environmental authorisation (the “Listed Activities”).
The Environment Minister published the EIA Regulations and three lists of Listed Activities (the "Listing Notices"). The EIA
Regulations contemplate two application processes for an environmental authorisation: a "basic assessment" (an abridged
process for lower-impact activities) and an "environmental impact assessment" (a more detailed process for higher-impact
activities). Activities in Listing Notices 1 and 3 trigger a basic assessment process, while those in Listing Notice 2 require a full
scoping and environmental impact assessment. The decision period for granting or refusing environmental authorisation is
capped at 300 days, excluding any appeal process. However, due to administrative delays, this timeline is not always met.
The DMPR is the competent authority responsible for implementing and enforcing environmental law relating to
prospecting and mining activities, including issuing environmental authorisations. Any decisions by the DMPR under the NEMA
and other environmental management acts are appealable to the DFFE.
Commencing a Listed Activity without an environmental authorisation is an offence, though applicants may seek
retrospective authorisation in terms of section 24G of the NEMA. The competent authority may reject a section 24G application,
and may also require remediation, rehabilitation, monitoring or other corrective measures as part of the rectification process.
Even if authorisation is granted, penalties may include substantial administrative fines, criminal fines, imprisonment, remediation
obligations and other enforcement measures. In addition, a convicted person may be required to pay damages or penalties and/
or the costs of the prosecution. Directors and responsible persons may, in certain circumstances, incur personal liability for
43
Table of contents
environmental offences and may be required to demonstrate that they took reasonable steps to prevent the commission of the
offence.
Financial provision
Upon the cessation of mining operations or termination of the right, we must apply for a closure certificate. Until the
Minister issues a closure certificate, a mining right holder must annually assess the environmental liabilities of the mining
operation (including the pumping and treatment of extraneous water) and put up financial provision for the rehabilitation, closure
and ongoing post decommissioning management of negative environmental impacts. If the Minister grants a closure certificate,
the Minister may release the financial provision but is entitled to retain part of the provision for future latent or residual liabilities.
Under the NEMLAA, any financial provision retained by the Minister must be transferred to an account managed by the Minister,
or in the case of insurance, the Minister must be able to access the funds directly. Notwithstanding this, we will remain
responsible for any such latent or residual liabilities should they arise. If such liabilities arise, the DMPR may elect to implement
the measures using the retained funds and recoup any shortfall from us. We will have no control over the way such funds are
utilised to remedy the liability. If no liabilities arise, there is no mechanism in which we can reclaim these unused funds.
The Financial Provisioning Regulations, 2015 sought to rectify certain alleged shortcomings of guidelines (the "DMR
Guidelines"), issued by the DMR by requiring the inclusion of preliminary and general costs in the financial provision
calculations, imposing VAT (at 15%) on the total amount, prohibiting the withdrawal of trust funds for concurrent rehabilitation
(even in circumstances where the financial provision exceeds the evaluated environmental liability) and ceding a portion of the
funds to the Minister as security for possible latent and residual post-closure environmental impacts.
The Financial Provisioning Regulations, 2015 impose much more stringent obligations on mining and prospecting rights
holders than was required under the DMR Guidelines. As a result, the mining industry has expressed its opposition to the
Financial Provisioning Regulations, 2015 and the date by when existing prospecting and mining rights holders were required to
comply with the Financial Provisioning Regulations, 2015 has been indefinitely delayed until new regulations are published.
Several draft regulations have been published for comment, but no new final regulations have been published. Any prospecting
or mining right applied for or renewed after the Financial Provisioning Regulations, 2015 came into effect is required to comply
with the Financial Provisioning Regulations, 2015.
The Financial Provisioning Regulations, 2015 apply to prospecting and mining operations. Processing residue stockpiles
and residue deposits created prior to 1 May 2004 does not currently require a mining permit or a mining right. As a result,
financial provision has not been required for these activities. Amendments to the MPRDA and NEMA, however, seek to
incorporate these activities within the ambit of the MPRDA and the requirements to put up financial provision. This may require
us to put up more financial provision for rehabilitation of these residue stockpiles and residue deposits. Even if these
amendments are not forthcoming, we have a duty of care responsibility to take measures to prevent pollution or environmental
degradation arising from these residue stockpiles and deposits.
See Item 5: "Operating and Financial Review and Prospects – Operating Results – Key factors affecting our results  –
Climate Change, Environmental Factors and Carbon tax" for a discussion regarding carbon tax.
Duty of care
The NEMA requires any person who has caused, is causing or is likely to cause significant contamination to take
reasonable measures to address it. This obligation applies retrospectively and imposes strict liability. That is, we would be
responsible for implementing reasonable measures even if we were not responsible for causing the pollution or environmental
degradation. If we fail to implement the required reasonable measures, the competent authority, which includes the director-
general of the DFFE, the head of the provincial environmental department, the director-general of the DMPR or, since the
NEMLAA, a municipal manager, may issue a directive instructing that person to carry out specified measures. If the person does
not comply, the competent authority may apply to court for an order compelling various parties, such as those in control of the
activities at the time, property owners or those who failed to prevent the pollution or degradation, to contribute to the costs.
Enforcement
Environmental mineral and petroleum inspectors are responsible for monitoring and enforcing compliance with the NEMA
and environmental management acts. These inspectors are authorised to, among other things, conduct investigations, carry out
search and seizure operations and issue compliance notices.
Liabilities
Failing to comply with the NEMA or environmental management Acts, compliance notices, directives or permits, licences or
authorisations is an offence and may, upon successful prosecution, result in significant fines of up to R10 million and/or ten
years imprisonment. In addition, it may result in damages claims, obligations to rehabilitate the environment, paying the costs of
the prosecution and even director and employee liability. Any person may use the relevant provisions in the NEMA to initiate the
prosecution of an entity, its directors and/or employees in their personal capacity.
Waste management
Under section 19 of the Waste Act, the Minister of Forestry, Fisheries and the Environment may publish a list of waste
management activities that are likely to have a detrimental effect on the environment. No one may commence or undertake a
listed activity unless they comply with the norms and standards created in terms of section 19(3) of the Waste Act or hold a
waste management licence. The list identifies activities for which a waste management licence is required. Activities in Category
A require a basic assessment, those in Category B require a scoping and environmental impact assessment, and those in
Category C do not require a licence but must comply with published norms and standards.
44
Table of contents
Regulatory uncertainty surrounds management and re-processing of residue stockpiles and residue deposits created prior
to 1 May 2004. These historical residue stockpiles and residue deposits currently fall outside the scope of the MPRDA (and
therefore outside the jurisdiction of the DMPR) and, as such, it is not possible to obtain a mining right or a mining permit over
such residue stockpiles or deposits. Currently, historical residue stockpiles and residue deposits are regulated under the Waste
Act insofar as they are considered “hazardous waste”.
Other waste management facilities constructed and/or operated by our operations may also be subject to licensing
requirements, including hazardous waste disposal sites and central salvage yards.
On 10 December 2025, the Minister of Forestry, Fisheries and the Environment published Government Notice 6938
("GN 6938"), which calls upon certain persons conducting specified legacy waste management activities to apply for waste
management licences within two years from the date of GN 6938. Government Notice 6939, also published on
10 December 2025, prescribes the procedure applicable to such applications. To the extent that any of our waste management
activities fall within the scope of GN 6938, we may be required to obtain a waste management licence by 10 December 2027,
resulting in additional regulatory compliance requirements and potential associated costs.
Mines must also follow the management measures set out in the Regulations Regarding the Planning and Management of
Residue Stockpiles and Residue Deposits from a Prospecting, Mining, Exploration or Production Operation, 2015. These
regulations do not apply retrospectively to existing stockpiles and deposits if included in an approved EMPr but impose costly
liner and barrier requirements for new ones established after that date.
The Waste Act also regulates contaminated land, regardless of when the contamination occurred or whether it happened at
a different time from the activity that caused it. Authorities must assess and report on contaminated land identified as
investigation areas or reported by landowners. Depending on the risk level, authorities may direct monitoring, management or
site remediation measures.
Failure to comply with the provisions of the Waste Act may result in penalties similar to those discussed under the NEMA
above. See “Integrated Annual Report for the 20-F 2026 – Sustainability performance – Waste management” on pages 188 to
191.
Water use and pollution
The NWA regulates the management and water quality of water resources, including watercourses, surface water,
estuaries and aquifers to ensure the sustainability of all water resources in the interests of all water users.
It defines water use to include taking, storing or diverting water; stream flow reduction activities; controlled activities under
sections 37(1) or 38(1); discharging or disposing of waste into or near water resources; altering watercourses; removing
underground water for safety or operational reasons; and using water for recreation.
Authorities regulate water use through water use licences, general authorisations and the continuation of lawful water uses
in place when the NWA took effect in October 1998. Most mining operations require a water use licence, particularly for water
abstraction, storage, effluent discharge, diversions and infrastructure that could pollute groundwater. These licences often
involve complex technical assessments, stakeholder consultation and regulatory review processes.
Mines must also comply with the water use regulations for mining in the Regulations on Use of Water for Mining and
Related Activities Aimed at the Protection of Water Resources, 1999, which were adopted under the NWA and restrict the
location of mining infrastructure and require the separation of clean and dirty water systems, along with proper water
management design.
On 24 April 2026, the Minister of Water and Sanitation published Government Notice 7408 ("GN 7408"), calling upon
unregistered water users to register specified water uses. GN 7408 applies to certain section 21(a) and 21(d) water uses and
provides for a 90-day registration period from publication. GN 7408 exempts certain water users from registration, including
Schedule 1 water users and water users falling within the area of operation of a water user association. GN 7408 may require
affected operations to register previously unregistered water uses and therefore may result in additional regulatory compliance
requirements and potential penalties for non-compliance.
The NWA also imposes a duty of care similar to the NEMA. Failure to comply may result in penalties similar to those under
NEMA.
The NWA Bill, which seeks to amend the NWA, was published for public comment. The comment period closed on
31 July 2026. The following provisions of the NWA Bill are material and may influence or affect our operations:
•The NWA Bill requires that the Minister of Water and Sanitation (the "Water Minister") declare SWSA. Regulations will
regulate activities that are prohibited or restricted from being conducted within and around SWSAs. In respect of mining,
the regulations will regulate the way existing water use licences held in respect of mining operations in SWSAs will be
reviewed. This potentially poses a significant risk to the environment and our operations if we are prevented from securing
new water use licences. The NWA Bill contemplates that no new water use licences may be issued for any water use
contemplated in section 21 relating to mining within a SWSA which is classified as “high risk”. It is unclear what constitutes
a “high risk” SWSA.
•The NWA Bill empowers the Water Minister to prescribe, by regulation, the criteria to be considered when redressing the
results of past racial and gender discrimination in relation to water use. The responsible authority must apply these criteria 
when considering water use licence applications under the proposed amendments to section 27. These amendments
require the responsible authority to "advance the redress of past racial and gender discrimination when making a decision
to issue a water use licence or general authorisation" and take "into account the demographic composition of water users,
in particular a water management area, and may set aside a certain volume of water in each water management area to
achieve" this redress. As these criteria are used to assess renewal applications, these amendments may require the
45
Table of contents
restructuring of asset ownership to secure water use licence renewals or additional water use licences for new water uses.
This may be particularly relevant in areas where the majority of water users are not from historically disadvantaged groups.
•The NWA Bill introduces section 27A to the NWA which requires that only “fit and proper” applicants may be granted water
use licences. Persons are not considered "fit and proper" (and thus disqualified from obtaining a water use licence) if "that
person (i) has contravened or failed to comply with the NWA, any directive issued in terms of the NWA, or any legislation
applicable to water resource management and water pollution; (ii) is or has been a director or senior manager of a
company, firm or a juristic person which has been found guilty of contravening or failed to comply with the NWA, any
directive issued in terms of the NWA, or any legislation applicable to water resources management and water pollution; or
(iii) has held a water use licence or is entitled to continue with an existing lawful water use and that licence or entitlement
has been suspended or revoked". This section could affect companies within the Harmony Group that have multiple
operations. If one operation fails to comply with the NWA or a directive or any other legislation regulating water
management or pollution, other operations may be prevented from obtaining water use licences under the auspices of this
section.
•Under the NWA Bill, a person may continue with an existing lawful water use subject to "any new conditions or obligations
necessary to protect the water resources and the environment, which the responsible authority may impose". The
responsible authority may also, on written notice to a person holding an entitlement to use water under an existing lawful
use, "curtail the volume of water which becomes available as a result of failure by water users to exercise the full existing
lawful use volume for any period specified by the Minister".
•The NWA Bill provides clarity regarding the fines that may be imposed for committing offences under the NWA. Currently, it
provides for a “fine” and/or imprisonment for up to five years for a first offence and ten years for a subsequent offence.
Under the proposed amendments, a fine of up to R10 million and/or ten years in prison may be imposed for certain
offences and a fine of R1 million and/or one year imprisonment for first time offenders and R5 million and/or 5 years
imprisonment for subsequent offences.
Emissions
In South Africa, the National Greenhouse Gas Emission Reporting Regulations, 2016, require that we register and report
GHG emissions from applicable activities identified in these regulations. We must report our GHG emissions and activity data in
respect of these operations in accordance with the Technical Guidelines for each of the relevant GHGs and the
Intergovernmental Panel on Climate Change emission sources by 31 March of each year. The Technical Guidelines are a
companion to the National Greenhouse Gas Emission Reporting Regulations, 2016 and describe the reporting methodology as
specified in the National Environmental Management: Air Quality Act, 39 of 2004 ("NEMAQA").
See Item 3D: “Key Information – Risk Factors – Risks Related to Climate, Environment and Social Licence –
Decarbonisation, carbon pricing and emerging climate regulation may increase costs and capital requirements” for a discussion
regarding the laws governing GHG emissions.
On 31 March 2026, the National Dust Control Regulations, 2026 were promulgated. The National Dust Control
Regulations, 2026 apply, among others, to holders of mining, prospecting, exploration and production rights and impose
requirements relating to the control, monitoring and reporting of dust including prescribed dustfall limits and the preparation and
implementation of dust management plans. The National Dust Control Regulations therefore require affected operations to
assess and, where necessary, enhance their existing dust management and monitoring measures to ensure compliance. The
National Dust Control Regulations, 2026 repeal the National Dust Control Regulations, 2013. Transitional provisions require
holders of existing approved dust management plans to submit reviewed plans within 60 days of the National Dust Control
Regulations, 2026 coming into operation, with existing plans remaining valid pending approval. The National Dust Control
Regulations, 2026 also require a transition to the prescribed dustfall monitoring methodology within six months.
Under the NEMAQA, companies conducting industrial activities listed in the Listed Activities and Associated Minimum
Emission Standards ("Listed Emissions Activities") are required to obtain an atmospheric emission licence ("AEL") before
commencing operations.
An AEL is issued by the relevant licensing authority, typically a local municipality or provincial government, and sets out
conditions relating to emissions monitoring, reporting and the use of emission control technologies. Licence holders are
generally required to submit regular emissions data and compliance reports to the authorities.
Failure to obtain or comply with the terms of an AEL may result in administrative enforcement measures, suspension or
revocation of the licence or criminal prosecution under South African law.
Our operations in South Africa include activities that fall within the scope of the Listed Emissions Activities under NEMAQA.
Accordingly, we are required to, and do, maintain valid AELs for applicable sites. We are also required to comply with the
associated minimum emission standards, conduct periodic emissions monitoring and report results to the relevant authorities.
Carbon Tax Act
The South African government introduced carbon tax under the Carbon Tax Act, 15 of 2019, with effect from 1 June 2019.
The tax is administered and collected by the South African Revenue Service ("SARS") as an environmental levy under the
Customs and Excise Act, 91 of 1964. Liability arises in respect of activities listed in Schedule 2 to the Carbon Tax Act where the
applicable thresholds are met.
Greenhouse gas emissions are determined using applicable methodologies approved by the Department of Forestry,
Fisheries and the Environment or the calculation methods prescribed by the Carbon Tax Act. The statutory carbon tax rate is
R308 per tonne of carbon dioxide equivalent ("CO₂e") for the 2026 tax period and is scheduled to increase annually under
section 5 of the Carbon Tax Act, reaching R462 per tonne in 2030.
46
Table of contents
The Carbon Tax Act provides various allowances that reduce carbon tax liability, subject to the relevant emissions category
and qualifying conditions. Using combined allowances of 60% to 95%, the illustrative effective tax at the 2026 statutory rate
ranges from R15.40 to R123.20 per tonne of CO₂e before allowances. The effective tax applicable to our operations depends on
the allowances for which those operations qualify. Phase 2 commenced on 1 January 2026, with the basic allowance retained,
the voluntary carbon-budget allowance discontinued after 2025, and carbon-offset allowances increased for relevant activities.
Regulations governing the performance allowance, trade-exposure allowance and carbon offsets have been promulgated.
The Carbon Offset Regulations have subsequently been amended, including by regulations gazetted on 14 March 2025 and
deemed effective from 1 January 2024.
It is expected that the Carbon Tax Act will be aligned with the Climate Change Act through higher rates of carbon tax in
respect of emissions exceeding an entity's applicable carbon budget. It is not yet clear to what extent the allowances currently
embedded in the carbon tax framework will remain available. For further discussion see Item 3D: “Key Information – Risk
Factors – Risks Related to Climate, Environment and Social Licence – Decarbonisation, carbon pricing and emerging climate
regulation may increase costs and capital requirements” and Item 5: “Operating and Financial Review and Prospects –
Operating Results – Key factors affecting our results – Climate Change, Environmental Factors and Carbon tax”.
Climate Change Act
The Climate Change Act was signed into law on 23 July 2024. The Act came into effect on 17 March 2025 by the
President’s proclamation in the Government Gazette. However, the commencement of certain provisions of the Climate Change
Act has been deferred to a later date. As the deferred provisions are numerous, the Act remains largely inapplicable to many key
areas. The reason for deferring these specific provisions is that the DFFE is developing a set of regulations that will enable
implementation of these provisions. Some of the draft regulations are at an advanced stage of development and are expected to
be published for public input and comment soon.
The Climate Change Act confirms that sectoral emissions targets ("SETs") will be set for GHG emitting sectors and sub-
sectors which shall be reviewed and revised every five years. It is anticipated that the SETs will become more stringent over
time. The Environment Minister must identify GHG emitting activities and permissible GHG emission thresholds above which
entities will be allocated a carbon budget and need to submit a GHG mitigation plan. It is anticipated that transitional
arrangements will be developed which mirror the approach adopted under the Minimum Emissions Regulations published under
NEMAQA.
Carbon budgets set out the GHG that may be emitted. At the time the carbon budget is allocated, all pollution prevention
plans contemplated under the NEMAQA and the National Pollution Prevention Plans Regulations, 2017 will be deemed to be a
GHG plan for the first five-year cycle. The person to whom a carbon budget is allocated must implement the GHG plan, monitor
compliance with the GHG plan and evaluate and report their performance in terms of the GHG plan. If the report indicates that
the person failed, is failing or will fail to comply with the carbon budget, it will need to provide a description of the measures it will
implement in order to remain within the carbon budget.
The Environment Minister may declare certain GHGs to be synthetic GHGs and specify if these must be phased out or
phased down and the timeframes within which this must be achieved. One particular concern is that organs of state must review
and if necessary amend “decisions” to ensure that the risks of climate change impacts and associated vulnerabilities are taken
into consideration and to give effect to the principles and objects of the Climate Change Act in a review. These decisions may
include existing administrative decisions such as environmental authorisations, atmospheric emissions licences, mining or
production rights and tenders granted to bidders under power procurement programmes for coal or gas. Before amending these
decisions, the relevant organ of state must give the holder of such consents, approvals or awards (the "Consents"):
(i)adequate notice of the proposed amendments to or withdrawal of Consents pursuant to the review; and
(ii)a reasonable opportunity to make representations regarding the amendments or withdrawal. If the relevant organs of
state fail to undertake the review, third parties such as NGOs, may seek to compel these organs of state to undertake
the review in respect of particular Consents or classes of Consents. The proposed amendments to the Consents may
have material implications on existing business and operations and may have an adverse effect on investment.
Laws and Regulations Pertaining to Environmental Protection – Australia
Queensland
The Environmental Protection Act 1994 (Qld) ("EP Act") is the principal environmental legislation in Queensland and
establishes the framework for environmental management, environmental assessment and regulation of environmentally
relevant activities ("ERAs"). The EP Act seeks to protect Queensland's environmental values while supporting ecologically
sustainable development through the prevention, minimisation and management of environmental harm. 
Environmental Authority ("EA") EPML00899613 for the Eva Copper Mine Project is granted under the EP Act and
authorises the conduct of mining activities and associated ERAs.
New South Wales
The Environmental Planning and Assessment Act 1979 (NSW) ("EP&A Act") and the Protection of the Environment
Operations Act 1997 (NSW) ("POEO Act") form the principal environmental legislation in New South Wales. Together these Acts
establish the framework for environmental assessment and environmental management. The EP&A Act and POEO Act seek to
protect New South Wales's environmental values while supporting ecologically sustainable development through the prevention,
minimisation, and management of environmental harm and pollution.
CSA is authorised to conduct mining activities through Development Consent No. 31:95 ("DA 31:95") granted under the
EP&A Act and Environment Protection Licence ("EPL") 1864 granted under the POEO Act.
47
Table of contents
Federal
The Environment Protection and Biodiversity Conservation Act 1999 (Cth) ("EPBC Act") is administered by the
Commonwealth Department of Climate Change, Energy, the Environment and Water and provides a legal framework to protect
and manage Australia’s plants, animals, habitats and places that are under threat. The EPBC Act covers nine protected matters
of National Environmental Significance ("MNES"):
•world heritage areas
•national heritage places
•wetlands of international importance (listed under the Ramsar Convention)
•listed threatened species and ecological communities
•listed migratory species (protected under international agreements)
•Commonwealth marine areas
•Great Barrier Reef Marine Park
•nuclear actions (including uranium mines)
•water resources (that relate to coal seam gas development and large coal mining development).
Under the EPBC Act, a person proposing to take an action that has, will have, or is likely to have a significant impact on an
MNES must refer the proposed action to the Commonwealth Minister for the Environment and Water (or their delegate) for
consideration. Following referral, the Commonwealth Minister determines whether the action is a controlled action requiring
assessment and approval under the EPBC Act, is not a controlled action, or is not a controlled action provided it is undertaken in
a particular manner. Where a controlled action determination is made, the action must undergo assessment under the EPBC Act
and receive approval before it can proceed.
The EPBC Act also protects the environment when actions are taken:
•on Commonwealth land or impact upon Commonwealth land
•by an Australian Government agency anywhere in the world
•that impact Commonwealth heritage places overseas.
To inform whether the Eva Copper Mine Project should be referred to the Commonwealth Minister for the Environment and
Water for a controlled action determination, a number of EPBC Act self‑assessments have been undertaken throughout project
definition and development.
These self-assessments concluded that the Eva Copper Mine Project was unlikely to have a significant impact on the three
EPBC Act-listed species that were known, or have potential to occur, within the Project area based on the available information
at the time. In March 2026, a Northern Blue-tongued Skink, "critically endangered" under the EPBC Act was identified during
vegetation clearing within the Project area. All clearing activities were suspended while further investigations were undertaken.
As an outcome of this review, it was determined that the Eva Copper Mine Project has the potential for a significant impact on
biodiversity related MNES, specifically listed threatened species and listed migratory species under Section 18 and Section 20
of the EPBC Act, respectively. As such, a decision was made to refer the Eva Copper Mine Project to the Commonwealth
Minister for the Environment and Water for consideration under the EPBC Act. The Eva Copper Mine Project was referred under
the EPBC Act in July 2026 (reference EPBC 2026/10587) and August 2026 (reference EPBC 2026/10616).
CSA is not subject to any approval issued under the EPBC Act.
The Commonwealth Environmental Offsets Policy 2012 provides the framework for the use of environmental offsets under
the EPBC Act. The policy applies where a proposed action is determined to have a significant impact on MNES after all
reasonable avoidance, mitigation and management measures have been considered and implemented.
Under the policy, offsets must be directly related to the impacted MNES and provide a conservation gain that is additional
to existing obligations and outcomes that would have occurred in the absence of the offset. Offset measures must be effective,
scientifically robust, legally secured, and capable of being monitored and enforced for the duration necessary to achieve the
intended conservation outcome.
The Commonwealth Offset Assessment Guide supports implementation of the policy by providing a standardised method
for quantifying residual impacts and calculating offset requirements for threatened species and ecological communities. Where
significant impacts are identified, the guide is used to determine the scale and nature of offset measures necessary to achieve
compliance with the EPBC Act.
The Australian Government is undertaking a substantial reform of the EPBC Act in response to recommendations from the
2020 Independent Review of the EPBC Act (the Samuel Review). The reforms are intended to strengthen environmental
protection, improve transparency and accountability, streamline assessment and approval processes, and support the Australian
Government's broader "Nature Positive" agenda. In November 2025, the Australian Parliament passed the Environment
Protection Reform Act 2025 (Cth) and related legislation, introducing significant amendments to the EPBC Act.
A key element of the reforms is the establishment of a revised national environmental regulatory framework including
National Environmental Standards. The Standards are intended to provide clear, consistent and measurable requirements for
environmental assessment, decision‑making, approval conditions, compliance and environmental outcomes. The Standards will
apply to a range of matters, including environmental assessment processes, restoration outcomes, compliance and
enforcement, and engagement with First Nations peoples. 
48
Table of contents
The reforms also provide for the establishment of new Commonwealth environmental institutions, including the National
Environmental Protection Agency ("NEPA"). The NEPA was established on 1 July 2026.
The National Greenhouse and Energy Reporting Act 2007 (Cth) ("NGER Act") establishes the legislative framework for
reporting GHG emissions, energy production, energy consumption and GHG projects by corporations in Australia. The NGER
Act makes registration and reporting mandatory for corporations whose energy production, energy use or GHG emissions meet
specified thresholds. Thresholds apply at facility-level and corporate group level. Facilities or controlling corporations that
exceed specified thresholds must register and report annually to the Australian Clean Energy Regulator. Entities must follow
detailed guidance for estimating and reporting GHG emissions, energy production and energy consumption. This guidance is
codified in the NGER (Measurement) Determination 2008, which outlines the methodologies and standards for compliance.
Disclosures under the NGER Act underpin Australia's climate policy and international reporting obligations and support the
Safeguard Mechanism, which provides a framework for Australia's largest emitters to measure, report and manage their
emissions. Key risks associated with non-compliance with the NGER Act include enforcement action by the Clean Energy
Regulator, civil penalties (including fines and public enforcement notices), adverse audit findings and regulatory scrutiny, and
reputational risk associated with inaccurate or incomplete reporting, noting that NGER data are publicly disclosed if above the
publication threshold (currently 50,000 tonnes of CO2-e).
In addition to GHG and energy reporting obligations, the NGER Act requires large facilities, whose net emissions exceed
the Safeguard Mechanism threshold, to keep their emissions at or below emissions baselines. The Safeguard Mechanism
applies to facilities with scope 1 covered emissions of more than 100,000 tonnes of CO2-e per year. Reforms to the Safeguard
Mechanism came into effect on 1 July 2023 which apply a decline rate to facilities’ baselines so that they are reduced
predictably and gradually over time on a trajectory consistent with achieving Australian Government’s emission reduction targets
of 43% below 2005 levels by 2030, 62-70% below 2005 levels by 2035, and net zero by 2050.
Harmony retains its ambition to achieve net zero by 2045. Harmony currently has Science Based Targets approved by the
Science Based Targets initiative ("SBTi") covering Scope 1 and Scope 2 emissions, together with an ambition to achieve net
zero by 2045. In line with the evolving SBTi Net Zero Standard, Harmony recognises that Scope 3 emissions may represent a
material portion of its total emissions footprint and may need to be incorporated into future target setting. As part of our Net Zero
action plan, Harmony is progressing a comprehensive Scope 3 emissions assessment across global operations and
strengthening the completeness of its Scope 1 and 2 inventories across regions including in Australasia. Harmony intends to
update and resubmit targets to the SBTi, if required, once the evidence base and governance processes are complete.
HGA will commence reporting under the NGER Act from fiscal 2026, with reporting obligations triggered by the acquisition
of CSA. The NGER reporting boundary includes all controlled Australian operations, and as the Eva Copper Project progresses
towards operations, relevant emissions and energy data will be incorporated into Harmony's annual NGER reporting. Projected
GHG emissions have also been quantified as part of the feasibility study to support emissions forecasting and the assessment
of potential future Safeguard Mechanism obligations.
HGA is subject to mandatory climate-related reporting under the Australian Sustainability Reporting Standards ("ASRS"),
including Australian Accounting Standards Board ("AASB") S2 Climate-related Disclosures, from fiscal 2026. These
requirements extend beyond GHG emissions reporting and require disclosure of climate-related governance, strategy, risks and
opportunities, risk management processes, anticipated financial effects, climate resilience, transition planning, and climate-
related metrics and targets.
In preparation for its first mandatory disclosure, Harmony has undertaken a substantial programme of work, including
establishing climate governance arrangements, completing climate risk and opportunity assessments and scenario analysis,
developing its emissions inventory, and strengthening climate-related reporting processes and controls. Further enhancements
are continuing in areas including integration of climate risks into business processes, financial quantification, transition planning,
scope 3 emissions and assurance readiness.
A transitional Progressive Rehabilitation and Closure Plan has been prepared for the Eva Copper Project pursuant to
section 754 of the EP Act. This plan outlines how the project will progressively rehabilitate and eventually close the site after
mining activities have concluded. The plan is under review by the regulator.
In addition, in accordance with the EP Act, it is a condition of an EA for a resource activity that the holder must not carry
out, or allow the carrying out of, a resource activity under the authority unless:
•an Estimated Rehabilitation Cost ("ERC") decision is in effect for the resource activity when the activity is carried out;
•the holder has paid a contribution to the scheme fund or given a surety for the authority under the Mineral and Energy
Resources (Financial Provisioning) Act 2018 (Qld) (the "MERFP Act"); and
•the holder has complied with the requirements under the MERFP Act for paying a contribution to the scheme fund, or
giving a surety for the authority, as required from time to time.
An ERC decision and associated surety are currently in place for activities being undertaken in relation to the relevant
mining leases. Revised ERC applications will need to be prepared and determined from time to time to authorise disturbance
activities prior to the commencement of further construction and mining activities. As progressive rehabilitation is completed, the
ERC may be adjusted to reflect the reduced liability.
Sustainability-related disclosures and claims are subject to the general prohibitions against misleading and deceptive
conduct under the Corporations Act 2001 (Cth) and the Australian Securities and Investments Commission Act 2001 (Cth).
These provisions apply to both mandatory climate-related disclosures and voluntary sustainability statements made in investor
communications, product disclosures, websites, and other public materials. Australian Securities and Investments Commission
("ASIC") Regulatory Guide 280 – Sustainability Reporting (RG 280) outlines ASIC's expectations for entities making
49
Table of contents
sustainability claims, including the requirement that such claims be factually accurate, based on reasonable grounds, and
supported by verifiable evidence. ASIC also refers entities to Information Sheet 271 – How to Avoid Greenwashing, which
provides practical guidance on substantiating sustainability-related representations. ASIC has emphasised that sustainability
claims must be clear, not overly broad or unqualified, and must reflect actual investment practices or operational realities.
Misleading claims may expose entities and their officers to enforcement action, reputational damage, and stakeholder litigation.
We will also continue to be subject to the ASRS which came into effect in January 2025 – refer to Item 3D: "Risk Factors –
Risks Related to Climate, Environment and Social Licence – Climate change presents material physical risks to our operations
and long-term value creation".
Laws and Regulations Pertaining to Environmental Protection – Papua New Guinea
The PNG Environment Act and various related regulations and guidelines regulate the impact of industry and other
activities on the environment and set out the environmental permitting requirements for developments, including mining projects.
The PNG Environment Act regulates discharges to air, land and water, and sets out the requirements for proponents to obtain
an EP for the construction, operation and closure of prescribed activities having the potential to cause environmental harm. In
most cases, a single, project-comprehensive EP is issued by the Managing Director of CEPA under the provisions of the PNG
Environment Act, and an annual administration fee is payable for this permit.
Under the PNG Environment Act proposed activities can be classified as Level 1, Level 2 or Level 3. The PNG
Environment Act requires a person or company that intends to carry out a proposed Level 3 activity to prepare and submit a
Notice of Intent and an Environmental Inception Report ("EIR"). This requirement should be fulfilled prior to carrying out a
detailed environmental impact assessment and submitting an environmental impact statement ("EIS"). The EIR is intended to
identify, at an early stage, potential environmental impacts that need to be addressed. It is effectively a scoping document for the
preparation of the EIS, and also assists with commencement of the essential consultation process with all relevant stakeholders.
An EIS is required for activities that are likely to have a significant adverse impact on the environment and other socio-
economic and/or cultural heritage aspects. This EIS must be lodged with CEPA for assessment, which includes a public review
and referral phase. For large projects, the review process may also involve an independent peer review.
An EIS provides full documentation of all environmental and social issues and commits the proponent to the employment
of relevant mitigation measures in relation to the development activity. Typically, it addresses such matters as:
•overview of proposal;
•description of proposed activity;
•characteristics of receiving environment (physical, biological and social);
•waste minimisation; and
•environmental management, monitoring and reporting.
The PNG Government uses the EIS in accordance with statutory processes as the means to assess a project's impacts
and benefits, and to decide whether the PNG Environment Minister should grant approval in principle for the project under the
PNG Environment Act. Thereafter, the Managing Director of CEPA may grant a Level 3 environment permit for the activity. The
EP presents the conditions with which we must comply, and reports outlining our performance against each condition are
provided to CEPA annually.
In 2010, the PNG Government engaged the Scottish Association for Marine Science ("SAMS") to conduct an independent
assessment of DSTP systems in PNG with consideration to international best practice, and to prepare the guidelines resulting
from this assessment (referred to as "SAMS 2010"). SAMS 2010 are referenced in the PNG Government’s Terms of Reference
for an EIS for DSTP projects.
An EIS was submitted to CEPA on 25 June 2018 and an EP for the Wafi-Golpu Project was issued on 18 December 2020.
An EP is generally a single, project-comprehensive document which presents all the conditions with which we must comply, and
the issued permit includes conditions relating to DSTP. An annual administration fee is payable and reports outlining our
performance against each condition must be provided to CEPA annually.
Australian National Contact Point for Responsible Business Conduct ("AusNCP") complaint
In November 2022, Huon Gulf coastal villagers represented by the Centre for Environmental Law and Community Rights
Inc. ("CELCOR") lodged a complaint with AusNCP against HGA and Newcrest Mining Limited ("Newcrest"). The complaint
alleged that certain activities associated with the proposed Wafi-Golpu Project, particularly the proposed use of DSTP, did not
comply with various human rights, environmental and disclosure requirements under the OECD Guidelines.
On 29 August 2025, the AusNCP Independent Examiner published a final statement following its examination of the
complaint. The Independent Examiner found that certain activities appeared not to align with the OECD Guidelines in some
areas, including aspects of human rights due diligence, environmental due diligence and certain disclosure practices, and made
a number of recommendations. The Independent Examiner did not find all matters raised in the complaint to be inconsistent with
the OECD Guidelines.
The AusNCP process is a non-judicial grievance mechanism and its recommendations are not legally binding.
Nevertheless, the findings and recommendations may affect stakeholder perceptions of the project and expectations regarding
environmental and human rights due diligence, disclosure and stakeholder engagement. HGA continues to assess the findings
and recommendations and their implications for the project.
50
Table of contents
Actual or perceived failure to address the recommendations adequately could adversely affect stakeholder confidence, the
project’s reputation and social licence to operate, and engagement with communities, government authorities, investors and
potential financiers.
The PNG Mining Act and PNG Environment Act do not deal expressly with mine closure and environmental rehabilitation,
which matters are dealt with by means of PNG MRA and CEPA policies. The existing closure policy is the “Mining Project
Rehabilitation and Closure Guidelines” issued in 2019, which stipulates “It is a primary duty of a tenement holder to plan,
implement and fund mine and mine-related site rehabilitation and closure in accordance with the principles of sustainable
development, including preventative measures for the protection of the environment, communities, and human and wildlife
health and safety”. The policy envisages:
•early and continuous mining project rehabilitation and closure planning;
•early development and tabling of a rehabilitation and mine closure plan and regular updating of the plan over the life of the
mine; and
•tenement holders will provide adequate and accessible financial assurance for implementing mining project closure
obligations that is supported by independent expert review. This assurance can take various forms, including letters of
credit, securities and guarantees and trust funds, alone or in combination.
Cultural heritage sites are protected under the PNG Conservation Areas Act 1978, which regulates the conservation of
sites having particular historic, scientific and social importance in coordination with the provisions of EPs issued under the PNG
Environment Act, and archaeological permits issued by the PNG National Museum and Art Gallery.
Potential Changes to Papua New Guinea Environment Laws
A process of mining regime review is underway within PNG and a number of environmental matters are under
consideration. These include a Biodiversity Offset Policy (which anticipates biodiversity offset payments to support biodiversity
incentives) and a National Oceans Policy.
Harmony's operations and projects in PNG will potentially be affected by changes to PNG environmental laws, and
Harmony continues to engage with the PNG Government on these matters through the offices of the PNG CORE and directly
with CEPA and the PNG MRA in relation to PNG mining legislation, mining leases and mine closure planning. See Item 3D:
“Risk Factors – Risks Related to Climate, Environment and Social Licence – Environmental liabilities, rehabilitation obligations,
biodiversity requirements and closure costs may be materially higher than expected" and "– A tailings facility failure could have
far-reaching consequences, and adverse developments concerning the proposed DSTP at Wafi-Golpu could materially
adversely affect the project and our business”.
Labour Relations
South Africa
Approximately 94% of employees in South Africa are represented by recognised trade unions. Recognition is governed by
legislation and Company policy regulating trade union recognition. In South Africa, Harmony operates in a multi-union
environment: five unions are active at Company level representing employees. The unionised employees are represented by the
National Union of Mineworkers, representing 51% of employees, followed by, Association of Mineworkers and Construction
Union, representing 30% of employees, the National Union of Metalworkers of South Africa representing 6% of employees,
United Association of South Africa representing 5% of employees, Solidarity representing 2% of employees in the Company,
whilst 6% are not unionised. Conditions of employment and wages for employees in the bargaining unit are the outcome of
collective bargaining with unions. A five-year wage agreement was signed with unions on 4 April 2024.
Employee relations in South Africa are dynamic and are based on inclusion and collaboration that are regulated by
employment legislation, most notably the Labour Relations Act, 66 of 1995, the Basic Conditions of Employment Act, 75 of 1997,
the Employment Equity Act, 55 of 1998 (and its regulations), collective agreements as well as internal human resources and
related policies. See “Integrated Annual Report for the 20-F 2026 – Sustainability performance – Engaged workforce” on pages
103 to 118.
Australia
Employment and industrial relations for most private-sector employees in Australia, including our Australian workforce, are
regulated principally by the Fair Work Act 2009 (Cth) and associated regulations. The federal framework establishes minimum
employment conditions through the National Employment Standards, the national minimum wage, applicable modern awards
and enterprise agreements. It also regulates collective bargaining, union representation, protected industrial action, unfair
dismissal, workplace rights and certain labour-hire arrangements. Employment contracts operate subject to these statutory
minimum standards and any applicable award or enterprise agreement. The Fair Work Commission administers the national
workplace relations system, including approving enterprise agreements and dealing with bargaining and industrial disputes,
while the Fair Work Ombudsman monitors and enforces compliance.
Employees engaged in mining operations may be covered by the Mining Industry Award 2020 or an applicable enterprise
agreement. Certain employees at CSA are covered by the Cobar Management Pty Limited Operations Enterprise Agreement
2024, which regulates matters including remuneration, leave, overtime and other employment conditions. A portion of the CSA
workforce has also historically been represented by the Australian Workers’ Union.
51
Table of contents
In Queensland, there are a number of well-established mining trade unions, particularly in the coal and energy sectors. At
present, our workforce at the Eva Copper Project is not unionised. However, if the Eva Copper Project moves into the
development and operational phases, we expect a portion of its workforce to become unionised. Unions could also initiate
enterprise bargaining under the Fair Work Act 2009 (Cth), or the Industrial Relations Act 2016 (Qld), which is a formal process in
which an employer and a group of employees (usually represented by unions) negotiate a legally binding enterprise agreement.
Papua New Guinea
Employee relations in PNG are regulated by the PNG Employment Act of 1978 and the PNG Employment of Non-Citizens
Act 1978. Individual contracts are entered into, and the workforce is not unionised. Wages are guided by independent market
research that compares mining, oil and gas companies in the region.
The Papua New Guinea National Content Policy for Resource Sectors 2023, administered by the PNG Department of
Commerce and Industry, includes a policy area relating to employment opportunities for Papua New Guineans.
Industrial relations at Hidden Valley have been established through regular dialogue between management and employees
via the Employee Relations Committee. In addition, Hidden Valley mine employment is guided by the Employment and Training
Plan appended to the Hidden Valley MOA dated August 2005 between Morobe Consolidated Goldfields Limited, the PNG
Government, provincial and local governments and the Landowner Association. The Hidden Valley MOA requires that, as far as
is reasonably possible, preference in training and employment is given to local and landholder candidates before individuals
from other provinces or countries. Compliance with this agreement is a critical issue in maintaining Hidden Valley mine’s licence
to operate.
Intellectual Property
Harmony is not dependent on intellectual property (including patents or licences), industrial, commercial or financial
contracts (including contracts with customers or suppliers) or new manufacturing processes for the conduct of its business as a
whole.
Seasonality
Subject to other factors and unforeseen circumstances, in the third quarter production is generally lower than production
during the rest of the year as a result of the ramp-up of operations after annual holiday production declines.
Raw Materials
Harmony uses chemicals, including cyanide, hydrochloric acid and caustic soda, as key reagents in the production of gold.
These chemicals are available from a limited number of suppliers and with the exception of cyanide do not represent a material
portion of the Company’s costs. Given the challenges associated with suppliers, ageing production plants and reliability thereof,
Harmony is currently experiencing continued interrupted supply of the foregoing stated reagents as well as other critical
consumables utilised in the production of gold across our global operations. The latter has negatively impacted Harmony’s
purchasing power and security of supply. As a result of sourcing from third-party raw materials suppliers importing consumables
internationally, the security of supply is at a higher premium. Additionally, our stocking strategies account for potential lead time
variation and supply constraints, thus minimising the risk of changes in the marketplace. While commodity pricing is subject to
volatility over time, we believe our contractual terms which include rise and fall clauses are dynamic enough to mitigate the
market movement volatility.
Global commodity markets experienced a historic shock following the outbreak of the war in the Middle East, which caused
significant disruptions to energy and fertilizer supplies after the effective closure of the Strait of Hormuz in February 2026. The
resulting supply shortages, combined with geopolitical uncertainty and shipping disruptions, have driven commodity prices
higher and increased volatility across global markets. In the precious metals market, gold, silver, and platinum prices surged in
January 2026 amid heightened geopolitical tensions and strong speculative demand. However, prices subsequently moderated
due to profit-taking, reduced exchange-traded fund inflows, and declining interest-rate expectations. The industrial metals
market reflected an increase in most commodities, with aluminium prices reaching a multi-year high during the first quarter of
2026, while copper, tin and zinc prices also increased due to supply disruptions caused by the war. Nickel prices also trended
upwards amid a policy shift in Indonesia, a key producer of the industrial metal. However, lead prices decreased amid high
global inventories, while the decline in iron ore prices was mainly driven by weak demand growth amid China’s prolonged
property sector downturn and lower global construction activity. In addition, industrial metal prices are expected to remain under
upward pressure due to higher energy and input costs, supply-chain disruptions, and uncertainty surrounding global economic
growth. Base metal prices could increase more than previously anticipated amid inflexible supply and resilient demand, while
aluminium supplies face additional risks because the Gulf region is an important source of global production. The energy market
has experienced substantial price increases as a result of the conflict and restrictions on shipments through the Strait of
Hormuz, a critical passage for global oil and liquefied natural gas supplies. Brent crude oil prices increased amid substantial
supply shortages as a direct result of the war in the Middle East. Natural gas prices have also increased sharply in Asia and
Europe as competition for alternative supplies intensified following a notable decline in exports from the Middle East.
Furthermore, soft commodity prices are also exposed to rising production and transportation costs, particularly through higher
fertilizer prices and disruptions affecting key agricultural inputs. Additional pressures to food prices include the ongoing El Nino
event which poses great climate risks and is expected to strengthen through late 2026 and persist into early 2027, and the
decline in humanitarian funding in 2026. These pressures could contribute to higher food prices and intensify inflationary risks,
especially in import-dependent economies. Overall, the outlook for commodity markets in 2026 is characterised by heightened
volatility, elevated prices, and substantial uncertainty, with future developments depending largely on the duration of the conflict,
the extent of damage to Middle Eastern production capacity, and the speed at which shipping volumes through the Strait of
Hormuz return to normal. See Item 3D: "Key Information – Risk Factors – Risks Related to Commodity Prices, Cash Flow and
Financial Performance – Inflationary pressures and escalating input costs may erode profitability and reduce future returns".
52
Table of contents
Land Expropriation
South Africa
In December 2017, during its national conference, the African National Congress ("ANC") resolved that as a matter of
policy, the ANC should pursue the expropriation of land without compensation, provided that such expropriation is carried out
without destabilising the agricultural sector, endangering food security or undermining economic growth and job creation. In
February 2018, the National Assembly assigned the Constitutional Review Committee ("CRC"), to review section 25 of South
Africa’s Constitution and other relevant clauses to make it possible for the state to expropriate land in the public interest without
compensation. On 4 December 2018, South Africa’s Parliament adopted the CRC’s report dated 15 November 2018 in which it
recommended that section 25 of South Africa’s Constitution be amended to make explicit that expropriation of land without
compensation is a legitimate option for land reform. On 13 March 2019, the CRC announced that the work to amend section 25
of South Africa’s Constitution would not be finished before the South African general elections in May 2019 and that
consequently the matter would be taken up by Parliament after the elections.
The Draft Constitution Eighteenth Amendment Bill was published for comment at the end of 2019. The aim of the Draft
Constitution Eighteenth Amendment Bill is to amend the Constitution of South Africa, 1996 so as to provide that where land and
any improvements thereon are expropriated for the purpose of land reform, the amount of compensation payable may be nil.
The Draft Constitution Eighteenth Amendment Bill failed to receive the required two-thirds approval of the National Assembly in
December 2021 and the proposed Amendment Bill is no longer being pursued.
In 2019, prior to the introduction of the Draft Constitution Eighteenth Amendment Bill, a draft expropriation bill (the "Draft
Expropriation Bill") was published for public comment by the South African Minister for Public Works (the "Minister for Public
Works"), which would allow the state to expropriate land without compensation where doing so would be for a public purpose or
in the public interest. In determining to expropriate land without compensation, this legislation would also require the
consideration of “all relevant circumstances”, which include, among other things, whether the land is held purely for speculative
purposes, is owned by the state or is abandoned. Following significant comments raised by the public on the Draft Expropriation
Bill, in October 2020, a new draft expropriation bill (the "New Draft Expropriation Bill") was introduced by the Minister for
Public Works of South Africa. The New Draft Expropriation Bill was approved by the National Assembly on 28 September 2022.
On 19 March 2024, the NCOP passed the New Draft Expropriation Bill but resolved to return the New Draft Expropriation
Bill to the National Assembly with proposed amendments. Following a meeting of the National Assembly, the amended New
Draft Expropriation Bill was published and sent to the President on 27 March 2024 for assent into law.
On 24 January 2025, the Expropriation Act, was assented to by the President of South Africa and has been signed into law.
However, the date for its commencement via proclamation in the Government Gazette has not yet been set. The Expropriation
Act allows the South African Government, subject to due process being followed, to expropriate land without compensation
where doing so would be for a public purpose or in the public interest. Pursuant to section 12(3) of the Expropriation Act, land
which falls within one of the following categories may be subject to expropriation without compensation:
•land not in use, with the owner’s primary purpose not being development or income generation, but benefiting from
appreciation in market value;
•land held by an organ of state, not used for core functions, not reasonably likely to be needed for future activities, and
acquired without consideration;
•land which the owner has abandoned by failing to exercise control over it despite being reasonably capable of doing so;
and
•land where the market value is equivalent to or less than the present value of direct state investment or subsidy in its
acquisition and beneficial capital improvement.
The Expropriation Act has been the subject of various different constitutional challenges and is unlikely to enter into force
before these challenges have been disposed of. AfriForum NPC and IRR Legal NPC filed papers with the Western Cape
Division of the High Court challenging the constitutionality of certain provisions of the Expropriation Act, seeking an order
declaring sections 12(3), 12(4) and 19(8) of the Act unconstitutional and severing them from the Act, together with appropriate
relief in respect of the admitted drafting error in sections 19(2) and 19(3) of the Act, or such other relief as the court considers
appropriate. IRR Legal’s challenge is directed mainly at sections 12(2)(e), 12(3)(a) to (d) and 12(4) of the Act, on its own basis
for contending that these provisions are unconstitutional. The Democratic Alliance ("DA") also challenged the Expropriation Act
on both substantive and procedural grounds. On the procedural front, the DA contends that “the process of adopting the Act did
not conform to the Constitution, as five of the seven provinces did not vote in the manner prescribed by law and regulation”.
On the substantive front, the DA contends that “the Act is vague and contradictory in several clauses, which renders it
unconstitutional”. Vaderland Stigting (Case No 2025-971785) also filed papers with the High Court.
The matters were heard simultaneously by a full bench of the Western Cape High Court between 3 and 7 August 2026.
These matters are being defended by the Speaker of the National Assembly, Thoko Didiza, President Cyril Ramaphosa, and the
Economic Freedom Fighters ("EFF").
Other parties that have been involved include the Emperor Thembu 2nd Votani Majola, the Free Market Foundation’s Rule
of Law Project and the Association for Rural Advancement, all of whom have been admitted as amici curiae.
Irrespective of how these arguments are resolved, if the applicants are successful on constitutional grounds and the
relevant provisions are declared unconstitutional, this would need to be confirmed by the Constitutional Court, and the decision
would likely be appealed by the respondents. Should the respondents be successful instead, a similar outcome is likely, as the
applicants would then be expected to appeal. Accordingly, the matter is likely to be several months, if not years, away from
reaching finality.
53
Table of contents
In principle an expropriation of land could be supportive of mining and could be used to assist in securing land rights for the
purposes of mining. This, however, is generally unnecessary as section 5(3) of the MPRDA provides a statutory right of access
for the mining right holder to the mining area for the purposes of conducting mining operations and does not require the holder
to own the land on which it conducts operations. The expropriation of land on which mining activities are conducted would not
have any impact on existing mining rights held over the land but may introduce additional parties with whom access rights must
be negotiated or enforced in a court of law, premised on the rights in section 5 of the MPRDA.
Nationalisation of mines
There is no stated intention to use the Expropriation Act or other existing expropriation rights to expropriate mining rights or
mining land with or without compensation. In this regard the constitutional right in section 25 would require any such
expropriation to take place by a law of general application, not be arbitrary, be for a public purpose or in the public interest and
follow a fair procedure, and be subject to compensation that is just and equitable, reflecting an equitable balance between the
public interest and the interests of those affected and having regard to all relevant circumstances, including the current use of
the property, the history of its acquisition and use, its market value, the extent of direct state investment or subsidy in its
acquisition and beneficial capital improvement, and the purpose of the expropriation.
While the South African government has stated that it does not intend to nationalise mining assets or mining companies,
certain political parties have at certain points in the past stated publicly and in the media that the government should embark on
a programme of nationalisation.
In this regard two minority political parties, namely the EFF and the uMkhonto weSizwe Party ("MKP"), are the primary
political parties in South Africa that currently support the nationalisation of mines.
The ANC, which since 2024 has governed in coalition with other parties including the DA, has rejected the possibility of
mine nationalisation for now. It has, however, adopted two recommended approaches to interacting with the mining industry
which may be interpreted as at odds with private sector investment. The first approach contemplates, among other things,
greater state intervention in the mining industry, including the revision of existing royalties, the imposition of new taxes, royalty
tax and an increase in the South African government’s holdings in mining companies. The second approach contemplates the
South African government taking a more active role in the mining sector, including through the introduction of a state mining
company to be involved in new projects either through partnerships or individually.
Taxation
South Africa
In 2015 and 2017, the Davis Tax Committee, appointed by the then-President to review South Africa's tax regime, issued
interim and final reports recommending changes to the mining tax regime, including discontinuing the upfront capital expenditure
write-off in favour of an accelerated depreciation regime, retaining the so-called "gold formula" for existing gold mines only, and
phasing out additional capital allowances available to gold mines to align the gold mining tax regime with the general corporate
tax system. As at 30 June 2026, National Treasury has not adopted, formally rejected, or otherwise acted on these
recommendations. If any such recommendations are adopted as legislation they could have a material adverse effect on our
business, results of operations and financial condition.
The Taxation Laws Amendment Act, 23 of 2020 ("2020 Taxation Laws Amendment Act"), which came into force on 20
January 2021, addressed certain proposals contained in the Draft Taxation Laws Amendment Bill, 2020. However, the 2020
Taxation Laws Amendment Act did not include the Draft Taxation Laws Amendment Bill, 2020's proposed restrictions on contract
miners' use of the accelerated capital expenditure allowance or the proposed elimination of the Minister of Finance's discretion
to uplift the ring-fencing of capital expenditure on a per mine basis. No substitute legislation addressing these specific proposals
has been introduced since the Act came into force.
Assessed Losses
In South Africa, to the extent that the balance of assessed loss exceeds 80 percent of current-year taxable income,
companies are able to set off the higher of R1 million or 80 percent of taxable income when calculating their tax liability. Any
remaining assessed loss that is not utilised in any given year may be carried forward indefinitely as previously. This limitation
does not apply to assessed capital losses, which in most cases remain fully available for set-off against capital gains of the
taxpayer.
In the case of mining companies, the legislation has been clarified to state that the deduction of the mining capital
expenditure is calculated after the set-off of the assessed loss. The balance of unredeemed capital expenditure will be carried
forward to the following year of assessment.
If the current year’s taxable income calculation results in an assessed loss before taking into account an assessed loss
carried forward from the previous year of assessment, the loss limitation rule does not apply. In such a case the full amount of
the current year’s assessed loss is added to the previous year’s assessed loss and the entire aggregate balance of assessed
loss is carried forward to the following year of assessment. The restriction will not apply should a company have taken steps to
liquidate.
54
Table of contents
Base Erosion and Profit Shifting
The South African Government is fully committed to implementing the Inclusive Framework of the OECD relating to Base
Erosion and Profit Shifting developed by the OECD/G20 countries. Although South Africa is not a member country, it is an early
adopter of the relevant measures. Consistent with this approach, it has not only implemented and strengthened the rules
relating to the ability to deduct interest, but it has also widened the scope of the transfer pricing rules to include associated
enterprises. In addition, it also strengthened the laws relating to hybrid equity and hybrid interest and the returns from these
instruments.
South Africa is also a signatory to the Multilateral Convention to Implement Tax Treaty related Measures to Prevent Base
Erosion and Profit Shifting. In this context the Multilateral Instrument was incorporated into South African tax law with effect from
1 January 2023. Among other things South Africa adopted the Principal Purpose Test to deal with treaty abuse.
In addition, South Africa also signed the so-called Pillar 1 and Pillar 2 proposals that are aimed at reducing opportunities
for tax planning and tax avoidance for multinational entities by limiting tax competition and the jurisdictions in which taxes are
paid. Effectively Pillar 1 aims to allocate business profits based on actual business activities in a specific country, whereas Pillar
2 aims to establish a minimum global tax rate of 15%.
The Global Minimum Tax Act, 46 of 2024, became effective on 24 December 2024 and applies to Harmony's 2025 year of
assessment. Based on preliminary calculations using the June 2025 and March 2026 South African results, Harmony's South
African operations qualify for one of the safe-harbour provisions and no top-up tax is expected. The legislation enables South
Africa to impose a multinational top-up tax at a rate of 15% on the excess profits of in-scope multinational enterprise groups.
It applies where a group's consolidated annual revenue equals or exceeds €750 million in at least two of the preceding four
fiscal years, which threshold applies to the Group.
Australia has enacted similar legislation which was effective from the 2025 tax year. A preliminary analysis was undertaken
for PNG and Australia for the fiscal year 2026 and zero top-up tax is expected.
Renewable Energy
South Africa is not only committed to reduce the carbon footprint consistent with the OECD Guidelines, but it has also
introduced additional measures to increase the carbon tax over the next few years. In addition and to cater for constant load
shedding, it introduced measures to incentivise taxpayers to invest in renewable energy projects by allowing an allowance of up
to 125% if the project was brought into use before 1 March 2025. Although none of our projects were brought into use before
this date, the expenditure will still qualify for a 100% deduction in terms of the South African unredeemed capital expenditure
rules when brought into use. See “– Laws and Regulations Pertaining to Environmental Protection – South Africa” above.
C. ORGANISATIONAL STRUCTURE
Harmony is a holding company with its significant ownership interests organised as set forth in Exhibit 8.1 "Significant
Subsidiaries of Harmony Gold Mining Company Limited”.  Also see note 2.1 “Consolidation” of our consolidated financial
statements, set forth beginning on page F-1.
D. PROPERTY, PLANT AND EQUIPMENT
See “– Delivering profitable ounces – Performance by operation” on pages 29 to 67 of the Integrated Annual Report for the
20-F 2026 which is incorporated herein by reference. Also see note 14 “Property, Plant and Equipment” and note 32 “Additional
cash flow information” of our consolidated financial statements, set forth beginning on page F-1.
Also see Item 4: “Information on the Company – Business Overview – Regulation – Laws and Regulations Pertaining to
Environmental Protection - South Africa”, “– Laws and Regulations Pertaining to Environmental Protection - Australia", “– Laws
and Regulations Pertaining to Environmental Protection - Papua New Guinea"  and “–  Capital Expenditures” and Item 5:
“Operating and Financial Review and Prospects – Liquidity and Capital Resources".
55
Table of contents
MINERAL RESOURCE AND MINERAL RESERVE SUMMARY DISCLOSURE
Harmony is providing disclosure in compliance with Regulation S-K 1300 for its fiscal year ending 30 June 2026.
Harmony has developed a process to determine which properties are material to its business or financial condition for
purposes of the individual property disclosure requirements of Item 1304 of Regulation S-K 1300. The key considerations taken
into account by Harmony in its materiality assessment include qualitative and quantitative factors in the context of our overall
business and financial condition. The materiality assessment covers all of our mining properties (regardless of the stage of the
mining property) and all of our mining and related activities from exploration through extraction, and is reviewed by us on an
annual basis. Based on the above considerations, Harmony has determined that, as at 30 June 2026, its material properties for
purposes of Regulation S-K 1300 are Doornkop, Free State Surface Operations, Kalgold, Kusasalethu, Moab Khotsong,
Mponeng, Target, Tshepong North, Tshepong South, Mine Waste Solutions, Hidden Valley, Wafi-Golpu Project, the Eva Copper
Project and the CSA Mine. Following the assessment described above, Joel, which was classified as individually material in the
preceding annual report, is no longer considered individually material for purposes of Regulation S-K 1300. The individual
property disclosure concerning Joel and the incorporation by reference of its previously filed TRS are retained voluntarily to
provide continuity of information.
With respect to the CSA Mine, an initial TRS has been prepared by the relevant Qualified Person ("QP") and is filed as
Exhibit 96.15 hereto. With respect to Doornkop, Tshepong North,Tshepong South and the Eva Copper Project, updated TRSs
have been prepared by the relevant QPs and re-filed as Exhibits 96.9, 96.12, 96.13 and 96.14 hereto. With respect to
Free State Surface Operations, Joel, Kalgold, Kusasalethu, Moab Khotsong, Mponeng, Target, Mine Waste Solutions,
Hidden Valley and the Wafi-Golpu Project, Harmony has determined that, as at 30 June 2026 (i) there have not been any
material changes to the Mineral Resources or Mineral Reserves reported in the TRSs for these properties and (ii) all material
assumptions and information pertaining to the disclosure of the Mineral Resources and Mineral Reserves for Free State Surface
Operations, Joel, Kalgold, Kusasalethu, Moab Khotsong, Mponeng, Target, Mine Waste Solutions, Hidden Valley, and the
Wafi-Golpu Project, remain current in all material respects, based on all facts and circumstances, both quantitative and
qualitative. As a result, the previously filed TRSs for Free State Surface Operations, Joel, Kalgold, Kusasalethu,
Moab Khotsong, Mponeng, Target, Mine Waste Solutions, Hidden Valley and the Wafi-Golpu Project are incorporated by
reference as Exhibits 96.3, 96.2, 96.6, 96.8, 96.4, 96.5, 96.1, 96.7, 96.10 and 96.11, respectively, hereto.
Mineral Resources and Mineral Reserves are estimates that contain inherent risk and depend upon geologic interpretation
and statistical inferences drawn from drilling and sampling analysis, which may prove to be unreliable. For additional information
on the risks and uncertainties associated with Harmony’s mining properties, see Item 3D: "Key Information – Risk Factors".
Harmony’s South African operations include nine deep-level mines, an open pit mining operation and several surface
retreatment facilities. Combined, these account for gold Mineral Resources (exclusive of Mineral Reserves) of 65.1 million
ounces and gold Mineral Reserves of 21.2 million ounces at 30 June 2026.
Harmony has three underground mining operations in the West Rand: Doornkop, Kusasalethu and Mponeng. As at
30 June 2026, their combined Mineral Resources (exclusive of Mineral Reserves) were 26.1 million ounces and the combined
Mineral Reserves were 6.4 million ounces. Harmony has one underground mining operation in the Klerksdorp goldfield: Moab
Khotsong. As at 30 June 2026, the estimated Mineral Resources (exclusive of Mineral Reserves) were 4.9 million ounces and
the estimated Mineral Reserves were 3.2 million ounces. Harmony has five active underground mining operations in the Free
State: Joel, Masimong, Tshepong South, Tshepong North, and Target 1. As at 30 June 2026, their combined estimated Mineral
Resources (exclusive of Mineral Reserves) were 29.6 million ounces and the combined estimated Mineral Reserves were 2.9
million ounces.
Harmony has one open pit mine and several surface retreatment facilities in South Africa. These include Kalgold and 
various surface sources (marginal ore, Waste Rock Dumps ("WRDs") and tailings), available for retreatment in the Free State
(largely in the vicinity of Welkom), surface sources around Moab Khotsong (Mispah and Kop Paydam), that are available for
retreatment, Mine Waste Solutions, Vaal River and West Wits. As at 30 June 2026, their combined estimated Mineral Resources
(exclusive of Mineral Reserves) were 4.5 million ounces and the combined estimated Mineral Reserves were 8.7 million ounces.
In PNG, Harmony has one wholly-owned open-pit, gold and silver mine: Hidden Valley, and a 50% interest in the Wafi-
Golpu Project. As at 30 June 2026, our combined estimated attributable Mineral Resources (exclusive of Mineral Reserves) in
PNG totalled 10.4 million ounces of gold, 2.1 million tonnes of contained copper metal and 30.8 million ounces of silver. The
combined estimated attributable Mineral Reserves in PNG totalled 5.8 million ounces of gold, 2.3 million tonnes of contained
copper metal and 12.6 million ounces of silver.
In Australia, Harmony owns and operates the CSA Mine in New South Wales and is developing the Eva Copper Project in
Queensland. Following the acquisition of MAC Copper in October 2025, the CSA Mine became Harmony's first operating copper
mine and a significant contributor to the Group's copper production. The Eva Copper Project is currently in the execution phase.
As of 30 June 2026, our combined estimated Mineral Resources (exclusive of Mineral Reserves) in Australia totalled 0.2 million
ounces of gold, 1.3 million tonnes of contained copper metal and 4.8 million ounces of silver. The combined estimated Mineral
Reserves in Australia totalled 0.4 million ounces of gold, 1.6 million tonnes of contained copper metal and 7.0 million ounces of
silver.
56
Table of contents
Locations of Properties
The following graphic sets out the geographical distribution of Harmony’s mining properties.
SA Locations.jpg
57
Table of contents
EXPLORATION - AUS and PNG Combined 2026.jpg
Maps showing the location of individual properties as well as infrastructure and licences are shown in “—Individual
Property Disclosure” below. All operations are 100 percent owned unless otherwise indicated.
58
Table of contents
The following table sets out the aggregate production of Harmony’s mining operations for the years ended 30 June 2026,
2025 and 2024.
Fiscal year ended 30 June
2026
2025
2024
Gold produced (kg)
44,464
46,023
48,578
Gold produced (000oz)
1,430
1,480
1,562
Overview of Mining Properties and Operations
The following information is detailed for each material property in “– Individual Property Disclosure” below:
•the location of the properties;
•the type and amount of ownership interests;
•the identity of the operator or operators;
•titles, mineral rights, leases or options and acreage involved;
•the stages of the properties (exploration, development or production);
•key permit conditions;
•mine types and mineralisation styles; and
•processing plants and other available facilities.
Methodology
Mineral Resources
A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such
form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction ("RPEEE"). The
location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are known, estimated or
interpreted from specific geological evidence and knowledge, including sampling.
An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated
based on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade
or quality continuity. An Inferred Resource has a lower level of confidence than that applying to an Indicated Mineral Resource
and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of an Inferred Mineral Resource
could be upgraded to an Indicated Mineral Resource with continued exploration.
An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and
physical characteristics are estimated with sufficient confidence to allow the application of modifying factors in sufficient detail to
support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately
detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity
between points of observation.
A Measured Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and
physical characteristics are estimated with confidence sufficient to allow the application of modifying factors to support detailed
mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and
reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of
observation. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated or an
Inferred Mineral Resource. It may be converted to either a Proved Mineral Reserve or a Probable Mineral Reserve.
Mineral Resource estimation
To meet the requirement in the South African Code for the Reporting of Exploration Results, Mineral Resources and
Mineral Reserves ("SAMREC") that Mineral Resources demonstrate RPEEE, Harmony applies an appropriate cut-off grade and/
or economic constraints to the quantified mineralised body using a process that incorporates a long-term view of commodity
prices, operating costs, recoveries and other relevant modifying factors. In applying this process, Harmony uses a gold price of
US$3,061/oz or R1,730,000/kg to determine Mineral Resource cut-off grades at its gold operations.
The estimation of Mineral Resources is based on geoscientific knowledge and borehole and sampling data, with input from
our Ore Reserve managers, geologists and geostatistical staff. All sampling is subject to quality assurance and quality control
procedures prescribed by SAMREC to ensure data quality and accuracy. Based on geological, grade and structural
characteristics, each orebody is divided into geozones and estimated using appropriate computerised geostatistical
methods.Mineral Resources are classified as Measured, Indicated or Inferred according to confidence in the geological
interpretation and grade estimation, taking into account data quality, geological continuity, estimation quality and drilling density.
The QP assesses RPEEE using methods appropriate to the deposit style and anticipated mining method while applying
consistent Harmony standards and governance processes. For open pit deposits, this is generally supported through economic
pit optimisation using appropriate commodity price, cost and recovery assumptions. For underground deposits, RPEEE is
assessed using mining method, mineability, access and economic assumptions consistent with the style of mineralisation and
anticipated extraction approach.
59
Table of contents
Mineral Reserves represent the economically mineable portion of Measured and Indicated Mineral Resources that are
incorporated into the LOM plan. The conversion of Mineral Resources to Mineral Reserves is based on detailed mine planning
and the application of modifying factors, including mining, metallurgical, economic, marketing, legal, environmental, social and
governmental considerations.
The methodologies applied to convert Mineral Resources to Mineral Reserves vary according to the mining method, stage
of development and characteristics of the orebody. At all operations and projects, Mineral Reserve estimates are supported by
appropriate mine designs, production schedules, economic assessments and consideration of relevant operational constraints.
At Harmony's underground South African operations, Mineral Reserves are estimated using detailed LOM plans developed
from the Measured and Indicated Mineral Resource base. The optimal cut-off grade is determined using Harmony's Optimiser
software, which identifies the lowest grade at which the orebody can be mined to maximise total profit under a defined set of
mining, processing and economic assumptions. Key inputs include the Measured and Indicated Resource blocks (per shaft
section), commodity price assumptions, planned production rates, the mine recovery factor (equivalent to the mine call factor 
multiplied by the plant recovery factor) and planned cash operating costs (rand per tonne). Harmony uses a gold price of
US$2,915/oz or R1,650,000/kg to determine Mineral Reserve cut-off grades at its gold operations.
At the deep-level South African operations, Mineral Reserve estimates incorporate allowances for mining losses, support
pillars, unpay and off-reef mining, reflecting the geotechnical and operational realities of mining at depth.
In Australasia, Mineral Reserves are estimated across a diverse portfolio of open pit and underground operations and
projects. For open pit assets, Mineral Reserves are based on economically optimised pit shells, detailed mine design, production
scheduling and the application of appropriate modifying factors. For underground operations such as CSA, Mineral Reserves
are supported by mine designs, production schedules and economic evaluations aligned with the selected mining method and
operational constraints.
At the Wafi-Golpu Project specifically, Mineral Reserves are derived using block cave optimisation studies that evaluate
cave footprint selection, extraction level design, production sequencing, draw strategy, cave propagation geotechnical
performance and economic outcomes. Given the scale and long-term nature of the deposit, Mineral Reserve estimation
integrates mining, processing, infrastructure and economic assumptions to determine the optimal extraction strategy and project
value.
A range of disciplines, including health and safety, geology, survey, planning, mining engineering, rock engineering,
metallurgy, financial management, human resources management and environmental management, are involved in the LOM
planning process and the conversion of Mineral Resources into Mineral Reserves. The modifying factors related to the ore flow
that are used to convert Mineral Resources to Mineral Reserves through the LOM planning process are stated for each shaft.
For these factors, historical information is used, except if there is a valid reason to do otherwise. The factors are reviewed and
updated annually using operating experience, technical studies and project-specific assumptions to ensure that Mineral Reserve
estimates remain realistic and achievable.
Although the criteria for classifying Mineral Reserves under the SAMREC, 2016 differ in certain respects from those under
Regulation S-K 1300, the tables below present only the Mineral Reserves at Harmony’s operations and advanced projects as at
30 June 2026 that satisfy the classification requirements of Regulation S-K 1300.
Mineral Reserves
Modifying factors are considerations used to convert Mineral Resources to Mineral Reserves. These include, but are not
restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and
governmental factors. A Mineral Reserve is the economically mineable part of a Measured and/or Indicated Mineral Resource. It
includes diluting materials and allowances for losses, which may occur when the material is mined or extracted. It is defined by
studies at prefeasibility or feasibility level as appropriate, which include the application of modifying factors. Such studies
demonstrate that, at the time of reporting, extraction could reasonably be justified. The reference point at which Mineral
Reserves are defined, usually the point where the ore is delivered to the processing plant, must be stated. It is important that in
all situations where the reference point is different, such as for a saleable product, a clarifying statement is included to ensure
that the reader is fully informed as to what is being reported.
A Probable Mineral Reserve is the economically mineable part of an Indicated Mineral Resource, and in some
circumstances, a Measured Mineral Resource. The confidence in the modifying factors applied to a Probable Mineral Reserve is
lower than that applicable to a Proved Mineral Reserve.
A Proved Mineral Reserve is the economically mineable part of a Measured Mineral Resource. A Proved Mineral Reserve
implies a high degree of confidence in the modifying factors. A "scoping study" is an order of magnitude technical and economic
study of the potential viability of Mineral Resources that includes appropriate assessments of realistically assumed modifying
factors together with any other relevant operational factors that are necessary to demonstrate at the time of reporting that
progress to a prefeasibility study can be reasonably justified.
A prefeasibility study is a comprehensive study of a range of options for the technical and economic viability of a mineral
project that has advanced to a stage where a preferred mining method, in the case of underground mining, or the pit
configuration, in the case of an open-pit, is established and an effective method of mineral processing is determined. It includes
a financial analysis based on reasonable assumptions on the modifying factors and the evaluation of any other relevant factors
which are sufficient for a competent person, acting reasonably, to determine if all or part of the Mineral Resource may be
converted to a Mineral Reserve at the time of reporting.
60
Table of contents
A feasibility study is a comprehensive technical and economic study of the selected development option for a mineral
project that includes appropriately detailed assessments of applicable modifying factors together with any other relevant
operational factors and detailed financial analysis that are necessary to demonstrate at the time of reporting that extraction is
reasonably justified (economically mineable). The results of the feasibility study may reasonably serve as the basis for a final
decision by a proponent or financial institution to proceed with, or finance, the development of the project. The confidence level
of the study will be higher than that of a prefeasibility study.
For the reporting of Mineral Reserves the following parameters were applied:
• US$2,915/oz gold ("Au"), US$38.90/oz silver ("Ag") and US$4.78/lb copper ("Cu");
•an exchange rate of R17.60 per US dollar, and A$1.47 per US dollar
•the above parameters resulting in a gold price of R1,650,000/kg for the South African assets; and
•the Wafi-Golpu Project retains the feasibility commodity prices of US$1,200/oz Au and US$3.00/lb Cu;
Mineral Resources (exclusive of Mineral Reserves)
As at 30 June 2026, Harmony had aggregate attributable Measured and Indicated Resources (exclusive of Mineral
Reserves) of approximately 44.1 million ounces of gold, 32.0 million ounces of silver, 2.2 million tonnes of copper and
46.6 million pounds of uranium.
Operations
Measured Resources
Indicated Resources
Measured and Indicated
Resources
Inferred Resources
Gold
Tonnes
(Mt)
Grade
(g/t)
Au
(000kg)
Tonnes
(Mt)
Grade
(g/t)
Au
(000kg)
Tonnes
(Mt)
Grade
(g/t)
Au
(000kg)
Tonnes
(Mt)
Grade
(g/t)
Au
(000kg)
South Africa underground
Tshepong North
11.385
11.87
135.110
4.956
12.31
60.986
16.341
12.00
196.096
7.578
10.20
77.309
Tshepong South
6.402
12.34
79.001
9.460
11.02
104.209
15.862
11.55
183.210
22.970
11.24
258.074
Joel
2.023
7.09
14.335
3.126
7.38
23.074
5.149
7.27
37.409
0.277
7.09
1.964
Masimong
1.877
10.04
18.844
0.381
8.88
3.380
2.258
9.84
22.225
0.153
8.42
1.285
Target 1
5.478
7.68
42.090
3.177
7.17
22.767
8.655
7.49
64.857
2.749
6.58
18.090
Target 3
0.714
10.16
7.251
3.800
10.56
40.140
4.513
10.50
47.391
1.210
10.53
12.744
Doornkop
19.653
3.66
71.938
16.634
3.74
62.196
36.287
3.70
134.134
11.844
3.73
44.235
Kusasalethu
1.269
15.64
19.846
4.960
9.40
46.609
6.229
10.67
66.456
2.028
9.01
18.271
Mponeng
2.059
13.89
28.600
12.649
12.42
157.152
14.708
12.63
185.752
31.609
11.51
363.960
Moab Khotsong
2.374
17.67
41.955
3.553
16.88
59.982
5.927
17.20
101.938
2.681
18.35
49.199
Total South Africa
underground
53.233
8.62
458.971
62.695
9.26
580.496
115.928
8.97
1,039.467
83.099
10.17
845.131
South Africa surface
Kalgold
7.103
0.91
6.432
25.119
1.25
31.282
32.222
1.17
37.714
27.169
0.43
11.574
Other Free State Tailings
78.504
0.26
20.460
—
—
—
78.504
0.26
20.460
127.303
0.17
21.400
Phoenix
11.845
0.27
3.251
6.621
0.29
1.917
18.466
0.28
5.167
—
—
—
Central
—
—
—
1.138
0.31
0.352
1.138
0.31
0.352
—
—
—
Free State WRD
—
—
—
0.078
0.55
0.043
0.078
0.55
0.043
11.649
0.45
5.212
Mine Waste Solutions
50.525
0.20
10.022
55.519
0.24
13.120
106.044
0.22
23.142
79.371
0.13
10.694
Mine Waste Solutions WRD
—
—
—
1.768
0.30
0.530
1.768
0.30
0.530
2.502
0.24
0.611
West Wits tailings
—
—
—
9.680
0.33
3.170
9.680
0.33
3.170
—
—
—
West Wits WRD
—
—
—
0.104
0.37
0.038
0.104
0.37
0.038
—
—
—
Total South Africa Surface
(including Kalgold)
147.977
0.27
40.165
100.027
0.50
50.452
248.004
0.37
90.617
247.993
0.20
49.490
Total South Africa
201.210
499.136
162.722
630.948
363.932
3.11
1,130.085
331.092
894.621
Papua New Guinea¹
Hidden Valley
2.702
0.74
2.000
21.639
1.48
32.000
24.341
1.40
34.000
1.290
1.47
1.900
Wafi
—
—
—
54.000
1.66
89.000
54.000
1.66
89.000
15.000
1.30
20.000
Golpu
—
—
—
155.000
0.58
90.372
155.000
0.58
90.372
70.000
0.62
44.000
Nambonga
—
—
—
—
—
—
—
—
—
24.000
0.69
16.000
Kerimenge
—
—
—
27.029
0.96
26.000
27.029
0.96
26.000
4.799
0.83
4.000
Total Papua New Guinea
2.702
0.74
2.000
257.669
0.92
237.372
260.370
0.92
239.372
115.089
0.75
85.900
Australia
Little Eva
—
—
—
37.973
0.05
1.994
37.973
0.05
1.994
23.893
0.09
2.048
Bedford
—
—
—
0.893
0.13
0.119
0.893
0.13
0.119
0.632
0.10
0.066
Lady Clayre
—
—
—
6.724
0.17
1.168
6.724
0.17
1.168
9.759
0.15
1.420
Ivy Ann
—
—
—
6.908
0.10
0.666
6.908
0.10
0.666
0.188
0.10
0.019
Total Australia
—
—
—
52.496
0.08
3.948
52.496
0.08
3.948
34.471
0.10
3.552
Total Gold
203.912
501.136
472.887
872.268
676.799
2.03
1,373.404
480.653
984.073
1 Total attributable.
61
Table of contents
Measured Resources
Indicated Resources
Measured and Indicated
Resources
Inferred Resources
Copper
Tonnes
(Mt)
Grade
(%)
Cu
(000t)
Tonnes
(Mt)
Grade
(%)
Cu
(000t)
Tonnes
(Mt)
Grade
(%)
Cu
(000t)
Tonnes
(Mt)
Grade
(%)
Cu
(000t)
Papua New Guinea
Golpu
—
—
—
155.000
0.95
1,470.000
155.000
0.95
1,470.000
70.000
0.86
600.000
Nambonga
—
—
—
—
—
—
—
—
—
24.000
0.20
46.949
Total Papua New Guinea
—
—
—
155.000
0.95
1,470.000
155.000
0.95
1,470.000
94.000
0.69
646.949
Australia
Little Eva
—
—
—
37.973
0.28
105.735
37.973
0.28
105.735
23.893
0.33
79.496
Turkey Creek
—
—
—
5.153
0.40
20.520
5.153
0.40
20.520
4.481
0.41
18.159
Blackard
—
—
—
35.199
0.43
150.668
35.199
0.43
150.668
22.714
0.40
90.958
Scanlan
—
—
—
6.650
0.54
35.776
6.650
0.54
35.776
3.574
0.53
18.961
Bedford
—
—
—
0.893
0.52
4.644
0.893
0.52
4.644
0.632
0.36
2.300
Lady Clayre
—
—
—
6.724
0.38
25.363
6.724
0.38
25.363
9.759
0.36
35.143
Ivy Ann
—
—
—
6.908
0.53
36.752
6.908
0.53
36.752
0.188
0.31
0.578
Legend
—
—
—
36.254
0.45
163.506
36.254
0.45
163.506
3.755
0.35
12.996
Great Southern
—
—
—
12.915
0.42
53.629
12.915
0.42
53.629
1.920
0.39
7.553
CSA Mine
1.343
7.65
102.691
1.479
4.90
72.490
2.822
6.21
175.181
6.173
3.76
231.942
Total Australia
1.343
7.65
102.691
150.146
0.45
669.084
151.489
0.51
771.774
77.089
0.65
498.086
Total Copper
1.343
7.65
102.691
305.146
0.70
2,139.084
306.489
0.73
2,241.774
171.089
0.67
1,145.034
Measured Resources
Indicated Resources
Measured and Indicated
Resources
Inferred Resources
Silver
Tonnes
(Mt)
Grade
(g/t)
Ag
(000kg)
Tonnes
(Mt)
Grade
(g/t)
Ag
(000kg)
Tonnes
(Mt)
Grade
(g/t)
Ag
(000kg)
Tonnes
(Mt)
Grade
(g/t)
Ag
(000kg)
Papua New Guinea
Hidden Valley
2.702
20.36
55.000
21.639
20.61
446.000
24.341
20.58
501.000
1.290
12.11
15.628
Golpu
—
—
—
155.000
1.30
201.500
155.000
1.30
201.500
70.000
1.10
77.000
Total Papua New Guinea
2.702
20.36
55.000
176.639
3.67
647.500
179.341
3.92
702.500
71.290
1.30
92.628
Australia
CSA Mine
1.343
23.96
32.169
1.479
13.91
20.567
2.822
18.69
52.735
6.173
24.83
153.264
Total Australia
1.343
23.96
32.169
1.479
13.91
20.567
2.822
18.69
52.735
6.173
24.83
153.264
Total Silver
4.044
21.55
87.169
178.118
3.75
668.067
182.163
4.15
755.235
77.463
3.17
245.892
Measured Resources
Indicated Resources
Measured and Indicated
Resources
Inferred Resources
Zinc
Tonnes
(Mt)
Grade
(%)
Zn
(000t)
Tonnes
(Mt)
Grade
(%)
Zn
(000t)
Tonnes
(Mt)
Grade
(%)
Zn
(000t)
Tonnes
(Mt)
Grade
(%)
Zn
(000t)
Australia
CSA Mine
—
—
—
0.197
2.73
5.365
0.197
2.73
5.365
2.455
7.26
178.325
Total Zinc
—
—
—
0.197
2.73
5.365
0.197
2.73
5.365
2.455
7.26
178.325
Measured Resources
Indicated Resources
Measured and Indicated
Resources
Inferred Resources
Uranium
Tonnes
(Mt)
Grade
(kg/t)
U3O8
(Mkg)
Tonnes
(Mt)
Grade
(kg/t)
U3O8
(Mkg)
Tonnes
(Mt)
Grade
(kg/t)
U3O8
(Mkg)
Tonnes
(Mt)
Grade
(kg/t)
U3O8
(Mkg)
South Africa
Free State surface
78.504
0.09
7.296
78.504
0.09
7.296
—
—
—
Moab underground
—
—
—
5.927
0.94
5.580
5.927
0.94
5.580
2.681
0.65
1.754
Mine Waste Solutions
50.525
0.07
3.395
55.519
0.09
4.862
106.044
0.08
8.256
79.371
0.04
2.986
Total Uranium
50.525
0.07
3.395
139.949
0.13
17.737
190.475
0.11
21.132
82.052
0.06
4.740
Note: rounding of numbers may result in slight computational discrepancies.
Mineral Reserves
As at 30 June 2026, Harmony had aggregate attributable Proved and Probable Mineral Reserves of approximately
27.4 million ounces of gold, 19.6 million ounces of silver, 4.0 million tonnes of copper and 7.7 million pounds of uranium.
62
Table of contents
Operations
Proved Reserves
Probable Reserves
Total Mineral Reserves
Gold
Tonnes
(Mt)
Grade
(g/t)
Au²
(000kg)
Tonnes
(Mt)
Grade
(g/t)
Au²
(000kg)
Tonnes
(Mt)
Grade
(g/t)
Au²
(000kg)
South Africa underground
Tshepong North
4.143
5.26
21.772
6.423
4.96
31.828
10.566
5.07
53.601
Tshepong South
1.404
5.75
8.071
0.511
3.43
1.753
1.915
5.13
9.824
Joel
1.454
4.96
7.216
0.578
5.01
2.897
2.032
4.98
10.112
Masimong
1.020
3.91
3.988
0.297
3.56
1.055
1.316
3.83
5.044
Target 1
2.463
4.64
11.433
0.392
4.34
1.700
2.855
4.60
13.133
Doornkop South Reef
5.626
3.65
20.536
5.531
4.22
23.356
11.158
3.93
43.892
Kusasalethu
1.880
6.27
11.795
0.706
4.69
3.311
2.586
5.84
15.106
Mponeng
4.512
9.96
44.938
10.833
8.80
95.332
15.345
9.14
140.270
Moab Khotsong including Zaaiplaats
2.263
6.78
15.340
9.769
8.66
84.621
12.031
8.31
99.961
Total South Africa underground
24.763
5.86
145.089
35.040
7.02
245.852
59.804
6.54
390.941
South Africa Surface
Kalgold
13.422
1.03
13.858
5.244
1.02
5.351
18.665
1.03
19.208
Tailings
Other Free State Tailings
82.099
0.25
20.643
511.608
0.23
115.574
593.707
0.23
136.217
Phoenix
12.170
0.28
3.442
12.170
0.25
3.063
24.340
0.27
6.505
Central
—
—
—
34.513
0.28
9.518
34.513
0.28
9.518
Mine Waste Solutions
3.215
0.32
1.013
323.571
0.28
90.140
326.785
0.28
91.154
West Wits tailings
—
—
—
20.694
0.33
6.748
20.694
0.33
6.748
Total South Africa Surface
(including Kalgold)
110.906
0.35
38.955
907.800
0.25
230.395
1,018.706
0.26
269.350
Total South Africa
135.669
184.044
942.840
476.247
1,078.509
660.291
Papua New Guinea
Hidden Valley
2.141
1.07
2.294
13.865
1.36
18.887
16.006
1.32
21.181
Golpu ¹
—
—
—
190.000
0.83
158.628
190.000
0.86
158.628
Total Papua New Guinea
2.141
1.07
2.294
203.865
0.87
177.515
206.006
0.87
179.809
Australia
Little Eva
—
—
—
145.229
0.06
9.431
145.229
0.06
9.431
Bedford
—
—
—
3.954
0.13
0.526
3.954
0.13
0.526
Lady Clayre
—
—
—
6.001
0.17
1.000
6.001
0.17
1.000
Ivy Ann
—
—
—
—
—
—
—
—
—
Total Australia
—
—
—
155.183
0.07
10.957
155.183
0.07
10.957
Total Gold
137.811
186.338
1,301.888
664.719
1,439.699
851.057
¹ Total attributable.
Operations
Proved Reserves
Probable Reserves
Total Mineral Reserves
Copper
Tonnes
(Mt)
Grade
(%)
Cu²
(000t)
Tonnes
(Mt)
Grade
(%)
Cu²
(000t)
Tonnes
(Mt)
Grade
(%)
Cu²
(000t)
Papua New Guinea
Golpu ¹
—
—
—
190.000
1.23
2,330.000
190.0
1.23
2,330.000
Total Papua New Guinea
—
—
—
190.000
1.23
2,330.000
190.000
1.23
2,330.000
Australia
Little Eva
—
—
—
145.229
0.34
488.300
145.229
0.34
488.300
Turkey Creek
—
—
—
21.900
0.42
92.200
21.900
0.42
92.200
Blackard
—
—
—
78.600
0.50
393.800
78.600
0.50
393.800
Scanlan
—
—
—
8.300
0.63
52.600
8.300
0.63
52.600
Bedford
—
—
—
3.954
0.47
18.500
3.954
0.47
18.500
Lady Clayre
—
—
—
6.001
0.42
25.400
6.001
0.42
25.400
CSA MIne
12.531
3.27
410.303
5.161
3.23
166.565
17.691
3.26
576.868
Total Australia
12.531
3.27
410.303
269.144
0.46
1,237.365
281.675
0.58
1,647.668
Total Copper
12.531
3.27
410.303
459.144
0.78
3,567.365
471.675
0.84
3,977.668
¹ Total attributable.
Operations
Proved Reserves
Probable Reserves
Total Mineral Reserves
Silver
Tonnes
(Mt)
Grade
(g/t)
Ag2
(000kg)
Tonnes
(Mt)
Grade
(g/t)
Ag2
(000kg)
Tonnes
(Mt)
Grade
(g/t)
Ag2
(000kg)
Papua New Guinea
Hidden Valley
2.141
21.62
46.306
13.865
24.83
344.230
16.006
24.40
390.536
Australia
CSA Mine
12.531
12.70
159.186
5.161
11.39
58.802
17.691
12.32
217.988
Total Silver
14.672
14.01
205.492
19.026
21.18
403.032
33.697
18.06
608.524
63
Table of contents
Operations
Proved Reserves
Probable Reserves
Total Mineral Reserves
Uranium
Tonnes
(Mt)
Grade
(kg/t)
U3O8²
(Mkg)
Tonnes
(Mt)
Grade
(kg/t)
U3O8²
(Mkg)
Tonnes
(Mt)
Grade
(kg/t)
U3O8²
(Mkg)
South Africa
Moab Khotsong underground
—
—
—
12.031
0.29
3.503
12.031
0.29
3.503
1Metal figures are fully inclusive of all mining dilutions and gold losses, and are reported as mill-delivered tonnes and head grades.
Metallurgical recovery factors have not been applied to the reserve figures.
Note: rounding of numbers may result in slight computational discrepancies.
Harmony discontinued reporting gold equivalents as attributable Mineral Resources and Mineral Reserves as at 30 June 2026.
This improves transparency and aligns with best practice. Reporting gold and copper separately provides a clearer, more
accurate representation of the underlying Mineral Resources and Mineral Reserves, avoids reliance on price-based
assumptions, and allows stakeholders to assess each commodity’s value independently. Harmony reported on attributable gold
and copper Mineral Resources and Mineral Reserves separately as at 30 June 2026.
As at 30 June 2026, Harmony’s attributable gold Mineral Reserves were 27.4 million ounces of gold, an increase from
26.9 million ounces at 30 June 2025. The year on year Mineral Reserve reconciliation is shown below.
Description
(000kg)
Moz
30 June 2025 – Gold
837
26.9
Changes during fiscal 2026
Mined
(52)
(1.7)
Other losses (geology, planning)
(20)
(0.6)
Reserve additions from Operations
86
2.8
30 June 2026 – Gold
851
27.4
Note: rounding of numbers may result in slight computational discrepancies.
The increase is primarily due to the extension of the LOM at Mponeng, Kusasalethu and Masimong as well as the Tshepong
LOM extension project and Eva Copper Project.
As at 30 June 2026, Harmony’s attributable copper Mineral Reserves were 4.0 million tonnes of contained copper metal, an
increase from 2.3 million tonnes at 30 June 2025. The year on year Mineral Reserve reconciliation is shown below.
Description
Mt
Mlb
30 June 2025 Copper
2.3
5.135
Changes during fiscal 2026
Mined
—
—
Other losses (geology, planning)
Reserve additions from Operations
1.6
3.632
30 June 2026 Copper
4.0
8.768
Note: rounding of numbers may result in slight computational discrepancies.
The increase is mainly due to the acquisition of the CSA Mine in Australia as well as the approval of the Eva Copper Project.
64
Table of contents
MINERAL RESOURCE AND MINERAL RESERVE INDIVIDUAL PROPERTY DISCLOSURE
For more information about Harmony’s mines, including a summary of the Company’s mining rights and licences refer to
Item 4: "Information on the Company – Business Overview – Regulation”. For detailed information about Harmony’s mines,
including the mining rights and licences refer to the TRS on each individual property, filed as an exhibit to this annual report on
Form 20-F.
Doornkop
Property Description
Doornkop is an underground gold mine located in the West Wits mining district southwest of Johannesburg, in the Gauteng
Province. At longitude 27°47'26.55"E and latitude 26°13'03.2"S, the mine forms part of Harmony's West Rand (“West Wits”)
operations. Doornkop is wholly-owned and operated by Harmony.
The following graphic illustrates the location of the Doornkop mine, along with certain infrastructure.
westrandops.jpg
The Doornkop shaft complex is located south of Krugersdorp, 30km west of Johannesburg, in the Gauteng Province,
South Africa. The property lies between Sibanye Stillwater Limited’s Cooke 1 shaft and Durban Roodepoort Deep Limited.
Doornkop forms part of Harmony’s West Rand operations and extends to a maximum depth of approximately 2,000m below
mine datum (“BMD”). Current mining operations extract the South Reef, with the Mineral Reserves being comprised entirely of
this reef. Mineral Resources are comprised of the South Reef and the Kimberley Reef, and a limited (<0.5%) amount of the Main
Reef.
There is no material litigation against Harmony that threatens its mineral rights, tenure, or operations.
Operational Infrastructure
Infrastructure in the region is well established, supporting the numerous operational gold mines in the area. The regional
infrastructure includes national and provincial paved road networks, power transmission and distribution networks, water supply
networks and communication infrastructure. Doornkop’s surface and underground infrastructure, including its power and water
supplies, is sufficient for the current and planned production level requirements.
Doornkop’s main and vent shaft systems are currently exploiting the South Reef to approximately 2,000m BMD. The
narrow South Reef is exploited by means of conventional stoping. The ore mined at Doornkop is processed at the mine’s
carbon-in-pulp ("CIP") plant, which is located adjacent to the shaft. Operations are powered by electricity from Eskom.
Doornkop draws its workforce principally from established mining communities in the West Rand and surrounding Gauteng
area, supplemented by specialist contractors where required. Its principal equipment, facilities, infrastructure and underground
development are of varying ages and are subject to ongoing inspection, preventive maintenance, refurbishment and
replacement programmes. Management considers their physical condition adequate to support the current LOM plan, with
material modernisation and replacement projects included in sustaining capital plans as required. As at 30 June 2026, Doornkop
employed 3,113 people and engaged 928 contractors.
65
Table of contents
Doornkop is an established operation, and the currently available infrastructure is sufficient to support the mine plan.
Doornkop is accessible via the national and provincial roads. The general layout of Doornkop infrastructure is displayed in the
graphic below.
doornkopmap222.jpg
The “property, plant, and equipment” at Doornkop as at 30 June 2026, including buildings and mine infrastructure, mining
assets, rehabilitation and assets under construction, had a carrying value of R5.3 billion.
Doornkop did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no significant
encumbrances exist.
Geology
Doornkop is situated on the northwestern margin of the Witwatersrand Basin of South Africa, one of the most prominent
gold provinces in the world. While there are several gold-bearing conglomerate reefs present within the mining right area, only
the Kimberley Reef and South Reef are considered to have prospects for economic extraction at this stage.
In the West Rand Goldfield, the Kimberley Reefs include a number of different gold-bearing conglomerate horizons. At
Doornkop, it is the Kimberley K9 Reef horizon which comprises the Mineral Resources along with the South Reef. The
Kimberley K9 Reef rests on an unconformity and is a multi-pulse conglomerate which is divided into four cycles, each consisting
of an upper conglomerate and a lower quartzite.
The South Reef comprises a basal conglomerate unit and a cycle of trough cross-bedded sediments. The South Reef is
dominated by silicate phases such as quartz, carbon (seam and specks), as well as sulphide phases such as pyrite, pyrrhotite
and chalcopyrite. While the upper cycles may carry some gold values, up to 95% of the gold present is located in the lower
cycle.
Both the Kimberley Reef and the South Reef have been subjected to faulting and are intruded by a series of dykes and
sills of various ages that cut across the reefs. The gold mineralisation is interpreted to have succeeded a period of deep burial,
fracturing, and alteration. The gold and other elements are believed to have precipitated through the reaction of hydrothermal
fluids at high temperatures along the reef horizons.
History
Although exploration in the Doornkop area dates back to the early 1930s, and multiple phases of exploration and mining
activities have taken place in the intervening years, the sinking of the main and ventilation shafts at Doornkop only commenced
in 1983. At the time, Doornkop was owned by Johannesburg Consolidated Industries Limited ("JCI").
It was initially planned to mine both the Kimberley and the South Reefs. However, a decision was then taken by JCI to
target the shallower Kimberley Reef only, mining it by mechanised methods. In addition, the deepening of the main shaft
required to access the South Reef was deferred. During 1989, the planned production rates from the Kimberley Reefs were
achieved, but the anticipated grades were not recovered. Adverse geological structures were encountered, and the decrease in
grades was attributed to difficulties associated with the mechanised mining methods resulting in dilution.
66
Table of contents
A review of the operation was undertaken in 1991, and the mining approach was changed to a more selective mining cut,
targeting higher grade areas of Kimberley Reef only. In 1999, the deepening project was stopped, as a result of the low
prevailing gold prices. The sub-vertical shaft sinking had been completed with the shaft bottom at 1,953m BMD. The deepening
of the main shaft stopped at 1,340m BMD.
Harmony acquired Doornkop when it took over control of Randfontein Estates Limited ("REL"), in early 2000. Harmony
continued mining the Kimberley Reef using mechanised mining methods, but revisited the work done toward extracting the
South Reef. The mining method for the Kimberley Reef was subsequently changed to the conventional stoping approach, in
order to extract a reduced tonnage at an improved grade.
In 2020, a capital project was approved to extend operations to new mining levels on 207 and 212 levels. While the 207
level is now mining reef, the 212 level is currently focused on access development, which commenced from the shaft position in
2017 as early works. The shaft infrastructure is currently undergoing upgrades, while an ore handling system is being
established on 215 level to facilitate production from the 207 and 212 levels.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
The current mining rights are held by REL, a wholly owned subsidiary of Harmony. The rights encompass an area of
4,459.25ha and were successfully converted, executed and registered as a new order mining right at the Mineral and Petroleum
Resources Titles Office ("MPRTO"). They are secured under Mining Authorisation number ML 13/97.
Harmony’s Doornkop mineral tenure comprises two mining rights covering approximately 4,459ha, namely:
•GP30/5/1/2/2/09 MR valid from 7 October 2008 to 6 October 2038; and
•GP30/5/1/2/2/174 MR valid from 23 May 2014 to 22 May 2030.
Harmony has the exclusive right to renew the rights.
A summary of the status of EPs and licences issued as at 30 June 2026, related to the Doornkop operation is presented in
the table below.
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
EMPr
GP30/5/1/2/2/(09)
EM
DMPR
7 June 2010
LOM
Certificate of Registration (Nuclear)
01/0025/06
National Nuclear
Regulator
31 May 2003
LOM
Water Use Permit
33/2/323/24
DWS
1 December 1977
LOM
Cyanide Management Certification
N/A
ICMC2
19 April 2024
18 April 2027
Precious Metal Refining Licence
1889/000251/66
SADPMR4
29 June 2011
26 June 2041
Environmental Authorisation for Water
Treatment Plant
GP30/5/1/2/2/(09)
EM
DMPR
23 August 2016
LOM
Licence to impound water in a dam with
safety risk
12/2/C221/69
DWS
17 July 2009
LOM
Salvage yard registration
HWSD/24-25/0020
GDARD3
18 June 2024
LOM
1German certification body for ISO standards.
2International Cyanide Management Code.
3Gauteng Department of Agriculture and Rural Development.
4SA Diamond and Precious Metals Regulator.
Mining Method
Doornkop is a deep level underground gold mine currently operating at depths ranging between 1,870m and 1,950m BMD.
The mining method used at Doornkop is conventional breast mining, in a sequential grid, also known as sequential grid
mining ("SGM").
Doornkop does not use backfill for the support of stopes. The SGM method makes use of dip pillars and reduced mining
spans with pre-developed tunnels, aimed at controlling geotechnical stress.
The mining sequence at Doornkop is typically a V-shaped configuration, colloquially referred to as the “inverted Christmas
tree”. An underhand face configuration is adopted when mining towards the west and an overhand face configuration when
mining towards the east.
Primary development is done off-reef (in waste rock), while secondary development is done on-reef (in the mineralised
zone).
67
Table of contents
Mineral Processing
Doornkop's gold processing facility has been in operation since the mid-1980s. The technology used to process the gold-
bearing ore is well established and is suitable for the style of mineralisation.
The milled ore from Doornkop follows a standard cyanide leach, CIP and electrowinning process in order to extract the
gold bullion.
The plant is currently operating below its designed throughput capacity and in the past has operated at the throughput
required to deliver the forecasted ounces of gold in the LOM.
Qualified Persons
The QP was employed on a full-time basis by Harmony. The QP's qualifications, areas of responsibility and personal
inspection of the property are summarised in the graphic below.
Qualified Person
Professional
Organisation
Qualification
TRS Section
Responsibility 
Personal
Insp.
Mr. H Chirambadare
SACNASP, GSSA
BSc. (Geol, Math), BSc. (Hons) Geol,
MENG, MBA
All
Full time
Exploration
Exploration at Doornkop has been focussed on improving confidence in the geological model, as well as adding and
upgrading additional Mineral Resources to the mine as existing Mineral Resources are depleted through mining. Over the years,
geological data has been obtained through surface drilling, a seismic survey, underground drilling, underground channel (chip)
sampling and geological mapping.
Surface exploration drilling has taken place over several different campaigns since exploration was initially undertaken in
the 1930s. Surface drilling provides widely spaced initial grade and channel width information, upon which mine development
decisions are based.
Underground exploration drilling is a continuous process which would have been in place since the operation commenced.
The underground drilling provides geological information, which is used for the Mineral Resource estimates, as well as for mine
planning purposes.
Diamond core drilling was used for all underground drill holes. Diamond core drilling has been undertaken using hydraulic
and pneumatic drill rigs.
Drilling and logging practices are based on the Harmony company standards, which have been in place since Harmony
took over Doornkop.
During calendar 2025, Doornkop completed 165 underground diamond drill holes, of which 61 intersected the South Reef,
and continued monthly underground channel sampling on a 4m by 6m grid. A total of 47,043 samples were assayed for gold by
fire assay with a gravimetric finish, comprising 45,329 primary samples and 1,714 quality assurance and quality control samples.
See Sections 7 and 8 of the Doornkop TRS.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
Mineral Resource Estimate
The Mineral Resource estimate for Doornkop is considered to have RPEEE in line with SAMREC, 2016. The cut-off value
for the Mineral Resources has been determined as 450cmg/t, based on the economic assumptions presented in the table below
at 30 June 2026.
Description
Unit
Value
Gold price
US$/oz
3,061
Exchange rate
R:US$
17.60
Gold price
R/kg
1,730,000
Plant recovery factor
%
96.65
Unit cost1
R/t
4,390
1 Unit cost includes cash-operating cost, royalty and ongoing development capital.
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions.
The Mineral Resources were originally prepared, classified and reported according to the SAMREC, 2016. For the
purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of
Regulation S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
68
Table of contents
The Mineral Resource estimate, as at 30 June 2025 and 30 June 2026, exclusive of the reported Mineral Reserves, is
summarised in the table below.
Fiscal Year Ended 30 June
% Change
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
Measured
19.653
3.66
71,938
19.944
3.74
74,506
(3.4)
Indicated
16.634
3.74
62,196
13.987
3.77
52,764
17.9
Total / Ave. Measured + Indicated
36.287
3.70
134,134
33.931
3.75
127,270
5.4
Inferred
11.844
3.73
44,235
11.643
3.91
45,480
(2.7)
Notes
1.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. H. Chirambadare, who is Ore Reserve Manager at
Doornkop, and a Harmony employee.
2.The Mineral Resource tonnes are reported as in-situ with RPEEE in line with SAMREC,2016.
3.No modifying factors or sources of dilution have been included to the in-situ Mineral Reserve that is subtracted from the SAMREC Mineral
Resource to derive the Mineral Resources under Regulation S-K 1300.
4.The Mineral Resources are reported using a cut-off value of 450 cmg/t determined at a gold price of US$3,061/oz.
5.Tonnes are reported rounded to three decimal places. Gold values are rounded to zero decimal places.
6.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
7.Rounding as required by reporting guidelines may result in apparent summation differences.
8.The Mineral Resource estimate is for Harmony’s 100% interest.
The increase in Mineral Resources is mainly a result of a reduction in the cut-off grade from 490 cmg/t to 450 cmg/t.
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call and plant recovery factors.
The Mineral Reserve estimate, as at 30 June 2025 and 2026, is summarised in the table below.
 
Fiscal Year Ended 30 June
 
 
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
% Change
Proved
5.626
3.65
20,536
4.294
3.74
16,075
27.7
Probable
5.531
4.22
23,356
9.378
4.11
38,545
(39.4)
Total / Ave. Proved + Probable
11.158
3.93
43,892
13.672
4.00
54,621
(19.6)
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. H. Chirambadare, who is the Doornkop Ore Reserve
Manager, and a Harmony employee.
2.Tonnes, grade, and gold content (oz) are declared as net delivered to the mills.
3.Figures are fully inclusive of all mining dilutions, gold losses and are reported as mill delivered tonnes and head grades. Metallurgical
recovery factors have not been applied to the reserve figures.
4.Gold content has not taken metallurgical recovery factors into account.
5.Mineral Reserves are reported using a cut-off grade of 500cmg/t determined using a gold price of US$2,915/oz.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
The decrease in Mineral Reserves is due to normal depletion and the adjustment to the algorithm parameters in the design
and scheduling programme.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for Doornkop. The modifying factors are consistent with the modelling, planning and computing estimates used in determining
the Mineral Reserves, which are also consistent with historical performance.
69
Table of contents
Modifying Factor
Unit
Value
Relative Density
t/mᶟ
2.77
Stoping width
cm
124
Gully (dilution)
%
6.73
Off Reef
%
4.83
Waste to Reef
%
0.33
Flushing tons
%
—
Discrepancy
%
18.75
Mine Call Factor
%
82.00
Plant Recovery Factor
%
96.65
Mine Recovery Factor
%
79.25
Plant Call Factor
%
100.00
Mineral Reserve cut-off
cmg/t
500
The 2026 Doornkop Mineral Resource and Mineral Reserve estimates reflect the updated geological model, cut-off
assumptions, mine design and scheduling methodology described above. The material assumptions and criteria supporting the
Mineral Resource and Mineral Reserve estimates are described in Sections 11 and 12, respectively, of the Doornkop TRS. For
additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
70
Table of contents
Free State Surface Operations
Property Description
The Free State Surface Operations comprise producing components and a prefeasibility-stage component and are located
near the towns of Welkom and Virginia, Free State Province, South Africa. The Phoenix Project and Central Plant Reclamation
are producing components, while Other Free State Tailings is at the prefeasibility stage. The operations reclaim and re-treat
local surface TSFs and WRDs.
The Free State Surface Operations comprise Mineral Resources located in 25 TSFs and three WRDs; three of the TSFs
are actively being mined and processed through two processing plants. The Free State Surface Operations comprise the
following:
•Phoenix Project: this project is currently reclaiming two TSFs which are processed through the Saaiplaas Plant;
•Central Plant Reclamation: this operation is currently reclaiming two TSFs which are processed through the Central Plant;
•Other Free State Tailings: this project is currently at the prefeasibility stage. It is envisaged that the project will include the
treatment of material from 22 TSFs, which are planned to be processed through the existing Central and Saaiplaas Plants,
as well as a new plant comprising two 600ktpm treatment modules; and
•Three WRDs located across Harmony's Free State mining operations.
The Free-State Surface Operations and their associated mineral rights are wholly owned by Harmony, except for the
Phoenix Project. The Phoenix Project is 100% owned by Harmony’s BBBEE subsidiary, Tswelopele Beneficiation Operation
(Pty) Limited, of which Harmony is a 77% shareholder (5% is held by the Harmony Community Trust).
FSS Property description.jpg
71
Table of contents
The location of the TSFs situated between Welkom and Virginia is presented in the figure below.
Surfaces Sources Tailings - Location of Free State Surface Operations 2026.jpg
72
Table of contents
The location of the WRDs is presented in the figure below.
fsmap222.jpg
Phoenix Project is a tailings retreatment operation located approximately 6km north of the town of Virginia; it currently
re-treats material from the FSS6 and Dam 21 TSFs using the Saaiplaas Plant. The Saaiplaas Plant is located at latitude
28°03’37.68”S and longitude 26°53’14.59”E.
The Central Plant Reclamation currently re-treats material from the FSS5 and FSS3 TSFs using the Central Plant. The
FSS5 TSF is located close to the southern edge of the town of Welkom, while the Central Plant is located approximately 7km
southeast of the Saaiplaas Plant at latitude  28°02’8.36”S and longitude  26°52’8.99”E.
The Other Free State Tailings is currently at prefeasibility stage. Although the results of the prefeasibility study completed
in 2009 indicate a positive net present value, Other Free State Tailings has not yet been commissioned. The project currently
comprises 22 TSFs. The reserve reclamation financial model done for Other Free State Tailings as part of our 2026 business
plan demonstrates positive free cash flow.
There is no material litigation against Harmony that threatens its mineral rights, tenure, or operations.
73
Table of contents
Operational Infrastructure
The surrounding areas of Welkom and Virginia are well developed in terms of access and mining-related infrastructure
supporting the numerous operational gold mines in the area. The regional infrastructure includes national and provincial paved
road networks, power transmission and distribution networks, water supply networks and communication infrastructure.
Operations are powered by electricity from Eskom.
The Free State Surface Operations draw their workforce principally from Welkom, Virginia and other established Free State
mining communities, supplemented by specialist contractors where required. Their principal equipment, facilities and
infrastructure are of varying ages and are subject to ongoing inspection, preventive maintenance, refurbishment and
replacement programmes. Management considers their physical condition adequate to support the current LOM plans, with
material modernisation and replacement projects included in sustaining capital plans as required.
The Free State Surface Operations have adequate access to the infrastructure required to meet the planned LOM
production schedules. In addition, all provisions and plans required for the Other Free State Tailings have been made.
The surface infrastructure located in the vicinity of Welkom and Virginia is displayed in the graphic below.
FS - Location of Free State Surface Operations' TSFs 2026 - Figure 3-2 2D JPEG-001.jpg
74
Table of contents
The “property, plant, and equipment” at Free State Surface Operations (Tswelopele Beneficiation and Central Plant
Reclamation) as at 30 June 2026 had carrying values of R290 million and R208 million respectively.
Free State Surface Operations did not incur any fines or penalties for non-compliance during the year ended 30 June 2026
and no significant encumbrances exist.
Geology
Material contained in the TSFs and WRDs originates from deep level gold mines, operated by Harmony and other mining
companies. The mining operations predominantly extract narrow, tabular gold-bearing conglomerate reefs, namely the Basal, B,
Elsburg, Dreyerskruil and Beatrix Reefs.
These reefs occur within the Archean Witwatersrand Basin which hosts the Witwatersrand Supergroup succession. The
Basal Reef is located at the base of the Harmony Formation, within the Johannesburg Subgroup of the Central Rand Group
("CRG"). The B Reef is part of the Spes Bona Formation at the base of the Aandenk Formation, within the Turffontein Subgroup
of the CRG. The Beatrix Reef is part of the Earls Court Member of the Aandenk Formation, within the Turffontein Subgroup of
the CRG. The Elsburg and Dreyerskruil Reefs occur within the Eldorado Formation of the Turffontein Subgroup, capping the
CRG in the Free State Goldfield.
The TSF material is the waste product of crushing, milling and gold extraction by carbon-in-leach ("CIL") or CIP methods.
As man-made deposits the TSFs are not the result of natural sedimentary processes. The grade of the TSFs is a function of the
grade of the original reef sources, and the efficiency of the processing method at the time of treatment.
The WRDs comprise unconsolidated, untreated, low-grade gold-bearing rock extracted from underground workings during
the mining process. These WRDs are also man-made and are not formed as a result of natural sedimentary processes. They
exhibit no structure or continuity. The grade of the WRDs is a function of the grade of the original reef sources.
The most significant mineral in the TSFs and WRDs is quartz, which makes up more than 60% of the bulk mineral
composition. The gold predominantly occurs in association with pyrite. Other minerals identified include silver, copper, iron
oxide, nickel, bismuth, uranium, lead and zinc from the Basal, B, Elsburg, Dreyerskruil and Beatrix conglomerates.
History
The Saaiplaas Plant originally processed ore from Saaiplaas 1, 2 and 3 shafts. Saaiplaas 1 closed around 1980, Saaiplaas
2 around 1996, and Saaiplaas 3 around 2000. The Saaiplaas Plant once also processed ore from the Erfdeel (now Masimong)
shafts. With the decline of mining in the area, the plant was relegated to processing unmilled surface source material (waste) at
a rate of 110,000tpm until July 2007. As all material currently processed by the plant is recovered by hydro-mining from old,
desiccated tailings dams in the area, crushing or milling is not required. The ore-receiving silos were demolished in July 2007
when milling ceased.
Plant commissioning began for the Central Plant Reclamation in June 2017 with ramp-up to a capacity of 300,000t a
month. Central Plant, which had previously processed WRDs, was converted into a tailings retreatment operation during 2016
and started treating TSF material only in fiscal 2017.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
The mineral tenure of the Free State Surface Operations, under which the activities of reclaiming TSFs and WRDs are
permitted, falls within the mining rights held by Harmony.
The different mining right areas and associated TSFs and WRDs that form part of the Free State Surface Operations are
detailed in the table below.
75
Table of contents
TSF Name
Licence
Type
Reference
No.
Effective Date
Expiry Date
Mineral
Brand A (PB Dam A)
MR
FS (82)
11 December 2007
10 December 2029
Au
No. 21 (H3)
MR
FS (82)
11 December 2007
10 December 2029
Au
FSS3
MR
FS (227)
4 February 2010
3 February 2028
Au
FSS5
MR
FS (227)
4 February 2010
3 February 2028
Au
FSS6
MR
FS (227)
4 February 2010
3 February 2028
Au
FSN6
MR
FS (227)
4 February 2010
3 February 2028
Au
No. 32
MR
FS (82)
11 December 2007
10 December 2029
Au
FSS1
MR
FS (227)
4 February 2010
3 February 2028
Au, Ag, Cu, Fe, Ni,
Bi, U, Pb, Zn
FSS2 East and West
MR
FS (83/227)
11 December 2007
10 December 2029
Au
FSS4
MR
FS (83)
11 December 2007
10 December 2029
Au
FSS7
MR
FS (83)
11 December 2007
10 December 2029
Au
FSS8 East
MR
FS (82)
11 December 2007
10 December 2029
Au
FSS8 West
Brand D (PB Dam D)
MR
FS (82)
11 December 2007
10 December 2029
Au
Saaiplaas 1
MR
FS (82)
11 December 2007
10 December 2029
Au
Saaiplaas 3 and 2
MR
FS (82)
11 December 2007
10 December 2029
Au
Saaiplaas 5b
MR
FS (82)
11 December 2007
10 December 2029
Au
No. 23 (Central Plant)
MR
FS (82)
11 December 2007
10 December 2029
Au
No. 30a
MR
FS (82)
11 December 2007
10 December 2029
Au
No. 33A
MR
FS (82)
11 December 2007
10 December 2029
Au
No. 33b
MR
FS (82)
11 December 2007
10 December 2029
Au
No. 34a
MR
FS (82)
11 December 2007
10 December 2029
Au
Target Slimes Dam
MR
225
12 December 2013
11 December 2026
Au, Ag, Cu, Fe, Ni,
Bi, U, Pb, Zn
Pres Steyn 9 (Freddies 9)
MR
226
4 February 2010
3 February 2040
Au, Ag, Cu, Fe, Ni,
Bi, U, Pb, Zn
ARM (1+2+3+4) (Welkom Slime
Dam)
The ARM TSF was created before the MPRDA was promulgated in 2004 and therefore is
not regulated by the MPRDA and does not need to be converted under a new order mining
right. The TSF is however included in the water use licence application.
A summary of the status of EPs and licences issued as at 30 June 2026 related to the Free State Surface Operations is
presented in the table below.
Operation
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
Phoenix Project
Atmospheric Air Emission
Licence – Exemption
LDM/AEL/YMK/017
Lejweleputswa
District
Municipality
1 November 2024
December
2029
Water Permit
1214N
DWS
N/A
LOM
575N
DWS
30 September 1987
LOM
718N
DWS
5 October 1993
LOM
Water Use Registration
23007522
DWS
26 July 2019
LOM
Central Plant
Reclamation
Atmospheric Air Emission
Licence
LDM/RAEL/02/2024
Lejweleputswa
District
Municipality
1 May 2024
1 April
2029
Water Permit
1214N
DWS
N/A
LOM
General
EMPr
FS30/5/1/2/3/2/1(82)
EM
DMPR
12 March 2010
LOM
Mining Method
The mining methods used at the Free State Surface Operations are hydro-mining for the TSFs, and reclamation of WRDs
uses tracked dozers and front-end loaders ("FELs").
The tailings material is reclaimed by blasting the TSF face with high pressure water, resulting in the slurry gravitating
towards the pumping stations. Several hydraulic monitoring guns deliver high pressure water to the face of the TSF. The hydro-
mining method allows for flexibility as the monitoring guns can be positioned to selectively reclaim the required areas in the TSF.
The bench heights are constrained by the force delivered by the monitoring gun nozzle, taking safety measures into account.
For safety reasons, the top down method of hydro-mining is implemented. The gun is positioned at the top of the face,
where it will cut downwards at a safe angle (a maximum angle of 45°). The horizontal distance between the cutting face and the
bottom of the bench varies between 10m and 15m, depending on the bench angle. The track for the monitoring gun is located
2m from the cutting face, allowing for a safe angle of repose, taking geotechnical parameters into account.
76
Table of contents
The pump stations are located at the lowest point of the TSF, which ensures that the slurry material gravitates towards the
pump stations, where it is then pumped to the processing plant.
With respect to WRDs, dozers are positioned on top of the WRD. The dozers are used to create safe loading faces and
blend the rock. The material is then loaded from the face onto trucks using FELs and transported to the relevant gold plants for
processing. When loading is done at the bottom of the WRD, precaution must be taken to ensure that the face is not undercut.
These precautions are in place to prevent rock falls from the dump. A slope with a maximum inclination angle of 15° is created
towards the loading point, where the WRD material is pushed down. The slope angle is monitored and maintained on a
continuous basis.
As a safety measure, two red indicating poles are located at the top of the dump in the area where the dozer is working.
The dozer must not go beyond the indicating poles, and dozing does not take place vertically above a loading point where an
FEL is loading. A 30m advance is required between the dozer and the point vertically above an active loading point. As an
additional safety consideration, operations at the WRDs take place during hours of daylight.
The WRD material is loaded onto rail hoppers using the FELs and transported to the relevant processing plant.
Mineral Processing
Two plants, namely the Central Plant and the Saaiplaas Plant, are currently dedicated to the processing of tailings material.
Reclaimed tailings are pumped as slurry via pipelines and WRD material is transported by truck, to the respective plants for
processing.
The Saaiplaas Plant forms part of the Phoenix Project and is currently treating reclaimed tailings at a rate of 507ktpm from
FSS6 and Dam 21 TSFs.
Reclaimed tailings from FSS5 TSF and FSS3 are processed through the Central Plant at a rate of 319ktpm. The rate of
treatment will remain unchanged for the duration of the LOM even when new TSFs form part of the feed to the plant.
The prefeasibility study proposes the processing of additional TSFs that are planned to be treated through the existing
Central and Saaiplaas Plants and a new plant comprising two 600ktpm treatment modules.
Qualified Persons
The QP was employed on a full-time basis by Harmony. The QP's qualifications, areas of responsibility and personal
inspection of the property are summarised in the graphic below.
Qualified Person
Professional
Organisation
Qualification
TRS Section
Responsibility 
Personal
Insp.
Mr. BJ Selebogo
SAGC
MSCC, HND (MRM)
All
Full time
Exploration
Various auger drilling and sampling campaigns have been undertaken and are on record from 2007 to 2020. A total of
248 drill holes were drilled into nine TSFs (including Saaiplaas Complex, FSS1, FSS4, FSN6, FSS6, FSS7) between January
2017 and February 2020. The purpose of the drilling was to determine grade estimates. The most recent drilling was done for
FSS3 in 2023.
WRDs cannot be explored using drilling because they comprise of unconsolidated rock. Instead, they are sampled around
the periphery using pitting.
The drilling and sampling methodology in use for Harmony’s TSFs at the Free State Surface operation has been developed
specifically for the challenges posed by these deposits and is aligned with industry best practice. An internal protocol is in place,
and the drilling components are applied by contractors who are experienced in this specific methodology.
The drill hole samples are deemed to be representative as they provide both vertical and horizontal coverage of each TSF.
Drill holes are positioned at regular intervals across the TSFs.
The data spacing, density and distribution are sufficient to support the estimation of Mineral Resources for the various
TSFs.
WRDs are not explored using exploration methods due to their unconsolidated nature.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
Mineral Resource Estimate
The Mineral Resources were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of Regulation
S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
77
Table of contents
The Mineral Resource estimate for the TSFs as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is
summarised in the table below:
 
 
Fiscal Year Ended 30 June
 
 
 
2026
2025
 
Mineral
Resource
Category
Operation / Project
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
%
Change
Measured
Phoenix Project
11.845
0.27
3,251
18.144
0.28
5,098
(36.2)
Other Free State Tailings
78.504
0.26
20,460
82.788
0.27
22,487
(9.0)
Sub Total / Ave. Measured
90.349
0.26
23,711
100.931
0.27
27,585
(14.0)
Indicated
Phoenix Project
6.621
0.29
1,917
—
—
—
—
Central Plant
1.138
0.31
352
—
—
—
—
Sub Total / Ave. Indicated
7.759
0.29
2,269
—
—
—
—
Total / Ave. Measured + indicated
98.108
0.26
25,980
100.931
0.27
27,585
(5.8)
Inferred
Phoenix Project
—
—
—
—
—
—
—
Other Free State Tailings
127.303
0.17
21,400
123.428
0.20
24,263
(11.8)
Total / Ave. Inferred
127.303
0.17
21,400
123.428
0.20
24,263
(11.8)
Notes:
1.The Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according
to SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. BJ Selebogo, who is the Ore Reserve Manager,
and a Harmony employee.
2.The Mineral Resource tonnes are reported as in-situ with RPEEE in line with SAMREC, 2016.
3.No cut-off grade has been applied for the estimation of Mineral Resources. Mineral Resource tonnes are reported based on a gold price of
US$3,061/oz.
4.Tonnes are reported as million tonnes rounded to three decimal places. Gold values are rounded to zero decimals places.
5.Uranium content is not reported for any of the projects.
6.Metal content does not include allowances for processing losses.
7.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
8.Rounding as required by reporting guidelines may result in apparent summation differences.
9.The Mineral Resource estimate is for Harmony’s 100% interest.
The change in Mineral Resources is a result of an increase in Inferred Mineral Resource at lower grades due to new
deposition at FSS2, Brand D, Dam 23 and Target Slime Dams and survey updates.
The Mineral Resource estimate for the WRDs as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is
summarised in the table below:
 
 
Fiscal Year Ended 30 June
 
 
 
2026
2025
 
Mineral
Resource
Category
Operation / Project
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
%
Change
Measured
WRD
—
—
—
—
—
—
—
Indicated
WRD
0.078
0.55
43
0.078
0.55
43
—
Total / Ave. Indicated
0.078
0.55
43
0.078
0.55
43
—
Inferred
WRD
11.649
0.45
5,212
11.207
0.44
4,887
6.6
Notes:
1.The Mineral Resources were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of this report on
Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP
responsible for the estimate is Mr. BJ Selebogo, who is the Ore Reserve Manager, and a Harmony employee.
2.The Mineral Resource tonnes are reported as in situ with RPEEE in line with SAMREC, 2016.
3.No cut-off grade has been applied for the estimation of Mineral Resources. Mineral Resource tonnes are reported based on a gold price of
US$3,061/oz.
4.Tonnes are reported as million tonnes rounded to three decimal places. Gold values are rounded to zero decimal places.
5.Uranium content is not reported for any of the projects.
6.Metal content does not include allowances for processing losses.
7.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
8.Rounding as required by reporting guidelines may result in apparent summation differences.
9.The Mineral Resource estimate is for Harmony’s 100% interest.
The change in Mineral Resources is due to depletion, offset by the addition of new WRDs.
78
Table of contents
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational planning processes.
The planning team utilises and takes into consideration historical technical parameters achieved. In addition, Mineral Resource
conversion to Mineral Reserves considers certain modifying factors, plant call factor, and plant recovery factors.
The Mineral Reserve estimate for the Free State Surface Operations as at 30 June 2025 and 2026, is summarised in the
table below.
 
 
Fiscal Year Ended 30 June
 
 
 
2026
2025
 
Mineral
Reserve
Category
Operation / Project
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
%
Change
Proved
Phoenix Project
12.170
0.28
3,442
30.425
0.27
8,108
(57.6)
Other Free State Tailings
82.099
0.25
20,643
86.527
0.27
23,410
(11.8)
Sub Total / Ave Proved
94.270
0.26
24,084
116.952
0.27
31,519
(23.6)
Phoenix Project
12.170
0.25
3,063
—
—
—
—
Probable
Central Plant
34.513
0.28
9,518
39.671
0.27
10,673
(10.8)
Other Free State Tailings
511.608
0.23
115,574
483.358
0.23
110,395
4.7
Sub Total / Ave Probable
558.291
0.23
128,155
523.029
0.23
121,068
5.9
Total / Ave Proved + Probable
652.561
0.23
152,240
639.981
0.24
152,587
(0.2)
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. BJ. Selebogo, who is the Ore Reserve Manager, and a
Harmony employee.
2.Tonnes, grade, and gold content (oz) are declared as net delivered to the mills.
3.Gold content has not taken metallurgical recovery factors into account.
4.Mineral Reserves are reported using cut-off grades calculated for each TSF, ranging between 0.145g/t and 0.149g/t for Central and
Saaiplaas Plant respectively, and a gold price of US$2,915/oz. The Other Free State Tailings are supported by a pre-feasibility study.
5.Recovered gold (kg) is based on a conversion factor of 32.1507oz/kg.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
The decrease in Mineral Reserves is mainly due to depletions, survey updates and resource model updates.
There are no Mineral Reserves for the WRDs.
79
Table of contents
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for the Free State Surface Operation. The modifying factors are consistent with the modelling, planning and computing
estimates used in determining the Mineral Reserves, which are also consistent with historical performance.
Operation / Project
Source
Cut-off Grade
(g/t Au)
Plant
Recovery
(%)
Phoenix Project
No. 21 (H3)
0.17
46.00
FSS6
0.13
46.00
Central Plant Reclamation
FSS5
0.15
48.89
FSS3
0.15
48.89
Other Free State Tailings
Free State South 1 (FSS1)
0.11
51.71
Free State South 2 East & West (FSS2 E&W)
0.18
51.71
Free State South 4 (FSS4)
0.11
51.71
Free State South 7 (FSS7)
0.12
48.67
Free State South 8 (FSS8-E)
0.11
51.71
Free State South 8 (FSS8-W)
0.11
51.71
Free State North 6 (FSN6)
0.14
43.32
Brand D
0.16
52.57
Saaiplaas 1
0.11
52.57
Saaiplaas 3 & 2
0.13
52.57
Saaiplaas 5b
0.11
52.57
No. 23 (Central Plant)
0.11
52.57
No. 30a
0.11
52.57
No. 33b
0.12
48.97
No. 34a
0.11
52.57
No. 32
0.12
49.89
No 33A
0.11
52.51
Target Slimes Dam
0.13
52.00
Pres Steyn 9 (Freddies 9)
0.11
52.00
For additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
80
Table of contents
Joel
Property Description
Joel is a production-stage property located on the southern edge of the Witwatersrand Basin in the Free State Goldfield
and lies 270km south southwest of Johannesburg at latitude 28°16'17.19"S and longitude 26°48'57.97"E. Joel is the
southernmost of the gold mines within the Harmony stable and is situated approximately 40km south of Welkom, 30km
southeast of Virginia and 20km north of Theunissen. The mine has a common boundary with Beatrix Mine to the west of the
mine property, but there are no underground connections between the two mines.
Joel mine is accessible via national and provincial roads. The general layout of Joel infrastructure in relation to the other
Harmony Free State mines, is displayed in the graphic below.
Joel Property description.jpg
Joel is an intermediate-depth underground gold mine that consists of two shaft complexes interconnected via a triple
decline system, spanning four levels and mining at depths of 1,379m BMD. Joel currently has a LOM expectancy of five years
and the mine is wholly-owned and operated by Harmony.
There is no material litigation against Harmony that threatens its mineral rights, tenure, or operations.
Operational Infrastructure
The surrounding areas of Welkom and Virginia are well developed in terms of access and mining-related infrastructure
supporting the numerous operational gold mines in the area. The regional infrastructure includes national and provincial paved
road networks, power transmission and distribution networks, water supply networks and communication infrastructure.
Joel has two operational shaft complexes namely North Shaft and South Shaft, which service and support the mining
operation as defined in the LOM plan. The former Joel gold plant located near North Shaft was decommissioned in 2019. Joel
ore is currently trucked over a distance of 35km to the Bambanani ore transfer site. The ore is then transported by rail to the
Harmony One Plant, over a distance of 7km.
Joel draws its workforce principally from Welkom, Virginia, Theunissen and other established Free State mining
communities, supplemented by specialist contractors where required. Its principal equipment, facilities, infrastructure and
underground development are of varying ages and are subject to ongoing inspection, preventive maintenance, refurbishment
81
Table of contents
and replacement programmes. Management considers their physical condition adequate to support the current LOM plan, with
material modernisation and replacement projects included in sustaining capital plans as required.
Operations are powered by electricity from Eskom.
Joel’s surface and underground infrastructure, including its power and water supplies, are sufficient for the LOM plan
production requirements.
joelmap222.jpg
The “property, plant, and equipment” at Joel as at 30 June 2026, including buildings and mine infrastructure, mining assets,
rehabilitation and assets under construction, had a carrying value of R1.5 billion.
Joel did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no significant
encumbrances exist.
Geology
Joel is situated in the Free State Goldfield, on the southwestern margin of the Witwatersrand Basin of South Africa, one of
the most prominent gold provinces in the world. The major gold bearing conglomerate reefs are mostly confined to the CRG of
the Witwatersrand Supergroup.
The Free State Goldfield is structurally divided into two sections, cut by the north-south striking De Bron Fault, which has a
downward vertical displacement to the west of about 1,500m in the region of Bambanani, as well as a dextral shift of 4km. This
known lateral shift allows a reconstruction of the reefs to the west and east of the De Bron Fault. Several other major faults lie
parallel to the De Bron Fault. Joel lies to the west of the De Bron Fault. Dips of the reef are mostly towards the east, averaging
30° but become steeper approaching the De Bron Fault. Between the east and west blocks lies the uplifted horst block of WRG
sediments with no reef preserved.
The reef currently exploited at Joel is the Beatrix Reef, which covers approximately 90% of the mine. The other potentially
economically-viable reefs are the VS5 Reef and the Footwall Reef ("Aandenk") which cover the remaining 10% of Joel.
Mineralisation is associated with the presence of medium to coarse, clast-supported oligomictic pebble horizons. The
significant minerals in the deposit are quartz (60%), pyrite (35%) and garnets (5%) within medium to coarse, clast-supported
oligomictic pebble horizons. Detrital carbon is also common.
History
Active prospecting in the area began on the farms Leeuwbult 580 and Leeuwfontein 256 in 1981. Construction of the twin-
shaft system began in September 1985 and was completed by December 1987. The Joel South Shaft was designed to be a fully
trackless mining operation.
Previously known as HJ Joel Mine, its name was changed to Joel in 1998 when AngloGold Limited, the predecessor to
AngloGold, was established. The mine’s name changed again to Taung in 1999 and finally reverted to Joel in January 2002
when the Freegold Joint Venture between Harmony and African Rainbow Minerals Limited ("ARMGold") assumed responsibility
for the operation.
Joel has been wholly-owned by Harmony since 2023.
82
Table of contents
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
The current mining right (30/5/1/2/2/10044MR) which encompasses an area of 2,166.92ha was successfully converted,
executed and registered as a new order mining right at the MPRTO on 6 August 2010. The right was granted on 3 December
2007 for a period of 11 years, ending on 2 December 2018, and was further renewed in terms of section 24(1) of the MPRDA on
23 February 2023 for a further 11 years, ending on 14 February 2030.
The following mining rights make up the full mining lease area of approximately 2,166.9ha:
•30/5/1/2/2/10044MR valid from 23 February 2019 to 14 February 2030.
A summary of the status of all EPs and licences issued at 30 June 2026 related to Joel is presented in the table below.
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
EMPr
FS 30/5/1/2/3/2/1/13MR
DMPR
16 April 2010
LOM
Water Permit
1459B (B33/2/340/116)
DWS
27 May 1991
LOM
Water Permit
1460B (B33/2/340/116)
DWS
15 March 1991
LOM
Waste Disposal Permit
1339N(B33/2/340/116/P35)
DWS
16 September 1992
LOM
Water Permit
3M (B33/2/340/116)
DWS
27 May 1991
LOM
Sewage Treatment
Permit
QC404.00.XR01
DWS
20 August 1986
LOM
Water Permit
1339N (B33/2/340/116)
DWS
15 March 1991
LOM
Environmental
Authorisation
EMS/11(i)/12(ii)(a)(c), 14,
19 ,24(ii),1, 15, 4(b)(i)(gg),
10(b)(i)(gg)(hh), 12(b)(i),
14(ii)(a)(b)(i)(hh)/22/16
DESTEA1
11 September 2023
11 September 2033
1 Department of Economic, Small Business Development, Tourism and Environmental Affairs of the Free State.
Mining Method
Joel was originally designed to adopt trackless mechanised mining when production commenced at South Shaft, but in
1994 a decision was made to change to conventional mining mainly due to the high operating costs of trackless mining. Joel
consists of two interconnected shaft complexes, the South Shaft complex which is the main operational shaft and the North
Shaft which is available for hoisting ore.
Joel’s upper mining levels are in a mature phase of operation. The decline project development, from 129 to 137 level,
which started in 2011, is complete. This included mining up to 137 level and the Beatrix Mine block exchange. The decline
project to access the orebody from 137 level included two declines that were developed at 12° from 129 level – a chairlift decline
and a conveyor belt decline. The belt, main tips and chairlifts have been completed. Reef development and stoping commenced
on 137 level in 2016.
Joel has adopted conventional breast mining on a scattered grid (or scattered mining) which is tailored to the variable
grades intersected as well as the associated rock-related hazards anticipated at this depth. Stoping panel stability in an
intermediate stress environment may require additional stabilising pillars be left to support the immediate hanging wall. These
take the form of inter-panel crush pillars between neighbouring mining panels.
The primary economic reef mined is the narrow tabular Beatrix Reef, accessed via conventional grid development. Mining
consists of horizontal footwall development to access the reef horizon with inclined development on the reef plane to establish
mining faces. Ore is cleared from the stopes through ore passes into the underlying cross-cuts.
Mineral Processing
The former Joel gold plant designed and commissioned during the construction of the mine was decommissioned in fiscal
2019 and all ore mined at Joel is now processed at the Harmony One Plant.
The Harmony One Plant processes underground ore from multiple operations, as well as surface ore from nearby WRDs.
The plant was commissioned in 1986 and comprises three independent modules, each consisting of four feed silos, two run-of-
mine ("ROM") mills, two conventional thickeners, cyanide leaching, CIP adsorption, elution, zinc precipitation, and smelting
circuits. The plant's CIP process reflects the technology that was current at the time of its construction.
The Harmony One Plant has a steady-state design capacity of 390ktpm using its conventional CIP flowsheet.
Qualified Persons
The QP was employed on a full-time basis by Harmony. The QP's qualifications, areas of responsibility and personal
inspection of the property are summarised in the graphic below.
Qualified Person
Professional
Organisation
Qualification
TRS Section
Responsibility 
Personal
Insp.
Mr. JD Ackermann
SACNASP
BSc Geol
All
Full time
83
Table of contents
Exploration
Geological data has been obtained through initial surface drilling, followed by underground drilling, mapping and channel
(chip) sampling.
Since the inception of Joel in 1986, 48 exploration drill holes have been drilled from surface. 40 of the holes were drilled by
the previous owners of the mine and eight holes, totalling 10,800m, have been drilled during Harmony’s tenure.
Surface exploration drilling by Harmony began in 2010, with the eight planned holes and their associated deflections. The
purpose was to increase geological knowledge of structure, facies and grade distribution up to 137 level for the deepening of
infrastructure to 137 level.
In 2019, five holes were drilled to explore for the VS5 Reef boundary in the eastern side of the shaft on 129 level and to
determine the facies and value towards 145 level for the extension of the shaft to 145 level.
Underground exploration drilling has been ongoing throughout the operational life of Joel to identify organic growth
opportunities. Underground exploration drilling is undertaken to supplement the surface drilling on a closer grid spacing for reef
location, grade distribution and the presence of structures.
The underground infill drilling programme is in place to improve data density in specific areas, and drill holes are drilled
from the underground development access drives. The drill hole spacing is typically every 30m along strike and 30m down dip,
with higher density in the western limb of the asymmetric syncline to the north-west of the mine. The underground drill holes are
short drill holes rarely exceeding 200m in length.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
Mineral Resource Estimate
The Mineral Resource estimate at Joel is considered to have reasonable prospect for eventual economic extraction by
underground mining methods. The cut-off grade for the Mineral Resource is determined at 562cmg/t gold based on the
economic assumptions presented in the table below at 30 June 2026.
Description
Unit
Value
Gold price
US$/oz
3,061
Exchange rate
R:US$
17.60
Gold price
R/kg
1,730,000
Plant recovery factor
%
94.24
Unit cost
R/t
5,186
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions.
The Mineral Resources were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of Regulation
S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
The Mineral Resource estimate as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is summarised
in the table below.
Fiscal Year Ended 30 June
%
Change
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Measured
2.023
7.09
14,335
1.817
8.46
15,374
(6.8)
Indicated
3.126
7.38
23,074
2.938
6.82
20,033
15.2
Total / Ave. Measured + Indicated
5.149
7.27
37,409
4.755
7.45
35,407
5.7
Inferred
0.277
7.09
1,964
0.185
8.01
1,484
32.3
Notes:
1.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. JD Ackermann, who is the Ore Reserve Manager
at Joel, and a Harmony employee.
2.The Mineral Resource tonnes are reported as in-situ with reasonable prospects for eventual economic extraction in line with SAMREC,
2016.
3.No modifying factors or sources of dilution have been included to the in-situ Mineral Reserve that is subtracted from the SAMREC Mineral
Resource to derive the Mineral Resource under Regulation S-K 1300.
4.The Mineral Resources are reported using a cut-off value of 562cmg/t determined at a gold price of US$3,061/oz.
5.Tonnes are reported as rounded to three decimal places. Gold values are rounded to zero decimal places.
6.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
84
Table of contents
7.Rounding as required by reporting guidelines may result in apparent summation differences.
8.The Mineral Resource estimate is for Harmony’s 100% interest.
The increase in Mineral resource is primarily a result of an increase in grade in the Eastern block.
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call and plant recovery factors.
The Mineral Reserve estimate as at 30 June 2025, and 2026, is summarised in the table below.
 
Fiscal Year Ended 30 June
 
 
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
%
Change
Proved
1.454
4.96
7,216
2.078
4.69
9,740
(25.9)
Probable
0.578
5.01
2,897
0.168
5.35
899
222.2
Total / Ave. Proved + Probable
2.032
4.98
10,112
2.246
4.74
10,639
(5.0)
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. JD Ackermann, who is the Joel Ore Reserve Manager,
and a Harmony employee.
2.Tonnes, grade, and gold content (oz) are declared as net delivered to the mills.
3.Figures are fully inclusive of all mining dilutions, gold losses and are reported as mill delivered tonnes and head grades. Metallurgical
recovery factors have not been applied to the reserve figures.
4.Gold content has not taken metallurgical recovery factors into account.
5.Mineral Reserves are reported using a cut-off grade of 580cmg/t determined using a gold price of US$2,915/oz.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
The decrease in Mineral Reserves was due to depletion. These decreases were partially offset by additional ounces
identified and the one year extension of the LOM.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for Joel. The modifying factors are consistent with the modelling, planning and computing estimates used in determining the
Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
Relative Density
t/m3
2.75
Average Stoping Width
cm
175
Gully
%
4.98
Off Reef
%
0.57
Waste to Reef
%
0.39
Flushing Tons
%
0.00
Discrepancy
%
0.00
Mine Call Factor
%
80.00
Plant Recovery Factor
%
94.24
Mine Recovery Factor
%
75.39
Plant Call Factor
%
100.00
Mineral Reserve Cut Off
cmg/t
580
For additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
85
Table of contents
Kalgold
Property Description
Kalgold is a production-stage property located at latitude 26°10'12.85"S and longitude 25°14'02.70"E, 55km southwest of
Mahikeng, between Mahikeng and Stella, along the Mahikeng-Vryburg road (N18) in North West Province, South Africa. Kalgold
Mine is serviced by well-maintained sealed roads with good access to all nearby towns and cities. The mine is surrounded by
farmland and the closest community is at Kraaipan, approximately 15km to the south of the mine. The Kalgold Mine has been in
operation since December 1995 and is the only significant mining operation in the region. Kalgold is wholly-owned and operated
by Harmony.
The following graphic illustrates the location of the Kalgold mine, along with certain infrastructure.
Surface sources Kalgold - Kraaipan Greenstone Belt 2026.jpg
Kalgold is an open-pit mining operation, extracting ore from a series of satellite orebodies. There is no material litigation
against Harmony which threatens its mineral rights, tenure, or operations.
86
Table of contents
Operational Infrastructure
Infrastructure in the region is well established. The regional infrastructure includes national and provincial paved road
networks, power transmission and distribution networks, water supply networks and communication infrastructure. Schools,
clinics and hospitals are readily available in the surrounding areas. Operations are powered by electricity from Eskom.
Ore and waste material are transported separately, with ore being trucked from the pit to the plant ROM pad, and waste
rock going to the mine's WRDs. Low-grade ore is transported by truck and stockpiled for future processing. Kalgold has its own
processing plant situated adjacent to the mine.
Kalgold is accessible via the provincial roads. The detailed surface infrastructural layout includes established haul roads for
the transport of ore and waste, the WRDs, and stockpiles for the associated pits.
Kalgold draws its workforce principally from nearby North West communities, supplemented by personnel recruited
elsewhere and specialist contractors where required. Its principal mobile equipment, plant, facilities and infrastructure are of
varying ages and are subject to ongoing inspection, preventive maintenance, refurbishment and replacement programmes.
Management considers their physical condition adequate to support the current LOM plan, with material modernisation and
replacement projects included in sustaining capital plans as required.
The general layout of Kalgold infrastructure is displayed in the graphic below.
Kalgold 2026.jpg
87
Table of contents
The “property, plant, and equipment” at Kalgold as at 30 June 2026, including buildings and mine infrastructure, mining
assets, rehabilitation and assets under construction, had a carrying value of R1.5 billion. Kalgold did not incur any fines or
penalties for non-compliance during the year ended 30 June 2026 and no significant encumbrances exist.
Geology
The Kalgold lode deposit is located within the geological terrane known as the Archaean Kraaipan Greenstone Belt
("KGB"). The KGB forms part of the Kaapvaal Craton of South Africa and comprises a linear belt of weakly metamorphosed
mafic volcanic rocks with interbedded metasedimentary rocks and Banded Iron Formation ("BIF"). The belt extends in a roughly
north/south direction over 250km from South Africa into southern Botswana.
The belt is intruded by several granitoid suites which range from tonalitic and trondhjemitic gneisses through to
granodiorite-monzonite suites. There is a general paucity of outcrop owing to the variably developed weathering profile and to
the Tertiary-to-Recent cover, including transported Kalahari sands. Due to the younger cover rocks and lack of surface
exposure, the mineralisation potential of the belt was poorly understood for many years.
The Kalgold lode deposit is accessed through five discrete mining areas, namely D-Zone, Henry's, A-Zone, Watertank, and
Windmill pits. Watertank pit is split into Watertank Main and Watertank North. Watertank North refers to the northern extension
of the pit. D-Zone pit was mined out in 2009 and the geology of the D-Zone pit is used as a benchmark for the other pits. The
geology consists of mafic schist, which forms the immediate footwall, a BIF horizon as the main mineralised zone and a
succession of clastic sediments consisting of shale, greywacke, and volcanic conglomerates as the hanging wall. Mining is
currently taking place at A-Zone and Watertank pits.
Mineralisation at Kalgold is essentially strata bound to the BIF packages, resulting from intense silica, carbonate, sulphide
and potassium alteration and metasomatic replacement of the BIF lenses. The mineralisation is manifested primarily as quartz
veined and sulphidised BIF, with sulphides dominated by pyrrhotite and pyrite. Gold predominantly occurs as small grains of
native gold, in association with pyrrhotite and trace chalcopyrite and sphalerite.
History
Kalgold was originally developed by Shamrock Mining and Prospecting Company (Proprietary) Limited (“Shamrock”),
which was formed in 1982 as a wholly-owned exploration and development subsidiary of Shell Limited, which began exploring
the Kraaipan Greenstone in the 1980s. In 1994, West Rand Consolidated Mines acquired Shamrock. The company changed its
name to Kalahari Goldridge Mining Company Limited (“Kalahari Goldridge”) in May 1996 and was listed on the JSE on
14 October 1996. Harmony acquired Kalahari Goldridge and with it, Kalgold, in July 1999.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
The Kalgold mining right, which encompassed 615ha, was successfully converted, executed, and registered as a new
order mining right on 24 February 2015, as MR12/2015 under Mining Right Protocol 574/2008. The mining right remains valid
until 27 August 2038.
A Section 102 amendment, in terms of the MPRDA, to include aggregates and certain portions of the farms Goldridge 632
IO and Ferndale 544 IO, into the mining right, was executed on 9 November 2010, under Mining Right Protocol 774/2010.
Prospecting rights issued for gold over the farms Goldridge 632 IO and Ferndale 544 IO, covering an area of 16,360 ha,
are valid until 17 December 2028.
Under the MPRDA, Harmony is entitled to apply to renew the mining right upon its expiry.
Harmony is the holder of the following mining rights:
•NW30/5/1/2/2/77 MR valid from 28 August 2008 to 27 August 2038; and
•NW FS 30/5/1/1/2/14264 PR valid from 18 December 2025 to 17 December 2028.
88
Table of contents
A summary of the status of EPs and licences issued as at 30 June 2026, related to the Kalgold operation is presented in
the table below.
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
EMPr (Amendment)
NW30/5/1/2/2/77 MR
DMPR
8 March 2022
LOM
Environmental
Authorisation
(NW) 30/5/1/2/3/2/1/77 EM
DMPR
4 October 2022
LOM
Environmental
Authorisation (D-Zone
South)
NW30/5/1/1/3/2/1/14264 EM
DMPR
22 April 2025
LOM
Environmental
Authorisation (updated
closure plan for D-
Zone)
NW30/5/1/2/3/2/1/(77) MR
DMPR
12 September 2016
LOM
Water Use Licence
07/D41B/ABCGIJ/4754
DWS
22 February 2021
22 February 2036
Water Use Licence
10/D41B/G/17109
DWS
5 September 2025
5 September 2040
Certificate of
Registration
Inflammable Liquids
and Substances
FS/FLM 01/06/01/2026
Ngaka Modiri Molema
District Municipality
3 June 2026
3 June 2027
Certificate of
Registration
Inflammable Liquids
and Substances
FS/FLM 01/06/02/2026
Ngaka Modiri Molema
District Municipality
3 June 2026
3 June 2027
Certificate of
Registration
Inflammable Liquids
and Substances
FS/FLM 01/06/03/2026
Ngaka Modiri Molema
District Municipality
3 June 2026
3 June 2027
Certificate of
Registration
Inflammable Liquids
and Substances
FS/GAS
PERMIT01/02/01/2026
Ngaka Modiri Molema
District Municipality
3 June 2026
3 June 2027
Protected Trees Permit
06-B-05-2026
DFFE
29 May 2026
20 May 2027
Atmospheric Air
Emission Licence
NWPG/KALGOLDAEL
4.1,4.13 & 4.17/SEP2024
DEDECT1
2 September 2024
31 August 2029
1 North West Department: Economic Development, Environment, Conservation and Tourism.
Mining Method
Kalgold is an open-pit mining operation located in the geological terrane of the Archaean KGB. Gold mineralisation is
hosted by steeply dipping BIF interbedded with schist, shale, and greywacke. The nature of the orebody requires the selective
mining of the ore blocks, defined by the east and west mineralised limbs, to separate the ROM destined ore, above the Mineral
Reserve cut-off of 0.58g/t. Based on the gold grade, properties of the host rock, and shallow depth of mineralisation, open pit
mining is appropriate for Kalgold. The gold deposit is mined most cost effectively, using a modular approach with multiple small
to medium open pits defined by mineralised zones.
Mineral Processing
Kalgold's gold processing facility has been in operation since 1996. The technology used to process the gold-bearing ore is
well established and has proven to be suitable for the style of mineralisation. Kalgold processes the ore using a well-established
cyanide and CIL process for the recovery of gold. The average planned milling tonnage per month is 130ktpm at the planned
feed grade of 1.00g/t. The plant is operating at its designed throughput capacity and has shown its ability to produce the
forecasted ounces of gold at that capacity.
Qualified Persons
The QP was employed by Harmony. The QP's qualifications, areas of responsibility and personal inspection of the property
are summarised in the graphic below.
Qualified Person
Prof. Assoc.
Qualifications
TRS Section
Responsibility 
Personal
Insp.
Mr. TJ Mosholi
SACNASP
BSc. Hons (Geol)
All
Full time
Exploration
In the period 2017 to 2019, definition and exploration drilling were undertaken over the Kalgold line of lode deposit. This
exploration was aimed at validating and expanding the Mineral Resource estimate at that time. The drilling yielded significant
extensions to the Mineral Resource area, expanding on the understanding of the deposit. The drilling results were analysed and
incorporated into the geological model to upgrade the Mineral Resource estimates, and in-fill the areas between A-Zone and
Watertank mining pits.
Further exploration drilling took place from 2021 to 2023. The results from this exploration drilling extended the mineralised
area beyond the current resource limits. The exploration drilling and subsequent definition of the Mineral Resources are ongoing
whereby new data is incorporated into the geological model and Mineral Resource estimate.
89
Table of contents
The prospecting right for D-Zone South exploration drilling was granted in December 2025 and executed by the DMPR in
March 2026. Exploratory work planned to the south of the D-Zone commenced in May 2026. This drilling is aimed at expanding
Mineral Resources and Reserves at Kalgold.
The QP is of the opinion that the drilling and survey processes, the geological and geotechnical logging and the sampling
and assaying data are appropriate for the Kalgold modelled deposit and mineralisation style.
Mineral Resource Estimate
The Mineral Resources at Kalgold are considered to have reasonable prospects of economic extraction by open pit mining
methods. Kalgold is an ongoing operation with a well-defined set of operating parameters and costs. These parameters are
used to generate a series of open pit Mineral Resource shells based on various gold prices, to constrain the Mineral Resource
block model for reporting purposes. Based on the parameters presented in the table below, the cut-off grade for reporting the
Kalgold Mineral Resources as at 30 June 2026, is 0.55g/t gold.
Description
Unit
Value
Gold price
R/kg
1,730,000
Planned recovery factor
%
86.00
Mining costs
R/t
Modelled based
on Andru mining
rates
Processing costs
R/t
394
Plant throughput
ktpm
130
Planned dilution (Weighted planned per pit)
%
7.5
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions. The Mineral Resources were originally prepared, classified and reported according to SAMREC, 2016. For the
purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of
Regulation S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
The Mineral Resource estimate, as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is summarised
in the table below.
Fiscal Year Ended 30 June
%
Change
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Measured
7.103
0.91
6,432
8.941
1.09
9,742
(34.0)
Indicated
25.119
1.25
31,282
15.251
1.32
20,126
55.4
Total / Ave. Measured + Indicated
32.222
1.17
37,714
24.192
1.23
29,868
26.3
Inferred
27.169
0.43
11,574
32.447
0.61
19,900
(41.8)
Notes:
1. Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. TJ Mosholi, who is the Ore Reserve Manager at
Kalgold, and a Harmony employee.
2. The Mineral Resource tonnes are reported as in-situ with reasonable prospects for eventual economic extraction in line with SAMREC, 2016.
3. No modifying factors or sources of dilution have been included to the in-situ Mineral Reserve that is subtracted from the SAMREC Mineral
Resource to derive the Mineral Resource under Regulation S-K 1300.
4.The Mineral Resources are reported using a cut-off value of 0.55g/t and a gold price of US$3,061/oz; for an assumed plant throughput of
132.5ktpa.
5. Tonnes are reported as rounded to three decimal places. Gold values are rounded to zero decimal places.
6. Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
7. Rounding as required by reporting guidelines may result in apparent summation differences.
8. The inferred portion of the Mineral Resource includes the historical Surface tailings of 6,263kg (0.201Moz).
9. The Mineral Resource estimate is for Harmony’s 100% interest.
The change in Mineral Resources is due to the pit shell design that was optimised, incorporating new geological information that
resulted in the adjustment of the ore limbs, both east and west.
90
Table of contents
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call and plant recovery factors.
The Mineral Reserve estimate as at 30 June 2025 and 2026, is summarised in the table below.
 
Fiscal Year Ended 30 June
 
 
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
%
Change
Proved
13.422
1.03
13,858
10.312
0.96
9,907
39.9
Probable
5.244
1.02
5,351
8.340
1.12
9,309
(42.5)
Total / Ave. Proved + Probable
18.665
1.03
19,208
18.652
1.03
19,216
0.0
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. TJ Mosholi, who is the Kalgold Ore Reserve Manager,
and a Harmony employee.
2.Tonnes, grade, and gold content are declared as net delivered to the mills.
3.Figures are fully inclusive of all mining dilutions, gold losses and are reported as mill delivered tonnes and head grades. Metallurgical
recovery factors have not been applied to the reserve figures.
4.Gold content has not taken metallurgical recovery factors into account.
5.Mineral Reserves are reported using a cut-off grade of 0.58g/t determined using a gold price of US$2,915/oz.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
The change in Mineral Reserves was due to the pit shell design that was optimised, incorporating new geological
information that resulted in the adjustment of the ore limbs, both east and west.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for Kalgold. The modifying factors are consistent with the modelling, planning and computing estimates used in determining the
Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
Mineral Reserve cut-off - Pit Mineral Reserves
g/t
0.58
Mine Call Factor - Pit Mineral Reserves
%
100.00
Dilution - Pit Mineral Reserves (Weighted planned per pit)
%
7.50
Plant Recovery Factor - Pit Mineral Reserves
%
86.00
Plant Recovery Factor - Stockpile Mineral Reserves
%
70.00
91
Table of contents
Kusasalethu
Property Description
Kusasalethu is a production-stage, deep level gold mine, operating at depths ranging between 2,900m and 3,300m BMD,
extracting the Ventersdorp Contact Reef ("VCR") and located in the West Wits mining district, Gauteng Province. At latitude
26°27'16.23"S and longitude 27°21'32.91"E, the mine is approximately 70km southwest of Johannesburg and 15km south
southwest of Carletonville and forms part of Harmony's West Wits operations. Kusasalethu is wholly-owned and operated by
Harmony.
The following graphic illustrates the location of the Kusasalethu mine, along with certain infrastructure.
Kusasalethu property description.jpg
All relevant underground mining and surface right permits, and any other permit related to the work conducted on the
property have been obtained and are valid. There are no known legal proceedings against Harmony, which threaten its mineral
rights, tenure, or operations.
Operational Infrastructure
Infrastructure in the region is well established supporting the numerous operational gold mines in the area. The regional
infrastructure includes national and provincial paved road networks, power transmission and distribution networks, water supply
networks and communication infrastructure.
Kusasalethu comprises a twin-shaft system with two surface vertical shafts and two vertical sub-shafts. Ore is hoisted to
surface and is delivered to the plant by road. Although Kusasalethu has its own processing plant situated adjacent to the mine,
this plant does not treat the mine’s ore and only supplies backfill material for underground support purposes. The ore mined
from Kusasalethu is processed at the Mponeng Plant, located adjacent to the Mponeng shaft approximately 17km away.
Operations are powered by electricity from Eskom.
Kusasalethu draws its workforce principally from Carletonville and established mining communities in the West Rand,
supplemented by specialist contractors where required. Its principal equipment, facilities, infrastructure and underground
development are of varying ages and are subject to ongoing inspection, preventive maintenance, refurbishment and
replacement programmes. Management considers their physical condition adequate to support the current LOM plan, with
material modernisation and replacement projects included in sustaining capital plans as required.
92
Table of contents
Kusasalethu is accessible via the national and provincial roads. The general layout of Kusasalethu infrastructure in relation
to the neighbouring Harmony mines is displayed in the graphic below.
kusmap222.jpg
The “property, plant, and equipment” at Kusasalethu as at 30 June 2026 including buildings and mine infrastructure, mining
assets, rehabilitation and assets under construction, had a carrying value of R1.0 billion.
Kusasalethu did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no significant
encumbrances exist.
Geology
Kusasalethu is located on the north-western margin of the Archean Witwatersrand Basin, one of the prominent gold
provinces in the world. There are seven gold-bearing conglomerates within the mining right area, of which only the VCR is
economically viable.
The VCR is a tabular, inclined, gold-bearing quartz pebble conglomerate of intermediate to high grade. It forms the base of
the Ventersdorp Supergroup, which caps the CRG of the Witwatersrand Supergroup via an angular unconformity. This reef is
characterised by its palaeomorphology, where a thick reef is preserved in the form of terraces separated stratigraphically by a
thin inter-terrace slope reef.
The Kusasalethu mining right area is also intruded by dolerite sills and syenite dykes of different ages. Many of these
dykes strike north to north–northeast with thicknesses that vary from 1m to 90m.
History
Kusasalethu was previously known as Elandsrand Gold Mine when it was owned by AngloGold. The shaft system (i.e., the
vertical twin shaft) together with the gold plant were commissioned in 1978.
In 2001, Harmony took control and ownership of Elandsrand Gold Mine and Deelkraal Gold Mine from AngloGold. The
name Elandsrand was changed to Kusasalethu in 2010.
Kusasalethu is part of the West Wits mining district that includes the former Western Deep Levels shafts which include the
Mponeng, TauTona and Savuka Mines, all now also 100% owned by Harmony.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
A single mining right covers Kusasalethu which was successfully converted, executed and registered as a new order
mining right at the MPRTO. The principal mining right (GP30/5/1/2/2/(07) MR) covers an area of 5,113ha for the mining of gold.
This mining right was granted on 18 December 2007, and, unless cancelled or suspended, will continue in force for 30 years
ending 17 December 2037.
93
Table of contents
A section 102 application was submitted in 2018 to combine the contiguous farms Buffelsdoorn 143IQ and Deelkraal
142IQ, which increased the extent of the original mining right from 5,113ha to the current 7,000ha.
The following mining rights make up the full mining lease area of approximately 7,000ha:
•GP30/5/1/2/2(07) MR valid from 18 December 2007 to 17 December 2037.
A summary of the status of EPs and licences issued as at 30 June 2026, related to Kusasalethu operation is presented in
the table below.
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
EMPr
GP30/5/1/2/3/2/1(07) EM
DMPR
20 March 2010
LOM
Water Use Licence
08/C23J/AJFG/10192
DWS
14 December 2020
13 December 2040
Water Use Licence
08/C23E/CGI/14317
DWS
1 May 2024
1 May 2029
Mining Method
Kusasalethu is a deep level underground gold mine, currently operating at depths ranging between 2,900m and 3,300m
BMD. Access to the orebody is gained through a twin shaft system from surface to 73 level. The twin sub shaft system extends
from 73 level to 115 level.
The VCR horizon is extracted at Kusasalethu, and mining is conducted over five levels (95 level to 113 level) using SGM
techniques.
Due to the current mining depths at Kusasalethu, the SGM method with backfill and pre-conditioning is used. The SGM
method is preferred due to the variability of the VCR orebody with respect to value, and the seismic risk associated with deep
level mining. The mining sequence used for breast mining is a V-shaped configuration, colloquially referred to as the “inverted
Christmas tree”. An underhand face configuration is adopted when mining towards the west, and an overhand face configuration
when mining towards the east. The SGM method makes use of dip pillars and reduced mining spans with pre-developed
tunnels, aimed at further control of stresses experienced during rock movement.
Primary development is done off-reef (in waste rock), while secondary development is done on-reef (in the mineralised
zone).
Mineral Processing
The ore from Kusasalethu is processed at Mponeng’s gold processing facility which has been in operation since 1986. The
technology used to process the gold-bearing ore is well established and suitable for the style of mineralisation (i.e., VCR ore).
The ore milled at the Mponeng Plant follows a standard cyanide leach, CIP, and electrowinning process in order to extract
the gold bullion. The plant is designed to process 95tph of ore. The plant capacity is well-matched to accommodate the total ore
feed from Kusasalethu and Mponeng, and the gold produced is in line with the forecast ounces.
Qualified Persons
The QP was employed on a full-time basis by Harmony. The QP's qualifications, areas of responsibility and personal
inspection of the property are summarised in the graphic below.
Qualified Person
Professional
Organisation
Qualification
TRS Section
Responsibility 
Personal
Insp.
Mr. JM Modise
SAGC
MSCC, NHD (MRM)
All
Full time
Exploration
Exploration at Kusasalethu has mainly focussed on improving confidence in the geological model, as well as adding and
upgrading additional Mineral Resources to replace depletion. Geological data has been obtained through underground channel
(chip) sampling, underground mapping and underground drilling. The close spaced underground data gathering was preceded
by a surface geophysical seismic survey, as well as surface diamond core drilling. Exploration from underground platforms
continues to improve geological confidence for the VCR.
Exploration work on the Kusasalethu mining right area commenced in the early 1940s as part of the Western Deep Levels
evaluation programme. The work was initially limited to surface platforms, where an extensive surface exploration programme
was conducted across the Western Deep Levels leases by Anglo American Corporation Limited ("AAC").
Underground exploration drilling has been ongoing throughout the operational life of Kusasalethu. As the underground
areas are accessed, platforms are generated for underground drilling.
The drilling of exploration holes is limited by the availability of sufficient drilling platforms or development ends. Long
inclined borehole ("LIB") exploration holes are used to explore prospective areas for organic growth to the east of the current
mine on 102,105,109 and 113 levels. The drilling information will inform the geology and estimation models to the east of the
BV78 dyke and Grass dyke.
94
Table of contents
An underground infill drilling system, using short hole drilling, is in place to improve data density in specific areas and holes
are drilled from the underground development access drives. Drilling and logging practices are based on the Harmony company
standards, which have been in place since Harmony took over Kusasalethu in 2001.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
Mineral Resource Estimate
The Mineral Resource estimate for Kusasalethu is considered to have reasonable prospects for eventual economic
extraction in line with SAMREC, 2016. The cut-off value for the Mineral Resources is determined at 943cmg/t gold based on the
economic assumptions presented in the table below at 30 June 2026.
Description
Unit
Value
Gold price
US$/oz
3,061
Exchange rate
R:US$
17.60
Gold price
R/kg
1,730,000
Plant recovery factor
%
96.3
Unit cost
R/t
7,537
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions.
The Mineral Resources were originally prepared, classified and reported according to the SAMREC, 2016. For the
purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of
Regulation S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
The Mineral Resource estimate, as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is summarised
in the table below.
Fiscal Year Ended 30 June
%
Change
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Measured
1.269
15.64
19,846
—
—
—
—
Indicated
4.960
9.40
46,609
6.933
9.48
65,717
(29.1)
Total / Ave. Measured + Indicated
6.229
10.67
66,456
6.933
9.48
65,717
1.1
Inferred
2.028
9.01
18,271
2.419
8.78
21,233
(14.0)
Notes:
1.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. JM Modise, who is the Ore Reserve Manager at
Kusasalethu, and a Harmony employee.
2.The Mineral Resource tonnes are reported as in-situ with reasonable prospects for eventual economic extraction in line with SAMREC,
2016.
3.No modifying factors or sources of dilution have been included to the in-situ Mineral Reserve that is subtracted from the SAMREC Mineral
Resource to derive the Mineral Resource under Regulation S-K 1300.
4.The Mineral Resources are reported using a cut-off value of 943cmg/t determined at a gold price of US$3,061/oz.
5.Tonnes are reported rounded to three decimal places. Gold values are rounded to zero decimal places.
6.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
7.Rounding as required by reporting guidelines may result in apparent summation differences.
8.The Mineral Resource estimate is for Harmony’s 100% interest.
The increase in Mineral Resources was due to an increase in the cmg/t value.
95
Table of contents
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call and plant recovery factors.
The Mineral Reserve estimate, as at 30 June 2025 and 2026, is summarised in the table below.
 
Fiscal Year Ended 30 June
 
 
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
%
Change
Proved
1.880
6.27
11,795
1.875
6.26
11,731
0.5
Probable
0.706
4.69
3,311
0.023
4.94
114
2807.0
Total / Ave. Proved + Probable
2.586
5.84
15,106
1.898
6.24
11,845
27.5
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. JM Modise, who is the Kusasalethu Ore Reserve
Manager, and who is a Harmony employee.
2.Tonnes, grade, and gold content (oz) are declared as net delivered to the mills.
3.Figures are fully inclusive of all mining dilutions, gold losses and are reported as mill delivered tonnes and head grades. Metallurgical
recovery factors have not been applied to the Mineral Reserve figures.
4.Gold content has not taken metallurgical recovery factors into account.
5.Mineral Reserves are reported using a cut-off grade of 983cmg/t determined using a gold price of US$2,915/oz.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
The change in Mineral Reserves was a result of depletion that was partially offset by the extension of the LOM by two
years as a result of additional ounces above Reserve cut-off based on new geological information from development and
exploration drilling.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for Kusasalethu. The modifying factors are consistent with the modelling, planning and computing estimates used in determining
the Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
RD
t/m³
2.78
Stoping Width
cm
131.0
Gully
%
6.42
Off Reef
%
3.00
Waste to Reef
%
0.83
Flushing
%
1.68
Discrepancy
%
14.69
Mine Call Factor
%
82.00
Plant Recovery Factor
%
96.30
Mine Recovery Factor
%
78.97
Plant Call Factor
%
100.00
Mineral Reserves Cut Off
cmg/t
983
For additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
96
Table of contents
Moab Khotsong
Property Description
Moab Khotsong is a production-stage property that comprises two operating underground deep level gold mines, namely
the Moab Khotsong Mine and the Great Noligwa Mine. Moab Khotsong is sub-divided by major faults into three distinct
geographical mining areas. These mining areas are referred to as Top Mine, accessed through Great Noligwa and Moab
Khotsong shafts, Middle Mine, accessed through Moab Khotsong shaft, and Zaaiplaats, a board approved project currently
being accessed through a decline system from Moab Khotsong.
At latitude 26°59'12.7"S and longitude 26°48'03.3"E, Moab Khotsong is approximately 180km from Johannesburg. The
mine is located approximately 10km east of Orkney and directly south of the Vaal River, which forms the border between the
North West and Free State provinces. Moab Khotsong is wholly-owned and operated by Harmony.
The following graphic illustrates the location of Moab Khotsong and the associated mines, along with certain infrastructure.
Moab Khotsong.jpg
Moab Khotsong comprises the underground and surface assets associated with two mines, namely Moab Khotsong Mine
and Great Noligwa Mine, which Harmony acquired from AngloGold in 2018. Both are deep level gold mines, operating at depths
of between 2km and 3km. They are situated directly south of the Vaal River approximately 10km east of the town of Orkney, in
the Free State Province of South Africa. The primary reef mined is the Vaal Reef ("VR"), with additional production being
sourced from the C Reef.
Moab Khotsong is sub-divided by major faults into three distinct geographical mining areas. These are referred to as Top
Mine, accessed through Great Noligwa shaft, Middle Mine, accessed through Moab Khotsong shaft, and Zaaiplaats, accessed
through a decline system off the base of the Moab Khotsong shaft.
There is no material litigation against Harmony that threatens its mineral rights, tenure, or operations.
Operational Infrastructure
Infrastructure in the region is well established supporting the numerous operational gold mines in the area. The regional
infrastructure includes national and provincial paved road networks, power transmission and distribution networks, water supply
networks and communication infrastructure.
The operations are powered by electricity from Eskom, and they have the necessary water and power infrastructure to
support their remaining lives, including Zaaiplaats.
Moab Khotsong draws its workforce principally from Orkney, Klerksdorp and other established mining communities in the
region, supplemented by specialist contractors where required. Its principal equipment, facilities, infrastructure and underground
development are of varying ages and are subject to ongoing inspection, preventive maintenance, refurbishment and
replacement programmes. Management considers their physical condition adequate to support the current LOM plan, with
material modernisation and replacement projects included in sustaining capital plans as required.
Moab Khotsong Mine has a single vertical main-shaft to 103 level and a sub-shaft from 73 level to 103 level. Great Noligwa
Mine has a twin vertical shaft to 80 level and is connected with Moab Khotsong on 64, 68, 70 and 76 levels. These two mines
97
Table of contents
are collectively referred to as the Moab Khotsong operation, which has a dedicated ore processing plant. A decline system is
currently being developed from 101 level to 114 level in order to access the Zaaiplaats area below the current infrastructure.
The infrastructural layout includes hoisting facilities; logistical support for ore handling, sampling, and transporting; the
processing plant; waste rock facilities; tailings and leaching infrastructure; roads; water and power supply; ventilation and
refrigeration systems; stores and workshop support; electrical supply; offices; housing and security.
The location of the surface infrastructure is displayed in the graphic below.
Figure 15-1.jpg
98
Table of contents
The “property, plant, and equipment” at Moab Khotsong as at 30 June 2026, including buildings and mine infrastructure,
mining assets, rehabilitation and assets under construction, had a carrying value of R10.0 billion.
Moab Khotsong did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no
significant encumbrances exist.
Geology
Moab Khotsong is situated within the Klerksdorp Goldfield on the western margin of the Witwatersrand Basin of South
Africa, one of the most prominent gold provinces in the world. The major gold bearing conglomerate reefs are mostly confined to
the CRG of the Witwatersrand Supergroup.
The CRG is up to 2,100m thick in the Vaal River area and the general orientation of the Witwatersrand Supergroup
succession in this goldfield is interpreted as southwest-trending and southeast dipping. A series of northeast-trending faults
including the Buffelsdoorn, the Kromdraai, the Buffels East and the Jersey Faults, is a key feature of the Klerksdorp Goldfield
and the key structural features at Moab Khotsong are related to this series of faults.
Moab Khotsong exploits gold mineralisation occurring in the VR. This reef is stratigraphically located near the top of the
Johannesburg Sub-group, within the CRG. The VR ranges in depth at Moab Khotsong from 1,500m BMD to 3,990m BMD. Gold
mineralisation also occurs in the stratigraphically higher C Reef, which lies approximately 225m above the VR. However, the
C Reef typically contributes less than 5% to the mining production.
History
Great Noligwa Mine was developed by AAC and was originally known as Vaal River No. 8 Shaft. Work on Great Noligwa
was initiated in 1968, and the mine produced its first gold in 1972. Great Noligwa reached its production peak of around
1,000koz per annum in the late 1990s and at present, mining activity at Great Noligwa Mine is concentrated on the extraction of
pillars.
The Moab Khotsong Mine was developed by AngloGold and is the youngest of South Africa’s deep-level gold mines. It
came into production in 2003 and has been continuously economically exploited since then. The Great Noligwa Mine was
merged with Moab Khotsong Mine in 2014, and since the merger of the two mines, annual production has been in the order of
250koz of gold.
Harmony assumed ownership of Moab Khotsong in March 2018, and has since added the Zaaiplaats area to the Mineral
Resources and Mineral Reserves. The inclusion of Zaaiplaats in the LOM plan has extended the life of Moab Khotsong for
20 years up to 2044 and the overall production is expected to be in the order of 200koz of gold per annum.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
Harmony holds two mining rights, which have been successfully converted, executed and registered as new order mining
rights at the MPRTO. These rights cover a total combined area of 10,991.13ha for the mining of gold, silver, nickel and uranium.
Both mining rights are valid and remain effective unless cancelled or suspended. Under the MPRDA, Harmony is entitled to
apply to renew the mining right on its expiry.
Harmony’s Moab Khotsong mineral tenure comprises two mining rights covering approximately 10,991ha, namely:
•NW30/5/1/2/2/15 MR valid from 12 September 2007 to 11 September 2037; and
•NW30/5/1/1/2/16 MR valid from 20 August 2008 to 19 August 2038.
A summary of the status of EPs and licences issued as at 30 June 2026 related to the Moab Khotsong operation is
presented in the table below.
99
Table of contents
Permit
Holder
Operation
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
Harmony
Moab
Khotsong
EMPr
NW30/5/1/2/2/15&16 MR
DMPR
19 March 2025
LOM
Harmony
Atmospheric Emission
Licence
AEL/FS/MKO-
HGM/14/10/2019F
DFFE
2 December 
2025
1 December 
2030
Harmony
Waste Management
Licence
NWP/WM/DK2/
2018/04/01/02
DARD1
13 March  2019
LOM
Harmony
Water Use Licence
08/C24B/AGJ/9799
DWS
12 November 
2020                                                                                                                                                                                                                                                                                                     
Amendment :
30 October 
2023
12 November 
2040
Harmony
Registration for Dam
Safety Risk
C241/36
DWS
11 November
2024
LOM
Harmony
Vaal River
Water Registration
Certificate
Ref. No. 23116192 WUL:
08/C24B/AFG/9798
DWS
30 October
2023
LOM
Harmony
Registration for Dam
Safety Risk
C241/36
DWS
11 November
2024
LOM
C242/48
5 November
2024
LOM
Harmony
Water Care Works
Registration (Class D)
35
DWS
23 January
2024
LOM
32
23 January
2024
LOM
41
23 January
2024
LOM
1 Department of Agriculture, Land Reform and Rural Development.
Mining Method
The tabular nature of the orebody, along with its depth and structural complexity, dictates the mining method employed at
Moab Khotsong. The primary mining method used at Moab Khotsong is conventional breast mining, on a scattered grid. This
method, as opposed to the SGM, is necessitated by the complex geology at Moab Khotsong, which prevents the implementation
of a strict mining sequence. Moab Khotsong makes extensive use of backfill for the support of stopes. The economic reef
horizons of Top and Middle Mine are exploited between depths of 1,698m and 3,054m BMD.
Zaaiplaats is located between the elevations of 3,054m and 3,526m BMD. Zaaiplaats will be accessed by declines from the
northeastern end of the Zaaiplaats property to take advantage of the existing access development in place.
The scattered mining makes use of pillars with a pre-developed grid of tunnels, aimed at providing geological information
ahead of the mining face, in order to control geotechnical stress. The Geotechnical Engineering department provides detailed
numerical modelling and guidance regarding the best mining practices to be applied to minimise the risk associated with
seismicity.
Primary development is done off-reef (in waste rock), while secondary development is done on-reef (in the mineralised
zone).
Mineral Processing
The gold processing facility at Great Noligwa has been in operation since the 1960s and is hence a well-established
operation. The technology used to process the gold-bearing ore is well established, being used across the majority of South
African gold operations and suitable for the style of mineralisation. The milled ore follows a reverse gold leach method using an
acid uranium leach, gold cyanide leach, CIP and electrowinning process in order to extract the gold bullion. The current plant
capacity is 260ktpm, or daily treatment rate of approximately 9,420tpd at 92% availability and in fiscal 2026 operated below its
designed throughput capacity.
Qualified Persons
The QP was employed on a full-time basis by Harmony. The QP's qualifications, areas of responsibility and personal
inspection of the property are summarised in the graphic below.
Qualified Person
Professional
Organisation
Qualification
TRS Section
Responsibility 
Personal
Insp.
Mr. RF. Gaelejwe
SACNASP
B.Sc. Hons (Geol), PGDip, EMBA
All
Full time
Exploration
Exploration at Moab Khotsong has focussed on improving confidence in the geological model, as well as adding and
upgrading additional Mineral Resources to the mine. Geological data has been obtained from an initial geophysical seismic
survey and later through surface drilling, underground channel (chip) sampling, underground mapping and underground drilling.
The surface drill holes used in the estimation of the current Mineral Resources were drilled by AAC and AngloGold before
Harmony acquired Moab Khotsong.
100
Table of contents
Underground exploration drilling has been ongoing throughout the operational life of Moab Khotsong as the mine deepens.
Underground drilling intersections are sampled where possible and, if acceptable and representative, are used in the estimation
process. For estimation purposes 142 surface exploration drilling, LIB exploration drilling and underground exploration drilling
intersections were used.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
Mineral Resource Estimate
The Mineral Resource estimate for Moab Khotsong is considered to have reasonable prospects for eventual economic
extraction in line with SAMREC, 2016. The cut-off value for the Mineral Resources is determined per mining area as follows: Top
Mine and Middle Mine 500cmg/t; and Zaaiplaats 1,350cmg/t based on the economic assumptions presented in the table below
at 30 June 2026.
Description
Unit
Value
Gold price
US$/oz
3,061
Exchange rate
R:US$
17.60
Gold price
R/kg
1,730,000
Plant recovery factor
%
96.25
Unit cost (Specific cost applied per mining area)
R/t
5,829
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions.
The Mineral Resources were originally prepared, classified and reported according to the SAMREC, 2016. For the
purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of
Regulation S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
The Mineral Resource estimate, as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is summarised
in the table below.
Gold
Fiscal Year Ended 30 June
%
Change
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold Grade
(g/t)
Gold
Content
(kg)
Measured
2.374
17.67
41,955
2.681
16.13
43,246
(3.0)
Indicated
3.553
16.88
59,982
3.257
16.65
54,234
10.6
Total / Ave. Measured +
Indicated
5.927
17.20
101,938
5.938
16.42
97,480
4.6
Inferred
2.681
18.35
49,199
2.682
17.90
48,022
2.4
Uranium
Fiscal Year Ended 30 June
%
Change
2026
2025
Mineral Resource Category
Tonnes
(Mt)
U3O8
(kg/t)
U3O8
(t)
Tonnes
(Mt)
U3O8
(kg/t)
U3O8
(t)
Measured
—
—
—
—
—
—
—
Indicated
5.927
0.94
5,580
5.938
0.72
4,253
31.2
Total / Ave. Measured +
Indicated
5.927
0.94
5,580
5.938
0.72
4,253
31.2
Inferred
2.681
0.65
1,754
2.682
0.60
1,614
8.7
Notes:
1.The Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according
to SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. RF Gaelejwe, who is the Ore Reserve Manager,
and who is a Harmony employee.
2.The Mineral Resource tonnes are reported as in-situ with reasonable prospects for eventual economic extraction in line with SAMREC,
2016.
3.No modifying factors or sources of dilution have been included to the in-situ Mineral Reserve that is subtracted from the SAMREC Mineral
Resource to derive the Mineral Resource under Regulation S-K 1300.
4.The Gold Mineral Resources are reported using a cut-off value per area of 500cmg/t and 1,350cmg/t determined at a gold price of
US$3,061/oz.
5.Tonnes are reported as rounded to three decimal places. Gold values are rounded to zero decimal places.
6.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
7.Rounding as required by reporting guidelines may result in apparent summation differences.
8.The Mineral Resource estimate is for Harmony’s 100% interest.
101
Table of contents
9.Uranium is reported as a by-product of gold.
The gold Mineral Resource increased due to structural gains and value in the Zaaiplaats project area. Year on year
uranium Mineral Resource variability is driven by new geological information in the Zaaiplaats mining front.
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call and plant recovery factors.
The Mineral Reserve estimate, as at 30 June 2025, and 2026, is summarised in the table below.
Gold
Fiscal Year Ended 30 June
 
 
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
%
Change
Proved
2.263
6.78
15,340
3.213
7.38
23,715
(35.3)
Probable
9.769
8.66
84,621
9.788
8.43
82,500
2.6
Total / Ave. Proved + Probable
12.031
8.31
99,961
13.001
8.17
106,215
(5.9)
Uranium
Fiscal Year Ended 30 June
 
 
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
U3O8
(kg/t)
U3O8
(t)
Tonnes
(Mt)
U3O8
(kg/t)
U3O8
(t)
% Change
Proved
—
—
—
—
—
—
—
Probable
12.031
0.29
3,503
13.001
0.36
4,646
(24.6)
Total / Ave. Proved + Probable
12.031
0.29
3,503
13.001
0.36
4,646
(24.6)
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. RF Gaelejwe, who is the Ore Reserve Manager, and
who is a Harmony employee.
2.Tonnes, grade, and gold content (oz) are declared as net delivered to the mills.
3.Figures are fully inclusive of all mining dilutions, gold losses and are reported as mill delivered tonnes and head grades. Metallurgical
recovery factors have not been applied to the Mineral Reserve figures.
4.Gold content has not taken metallurgical recovery factors into account.
5.Gold Mineral Reserves are reported using a cut-off grade per mining area of 1,200cmg/t and 1,800cmg/t determined using a gold price of
US$2,915/oz.
6.Uranium is reported as a by-product of gold.
7.Rounding as required by reporting guidelines may result in apparent summation differences.
The decrease in Mineral Reserves is due to depletion that was partially offset by structural gains and value in the
Zaaiplaats project area.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for Moab Khotsong. The modifying factors are consistent with the modelling, planning and computing estimates used in
determining the Mineral Reserves, which are also consistent with historical performance.
102
Table of contents
Modifying Factor
Unit
Moab Khotsong
Middle Mine
Zaaiplaats
Great Noligwa
Top Mine
Relative Density
t/m³
2.78t/m³
2.78t/m³
2.78t/m³
Stoping width
cm
183cm
154.0cm
183cm
Gully
%
10.69
10.10
10.69
Off Reef
%
16.15
13.64
16.15
Waste to Reef
%
3.45
—
3.45
Flushing tons
%
4.68
7.98
4.68
Discrepancy
%
4.42
18.70
4.42
Mine Call Factor
%
67.00
78.00
67.00
Plant Recovery Factor
%
96.25
96.50
96.25
Mine Recovery Factor
%
64.49
75.27
64.49
Plant Call Factor
%
100.00
100.00
100.00
Mineral Reserve cut-off
cmg/t
1,200
1,800
1,200
For additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
103
Table of contents
Mponeng
Property Description
Mponeng is a production-stage underground gold producing mine located in the West Wits mining district south-west of
Johannesburg, on the border between Gauteng and the North West Province. At latitude 26°26'15.60"S and longitude
27°25'41.24"E, the mine is approximately 65km from Johannesburg and 15km from Carletonville and forms part of Harmony's
West Wits operations. Mponeng is wholly-owned and operated by Harmony.
The following graphic illustrates the location of the Mponeng mine, along with certain infrastructure.
Mponeng property description.jpg
Mponeng is the deepest mine in the world with development currently at 3,841m BMD. The primary reef mined is the VCR,
and some limited mining from the Carbon Leader Reef ("CLR"), with future expansion planned on both the VCR and the CLR
horizon. The original vertical twin shaft sinking from the surface commenced in 1981 and was commissioned along with the gold
plant complex in 1986.
There is no material litigation against Harmony that threatens its mineral rights, tenure, or operations.
Operational Infrastructure
Infrastructure in the region is well established, supporting the numerous operational gold mines in the area. The regional
infrastructure includes national and provincial paved road networks, power transmission and distribution networks, water supply
networks and communication infrastructure.
Mponeng comprises a twin-shaft system with two surface vertical shafts and two sub-vertical shafts. A decline system,
consisting of four declines, extends from 120 level towards 123 and 126 levels to access and mine the VCR. Ore and waste
material are hoisted separately with ore being delivered to the plant by means of a conveyor belt and the waste rock going to the
low-grade stockpile. Mponeng has its own processing plant situated adjacent to the mine. Operations are powered by electricity
from Eskom.
Mponeng draws its workforce principally from Carletonville and established mining communities in the West Rand,
supplemented by specialist contractors where required. Its principal equipment, facilities, infrastructure and underground
development are of varying ages and are subject to ongoing inspection, preventive maintenance, refurbishment and
replacement programmes. Management considers their physical condition adequate to support the current LOM plan, with
material modernisation and replacement projects included in sustaining capital plans as required.
104
Table of contents
Mponeng is accessible via the national and provincial roads. The general layout of Mponeng infrastructure in relation to the
neighbouring Harmony mines, the TauTona Mine and Savuka Mine is displayed in the graphic below.
West Wits Maps_Updated.jpg
The “property, plant, and equipment” at Mponeng as at 30 June 2026, including buildings and mine infrastructure, mining
assets, rehabilitation and assets under construction, had a carrying value of R7.6 billion.
Mponeng did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no significant
encumbrances exist.
Geology
Mponeng is situated on the northwestern margin of the Witwatersrand Basin of South Africa, one of the prominent gold
provinces in the world. There are seven gold-bearing conglomerates within the lease area, of which only the VCR and CLR are
economically viable.
The VCR is a gold bearing quartz pebble conglomerate of intermediate to high grade. It forms the base of the Ventersdorp
Supergroup, which caps the Witwatersrand Supergroup through an angular unconformity. A characteristic of this horizon is the
pronounced palaeomorphology, where a thick reef is preserved in the form of terraces separated stratigraphically by a thin inter-
terrace slope reef.
The CLR, historically mined at the adjacent Harmony wholly-owned TauTona and Savuka Mines, is reported as part of the
Mponeng Mineral Resource. It is a c.20cm thick tabular, auriferous quartz pebble conglomerate. It lies 800-900m
stratigraphically deeper than the VCR, near the base of the Johannesburg Subgroup of the CRG of the Witwatersrand
Supergroup.
Both the VCR and the CLR have been subjected to faulting and are intruded by a series of igneous dykes and sills of
various ages that cut across the reefs. The gold mineralisation at Mponeng succeeded a period of deep burial, fracturing, and
alteration. The gold and other elements are believed to have precipitated through the reaction of hydrothermal fluids at high
temperatures along the reef horizons.
History
Mponeng was formerly known as Western Deep Levels South Shaft, or No.1 Shaft when AAC first owned the operation.
The No. 1 South Shaft system (i.e., the vertical twin shaft) together with the Mponeng gold plant were commissioned in 1986.
The shaft system allowed access to the deeper VCR in the southern part of the lease area.
The name changed to Mponeng in 1999 while the mine was operated by AngloGold. On 1 October 2020, Harmony took full
control and ownership of Mponeng as part of the acquisition of AngloGold's South African business.
Mponeng is part of the West Wits mining district that includes the Savuka Mine (previously known as Western Deep Levels
No.2 Shaft) and the TauTona Mine (previously known as Western Deep Levels No. 3 Shaft) (both now also 100% owned by
Harmony). These two mines predominantly exploited the CLR within the lease area, which is now mostly mined out resulting in
them being placed on care and maintenance in 2017. The Mineral Resources and Mineral Reserves for TauTona were
transferred to Mponeng during the same year.
105
Table of contents
During February 2024, the LOM extension project was approved allowing further access development into the VCR and
CLR. This entails further deepening of the VCR from the current 126 level towards 135 level. For the CLR it entails further
deepening from the current 120 level towards 127 level.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
The following mining rights make up the full mining lease area of approximately 6,778.6ha:
• GP30/5/1/2/2(01) MR valid from 1 February 2006 to 1 February 2036
• GP30/5/3/2/2(11) MR to be incorporated with GP(01) MR and;
• GP30/5/1/2/2(248) MR (for Sand) valid from 16 October 2012 to 15 October, 2026. Also to be incorporated into
GP(01) MR in terms of section 11.
All mining rights related to Mponeng were transferred and are held by Harmony. There are two mining rights that form the
Mponeng area which were successfully converted, executed and registered at the MPRTO. The principal mining right
(GP30/5/1/2/2(01) MR) covers an area of 6,704ha for the mining of gold, silver, nickel and uranium. This mining right, granted on
1 February 2006, unless cancelled or suspended will continue in force for 30 years ending 1 February 2036. The incorporation
of the mining right, GP30/5/1/2/2(248) MR, is part of the section 11 and section 102 process.
The mining rights GP30/5/1/2/2(01) MR and GP30/5/1/2/2(248) MR were ceded from AngloGold to Golden Core, a wholly
owned subsidiary of Harmony, on 1 October 2020 and were successfully registered in the Mining Titles Office on 14 June 2021
as part of AngloGold's sale of its last remaining South African assets to Harmony, including its West Wits operation.
A section 102 application in terms of the MPRDA was submitted by AngloGold in March 2017 to consolidate its West Wits mining
rights into a single mining right (GP30/5/1/2/2(01) MR) ("AngloGold Ashanti Application"). The AngloGold Ashanti Application
was approved by the DMPR in August 2020, but was not implemented due to a change in circumstances as a result of
Harmony’s acquisition of Mponeng and was consequently withdrawn. On 15 February 2022, Golden Core submitted an
application in terms of section 102 of the MPRDA, substantively similar to the AngloGold Ashanti Application, to consolidate the
mining rights and mining right areas into a single mining right (GP30/5/1/2/2(01) MR) ("Golden Core Application"). The Golden
Core Application is currently pending at the DMPR.
A renewal application for GP30/5/1/2/2(248) MR was timeously submitted, while awaiting the processing of the Golden
Core Application by the DMPR, as the DMPR advised that they could not process the consolidation application while there was
a renewal application submitted. The estimated timeline for approval is by end of 2026 and Harmony does not view there being
a material risk while the approval is pending.
A summary of the status of EPs and licences issued as at 30 June 2026 related to Mponeng’s operation is presented in the
table below.
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
EMPr (Amendment)
(GP) 30/5/1/2/3/2/1 (01)
DMPR
12 April 2012
LOM
Waste Management Licence
GAUT 002/09-10/W0011
GDARD1
December 2024
December 2044
Hazardous Waste Generator
Certificate
GPG-01-513
GDARD1
14 July 2015
LOM
Water Use Licence
08/C23E/AEFGCEI/12157
DWS
Licence issued to
Harmony on 27
September 2022
September 2031
Landfill site registration
GPL-01-514
002/09-10/W0011
GWIS
17 June 2026
17 June 2028
Certificate of Registration
Inflammable Liquids and
Substances
RP438/ptn5
West Rand
District
Municipality
September 2025
September 2026
1 Gauteng Department of Agriculture and Rural Development.
Mining Method
Mponeng is a deep level underground gold mine currently operating at depths ranging between 3,160m and 3,740m BMD,
and currently the deepest mine in the world with development at 3,841m BMD. Potential future mining operations at Mponeng
are expected to deepen the shaft bottom to 4,227m BMD. The reef portion currently being mined at Mponeng is accessible
between 3,000 – 3,600m BMD.
There are two mining methods in practice at Mponeng. Historically, longwall mining was practised at Mponeng until the
breast mining method was used, aimed at reducing the occurrence of large seismic events. However, this has evolved to the
SGM method with backfill support. The SGM method makes use of dip pillars and reduced mining spans with pre-developed
tunnels, aimed at further control of stresses experienced in rock movement. While Mponeng’s business plan is based primarily
on the SGM method, there are sections of the mine that are still operating using the breast mining method. The mining
sequence is a V-shaped configuration, colloquially referred to as the “inverted Christmas tree”. An underhand face configuration
is adopted when mining towards the west and an overhand face configuration when mining towards the east.
106
Table of contents
Mineral Processing
Mponeng's gold processing facility, the Mponeng plant, has been in operation since 1986. The technology used to process
the gold-bearing ore is well established and is suitable for the style of mineralisation (VCR and CLR ore). The current capacity of
the plant is designed to process 95tph ore. The plant is operating below its designed throughput capacity and has shown its
ability to produce the forecasted ounces of gold at said capacity.
Qualified Persons
The QP was employed on a full-time basis by Harmony. The QP's qualifications, areas of responsibility and personal
inspection of the property are summarised in the graphic below.
Qualified Person
Professional
Organisation
Qualification
TRS Section
Responsibility 
Personal
Insp.
Mr. W. Oliver
SAGC
MSCC, GDE (Mining Engineering)
All
Full time
Exploration
Exploration at Mponeng has mainly focussed on improving confidence in the geological model, as well as adding and
upgrading additional Mineral Resources to the mine. Geological data has been obtained through structured underground
channel (chip) sampling, mapping and drilling. This underground detailed, closer spaced data gathering exercise has been
preceded by surface exploration of the lease area using a historical geophysical seismic survey, as well as surface diamond
core drilling.
Exploration from underground platforms is currently continuing for the VCR in the east and west of the current mining
levels, between 3,500m and 3,700m BMD, to improve geological confidence.
Exploration of the VCR target areas west and east of the 126-level mining front continued during fiscal 2026. These will
form part of the approved exploration campaign. These targets will generate the needed information in two areas, on the
Booysens/Kimberley transition towards the east, ahead of the planned LOM extension areas and the area west of the Kimberley
estimation domains.
Both areas are currently showing high levels of variability that will benefit from the additional information that will be
generated for the completion of these exploration drill holes. VCR variability limits the forward confidence in the Mineral
Resource estimation. More data collected can assist the QP to define the zones of high variability.
Mponeng infill exploration drilling of the VCR from 2025 to 2026 completed 6,105m of drilling and increased confidence of
the estimated ounces on the eastern area of the Booysens Shale footwall zone. For the 2026 - 2027 period an additional
6,104m is planned to improve confidence of the Indicated Mineral Resource portions and continue to focus on the below
126 level LOM extension area.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
Mineral Resource Estimate
The Mineral Resource estimate is reported in situ within the Mponeng lease area (which includes the TauTona Mine and
Savuka Mine), as determined through the analysis of the reasonable prospect for eventual economic extraction by underground
mining method. The cut-off value for the Mineral Resources is determined at 761cmg/t gold based on the economic assumptions
presented in the table below at 30 June 2026.
Description
Unit
Value
Gold price
US$/oz
3,061
Exchange rate
R:US$
17.60
Gold price
R/kg
1,730,000
Plant recovery factor
%
98.00
Unit cost1
R/t
8,758
1 Unit cost includes cash operating cost, royalty and ongoing development capital.
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions.
The Mineral Resources were originally prepared, classified and reported according to the SAMREC, 2016. For the
purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of
Regulation S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
107
Table of contents
The Mineral Resource estimate, as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is summarised
in the table below.
Fiscal Year Ended 30 June
%
Change
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Measured
2.059
13.89
28,600
3.767
16.60
62,527
(54.3)
Indicated
12.649
12.42
157,152
13.471
12.96
174,629
(10.0)
Total / Ave. Measured + Indicated
14.708
12.63
185,752
17.239
13.76
237,156
(21.7)
Inferred
31.609
11.51
363,960
32.442
11.40
369,698
(1.6)
Notes:
1.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. W Olivier, who is the Ore Reserve Manager at
Mponeng, and a Harmony employee.
2.Mineral Resource tonnes are reported as in-situ with reasonable prospects for eventual economic extraction in line with SAMREC, 2016.
3.No modifying factors or sources of dilution  have been included to the in-situ Mineral Reserve that is subtracted from the SAMREC Mineral
Resource to derive the Mineral Resource under Regulation S-K 1300.
4.Mineral Resources are reported using a cut-off value of 761cmg/t determined using a gold price of US$3,061/oz.
5.Tonnes are reported as rounded to three decimal places. Gold values are rounded to zero decimal places.
6.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
7.Rounding as required by reporting guidelines may result in apparent summation differences.
8.The Mineral Resource estimate is for Harmony’s 100% interest.
The decrease in Mineral Resources is attributable to the establishment of new rock engineering support pillars and the
removal of areas that no longer have reasonable prospects for eventual economic extraction.
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call and plant recovery factors.
The Mineral Reserve estimate, as at 30 June 2025, and 2026, is summarised in the table below.
 
Fiscal Year Ended 30 June
 
 
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
% Change
Proved
4.512
9.96
44,938
3.564
10.32
36,783
22.2
Probable
10.833
8.80
95,332
10.992
9.07
99,717
(4.4)
Total / Ave. Proved + Probable
15.345
9.14
140,270
14.556
9.38
136,499
2.8
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. W. Olivier, who is the Mponeng Ore Reserve Manager,
and a Harmony employee.
2.Tonnes, grade, and gold content are declared as net delivered to the mills.
3.Figures are fully inclusive of all mining dilutions, gold losses and are reported as mill delivered tonnes and head grades. Metallurgical
recovery factors have not been applied to the reserve figures.
4.Gold content has not taken metallurgical recovery factors into account.
5.Mineral Reserves are reported using a cut-off grade of 971cmg/t determined using a gold price of US$2,915/oz.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
The increase in Mineral Reserves is primarily driven by the extension of the mine's economic life to 2046, which enabled
the declaration of additional reserve ounces within the LOM extension.
108
Table of contents
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for Mponeng. The modifying factors are consistent with the modelling, planning and computing estimates used in determining
the Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
Relative density
t/m³
2.71
Stoping width
cm
154.0
Gully
%
7.24
Off reef
%
9.31
Waste to reef
%
2.14
Flushing tons
%
6.69
Discrepancy
%
12.72
Mine call factor
%
80.65
Plant recovery factor
%
98.00
Mine recovery factor
%
79.04
Plant call factor
%
100.00
Mineral Reserve cut-off
cmg/t
971
For additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
109
Table of contents
Target
Property Description
Target is an advanced, single-shaft, production stage, deep-level gold mine which has been operational for approximately
30 years. While most of the gold mineralisation extracted comes from mechanised mining (massive mining techniques),
conventional stoping is still employed for extraction of gold and also to de-stress areas ahead of mechanised mining. The mine
is located in the Free State Province of South Africa, approximately 270km southwest of Johannesburg and 30km north of the
town of Welkom, at latitude 27°45'42.59"S and longitude 26°38'24.92"E. Target is wholly-owned and operated by Harmony.
The following graphic illustrates the location of the Target mine, along with certain infrastructure.
Target property description.jpg
All relevant underground mining and surface right permits, and any other permit related to the work conducted on the
property have been obtained and are valid. There are no known legal proceedings against Harmony, which threaten its mineral
rights, tenure, or operations.
Operational Infrastructure
The surrounding areas of Welkom and Virginia are well developed in terms of access and mining-related infrastructure
supporting the numerous operational gold mines in the area. The regional infrastructure includes national and provincial paved
road networks, power transmission and distribution networks, water supply networks and communication infrastructure. Target’s
surface and underground infrastructure, including its power and water supplies, are sufficient for the LOM plan production
requirements.
Target includes a single underground mine constructed as an extension to the Loraine Gold Mine ("Loraine") and uses a
single shaft as access. The ore and development rock are hoisted together, with ore milled and processed at the Target Plant
adjacent to the mine. Operations are powered by electricity from Eskom.
The Target mining area is well developed in terms of access and mining-related infrastructure. Access to the Target shafts
(1, 2, 3 and 5) is via a well-maintained paved road. Adequately maintained roads are used to access other areas of the mine
such as the explosives magazines, sewage works, tailings dam and the evaporation ponds. The area also has access to rail
links and an airfield within proximity.
110
Table of contents
The surface infrastructure associated with Target is presented in the graphic below.
tagetmap222.jpg
Target draws its workforce principally from Welkom and other established Free State mining communities, supplemented
by specialist contractors where required. Its principal equipment, facilities, infrastructure and underground development are of
varying ages and are subject to ongoing inspection, preventive maintenance, refurbishment and replacement programmes.
Management considers their physical condition adequate to support the current LOM plan, with material modernisation and
replacement projects included in sustaining capital plans as required.
The “property, plant, and equipment” at Target as at 30 June 2026, including buildings and mine infrastructure, mining assets,
rehabilitation and assets under construction, had a carrying value of R2.0 billion.
Target did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no significant
encumbrances exist.
Geology
Target is situated within the Free State Goldfield on the south-western margin of the Witwatersrand Basin, one of the
world's largest gold provinces. The major gold bearing conglomerate reefs are mostly confined to the CRG of the Witwatersrand
Supergroup.
Folding forms the major structural feature within the lease area and is manifested as an asymmetric syncline, the axis of
which trends northward with a general plunge of 10° to 12°. The western limb of the syncline commonly dips at more than 55°
and gradually flattens eastward to approximately 10°. Numerous prominent faults, which divide the ore-body into different mining
blocks, are also present.
The east-west trending faults generally exhibit displacements ranging from 15m to 25m and are traceable over distances of
less than 150m. In contrast, the two prominent north-south trending faults, the Eldorado Fault and the Border Fault, are
traceable over strike lengths of more than 2km.
111
Table of contents
Gold mineralisation currently exploited is hosted within a succession of Elsburg and Dreyerskuil ("DK") quartz pebble
conglomerate reefs hosted by the van den Heeversrust and Dreyerskuil (Uitkyk) members of the Eldorado (Elsburg) Formation,
respectively.
Additional mineralisation occurs in the Big Pebble Reef of the underlying Kimberley (formerly Aandenk) Formation. All
these units are within the Turffontein Subgroup of the CRG. Mineralisation is associated with the presence of medium to coarse,
clast-supported oligomictic pebble horizons. The presence of allogenic (buckshot) pyrite and detrital carbon is also common.
History
Anglovaal Limited ("Anglovaal") previously held the mineral rights for the Target property. Target Exploration Company
Limited ("Target Exploration Company"), a company formed by Anglovaal specifically for the purpose of exploration, later
acquired this area.
Options to the mineral rights north of Target were acquired by Sun Mining and Prospecting Company (Pty) Limited ("Sun").
The formation of Avgold Limited ("Avgold") in 1996 was intended to further the gold mining and exploration interests of
Anglovaal.
Harmony acquired Target in May 2004 by acquiring 100% of Avgold's shares. In 2017, an optimisation project commenced
with the aim of reducing hauling distances and to improve gold production. The surface bulk-air-cooler and the No. 8 fridge plant
were commissioned in November 2021. The 291 level crusher installation and the 282 to 291 level conveyor belt extension, both
of which formed part of the optimisation project, were completed and commissioned in November 2023.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
The current mining rights encompass an area of 7,952.78ha. Harmony holds several mining rights for Target, which were
successfully converted and executed as new order mining rights. Certain of these rights are still to be registered at the MPRTO.
The FS30/5/1/2/2/14MR has been renewed on 5 January 2026, for a further six years, expiring 4 January 2032. The new
reference number for the renewal of the right is FS30/5/1/2/2/10093MR.
The summary of mineral tenure and the approved mining rights include the following:
•FS30/5/1/2/2/14MR, which is valid from 20 February 2008, to 4 January 2032, and covers 4,237.00ha; and
•FS30/5/1/2/2/225MR, which is valid from 12 December 2013, to 11 December 2026, and covers 3,715.78ha.
A summary of the status of EPs and licences issued as at 30 June 2026, related to Target is presented in the table below.
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
EMPr
FS 30/5/1/2/3/2/1(14)
EM
DMPR
16 April 2010
LOM
Atmospheric Emission
Licence
LDM/RAEL/01/2024
Lejweleputswa District
Municipality
February, 2024
January, 2029
Water Permit
789N
DWS
4 November 2008
Valid – pending issue of
new licence
Water Permit
1046B
DWS
4 November 2008
Valid – pending issue of
new licence
Mining Method
The Target deposit comprises stacked mineralised multiple conglomerate reef bands interbedded with layers of quartzites
and quartzwacke. The reef channel thickness increases towards the west, which allows for compositing of the Elsburg Reefs
into thick mineralised mining packages to enable the application of massive open stoping mining method. The height of a
massive stope or mineralised mining package ranges from 15m to 39m. The Dreyerskuil Reefs, which overlie the Elsburg Reefs,
are characterised by thinner, discrete reef horizons that are amenable to narrow-reef conventional mining methods.
Target is essentially a trackless mining operation with a combination of highly mechanised massive open stope, sub-level
open stope mining, and labour-intensive narrow reef stoping, the latter being more typical of South African gold mines’
conventional stoping.
The primary ore extraction method adopted at Target is massive mining of the thick mining horizons (EA1, EA3, EA7 and
EA8) through a combination of scattered open stoping supplemented with the use of a 6%-cement backfill, and sub-level open
stoping which does not make use of backfilling.
The balance of the ore is mined using a Narrow Reef Mining ("NRM") method on the thinner Dreyerskuil Reefs, which does
not make use of backfilling either.
Massive open stoping accounts for ±70% of the ore production with ±30% coming from conventional narrow reef stoping.
Mineral Processing
The Target Plant was commissioned in November 2001. The plant was designed to treat a total tonnage of 105ktpm with a
potential to expand to 160ktpm for future demand. Currently the plant treats ore from Target and Tshepong waste dump.
112
Table of contents
Qualified Persons
The QP was employed on a full-time basis by Harmony. The QP's qualifications, areas of responsibility and personal
inspection of the property are summarised in the graphic below.
Qualified Person
Professional
Organisation
Qualification
TRS Section
Responsibility 
Personal
Insp.
Mr. S. Motlatla
SACNASP
BSc. Hons (Geol), GDE (Mining)
All
Full Time
Exploration
Geological data has been obtained through initial surface drilling, followed by underground drilling, mapping and channel
(chip) sampling.
Initial surface drilling carried out during the 1980s, under the auspices of Sun, was designed to delineate the northward
continuation of the synclinal axis, around which most of Loraine’s gold deposits are located. Following the incorporation of
Target Exploration Company in 1990, a total of 17 drillholes and three long deflections from existing drillholes were drilled in
three arrays parallel to the western margin, namely the Western, Central and Eastern arrays.
The central array targeted the Elsburg Reefs, while the western and eastern arrays focussed on definition of the proximal
(steep west limb) and distal Kimberley and Basal Reefs, respectively.
The positive surface drilling results led to the construction of an underground drilling platform. Underground exploration
drilling has been ongoing throughout the operational life of Target as the mine deepens. Most of the underground drillholes are
used in the geological modelling and estimation of the current Mineral Resources.
Underground diamond core drilling is conducted using hydraulic driven drill rigs, which typically drill BX core. Drill holes are
typically short, rarely exceeding 300m in length.
Fans of drill holes are drilled from diamond drilling bays, which are developed at 50m intervals along the decline return
airway decline. The drilling fans consist of up to ten individual drill holes at inclinations ranging from -15° East to +30° West of
vertical, or as dictated by local geological structures. Maximum drillhole lengths of 350m are required for complete Dreyerskuil
intersections in the synclinal axis. Drill holes are stopped once the Ventersdorp lava has been intersected, or, in the case of
flatter drill holes, once the trough axis has been identified and the drill hole is drilling parallel to the bedding.
Exploration drilling is currently in progress to determine the economic potential of EA3 Reefs and DK Reefs along the sub-
crop of the Elsburg Reefs. Additional to the capital exploration, an underground infill drilling programme is in place to improve
data density to enhance the estimation model.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
Mineral Resource Estimate
The Mineral Resource estimate is reported in situ within the Target lease area, as determined through the analysis of the
reasonable prospect for eventual economic extraction using underground mining methods. The Mineral Resource has been
reported above cut-off grades of 3.08g/t for massive open stoping and 719cmg/t for narrow-reef conventional mining, based on
the economic assumptions presented in the table below as at 30 June 2026.
Description
Unit
Value
Gold price
US$/oz
3,061
Exchange rate
R:US$
17.60
Gold price
R/kg
1,730,000
Plant recovery factor
%
94.50
Unit cost1
R/t
4,842
1 Unit cost includes cash-operating cost, royalty and ongoing development capital.
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions.
The Mineral Resources were originally prepared, classified and reported according to the SAMREC, 2016. For the
purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of
Regulation S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
113
Table of contents
The Mineral Resource estimate, as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves is summarised
in the table below.
Fiscal Year Ended 30 June
% Change
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
Measured
5.478
7.68
42,090
5.588
7.77
43,411
(3.0)
Indicated
3.177
7.17
22,767
3.761
6.94
26,112
(12.8)
Total / Ave. Measured + Indicated
8.655
7.49
64,857
9.349
7.44
69,524
(6.7)
Inferred
2.749
6.58
18,090
3.686
5.99
22,080
(18.1)
Notes:
1.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. S Motlatla, who is the Target Ore Reserve
Manager, and a Harmony employee.
2.The Mineral Resource tonnes are reported as in-situ with reasonable prospects for eventual economic extraction in line with SAMREC,
2016.
3.No modifying factors or sources of dilution have been included to the in-situ Mineral Reserve that is subtracted from the SAMREC Mineral
Resource to derive the Mineral Resource under Regulation S-K 1300.
4.Mineral Resources are reported using a cut-off grade of 3.08g/t for massive open stope mining and 719cmg/t for narrow reef conventional
mining determined at a gold price of US$3,061/oz.
5.Tonnes are reported as rounded to three decimal places. Gold values are rounded to zero decimal places.
6.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
7.Rounding as required by reporting guidelines may result in apparent summation differences.
8.The Mineral Resource estimate is for Harmony’s 100% interest.
The decrease in reported Mineral Resources is attributable to the application of a higher reporting cut-off grade for the
narrow reef conventional mining Mineral Resource estimate than was previously applied. This change in reporting methodology
was implemented following recommendations arising from an independent external audit conducted by Mineral Corporation
Consultancy (Pty) Limited (which trades as The Mineral Corporation or "TMC"), which recommended that cut-off grades be
estimated separately for narrow reef conventional mining and massive open stope mining.
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call and plant recovery factors.
The Mineral Reserve estimate, as at 30 June 2025 and 2026, is summarised in the table below.
 
Fiscal Year Ended 30 June
 
 
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
% Change
Proved
2.463
4.64
11,433
2.421
4.46
10,796
5.9
Probable
0.392
4.34
1,700
1.082
4.48
4,850
(65.0)
Total / Ave. Proved + Probable
2.855
4.60
13,133
3.503
4.47
15,646
(16.1)
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. S. Motlatla, who is the Target Ore Reserve Manager,
and a Harmony employee.
2.Tonnes, grade, and gold content are declared as net delivered to the mills.
3.Figures are fully inclusive of all mining dilutions, gold losses and are reported as mill delivered tonnes and head grades. Metallurgical
recovery factors have not been applied to the reserve figures.
4.Gold content has not taken metallurgical recovery factors into account.
5.Mineral Reserves are reported using a cut-off grade of 3.45g/t for massive open stope mining and 752cmg/t for the narrow reef conventional
mining determined at a gold price of US$2,915/oz.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
114
Table of contents
The decrease in Mineral Reserves is primarily the result of mining depletion, revised mine designs, and changes in the
planned mining mix within the massive open stoping areas.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for Target. The modifying factors are consistent with the modelling, planning and computing estimates used in determining the
Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
Relative Density
t/m3
2.71
Average Stoping Width
cm
178
Mine Call Factor
%
95.00
Plant Recovery Factor
%
94.50
Mineral Reserve Paylimit - NRM
cmg/t
752
Mineral Reserve Cut-off - Massive Open Stoping
g/t
3.45
Mineral Reserve Cut-off - Development
g/t
3.45
Dilution - Massive Open Stoping
%
6.00
For additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
115
Table of contents
Tshepong North
Property Description
The Tshepong North is a production-stage property comprising the underground and surface assets, situated between the
towns of Welkom and Odendaalsrus in the Free State Province of South Africa. The mine is a moderate to deep-level gold mine,
operating at depths of between 1.6km and 2.5km BMD.
The mine is located in the Free State Province of South Africa, approximately 250km southwest of Johannesburg and
15km to the north of the town of Welkom, situated at latitude 27°51’56.45”S and longitude 26°42’45.15”E.
The following graphic illustrates the location of Tshepong North, along with certain infrastructure.
Tshepong North location.jpg
Historically, the primary reef mined is the Basal Reef, although B Reef mining has increased in the past four years from
8% to 60%.
All relevant underground mining and surface right permits, and any other permit related to the work conducted on the
property have been obtained and are valid. There are no known legal proceedings against Harmony, which threaten its mineral
rights, tenure, or operations.
Operational Infrastructure
The areas surrounding Welkom and Odendaalsrus are well-equipped with access and mining-related infrastructure, which
effectively supports the region's numerous operational gold mines. This infrastructure includes national and provincial paved
road networks, power transmission and distribution systems, water supply networks, and communication facilities.
Tshepong North operates with a single shaft system, where ore and waste are hoisted to surface through the main vertical
shaft. The operation is further supported by a twin decline system extending from 66 Level to 77 Level which provides access to
the Sub-75 Level mining areas included in the LOM. Ore and waste are transported separately using a conveyor belt system.
Ore extracted from Tshepong North is transported by rail from the shaft to the Harmony One Plant in Welkom for
processing. The operations are powered by electricity supplied by Eskom.
116
Table of contents
Tshepong North draws its workforce principally from Welkom, Odendaalsrus and other established Free State mining
communities, supplemented by specialist contractors where required. Its principal equipment, facilities, infrastructure and
underground development are of varying ages and are subject to ongoing inspection, preventive maintenance, refurbishment
and replacement programmes. Management considers their physical condition adequate to support the current LOM plan, with
material modernisation and replacement projects included in sustaining capital plans as required. As at 30 June 2026, its
workforce comprised 4,165 people, approximately 89% of whom were permanent employees, with the balance being
contractors.
The surface infrastructure associated with Tshepong North is displayed in the graphic below.
JB Operational Infrastructure.jpg
The “property, plant, and equipment” at Tshepong North as at 30 June 2026, including buildings and mine infrastructure,
mining assets, rehabilitation and assets under construction, had a carrying value of R4.0 billion.
Tshepong North did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no
significant encumbrances exist.
117
Table of contents
Geology
Tshepong North is situated within the Free State Goldfield on the south-western margin of the Witwatersrand Basin, one of
the world's largest gold provinces. Gold mineralisation is associated with stratiform conglomerate reefs within the CRG of the
Witwatersrand Supergroup.
The general orientation of the Witwatersrand Supergroup succession in this goldfield is interpreted as north-trending, within
a syncline that is plunging to the north. The syncline has been divided by faults into the Odendaalsrus, Central Horst and
Virginia sections. The Tshepong North mining right area is also affected by the Ophir and Dagbreek faults.
Tshepong North exploits the Basal Reef and B Reef, both of which occur within the CRG of the Witwatersrand Basin. While
the Basal Reef remains an important orebody, the B Reef has become the dominant production horizon and currently
contributes approximately 60% of the mine’s production volume. The B Reef occurs approximately 150m to 170m
stratigraphically above the Basal Reef.
Mineralisation is associated with the presence of medium to coarse, clast-supported oligomictic pebble horizons. The
presence of allogenic pyrite and detrital carbon is also common.
The mining area is structurally influenced by the Ophir and Dagbreek faults. The Dagbreek Fault bisects the mine into
eastern and western domains and represents the most significant structural feature affecting the distribution of Mineral
Resources and Mineral Reserves.
History
A feasibility study for Tshepong North was completed in 1984, with shaft sinking commencing in 1986 and the mine being
commissioned in November 1991. Tshepong North formed part of the Free State operations acquired from AngloGold by
ARMgold/Harmony Freegold Joint Venture Company (Proprietary) Limited, a joint venture owned equally by Harmony and
ARMGold. The acquisition became effective on 1 January 2002 and was completed on 23 April 2002. Harmony obtained full
ownership of Tshepong North following the completion of its merger with ARMGold in September 2003.
Development of Sub 66 and Sub 71 decline projects progressively extended mining to depths of approximately 2,200m
below surface, while the operation's mining rights were converted under the MPRDA in 2007.
In June 2017, Tshepong North and Phakisa were consolidated into Tshepong Operations, with Mineral Resource and
Mineral Reserve reporting combined under a single operation. In June 2022, reporting was separated and Tshepong North
resumed reporting as an individual operation.
In 2026, the approval of the Tshepong North LOM Extension Project, incorporating the East South Upper ("ESU") B Reef
and Sub-75 Basal Reef reserve blocks, extended the operation's planned life from 2031 to 2041.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
The current mining right for Tshepong North and Tshepong South encompasses an area of 10,798.74ha. Harmony holds
several mining rights in the Free State Goldfields which have been successfully converted and executed as new order mining
rights, some of which are still to be registered at the MPRTO.
Tshepong North is wholly owned by Harmony, including the associated mineral rights.
Mining at Tshepong North is carried out under the following mining rights, covering both Tshepong North and Tshepong
South:
•FS30/5/1/84MR, which is valid from 11 December 2007, to 10 December 2029, and covers an area of 10,798.74ha.
A summary of the status of EPs and licences issued as at 30 June 2026, related to both Tshepong North and Tshepong
South is presented in the table below.
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
Environmental Management Programme
(EMPr)
FS30/5/1/2/3/2/1(84)EM
DMPR
16 April 2010
LOM
Water Permit 936B. Harmony. Free State
Geduld Mines. Discharge of untreated effluents.
B33/2/340/31
DWS
2 April 1981
LOM
Water Permit 870B. Harmony. Discharge of
untreated effluents.
B33/2/340/25
DWS
27 May 1991
LOM
Water Permit 1214N. Free State Consolidated
Gold Mine. Tshepong, Freddie’s and Phakisa
shafts.
B33/2/340/12
DWS
Not indicated.
LOM
Water Permit 1214N. Free State Consolidated
Gold Mine. Tshepong, Freddie’s and Phakisa
shafts.
B33/2/340/12
DWS
Not indicated.
LOM
118
Table of contents
Mining Method
Tshepong North is a deep-level underground gold mining operation, with mining activities extending to depths of
approximately 2,500m below surface. The operation primarily utilises the SGM method. SGM incorporates dip pillars, reduced
mining spans and pre-developed access drives to manage rock stress and enhance mining stability in a deep-level mining
environment.
The mining layout is designed to extract the orebody in a planned sequence towards stabilising and regional pillars,
reducing the creation of remnant pillars and assisting in the management of seismic risk.
Primary development is generally conducted off reef, with secondary development and stoping taking place on reef. SGM
remains the principal mining method across the operation, including the recently approved ESU B Reef and Sub-75 Basal Reef
mining areas incorporated into the LOM Extension Project.
In selected mining areas, alternative mining methods, including breast stoping, undercut stoping and open stoping, are
employed where appropriate.
Mineral Processing
All ore mined at Tshepong North is processed at Harmony One Plant. The Harmony One Plant processes underground ore
from multiple operations, as well as surface ore from nearby WRDs. The plant was commissioned in 1986 and comprises three
independent modules, each consisting of four feed silos, two ROM mills, two conventional thickeners, cyanide leaching, CIP
adsorption, elution, zinc precipitation, and smelting circuits. The plant's CIP process reflects the technology that was current at
the time of its construction.
The Harmony One Plant has a steady-state design capacity of 390ktpm using its conventional CIP flowsheet.
Qualified Persons
The QP was employed on a full-time basis by Harmony. The QP's qualifications, areas of responsibility and personal
inspection of the property are summarised in the graphic below.
Qualified Person
Professional
Organisation
Qualification
TRS Section
Responsibility 
Personal
Insp.
Mr. A. Louw
SACNASP
BSc. Hons. (Geohydrology)
All
Full Time
Exploration
Geological data has been obtained through initial surface drilling, followed by underground drilling, mapping and channel
(chip) sampling.
Tshepong North is engaged in ongoing exploration drilling of the B Reef to assess the potential extension of existing pay
shoots and their connection to adjacent mines. Footwall development at the 71 Level (decline area) commenced during fiscal
2022 and is being utilised as a platform for drilling to confirm and delineate the anticipated B Reef channel, which is projected to
extend in an east-north-southwest direction. Based on exploration drilling results, geological mapping, chip sampling and
ongoing mining activities, the ESU B Reef mineralisation between 60 and 66 Levels and the Sub-75 Basal Reef area have been
confirmed and incorporated into the Tshepong North LOM Extension Project. Both projects have progressed beyond the concept
study stage, have been converted to Mineral Reserves and are currently in execution as part of the approved mine plan. The
inclusion of these reserve blocks supported the approval of the Tshepong North LOM Extension Project, extending the
operation's planned life from 2031 to 2041.
Throughout the mine's operational life, underground exploration drilling has been conducted as the mine deepens. This
drilling is performed using hydraulic and pneumatic drill rigs for diamond core drilling and is designed to improve data density in
specific areas.
Drill holes are drilled from diamond drilling bays in footwall development ends, at 50m intervals along crosscuts and at
100m intervals along haulages and return airways. Drill fans typically comprise up to three individual drill holes, with inclinations
varying from 50° to 120° of vertical, or adjusted to accommodate local geological structures.
Logging procedures are conducted in accordance with Harmony standards, which are applied consistently across all
surface and underground operations and have been in place since 2001.
During calendar 2025, Tshepong North completed 96 underground diamond drill holes totalling 11,060m; 81 holes returned
reef intersections, including 19 Basal Reef and 62 B Reef holes. Underground chip samples were collected from advancing
faces and drill core was sampled in accordance with Harmony's procedures. A total of 52,905 samples were submitted for gold
analysis by fire assay with a gravimetric finish. See Sections 7 and 8 of the Tshepong North TRS.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
119
Table of contents
Mineral Resource Estimate
The Mineral Resource estimate of Tshepong North is considered to have reasonable prospects for eventual economic
extraction. The cut-off value for the Mineral Resources is determined at 661cmg/t for the gold based on the economic
assumptions presented in the table below at 30 June 2026.
Tshepong North
 
 
Description
Unit
Value
Gold price
US$/oz
3,061
Exchange rate
R:US$
17.60
Gold price
R/kg
1,730,000
Plant recovery factor
%
95.60
Unit cost1
R/t
5,268
1 Unit cost includes cash operating cost, royalty and ongoing development capital
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions.
The Mineral Resources were originally prepared, classified and reported according to the SAMREC, 2016. For the
purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of
Regulation S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
The Mineral Resource estimate for Tshepong North, as at 30 June 2025 and 2026, exclusive of the reported Mineral
Reserves, is summarised in the table below.
Fiscal Year Ended 30 June
% Change
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Measured
11.385
11.87
135,110
12.125
12.40
150,403
(10.2)
Indicated
4.956
12.31
60,986
6.567
11.43
75,096
(18.8)
Total / Ave. Measured + Indicated
16.341
12.00
196,096
18.692
12.06
225,499
(13.0)
Inferred
7.578
10.20
77,309
8.272
9.30
76,917
0.5
Notes:
1.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. A. Louw, who is Ore Reserve Manager at
Tshepong North, and a Harmony employee.
2.The Mineral Resource tonnes are reported as in-situ with reasonable prospects for eventual economic extraction.
3.No modifying factors or sources of dilution have been included to the in-situ Mineral Reserve that is subtracted from the SAMREC Mineral
Resource to derive Mineral Resources under Regulation S-K 1300.
4.The Mineral Resources are reported using a cut-off value of 661cmg/t determined at a gold price of US$3,061/oz.
5.Tonnes are reported as rounded to three decimal places. Gold values are rounded to zero decimal places.
6.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
7.Rounding as required by reporting guidelines may result in apparent summation differences.
8.The Mineral Resource estimate is for Harmony’s 100% interest.
The decrease in Mineral Resources is primarily attributable to mining depletion and the conversion of Mineral Resources to
Mineral Reserves, with the impact partially offset by classification improvements and updated geological modelling.
120
Table of contents
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call and plant recovery factors.
The Mineral Reserve estimate for Tshepong North, as at 30 June 2025, and 2026, is summarised in the table below.
 
Fiscal Year Ended 30 June
 
 
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
% Change
Proved
4.143
5.26
21,772
2.403
4.55
10,936
99.1
Probable
6.423
4.96
31,828
1.606
5.85
9,391
238.9
Total / Ave. Proved + Probable
10.566
5.07
53,601
4.009
5.07
20,327
163.7
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. A. Louw, who is Ore Reserve Manager at Tshepong
North, and a Harmony employee.
2.Tonnes, grade, and gold content are declared as net delivered to the mills.
3.Figures are fully inclusive of all mining dilutions, gold losses and are reported as mill delivered tonnes and head grades. Metallurgical
recovery factors have not been applied to the reserve figures.
4.Gold content has not taken metallurgical recovery factors into account.
5.Mineral Reserves are reported using a cut-off grade of 717cmg/t determined using a gold price of US$2,915/oz.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
The increase in Mineral Reserves was primarily attributable to the inclusion of the ESU B Reef and Sub-75 Basal Reef
reserve blocks following approval of the Tshepong North LOM Extension Project. This increase was partially offset by normal
depletion and the adjustment to the algorithm parameters in the design and scheduling programme.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for Tshepong North. The modifying factors are consistent with the modelling, planning and computing estimates used in
determining the Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
Relative Density
t/m3
2.72
Stoping Width
cm
125
Gully
%
8.09
Off Reef
%
4.81
Waste to Reef
%
3.71
Flushing tons
%
2.53
Discrepancy
%
8.41
Mine Call Factor
%
68.00
Plant Recover Factor
%
95.60
Mine Recover Factor
%
65.01
Plant Call Factor
%
100.00
Mineral Reserve cut-off
cmg/t
717
Note: Development waste to reef, including the decline development.
The 2026 Tshepong North Mineral Resource and Mineral Reserve estimates reflect the approved LOM extension project,
updated geological information and refinements to the mine design and scheduling methodology described above. The material
assumptions and criteria supporting the Mineral Resource and Mineral Reserve estimates are described in Sections 11 and 12,
respectively, of the Tshepong North TRS filed as an exhibit to this annual report on Form 20-F. For additional information, see
the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
121
Table of contents
Tshepong South
Property Description
Tshepong South is a production-stage property comprising one operating underground gold mine. It is a mature, moderate
to deep-level underground operation using conventional underground mining methods at depths of up to 2,427m BMD. The
mine utilises the Tshepong South and Nyala shafts. Tshepong South depends on services rendered through Nyala where four
main compressors are commissioned and Tshepong South’s ore is hoisted.
The mine is located in the Free State Province of South Africa, approximately 250km southwest of Johannesburg and
15km to the north of the town of Welkom. Tshepong South is situated adjacent to the south of Tshepong North, and is located at 
latitude 27°54’1.27”S and longitude 26°43’30.05”E.
The following graphic illustrates the location of Tshepong South, along with certain infrastructure.
Tshepong South location.jpg
The primary reef mined is the Basal Reef, with additional gold mineralisation being found in the B Reef and A Reef. The B
Reef, a secondary reef mined, which lies approximately 145m stratigraphically above the Basal Reef, contributes to about 40%
of the total mining production profile at Tshepong South.
All relevant underground mining and surface right permits, and any other permit related to the work conducted on the
property have been obtained and are valid. There are no known legal proceedings against Harmony, which threaten its mineral
rights, tenure, or operations.
Operational Infrastructure
The surrounding areas of Welkom and Odendaalsrus are well developed in terms of access and mining-related
infrastructure, which supports the numerous operational gold mines in the area. The regional infrastructure includes national and
provincial paved road networks, power transmission and distribution networks, water supply networks and communication
infrastructure.
Tshepong South operates a single vertical shaft for man and materials. Rock is transported from the underground working
via a RailVeyorTM system to the Nyala shaft for hoisting.
122
Table of contents
The Tshepong South ore is transported, by rail, from Nyala shaft to the Harmony One Plant in Welkom for processing.
Tshepong South is powered by electricity from Eskom.
Tshepong South draws its workforce principally from Welkom and other established Free State mining communities,
supplemented by specialist contractors where required. Its principal equipment, facilities, infrastructure and underground
development are of varying ages and are subject to ongoing inspection, preventive maintenance, refurbishment and
replacement programmes. Management considers their physical condition adequate to support the current LOM plan, with
material modernisation and replacement projects included in sustaining capital plans as required. As at 30 June 2026, its
workforce comprised 3,474 people, approximately 88% of whom were permanent employees, with the balance being
contractors.
123
Table of contents
The surface infrastructure associated with Tshepong South is displayed in the graphic below.
Tshepong South OI.jpg
The “property, plant, and equipment” at Tshepong South as at 30 June 2026, including buildings and mine infrastructure,
mining assets, rehabilitation and assets under construction, had a carrying value of R3.1 billion.
Tshepong South did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no
significant encumbrances exist.
124
Table of contents
Geology
Tshepong South is situated in the Free State Goldfields, on the southwestern margin of the Witwatersrand Basin of South
Africa, one of the most prominent gold provinces in the world. The major gold bearing conglomerate reefs are mostly confined to
the CRG of the Witwatersrand Supergroup.
The general orientation of the Witwatersrand Supergroup succession in this goldfield is interpreted as north-trending, within
a syncline that is plunging to the north. The syncline has been divided by faults into the Odendaalsrus, Central Horst and
Virginia sections. The Tshepong South mining right area is also affected by the Tribute fault (~270m) and Arrarat Fault (~180m)
to the far south-east of the shaft.
Tshepong South primarily exploits the Basal Reef, which occurs within the Harmony Formation of the Johannesburg
Subgroup of the CRG.
Mineralisation also occurs within the stratigraphically higher A- and B-Reef horizons of the Aandenk Formation, within the
Turffontein subgroup of the CRG. Although the Basal Reef remains the primary mining horizon, the economic extraction of the
B-Reef is increasing as additional geological information becomes available.
Mineralisation is associated with the presence of medium to coarse, clast-supported oligomictic pebble horizons. The
presence of allogenic pyrite and detrital carbon is also common.
History
Tshepong South was formerly known as FSG 4, Freddies 4 and Phakisa. Tshepong South development commenced in
October 1993 and shaft sinking was started in February 1994. In 1995, shaft sinking was halted on 59 Level due to the
prevailing low gold price. Operations at Tshepong South recommenced in September 1996 and sinking was completed to 75
Level, before being halted again in 1999.
Tshepong South formed part of the Free State operations acquired from AngloGold by ARMgold/Harmony Freegold Joint
Venture Company (Proprietary) Limited, a joint venture owned equally by Harmony and ARMGold. The acquisition became
effective on 1 January 2002 and was completed on 23 April 2002. Harmony obtained full ownership of Tshepong South following
the completion of its merger with ARMGold in September 2003. Sinking and equipping was completed to a depth of 2,427m in
2006. Tshepong South and Tshepong North were merged into the Tshepong operation by Harmony in June 2017, but again split
into separate entities in June 2022.
Mining of the B Reef commenced in February 2024 and it is contributing approximately 40% of the total production profile.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
The current mining right for Tshepong South and Tshepong North encompasses an area of 10,798.74ha. Harmony holds
several mining rights in the Free State Goldfields which have been successfully converted and executed as new order mining
rights, some of which are still to be registered at the MPRTO.
Tshepong South is wholly owned by Harmony, including the associated mineral rights.
Mining at Tshepong South is carried out under the following mining rights, covering both Tshepong North and Tshepong
South:
•FS30/5/1/84 MR, which is valid from 11 December 2007 to 10 December 2029 and covers an area of 10,798.74ha.
A summary of the status of EPs and licences issued as at 30 June 2026, related to both Tshepong South and Tshepong
North is presented in the table below.
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
EMPr
FS 30/5/1/2/3/2/1(84)EM
DMPR
16 April 2010
LOM
Water Permit 936B. Harmony. Free State
Geduld Mines. Discharge of untreated effluents.
B33/2/340/31
DWS
2 April 1981
LOM
Water Permit 870B. Harmony. Discharge of
untreated effluents.
B33/2/340/25
DWS
27 May 1991
LOM
Water Permit 1214N. Free State Consolidated
Gold Mine. Tshepong, Freddie’s and Phakisa
shafts.
B33/2/340/12
DWS
Not indicated.
LOM
125
Table of contents
Mining Method
Tshepong South may be classified as a moderate to deep-level underground gold mine currently operating at depths of up
to 2,427m BMD.
The orebody at Tshepong South is broken up into blocks by geological structures with large throws. Due to the orebody
being broken up into these smaller blocks, a scattered mining method is used at Tshepong South. Scattered mining is when
mining is done between the major geological structures. The mine design criteria are based on the SGM method under which
the crosscuts are spaced at a fixed distance of 160m; however, additional development may be required in some instances and/
or crosscut spacing reduced/increased depending on the prevailing geological structures. Primary waste development is done
ahead of the stoping front in the virgin stress environment.
Primary development is done off-reef (in waste rock), while secondary development is done on-reef (in the mineralised
zone). In primary development, horizontal haulages are developed from the vertical shaft, extending to the extremities of the
mining level. Inter-level spacing is the perpendicular distance between two consecutive level stations underground. Further
development is done at set intervals along the haulages towards the mineralised zones in the form of crosscuts. For secondary
development, an inclined excavation that connects two levels is established, referred to as a raise or winze, depending on the
upwards or downwards direction of the development.
A key feature of scattered mining is that the mine design includes pillars in the stoping areas that are designed to cave in a
planned and controlled manner. These pillars are referred to as crush pillars and the dimensions of the pillars are determined by
the geotechnical properties of the host rock. The use of crush pillars minimises the risk of unpredicted collapse of stoping areas.
These collapses can compromise the safety of mining operations and may lead to permanent closure of stoping panels or
sterilisation of ore.
Mineral Processing
All ore mined at Tshepong South is processed at Harmony One Plant.
Qualified Persons
The QP was employed on a full-time basis by Harmony. The QP's qualifications, areas of responsibility and personal
inspection of the property are summarised in the graphic below.
Qualified Person
Professional
Organisation
Qualification
TRS Section
Responsibility 
Personal
Insp.
Mr. J.P. van Deventer
SACNASP
B.Sc Hons (Geology)
All
Full Time
Exploration
Geological data has been obtained through initial surface drilling, followed by underground drilling, mapping and channel
(chip) sampling. The underground infill drilling system is in place to improve data density in specific areas and holes are drilled
from the underground development access drives.
Since 2022 capital exploration drilling has been ongoing to determine areas of economic value in the B-Reef channels
extrapolated from the high grade channels being mined in the west-south area of Tshepong North shaft.
Underground exploration drilling has been ongoing throughout the operational life of Tshepong South. Underground
diamond core drilling is conducted using hydraulic driven and pneumatic drill rigs.
The underground infill drilling system is in place to improve data density in specific areas and holes are drilled from the
underground development access drives.
Drill holes are drilled from diamond drilling bays in footwall development ends, at 50m intervals along crosscuts and at
100m intervals along haulages and return airways. Drill fans typically comprise up to ten individual drill holes, with inclinations
varying from 5° to 90° of vertical, or adjusted to accommodate local geological structures.
Logging procedures are conducted in accordance with Harmony's standards, which have been applied consistently at all
surface and underground mines and are best practice and have been in place consistently since 2001.
During the 2026 drilling campaign, Tshepong South completed 128 underground diamond drill holes totalling 13,883m. The
programme yielded 47 Basal Reef  intersections and 85 B Reef intersections, with four drillholes intersected both reef horizons.
Underground channel sampling averaged approximately 405 gold sample sections per month. From January 2025 through
March 2026, 31,637 samples were submitted for gold analysis by fire assay with a gravimetric finish. See Sections 7 and 8 of
the Tshepong South TRS.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
126
Table of contents
Mineral Resource Estimate
The Mineral Resource estimate for Tshepong South is considered to have reasonable prospects for eventual economic
extraction. The cut-off value for the Mineral Resources is determined at 727cmg/t for the gold, based on the economic
assumptions presented in the table below at 30 June 2026.
Tshepong South
 
 
Description
Unit
Value
Gold price
US$/oz
3,061
Exchange rate
R:US$
17.60
Gold price
R/kg
1,730,000
Plant recovery factor
%
95.32
Unit cost1
R/t
6,482
1 Unit cost includes cash operating cost, royalty and ongoing development capital.
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions.
The Mineral Resources were originally prepared, classified and reported according to the SAMREC, 2016. For the
purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of
Regulation S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
The Mineral Resource estimate for Tshepong South, as at 30 June 2025 and 2026, exclusive of the reported Mineral
Reserves is summarised in the table below.
Fiscal Year Ended 30 June
% Change
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
Measured
6.402
12.34
79,001
5.507
12.80
70,514
12.0
Indicated
9.460
11.02
104,209
8.892
11.35
100,964
3.2
Total / Ave. Measured + Indicated
15.862
11.55
183,210
14.399
11.91
171,478
6.8
Inferred
22.970
11.24
258,074
22.729
11.33
257,508
0.2
Notes:
1.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. J.P. van Deventer who is the Ore Reserve
Manager at Tshepong South, and a Harmony employee.
2.The Mineral Resource tonnes are reported as in-situ with reasonable prospects for eventual economic extraction.
3.No modifying factors or sources of dilution have been included to the in-situ Mineral Reserve that is subtracted from the SAMREC Mineral
Resource to derive Mineral Resource under Regulation S-K 1300.
4.The Mineral Resources are reported using a cut-off value of 727cmg/t determined at a gold price of US$3,061/oz.
5.Tonnes are reported as rounded to three decimal places. Gold values are rounded to zero decimal places.
6.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
7.Rounding as required by reporting guidelines may result in apparent summation differences.
8.The Mineral Resource estimate is for Harmony’s 100% interest.
The increase in Mineral Resources was due to the increase in the B Reef Mineral Resources as result of new geological
information.
127
Table of contents
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call and plant recovery factors.
The Mineral Reserve estimate for Tshepong South, as at 30 June 2025, and 2026, is summarised in the table below.
 
Fiscal Year Ended 30 June
 
 
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade (g/t)
Gold
Content
(kg)
% Change
Proved
1.404
5.75
8,071
2.159
6.53
14,102
(42.8)
Probable
0.511
3.43
1,753
0.423
3.22
1,362
28.7
Total / Ave. Proved + Probable
1.915
5.13
9,824
2.582
5.99
15,464
(36.5)
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. J.P. van Deventer who is the Ore Reserve Manager at
Tshepong South, and a Harmony employee.
2.Tonnes, grade, and gold content are declared as net delivered to the mills.
3.Figures are fully inclusive of all mining dilutions, gold losses and are reported as mill delivered tonnes and head grades. Metallurgical
recovery factors have not been applied to the reserve figures.
4.Gold content has not taken metallurgical recovery factors into account.
5.Mineral Reserves are reported using a cut-off grade of 752cmg/t determined using a gold price of US$2,915/oz.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
The decrease in Mineral Reserves is due to normal depletion and the adjustment to the algorithm parameters in design
and scheduling programme.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for Tshepong South. The modifying factors are consistent with the modelling, planning and computing estimates used in
determining the Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
Relative Density
t/m3
2.72
Stoping Width
cm
143
Gully
%
6.92
Off Reef
%
5.24
Waste to Reef
%
0.23
Flushing tons
%
—
Discrepancy
%
12.73
Mine Call Factor
%
80.00
Plant Recover Factor
%
95.32
Mine Recover Factor
%
76.26
Plant Call Factor
%
100.00
Mineral Reserve cut-off
cmg/t
752
The 2026 Tshepong South Mineral Resource and Mineral Reserve estimates reflect new geological information, normal
depletion and refinements to the mine design and scheduling methodology described above. The material assumptions and
criteria supporting the Mineral Resource and Mineral Reserve estimates are described in Sections 11 and 12, respectively, of
the Tshepong South TRS filed as an exhibit to this annual report on Form 20-F.
For additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
128
Table of contents
Mine Waste Solutions
Property Description
Mine Waste Solutions is a production-stage property comprising two distinct, geographically separated, operations namely
the Mine Waste Solutions ("MWS") operation located on the Free State - North West provincial boundary, and the West Wits
operation situated in the West Rand region of the Gauteng Province. Each operation will be discussed separately due to their
geographical locations.
MWS and its associated mineral rights are wholly owned by Harmony. Harmony acquired the assets as part of the
transaction to take full ownership and control of AngloGold's remaining South African business, as of 1 October 2020.
The location of the MWS operation and the West Wits operation is presented in the figure below.
MWS property location.jpg
129
Table of contents
The following graphic illustrates the location of the MWS operation, along with certain infrastructure.
VAAL RIVER - LOCATION AND CLASSIFICATION 2024 - FIGURE 3-2 PDF- jpeg-001.jpg
The following graphic illustrates the location of the West Wits operation, along with certain infrastructure is
WES WITS - LOCATION AND CLASSIFICATION - 2024 - FIGURE 3-3 PDF-jpeg-001.jpg
130
Table of contents
The MWS operation is located in the Vaal River area, and straddles the Free State, North West provincial border of South
Africa, close to the town of Klerksdorp. The MWS gold plant, at latitude 26°47’41.83”S and longitude 26° 50’8.66”E, is situated
close to the town of Stilfontein, while the TSFs and WRD for this operation are scattered over an area that stretches
approximately 13.5km north to south and 14.0km east to west.
The West Wits operation is situated in the West Rand region of the Gauteng Province. The West Wits operation is situated
approximately 75km west of Johannesburg. The site is approximately 7km south of Carletonville. West Wits operation occupies
an area of 4,176ha in extent and is close to the boundary between Gauteng and North West Province.
The West Wits operation reprocesses tailings from the Old North TSF at the Savuka plant, at latitude 27° 24’11.30”S and
longitude 26° 25’20.31”E.
There is no material litigation against Harmony that threatens its mineral rights, tenure, or operations.
Operational Infrastructure
Infrastructure in the region is well established supporting the numerous operational gold mines in the area. The regional
infrastructure includes national and provincial paved road networks, power transmission and distribution networks, water supply
networks and communication infrastructure. Operations are powered by electricity from Eskom.
The MWS operation is accessible from Johannesburg via the N12 national road and R502 regional road in Klerksdorp,
North West. A large network of either tarred roads or well-maintained gravel roads exist between the tailing dams, WRDs and
the MWS plant that are scattered in the area. The West Wits operation near Carletonville is accessible via the N12 national road
and R500 regional road from Johannesburg.
The surface infrastructure associated with the MWS operation and the West Wits operation is presented in the graphic
under "– Property Description" above.
The “property, plant, and equipment” as at 30 June 2026, including buildings and mine infrastructure, mining assets,
rehabilitation and assets under construction, had a carrying value of R5.0 billion for the MWS operation and R211 million for the
West Wits operation.
MWS draws its workforce principally from Klerksdorp, Carletonville and surrounding established mining communities,
supplemented by specialist contractors where required. Its principal equipment, plants, facilities and infrastructure are of varying
ages and are subject to ongoing inspection, preventive maintenance, refurbishment and replacement programmes.
Management considers their physical condition adequate to support the current LOM plans, with material modernisation and
replacement projects included in sustaining capital plans as required.
The MWS operation and the West Wits operation did not incur any fines or penalties for non-compliance during the year
ended 30 June 2026 and no significant encumbrances exist.
Geology
Material contained in the TSFs and WRDs predominantly originates from deep level gold mines, operated by Harmony and
others, mostly located in Klerksdorp and Carletonville. The West Wits operation predominantly extracts tabular gold-bearing
conglomeratic reefs, namely the CLR and VCR. The MWS operation, however, mainly exploits TSFs and WRDs derived from
the VR.
The Witwatersrand Reefs occur within the Archean Witwatersrand Basin which hosts the Witwatersrand Supergroup
succession. The VCR horizon is located at the top of the Turffontein Subgroup of the CRG, capping the Witwatersrand
Supergroup. The VR horizon is situated within the Krugersdorp Formation, in the Johannesburg Subgroup of the CRG. The CLR
is situated near the base of the Johannesburg Subgroup.
The TSF material comprises previously treated residues of gold-bearing conglomeratic reefs processed by CIL. They are
man-made “deposits” and are not the result of natural sedimentary processes. The grade of the TSFs is determined by the
grade of the ore source at the time that they were processed, and the processing efficiency.
The WRDs are unconsolidated and are comprise of untreated, low grade, gold-bearing material from underground
workings. The WRDs are also man-made deposits, with very little structure or continuity, and are deposits in which the grade
does not behave as a natural mineral deposit.
The most significant mineral in the TSFs and WRDs is quartz, which makes up more than 60% of the bulk mineral
composition. The gold predominantly occurs in pyrite. Other minerals identified include uranium, iron oxide, titanium oxide and
calcite from the VR, VCR and CLR conglomerates.
History
The MWS operation commenced production in 1952 and was the original gold processing plant for the Stilfontein Gold
Mine. Following the rise in the uranium price in the 1970s, the operation investigated uranium recovery from the Stilfontein Gold
Mine’s gold tailings dams and commissioned the uranium plant in mid-1979. The plant operated until 1989, processing 29.4Mt of
tailings and recovering 4.56t of U3O8. In 2003, the plant was converted into a gold tailings treatment operation and no further
uranium was produced at that stage.
In 2007, First Uranium (Pty) Ltd (South Africa) ("First Uranium") acquired the MWS operation with the purpose of treating
the tailings dams for both gold and uranium. The second and third processing plants were commissioned between 2007 and
2012.
131
Table of contents
On 20 July 2012, the MWS operation was acquired by AngloGold from First Uranium. The MWS uranium plant and
flotation plants were commissioned in 2014, and were further reconfigured into a more efficient operation during 2016, as part of
an optimisation drive. In 2017, the uranium and flotation plants were discontinued resulting in the MWS operation again
producing only gold.
On 1 October 2020, Harmony acquired all of AngloGold's surface operations, including the MWS operation.
The Savuka plant was commissioned in 1961 and originally designed to treat ore from Savuka Mine and TauTona Mine. In
2015, upon the change in strategy to process the reef from the aforementioned shafts at Mponeng plant, the plant was
converted into a tailings and WRD treatment facility. The Savuka plant treats tailings material from the Old North TSF. On 1
October 2020, Harmony acquired all of AngloGold’s South African business, including the surface assets which constitute the
West Wits operation.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – South Africa” above
for a summary of the regulatory environment in South Africa.
The MWS operation’s licence to operate is covered by the environmental authorisation under NEMA, applicable water-use
and other regulatory approvals, and relevant surface rights. Under the MPRDA, no mining right is required to reclaim historical
TSFs. The West Wits operation operates under GP30/5/1/2/2(01) MR, which is valid until 1 February 2036.
Following Harmony’s acquisition of the MWS operation, the relevant permits and licences were transferred to Harmony,
and financial provision is maintained for rehabilitation liabilities relating to the operation. The relevant environmental and water-
use permits remain in force and are audited regularly for compliance. An environmental authorisation for the Kareerand TSF
expansion was issued to MWS in 2022. MWS also received environmental authorisation to increase the capacity of the return-
water pipeline from the Kareerand TSF to the MWS plant and reclamation activities.
A summary of the status of EPs and licences issued as at 30 June 2026 related to MWS is presented in the table below.
Permit
Holder
Permit / Licence
Reference No.
Issued By
Date Granted
Validity
MWS
Certificate of Registration 
Inflammable Liquids and
Substances
1051
City Council
of Matlosana
Fire and
Rescue
31 December 2026
30 December 2027
1052
1054
1055
1056
1057
Certificate of Registration
COR-30 (Variation 30)
NNR
14 April 2023
LOM
Environmental Authorisation
for Mispah TSF Reclamation
14/12/16/3/3/1/2714
DWS
9 July 2023
LOM
Environmental authorisation
for Kareerand TSF
operations
NWP/EIA/176/2008
DMRE
11 November 2021
LOM
Atmospheric Emission
Licence
NWPG/CHEMWES/
AEL 4,1,4,2&4
DEDECT
17 November 2025
30 November 2030
Harmony
Water Use Licence
08/C24B/AIACGI/11868
DWS
10 June 2022
9 June 2042
08/C24B/CI/13793
30 October 2023
29 October 2031
10/C24A/CICI/14662
31 July 2024
30 July 2044
Dam Enlargement Licence
12/2/C241/37
DWS
25 November 2022
LOM
132
Table of contents
Image_2.jpg
Mining Method
The mining methodologies adopted at MWS entail the hydro-mining of the TSFs and reclamation of WRDs using FELs.
The TSF material is reclaimed using several hydraulic monitoring guns which deliver high-pressure water to the face. High
pressure water is transferred to the monitoring guns observing the maximum design capacity of the equipment, limited to 40
bars. Typically, a 25m mining face length is achieved with a water pressure in the range of 27bar to 30bar.
The tailings material can be selectively mined based on the positioning of the monitoring guns. The TSF face is broken by
water pressure and the resulting slurry gravitates towards the collection sumps that deliver the slurry to the pumping stations,
which is then pumped via overland pipelines to the respective plant streams. The TSFs are fed into one of the three plant
streams, that comprise the MWS operation. The tailings material size is appropriate for high-pressure water to re-pulp the
consolidated slimes to a slurry at a minimum relative density of around 1.45. No milling is required, as the material has
previously been milled through the CIL plant treatment process.
Waste rock arises from underground development and is conveyed to large dumps where it is stockpiled. The grade values
are inconsistently distributed amongst these rock deposits. Waste rock from off-reef development can also become
contaminated during transport to surface by mineralised rock from unpay and marginal areas.
Tracked bulldozers are used on the top of WRDs during daylight hours, demarcated by surveyed markers, in accordance
with safety standards. Vertical dozing operations are prohibited. During dozing operations, the geotechnical considerations and
the materials’ natural angle of repose are adhered to, so as to maintain the WRD slope stability during loading operations.
Bulldozers are also used at the bottom of the WRDs to create a safe loading distance between the base of the WRD and
the loading face. Loading measures take careful account of the existing dump design and ensure that extraction of the material
is done safely. FEL are used to load the dozed material into rail hoppers or trucks, for transport to milling and mineral
processing.
Mineral Processing
There are two plants, namely the MWS plant and the Savuka plant, which are dedicated to the processing of tailings
material. Reclaimed tailings are pumped as slurry via pipelines to the MWS and Savuka plants and WRD material is transported
on trucks to the Mponeng plant for processing.
The MWS plant is currently capable of processing 86,000tpd. This includes Stream 4 which was commissioned in
December 2024.
The Savuka plant is a single process flow with a current processing capacity of 10,600tpd.
133
Table of contents
Qualified Persons
The QP was employed on a full-time basis by Harmony. The QP's qualifications, areas of responsibility and personal
inspection of the property are summarised in the graphic below.
Qualified Person
Professional
Organisation
Qualification
TRS Section
Responsibility 
Personal
Insp.
Mr. BJ. Selebogo
SAGC
MSCC, HND (MRM)
All
Full time
Exploration
Prior to 2011, grade estimations for the TSFs were based on residue grades obtained from the process plants, as well as
various sampling projects in selected areas. Most of these TSFs have since been re-sampled by means of an extensive auger
drilling exercise which commenced in 2011. The remaining TSFs will be re-sampled once they go out of service and become
dormant.
A total of 1,620 drill holes have been drilled in these TSFs from 2011 to date for both MWS operation and the West Wits
operation.
WRDs cannot be explored using drilling because they comprise of unconsolidated rock. No drilling is undertaken on the
WRDs at the MWS operation or the West Wits operation.
The drilling and sampling methodology in use for Harmony’s TSFs has been developed specifically for the challenges
posed by these deposits and is aligned with industry best practice. This protocol has been in place since 2011, and the drilling
components are applied by contractors who are experienced in this specific methodology.
The drill hole samples are deemed to be representative as they provide both vertical and horizontal coverage of each TSF.
Drill holes are positioned at regular intervals across the TSF.
The data spacing, density and distribution are sufficient to support the estimation of Mineral Resources for the various
TSFs.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
Mineral Resource Estimate
The Mineral Resources were originally prepared, classified and reported according to the SAMREC, 2016. For the
purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of
Regulation S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
The Mineral Resource estimate for the MWS operation, as at 30 June 2025 and 2026, exclusive of the reported Mineral
Reserves, is summarised in the table below:
 
Fiscal Year Ended 30 June
 
 
 
2026
2025
 
 
 
 
Grade
Metal Content
 
Grade
Metal Content
 
Mineral
Resource
Category
Source
Tonnes
(Mt)
Gold
(g/t)
U3O8
(kg/t)
Gold
(kg)
U3O8
(t)
Tonnes
(Mt)
Gold
(g/t)
U3O8
(kg/t)
Gold
(kg)
U3O8
(t)
%
Change
Measured
TSF
50.525
0.20
0.067
10,022
3,395
47.553
0.19
0.068
9,130
3,243
9.8
WRD
—
—
—
—
—
—
—
—
—
—
—
Sub Total / Ave.
Measured
50.525
0.20
0.067
10,022
3,395
47.553
0.19
0.068
9,130
3,243
9.8
Indicated
TSF
55.519
0.24
0.088
13,120
4,862
52.357
0.23
0.089
12,089
4,639
8.5
WRD
1.768
0.30
—
530
—
2.055
0.30
—
617
—
(14.1)
Sub Total / Ave.
Indicated
57.287
0.24
0.085
13,650
4,862
54.412
0.23
0.085
12,706
4,639
7.4
Total / Ave. Measured
+ Indicated
107.812
0.22
0.077
23,672
8,256
101.965
0.21
0.077
21,836
7,882
8.4
Inferred
TSF
79.371
0.13
0.038
10,694
2,986
81.763
0.13
0.038
11,018
3,097
(2.9)
WRD
2.502
0.24
—
611
—
2.502
0.24
—
611
—
—
Total / Ave. Inferred
81.873
0.14
0.036
11,305
2,986
84.265
0.14
0.037
11,629
3,097
(2.8)
Notes:
1.The Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according
to SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. BJ. Selebogo, who is Ore Reserve Manager, and
a Harmony employee.
2.The Mineral Resource tonnes are reported as in-situ with reasonable prospects for eventual economic extraction.
3.No cut-off grade has been applied for the estimation of Mineral Resources. Mineral Resource tonnes are reported based on a gold price of
US$3,061/oz.
4.Tonnes are reported as million tonnes rounded to three decimal places. Gold values are rounded to zero decimal places.
5.Uranium content is reported as part of the MWS Mineral Resource estimate only.
134
Table of contents
6.Metal content does not include allowances for processing losses.
7.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
8.Rounding as required by reporting guidelines may result in apparent summation differences .
9.The Mineral Resource estimate is for Harmony’s 100% interest.
The decrease in Mineral Resources for the MWS operation is the result of estimation model and survey updates.
The Mineral Resource estimate for the West Wits Operation, as at 30 June 2025, and 2026, is summarised in the table
below:
Fiscal Year Ended 30 June
 
 
2026
2025
 
 
Grade
Metal Content
 
Grade
Metal Content
 
Mineral
Resource
Category
Source
Tonnes
(Mt)
Gold
(g/t)
U3O8
(kg/t)
Gold
(kg)
U3O8
(t)
Tonnes
(Mt)
Gold
(g/t)
U3O8
(kg/t)
Gold
(kg)
U3O8
(t)
%
Change
Measured
TSF
—
—
—
—
—
—
—
—
—
—
—
WRD
—
—
—
—
—
—
—
—
—
—
—
Sub Total / Ave.
Measured
—
—
—
—
—
—
—
—
—
—
—
Indicated
TSF
9.680
0.33
—
3,170
—
9.669
0.32
—
3,050
—
3.9
WRD
0.104
0.37
—
38
—
0.164
0.37
—
60
—
(36.7)
Sub Total / Ave.
Indicated
9.784
0.33
—
3,208
—
9.833
0.32
—
3,110
—
3.2
Total / Ave.
Measured + Indicated
9.784
0.33
—
3,208
—
9.833
0.32
—
3,110
—
3.2
Inferred
TSF
—
—
—
—
—
—
—
—
—
—
—
WRD
—
—
—
—
—
—
—
—
—
—
—
Total / Ave. Inferred
—
—
—
—
—
—
—
—
—
—
—
Notes:
1.The Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according
to SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The QP responsible for the estimate is Mr. BJ. Selebogo, who is Ore Reserve Manager, and
a Harmony employee.
2.The Mineral Resource tonnes are reported as in-situ with reasonable prospects for eventual economic extraction.
3.No cut-off grade has been applied for the estimation of Mineral Resources. Mineral Resource tonnes are reported based on a gold price of
US$3,061/oz.
4.Tonnes are reported as million tonnes rounded to three decimal places. Gold values are rounded to zero decimal places.
5.Uranium content is reported as part of the MWS Mineral Resource estimate only.
6.Metal content does not include allowances for processing losses.
7.Mineral Resources are exclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not necessarily demonstrate
economic viability.
8.Rounding as required by reporting guidelines may result in apparent summation differences .
9.The Mineral Resource estimate is for Harmony’s 100% interest.
The change in Mineral Resources for the West Wits operation is a result of survey updates.
135
Table of contents
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational planning
processes. The planning team utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, plant call factor, and plant recovery factors.
The Mineral Reserve estimate for the MWS operation, as at 30 June 2025 and 2026, is summarised in the table below:
 
 
Fiscal Year Ended 30 June
 
 
 
2026
2025
 
Mineral Reserve
Category
Source
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
% Change
Proved
TSF
3.215
0.32
1,013
7.756
0.30
2,353
(56.9)
WRD
—
—
—
—
—
—
—
Sub Total / Ave. Proved
3.215
0.32
1,013
7.756
0.30
2,353
(56.9)
Probable
TSF
323.571
0.28
90,140
344.711
0.28
95,334
(5.4)
WRD
—
—
—
—
—
—
—
Sub Total / Ave. Probable
323.571
0.28
90,140
344.711
0.28
95,334
(5.4)
Total / Ave. Proved + Probable
326.785
0.28
91,154
352.467
0.28
97,687
(6.7)
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. BJ. Selebogo, who is the Ore Reserve Manager, and a
Harmony employee.
2.Tonnes, grade, and content are declared as net delivered to the mills.
3.Gold content has not taken metallurgical recovery factors into account.
4.Mineral Reserves are reported using a cut-off grade of 0.150g/t and a gold price of US$2,915/oz.
5.Recovered gold (kg) is based on a conversion factor of 32.1507oz/kg.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
The decrease in Mineral Reserves for the MWS operation is due to survey updates.
The Mineral Reserve estimate for the West Wits operation, as at 30 June 2025, and 2026, is summarised in the table
below:
 
 
Fiscal Year Ended 30 June
 
 
 
2026
2025
 
Mineral Reserve
Category
Source
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
% Change
Proved
TSF
—
—
—
—
—
—
—
WRD
—
—
—
—
—
—
—
Sub Total / Ave. Proved
—
—
—
—
—
—
—
Probable
TSF
20.694
0.33
6,748
24.057
0.33
7,891
(14.5)
WRD
—
—
—
—
—
—
—
Sub Total / Ave. Proved
20.694
0.33
6,748
24.057
0.33
7,891
(14.5)
Total / Ave. Proved + Probable
20.694
0.33
6,748
24.057
0.33
7,891
(14.5)
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300. The QP responsible for the estimate is Mr. BJ. Selebogo, who is the Ore Reserve Manager, and a
Harmony employee.
2.Tonnes, grade, and gold content are declared as net delivered to the mills.
3.Gold content is recovered gold after taking into consideration the modifying factors.
4.Mineral Reserves are reported using a cut-off grade of 0.195g/t at recovery of 44.1%, a gold price of USD2,915/oz and R142/t.
5.Recovered gold (kg) is based on a conversion factor of 32.1507oz/kg.
6.Rounding as required by reporting guidelines may result in apparent summation differences.
Then change in Mineral Reserves for West Wits operation is due to survey updates.
136
Table of contents
The tables below present a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for the MWS operation. The modifying factors are consistent with the modelling, planning and computing estimates used in
determining the Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
Gold Accounted For (“GAF”) - Grade Cut-off
g/t
0.15
Recovery Factor
%
44.69
Plant Call Factor
%
100.00
Dilution
%
N/A
Conversion factor
oz/kg
32.1507
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for the West Wits operation. The modifying factors are consistent with the modelling, planning and computing estimates used in
determining the Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
GAF - Grade Cut-off
g/t
0.20
Recovery Factor
%
44.13
Mine Call Factor
%
100.00
Dilution
%
N/A
For additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
137
Table of contents
Hidden Valley
Property Description
The Hidden Valley mine is a production-stage property located in the Morobe Province of PNG and is 100% owned and
operated by Morobe Consolidated Goldfields Limited, a wholly-owned subsidiary of Harmony. The Hidden Valley mine consists
of the Hidden Valley Kaveroi open pit ("HVK") and an ore processing facility in steep, heavily forested, mountainous terrain. The
deposit is located at latitude 7°27'33.96"S and longitude 146°40'19.18"E, approximately 20km southwest of Wau within mining
lease ML151.
The following graphic illustrates the location of the Hidden Valley mine.
Papua New Guinea - Divider 2026.jpg
The mineral tenure is presented in the table below.
Licence Holder
Licence Type
Reference No.
Effective Date
Expiry Date
Area (ha)
Morobe Consolidated Goldfields
Limited
Mining Lease
ML151
4 March 2005
3 March 2040
4,098.29
Operational Infrastructure
Wau is the closest town (pop. 5,800) to the Hidden Valley mine. The nearest larger service centre is Bulolo. The latest
publicly available town-level census data (2011) recorded a population estimated at 20,000, while the wider Bulolo District had
approximately 95,800 residents in the 2024 census. In the 1930s, when Bulolo was a centre of gold-dredging operations on the
Bulolo River, the town population was approximately 7,100. The town has an airfield, schools and health facilities. Forestry,
agriculture and mining, including alluvial gold mining, are important economic activities in the area.
Lae, the capital of Morobe Province (pop. 203,100), is a major transport hub and an important commercial, administrative,
industrial, residential and educational centre for Morobe Province and PNG.
138
Table of contents
Hidden Valley draws its workforce mainly from Morobe Province and elsewhere in PNG, supplemented by specialist
contractors and expatriate personnel as required. Mobile equipment, plant and infrastructure are maintained through inspection,
preventive maintenance, refurbishment and replacement programmes. Management considers the infrastructure adequate to
support the current LOM plan, with required replacements included in sustaining capital plans.
The existing infrastructure located at the mine site is sufficient to support the current mine plan.
The property, plant, and equipment of Hidden Valley as at 30 June 2026, including buildings and mine infrastructure,
mining assets, decommissioning assets, rehabilitation and assets under construction, had a carrying value of R5.4 billion.
For information on assets and liabilities (including costs after depreciation) of Hidden Valley see Note 40 "Segment Report”
to our consolidated financial statements set forth beginning on page F-1.
Hidden Valley did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no
significant encumbrances exist.
The surface infrastructure plan for the mine area is presented in the graphic below.
hvmap222.jpg
Geology
The HVK deposit is a vein-stockwork gold-silver deposit located in the southeast corner of the Wau Graben and is hosted
by the Morobe Granodiorite. The Kaindi Metamorphics occur as a cap to the HVK mineralisation. It comprises grey-black and
green-brown, variably carbonaceous, schistose, quartz-rich psammites and pelites that have undergone regional greenschist
metamorphism and localised, higher grade contact metamorphism on intrusive contacts with Morobe Granodiorite. The
granodiorite comprises two parts; an upper homogenous granodiorite of uniform texture cut by thin aplite dykes and feldspar
porphyry dykes. Below the HVK fault is a lower, more heterogeneous unit comprising granodiorite, diorite, adamellite, tonalite
and feldspar porphyry. The lower unit tends to contain gypsum veining, not regularly seen in the upper unit.
Numerous porphyry dykes of the Edie Creek Suite intrude both the Kaindi Metamorphics and the Morobe Granodiorite.
Porphyry composition varies from hornblende-biotite to feldspar-quartz phenocryst varieties. These bodies are not generally
mineralised but do commonly show some alteration.
Surficial weathering, mainly by downward percolation of oxygenated meteoric water, is variable over the gold-silver deposit
due to lithological, alteration and structural discontinuities. Of the two main rock units the granodiorite is usually more deeply
weathered than the metasediment. At the HVK deposit, four distinct oxidation zones are recognised; an oxide zone, partial
oxidation zone, a zone of fracture oxidation, and a fresh (primary) zone. However, the effects of supergene gold enrichment or
depletion (if present) are minimal for the HVK deposit.
139
Table of contents
History
Gold was discovered in Hidden Valley Creek by W.H. Chapman in 1927 (Lowensteub, 1982), and worked until 1929. In
1945, stream alluvial gold samples were taken close to the HVK discovery outcrop, but the deposit remained hidden. In 1984,
CRA Exploration (Pty) Ltd ("CRAE") discovered the HVK deposit when it carried out a regional stream sediment sampling
programme in the headwaters of the Upper Watut River, -80mesh sediment samples returned values of 54ppm gold. Mapping
up the creeks revealed that a landslide on the northern bank of Hidden Valley Creek had exposed altered and mineralised
granodiorite with initial chip sampling returning 55m at 3.8ppm gold. Drilling commenced in 1985, with the third and fourth holes
intersecting wide zones of mineralisation.
CRAE completed a prefeasibility study in 1989, and concluded the deposit was too marginal at that time to develop. In
1992, Placer Pacific Limited entered into a joint venture with CRAE but withdrew from the joint venture in 1993. In that time
Placer drilled 13 holes and tested some adjacent targets. The project went through a hiatus until 1995, when CRAE reviewed
the project. In 1997, CRAE (now known as Rio Tinto Limited) sold its interest in the HVK deposit to a wholly-owned subsidiary of
Australian Gold Fields NL ("AGF"), which was subsequently placed into administration. Aurora Gold Limited ("Aurora") acquired
the deposit from the administrators of AGF in September 1998. Aurora completed a prefeasibility study on the project in 2002.
Abelle Limited ("Abelle") obtained 100% ownership of the deposit in February 2003, following the merger of Abelle with Aurora.
Harmony effectively acquired 100% of Abelle on 1 May 2003. An MOA between landowners and the PNG Government was
signed on 5 August 2005, resulting in the mining lease for the Hidden Valley project being granted. Harmony commenced and
completed a feasibility project on the deposit and commenced construction in 2008.
In August 2008, Harmony and Newcrest commenced a joint venture relationship in the Morobe Province of PNG, and the
Hidden Valley Joint Venture was established as an unincorporated 50:50 joint venture between Morobe Consolidated Goldfields
Limited (Harmony) and Newcrest PNG1 Limited (Newcrest). The Hidden Valley mine has been in operation since 2009, and was
officially opened in September 2010.
In October 2016, Harmony acquired Newcrest’s joint venture interest, and Morobe Consolidated Goldfields Limited took
100% ownership of the Hidden Valley mine.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – Papua New Guinea”
above for a summary of the regulatory environment in PNG.
Hidden Valley operates within mining lease, ML151, and also within Mining Easement ME 82 and Lease for Mining
Purposes LMP 80. All tenements are registered in the name of Morobe Consolidated Goldfields Limited and are valid until March
2040.
In accordance with the PNG Environment Act, an EIS was submitted to the Department of Environment and Conservation
(now CEPA) in February 2004. The EIS was approved in January 2005, and the Waste Discharge Permit WD-L3(50) and Water
Extraction Permit WE-L3(38) were issued. In 2017, these permits were amalgamated as Environment Permit EP-L3(578).
Post June 30 (in August) 2026, CEPA approved the amendment of Environment Permit EP-L3(578) to support the Stage 9
expansion and extended its term to March 2040.
In accordance with condition 4 of Environment Permit EP-L3(578), Morobe Consolidated Goldfields Limited reviews and
updates its Hidden Valley Environmental Management Plan every three years. The most recent iteration (2025-2027) was
approved by CEPA in October 2025.
A summary of the status of EPs and tenements issued as at 30 June 2026, is presented in the table below.
Permit / Licence
Status
Mining Lease
ML151 current. Expiry 3 March 2040.
Lease for Mining Purpose
LMP80 current. Expiry 3 March 2040.
Mining Easement
ME82 current. Expiry 3 March 2040.
Environment Permit
EP-L3(578) current.  Expiry 29 March 2030.1
1EP-L3(578) expiry extended to March 2040 by CEPA post June, 2026.
Mining Method
Hidden Valley is an open pit gold-silver operation, operating conventional truck/excavator open pits and an ore-processing
plant. One single open pit is currently in operation; the HVK pit. The HVK pit supplies all of the ore to the processing plant which
is located some 6km away. The Hamata open pit has been exhausted and is currently being converted into TSF2.
Mining operations employ conventional open-pit mining methods, with backhoe excavators and rigid dump trucks as the
primary load-and-haul equipment. Front-end loaders are used for crusher feed and stockpile reclaim, with smaller articulated
dump trucks used for construction activities. Mining is undertaken on 9m blast benches, excavated in three 3m flitches. Inter-
ramp design is based on 18m bench heights.
Waste is disposed in engineered valley fill WRDs, with toes keyed in and buttressed using competent non-acid producing
rock. The construction of the Neikwiye valley toe buttress and underdrain network was completed in the 2018 fiscal year and
waste rock will be disposed in this dump envelope through the remainder of the mine life. Similarly underdrain construction and
toe buttress has been constructed in the Kaveroi Valley with selective placement to continue in this area for the LOM.
140
Table of contents
The Hidden Valley processing plant was designed to treat 4.2Mtpa of gold/silver bearing ore nominally although
operational issues have prevented the plant reaching its intended capacity. The processing plant treats gold/silver ore from the
HVK deposit. Crushed ore is conveyed from the HVK pit via a 4.5km long overland pipe conveyor.
Tailings are stored in TSF1 located to the southwest of the process plant. Dam-wall construction of the TSF is ongoing and
largely constitutes placement of suitable oxide and fresh competent material sourced from mining in the Hamata pit. The
processing inventory in this Mineral Reserve estimate is constrained by remaining TSF capacity. TSF1 and TSF2 have a
combined remaining capacity of 16Mt, deposition into both facilities will be utilised to maximise storage capacity with advantages
in water management, density and settling. 
Mineral Processing
The Hidden Valley CIL processing plant, located adjacent to the Hamata open pit, was commissioned in 2009. The Hidden
Valley processing plant is designed to treat 4.2Mtpa of gold bearing ore nominally from three separate open pits. Three distinct
ore types are to be treated through two alternate treatment routes:
•whole ore processing: used to process the blend containing oxide, transitional and primary ore from the HVK deposits; and
•primary ore processing: used when processing only the primary ore from the HVK deposit.
Transition and primary ores have a significantly higher silver content with a gold:silver ratio of 1:15. Transition sulphur
averages 0.96% while primary ore has a sulphur grade of 1.81%.
Qualified Persons
The QP is employed on a full-time basis by Harmony. The QPs’ qualifications, areas of responsibility and personal
inspection of the property are summarised in the table below:
Qualified Person
Prof. Assoc.
Qualifications
TRS Section
Responsibility 
Personal Insp.
Mr. G. Job
FAusIMM
BSc. MSc (Min Econ)
All sections
Regular, last Feb 2023
The QP relied upon information, analyses and technical work prepared by appropriately qualified subject matter
experts in the disciplines of geology, mine planning, geotechnical engineering, hydrogeology, tailings management,
metallurgy, environmental management, infrastructure and finance. These specialist contributions included
information relating to mining rights, surface rights, contractual agreements, historical operating expenditures,
community relations and other matters.
The QP reviewed and accepted the work of these specialists and considers it reasonable and suitable for use in support of
the mineral resource and mineral reserve disclosures contained in this Annual Report on Form 20-F. Responsibility for such
scientific and technical disclosure remains with the QP.
Exploration
The HVK deposit has had a long history of exploration dating back to the 1980s.
A large mapping dataset exists from detailed work completed over the years. The geological model used in the Mineral
Resource estimate has been based upon combined drill hole data and surface mapping that has been completed over time.
Structural mapping in and around the site and within the open pits has been conducted on a number of occasions. Observations
gathered during open pit mapping have been combined with more regional mapping work completed over time by site geologists
and consultants to construct a robust geological model that will support the grade estimate.
Available regional government geophysical datasets include a 1,000m spaced fixed-wing airborne magnetic survey, a
400m spaced helicopter airborne magnetic survey and a 2,000m spaced fixed-wing gravity survey. Available company
geophysical datasets include a 50m spaced helicopter airborne magnetic survey, some prospect-specific ground magnetic
survey stations, and induced polarisation surveys.
Regional stream sediment and "Ridge and Spur" soil sampling was completed by CRAE between 1983 and 1989.
Additional soils and trenches were completed prior to and post the commencement of drilling. Drilling data and mining have
superseded the information in the trenching programmes.
Available geochemical sampling on ML151 includes a total of 27,756 surface samples. These are a mix of historical
company data and Harmony collected sampling. Surface geochemical sampling techniques include soil (10,745), rock chip
(13,665), wacker (2,033), auger (920) and stream sediment (393), plus some other less common techniques. Available assay
suites for both historical company data and Harmony collected sampling vary widely, with assay suites generally extended to
more elements in more modern times.
CRAE discovered the HVK deposit using a stream sediment sampling campaign up the headwaters of the Upper Watut
River in 1984. Sediment samples (-80mesh) returned values of 54ppm Au. No further information is available on the stream
sediment sampling campaign. This data is not, however, used in geological modelling and Mineral Resource estimation.
141
Table of contents
Surface drilling completed to date included diamond core and reverse circulation ("RC") drilling. Drilling was undertaken
continuously between 2009 and 2012, with some minor additional drilling done since. Recent deeper RC holes and diamond
holes have been drilled as infill and extension drilling during 2014 to 2026, with various degrees of success to close up the drill
spacing. A total of 42,067 holes measuring 1,524,108m of drilling were used in the generation of the 2026 geology and domain
model. This includes both blast and RC operational grade control drilling. A total of 26,228 drill holes, comprising 1,127,131m of
drilling, were used in the Mineral Resource estimate. It should be noted that these numbers include grade control drilling. The
grade control drilling was included using a short range, first pass estimate that informed the Mineral Resource estimate in and
around the GC drilling only, this was to combat sample support issues which would result from such closely spaced drilling
informing the majority of the model.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
Mineral Resource Estimate
The Mineral Resource estimate is reported in situ within the Hidden Valley lease area, as determined through the analysis
of the reasonable prospect for eventual economic extraction by an opencut mining method using a pit shell constraint. A cut-off
value for the Mineral Resources is determined at 0.70g/t gold based on the economic assumptions set forth in the table below at
30 June 2026.
Description
Unit
Value
Gold price
US$/oz
3,061
Silver price
US$/oz
38.9
A$ Exchange rate
US$:A$
0.68
K Exchange rate
K:US$
4.20
Plant recovery factor – (ave of multi variate curve)
%
87.00
Unit cost1
K/t
16.30
1 Unit cost includes cash operating cost, royalty and ongoing development capital.
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions.
The Mineral Resources were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of Regulation
S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
The Mineral Resource estimate, as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is summarised
in the table below.
Fiscal Year Ended 30 June
2026
2025
Grade
Metal Content
Grade
Metal Content
Mineral Resource
Category
Tonnes
(Mt)
Gold
(g/t)
Silver
(g/t)
Gold
(kg)
Silver
(kg)
Tonnes
(Mt)
Gold
(g/t)
Silver
(g/t)
Gold
(kg)
Silver
(kg)
%
Change
Measured
2.702
0.74
20.36
2,000
55,000
0.703
0.67
14.53
467
10,214
328.3
Indicated
21.639
1.48
20.61
32,000
446,000
30.867
1.23
17.73
37,857
547,351
(15.5)
Total / Ave. Measured +
Indicated
24.341
1.40
20.58
34,000
501,000
31.570
1.21
17.66
38,324
557,565
(11.3)
Inferred
1.290
1.47
12.11
1,900
15,628
1.823
1.29
11.09
2,346
20,223
(19.0)
Notes:
1.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300.
2.Mineral Resources are adjusted for mining depletion to end April 2026, with assumed production for May and June, 2026.
3.The Mineral Resource tonnes are reported as in situ with reasonable prospects for eventual economic extraction.
4.Measured Resources include surface stockpiles only.
5.Mineral Resources are reported on a 100% basis. Harmony holds a 100% interest.
6.Mineral Resources are reported exclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated
economic viability.
7.Mineral Resources at HVK are reported assuming a bulk open pit mining metallurgical recovery for silver and gold by sulphide flotation and
cyanidation. Mineral Resources are reported above a gold grade cut-off of 0.70g/t on the results of a profit algorithm; this equates to a
marginal ore cut-off grade. The profit algorithm takes account of metal price, grade, ore processing route, recoveries and costs. Metal price
assumptions are US$3,061/oz gold, US$38.90/oz silver and a 0.68 US$/A$ exchange rate. Adjustments to these figures will potentially
impact upon the economic cut-off grade.
8.Tonnages are metric tonnes. Gold and silver ounces are estimates of metal contained in tonnages and do not include allowances for
processing losses.
9.Rounding as required by reporting guidelines may result in apparent differences between tonnes, grade and contained metal content.
Rounding is to three significant figures for tonnes.
10.The decrease in Mineral Resource tonnes is a result of changes to material reporting, and depletion related to mining over the past year.
142
Table of contents
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call factors.
The most significant changes in this Mineral Reserve estimate relative to the June 2025 release include:
•Depletions (pit and stockpiles) to end June 2026
•Updated Resource model through the addition of additional grade control information
•Amendment to the Stage 8 design to account for geotechnical considerations
•Minor adjustment to the TSF constraints to account for investigation works completed over the year
•Minor increase in starting stockpiles
The Mineral Reserve estimate, as at 30 June 2025 and 2026, is summarised in the table below.
Fiscal Year Ended 30 June
2026
2025
Grade
Metal Content
Grade
Metal Content
Mineral Reserve
Category
Tonnes
(Mt)
Gold
(g/t)
Silver
(g/t)
Gold
(Kg)
Silver
(Kg)
Tonnes
(Mt)
Gold
(g/t)
Silver
(g/t)
Gold
(Kg)
Silver
(Kg)
%
Change
Proved
2.141
1.07
21.62
2,294
46,306
1.630
0.95
22.69
1,555
36,982
47.5%
Probable
13.865
1.36
24.83
18,887
344,230
16.997
1.45
24.52
24,603
416,694
(23.2)%
Total / Ave. Proved +
Probable
16.006
1.32
24.40
21,181
390,536
18.627
1.40
24.36
26,158
453,676
(19.0)%
Notes:
1.Mineral Reserves are reported with an effective date of 30 June 2026, and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300.
2.Mineral Resources are reported on a 100% basis. Harmony holds a 100% interest.
3.Mineral Reserves are reported using the following assumptions: open pit mining method, gold price of US$2,915/oz, silver price of US$38.9/
oz at US$/A$ 0.68 exchange rate.
4.Not all “ore” as defined at the economic cut off reports to the Mineral Reserve due to the constrained tailing storage facility with some
marginal grade ore material remaining on stockpile. The Proved Mineral Reserve is limited to stockpiles. Probable Mineral Reserve is
derived from the Indicated Mineral Resource.
5.Gold and silver ounces are estimates of metal contained in tonnages and do not include allowances for processing losses.
6.Rounding as required by reporting guidelines may result in apparent differences between tonnes, grade and contained metal content.
Rounding is to three significant figures for tonnes.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral
Reserve. The modifying factors are consistent with the modelling, planning and computing estimates used in determining the
Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
Gold Price
US$/oz
2,915
Silver Price
US$/oz
38.90
Exchange Rate
A$ : US$
0.68
K : US$
4.20
Tonnage Recovery
%
100
Gold Modifying Factor (ave)
HVK
%
92.50
For additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
143
Table of contents
Wafi-Golpu Project
Property Description
The Wafi-Golpu Project is a development-stage property situated in the Morobe Province of PNG, approximately 65km
southwest of Lae, the nearest commercial centre. The Wafi-Golpu Project comprises the Golpu copper–gold porphyry deposit
("Golpu deposit"), the Wafi epithermal gold deposit ("Wafi deposit") and the Nambonga copper-gold porphyry deposit
("Nambonga deposit"). Mineral Resources and Mineral Reserves were estimated for the Golpu deposit. Additional Mineral
Resources were estimated for the Wafi deposit and the Nambonga deposit; however, these deposits are not currently included
in the mine plan. No production has yet occurred at this property. The Wafi-Golpu Project is situated at latitude 6°51’39.13”S and
longitude 146°27’40.78”E.
The Wafi-Golpu Project did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no
significant encumbrances exist.
The following graphic illustrates the location of the Wafi-Golpu Project.
Wafi-Golpu Project location.jpg
The Wafi-Golpu Joint Venture ("WGJV") participants hold two exploration licences ("ELs") covering a total area of
12,894ha. The deposits are located within EL440, with a range of major surface facilities to be located on EL1105.
The WGJV participants also hold an EP for the project issued under the PNG Environment Act. The permit authorises the
utilisation of DSTP as the tailings management method for the Wafi-Golpu Project.
Both tenements were in good standing as at 30 June 2026. Other than the EP grant permit review, there is no material
litigation (including violations or fines) that threatens its mineral rights, tenure, or operations. The grant of the environment permit
for the Wafi-Golpu Project is currently the subject of two judicial review proceedings against the State of PNG, the first of which
was instituted in March 2021 by a previous Governor of the Morobe Province in PNG and the second of which was instituted in
December 2022 by Huon Gulf coastal villagers represented by the CELCOR.
144
Table of contents
With regard to the proceedings instituted in March 2021, the matter is yet to go to a substantive hearing. The National
Court granted leave to proceed with the judicial review and made interim orders. These orders were challenged by the PNG
State via an appeal to the Supreme Court which is still pending. There have been two changes of Governor since the
proceedings were commenced and it is unclear whether the current Governor will continue with or withdraw these proceedings.
With regard to the proceedings instituted in December 2022, the matter went to substantive hearing on 12 June 2025 and on
26 May 2026 the court delivered a decision dismissing the proceedings. The plaintiffs have lodged an appeal against that
decision in the Supreme Court of PNG.
See Item 3D: “Risk Factors – Risks Related to Regulation, Compliance, Governance and Legal Matters – Litigation,
regulatory proceedings and other legal disputes may result in material losses and operational disruption” and Item 8: "Financial
information – Consolidated statements and other financial information – Legal Proceedings – Wafi-Golpu EP proceedings".
Operational Infrastructure
The closest major community is Lae (pop. 203,100). Lae is the capital of Morobe Province and a major transport hub and
an important commercial, administrative, industrial, residential and educational centre for Morobe Province and PNG.
The Wafi-Golpu Project is located in a mountainous area of PNG. A combination of roads and access tracks exist between
Lae and the project site. However, the track components are suitable for four-wheel drive vehicles and purpose-built trucks only.
During major rainfall events this access route may become closed to vehicular traffic.
Current access to the planned mine site is via a partly-sealed road from Lae to Timini, and a gravel road from Timini
(Demakwa) to Wafi, with the trip taking about three to four hours depending on the weather. As part of project development, a
new road (including bridges) (the "northern access road"), will be constructed, running from the Highlands highway to the mine
site, and linking up with the current exploration access road. A private mine access road will be constructed from the intersection
of the northern access road and the current exploration access road.
Commercial airlines operate flights between the national capital, Port Moresby, and Nadzab airport, which is approximately
a one-hour drive by road from Lae. The Nadzab airstrip is sealed. Helicopter access to the mine site area is available, with a
suitable area at the proposed mine site cleared for landing.
Current personnel are drawn principally from Morobe Province and elsewhere in PNG, supplemented by specialist
contractors and expatriate personnel where required. The existing exploration camp, access routes and related support facilities
are maintained in a condition adequate for current exploration and development activities. The principal mine, processing and
infrastructure facilities contemplated by the project plan have not yet been constructed and would be constructed, commissioned
and modernised as the project proceeds.
The “property, plant, and equipment” of the Wafi-Golpu Project as at 30 June 2026, including buildings and mine
infrastructure, mining assets, decommissioning assets, rehabilitation and assets under construction, had a carrying value of
R2,219 million.
The Wafi-Golpu Project is a greenfield site that currently does not have any infrastructure to support the planned mining
and processing operations. There is no effective local infrastructure with respect to power, water, and roads that are trafficable
by vehicles other than all-wheel drive vehicles. Water supply for drilling was sourced from rivers, and power at the exploration
camp is locally generated. The proposed surface infrastructure plan for the mine area is displayed in the graphic below, along
with the start of the infrastructure corridor.
145
Table of contents
wafimap222.jpg
146
Table of contents
Geology
Wafi–Golpu is a complex, multiphase mineralised system comprising the:
•Golpu porphyry copper–gold deposit;
•Wafi deposit; and
•Nambonga porphyry gold–copper deposit.
The Golpu porphyry copper-gold deposit is hosted by the Golpu Intrusive Complex, which consists of multiple, hornblende-
bearing diorite porphyries intruded into the host metasedimentary lithologies. The porphyries are separated based on their
spatial position and, where not texturally destroyed, into coarse hornblende-rich variants, feldspathic-rich units and porphyries
containing quartz-eye inclusions. Intrusions range from small dykes to small stocks/bosses and apotheoses. Single intrusions
pinch and swell vertically over tens of metres and form dykes, pipes and stocks.
The Wafi epithermal deposit is hosted by the metasedimentary host rocks around the edges of the Wafi Diatreme
Complex. The Wafi Diatreme Complex is a roughly rectangular shaped feature, 800m by 400m at surface with steep, inward-
dipping sides. The diatreme comprises intrusive and sedimentary breccias, volcaniclastic rocks and tuffs, and was intruded by
several phases of unmineralised dacitic porphyries.
The Nambonga porphyry gold-copper deposit is situated in diorite porphyry stock and is typically medium-grained,
containing plagioclase and hornblende phenocrysts set in a feldspathic matrix. The diorite is cut by a late barren diorite phase at
depth. The diorite has intruded lithologies of the Owen Stanley Metamorphic Complex, consisting of metasandstone and minor
metaconglomerate.
History
Historical exploration dates back to 1977 and has included regional exploration sampling, geophysical surveys,
geochemical sampling, RC and diamond core drilling.
CRAE identified mineralised float in a regional geochemical sampling programme and discovered the outcropping
mineralisation of the Wafi A Zone near Mount Golpu in 1979. The Mt Wanion EL (EL440) was granted in 1980. The discovery of
the Golpu deposit occurred in 1990.
Aurora acquired the project in 2001 and updated the Wafi Mineral Resource estimate for the A Zone, B Zone and Link
Zone in 2002. A check resource estimate for Wafi was completed in 2002. Aurora merged with Abelle in 2003. An updated Wafi
Mineral Resource estimate was completed in 2003.
Harmony acquired Abelle in 1 May 2003 and completed the Wafi–Golpu concept study. Mineral Resource estimates for
selected deposits were updated in 2005, 2006 and 2007. The Golpu standalone prefeasibility study was completed in 2007. The
Wafi-Golpu integrated prefeasibility study was completed in 2007. The Nambonga porphyry was discovered in 2007.
In August 2008, Harmony and Newcrest commenced a joint venture relationship in the Morobe Province of PNG, and the
WGJV was established as a 50:50 unincorporated joint venture between Wafi Mining Limited ("Wafi Mining") and Newcrest
PNG2 Limited ("Newcrest PNG2"), subsidiaries respectively of Harmony and Newcrest and together referred to as the "WGJV
participants". In November 2023, Newmont Corporation ("Newmont") completed the acquisition of Newcrest.
The Golpu development project desktop study was completed in 2009. This was followed by the Wafi concept study
(2010), the Wafi–Golpu prefeasibility study (2012), and the Wafi Golpu prefeasibility optimisation study (2014). Regional
geological mapping and geological synthesis was completed in 2015, which led to a re-evaluation of the development approach
and the Golpu Stage 2 prefeasibility study, completed in 2015. The Golpu feasibility study was then completed in 2016.
On 25 August 2016, the WGJV submitted a Special Mining Lease ("SML") application to the PNG MRA for an SML area
including the Golpu, Wafi and Nambonga deposits. The SML application included applications for ancillary mining tenements, a
Proposal for Development, which incorporated the 2016 feasibility study report, and supporting application documents such as a
National Content Plan. Further data collection and technical assessment were undertaken in 2016–2017. The feasibility study
update was completed in December 2017 and submitted to the PNG MRA in March 2018. Permitting negotiations for the grant
of the SML application resumed in 2018.
In December 2018, the WGJV participants entered into a Memorandum of Understanding with the State regarding the
timetable and progress of the permitting process. The State of PNG withdrew from that memorandum in November 2019.
Subsequently, the parties entered into a Framework Memorandum of Understanding on 6 April 2023, which continues to
underpin the ongoing permitting process.
An EIS was submitted to CEPA on 25 June 2018, and an EP for the Wafi-Golpu Project was issued on 18 December 2020.
The EP includes conditions relating to DSTP.
147
Table of contents
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – Papua New Guinea”
above for a summary of the regulatory environment in PNG.
The WGJV holds two ELs covering a total area of 12,894ha, each of which is registered in the names of Wafi Mining and
Newcrest PNG2. The deposits are all located within EL440, with a range of major surface facilities to be located on EL1105. The
summary of mineral tenure is presented in the table below showing the current term.
Licence Holder
Licence Type
Reference No.
Effective Date
Expiry Date
Area (ha)
Wafi Mining and
Newcrest PNG2
Exploration Licence
EL440
11 March 2024
10 March 20261
9,501
Wafi Mining and
Newcrest PNG2
Exploration Licence
EL1105
26 January 2023
25 January 20252
3,393
1 Renewal submitted on 8 December 2025.
2 Renewal submitted on 16 October 2024.
Both tenements are in good standing and both EL440 and EL1105 are currently under renewal. The WGJV participants
lodged an application to extend the term of each of EL440 and EL1105 for a further two years in accordance with the
requirements of the PNG Mining Act.
If exploration under either EL results in a mineral discovery, the PNG State has a back-in right in respect of that discovery.
This right allows the PNG State at any time before the start of mining, to acquire a participating interest of up to 30% in the
discovery by paying a price equal to its pro rata share of accumulated exploration expenditure. Once this interest is acquired,
the PNG State must contribute its pro rata share of future exploration and development costs unless otherwise agreed.
The PNG Government has indicated that it intends to exercise its back-in right to take its full 30% interest. If it does so, the
interests of Wafi Mining and Newcrest PNG2 would each be reduced to 35%.
The tenements required to develop and operate the Wafi-Golpu Project and which, as at 30 June 2026 are under
application, are summarised below:
•SML 10. For Block cave mines, Watut declines portal terrace, process plant terrace, Watut process plant, Nambonga
decline portal terrace, waste rock storage facilities ("WRSFs"), Miapilli clay borrow pit, water treatment facilities,
sedimentation dams, raw water dam, explosives magazine facilities, waste management facility, concrete batch plants,
electrical substations, workshops and administration buildings, accommodation facility;
•LMP 100. For Finchif construction accommodation facility and power generation facilities;
•LMP 104. For Port facilities area (including concentrate filtration plant);
•LMP 105. For outfall area;
•ME 91. For Infrastructure corridor pipelines and power transmission lines from the northern boundary of the SML
application to Lae and to the power generation facilities;
•ME 92. For Mine access road;
•ME 93. For northern access road;
•ME 94. For wastewater discharge pipeline (for mine dewatering) to the Watut River and co-located raw water make-up
pipeline;
•ME 96. For terrestrial tailings pipeline – Lae to Wagang;
•ME 97. For component of outfall system, specifically the seawater intake and DSTP outfall pipelines;
•ML 183. Northern Access Road Quarry;
•ML 184. Madzim Gravel Pit;
•ML 185. Lense Sibal Beamena Hard Rock Quarry;
•ML 186. South Papas Gravel Pit; and
•ME 115. Madzim Gravel Pit Access Track.
Environment Permit
The WGJV participants hold a Level 3 Environment Permit (EP-L3 (767)) for the Wafi-Golpu Project.
An EIR was submitted to CEPA in May 2017 and approved in June 2017. An EIS was submitted to CEPA in June 2018,
and approved in November 2020. The EP was issued on 18 December 2020, has a term of 50 years and includes conditions
relating to DSTP. The EIS included a framework Environment Management Plan. As a condition of the EP, an Environmental
Management and Monitoring Plan must be prepared and submitted to CEPA for approval.
148
Table of contents
Permit / Licence
Status
EIR
Submitted May 2017, approved June 2017.
EIS
Submitted June 2018, approved November 2020.
Level 3 Environment Permit EP-L3 (767)
Approved December 2020. Valid for 50 years.
EMMP
To be prepared as a condition of EP-L3 (767)
Mining Method
The proposed mining method is block caving on three levels, namely BC40, BC42 and BC44. The BC44 and BC42
underground services and infrastructure areas are designed to a feasibility level of confidence. The BC40 cave footprint and
thus extraction level layout are designed at a prefeasibility confidence level. The infrastructure for BC40 is identical to that of
BC44 and BC42 and is at a feasibility level of confidence. There will be no additional surface infrastructure for BC40.
Block caving was selected for the following reasons:
•orebody geometry and geotechnical conditions;
•high productivity, low operating cost mining method; and
•higher-value material located at depth can be accessed earlier in the mine plan.
The proposed mine plan uses technology conventional to block cave operations, including mine design and equipment.
The mine is planned to operate 24 hours per day, every day of the year, apart from scheduled and unscheduled shutdowns.
Access to the mine workings will be via the Watut and Nambonga declines, with each generating waste rock that will either
be used in construction activities, processed or deposited within the WRSFs. Block cave mining will not result in the production
of waste rock because all material extracted from the block cave will be fed to the Watut process plant. Block cave mining will
cause a subsidence zone of fractured rock to develop that will propagate to surface.
During caving operations, ore from the block cave drawpoints will be delivered by vehicles to an underground crusher. The
crushed ore will then be conveyed to the surface. The ore conveyor emerging at the Watut declines portal terrace will continue
overland for approximately 600m to deliver crushed ore to a coarse ore stockpile adjacent to the Watut process plant for
processing.
Mineral Processing
The proposed Watut process plant will be a compact copper concentrator that is progressively built (in line with the profile
of the mine ramp-up) to be capable of processing approximately 17Mtpa of crushed ore at peak capacity to produce a high-
grade copper concentrate. The plant is designed to cater for the ore composition changes over the LOM, and blending is not
expected to be required.
A two-stage ramp-up philosophy will be used. The plant will run intermittently (campaign treatment) and in 50% turndown
mode for the first three years. During the mine ramp-up period, the total volume of the coarse ore stockpile and start-up
stockpile will be used to maintain plant utilisation as high as practicable, minimising the number of plant stops.
Models for the two process flowsheet variations were derived from the validated base case flowsheets, using standard
metal balance techniques per unit operation.
Qualified Persons
The QP is employed on a full-time basis by Harmony. The QPs’ qualifications, areas of responsibility and personal
inspection of the property are summarised in the table below:
Qualified Person
Prof. Assoc.
Qualifications
TRS Section
Responsibility 
Personal Insp.
Mr. G. Job
FAusIMM
BSc. MSc (Min Econ)
All sections
Regular, last 2020
The QP relied upon information, analyses and technical work prepared by appropriately qualified subject matter experts in the disciplines of
geology, mine planning, geotechnical engineering, hydrogeology, tailings management, metallurgy, environmental management, infrastructure
and finance. These specialist contributions included information relating to mining rights, surface rights, contractual agreements, historical
operating expenditures, community relations and other matters.
The QP reviewed and accepted the work of these specialists and considers it reasonable and suitable for use in support of the mineral resource
and mineral reserve disclosures contained in this Annual Report on Form 20-F. Responsibility for such scientific and technical disclosure
remains with the QP.
Exploration
The Wafi-Golpu Project has had a long history of exploration dating back to the 1980s.
A number of mapping programmes were conducted over the Wafi-Golpu Project area including 1:10,000 fact mapping of
available outcrop. Mapping data and subsequent interpretations were used together with drill hole data to model the deposit
geology and structure. A structural model for the Wafi–Golpu area was compiled in 2011.
Geophysical surveys were conducted as part of the early-stage exploration activities. The following surveys were
conducted:
•CRAE,1985: Dipole-dipole IP/resistivity survey;
•CRAE/Elders, 1990: Moving loop time domain electromagnetic ("EM") geophysical survey; and
149
Table of contents
•CRAE, 1991–1997: Aeromagnetic, ground magnetic, SP, IP, and controlled source audio-frequency magnetotelluric
("CSAMT") geophysical surveys
WGJV staff re-examined some of the geophysical data in 2018, as follows:
•the 1985 survey, conducted using 100m and 200m dipole spacing, was compiled and inverted in three dimensions ("3D").
Generally high chargeability values were noted, and clearly defined the lithocap as a strong resistor above a relatively
conductive zone of clay alteration; and
•the 1990 EM survey data were inverted in 3D and show a clear conductor that coincides with the top of the Golpu deposit.
This conductor is probably due to sulphide veining which, unlike magnetite, has not been affected by late advanced argillic
alteration.
CRAE completed ridge and spur sampling programmes from 1980–1982. CRAE also conducted an initial trenching
programme comprising 102 trenches, varying in length from 1–1,840m, for a total 34,129m of trenching. Information from these
programmes was superseded by drill data.
A total of 795 drill holes (including wedges) were completed in the project area by Harmony and its JV partners between
1983 and 2018, comprising 286,540m of core drilling and 17,180m of RC drilling.
In fiscal 2026 drilling at the Wafi-Golpu Project comprised five holes for 2,044m. One hole was completed to obtain
representative samples for metallurgical investigations at the Wafi Gold Deposit, four holes were completed to support
geotechnical studies adjacent to the proposed Nambonga Decline. Regional surface sampling and mapping was ongoing across
the Wafi-Golpu tenement package and comprised 1,744 samples.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources and Mineral Reserves.
Mineral Resource Estimate
The Mineral Resource estimate assumes a bulk mining underground extraction method such as block caving and
metallurgical recovery for copper and gold by sulphide flotation.
The Mineral Resource estimate is reported based on mass mining by block cave with no internal selectivity. The 40m x
40m x 40m parent block size was an appropriate cell size for the planned bulk mining method. The shell did not represent a
conceptual block cave footprint and associated draw column height. However, it did represent the economic material potentially
recoverable from a major block cave. The primary model was passed through a net smelter return ("NSR") calculation sheet and
a breakeven value shell was generated at margin zero to remove isolated projections and incorporate a small volume of internal
waste. In 2026, the molybdenum Mineral Resource was removed from the Mineral Resource statement as there is currently no
identified economic extraction scenario for the molybdenum. Consequently, the molybdenum mineralisation no longer satisfies
the requirement for reasonable prospects for economic extraction.
The metallurgical recovery model was based on copper flotation with copper and gold recovered to concentrate. Extensive
testwork was completed to establish algorithms developed from variability modelling. Metallurgical domains were based on both
the host rock type and alteration style. Each metallurgical domain was assigned a recovery algorithm, typically subdivided based
on Cu:S and Au:S ratios.
The NSR estimation was required only to establish the Mineral Resource reporting breakeven value shell. Mining and
milling costs were based on a block caving mining method and milling through a copper concentrator. The breakeven value shell
spatially constraining the grade model includes internal waste, and excluded isolated above-cut-off blocks, which reflected the
potential bulk mining scenario. There was no revenue assumed from silver or molybdenum in the NSR estimate; however, these
elements were estimated as part of the Mineral Resource estimation process as there may be potential for these metals to be
recovered with minor circuit modifications or concentrate contract negotiations.
The cut-off value is a NSR value that contains typical costs for the mining method and preliminary mining and metallurgical
recovery assumptions as outlined in the table below.
Description
Unit
Value
Gold price
US$/oz
1,300
Copper price
US$/lb
3.40
A$ Exchange rate
US$:A$
0.75
K Exchange rate
K:US$
3.10
Plant recovery factor - calculated
%
Varies
The Mineral Resources were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of Regulation
S-K 1300. There has been no mining at the Wafi-Golpu Project.
The Mineral Resource estimate for Golpu, as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is
summarised in the table below.
150
Table of contents
Fiscal Year Ended 30 June
% Change
Gold
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Measured
—
—
—
—
—
—
—
Indicated
155.000
0.58
90,372
155.000
0.58
90,372
—
Total / Ave. Measured + Indicated
155.000
0.58
90,372
155.000
0.58
90,372
—
Inferred
70.000
0.62
44,000
70.000
0.62
44,000
—
Fiscal Year Ended 30 June
% Change
Copper
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Content
(Mt)
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Content
(Mt)
Measured
—
—
—
—
—
—
—
Indicated
155.000
0.95
1.470
155.000
0.95
1.470
—
Total / Ave. Measured + Indicated
155.000
0.95
1.470
155.000
0.95
1.470
—
Inferred
70.000
0.86
0.600
70.000
0.86
0.600
—
Fiscal Year Ended 30 June
% Change
Silver
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Silver
Grade
(g/t)
Silver
Content
(kg)
Tonnes
(Mt)
Silver
Grade
(g/t)
Silver
Content
(kg)
Measured
—
—
—
—
—
—
—
Indicated
155.000
1.30
201,500
155.000
1.30
201,500
—
Total / Ave. Measured + Indicated
155.000
1.30
201,500
155.000
1.30
201,500
—
Inferred
70.000
1.10
77,000
70.000
1.10
77,000
—
Notes:
1.Mineral Resources are reported with an effective date of 30 June 2026 using SAMREC, 2016. For the purposes of this report on Form 20-F,
the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of Regulation S-K 1300.
2.The Mineral Resource tonnes are reported as in situ with reasonable prospects for eventual economic extraction.
3.Mineral Resources are reported on a 50% basis as Harmony holds a 50% interest in the WGJV.
4.Mineral Resources are reported exclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated
economic viability.
5.Mineral Resources at Golpu are reported assuming a bulk mining underground extraction method and metallurgical recovery for copper and
gold by sulphide flotation. Mineral Resources are reported above a NSR cut-off, which assumes a gold price of US$1,300/oz, a copper price
of US$3.40/lb, mining cost of US$8.37/t mined, processing cost of US$9.75/t processed, general and administrative (G&A) costs of
US$4.17/t processed, copper concentrate treatment charge of US$100/dmt of concentrate, transport cost of US$33.50/wet tonne of
concentrate, and copper refining charges of US$0.10/lb of recovered copper. Silver and molybdenum were not valued in the NSR cut-off;
however, these elements were reported within the Mineral Resource as they were expected to be recovered with minor circuit modifications
or concentrate contract negotiations. Over the LOM, it is anticipated that copper recoveries will average 94% and gold recoveries will
average 68%.
6.Metal contents reported do not include allowances for processing losses.
7.Rounding as required by reporting guidelines may result in apparent differences between tonnes, grade and contained metal content.
Rounding is to three significant figures for tonnes.
Mineral Resource estimate for Wafi, as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is
summarised in the table below:
Fiscal Year Ended 30 June
Gold
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
% Change
Measured
—
—
—
—
—
—
—
Indicated
54.000
1.66
89,000
54.000
1.66
89,000
—
Total / Ave. Measured + Indicated
54.000
1.66
89,000
54.000
1.66
89,000
—
Inferred
15.000
1.30
20,000
15.000
1.30
20,000
—%
Notes:
1.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300.
2.The Mineral Resource tonnes are reported as in situ with reasonable prospects for eventual economic extraction.
151
Table of contents
3.Mineral Resources are reported on a 50% basis as Harmony holds a 50% interest in the WGJV.
4.Mineral Resources are reported exclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated
economic viability.
5.Mineral Resources at Wafi are reported assuming open pit mining methods with limited internal selectivity, and a process method that is
anticipated to be a combination of CIP and CIL operation, with a flotation sulphide recovery mill process. The estimates are reported at cut-
offs of 0.4g/t Au for non-refractory gold mineralisation ("NRG") and 0.9g/t Au for refractory gold mineralisation ("RG"). Mineral Resources are
constrained within a conceptual open pit shell that uses the following input assumptions: gold price of US$1,400/oz; mining costs of
US$5.40/t mined, and process and general and administrative costs of US$17.30/t processed. Metallurgical recovery is estimated at 91% for
NRG and a minimum of 47% for RG. Approximate overall pit-slope angles range from 33° in oxidised material to 65° in fresh rock.
6.Metal contents reported do not include allowances for processing losses.
7.Rounding as required by reporting guidelines may result in apparent differences between tonnes, grade and contained metal content.
Rounding is to three significant figures for tonnes.
Mineral Resource estimate for Nambonga, as at 30 June 2025 and 2026, exclusive of the reported Mineral Reserves, is
summarised below:
Fiscal Year Ended 30 June
Gold
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
% Change
Measured
—
—
—
—
—
—
—
Indicated
—
—
—
—
—
—
—
Total / Ave. Measured + Indicated
—
—
—
—
—
—
—
Inferred
24.000
0.69
16,000
24.000
0.69
16,000
—
Fiscal Year Ended 30 June
% Change
Copper
2026
2025
Mineral Resource Category
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Content
(Mt)
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Content
(Mt)
Measured
—
—
—
—
—
—
—
Indicated
—
—
—
—
—
—
—
Total / Ave. Measured + Indicated
—
—
—
—
—
—
—
Inferred
24.000
0.20
0.047
24.000
0.20
0.047
—
Notes:
1.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300.
2.The Mineral Resource tonnes are reported as in situ with reasonable prospects for eventual economic extraction.
3.Mineral Resources are reported on a 50% basis as Harmony holds a 50% interest in the WGJV.
4.Mineral Resources are reported exclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated
economic viability.
5.Mineral Resources at Nambonga are reported assuming a bulk mining underground extraction method. The Mineral Resource is reported
using an assumed 0.5g/t Au cut-off grade. This cut-off grade is based on the adjacent Golpu deposit as an analogue, assumes an overall
mining, processing, and G&A operating cost estimate of about US$15.50/t, a gold price of US$1,300/oz, and a metallurgical recovery of 85%
for gold. This equates to a cut-off grade of approximately 0.46g/t Au, based on gold only. Conceptual costs associated with copper and silver
recovery were approximated as equivalent to 0.04g/t Au. The total cutoff grade for reporting purposes was 0.5g/t Au.
6.Metal contents reported do not include allowances for processing losses.
7.Rounding as required by reporting guidelines may result in apparent differences between tonnes, grade and contained metal content.
Rounding is to three significant figures for tonnes.
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
Mineral Reserves are derived from the Mineral Resources, a detailed business plan and the operational mine planning
processes. Mine planning utilises and takes into consideration historical technical parameters achieved. In addition, Mineral
Resource conversion to Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths,
planned mine call and plant recovery factors.
The Mineral Reserve estimate for Golpu, as at 30 June 2025 and 2026, is summarised in the table below.
152
Table of contents
Fiscal Year Ended 30 June
Gold
2026
2025
Mineral Reserve Category
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
Tonnes
(Mt)
Gold
Grade
(g/t)
Gold
Content
(kg)
% Change
Proved
—
—
—
—
—
—
—
Probable
190.000
0.83
158,628
190.000
0.83
158,628
—
Total / Ave. Proved + Probable
190.000
0.83
158,628
190.000
0.83
158,628
—
Fiscal Year Ended 30 June
% Change
Copper
2026
2025
Mineral Reserve Category
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Content
(Mt)
Tonnes
(Mt)
Copper
Grade
(%)
Copper
Content
(Mt)
Proved
—
—
—
—
—
—
—
Probable
190.000
1.23
2.330
190.000
1.23
2.330
—
Total / Ave. Proved + Probable
190.000
1.23
2.330
190.000
1.23
2.330
—
Notes:
1.Mineral Reserves are reported with an effective date of 30 June 2026, and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300.
2.Mineral Reserves are reported on a 50% basis as Harmony holds a 50% interest in the WGJV.
3.The Golpu Ore Reserve is extracted in three vertically stacked block cave lifts (BC44, BC42 and BC40). The block caving method has been
determined as the preferred extraction method. Each level utilises an El Teniente style layout with on-level crushers and 30m x 18m drawbell
spacing, based on expected fragmentation and cave propagation behaviour. This spacing mitigates risks associated with isolated draw and
reduces the need for rehabilitation from point loading
4.Mineral Reserves are reported using the following assumptions: gold price of US$1,200/oz, copper price of US$3.00/lb, above a NSR cut-off
of US$10/t (development), US$60/t (BC44), US$40/t (BC42), and US$19.15/t (BC40). Metallurgical recoveries vary by domain and average
approximately 68% for gold and 94% for copper.
5.Non-economic material drawn as part of the block caving process is treated as dilution. If the blended material from a drawpoint falls below
cut-off value, that drawpoint is closed. PCBC software was used in these simulations. Total dilution is estimated to be ~17%, including
~1.5% from toppling.
6.Tonnes, grade, and contained metal are reported as net delivered to the mill. Contained metal excludes processing losses.
7.Zero grade has been applied to unclassified and Inferred material within the extraction tonnage to ensure no metal contribution from areas
outside of Indicated category material. These tonnes are included in the mine schedule only where they must be extracted to access
classified ore.
8.Mineral Reserves assume the granting of mining lease applications; unfinalised mineral rights do not constrain the reported life-of-mine
schedule.
9.Rounding, as required by reporting guidelines, may result in apparent differences between tonnes, grade and contained metal content.
Rounding is to three significant figures for tonnes.
The 30 June 2026 Mineral Reserve estimate remains unchanged from the 30 June 2025 estimate. There is no change to
the mine plan.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve
for Golpu. The modifying factors are consistent with the modelling, planning and computing estimates used in determining the
Mineral Reserves, which are also consistent with historical performance.
Modifying Factor
Unit
Value
Gold Price
US$/oz
1,300
Copper Price
US$/lb
3.40
Exchange Rate
 
A$ : US$
 
0.75
K : US$
 
3.10
NSR Cutoff
 
Development
US$/t
10.00
BC44
US$/t
60.00
BC42
US$/t
40.00
BC40
US$/t
19.15
Metallurgical Recoveries - gold
%
68.00
Metallurgical Recoveries - copper
%
Various
Total Dilution
%
17.00
Including Toppling
%
1.50
There were no Mineral Reserves at Wafi or Nambonga.
For additional information, see the TRS on each individual property, filed as an exhibit of this annual report on Form 20-F.
153
Table of contents
Eva Copper Project
Property Description
The Eva Copper Project is a development-stage property located in Queensland, Australia, 76km by road northwest of
Cloncurry (pop. 3,000) and 194km by road from the regional mining centre of Mount Isa (pop. 22,000). Access to the project
from Cloncurry is via the sealed Burke Developmental Road, which passes 8.5km east of the proposed plant site; current
access is via cattle station and exploration tracks. The planned site for the plant and major infrastructure is also 11km north of
the major Dugald River Zinc Mine, which is owned by MMG Limited. The Eva Copper Project is situated at latitude
20°09’26.34”S and longitude 140°10’22.36”E.
The Project is at the construction stage with first production expected late calendar year 2028. The operation is proposed
as a large, open-pit copper-gold mining operation with an associated gravity and flotation processing plant. The project
comprises the main Little Eva and Blackard open pit Mineral Resources and four smaller Mineral Resources, expected to deliver
an ore mixture with a maximum of 25% native copper ore to a copper concentrator processing plant adjacent to the Little Eva
and Turkey Creek pits.
The following graphic illustrates the location of the Eva Copper Project.
Australian assets - Divider 2026.jpg
Operational Infrastructure
Other than access roads, the site has a 305-bed accommodation facility and other miscellaneous buildings and services
supporting exploration activities and preliminary work on site.
Current project personnel are drawn from the established mining workforce in Mount Isa and Cloncurry, supplemented by
specialist contractors where required. The existing access roads, accommodation camp and exploration support facilities are
maintained in a condition adequate for current activities. The principal mine and processing infrastructure and operating
equipment contemplated by the project plan have not yet been constructed or procured and would be constructed,
commissioned and modernised as the project proceeds.
The Eva Copper Project did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and
no significant encumbrances exist. The “property, plant, and equipment” of the Eva Copper Project as at 30 June 2026, including
buildings and mine infrastructure, mining assets, decommissioning assets, rehabilitation and assets under construction, had a
carrying value of R8.8 billion.
154
Table of contents
Geology
The Eva Copper Project is situated in the Mary Kathleen ("MK") domain of the Mount Isa Province of Queensland,
Australia, an area that has a history of mining dating back to the 1860s. The Mount Isa area hosts numerous base metal copper,
zinc and lead deposits of global significance, including the Mount Isa, Ernest Henry, Century, Dugald River, Cannington and
Selwyn deposits. The Eva Copper Project is hosted by Proterozoic-aged, metamorphosed and poly-deformed marine
sedimentary and volcanic rocks of the MK domain of the Eastern Fold Belt Inlier. Deformation, metamorphism and plutonic
activity took place during the Isan Orogeny, approximately 1,600 to 1,500 million years ago.
There are twelve known mineral deposits in the project area, of which six have been included in the current mine plan.
Mineral deposits are grouped into two types: copper-gold and copper only. There are five copper-gold deposits, four of which are
in the mine plan. These deposits are classified as iron oxide copper-gold deposits, where mineralisation is associated with
regional-scale haematite and albite alteration (red-rock alteration) and localised magnetite alteration. Copper sulphide
mineralisation, primarily chalcopyrite with lesser bornite, occurs as veins, breccias, fracture fill and disseminations in mafic to
intermediate volcanic or intrusive rocks. Gold is generally correlated with copper and is recovered in the copper concentrate.
Mineralisation appears to be localised and/or bounded by faults and other deformation-related structures.
All of the deposits have a 10m to 25m thick overlying zone of oxidation, where the rock is extensively weathered and
copper sulphide minerals have been leached or converted to various oxide minerals that cannot be recovered by flotation. The
oxide zones are treated as waste, but tonnages and copper grades have been estimated and the oxide mineralisation will be
stockpiled separately. With the exception of the Turkey Creek deposit, the copper-only deposits commonly have a significant
thickness of supergene material, where carbonate has been leached from the rock, reducing hardness and density and the
copper occurs as native-copper, chalcocite and other low-sulphur copper species. The carbonate-leached zone is separated
from the underlying sulphide zone by a thin transition zone. Each of these mineralogical zones has been modelled so that
resources can be estimated for each and the appropriate metallurgical recoveries can be applied for reserve estimation.
History
The Eva Copper Project has a long history and has been held under various tenures by a variety of exploration and mining
companies. Small-scale mining dating back to the early 1900s has occurred at deposits such as Little Eva, Bedford and Lady
Clayre.
Early work on the project area was undertaken by Ausminda Pty. Ltd. and CRAE between 1990 and 1996. In 1996,
Pasminco Limited ("Pasminco") acquired the property and undertook further exploration and drilling on the copper-only
deposits. Pasminco excised and retained the Dugald River zinc deposit and sold the remainder of the tenements to Universal
Resources ("URL") in 2001. URL also purchased the tenement hosting the Ivy Ann deposit from Dominion Metals Pty. Ltd. and
Pan Australian Resources NL. From 2001 to 2004, exploration work on the copper-only deposits was carried out under a joint
venture between URL and Bolnisi Logistics ("Bolnisi"). URL focussed its own 2001–2004 drilling on the Little Eva and Bedford
copper-gold deposits. In 2004, URL acquired Bolnisi and completed a 2005 feasibility study on mining and processing a blend of
sulphide ore from the Little Eva and Bedford deposits with native copper ore from the Blackard and Scanlan deposits.
In 2005, URL entered into a joint venture option agreement with Xstrata, where Xstrata had the right to explore the central
area of the tenements. Xstrata completed some significant work, but elected not to proceed in January 2013. URL completed a
second feasibility study between 2007 and 2009 based on the same blend of sulphide ore and native copper ore used in the
2005 study.
In December 2009, URL merged with Vulcan Resources Limited, under the name of Altona Mining Limited ("Altona"). In
2012 Altona completed a definitive feasibility study based on the copper-gold sulphide deposits, but excluding the native copper
deposits. Mining leases ("MLs") and an EA were granted in 2012 based on the 2009 definitive feasibility study mine plan. Altona
completed additional drilling at the Bedford, Lady Clayre, Ivy Ann, Blackard, Legend and Scanlan deposits, and discovered and
delineated major prospects at Turkey Creek, Anzac, Whitcher, Matchbox and Quamby from 2015 to 2016. An EA amendment
was granted in 2016 based on the revised 2012 definitive feasibility study mine plan and the integration of Turkey Creek into that
mine plan.
In 2018, Altona became a wholly owned subsidiary of Copper Mountain Mining Corporation ("CMMC") and was renamed
Copper Mountain Mining Pty Ltd. In 2022, Harmony (through its wholly-owned subsidiary, HGA) purchased the project from
CMMC and, in February 2023, commenced a confirmatory and expansion drilling programme and other studies designed to
progress the project to a decision to mine.
Mineral Tenure
Refer to Item 4: “Information on the Company – Business Overview – Regulation – Mineral Rights – Australia” above for a
summary of the regulatory environment in Australia.
The Eva Copper Project consists of five MLs and one exploration permit for minerals (“EPM”). All six of the planned pits are
located within the MLs, except for the Ivy Ann deposit, which lies within the EPM.
The MLs were granted in 2012 and are currently owned by Harmony's wholly-owned subsidiary Eva Copper Mine Pty. Ltd.
("ECMPL"). The MLs cover a total area of 143km2 and extend across two pastoral leasehold properties and one Native Title
determination area.
The following table sets forth relevant information in relation to ECMPL's MLs as at 30 June 2026.
155
Table of contents
Number
Name
Granted
Expiry
Area (ha)
90162
Scanlan
4 October 2012
31 October 2037
2,096.96
90163
Longamundi
4 October 2012
31 October 2037
1,411.29
90164
Blackard
13 November 2012
30 November 2037
5,131.07
90165
Little Eva
13 November 2012
30 November 2037
5,029.96
90166
Village
13 November 2012
30 November 2037
616.08
Pursuant to the EP Act, ECMPL holds an EA that permits, subject to stated conditions, the development and operation of
the Eva Copper Project on its five MLs.
Permit / Licence
Status
Environment authority EPML00899613
Current
ECMPL holds the following EPM as at 30 June 2026, as presented in the table below.
Number
Name
Holder
Granted
Expiry
Area (ha)
25760
King
ECMPL
17 November 2015
16 November 2030
28,601
Harmony also holds 20 EPMs surrounding the MLs and in the broader Mount Isa region through Harmony's wholly-owned
subsidiaries, Roseby Copper Pty. Ltd. and Roseby Copper (South) Pty. Ltd.
Queensland state legislation requires that, where significant disturbance will occur from exploration and mining activities,
the licence holder must reach an agreement for “Conduct and Compensation” with the pastoral leaseholder. Such agreements
have been secured for all the MLs and those portions of the EPM where ground disturbance has occurred or is anticipated.
Mining Method
Preliminary mining and project construction activities have commenced within the project area. Current activities include
earthworks, infrastructure development and drilling programmes supporting resource definition, geotechnical, metallurgical and
hydrological investigations. Commercial production has not yet commenced.
The planned mining method is conventional open-pit mining using drill and blast, hydraulic excavators and haul trucks, with
ore scheduled to be processed through the proposed concentrator facility.
Mineral Processing
The processing method selected for the Eva Copper Project is conventional sulphide flotation, supplemented by gravity
and magnetic separation circuits for the treatment of native copper ore. The process plant is designed to initially treat sulphide
ore from the Little Eva and Turkey Creek deposits, with native copper processing circuits planned to be commissioned as mining
progresses and ore feed transitions to include material from the Blackard and Scanlan deposits.
The design nameplate throughput of the processing plant is 18Mtpa. The concentrator flowsheet comprises primary
crushing, semi-autogenous grinding and ball milling, sulphide flotation to produce a saleable copper concentrate, and dedicated
regrind, gravity, magnetic separation and flotation circuits for the processing of native copper ore.
Qualified Persons
The QP is employed on a full-time basis by Harmony. The QPs’ qualifications, areas of responsibility and personal
inspection of the property are summarised in the table below:
Qualified Person
Prof. Assoc.
Qualifications
TRS Section
Responsibility 
Personal Insp.
Mr. G Job
FAusIMM
BSc. MSc (Min Econ)
All sections
Regular, last August
2023
The QP relied upon information, analyses and technical work prepared by appropriately qualified subject matter experts in the disciplines of
geology, mine planning, geotechnical engineering, hydrogeology, tailings management, metallurgy, environmental management, infrastructure
and finance. These specialist contributions included information relating to mining rights, surface rights, contractual agreements, historical
operating expenditures, community relations and other matters.
The QP reviewed and accepted the work of these specialists and considers it reasonable and suitable for use in support of the mineral resource
and mineral reserve disclosures contained in this Annual Report on Form 20-F. Responsibility for such scientific and technical disclosure
remains with the QP.
Exploration
Extensive geophysical surveying, primarily induced polarisation over the copper deposit areas and EM or CSAMT over the
Dugald River zinc deposit host rocks, as well as gravity and magnetic surveys, were undertaken in the area by CRAE. All of the
deposits subcrop and were initially identified by surface sampling and mapping. Airborne magnetic surveys over the project area
are available from various government agencies. Satellite hyperspectral surveys have also been used with some success by
various companies in the area.
156
Table of contents
CRAE's bedrock and soil geochemical programmes outside the Roseby copper deposits were not systematic, involved
minimal assessment of gold mineralisation and left most of the surrounding area untested by geochemical surveys. CRAE’s
focus at the time was on the copper only (non-gold bearing) deposits due to their relatively high grades and the Little Eva and
Lady Clayre areas were of secondary exploration interest. The Little Eva copper-gold prospect was drilled by CRAE to an
Inferred Resource status, but the gold content was not assessed. The Lady Clayre prospect was also drilled by CRAE at the
time, but no resource estimate was completed. Metallurgical sampling and testing were conducted at Blackard and Lady Clayre,
but not at Little Eva.
Following the acquisition of the project from CRAE by Pasminco, drilling and sampling programmes focussed primarily on
the Lady Clayre copper-gold sulphide prospect, Caroline (Lady Clayre East) and the copper-gold potential of the Mount Rose
Bee Fault area. This drilling was insufficient to define a formal resource at either deposit. Pasminco also initiated a soil and rock
sampling programme designed to examine the Mount Rose Bee Fault and related splay faults. While this programme detected
widespread but weak copper-gold mineralisation, generally in close spatial relationship with copper and gold soil geochemical
anomalies, Pasminco divested the Roseby copper project before the exploration programme was completed.
Xstrata conducted exploration in the central Roseby area under the terms of an option and earn-in agreement with Altona.
Xstrata also completed deep drilling below the Little Eva, Blackard, Great Southern and Longamundi deposits demonstrating the
presence of large mineralised systems. Xstrata also discovered a mineralised system under cover at Cabbage Tree Creek some
3km north of Little Eva. Xstrata has also completed extensive geochemical, rock sampling, mapping and geophysical surveys
generating numerous targets, some of which have been subject to initial drill testing with positive results.
Altona carried out systematic soil geochemistry work over much of the claim area and this work was continued by CMMC.
This work has established numerous copper-in-soils targets within the Eva Copper Project tenure and surrounding EPM.
Shallow drilling of these targets has established numerous mineralised positions with opportunities to establish new copper and
gold Mineral Resources.
Drilling by Harmony since acquiring the Eva Copper Project in December 2022 comprises some 183,576m (831 holes).
The drill programme was undertaken in conjunction with the Eva feasibility study update, designed to increase confidence in the
resource base and support study elements including metallurgical testwork, geotechnical aspects, primary water supply, and
infrastructure sterilisation. Drilling has also included work to test extensions of the existing deposits as well as historic zones of
mineralisation with potential for new satellite resource areas within the Eva Copper Project's granted ML tenure. In fiscal 2026
29,560m of drilling (155 holes) was completed at the Eva Copper Project. At year-end, the work programme was ongoing with
two drill rigs on-site.
While most of the drilling was undertaken on the Eva MLs, greenfield exploration on the ELs included:
•Compilation of historic geochemical, geophysical and historical drill datasets combined with field reconnaissance and drill
target development;
•Drill testing of prioritised targets including the historic Ivy Ann deposit (23 holes, 4,847m), and the Reaper prospect (12
holes, 2,833m); and
•Surface soil sampling on various regional prospects comprised 1,247 samples.
During fiscal 2026, Harmony completed 155 reverse-circulation and diamond drill holes totalling 29,560m at the Eva
Copper Project and collected 1,247 surface soil samples. Reverse-circulation chips and diamond core were generally sampled
at one-metre intervals; 27,954 primary samples were submitted for copper and gold analysis. See Sections 7 and 8 of the Eva
Copper Project TRS.
The QP is of the opinion that the quality and quantity of the exploration methods and information gathered are sufficient to
support the estimation of Mineral Resources.
Mineral Resource Estimate
The Mineral Resource estimate for the Eva Copper Project is considered to have reasonable prospects for eventual
economic extraction. Mineral Resources are reported at a 0.17% Cu cut-off by deposit type, based on the economic
assumptions presented in the table below at 30 June 2026.
Description
Unit
Value
Gold price
US$/oz
3,061
Copper price
US$/lb
5.40
Exchange rate
US$:A$
0.68
This cut-off value represents typical costs for the mining method and preliminary mining and metallurgical recovery
assumptions.
Mineral Resources for the Eva Copper Project's deposits were prepared by Harmony personnel, based on all drilling
conducted up to December 2025. The Mineral Resources were originally prepared, classified and reported according to
SAMREC, 2016. For purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300. The Mineral Resource estimate as at 30 June 2025 and 2026, exclusive of
Mineral Reserves, is summarised in the table below.  There are no Measured Resources.
The reduction in Mineral Resources between 2025 and 2026 is primarily due to the conversion of Mineral Resources to
Mineral Reserves following the declaration of a Mineral Reserve for the Eva Copper Project in 2026. Increases in Mineral
Resources were driven by additional drilling and changes in cut-off grades, which affected the reported Mineral Resource
inventory.
157
Table of contents
Fiscal Year Ended 30 June
Gold
2026
2025
Mineral Resource
Category
Open Pit
Tonnes
(Mt)
Grade
(g/t)
Gold
(kg)
Tonnes
(Mt)
Grade
(g/t)
Gold
(kg)
% Change
Total / Ave. Measured
—
—
—
—
—
—
—
Indicated
Little Eva
37.973
0.05
1,994
183.201
0.06
11,425
(82.5)
Bedford
0.893
0.13
119
3.318
0.15
486
(75.5)
Lady Clayre
6.724
0.17
1,168
4.349
0.18
772
51.3
Ivy Ann
6.908
0.10
666
5.202
0.07
382
74.3
Total / Ave. Indicated
52.496
0.08
3,948
196.070
0.07
13,066
(69.8)
Total / Ave. Measured + Indicated
52.496
0.08
3,948
196.070
0.07
13,066
(69.8)
Inferred
Little Eva
23.893
0.09
2,048
23.893
0.08
1,981
3.4
Bedford
0.632
0.10
66
0.958
0.12
113
(41.6)
Lady Clayre
9.759
0.15
1,420
0.747
0.10
75
1793.3
Ivy Ann
0.188
0.10
19
1.163
0.07
78
(75.6)
Total / Ave. Inferred
34.471
0.10
3,552
26.762
0.08
2,247
58.1
Fiscal Year Ended 30 June
Copper
2026
2025
Mineral Resource
Category
Open Pit
Tonnes
(Mt)
Grade
(%)
Copper
(Kt)
Tonnes
(Mt)
Grade
(%)
Copper
(Kt)
% Change
Total / Ave. Measured
—
—
—
—
—
—
—
Indicated
Little Eva
37.973
0.28
105.735
183.201
0.32
594.035
(82.2)
Bedford
0.893
0.52
4.644
3.318
0.55
18.301
(74.6)
Lady Clayre
6.724
0.38
25.363
4.349
0.43
18.908
34.1
Ivy Ann
6.908
0.53
36.752
5.202
0.34
17.823
106.2
Turkey Creek
5.153
0.40
20.520
28.454
0.42
119.210
(82.8)
Blackard
35.199
0.43
150.668
115.900
0.48
554.886
(72.8)
Scanlan
6.650
0.54
35.776
14.948
0.59
88.493
(59.6)
Legend
36.254
0.45
163.506
31.193
0.47
147.014
11.2
Great Southern
12.915
0.42
53.629
12.915
0.42
53.629
—
Total / Ave. Indicated
148.667
0.40
596.593
399.481
0.40
1,612.298
(63.0)
Total / Ave. Measured + Indicated
148.667
0.40
596.593
399.481
0.40
1,612.298
(63.0)
Inferred
Little Eva
23.893
0.33
79.496
23.893
0.33
79.496
—
Bedford
0.632
0.36
2.300
0.958
0.38
3.600
(36.1)
Lady Clayre
9.759
0.36
35.143
0.747
0.43
3.196
999.6
Ivy Ann
0.188
0.31
0.578
1.163
0.33
3.876
(85.1)
Turkey Creek
4.481
0.41
18.159
5.374
0.44
23.670
(23.3)
Blackard
22.714
0.40
90.958
33.719
0.40
136.048
(33.1)
Scanlan
3.574
0.53
18.961
9.666
0.48
46.273
(59.0)
Legend
3.755
0.35
12.996
5.001
0.33
16.397
(20.7)
Great Southern
1.920
0.39
7.553
1.920
0.39
7.553
—
Total / Ave. Inferred
70.916
0.38
266.144
82.442
0.39
320.109
(16.9)
Notes:
1.No Mineral Reserve was declared in 2025, hence 2025 figures are complete Mineral Resource figures, whereas 2026 Mineral Resources
are exclusive of Mineral Reserves, which are declared for the first time in 2026.
2.Mineral Resources are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Resources have been classified in accordance with
Item 1302(d)(1)(iii)(A) of Regulation S-K 1300.
3.The Mineral Resource tonnes are reported as in situ with reasonable prospects for eventual economic extraction.
4.Resources are reported at a cut-off grade based on approximate NSR values which equate to a copper grade of 0.16% Cu for sulphide ore
and 0.25% Cu for native copper ore.
5.Copper and gold Mineral Resources are hosted in the same deposits. They are reported in separate tables for clarity, as not all deposits
contain gold. Reported tonnages are the same underlying material and are not double-counted in project totals.
6.Mineral Resources are constrained within a pit shell generated with a copper price of US$5.40/lb, a gold price of US$3,061/oz and an
exchange rate of AU$1.00 = US$0.68.
7.Density measurements were applied (ranges from 2.4 t/m3 to 3.0 t/m3).
8.Significant figures have been reduced to reflect uncertainty of estimations and therefore numbers may not add due to rounding.
Mineral Reserve Estimate
The Mineral Reserve estimate for the Eva Copper Project has been prepared under the supervision of the QP responsible
for Mineral Reserves and is based on the feasibility study completed by Harmony in November 2025. Mineral Reserves are
reported in accordance with the SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been
classified in accordance with Item 1302(e)(2) of Regulation S-K 1300 with an effective date of 30 June 2026. Mineral Reserves
are derived from the Mineral Resources, a detailed business plan and the operational mine planning processes. Mine planning
utilises and takes into consideration historical technical parameters achieved. In addition, Mineral Resource conversion to
158
Table of contents
Mineral Reserves considers certain modifying factors, dilution, ore losses, minimum mining widths and planned mine call
factors.
The Mineral Reserve is derived from the LOM plan and schedule for six open pits (Little Eva, Turkey Creek, Blackard,
Scanlan, Bedford and Lady Clayre), constrained by available TSF capacity and achievable mining cost. The Ivy Ann deposit was
subject to pit shell optimisation and pit design but was excluded from the reserve mine plan on the basis of economic marginality
within the current LOM sequence.
The Mineral Reserve estimate for the Eva Copper Project, as at 30 June 2025 and 2026, is summarised in the table below.
Copper
Fiscal Year Ended 30 June
2026
2025
Mineral Reserve Category
Tonnes
(Mt)
Grade
(%)
Cu²
(000t)
Tonnes
(Mt)
Grade
(%)
Cu²
(000t)
% Change
Total / Ave. Proved
—
—
—
N/A
N/A
N/A
100.0
Probable
Little Eva
145.229
0.34
488.300
N/A
N/A
N/A
100.0
Turkey Creek
21.900
0.42
92.200
N/A
N/A
N/A
100.0
Blackard
78.600
0.50
393.800
N/A
N/A
N/A
100.0
Scanlan
8.300
0.63
52.600
N/A
N/A
N/A
100.0
Bedford
3.954
0.47
18.500
N/A
N/A
N/A
100.0
Lady Clayre
6.001
0.42
25.400
N/A
N/A
N/A
100.0
Total / Ave. Probable
263.983
0.41
1,070.800
N/A
N/A
N/A
100.0
Ave.
Proved +
Probable
Little Eva
145.229
0.34
488.300
N/A
N/A
N/A
100.0
Turkey Creek
21.900
0.42
92.200
N/A
N/A
N/A
100.0
Blackard
78.600
0.50
393.800
N/A
N/A
N/A
100.0
Scanlan
8.300
0.63
52.600
N/A
N/A
N/A
100.0
Bedford
3.954
0.47
18.500
N/A
N/A
N/A
100.0
Lady Clayre
6.001
0.42
25.400
N/A
N/A
N/A
100.0
Total / Ave. Proved + Probable
263.983
0.41
1,070.800
N/A
N/A
N/A
100.0
Fiscal Year Ended 30 June
Gold
2026
2025
Mineral Reserve Category
Tonnes
(Mt)
Grade
(g/t)
Au
(Kg)
Tonnes
(Mt)
Grade
(g/t)
Au
(Kg)
% Change
Total / Ave. Proved
—
—
—
N/A
N/A
N/A
100.0
Probable
Little Eva
145.229
0.06
9,431
N/A
N/A
N/A
100.0
Bedford
3.954
0.13
526
N/A
N/A
N/A
100.0
Lady Clayre
6.001
0.17
1,000
N/A
N/A
N/A
100.0
Ivy Ann
—
—
—
N/A
N/A
N/A
100.0
Total / Ave. Probable
155.183
0.07
10,957
N/A
N/A
N/A
100.0
Ave.
Proved +
Probable
Little Eva
145.229
0.06
9,431
N/A
N/A
N/A
100.0
Bedford
3.954
0.13
526
N/A
N/A
N/A
100.0
Lady Clayre
6.001
0.17
1,000
N/A
N/A
N/A
100.0
Ivy Ann
—
—
—
N/A
N/A
N/A
100.0
Total / Ave. Proved + Probable
155.183
0.07
10,957
N/A
N/A
N/A
100.0
Notes:
1.The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according to
SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300.
2.Mineral Reserves are stated on a dry metric tonne basis inclusive of mining dilution and ore loss.
3.Metal price assumptions: US$4.25/lb Cu, US$1,941/oz Au, A$:US$ = 0.68.
4.Metallurgical recoveries: 95% Cu (sulphide), 56% Cu (native copper flotation blend), 78% Au. Payable metal terms consistent with 25% Cu
concentrate grade specification.
5.Mining dilution and ore loss are captured through resource-model regularisation to the 10m × 10m × 10m Standard Mining Unit
(approximately 5.2 Mt dilution and 2.0 Mt ore loss at Blackard; 3.9 Mt dilution and 2.5 Mt ore loss at Turkey Creek; proportionally higher at
Bedford).
6.Cut-off grades are set on a NSR basis and vary by pit and ore zone with an overall project cut-off of approximately 0.17% Cu for sulphide
material.
7.Effective date of the Mineral Reserve: 30 June 2026.
The Eva Copper Project Mineral Reserve estimate is being reported by Harmony for the first time, and the Mineral
Resource estimate reflects updated drilling and geological models. The material assumptions and criteria supporting the Mineral
Resource estimate, including the geological database, estimation, classification, pit-shell constraints and cut-off assumptions,
are described in Section 11 of the Eva Copper Project TRS. The feasibility-study mine plan, modifying factors, metallurgical
recoveries, cut-off criteria and economic assumptions supporting the Mineral Reserve estimate are described in Section 12 of
that TRS, which is filed as an exhibit to this annual report on Form 20-F. For additional information, see the TRS on each
individual property, filed as an exhibit of this annual report on Form 20-F.
159
Table of contents
CSA Mine
Property Description
The CSA Mine is an underground copper mining operation located in western New South Wales, Australia, and is 100%
owned and operated by Cobar Management Pty Limited ("CMPL"), a wholly-owned subsidiary of Harmony. The mine is located
11km northwest of the town of Cobar (pop. 4,000) and approximately 600km west-northwest of Sydney (latitude 31°24’ 27.75”S,
longitude 145°48’5.51”E).
CMPL holds consolidated mining lease CML5, which covers approximately 2,470 ha, and three surrounding exploration
licences (EL5693, EL5983 and EL9587), which cover approximately 504km². CMPL also holds four wholly-owned exploration
licences south of Cobar that form part of the Southern Cobar Basin Hub.
The following graphic illustrates the location of CSA.
CSA location.jpg
The mineral tenure is presented in the table below.
Licence Holder
Licence Type
Reference No.
Effective Date
Expiry Date
Area (ha)
Cobar Management Pty Limited
Mining Lease
CML5
2 December
1993
24 June 2028
2,470
Operational Infrastructure
The CSA Mine is an underground copper mining operation with associated ore processing and concentrate production
facilities. Ore is sourced primarily from the QTS North ("QTSN") and QTS Central ("QTSC") underground ore bodies at depths
generally between 1,500m and 1,800m below surface. The underground mine is serviced by two hoisting shafts and a decline
extending to approximately 1,900m below surface. Ore is crushed underground, hoisted to surface and processed through the
CSA concentrator to produce copper concentrate for export. Historical production has averaged approximately 1.1Mtpa.
The operation is supported by established power, water, processing and transport infrastructure. Power is supplied via a
132 kV transmission line connected to the state energy network, with a 22 kV connection and backup diesel generation
available for emergency supply. Water is sourced primarily from the Cobar Water Board via a network of pumps and pipelines
from the Bogan River at Nyngan, supplemented by tailings water recycling, surface water capture and an installed borefield.
160
Table of contents
The operation is connected to regional transport infrastructure via sealed highways, public roads and rail links to the ports
of Newcastle and Port Kembla for export of copper concentrate. The nearby town of Cobar is serviced by commercial flights to
and from Sydney.
The CSA Mine employs approximately 500 people, most of whom reside in Cobar, supplemented by drive-in, drive-out and
fly-in, fly-out personnel and specialist contractors where required. The operation has been in continuous production since 1967.
Portions of the CSA Mine’s fixed infrastructure date from the development of the modern mine in the 1960s. The principal
shafts have since been upgraded, including a new headframe and double-drum winder at No. 1 shaft and a new Koepe winder
and control system at No. 2 shaft. The approximately 50-year-old semi-autogenous grinding mills were replaced in 2023. The
four coarse-ore bins date from the 1960s and have experienced maintenance-related downtime; they are currently operated at
partial capacity while a staged remediation programme is implemented. A major ventilation and cooling programme was
completed in 2022, with further ventilation and cooling works planned through fiscal 2029. Fixed and mobile plant maintenance
is reported as satisfactory, and ongoing capital programmes provide for mobile-fleet replacement and sustaining replacement
and refurbishment of processing and supporting infrastructure. See Sections 5, 13, 15 and 18 of the CSA Mine TRS.
The “property, plant, and equipment” of the CSA Mine as at 30 June 2026, including buildings and mine infrastructure,
mining assets, decommissioning assets, rehabilitation and assets under construction, had a carrying value of R31.3 billion.
The CSA Mine did not incur any fines or penalties for non-compliance during the year ended 30 June 2026 and no
significant encumbrances exist.
Geology
CSA is located within the Cobar Mineral Field of central western New South Wales, a well-established mineral province
hosting copper, gold and lead-zinc mineralisation. Mineralisation is hosted within the Silurian-age CSA siltstone, comprising a
steeply dipping sequence of interbedded siltstones and sandstones. The deposit contains five recognised mineralised systems:
Western, Eastern, QTSN, QTSC and QTS South. Current mining activities are focused primarily on the QTSN and QTSC ore
systems, which host high-grade copper mineralisation at depth.
History
The CSA orebody was first discovered in 1871 and a lease was granted in 1872 to Nancarrow, Gibs and Connelly.
Extraction of ore commenced in 1905, with a small smelter installed in 1915 to process lead and copper ores.
CMPL acquired the CSA mining leases in 1960 and installed a new shaft in 1962. Modern mine development commenced
in 1965 when Broken Hill South Limited established a mechanised underground mining operation, including new shafts, winding
systems, a concentrator and associated surface infrastructure. First underground production was achieved in 1967, and mining
operations have continued since that time.
The operation was acquired by Conzinc RioTinto Australia Pty Ltd in 1980 and subsequently sold to Golden Shamrock
Mines Pty Ltd ("GSM") in 1993. In October 1996, GSM was acquired by Ashanti Goldfields Company Limited, making it the
ultimate owner of Cobar Mines Pty Ltd, the operator of the CSA Mine. The operation was subsequently placed on care and
maintenance in 1997.
Glencore International AG (“Glencore”) acquired CSA in 1999 and resumed underground mining operations. The mine
remained under Glencore ownership and management for more than two decades, during which time significant exploration,
development and operational improvements were undertaken. CMPL managed and operated the mine throughout Glencore’s
ownership. In November 2021, the assets, tenements and residual interests relating to the CSA Mine were transferred to CMPL.
On 16 June 2023, the CSA Mine was acquired by MAC Copper (then Metals Acquisition Limited) through the acquisition of
CMPL. In October 2025, our subsidiary HGA acquired MAC Copper, bringing the CSA Mine into Harmony's portfolio as a wholly-
owned operation.
Mineral Tenure
The CSA Mine operates under CML5 held by CMPL. CML5 covers an area of approximately 2,470ha, the mining purpose
leases, MPL1093 and MPL1094, total approximately 30ha, while the surrounding exploration tenements (EL5693, EL5983 and
EL9587) cover approximately 504km² of highly prospective ground. To the south of Cobar, CMPL also holds a further four,
wholly-owned exploration licences (EL6223, EL6907, EL9595 and EL9596), which cover a total of 252km² and form part of the
Southern Cobar Basin Hub.
The operation is subject to approvals and regulatory requirements under the New South Wales mining and environmental
framework. Following the introduction of State Environmental Planning Policy No. 37, CMPL prepared a Statement of
Environmental Effects in May 1995 to support the continued operation of the CSA Mine and submitted Development Application
31:95.
Development Consent No. 31:95 for the continued operation of the underground mine, ore treatment plant, tailings dam
and associated service facilities was granted by Cobar Shire Council on 30 August 1995 ("DA 31:95").
The operation currently holds environment protection licence EPL1864, issued under the POEO Act. EPL1864 regulates
mining activities at the CSA Mine and has been amended periodically to reflect operational and regulatory requirements.
161
Table of contents
A summary of the status of EPs and tenements issued as at 30 June 2026, is presented in the table below.
Permit / Licence
Status
Mining Lease
CML5 current. Expiry 24 June 2028.
Exploration Licence
EL5693 current.  Expiry 7 February 2027.
Exploration Licence
EL5983 current.  Expiry 30 August 2027
Exploration Licence
EL6223 current.  Expiry 5 April 2029.
Exploration Licence
EL6907 current.  Expiry 11 October 2027
Exploration Licence
EL9587 current.  Expiry 20 July 2029.
Exploration Licence
EL9595 current.  Expiry 18 August 2029.
Exploration Licence
EL9596 current.  Expiry 18 August 2029.
Mining Purposes Lease
MPL1093 current.  Expiry 5 February 2029.
Mining Purposes Lease
MPL1094 current.  Expiry 5 February 2029.
Environment Protection Licence
EPL 1864 current. Amended 19 December 2023
Development Consent
DA 31:95 as amended
Mining Method
The CSA Mine is an underground mining operation targeting copper mineralisation within the CSA deposits. Current mining
activities are focussed primarily on the QTSN and QTSC ore systems. The mine uses mechanised long-hole open stoping with
cemented paste fill as the preferred mining method. A modified Avoca stoping method has historically been used successfully in
the narrower lenses (principally QTSC, and formerly Eastern and Western). Mining is undertaken using these various methods
depending on stope area, with ore extracted from underground stopes, crushed underground and hoisted to surface for
processing.
Mineral Processing
Ore extracted from the CSA Mine is crushed underground, hoisted to surface and processed through the CSA Mine
concentrator to produce copper concentrate for export. Processing involves crushing, grinding and flotation circuits that recover
copper-bearing minerals from the ore. Tailings generated during processing are managed through a combination of underground
backfilling and surface storage in tailings facilities.
Qualified Persons
The QP is employed on a full-time basis by Harmony. The QPs’ qualifications, areas of responsibility and personal
inspection of the property are summarised in the table below:
Qualified Person
Prof. Assoc.
Qualifications
TRS Section
Responsibility 
Personal Insp.
Mr. G. Job
FAusIMM
BSc. MSc (Min Econ)
All sections
Regular, last 2026
The QP relied upon information, analyses and technical work prepared by appropriately qualified subject matter experts in the disciplines of
geology, mine planning, geotechnical engineering, hydrogeology, tailings management, metallurgy, environmental management, infrastructure
and finance. These specialist contributions included information relating to mining rights, surface rights, contractual agreements, historical
operating expenditures, community relations and other matters.
The QP reviewed and accepted the work of these specialists and considers it reasonable and suitable for use in support of the mineral resource
and mineral reserve disclosures contained in this Annual Report on Form 20-F. Responsibility for such scientific and technical disclosure
remains with the QP.
Exploration
Exploration at the CSA Mine includes underground and surface drilling programmes designed to extend known mineralised
systems and identify additional resources within the broader tenement package. Exploration potential remains within the mine
area, most notably in the down-dip extensions of lodes which remain open at depth. Harmony has initiated a deep drilling
campaign from surface to target deep mineralisation that cannot currently be incorporated into Mineral Resources or Mineral
Reserves. The QP is of the opinion that the quality and quantity of the exploration methods and information are sufficient to
support the estimation of Mineral Resources.
The CSA Mine TRS does not report a discrete fiscal 2026 hole count, drilling metreage or assay count. Section 7 of the
TRS instead reports that underground diamond drilling averaged approximately 27,700m per year over the two years preceding
the TRS effective date of 30 June 2026 and that the current Mineral Resource estimate is based on approximately 2,932 drill
holes and more than 71,000 samples. Core sampling and analytical methods are described in Section 8 of the CSA Mine TRS.
162
Table of contents
Mineral Resource Estimate
The Mineral Resources were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of
Regulation S-K 1300. These Mineral Resources account for mining depletion recorded from July 2025 to June 2026.
The Mineral Resources are reported at a cut-off grade calculated using the following parameters:
Description
Unit
Value
Copper price
US$/lb
5.40
Silver price
US$/oz
38.9
Exchange rate
US$:A$
0.68
The Mineral Resource estimate for the CSA Mine as at 30 June 2026, with 2025 comparatives shown as not applicable, is
summarised in the table below:
Mineral Resource Estimation 30 June 2026.
Fiscal Year Ended 30 June
% Change
Copper
2026
2025
Mineral Resource Category
Tonnes
(Kt)
Grade
(%)
Content
(Kt)
Tonnes
(Kt)
Grade
(%)
Content
(Kt)
Measured
1,343
7.65
102.691
N/A
N/A
N/A
N/A
Indicated
1,479
4.90
72.490
N/A
N/A
N/A
N/A
Total / Ave. Measured + Indicated
2,822
6.21
175.181
N/A
N/A
N/A
N/A
Inferred
6,173
3.76
231.942
N/A
N/A
N/A
N/A
Fiscal Year Ended 30 June
% Change
Silver
2026
2025
Mineral Resource Category
Tonnes
(Kt)
Grade
(g/t)
Content
(000 kg)
Tonnes
(Kt)
Grade
(g/t)
Content
(000 kg)
Measured
1,343
23.96
32.169
N/A
N/A
N/A
N/A
Indicated
1,479
13.91
20.567
N/A
N/A
N/A
N/A
Total / Ave. Measured + Indicated
2,822
18.69
52.735
N/A
N/A
N/A
N/A
Inferred
6,173
24.83
153.264
N/A
N/A
N/A
N/A
Notes:
•The Mineral Resources were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of this report on
Form 20-F, the Mineral Resources have been classified in accordance with Item 1302(d)(1)(iii)(A) of Regulation S-K 1300.
•Mineral Resources are reported exclusive of Mineral Reserves.
•Price assumptions used in the estimation include US$11,900/t of copper and US$38.9/oz of silver, in line with Harmony's long-term market
guidance pricing .
•Geological mineralisation boundaries are defined at a nominal 2.5% Cu cut off for high grade lenses, and 1.5% Cu for the lower-grade
halo; Mineral Resources are reported above a 1.5% Cu cut-off grade.
•Cost assumptions underlying the cut-off grade calculation include A$109.30/t of ore mined, A$41.20/t of ore milled and A$48.50/t of G&A
costs.
•Metallurgical recovery assumptions used in the estimation were 97.5% copper recovery and 86.7% silver recovery.
•Mineral Resources are reported as dry, raw, undiluted, in-situ tonnes.
•Figures are subject to rounding.
•Harmony did not report CSA Mine Mineral Resource estimates as at 30 June 2025 because it acquired the CSA Mine in October 2025;
accordingly, the 2025 comparative figures and percentage changes are not applicable.
163
Table of contents
Mineral Reserve Estimate
The Mineral Reserves were originally prepared, classified and reported according to SAMREC, 2016. For the purposes of
this report on Form 20-F, the Mineral Reserves have been classified in accordance with Item 1302(e)(2) of Regulation S-K 1300.
The Mineral Reserve estimate is the economically mineable portion of the Measured and Indicated Mineral Resource and
has been derived using detailed stope designs, modifying factors calibrated against ten years of reconciliation history, and a
discounted cash flow economic evaluation using Harmony's market-guidance long-term real commodity price forecasts.
The Mineral Reserve estimate for the CSA Mine as at 30 June 2026,  with 2025 comparatives shown as not applicable, is
summarised in the table below
Fiscal Year Ended 30 June
 
Copper
2026
2025
 
Mineral Reserve Category
Tonnes
(Mt)
Grade
(%)
Content
(kt)
Tonnes
(Mt)
Grade
(%)
Content
(kt)
% Change
Proved
12.531
3.27
410.303
N/A
N/A
N/A
N/A
Probable
5.161
3.23
166.565
N/A
N/A
N/A
N/A
Total / Ave. Proved + Probable
17.691
3.26
576.868
N/A
N/A
N/A
N/A
Notes:
•The Mineral Reserves are reported with an effective date of 30 June 2026 and were originally prepared, classified and reported according
to SAMREC, 2016. For the purposes of this report on Form 20-F, the Mineral Reserves have been classified in accordance with
Item 1302(e)(2) of Regulation S-K 1300.
•Price assumptions used in the estimation include US$4.50/lb of copper, in line with Harmony’s long-term market guidance as at 30 June
2026
•The copper Mineral Reserve tonnes are reported using a stope cut-off grade of 2.26% Cu for FY27-FY28, a stope cut-off grade of 1.93%
for the remaining periods and a development breakeven cut-off grade of 1.0% Cu.
•Cost assumptions underlying cut-off grade calculation include A$109.30/t mined, A$41.20/t ore milled and A$48.50/t G&A.
•Metallurgical recovery assumptions used in the estimation were 97.5% copper recovery and 86.7% silver recovery.
•Silver is currently subject to a streaming arrangement whereby it generates a neutral net value to Harmony; accordingly, as such silver is
not included as a reportable Mineral Reserve of the asset.
•Figures are subject to rounding to reflect the accuracy of the estimate.
•Harmony did not report CSA Mine Mineral Reserve estimates as at 30 June 2025 because it acquired the CSA Mine in October 2025;
accordingly, the 2025 comparative figures and percentage changes are not applicable.
The table below presents a summary of the modifying factors used to convert the Mineral Resource to the Mineral Reserve for the CSA Mine.
The modifying factors are consistent with the modelling, planning and computing estimates used in determining the Mineral Reserves, which
are also consistent with historical performance.
Modifying Factor
Principal Assumption
Confidence
Mining dilution (based on stope type)
15-30%
High
Mining recovery (based on stope type)
87-90%
High
Processing recovery
97.50%
High
Copper price
US$9,900/t
Medium
Operating cost
A$224/t Milled (LOM)
High
The Mineral Resource and Mineral Reserve estimates for the CSA Mine are being reported by Harmony for the first time.
The material assumptions and criteria supporting the Mineral Resource estimate, including the geological database, modelling,
classification, cut-off grade and reasonable prospects for economic extraction, are described in Section 11 of the CSA Mine
TRS. The mine plan, modifying factors, cut-off grades, metallurgical recoveries and economic criteria supporting the Mineral
Reserve estimate are described in Section 12 of that TRS, which is filed as an exhibit to this annual report on Form 20-F.
164
Table of contents
Mineral Resource and Mineral Reserve Internal Controls Disclosure
Harmony’s Mineral Resources and Mineral Reserves estimates are subject to internal Competent Persons reviews
administered by the Central Ore Reserve Management team and cyclically by external and independent experts.
Harmony’s Mineral Reserve is an outcome of the Company’s business planning process which runs annually. This process
operates within a comprehensive framework where all inputs, including costs and capital requirements, are generated by the
operation, and reviewed at a regional and corporate level within the Company, thereby providing confidence in the estimates.
Harmony follows an embedded process of third-party reviews to provide expert independent assurance regarding the
Mineral Resources and Mineral Reserves estimates and compliance with the appropriate reporting codes.
In line with Harmony’s policy, each material operation is reviewed by an independent third party on average no less than
once every three years or when a material new Mineral Resource or Mineral Reserve declaration triggers a review. The 2026
reviews were for its South African operations at Doornkop, Tshepong North, Tshepong South, MWS and Free State Surface
Operations, and the Australasian operations, Hidden Valley, the Eva Copper Project, and the CSA Mine. No material issues
were identified in the estimation processes or LOM plans and compliance certificates have been issued by the independent
consultants for these operations and projects. The certificates state that the Mineral Resources and Mineral Reserves have
been estimated and reported in accordance with SAMREC, 2016. Third-party audits are also designed to support continual
improvement regarding practices for Mineral Resources and Mineral Reserves estimation and reporting.
165
Table of contents
ITEM 4A. UNRESOLVED STAFF COMMENTS
Not applicable.
ITEM 5. OPERATING AND FINANCIAL REVIEW AND PROSPECTS
You should read the following discussion and analysis together with our consolidated financial statements, including the
related notes, set forth beginning on page F-1.
On 11 August 2026, we determined that we were required to prepare an accounting restatement to correct errors in our
previously issued consolidated financial statements for fiscal 2024 and fiscal 2025. The previously issued consolidated financial
statements for fiscal 2025 and fiscal 2024 contained material misstatements and should no longer be relied upon. The
comparative information presented in this Item 5 has been restated, and all related period-to-period analyses, margins, earnings
per share measures and non-GAAP reconciliations have been recalculated using the restated amounts. See note 38
"Restatement of comparative information" to the consolidated financial statements set forth beginning on page F-1 and Item 15
"Controls and Procedures". See also Item 6.F "Disclosure of a registrant’s action to recover erroneously awarded compensation"
for the related incentive-based compensation recovery disclosure.
Except for the updated discussion under "– Restatement of prior-year comparatives" below, a full discussion of the
changes in our financial condition and results of operations between the fiscal years ended 30 June 2024 and 2025, has been
omitted from this annual report on Form 20-F, but may be found in Item 5: "Operating and Financial Review and Prospects", of
our annual report on Form 20-F for the year ended 30 June 2025, filed with the SEC on 31 October 2025, which is available free
of charge on the SEC’s website at www.sec.gov and our website at www.harmony.co.za.
Certain amounts for the fiscal years ended 30 June 2024 and 2025 presented in this Item 5 and in our consolidated
financial statements have been restated to correct prior-period errors relating to (i) a misalignment in algorithm parameters
within the mine planning and scheduling programme at the Doornkop, Tshepong North and Tshepong South operations, which
resulted in the overstatement of the LOM plan production estimates and affected units-of-production depreciation and the
related deferred tax rates from fiscal 2020 onwards, and (ii) the timing of recognition of payroll-related provisions and accruals
based on whether a constructive obligation existed at the reporting period end. Except where expressly stated otherwise, all
fiscal 2024 and fiscal 2025 amounts in this Item 5 are presented as restated. The restated amounts and the updated discussion
under "– Restatement of prior-year comparatives" below supersede the financial information and related year-on-year
comparisons in our 2025 annual report on Form 20-F affected by these errors. The restatements had no effect on the Group
cash flow statement, on revenue, or on profit for the year, profit attributable to owners of the parent or earnings per share for
fiscal 2025. For further detail, see note 38 “Restatement of comparative information” to our consolidated financial statements set
forth beginning on page F-1.
On 24 October 2025, Harmony acquired 100% of MAC Copper, which in turn has a 100% interest in CSA, its sole asset,
which is located in the Cobar Region of New South Wales, Australia. Accordingly, our results for fiscal 2026 include the results of
CSA from 24 October 2025, and are not directly comparable with fiscal 2025. The acquisition materially affected our financial
position, cash flows, financing arrangements and exposure to copper and silver prices, Australian-dollar exchange rates,
streaming arrangements and contingent consideration.
Overview
Harmony is a gold and copper mining company. During fiscal 2026, we completed the acquisition of MAC Copper, and we
now operate a portfolio of underground gold mines and surface retreatment operations in South Africa, an open-pit gold and
silver operation in PNG, and an underground copper mine in Australia. Fiscal 2026 is the first year in which our results include a
producing copper business.
Our gold sales for fiscal 2026 were 44,418 kilograms of gold (1.4 million ounces of gold) and in fiscal 2026 we processed
approximately 51 million tonnes of ore.
Our copper sales during fiscal 2026, for the period from 24 October 2025, following the MAC Copper acquisition, were
16,719 tonnes of copper (36.9 million pounds of copper) and we processed approximately 485,000 tonnes of ore.
As at 30 June 2026, our gold mining operations and projects reported total Proved and Probable Mineral Reserves of
approximately 27.4 million gold ounces, Measured and Indicated Mineral Resources (exclusive of Mineral Reserves) of
approximately 44.1 million gold ounces and Inferred Mineral Resources (exclusive of Mineral Reserves) of approximately
31.6 million gold ounces. Our copper mining operations and projects reported total Proved and Probable Mineral Reserves of
approximately 8.8 billion pounds of copper, Measured and Indicated Mineral Resources (exclusive of Mineral Reserves) of
approximately 4.9 billion pounds of copper and Inferred Mineral Resources (exclusive of Mineral Reserves) of approximately
2.5 billion pounds of copper. For further information on the Company’s Mineral Resources and Mineral Reserves, see Item 4:
"Information on the Company – Property, Plant and Equipment – Mineral Resource and Mineral Reserve Summary Disclosure”.
Operating segments are reported in a manner consistent with the internal reporting provided to the chief operating decision
maker. See note 40 "Segment report" of our consolidated financial statements set forth beginning on page F-1 for further details.
For segment purposes, the Group has two main economic products, being gold and copper. In order to determine
operating and reportable segments, management reviewed various factors, including geographical location as well as
managerial structure. It was determined that an operating segment consists of a shaft or a group of shafts or open pit mine
managed by an operational management team.
166
Table of contents
Our reportable segments are as follows:
Gold operations
•Moab Khotsong, Mponeng, Tshepong North, Tshepong South, Doornkop, Joel, Target 1, Kusasalethu, Masimong, MWS
and Hidden Valley; and
•All other surface operations, including those that treat historic tailings, namely Phoenix, Central Plant Reclamation, Savuka
Tailings, WRDs and Kalgold, are grouped together under “All other surface operations”.
Copper operations
•CSA.
A. OPERATING RESULTS
Key factors affecting our results
Gold and Copper Prices
Most of our revenue is derived from the sale of gold and copper. As a result, our operating results are directly affected by
fluctuations in the prices of gold and copper. Historically, gold prices have fluctuated widely and are influenced by numerous
factors beyond our control. As Harmony expands its exposure to copper, the Group's future operating results may also be
increasingly affected by fluctuations in copper prices. See Item 3D: “Key Information – Risk Factors – Risks Related to
Commodity Prices, Cash Flow and Financial Performance – Our profitability, cash flows, Mineral Reserve estimates and
shareholder returns are highly dependent on commodity prices; Inflationary pressures and escalating input costs may erode
profitability and reduce future returns” and “– Sovereign, political, regulatory and macroeconomic developments in the
jurisdictions in which we operate may adversely affect our business”. As a general rule, we sell the majority of our gold produced
at market prices to obtain the maximum benefit from increases in the prevailing gold price. Copper sales from CSA are
provisionally priced, with the selling price subject to final adjustments based on the LME prices for the quotational period
specified in the offtake agreement.
Since fiscal 2017, Harmony entered into derivative contracts to manage the variability in cash flows from the Group’s
production, in order to create cash certainty and protect the Group against lower commodity prices. Our hedging strategy was
expanded during the second half of fiscal 2024 to introduce gold zero cost collars to the derivative programme and to set a new
limit.
The limit set by the board is 30%, 20% and 10% of production in a 12-, 24- and 36-month period, respectively. The limit set
by the board for silver is 50% of the exposure over a 24-month period and 50% for uranium exposure over a 60-month period.
As part of the MAC Copper acquisition, Harmony took over the copper derivative contracts related to production at CSA. As at
30 June 2026, all the copper derivative contracts had matured. The limit set by the board for copper contracts going forward is
20% of copper production over a 24-month period. Management continues to top up these programmes as and when
opportunities arise to lock in attractive margins for the business, but we are not required to maintain hedging at these levels.
A portion of the production of the South African operations is linked to Rand gold forward contracts and Rand gold zero
cost collar contracts. US$ gold forward contracts and US$ gold zero cost collar contracts were entered into for the production
from Hidden Valley. The exposure to the variability in the price of silver for Hidden Valley is managed by entering into US$ silver
zero cost collars. The US$ silver zero collars have not been designated as hedging instruments for hedge accounting and the
gains and losses are accounted for in the income statement.
During fiscal 2026, the Group's cash inflows from uranium were managed by way of a forward contract, whereby uranium
prices are predetermined for a fixed amount of uranium production. These contracts are not designated as derivative contracts
as the “own use” exemption of IFRS 9 Financial instruments is applicable to them.
Effective 16 June 2023, MAC Copper entered into a copper purchase agreement (copper stream) with OR Royalties Inc.
("OR Royalties"). Under the terms of the copper stream, in exchange for an upfront cash deposit of up to US$75 million
(available copper deposit), the Group is required to deliver an amount of refined copper to OR Royalties in the form of
purchased copper warrants. The deliveries to OR Royalties are equal to the copper stream percentage (see note 29 "Streaming
arrangements" of our consolidated financial statements set forth beginning on page F-1 for further details) of payable copper
produced by CSA during the life of the mine. In addition to the copper deposit, the Group will receive ongoing cash payments for
refined copper delivered equal to 4% (copper cash price) of the cash settlement price for one tonne of refined copper quoted by
the LME on the date prior to the date of delivery (copper market price).
Effective 16 June 2023, MAC Copper entered into a silver purchase agreement (silver stream) with OR Royalties. Under
the terms of the silver stream, in exchange for an upfront cash deposit of US$75 million (silver deposit), the Group is required to
deliver to OR Royalties an amount of refined silver, in the form of purchased silver credits. The deliveries to OR Royalties are
equal to 100% of payable silver produced by CSA during the LOM. In addition to the silver deposit, the Group will receive
ongoing cash payments for refined silver delivered equal to 4% (silver cash price) of the silver price quoted by the London
Bullion Market Association for one ounce of refined silver on the day prior to the date of delivery (silver market price).
Significant and sustained changes in gold and copper prices may lead us to revise production profiles and development
activities and, in certain circumstances, increase or decrease production levels.
167
Table of contents
Harmony’s Realised Gold Price
In fiscal 2026, the average gold price received by us was R2,069,710 per kilogram or $3,811/oz. This average gold price
includes the net realised effective portion of the hedge-accounted gold derivatives.
The price of gold in US$ terms closed at US$4,007/oz on 30 June 2026, up from the closing price of US$3,303/oz on
30 June 2025. The range traded during the year reaffirms gold's safe haven status with investors during times of global
uncertainty and market volatility. The average spot gold price received (that is, excluding the impact of hedging gains or losses)
for the 2026 year was US$4,201/oz compared to US$2,786/oz in fiscal 2025.
Harmony is exposed to the impact of any significant decreases in the commodity prices received for its production. This is
mitigated to some extent by commodity derivatives and hedging arrangements, but as Harmony has limitations for the volume of
forward sales, commodity derivatives or hedging arrangements it may enter into for its future production, it is exposed to the
impact of decreases in the commodity prices on the remainder of its unhedged production. See Item 3D: “Key Information – Risk
Factors – Risks Related to Commodity Prices, Cash Flow and Financial Performance – Our profitability, cash flows, Mineral
Reserve estimates and shareholder returns are highly dependent on commodity prices".
In addition to the US$ gold price, the gold price received is impacted by the exchange rate of the Rand and other non-US$
currencies to the US dollar. An appreciation of the Rand and other non-US$ currencies against the US dollar will result in a
decrease in the revenue recorded, without considering the impact of the hedging instruments. Conversely, a depreciation of
these currencies against the US dollar would result in an increase of revenue recorded. See Item 3D: “Key Information – Risk
Factors – Risks Related to Commodity Prices, Cash Flow and Financial Performance – Foreign exchange volatility may
materially affect margins, earnings and project returns”. During fiscal 2026, the average exchange rate appreciated from
R18.15/US$1.00 in fiscal 2025, to R16.89/US$1.00 in fiscal 2026. See "– Exchange Rates" below for further discussion.
The following table sets out the average, the high and the low London Bullion Market price of gold and our average sales
price during the past two fiscal years:
Fiscal Year Ended 30 June
2026
2025
Average (US$/oz) .....................................................................................................................................
4,238
2,818
High (US$/oz) ............................................................................................................................................
5,399
3,432
Low (US$/oz) .............................................................................................................................................
3,275
2,329
Harmony’s average sales price1 (US$/oz) ............................................................................................
3,811
2,620
Average exchange rate (R/US$) ............................................................................................................
16.89
18.15
Harmony’s average sales price1 (Rand/kilogram) ................................................................................
2,069,710
1,529,358
1Our average sales price differs from the average gold price due to the timing of our sales of gold within each year. In addition, the effect of
hedge accounting i.e. realised losses from the cash flow hedges have been included in revenue.
Copper Concentrate Price, Provisional Pricing and Streaming Arrangements
CSA sells copper concentrate containing copper and silver pursuant to an offtake arrangement. Revenue is recognised
when control of the concentrate is transferred to the customer, with the selling price subject to final adjustments based on the
LME prices for the quotational period specified in the offtake agreement, net of treatment and refining charges. The period
between provisional and final pricing is typically 30 to 90 days, during which the provisionally priced receivable is measured at
fair value through profit or loss, with changes in fair value recognised as provisional pricing adjustments within revenue.
Movements in the copper price during that period therefore affect revenue after the date of sale.
In fiscal 2026, copper and silver revenue from contracts with customers at CSA amounted to R3.4 billion and R261 million,
respectively. Provisional pricing adjustments increased revenue by R126 million in respect of copper and R77 million in respect
of silver. Copper traded within a range of US$10,649 to US$14,083 per tonne and silver traded between US$46.89 and
US$116.58 per ounce during the period from acquisition to 30 June 2026.
Under the copper and silver streaming arrangements with OR Royalties, assumed on acquisition of MAC Copper, OR
Royalties is entitled to delivery of refined copper and silver against ongoing payments equal to 4% of the prevailing market price.
At 30 June 2026, streaming contract liabilities were R5.7 billion, of which R455 million was current and R5.3 billion was non-
current, and the outstanding deposits were US$53 million in respect of copper and US$28 million in respect of silver. During
fiscal 2026, these arrangements resulted in finance costs of R427 million and net fair value losses of R854 million, recognised in
profit or loss.
Costs
Our cash costs are between 80% and 85% of our total costs (excluding impairments and disposal/loss on scrapping of
assets). The remainder of our total costs consists primarily of share-based payments, exploration costs, corporate and sundry
expenditure, and amortisation and depreciation. Our cash costs consist primarily of production costs. Production costs are
incurred on labour, equipment, consumables and utilities. Labour costs are the largest component and typically comprise
between 50% and 55% of our production costs.
Our US dollar translated costs are sensitive to the exchange rate of the Rand and other non-US currencies to the US
dollar. See "– Exchange Rates" below. Appreciation of the Rand and other non-US currencies against the US dollar increases
working costs at our operations when those costs are translated from US dollars. See Item 3D: “Key Information – Risk Factors
– Risks Related to Commodity Prices, Cash Flow and Financial Performance – Foreign exchange volatility may materially affect
margins, earnings and project returns”.
168
Table of contents
Costs - Gold
All-in sustaining costs for the Group increased by 13.2% to R1,191,698 per kilogram from R1,053,189 per kilogram in fiscal
2025. This was driven by lower planned production, higher sustaining capital as well as higher cash costs due to annual wage
and above-inflation electricity tariff increases.
Our cash costs have increased from R874,770 per kilogram in fiscal 2025 to R991,654 per kilogram in fiscal 2026, mainly
due to above-inflation increase in electricity costs, higher royalties and labour increases.
Costs - Copper
Cash operating costs at CSA, net of by-product credits, were US$2.46 per pound (US$5,434 per tonne), and C1 cash
costs were US$2.47 per pound (US$5,450 per tonne), in fiscal 2026.
Management conducts a thorough review of costs at all operations to ensure that costs are properly managed and within
budget. However, it should be noted that there are risks beyond our control such as safety stoppages, which would result in
production being negatively affected while certain costs would still be incurred. This is discussed in more detail in Item 3D: "Key
Information – Risk Factors – Risks Related to Operations and Business Resilience – Safety incidents and loss of life may result
in production losses, regulatory intervention and reputational damage; Exposure to mining-related health hazards may result in
occupational disease and significant long-term liabilities and costs" and "– Infectious disease outbreaks and endemic disease
may disrupt our workforce and operations, and increase costs". We are also exposed to price increases on electricity, which is
regulated, as well as the implementation of other levies such as carbon tax. See Item 3D: "Key Information – Risk Factors –
Risks Related to Operations and Business Resilience – Production is dependent on reliable energy supply and increasing
energy costs may materially affect profitability" and "– Risks Related to Climate, Environment and Social Licence –
Decarbonisation, carbon pricing and emerging climate regulation may increase costs and capital requirements".
We remain subject to risks related to the volatility of commodity prices, as well as the potential shortage of supply and
disruptions of supply chains due to geopolitical instability, including impacts of the ongoing conflicts in the Middle East. See Item
3D: "Key Information – Risk Factors – Risks Related to Commodity Prices, Cash Flow and Financial Performance – Inflationary
pressures and escalating input costs may erode profitability and reduce future returns", "– Risks Related to Operations and
Business Resilience – Disruptions in critical supply chains may affect production, project execution and profitability" and "– Risks
Related to Commodity Prices, Cash Flow and Financial Performance – Sovereign, political, regulatory and macroeconomic
developments in the jurisdictions in which we operate may adversely affect our business".
Production Levels
In addition to commodity prices, Harmony’s income in any year is also influenced by its level of gold production. Production
levels are in turn influenced by grades, tonnages mined and processed through the plant and metallurgical recoveries. Gold
production decreased by 3.4% between 2026 and 2025, from 1,479,671 to 1,429,551 mainly driven by lower recovered grades,
infrastructure challenges and operational disruptions.
Following the acquisition of MAC Copper, Harmony's income is now also influenced by the level of copper production at
CSA. As with gold, copper production levels are influenced by ore grades, tonnages mined and milled, and metallurgical
recoveries. During fiscal 2026, CSA achieved a recovered copper yield of 3.75%, producing 18,207 tonnes of copper. There was
no copper production for fiscal 2025, as Harmony held no copper-producing assets prior to the acquisition of MAC Copper.
For more information on our business and operations, see Item 4: “Information on the Company – Business Overview” and
“– Property, Plant and Equipment – Mineral Resource and Mineral Reserve Summary Disclosure”.
Exchange Rates
Our revenues are very sensitive to the exchange rate of the Rand, Australian dollar and other non-US currencies to the US
dollar. Since gold and copper are generally sold in US dollars, most of our revenues are received in US dollars. Currently, the
majority of our gold earnings are generated in South Africa, while copper earnings are generated in Australia. Appreciation of the
Rand against the US dollar decreases our Rand-denominated gold revenues, while appreciation of the Australian dollar against
the US dollar decreases our Australian dollar-denominated copper revenues. In each case, this reduces operating margins and
net income from our South African and Australian operations. Depreciation of the Rand and Australian dollar against the US
dollar has the opposite effect. Accordingly, strengthening of the Rand generally results in poorer earnings for us if there is not a
similar increase in the gold price, and strengthening of the Australian dollar generally results in poorer earnings if there is not a
similar increase in the copper price.
The exchange rates obtained when converting US dollars to Rand and Australian dollar are determined by foreign
exchange markets, over which we have no control. The spot rate as at 30 June 2026 was R16.39/US$1.00, compared with
R17.75 per US$1.00 as at 30 June 2025, reflecting an appreciation of 7.7% of the Rand against the US dollar. The average
exchange rate for fiscal 2026 was R16.89 per US$1.00, reflecting an appreciation of 6.9% of the Rand against the US dollar
when compared to R18.15 in fiscal 2025. The spot rate as at 30 June 2026 was A$0.69/US$1.00 compared to A$0.65/US$1.00
on 24 October 2025, the acquisition date of MAC Copper, reflecting a depreciation of approximately 6.2% in the Australian dollar
against the US dollar during the period. In fiscal 2026, the Rand strengthened against the Australian dollar and closed at
R11.35/A$1.00 (2025: R11.68/A$1.00), reflecting an appreciation of 2.8% of the Rand against Australian dollar. The Kina
weakened against the Australian dollar and closed at PGK3.09/A$1.00 (2025: PGK2.72/A$1.00), reflecting a depreciation of
13.6%.
The average gold price received by us during fiscal 2026, before including the effect of the cash flow hedges, increased by
R655,820 per kilogram to R2,281,503 per kilogram from R1,625,683 per kilogram during fiscal 2025. This is driven by the US$
average gold price increase, with an offset effect of the foreign exchange movements noted above.
169
Table of contents
The average copper price received by us for the period from 24 October 2025 to 30 June 2026, before the effect of
provisional pricing adjustments, was US$12,399 per tonne. As CSA was acquired on 24 October 2025, no comparative copper
price information is presented for fiscal 2025. The US$ copper price increased from US$10,947 per tonne on 24 October 2025
to US$13,380 per tonne at 30 June 2026, with an offset effect from the movement in the Australian dollar against the US dollar
over the period, as noted above.
The majority of our working costs are incurred in Rand and, as a result of this, any appreciation of the Rand against the US
dollar would increase our working costs when translated into US dollars. Depreciation of the Rand against the US dollar would
cause a decrease in our costs in US dollar terms. Similarly, at our international operations, appreciation of the Australian dollar
or Kina against the US dollar would cause an increase in our costs in US dollar terms. See Item 3D: “Key Information – Risk
Factors – Risks Related to Commodity Prices, Cash Flow and Financial Performance – Foreign exchange volatility may
materially affect margins, earnings and project returns”.
We have several credit facilities and loans denominated in US dollars. This exposes us to the changes in the Rand against
the US dollar, which would affect our borrowings as well as the interest recognised. This will also affect the cash flows when the
borrowings are raised and repaid as well as at the time of the payments of the interest.
Movements in the currencies expose the Group's operations to foreign currency gains and losses on foreign-denominated
receivables and liabilities, including derivatives, contingent consideration and streaming arrangement liabilities. They also impact
the Group’s translation of its international operating results and net assets into its Rand presentation currency, which resulted in
a foreign exchange translation loss of R2.4 billion being recognised in other comprehensive income for fiscal 2026
(2025: R819 million).
Harmony has entered into foreign exchange derivative contracts in the form of zero cost collars, which establish a
minimum (floor) and maximum (cap) Rand/US dollar exchange rate at which to convert US dollars to Rand. The Group also
uses forward exchange contracts to manage the risks. At 30 June 2026, the zero cost collars had a nominal amount of
US$50 million in derivative contracts, covering a two-year period with a weighted average cap price of US$1.00=R20.14 and
weighted average floor price of US$1.00=R18.14.
The Bank of PNG has systematically allowed the Kina to weaken against the US dollar over several years. The Kina
weakened by 7.0% and 8.3% in fiscal 2025 and fiscal 2026 respectively. Since the introduction of a 150 basis point trading band
in June 2014, the Kina weakened by 82.8% against the US dollar as at 30 June 2026. Should the trading band continue,
depending on the level at which the exchange rate is set, there could be a negative impact on the results of the Hidden Valley
operation, as well as the Kina cost of development at Wafi-Golpu and other PNG exploration sites.
Geopolitical and socio-political risks
Harmony faces material exposure to geopolitical and socio-political risks across its operating jurisdictions. Globally, rising
tensions from conflicts, trade disputes, and shifting alliances disrupt supply chains and elevate input costs, which impact our
financial margins. Locally, socio-political pressures in South Africa, including high unemployment and persistent disparities, fuel
public dissatisfaction posing operational challenges. In PNG, political uncertainty and proposed legislative changes to mining
and mine safety legislation may threaten project viability and future investment. While these risks elevate cost and operational
pressures, they also contribute to upward momentum in the gold price, which can partially offset financial impacts and enhance
revenue potential. See Item 3D: "Key Information – Risk Factors – Risks Related to Commodity Prices, Cash Flow and Financial
Performance – Inflationary pressures and escalating input costs may erode profitability and reduce future returns”, “– Sovereign,
political, regulatory and macroeconomic developments in the jurisdictions in which we operate may adversely affect our
business”; “– We are subject to mining taxes, royalties and other regulatory imposts, and to policies and legislation relating to
greater state intervention in the mining sector" and "– Risks Related to Regulation, Compliance, Governance and Legal Matters
– Laws governing mineral rights affect our business and our mining rights could be altered, suspended or cancelled”.
Inflation
Inflation in South Africa was 5.0% at the end of fiscal 2026, up from 2.9% at the end of fiscal 2025. The increase was
driven by a combination of economic, policy and consumer behaviour factors.
We have seen increases in labour, contractors and electricity costs for our mining operations some of which have
increased at levels above the rate of inflation. Combined with geopolitical risks and further compounding inflationary pressure,
we believe we will see continued increases through 2027.
On 4 April 2024, Harmony announced the acceptance of a five-year wage agreement by the South African unions, which
became effective on 1 July 2024 and will remain in effect until 30 June 2029. This agreement will result in an increase of
approximately 6% per annum over the five-year period which is within our planning parameters.
Inflation in Australia was approximately 3.8% in the 12 months to June 2026, reflecting continued cost pressures across
housing, labour and services, although moderating from peak levels experienced in recent years.
The inflation rate in PNG at the end of fiscal 2025 was 3.6%, while inflation closed at 5.3% at the end of fiscal 2026. The
increase is driven by a mix of domestic policy reforms, commodity price shifts and structural economic changes.
Our profits and financial condition could be adversely affected if increased costs due to inflation, are not offset by a
concurrent devaluation of the Rand and other non-US currencies and/or an increase in the price of gold. See Item 3D: "Key
Information – Risk Factors – Risks Related to Commodity Prices, Cash Flow and Financial Performance – Inflationary pressures
and escalating input costs may erode profitability and reduce future returns".
170
Table of contents
South African Socio-Economic Environment
We are domiciled in South Africa and the majority of our operations are located in South Africa. The primary listing for our
shares is also on the JSE. As a result, we are subject to various economic, fiscal, monetary and political policies and factors that
affect South African companies generally. See Item 3D: "Key Information – Risk Factors – Risks Related to Climate,
Environment and Social Licence – Failure to maintain our social licence to operate could affect current and future operations"
and "– We may fail to meet ESG performance expectations and published targets, which could affect reputation, stakeholder
confidence and access to capital".
In particular, South African companies are subject to exchange control limitations. While exchange controls were relaxed
some years ago, South African companies remain subject to restrictions on their ability to deploy capital outside of the Southern
African Common Monetary Area. See Item 10: "Additional Information – Exchange Controls".
We must also comply with the SLPs that have been developed for each of our South African operations. These SLPs are
prepared in line with legislation governing the participation of HDPs in mining assets. See Item 3D: "Key Information – Risk
Factors – Risks Related to Regulation, Compliance, Governance and Legal Matters – Compliance with new and changing
corporate governance and public disclosure requirements increases our costs of compliance; Laws governing mineral rights
affect our business and our mining rights could be altered, suspended or cancelled.”
We have been granted mining licences under the MPRDA necessary for the conduct of our current operations. We have
therefore already incurred expenses relating to HDP participation. We believe the biggest challenge will lie in maintaining these
licences, as we will have a responsibility in respect of human resource development, procurement and LED. We are however
unable to provide a specific amount of what the estimated cost of compliance will be, but we will continue to monitor these costs
on an ongoing basis. See Item 4: "Information on the Company – Business Overview – Regulation – Mineral Rights – South
Africa – Mining Charter".
Electricity in South Africa
Eskom, the state utility, generates the majority of South Africa’s electricity supply. It generates, transmits and distributes
electricity to industrial, mining, commercial, agricultural and residential users.
In fiscal 2026, electricity supply remained constrained but improved, with fewer interruptions. Eskom suspended load
shedding in April 2024 as the Generation Recovery Plan improved plant performance. This improvement continued into fiscal
2026, therefore power interruptions did not materially impact production. Global energy prices remained volatile due to higher
demand, limited new supply, carbon tax uncertainty, and geopolitical conflicts.
Electricity supply remains tight during evening peak periods. We continue to participate in Eskom’s Critical Peak Pricing
pilot at four sites, allowing tariff savings outside surcharge periods.
The South African Government is expanding the Independent Power Producer programme to diversify supply and reduce
carbon emissions. Eskom’s transmission business was legally separated in July 2023 into the National Transmission Company
of South Africa ("NTCSA"), a wholly owned subsidiary with a licence from the National Energy Regulator of South Africa. NTCSA
began operating on 1 July 2024. Unbundling of the generation and distribution divisions is ongoing.
See Item 3D: "Key Information – Risk Factors – Risks Related to Operations and Business Resilience – Production is
dependent on reliable energy supply and increasing energy costs may materially affect profitability".
Renewable energy
Renewables are a growing component of South Africa’s energy mix. Forecasts project solar and wind will surpass coal by
2030 (IEA 2024). Increased use of renewable energy and self-generated power are reducing Eskom’s sales volumes,
contributing to tariff increases and delays in new grid connections. The government has also supported gas-to-power and
nuclear options, while continuing state support for coal.
In South Africa, a multi-phase renewable energy programme is underway, complemented by short-term power purchase
agreements, wheeled wind capacity, battery energy storage, rooftop solar installations, and supplier engagement. Recent
regulatory reforms in South Africa have significantly accelerated the country’s energy transition. The removal of licensing
requirements for embedded generation and the unbundling of Eskom’s transmission division have enabled greater private sector
participation in renewable energy development and the wheeling of electricity through the national grid. These changes have
created a more favourable environment for large-scale renewable energy investments. We are procuring approximately 260 MW
of wheeled wind energy, of which 47 MW is contracted and the balance is under negotiation, with first supply expected in fiscal
2029 on a phased basis. We have also contracted 255 MW of short-term power purchase agreements to supply energy from
fiscal 2027 to fiscal 2032, with a further 150 MW under consideration.
Phased strategy:
•Sungazer 1 – Nyala, Eland and Tshepong. 30 MW commissioned in August 2023, generating approximately 70 GWh pa;
•Sungazer 2 – Moab Khotsong, Great Noligwa Mine and Noligwa Gold Plant. Under construction. 100 MW capacity to
generate 230 GWh pa and is expected to be completed in fiscal 2027;
•Sungazer 3 – Harmony One plant, Central plant, Target and Joel. Up to 75 MW to generate up to 177 GWh pa, with the
first phase at Harmony One plant and Central plant (37 MW) targeted for completion in fiscal 2029, subject to securing the
required permits and grid access;
•Sungazer 3-Ext – Chemwes Proprietary Limited ("Chemwes") and Kalgold. Under investigation. Installed capacity of 33
MW to generate 76 GWh pa and is expected to be completed in fiscal 2030;
171
Table of contents
•Sungazer 4 – Mponeng. Installed capacity of 100 MW to generate 230 GWh pa and is expected to be completed in fiscal
2030, subject to securing the required permits and grid access;
•Wheeled wind – Procurement of circa 260 MW of wind energy is underway, of which 47 MW is contracted, with supply
phased in from fiscal 2029;
•Short-term power purchase agreement – 255 MW has been contracted and is expected to supply approximately 565 GWh
pa from fiscal 2027 to fiscal 2032, with a further 150 MW under consideration.
Harmony integrated climate-aligned finance into its capital structure to support long-term decarbonisation and operational
resilience. Over R20 billion in facilities have been secured, including a R3 billion green loan for the Sungazer 2 and 3 solar
project and sustainability-linked revolving credit facilities of R4 billion, US$500 million and A$250 million, and a term loan of
A$250 million.
See Item 5: "Operating and Financial Review and Prospects - Liquidity and capital resources – Outstanding Credit
Facilities, Refinancing and Other Borrowings – Refinancing". Also see Item 10: “Material Contracts – R3 Billion Green Term
Loan”, “– R4 Billion Syndicated Revolving Credit Facility”,“– US$500 Million Syndicated Facility” and “– A$500 Million
Syndicated Facility” and “– Social and ethics committee: chairperson’s report” on pages 240 to 241 and "– Climate and energy"
on pages 153 to 165 of the Integrated Annual Report for the 20-F 2026.
Electricity tariffs
As a major electricity consumer and mostly being supplied by Eskom, Harmony is exposed to significant additional costs
as a result of rising electricity tariffs. On 16 March 2026, Eskom officially announced an 8.8% tariff increase, which is effective
from 1 April 2026. The expected impact on fiscal 2027 is R850 million increase in operating costs for SA operations. Although
Eskom is showing signs of recovery in 2026, its structural challenges - especially municipal debt, tariff inadequacy and
governance issues suggest that financial instability could persist unless deeper reforms are implemented. This is likely to result
in further self-generation activity by Eskom's customers, which could further weaken Eskom. While the Multi Year Price
Determination ("MYPD'') provides a structured and predictable framework, external shocks and regulatory corrections can still
lead to unexpected price increases.
See Item 3D: “Key Information – Risk Factors – Risks Related to Operations and Business Resilience – Production is
dependent on reliable energy supply and increasing energy costs may materially affect profitability".
Energy efficiency
Harmony has worked closely with Eskom to manage electricity use and peak demand, underlining our commitment to
reduce energy consumption. This includes demand-side management strategies to reduce electricity consumption in peak
periods; timing the use of our services (pumping, hoisting, compressed air, refrigeration and ventilation) with cheaper off-peak
periods, making more efficient use of Eskom tariffs that reward load-shifting, and improving the efficiency of the services
provided for mining operations.
In 2016 Harmony contracted an energy services company to improve its energy management practices and aggressively
mitigate the impact of higher-than-inflation electricity price increases on its operational costs. Energy management assists in
maintaining the performance of implemented initiatives. This way Harmony focuses on continuously implementing new initiatives
and technologies, while eliminating the risk of forfeiting the benefit of completed projects. Our energy efficiency programme in
South Africa has since achieved cumulative savings of more than 2.6 TWh, equating to over R3.6 billion in avoided energy costs
and 2.95 million tCO2e.
We have implemented various energy efficiency projects in recent years. See “– Sustainability performance – Climate and
energy" on pages 153 to 165 of the Integrated Annual Report for the 20-F 2026.
Climate Change, Environmental Factors and Carbon tax
Climate change and the transition to a lower-carbon economy present both physical and transition-related risks for
Harmony. Rising temperatures, changing rainfall patterns, water scarcity and more frequent or severe extreme weather events
may disrupt operations, affect infrastructure, influence water availability and impact surrounding communities. Climate-related
risks may also affect supply chains, project development, operational costs and rehabilitation or closure planning.
Climate-related regulation continues to evolve across Harmony's operating jurisdictions and includes carbon-pricing
mechanisms, emissions reporting obligations, climate-related financial disclosures and broader decarbonisation policies. These
developments may increase compliance costs, influence capital allocation decisions, affect operational planning and require
continued investment in systems, governance, assurance and reporting capability.
In South Africa, Harmony is subject to the Carbon Tax Act, which became effective on 1 June 2019 and imposes a tax on
qualifying GHG emissions. The tax applies to emissions from fuel combustion, industrial processes and fugitive emissions, with
emissions determined in accordance with the reporting methodology approved by the DFFE. The carbon tax has been phased in
over time, with the first phase extended to 31 December 2025 and Phase 2 commencing from 1 January 2026.
The headline carbon tax rate increased from R236/tCO₂e in 2025 to R308/tCO₂e from 1 January 2026. Current published
carbon tax rates indicate further increases to R347/tCO₂e in 2027, R385/tCO₂e in 2028, R424/tCO₂e in 2029 and R462/tCO₂e in
2030. While the financial impact of the carbon tax has been moderated by available allowances, changes to the carbon tax
regime, carbon budget requirements and offset mechanisms may affect Harmony’s direct tax exposure over time. Recent
Phase 2 updates indicate that certain transitional allowances remain available, while the carbon budget allowance is expected to
fall away and emissions above mandatory carbon budgets may be subject to a higher tax rate once the relevant provisions take
effect.
172
Table of contents
Harmony is exposed to indirect carbon-related costs through electricity tariffs, fuel prices and supplier pass-through costs.
The South African National Treasury's 2026 Budget Review announced increases in the carbon fuel levy from 1 April 2026, with
petrol and diesel carbon fuel levies increasing to R0.19/litre and R0.23/litre, respectively. These developments may increase
operating costs and affect the cost of key inputs across the South African operations.
Harmony applies an internal carbon price for its South African operations to support planning and investment decision-
making. Carbon pricing assumptions are incorporated into LOM plans, resource models and impairment assessments. As
carbon costs increase, they may affect operating costs, project economics, forecast profitability and capital allocation decisions
across the portfolio. See Item 3D: “Key Information – Risk Factors – Risks Related to Climate, Environment and Social Licence
– Decarbonisation, carbon pricing and emerging climate regulation may increase costs and capital requirements” and Item 4:
"Information on the Company – Business Overview – Regulation – Laws and Regulations Pertaining to Environmental
Protection – South Africa”.
Climate-related disclosure requirements also continue to evolve internationally. IFRS S1 General Requirements for
Disclosure of Sustainability-related Financial Information and IFRS S2 Climate-related Disclosures provide a global baseline for
sustainability and climate-related financial reporting, with a growing number of jurisdictions adopting or aligning with these
standards.
Harmony retains its ambition to be net zero by 2045. Harmony currently has Science Based Targets approved by the SBTi
covering Scope 1 and Scope 2 emissions, together with an ambition to achieve net zero by 2045. In line with the evolving SBTi
Net Zero Standard, Harmony recognises that Scope 3 emissions may represent a material portion of its total emissions footprint
and may need to be incorporated into future target setting. As part of our Net Zero action plan, Harmony is progressing a
comprehensive Scope 3 emissions assessment across global operations and strengthening the completeness of its Scope 1
and 2 inventories across regions including in Australasia. Harmony intends to update and resubmit targets to the SBTi, if
required, once the evidence base and governance processes are complete.
In Australia, HGA is subject to mandatory climate-related financial disclosure requirements under the ASRS, including
AASB S2 Climate-related Disclosures, which apply to certain entities under the Corporations Act 2001 (Cth). For HGA, the first
reporting period subject to these requirements commenced on 1 July 2025 and ended on 30 June 2026. These requirements
apply to HGA as the reporting entity and therefore encompass its controlled operations, including the Hidden Valley mine in
PNG. Climate-related disclosures must address climate-related risks and opportunities across the reporting entity's operations
and value chain, requiring the collection, assessment and reporting of climate-related information from both Australian and PNG
operations.
In Australia, Harmony's operations are subject to GHG emissions and energy reporting obligations under the NGER Act. In
fiscal 2026, the relevant NGER reporting threshold was triggered following the acquisition of CSA, resulting in reporting
obligations across Harmony's Australian reporting boundary, including CSA, the Eva Copper Project and relevant corporate
facilities. Regulatory requirements relating to emissions reporting and climate policy continue to evolve and may increase
compliance costs, reporting obligations and administrative requirements. Certain Australian operations may also become subject
to the Safeguard Mechanism if applicable facility emissions thresholds are exceeded, which could require emissions reductions,
the surrender of eligible compliance units or other measures to address emissions above facility-specific baselines.
In South Africa, climate-related reporting expectations are also developing through the broader regulatory and market
environment. The JSE’s Sustainability and Climate Disclosure Guidance remains voluntary, but is intended to assist issuers in
navigating the sustainability and climate disclosure landscape, including alignment with International Sustainability Standards
Board IFRS S1 and IFRS S2 and South Africa-specific reporting considerations. South Africa has also strengthened its climate-
related regulatory framework through the Climate Change Act, which supports the transition to a lower-carbon and climate-
resilient economy. These developments may require Harmony to continue enhancing its climate-related governance, emissions
data management, reporting systems, assurance processes and disclosure controls to meet evolving regulatory, investor and
stakeholder expectations.
While climate-related regulatory requirements applicable directly to the Group's PNG operations are currently limited,
future regulatory developments in PNG, together with reporting obligations applying to HGA and its controlled operations, may
increase compliance, data collection, assurance and disclosure requirements.
In the United States, the SEC adopted climate-related disclosure rules in March 2024 and stayed their implementation in
April 2024 pending judicial review. In March 2025 the SEC ceased defending the rules in litigation and, on 29 May 2026,
proposed rescinding them in their entirety. The rules remain stayed pending the outcome of the rescission process and related
litigation.
Item 3D: "Key Information – Risk Factors – Risks Related to Climate, Environment and Social Licence – Decarbonisation,
carbon pricing and emerging climate regulation may increase costs and capital requirements" for further discussion on the
potential impact.
Production
The information set forth under the headings, “– Delivering profitable ounces – Performance by operation” on pages 29 to
67 of the Integrated Annual Report for the 20-F 2026 is incorporated herein by reference.
173
Table of contents
Results of Operations
Years Ended 30 June 2026 and 2025
Effect of the MAC Copper acquisition on comparability
On 24 October 2025, we acquired 100% of MAC Copper, whose sole operating asset is CSA. Our fiscal 2026 results
include CSA for the eight months since acquisition. Cash consideration of R17.5 billion was paid and R420 million of cash was
acquired, giving a net cash outflow of R17.1 billion. The purchase price allocation was presented provisionally at
31 December 2025 and was finalised at 30 June 2026. During the measurement period the fair value of property, plant and
equipment was reduced by R5.4 billion and the associated deferred tax liability by R2.8 billion, resulting in goodwill of
R2.6 billion being recognised on finalisation where none had been recognised provisionally. The goodwill of R2.6 billion at
30 June 2026 has been allocated to the CSA cash generating unit and is tested for impairment annually.
From the acquisition date, CSA contributed revenue of R3.8 billion and a net loss of R1.2 billion. Had the acquisition
occurred on 1 July 2025, Group revenue for fiscal 2026 would have been R101.9 billion and Group profit R30.8 billion on a pro
forma basis.
Acquisition-related costs of R1.4 billion were recognised, and integration costs of R94 million were recognised within
corporate, administration and other expenditure.
The acquisition also brought into the Group copper and silver streaming arrangements, a 1.5% NSR royalty and copper
price-linked contingent consideration, increased property, plant and equipment, borrowings, deferred tax liabilities,
environmental rehabilitation provisions and trade and other payables.
Revenue
Revenue increased by R25.3 billion to R99.2 billion in fiscal 2026, compared to R73.9 billion in fiscal 2025, mainly due to
the increase in the average US$ gold price received and the inclusion of copper revenue from CSA. Offsetting this increase was
the impact of the strengthening of the Rand/US$ exchange rate from an average of R18.15/US$ in fiscal 2025 to R16.89/US$
and a decrease in gold sold in fiscal 2026 compared to fiscal 2025 (see discussion below).
Hedging losses increased by R5.1 billion to R9.6 billion in fiscal 2026, compared to R4.6 billion in fiscal 2025. This was
mainly due to the realised effective portion of our hedge-accounted gold derivatives which were impacted by the average gold
market spot price of R2,301,395 per kilogram, compared to the average forward price of matured contracts of R1,442,602 per
kilogram in fiscal 2026. In fiscal 2025, the average gold market spot price was R1,644,902 per kilogram compared to the
average forward price of matured contracts of R1,306,033 per kilogram.
Revenue – Gold
The average gold price received (including hedging) increased by 35.3% from R1,529,358 per kilogram in fiscal 2025 to
R2,069,710 per kilogram in fiscal 2026. Total gold sold decreased by 3.8% from 46,193kg in fiscal 2025 to 44,418kg. The details
of these changes are discussed below:
Tshepong South's gold sold decreased by 7.5% from 2,737 kilograms in fiscal 2025 to 2,533 kilograms in fiscal 2026. This
was mainly due to a 6.4% decrease in recovered grade in fiscal 2026 to 5.72g/t from 6.11g/t in fiscal 2025. This decline was
attributable to elevated seismic activity necessitating the redeployment of crews to lower-risk areas, ultimately affecting the
overall mining mix.
At Moab Khotsong gold sold decreased by 15.7% from 6,178 kilograms in fiscal 2025 to 5,211 kilograms in fiscal 2026.
This was as a result of a 15.6% decrease in the recovered grade, from 8.21g/t in fiscal 2025 to 6.93g/t in fiscal 2026. The lower
grade resulted from changes made to the mining sequence in the high-grade blocks, resulting in lower face grade. The changes
to the mining sequence and face length flexibility was due to increased seismic activity, which also resulted in the withdrawal of
crews for safety.
At MWS gold sold decreased by 12.7% from 3,057 kilograms in fiscal 2025 to 2,670 kilograms in fiscal 2026. This was as a
result of a 17.7% decrease in the recovered grade, from 0.130g/t in fiscal 2025 to 0.107g/t in fiscal 2026. The lower processed
grades resulted from challenges experienced in reclaiming higher-grade TSF floors due to excessively wet areas due to high
rainfall as well as challenges with higher grade clay material in the TSF floor areas.
At Kusasalethu gold sold decreased by 13.6% from 3,658 kilograms in fiscal 2025 to 3,159 kilograms in fiscal 2026 due to
a decrease in the recovered grade of 7.8% from 6.67g/t to 6.15g/t. Ore milled decreased by 4.4% from 544,000 tonnes in fiscal
2025 to 520,000 tonnes in fiscal 2026. Production was periodically constrained by geological and mining-related challenges,
which necessitated the unplanned redeployment of crews adversely impacting overall output.
At the dumps, gold sold decreased by 26.3% from 1,458 kilograms in fiscal 2025 to 1,075 kilograms in fiscal 2026. This
was as a result of a decline in grade of 8.2% from 0.380g/t in fiscal 2025 to 0.349g/t in fiscal 2026 mainly as a result of milling
constraints as a number of plants prioritised reef milling, with depletion of sources, delays in commissioning as well as finalising
the conveyor belt from Loraine 1 waste rock dump to the Target Plant also contributing. Furthermore, the recovered grade was
negatively impacted by lower delivered grades  from several sources as well as lower recoveries during the last six months of
the year.
The Mponeng mine sold 9,503 kilograms of gold, a 9.1% decrease from the 10,454 kilograms sold in fiscal 2025, mainly
due to a decrease of 5.3% in the recovered grade from 11.27g/t to 10.67g/t in fiscal 2026. This was as a result of mining grades
easing from exceptionally high grades achieved in fiscal 2025 and various safety stoppages.
174
Table of contents
The decrease in gold sold by the Group was offset by the increase in gold sold as discussed below:
Tshepong North's gold sold increased by 37.2% from the 2,905 kilograms in fiscal 2025, to 3,986 kilograms, mainly due to
an increase of 19.0% in the recovered grade from 4.31g/t to 5.13g/t in fiscal 2026, coupled with an increase in ore milled of
15.3%. Ore milled increased from 673,000 tonnes in fiscal 2025 to 776,000 tonnes in fiscal 2026.
Hidden Valley's gold sold increased by 16.9% from the 5,098 kilograms in fiscal 2025, to 5,960 kilograms, mainly due to an
increase of 17.8% in the recovered grade from 1.35g/t to 1.59g/t in fiscal 2026.
Revenue – Copper
CSA contributed a total of R3.5 billion in copper revenue during fiscal 2026. Copper revenue from contracts with customers
amounted to R3.4 billion in fiscal 2026, reflecting copper concentrate sales of 16,719 tonnes at an average realised copper price
of US$5.62 per pound or US$12,399 per tonne. A favourable provisional pricing adjustment of R126 million relating to copper
concentrate was also recognised within revenue during the year.
Revenue – By-products
Substantially all of the Group's silver is derived from the Hidden Valley mine in PNG. Silver revenue increased by 37.9%
from R1.8 billion in fiscal 2025 to R2.5 billion in fiscal 2026, driven by a 112.6% increase in the average silver price received to
US$66.34 per ounce in fiscal 2026 from US$31.20 per ounce in fiscal 2025. This was partially offset by silver sold decreasing
29.5% from 99,523kg in fiscal 2025 to 70,126kg in fiscal 2026. The decrease in silver sold reflects lower silver output at Hidden
Valley. The decrease was partially offset by the addition of by-product silver contained in the CSA copper concentrate of
R185 million following the MAC Copper acquisition and a favourable silver provisional pricing adjustment of R77 million.
Sales and customers
All of our gold produced in South Africa during fiscal 2024 to 2026 was refined by Rand Refinery Proprietary Limited
("Rand Refinery"). Rand Refinery is owned by a consortium of the major gold producers in South Africa and Harmony held a
10.38% interest at 30 June 2026. All of our gold and silver produced in PNG during fiscal 2024 to 2026 was sold to the
Australian Bullion Corporation. The CSA copper concentrate, including contained silver, is sold under an offtake arrangement
and is delivered to the destination specified by the customer, which is typically the vessel on which it is shipped, the destination
port or the customer’s premises. The sales price is provisionally determined and is subject to final adjustment by reference to
the applicable quotational period, see "Key factors affecting our results – Copper Concentrate Price, Provisional Pricing and
Streaming Arrangements" above.
Cost of sales
Cost of sales includes production costs, impairments/reversals, amortisation and depreciation and other items, including
employment termination and restructuring costs. Cost of sales increased by 9.8% from R49.8 billion in fiscal 2025 to
R54.7 billion in fiscal 2026. Factors affecting the increase are discussed below.
175
Table of contents
Cash costs and all-in sustaining costs – Gold
The following table sets out, for our gold reportable segments, total kilograms produced and weighted average cash costs
per kilogram and total kilograms sold and weighted average all-in sustaining costs per kilogram for fiscal 2025 and fiscal 2026:
Year ended 30 June 2026
Year ended 30 June 2025 (Restated)
Percentage
(increase)/
decrease
Cash costs(1)
All-in sustaining
costs(1)
Cash costs(1)
All-in sustaining
costs(1)
Cash
costs-
kg
All-in
sustaini
ng
costs-
kg
Produ
ced-
Kg
R/kg
Sold-
Kg
R/kg
Produ
ced-
Kg
R/kg
Sold-
Kg
R/kg
Gold
South Africa
Moab Khotsong .............
5,182
1,194,477
5,211
1,302,718
6,184
846,963
6,178
951,955
(41.0)
(36.8)
Mponeng.........................
9,561
834,795
9,503
957,526
10,370
675,351
10,454
804,307
(23.6)
(19.0)
Tshepong North .............
3,977
963,025
3,986
1,143,151
2,900
1,071,725
2,905
1,300,791
10.1
12.1
Tshepong South ............
2,541
1,308,370
2,533
1,563,665
2,739
1,073,777
2,737
1,258,086
(21.8)
(24.3)
Doornkop ........................
2,851
1,219,067
2,815
1,482,134
2,720
1,163,565
2,730
1,440,593
(4.8)
(2.9)
Joel ..................................
1,399
1,505,998
1,398
1,791,547
1,634
1,142,605
1,639
1,343,321
(31.8)
(33.4)
Target 1 ...........................
1,409
1,930,013
1,392
2,268,356
1,387
1,809,603
1,415
2,202,435
(6.7)
(3.0)
Kusasalethu ...................
3,198
1,407,929
3,159
1,576,000
3,629
1,091,327
3,658
1,254,661
(29.0)
(25.6)
Masimong .......................
1,562
1,475,458
1,563
1,530,548
1,478
1,330,370
1,483
1,448,902
(10.9)
(5.6)
MWS ...............................
2,680
917,667
2,670
998,921
2,996
736,108
3,057
794,566
(24.7)
(25.7)
All other surface
operations .......................
4,200
936,897
4,228
1,118,885
4,879
809,959
4,839
888,992
(15.7)
(25.9)
International
Hidden Valley .................
5,904
214,049
5,960
658,503
5,107
458,928
5,098
868,228
53.4
24.2
Total gold kg ...................
44,464
44,418
46,023
46,193
Weighted average(2) ......
991,654
1,191,698
874,770
1,053,189
(13.4)
(13.2)
1Cash costs and all-in sustaining costs are non-GAAP measures. See “– Reconciliation of Non-GAAP Measures” below for definitions and
reconciliations of these measures.
2The offsetting of the by-product income for management's reporting purposes has the effect of decreasing the cash costs and the all-in
sustaining costs.
Our average gold cash costs increased by 13.4%, or R116,884 per kilogram, from R874,770 per kilogram in fiscal 2025
to R991,654 per kilogram in fiscal 2026. Cash costs per kilogram vary with the working costs per tonne (which are, in turn,
affected by the number of tonnes processed) and grade of ore processed. Production costs increased by 12.3% from
R43.1 billion in fiscal 2025 to R48.4 billion in fiscal 2026, mainly due to inflationary increases on costs including labour,
contractors and consumables as well as above-inflation increases on electricity. Further, the royalty expense increased due to
higher revenue generated by the South African operations, which forms the basis for the calculation of South African mining
tax royalties, as well as increasing rates used in the calculation. This was further impacted by the depletion of tax offsets due
to increased profitability over the past two years.
At Joel, all-in sustaining cost increased by 33.4% from R1,343,321 per kilogram in fiscal 2025 to R1,791,547 per kilogram
in fiscal 2026, driven by a 14.4% decrease in gold production to 1,399 kilograms from 1,634 kilograms, as well as production
costs increasing by 12.9%. The production costs increase was mainly due to annual wage and electricity tariff increases as well
as inflationary increases on consumables and contractors. MPRDA royalties increased by 120% during fiscal 2026 due to higher
revenue and profits.
At Moab Khotsong, all-in sustaining cost increased by 36.8% from R951,955 per kilogram in fiscal 2025 to R1,302,718 per
kilogram in fiscal 2026, mainly as a result of a 16.6% increase in production costs and a 16.2% decrease in gold production to
5,182 kilograms from 6,184 kilograms. The production costs increase was mainly due to annual wage and electricity tariff
increases as well as inflationary increases on contractors. MPRDA royalties increased by 27% to R405 million due to higher
revenue and profitability.
176
Table of contents
At Kusasalethu, all-in sustaining cost increased by 25.6% from R1,254,661 per kilogram in fiscal 2025 to R1,576,000 per
kilogram in fiscal 2026, mainly as a result of an 11.9% decrease in gold production to 3,198 kilograms from 3,629 kilograms.
Production costs increased by 11.6% and were mainly due to annual wage and electricity tariff increases as well as significantly
higher MPRDA royalties of R208 million, a 96% increase from fiscal 2025. Higher production costs were partially offset by lower
sustaining capital, decreasing by 19.4%.
At Mponeng, all-in sustaining cost increased by 19% from R804,307 per kilogram in fiscal 2025 to R957,526 per kilogram
in fiscal 2026, mainly due to an 11.4% increase in production costs and a 7.8% decrease in gold production to 9,561 kilograms
from 10,370 kilograms. The production costs increase was mainly due to annual wage and electricity tariff increases as well as
higher MPRDA royalties. Royalties increased by 45% as revenue and profits increased. Higher production costs were partially
offset by lower sustaining capital, decreasing by 17.1%.
At Tshepong South, all-in sustaining cost increased by 24.3% to R1,563,665 per kilogram in fiscal 2026, compared with
R1,258,086 per kilogram in fiscal 2025, mainly due to higher production costs and lower gold production which decreased from
2,739 kilograms in fiscal 2025 to 2,541 kilograms in fiscal 2026. Production costs increased by 14.4% mainly due to annual
wage and electricity tariff increases as well as an increase in the cost of consumables. MPRDA royalties increased by 127% due
to higher revenue and profits, further contributing to the increase in cost.
At MWS, all-in sustaining cost increased year on year by 25.7% from R794,566 per kilogram in fiscal 2025 to R998,921 per
kilogram in fiscal 2026. This was primarily as a result of a 10.5% increase in gold production and a 9.6% increase in production
cost, mainly relating to annual wage and electricity tariff increases as well as an increase in the cost of consumables.
All other surface operations
At Dumps, all-in sustaining cost increased by 26.9% from R984,564 per kilogram in fiscal 2025 to R1,249,799 per kilogram
in fiscal 2026. This was mainly due to a 27% decrease in gold production to 1,071 kilograms from 1,475 kilograms.
At Kalgold, all-in sustaining costs increased year on year by 37% from R1,120,104 per kilogram in fiscal 2025 to
R1,534,775 per kilogram in fiscal 2026. This was as a result of a decrease in gold production of 10% from 1,236 kilograms in
fiscal 2025 to 1,109 kilograms in fiscal 2026 and an 8.9% increase in production costs. The production costs increase was
mainly due to annual wage and electricity tariff increases as well as inflationary increases on contractors. MPRDA royalties
increased by 36% due to higher revenue and profitability. Sustaining capital, mainly driven by deferred stripping, increased by
165% when compared to fiscal 2025.
Cash operating costs and C1 cash costs– Copper
The following table sets out, for our copper reportable segments, total tonnes produced and weighted average cash
operating costs and total tonnes sold and weighted average C1 cash costs per tonne for fiscal 2026:
Year ended 30 June 2026
Year ended 30 June 2025
Percentage
(increase)/
decrease(1)
Cash operating
costs
C1 cash costs
Cash operating
costs
C1 cash costs
Cash
operating
costs
(t)
C1 cash
costs
(t)
Produced
(t)
US$/t
Sold
(t)
US$/t
Produced
(t)
US$/t
Sold
(t)
US$/t
Copper
International
CSA .......................
18,207
5,434
16,719
5,450
—
—
—
—
—
—
Total Copper .........
18,207
16,719
—
—
1Harmony had no copper-producing operations in fiscal 2025; accordingly, no fiscal 2025 amounts or percentage changes are presented.
During fiscal 2026, CSA produced 18,207 tonnes of copper at a yield of 3.75%. Cash operating costs at CSA, net of
by-product credits, amounted to R1.7 billion, equivalent to US$2.46 per pound or US$5,434 per tonne. After an inventory
movement of R46 million, production costs (net of by-product credits) were R1.6 billion and C1 cash costs were US$2.47 per
pound or US$5,450 per tonne in fiscal 2026. The acquisition of MAC Copper contributed R1.6 billion to the increase in costs.
CSA's cash operating costs are excluded from Harmony's all-in sustaining cost ("AISC") non-GAAP measure, as this is a
gold mining–specific metric.
Amortisation and depreciation
Amortisation and depreciation increased from R5.0 billion in fiscal 2025 to R7.3 billion in fiscal 2026, primarily due to the
assets acquired as part of the acquisition of MAC Copper, and a higher depreciable asset base at the South African operations
following the commissioning of assets at the end of fiscal 2025, which resulted in increased depreciation being recorded for the
year.
Impairment and reversal of impairment of assets
During fiscal 2026, we recorded a net reversal of impairment of property, plant and equipment of R2.8 billion. This
comprised impairment reversals recognised in respect of the Tshepong North cash-generating unit ("CGU") of R941 million at
31 December 2025 and R635 million at 30 June 2026 (R1.6 billion in aggregate), as well as reversals recognised at
30 June 2026 in respect of the Tshepong South (R651 million), Kusasalethu (R266 million) and Doornkop (R286 million) CGUs.
177
Table of contents
The reversals reflect an increase in the estimated service potential of the affected CGUs, driven principally by an increase
in our long-term US dollar gold price assumption from US$2,237 per ounce at 30 June 2025 to US$2,915 per ounce at
30 June 2026, and a corresponding increase in our long-term Rand gold price assumption from R1,334,000 per kilogram to
R1,650,000 per kilogram. See note 5 "Cost of sales" and note 14 "Property, plant and equipment" to our consolidated financial
statements set forth beginning on page F-1.
We review and evaluate our mining assets for impairment and reversal of previously recognised impairment when events
or changes in circumstances indicate the related carrying amounts may not be recoverable or that a previously recognised
impairment loss has reversed. An impairment loss is recognised for the amount by which the asset’s carrying amount exceeds
its recoverable amount. An impairment loss on an asset other than goodwill is reversed only where a change in the estimates
used to determine its recoverable amount has increased the asset's estimated service potential, limited to the carrying amount
(net of depreciation or amortisation) that would have resulted had no impairment been recognised. The recoverable amount is
the higher of an asset’s fair value less costs to sell and value in use. For the purposes of assessing impairment and reversal of
impairment, assets are grouped at the lowest levels for which there are separately identifiable cash flows (CGUs). Each
operating shaft, along with allocated common assets such as plants and administrative offices, is considered to be a CGU as
each shaft is largely independent of the cash flows of other shafts and assets.
Future cash flows are estimated based on estimated quantities of recoverable minerals, expected commodity prices
(considering current and historical prices, price trends and related factors), production levels and cash costs of production,
capital and reclamation costs, all based on detailed LOM plans. The significant assumptions in determining the future cash flows
for each individual operating mine at 30 June 2026, apart from production cost and capitalised expenditure assumptions unique
to each operation, included a gold price, copper price, silver price, exchange rate and resources multiples assumptions as
follows:
Fiscal Year Ended 30 June
2026
2025
Gold price (US$/oz) ..................................................................................................................................
2,915
2,237
Copper price (US$/lb) ...............................................................................................................................
4.78
n/a
Silver price (US$/oz) .................................................................................................................................
38.90
n/a
Rand gold price (R/kg) .............................................................................................................................
1,650,000
1,334,000
Exchange rate (R/US$) ............................................................................................................................
17.60
18.54
Gold resources multiples (US$/oz) (Underground resources) ...........................................................
Measured ...................................................................................................................................................
16.50
n/a
Indicated .....................................................................................................................................................
9.00
n/a
Inferred .......................................................................................................................................................
3.60
n/a
Copper resources multiples (US$/lb) .....................................................................................................
Inferred .......................................................................................................................................................
0.21
n/a
Zinc resources multiples (US$/lb) ..........................................................................................................
0.06
n/a
The term “recoverable minerals” refers to the estimated amount of gold, copper or silver that will be obtained from proved
and probable reserves and related exploration stage mineral interests, except for other mine-related exploration potential and
Greenfields exploration potential discussed separately below, after taking into account losses during ore processing and
treatment. Estimates of recoverable minerals from such exploration stage mineral interests are risk adjusted based on
management’s relative confidence in such materials. With the exception of other mine-related exploration potential and
Greenfields exploration potential, estimates of future undiscounted cash flows are included on an area of interest basis, which
generally represents an individual operating mine, even if the mines are included in a larger mine complex. In the case of
mineral interests associated with other mine-related exploration potential and Greenfields exploration potential, cash flows and
fair values are individually evaluated based primarily on recent exploration results and recent transactions involving sales of
similar properties.
Various factors could impact our ability to achieve our forecasted production schedules from proved and probable
reserves. Additionally, commodity prices, capital expenditure requirements and reclamation costs could differ from the
assumptions used in the cash flow models used to assess impairment and reversal of impairment. The ability to achieve the
estimated quantities of recoverable minerals from exploration stage mineral interests involves further risks in addition to those
factors applicable to mineral interests where proved and probable reserves have been identified, due to the lower level of
confidence that the identified mineralised material can ultimately be mined economically. Assets classified as other mine-related
exploration potential and Greenfields exploration potential have the highest level of risk that the carrying value of the asset can
be ultimately realised, due to the still lower level of geological confidence and economic modelling.
We determined reasonably possible changes in gold price assumptions of a 5.5% decrease (2025: 10.8%) and 29.9%
increase (2025: 29.1%). These changes were based on determining reasonably possible adjusted long-term US$ gold price
assumptions using the standard deviation of market analysts’ forecasted long-term US$ gold price assumptions. These
reasonably possible adjusted long-term US$ gold price forecasts were then compared to Harmony's long-term US$ gold price
assumption. These reasonably possible changes in assumptions would not change the conclusions reached regarding the
recognition of impairments or reversal of impairments. The quantum of the reversals is also not affected. We also determined
reasonably possible changes in copper price assumptions of an 11.2% decrease and an 11.4% increase. These changes were
based on determining reasonably possible adjusted long-term US$ copper price assumptions using the standard deviation of
market analysts’ forecasted long-term US$ copper price assumptions. These reasonably possible adjusted long-term US$
copper price forecasts were then compared to Harmony’s long-term US$ copper price assumption. The increase in the copper
178
Table of contents
price assumptions would have resulted in no impairments being recorded. An 11.2% decrease in the copper price assumptions
(with all other variables held constant) would have resulted in a R4.4 billion post-tax impairment being recorded as at
30 June 2026 for CSA.
No impairment charge was recorded in fiscal 2025.
Share-based payments cost
Share-based payments costs increased in fiscal 2026 to R601 million (2025: R573 million). The increase was as a result of
the Management Deferred Share Plan.
Income statement items other than revenue and cost of sales
Corporate, administration and other expenditure
Corporate, administration and other expenditure increased to R2.0 billion in fiscal 2026 from R1.6 billion in fiscal 2025
principally as a result of annual inflationary increases, higher annual incentive expense and costs of R94 million associated with
the integration of the acquired assets into Harmony's existing structures and systems. These integration-related costs comprised
project management and consultancy fees.
Gains/losses on derivatives
Losses on derivatives amounted to R898 million in fiscal 2026, compared to losses of R59 million in fiscal 2025. Gains/
losses on derivatives include the fair value movements of derivatives which have not been designated as hedging instruments
for hedge accounting purposes or where hedge accounting has been discontinued, the amortisation of day-one gains and
losses for derivatives and the hedging ineffectiveness. The day-one adjustment arises from the difference between the contract
price and market price on the day of the transaction. Potential sources of hedge ineffectiveness include counterparty and own
credit risk, day-one gains and losses, a mismatch in the timing of the derivative and underlying gold sale maturities, location
differential and the refining margin. Hedge ineffectiveness is measured by comparing the change in the expected cash flows
from a forward sale contract/zero cost collar contract versus the sale of an equivalent quantity of gold in the open market.
Ineffectiveness results when the changes in the fair values in the hedging instruments exceed the fair value changes in the
hedged item. Factors affecting gains/losses on derivatives are discussed below.
(a) Foreign exchange derivatives
Harmony maintains a foreign exchange derivative programme in the form of zero cost collars, which establish a floor and
cap US$/Rand exchange rate at which to convert US dollars to Rand, and forward exchange contracts. As hedge accounting is
not applied, the resulting gains and losses have been recorded in the income statement. In fiscal 2026, a gain amounting to
R243 million (2025: R235 million) was recorded.
(b) US$ commodity contracts
Harmony maintains a derivative programme for Hidden Valley by entering into commodity derivative contracts. The
contracts comprise US$ gold forward sale contracts, US$ gold zero cost collars and silver zero cost collars which establish a
minimum (floor) and maximum (cap) commodity sales price. During fiscal 2026, US$ copper swaps were recognised as part of
the MAC Copper acquisition and were entered into to hedge the copper price risk related to the copper production at CSA.
Hedge accounting has been applied to all US$ gold contracts and these are shown separately from the silver zero cost collars
and the US$ copper swaps that are not hedge accounted. Losses of R1.4 billion were recognised in revenue for fiscal 2026
compared to R506 million in fiscal 2025. During fiscal 2026 and 2025 a negligible amount of hedge ineffectiveness was
experienced. The gains and losses for the silver zero cost collars and copper swaps are recorded in gains/(losses) on
derivatives in the income statement. In fiscal 2026, losses on derivatives of R901 million relating to the silver zero cost collars
were recorded in the income statement, compared to losses of R150 million in fiscal 2025. Losses of R58 million relating to the
copper swaps were recorded in fiscal 2026 following the acquisition of MAC Copper. The copper swaps were fully settled at
30June 2026.
(c) Rand gold contracts
Harmony maintains a derivative programme for some of the South African companies by entering into commodity
derivative contracts. The contracts comprise forward sale contracts and zero cost collars. Hedge accounting is applied to these
contracts, resulting in the effective portion of the unrealised gains and losses being recorded in other comprehensive income
(other reserves). The contracts that matured realised losses of R4.1 billion in fiscal 2025 compared to a loss of R8.2 billion in
fiscal 2026, which has been included in revenue.
During fiscal 2026 and 2025 a negligible amount of hedge ineffectiveness was experienced.
Foreign exchange translation gain/(loss)
A foreign exchange translation gain of R866 million was recognised in fiscal 2026, compared with a loss of R107 million in
fiscal 2025. The gain was driven primarily by the translation of increased US dollar borrowings as the Rand strengthened
against the US dollar, partially offset by losses on other items.
Remeasurement of contingent consideration
The contingent consideration liability comprises the contingent portion of consideration transferred for the acquisition of the
Mponeng operations and related assets and Eva Copper. The contingent consideration liabilities associated with CSA, which
includes the NSR royalty and copper price‑linked contingent consideration, existed prior to Harmony's acquisition of MAC
Copper and originated with MAC Copper's acquisition of CSA from Glencore on 15 June 2023.
179
Table of contents
The contingent consideration for Mponeng remeasurement for both above and below infrastructure during fiscal 2026
amounted to R56 million and R427 million in fiscal 2025, mainly reflecting the changes in the production profile.
The remeasurement of the contingent consideration for Eva Copper in fiscal 2026 amounted to R64 million and
R403 million in fiscal 2025. The decrease in fiscal 2026 compared with fiscal 2025 was mainly due to the declaration of
additional Mineral Resources in fiscal 2025. No additional Mineral Resources were declared in fiscal 2026.
The remeasurement of the copper price‑linked contingent consideration amounted to R163 million in fiscal 2026, while the
remeasurement of the NSR royalty contingent consideration amounted to R350 million.
Fair value movements on streaming
During fiscal 2026, we recognised a fair value loss on streaming arrangements of R854 million, reflecting movements in
the fair value of the embedded copper and silver derivatives during the period. At 30 June 2026, the copper compound
derivative and silver derivative were valued at R147 million and R525 million, respectively, forming part of total streaming
contract liabilities of R5.7 billion.
Other operating expenses
Other operating expenses increased to R429 million in fiscal 2026 from R289 million in fiscal 2025 principally as a result of
an increase in the provision for bad debts allowance to R50 million in fiscal 2026, compared to a credit of R19 million in fiscal
2025.
Acquisition-related costs
Acquisition-related costs increased to R1.4 billion in fiscal 2026 from R40 million in fiscal 2025. The costs incurred in fiscal
2026 related to the acquisition of MAC Copper, including stamp duty, legal and advisory fees. The costs incurred in fiscal 2025
were primarily associated with activities undertaken in anticipation of the acquisition.
Investment income
During fiscal 2026 investment income amounted to R1.4 billion compared to R1.5 billion in fiscal 2025. The decrease was
mainly driven by lower mark-to-market gains on equity-linked deposits resulting from weaker market performance during fiscal
2026.
Finance costs
During fiscal 2026 finance costs amounted to R1.9 billion compared to R698 million in fiscal 2025. The increase was
primarily attributable to borrowings incurred to fund the acquisition of MAC Copper and the inclusion of finance costs associated
with streaming arrangement liabilities acquired as part of the transaction.
Income and mining taxes
In fiscal 2026, the tax rates for South African companies remained 33% for mining income and 27% for non-mining income. The
income tax rate remained 30% for Australian companies and PNG mining companies.
Harmony’s effective income and mining tax rates for fiscal 2025 (restated) and 2026 are presented in the table below:
Fiscal year ended 30 June
Income and mining tax
2026
2025
(Restated)
Effective income and mining tax rate ........................................................................................................
23%
31%
The effective tax rate for fiscal 2026 was lower than the mining statutory tax rate of 33% for Harmony and our subsidiaries
as a whole. This is mainly due to capital allowances, utilisation of deferred tax assets not previously recognised and recognition
of previously unrecognised deferred tax asset. Refer to note 11 "Taxation" to our consolidated financial statements beginning on
page F-1 for further detail.
During fiscal 2026, taxation amounted to R8.9 billion, compared to R6.6 billion in fiscal 2025. The increase was mainly as a
result of higher mining tax charges at the Group’s South African operations, reflecting the higher gold price realised during fiscal
2026, which increased taxable mining profits across the portfolio. The South African mining tax expense increased to R7.8 billion
in fiscal 2026 from R4.0 billion in fiscal 2025. In addition, international income taxes of R965 million were recognised for the first
time in fiscal 2026, mainly relating to the Group’s PNG and Australian operations following the acquisition of MAC Copper. This
increase was partially offset by the recognition of a net deferred tax credit of R185 million in fiscal 2026, compared to a net
deferred tax expense of R2.5 billion in fiscal 2025. The principal items reconciling the tax expense at the 33% statutory mining
tax rate to the reported tax expense were:
•Increase of temporary differences related to the carrying value of South African property, plant and equipment resulted in
an increase of R1.6 billion in the deferred tax expense (2025: R1.1 billion);
•Unwinding of temporary differences related to the utilisation of unredeemed capital expenditure and assessed loss
balances resulted in an increase of R1.9 billion in the deferred tax expense (2025: R167 million) and a decrease of
R1.3 billion (2025: R17 million increase) in the deferred tax expense, respectively;
•The change in deferred tax rates of the Group’s South African entities, applied to balances excluding hedge accounted
derivatives, resulted in an increase in the deferred tax expense and liability to the amount of R786 million
(2025: R1.1 billion); and
180
Table of contents
•previously unrecognised deferred tax assets of R1.1 billion and R1.5 billion were recognised by Morobe Consolidated
Goldfields Limited and HGA, respectively, reducing the tax expense by R2.6 billion (2025: nil).
Deferred tax rates for the South African operations are calculated based on estimates of the future profitability of each ring-
fenced mine when temporary differences will reverse. The future profitability of each ring-fenced mine, in turn, is determined by
reference to the LOM plan for that operation, which is based on parameters such as the Group’s long-term view of the US$ gold
price and the Rand/US$ exchange rate, as well as the reserves declared for the operation. As some of these parameters are
based on market indicators, they differ from one year to the next. In addition, the reserves may also increase or decrease based
on updated or new geological information. Changes in the future profitability of each ring-fenced mine impact the deferred tax
rates used to recognise temporary differences at these operations. The movement in deferred tax on temporary differences due
to changes in estimated effective tax rates results primarily from the movement in the effective deferred tax rate at Harmony
(includes Masimong and Harmony's portion of the Doornkop Joint Venture (Harmony Company)), Freegold (includes Joel,
Tshepong North and Tshepong South), Moab Khotsong, Mponeng, REL (includes Doornkop and Kusasalethu), Kalahari
Goldridge and Chemwes (includes MWS).
The deferred income tax rates changed significantly for the following entities:
Fiscal year ended 30 June
Deferred tax rates
2026
2025
(Restated)
Harmony
23.8
20.3
Freegold (Harmony) Proprietary Limited ("Freegold")
19.6
17.2
Harmony Moab Khotsong Operations Proprietary Limited
23.6
21.2
Golden Core Trade and Invest Proprietary Limited
21.0
17.2
REL
20.3
15.7
Kalahari Goldridge
27.7
26.2
Chemwes
28.9
26.3
South Africa
Generally, South Africa imposes tax on worldwide income (including capital gains) of all our South African incorporated tax
resident entities at a rate of 27% (2025: 27%) on non-mining income. The South African entities pay taxes separately on mining
income and non-mining income. The amount of our South African mining income tax is calculated on the basis of a gold mining
formula that takes into account our total revenue and profits from, and capital expenditure for, mining operations in South Africa.
5% of total mining revenue is exempt from taxation in South Africa as a result of the application of the gold mining formula. The
amount of revenue subject to taxation is calculated by deducting qualifying capital expenditure from taxable mining income. The
amount by which taxable mining income exceeds 5% of mining revenue, constitutes taxable mining income. We and our
subsidiaries account for taxes separately that are determined in respect of each entity. Hence, South Africa does not apply any
Group basis of taxation.
Previously, Harmony was able to carry forward assessed losses indefinitely and offset the total accumulated balance
against taxable income in the relevant year of assessment.
However, this was amended from fiscal 2023 and remained unchanged in fiscal 2026. Assessed losses utilised are limited
to the higher of R1 million or 80% of taxable income, and the balance remaining will be carried forward to the following year of
assessment. This essentially results in a minimum taxable income of 20%. The restriction on utilising losses has been made on
the basis that the calculation of the assessed loss restriction must be determined before any capital expenditure is deducted.
South Africa has a Controlled Foreign Company regime that effectively attributes certain types of passive income derived
by offshore subsidiaries and imputes that income as deemed taxable income as if it had been derived in South Africa under
South African tax rules.
Australia
Generally, Australia imposes tax on the worldwide income (including capital gains) of all our Australian incorporated and
tax resident entities. The current income tax rate for companies is 30%.
HGA and its wholly-owned Australian subsidiary companies are recognised and taxed as a single entity for income tax
purposes, called a consolidated Group. Under the Australian Tax Consolidation rules all of the Australian subsidiary companies
are treated as divisions of the Head Company, HGA. As a result, inter-company transactions between group members are
generally ignored for tax purposes. This allows the Group to transfer assets between group members without any tax
consequences, and deems all tax losses to have been incurred by HGA.
Papua New Guinea
PNG mining projects are taxed on a project basis. Therefore, each project is taxed as a separate entity, even though it may
be one of a number of projects carried on by the same company. PNG mining companies are subject to corporate income tax at
30%. Mining operations in PNG are currently subject to a 2% royalty and 0.5% Production Levy which are payable to the PNG
Government.
181
Table of contents
Operating Performance per Segment
For a further discussion on operating performance on a segment basis, refer to “– Delivering profitable ounces –
Performance by operation” on pages 29 to 67 of the Integrated Annual Report for the 20-F 2026. Also refer to note 40 “Segment
report” to our consolidated financial statements set forth beginning on page F-1.
Reconciliation of Non-GAAP Measures
The World Gold Council ("WGC") published revised industry guidance in November 2018 on the calculation of “all-in
sustaining costs” and “all-in cost”. These measures were developed to create a better understanding of the overall costs
associated with producing gold. Although Harmony is not a member of the WGC, we disclose these measures. The all-in
sustaining cost measure is an extension of the cash cost measure (referenced below) and incorporates costs related to
sustaining production. We use adjusted free cash flow as a liquidity measure.
Cash costs, cash costs per ounce/kilogram, all-in sustaining costs, all-in sustaining costs per ounce/kilogram and adjusted
free cash flows are all non-GAAP measures. These measures should not be considered by investors in isolation or as an
alternative to production costs, cost of sales, cash generated by operating activities or any other measure of financial
performance or liquidity calculated in accordance with IFRS. The calculation of these measures may vary significantly among
gold mining companies and, by themselves, do not necessarily provide a basis for comparison with other gold mining
companies. Nevertheless, Harmony believes that the cost measures are useful indicators to investors and management as they
provide an indication of profitability and efficiency, the trend in costs as the mining operations mature over time on a consistent
basis and an internal benchmark of performance to allow for comparison against other mines, both within the Group and at other
gold mining companies. The cost metrics are also a measure of an operation's performance by comparison of cash costs per
ounce/kilogram to the spot price of gold.
The adjusted free cash flow non-GAAP measure indicates the net cash generation or utilisation after capital expenditure,
and how much cash is available for distribution or other investing activities. Harmony believes adjusted free cash flow is useful
to investors in understanding how existing cash from operations is utilised as a source for sustaining our current capital plan and
future development growth. Adjusted free cash flow is not a measure of cash available for discretionary expenditures, since
Harmony has certain non-discretionary obligations such as the principal portion of debt obligations that are not deducted from
this measure.
Our cash costs consist primarily of production costs and are expensed as incurred. The cash costs are incurred to access
ore to produce current mined reserves. Cash costs do not include capital development costs, which are incurred to allow access
to the orebody for future mining operations and are capitalised and amortised when the relevant reserves are mined.
Total cash costs include mine production costs, transport and refinery costs, applicable general and administrative costs,
ore stockpiles, as well as ongoing environmental rehabilitation costs, transfers for stripping activities and costs associated with
royalties. Employee termination costs are included, however, employee termination costs associated with major restructuring
and shaft closures are excluded. The costs associated with movements in production inventories are excluded from total cash
costs. Gold ounces/kilograms produced are used as the denominator in the total cash costs per ounce/kilogram calculation.
For our copper operation, cash operating costs consist of the cash production costs incurred at CSA, net of by-product
credits and before movements in production inventories. Cash operating costs exclude depreciation and amortisation, capital
development costs and other capital expenditures. Cash operating costs per pound or tonne are calculated by dividing cash
operating costs by the pounds or tonnes of copper produced during the period.
C1 cash costs are a separate non-GAAP performance measure used to assess the operating efficiency of our copper
operations. C1 cash costs include operating costs incurred in mining and processing copper, site general and administrative
costs, freight, treatment and refining charges and other realisation and selling costs; are adjusted for movements in copper
concentrate inventories; and are reduced by silver and other by-product credits. C1 cash costs exclude depreciation and
amortisation, capital expenditures, rates and royalties, finance costs and income taxes. C1 cash costs per pound or tonne are
calculated by dividing C1 cash costs by the pounds or tonnes of copper produced during the period.
Management uses cash operating costs to monitor the cash production costs of CSA and C1 cash costs to evaluate the
mine’s operating efficiency over time and against other copper operations. Because the calculation of these measures may vary
among mining companies, they may not be comparable to similarly titled measures reported by other companies. Cash
operating costs and C1 cash costs are separate measures and should not be used interchangeably.
All-in sustaining costs include mine production costs, transport and refinery costs, applicable general and administrative
costs, costs associated with movements in production inventories, ore stockpiles, as well as ongoing environmental
rehabilitation costs, transfers for stripping activities and costs associated with royalties. Employee termination costs are
included, however, employee termination costs associated with major restructuring and shaft closures are excluded. The
following costs are also included: LED expenditure for continuing operations, corporate costs, sustaining exploration costs and
sustaining capital expenditure including ongoing capital development ("OCD") expenditure and rehabilitation accretion and
amortisation for continuing operations. Gold ounces/kilograms sold are used as the denominator in the all-in sustaining costs per
ounce/kilogram calculation. Depreciation costs are excluded.
Adjusted free cash flows are determined as cash generated by operating activities after deducting capital expenditure and
adjusting for the effects of once-off transactions (for example acquisition costs).
Changes in all-in sustaining costs per ounce/kilogram and cash costs per ounce/kilogram are affected by operational
performance. In US dollar terms, these measures are also affected by the changes in the currency exchange rate between the
Rand and the US dollar and, in the case of the PNG operations, the Kina.
182
Table of contents
While recognising the importance of reducing all-in sustaining costs and cash costs, our chief focus is on controlling and,
where possible, reducing total costs, including overhead costs. We aim to control total unit costs per ounce/kilogram produced
by maintaining our low total cost structure at our existing operations. We have implemented a management structure and
philosophy that is focused on reducing management and administrative costs.
The following is a reconciliation of total all-in sustaining costs, as a non-GAAP measure, to cost of sales, the most directly
comparable IFRS measure:
Fiscal year ended 30 June
2026
2025
(Restated)
(in R million, except for ounce/
kilogram amounts)
Cost of sales .......................................................................................................................................
54,656
49,766
Amortisation and depreciation .........................................................................................................
(7,336)
(4,979)
Rehabilitation expenditure ................................................................................................................
(98)
(142)
Care and maintenance costs of restructured shafts .....................................................................
(328)
(380)
Employment termination and restructuring costs ..........................................................................
(105)
(200)
Share-based payments .....................................................................................................................
(601)
(573)
Reversal of impairment of assets ....................................................................................................
2,779
—
Toll treatment costs ............................................................................................................................
(533)
(368)
By-products credits ............................................................................................................................
(2,723)
(2,631)
Stripping activities ..............................................................................................................................
1,171
730
Local economic development expenditure ....................................................................................
150
139
Corporate, administration and other expenditure costs ...............................................................
1,385
1,191
Copper-related cash costs1 ..............................................................................................................
(1,978)
—
Capital expenditure (OCD) ...............................................................................................................
2,938
2,741
Capital expenditure (exploration, abnormal expenditure and shaft capital) .............................
3,167
2,821
Other ....................................................................................................................................................
390
534
 
Total all-in sustaining costs ...............................................................................................................
52,934
48,649
Per kilogram calculation:
Kilogram sold ......................................................................................................................................
44,418
46,193
Total all-in sustaining costs per kilogram ........................................................................................
1,191,698
1,053,189
Total all-in sustaining costs (US$ million) .......................................................................................
3,135
2,681
Per ounce calculation:
 
Ounces sold ........................................................................................................................................
1,428,071
1,485,136
Total all-in sustaining costs per ounce ............................................................................................
2,195
1,804
1Copper costs related to production at CSA are excluded as all-in sustaining costs is a gold mining metric.
183
Table of contents
The following is a reconciliation of total cash costs, as a non-GAAP measure, to cost of sales, the most directly comparable
IFRS measure:
Fiscal year ended 30 June
2026
2025
(Restated)
(in R million, except for ounce/
kilogram amounts)
Cost of sales .......................................................................................................................................
54,656
49,766
Amortisation and depreciation .........................................................................................................
(7,336)
(4,979)
Rehabilitation expenditure ................................................................................................................
(98)
(142)
Care and maintenance costs of restructured shafts .....................................................................
(328)
(380)
Employment termination and restructuring costs ..........................................................................
(105)
(200)
Share-based payments .....................................................................................................................
(601)
(573)
Reversals of impairment of assets ..................................................................................................
2,779
—
By-product credits ..............................................................................................................................
(2,723)
(2,631)
Copper-related cash costs1 ..............................................................................................................
(1,978)
—
Gold and uranium inventory movement .........................................................................................
345
(258)
Other ....................................................................................................................................................
(519)
(343)
Total cash costs ..................................................................................................................................
44,092
40,260
Per kilogram calculation:
Kilograms produced ...........................................................................................................................
44,464
46,023
Total cash costs per kilogram ...........................................................................................................
991,654
874,770
Total cash costs (US$ million) ..........................................................................................................
2,611
2,218
Per ounce calculation: .......................................................................................................................
Ounces produced ...............................................................................................................................
1,429,551
1,479,671
Total cash costs per ounce ...............................................................................................................
1,826
1,499
1Copper-related cash costs are excluded because the total cash-cost measure presented in this table relates only to our gold operations. The
non-GAAP cost measures applicable to CSA are cash operating costs and C1 cash costs, which are separately defined and reconciled below.
The following is a reconciliation of total adjusted free cash flows, as a non-GAAP measure, to cash generated by operating
activities, the most directly comparable IFRS measure:
Fiscal year ended 30 June
2026
2025
(Restated)
(in R million)
Cash generated by operating activities ..........................................................................................
33,614
22,647
Additions to property, plant and equipment ...................................................................................
(17,845)
(11,855)
Acquisition-related costs ...................................................................................................................
1,379
—
Post retirement obligation settlement .............................................................................................
—
350
Total adjusted free cash flows ..........................................................................................................
17,148
11,142
184
Table of contents
The following is a reconciliation of total C1 cash costs, as a non-GAAP measure, to cost of sales, the most directly
comparable IFRS measure:
Fiscal year ended 30 June
2026
20251
(in R million, except for pounds/
tonnes amounts)
Cost of sales .......................................................................................................................................
54,656
—
Amortisation and depreciation .........................................................................................................
(7,336)
—
Rehabilitation expenditure ................................................................................................................
(98)
—
Care and maintenance costs of restructured shafts .....................................................................
(328)
—
Employment termination and restructuring costs ..........................................................................
(105)
—
Share-based payments .....................................................................................................................
(601)
—
Reversals of impairment of assets ..................................................................................................
2,779
—
Gold-related by-product credits .......................................................................................................
(2,723)
—
Gold-related cash costs2 ...................................................................................................................
(44,092)
—
Gold and uranium inventory movement .........................................................................................
345
—
Other ....................................................................................................................................................
(519)
—
Copper-related by-product credits ...................................................................................................
(261)
—
Copper inventory movements ..........................................................................................................
(46)
—
Royalty expense .................................................................................................................................
(132)
Refinery and transport charges .......................................................................................................
103
Total C1 cash costs ............................................................................................................................
1,642
—
Total C1 cash costs (US$ million) ....................................................................................................
99
—
Per tonne calculation:
Copper produced (t) ..........................................................................................................................
18,207
—
Total C1 cash costs per tonne ..........................................................................................................
5,450
—
Per pound calculation: .......................................................................................................................
Pounds produced (lbs'000) ...............................................................................................................
40,140
—
Total C1 cash costs per pound ........................................................................................................
2.47
—
1Information for fiscal 2025 has not been presented as the Group did not have any copper-producing operations during that year and the
related balances pertained to our gold operations.
2 Gold-related cash costs are excluded because the total C1 cash cost measure presented in this table relates only to our copper operations.
185
Table of contents
The following is a reconciliation of cash operating costs, as a non-GAAP measure, to cost of sales, the most directly
comparable IFRS measure:
Fiscal year ended 30 June
2026
20251
(in R million, except for pounds/
tonnes amounts)
Cost of sales .......................................................................................................................................
54,656
—
Amortisation and depreciation .........................................................................................................
(7,336)
—
Rehabilitation expenditure ................................................................................................................
(98)
—
Care and maintenance costs of restructured shafts .....................................................................
(328)
—
Employment termination and restructuring costs ..........................................................................
(105)
—
Share-based payments .....................................................................................................................
(601)
—
Reversals of impairment of assets ..................................................................................................
2,779
—
Gold related by-product credits ........................................................................................................
(2,723)
—
Gold-related cash costs2 ...................................................................................................................
(44,092)
—
Gold and uranium inventory movement .........................................................................................
345
—
Other ....................................................................................................................................................
(519)
—
Copper-related by-product credits ...................................................................................................
(261)
—
Copper inventory movements ..........................................................................................................
(46)
—
Total cash operating costs ................................................................................................................
1,671
—
Total cash operating costs (US$ million) ........................................................................................
99
—
Per tonne calculation:
Copper produced (t) ..........................................................................................................................
18,207
—
Total cash operating costs per tonne ..............................................................................................
5,434
—
Per pound calculation: .......................................................................................................................
Pounds produced (lbs'000) ...............................................................................................................
40,140
—
Total cash operating costs per pound .............................................................................................
2.46
—
1Information for fiscal 2025 has not been presented as the Group did not have any copper-producing operations during that year and the
related balances pertained to our gold operations.
2 Gold-related cash costs are excluded because the total cash operating cost measure presented in this table relates only to our copper
operation.
Within this report, our discussion and analysis is focused on the all-in sustaining costs, total cash costs, adjusted free cash
flows and C1 cash costs measures.
Restatement of prior-year comparatives
As described in note 38 “Restatement of comparative information” to our consolidated financial statements set forth
beginning on page F-1, the fiscal 2024 and fiscal 2025 comparatives have been restated. During fiscal 2026, management
identified a misalignment in algorithm parameters in the mine planning and scheduling programme used at the Tshepong North,
Tshepong South and Doornkop operations. This misalignment of algorithm parameters occurred during fiscal 2019 with the
implementation of the programme for these three operations. No other operations were affected by this misalignment. The
misalignment resulted in the overstatement of scheduled square metres mined in the LOM plan, which affected stated amounts
of tonnes milled and kilograms produced. Because the scheduling outputs feed into the reserve declaration process, this
overstatement led to an overstatement of declared Mineral Reserves, notwithstanding that the underlying geological model and
Mineral Resource estimates remained unchanged and unaffected by the misalignment. The misalignment only pertained to
forecasted production as included in LOM plans, and did not impact actual production results or declared Mineral Resources
since fiscal 2019. This resulted in understated units-of-production depreciation from fiscal 2020 onwards and errors in deferred
taxation.
During fiscal 2026, management also identified a prior-period error in the timing of recognition of the Group’s payroll
provisions and accruals. These amounts had been recorded in the financial year when the payments were made, rather than in
the reporting period in which the relevant constructive obligation existed.
The restatements did not affect revenue, gold sold, realised gold prices, and had no effect on the Group's cash flow
statement. Net profit for the year, net profit attributable to owners of the parent and basic and diluted earnings per share for
fiscal 2025 are unchanged from the amounts previously reported. For fiscal 2025, a R140 million reduction in net profit from
correcting the mine planning error was offset by a R140 million increase in net profit from correcting the payroll error. For fiscal
2024, correcting the payroll error reduced net profit by R405 million, partly offset by a R14 million increase from correcting the
mine planning error.
186
Table of contents
The restatements do, however, result in a change to a number of the fiscal 2024 amounts and the fiscal 2025 year-on-year
comparisons discussed in Item 5 of our 2025 annual report on Form 20-F. Those comparisons are updated below and
supersede the corresponding discussion in that filing:
Fiscal year ended 30 June 2025
Fiscal year ended 30 June 2024
As
previously
reported
As
restated
Adjustments
As
previously
reported
As
restated
Adjustments
(in R'million)
(in R'million)
Operating profit (a) ......................................
20,357
20,330
(27)
11,676
11,144
(532)
Profit before taxation (b) .............................
21,206
21,179
(27)
11,770
11,238
(532)
Taxation .........................................................
(6,658)
(6,631)
27
(3,082)
(2,941)
141
Net profit for the year (c) ............................
14,548
14,548
—
8,688
8,297
(391)
Profit attributable to owners of the
parent ............................................................
14,384
14,384
—
8,587
8,196
(391)
Basic earnings per share (cents) (d) ........
2,313
2,313
—
1,386
1,323
(63)
Diluted earnings per share (cents) (e) .....
2,288
2,288
—
1,364
1,302
(62)
Effect on fiscal year 2025:
(a)Growth in fiscal 2025 operating profit becomes 82.4%, rather than the 74.3% previously reported.
(b)Growth in fiscal 2025 profit before taxation becomes 88.5%, rather than the 80.2% previously reported.
(c)Growth in fiscal 2025 net profit for the year becomes 75.3%, rather than the 67.4% previously reported.
(d)Growth in fiscal 2025 basic earnings per share becomes 74.8%, rather than the 66.9% previously reported.
(e)Growth in fiscal 2025 diluted earnings per share becomes 75.7%, rather than the 67.7% previously reported.
On a restated basis, gross profit increased by 72.7%, from R14.0 billion in fiscal 2024 to R24.1 billion in fiscal 2025, and
gross profit as a percentage of revenue increased from 22.8% to 32.7%. The improvement continued to reflect the higher
realised gold price and the absence of the R2.8 billion impairment charge recognised in fiscal 2024, partly offset by lower gold
sales volumes and higher costs. The corrections reduced gross profit by R176 million in fiscal 2024 and R131 million in fiscal
2025.
Cost of sales for fiscal 2025 has been restated from R49.6 billion to R49.8 billion. Production costs for fiscal 2025 have
been restated from R43.2 billion to R43.1 billion. Amortisation and depreciation for fiscal 2025 has been restated from
R4.8 billion to R5.0 billion. Cost of sales for fiscal 2024 has been restated from R47.2 billion to R47.4 billion. Production costs for
fiscal 2024 have been restated from R38.9 billion to R39.0 billion. Amortisation and depreciation for fiscal 2024 has been
restated from R4.6 billion to R4.7 billion. Total all-in sustaining costs per kilogram for fiscal 2025 has been restated from
R1,054,346 to R1,053,189, and total all-in sustaining costs per ounce has been restated from US$1,806 to US$1,804. Total
cash costs per kilogram for fiscal 2025 has been restated from R874,901 to R874,770; the cash costs per ounce previously
reported for fiscal 2025 are unchanged at US$1,499 after rounding. Cost of sales for fiscal 2025 increased by 5.0% on the
restated fiscal 2024 comparative, compared with the 5.1% previously reported.
On a restated basis, production costs increased by 10.7% between fiscal 2024 and fiscal 2025, compared with the 10.9%
previously reported, and amortisation and depreciation increased by 4.9%, compared with the 4.3% previously reported. The
mine planning correction increased depreciation by R104 million in fiscal 2024 and R137 million in fiscal 2025. The payroll
correction also affects the previously reported fiscal 2025 versus fiscal 2024 cash-cost and all-in sustaining cost comparisons,
but does not change the trend of higher costs per kilogram, reflecting inflationary cost pressures, higher royalties and lower gold
production, with higher sustaining capital expenditure also contributing to all-in sustaining costs.
In addition, the discussion of corporate, administration and other expenditure in our 2025 annual report on Form 20-F
described an increase of 27.3%, from R1.3 billion in fiscal 2024 to R1.6 billion in fiscal 2025, attributed principally to annual
inflationary increases and higher annual incentives. On a restated basis, corporate, administration and other expenditure was
R1.6 billion in fiscal 2024 and R1.6 billion in fiscal 2025, an increase of 0.4%. The previously reported movement, and the
explanation given for it, reflected the timing of recognition of payroll-related provisions and accruals that has since been
corrected, and should no longer be relied upon.
Other operating expenses have been restated from R195 million to R252 million for fiscal 2024 and from R346 million to
R289 million for fiscal 2025, a net increase of 14.7% rather than the 77.4% previously reported.
Taxation expense increased by 125.5%, from R2,941 million in fiscal 2024 to R6,631 million in fiscal 2025, on a restated
basis, principally reflecting higher mining tax arising from the higher realised gold price and increased profitability. The
corrections reduced deferred tax expense by R141 million in fiscal 2024 and R27 million in fiscal 2025. The restated effective
income and mining tax rates were 26.2% for fiscal 2024 and 31.3% for fiscal 2025.
187
Table of contents
The deferred income tax rates applied at 30 June 2024 have been restated, reflecting the revised production profile and
the consequent change in the estimated future profitability of the affected ring-fenced mines:
Fiscal year ended 30 June
2024
Deferred tax rates
As
previously
reported
As restated
Harmony
26.4%
25.4%
Freegold
12.6%
11.7%
REL
12.3%
9.9%
The restatements also affected the balance sheet at 30 June 2025. Property, plant and equipment has been restated from
R48.3 billion to R47.6 billion, deferred tax assets from R114 million to R126 million, retained earnings from R14.6 billion to
R13.3 billion, deferred tax liabilities from R4.5 billion to R4.2 billion and trade and other payables from R6.7 billion to R7.6 billion.
The increase in trade and other payables reduced net current assets at 30 June 2025 by R972 million compared with the
amounts previously reported. These restatements did not affect the Group’s liquidity, borrowings, capital commitments or
compliance with debt covenants for fiscal 2025, and had no impact on the Group's cash flow statement.
The restatements also affected the balance sheet at 30 June 2024. Property, plant and equipment has been restated from
R41.3 billion to R40.8 billion, deferred tax assets from R140 million to R156 million, retained earnings from R2.2 billion to
R945 million, deferred tax liabilities from R3.0 billion to R2.7 billion and trade and other payables from R5.5 billion to R6.6 billion.
The increase in trade and other payables reduced net current assets at 30 June 2024 by R1,082 million compared with the
amounts previously reported. These restatements did not affect the Group’s liquidity, borrowings, capital commitments or
compliance with debt covenants for fiscal 2024, and had no impact on the Group's cash flow statement.
See Item 3D: “Key Information – Risk Factors” and Item 15: “Controls and Procedures”.
188
Table of contents
B. LIQUIDITY AND CAPITAL RESOURCES
At 30 June 2026, current liabilities of R24.3 billion exceeded current assets of R20.4 billion, primarily due to short-term
interest-bearing borrowings of R9.5 billion maturing within the next 12 months. In June 2026, the Group finalised the refinancing
of its existing debt facilities and secured new committed facilities totalling R20.9 billion, with maturities extending to
December 2032. Management believes that these facilities, together with cash generated from operations, will be sufficient to
fund its contractual obligations, debt service requirements and working capital needs as they become due. At 30 June 2026, the
Group was in compliance with all applicable financial covenant requirements. See "– Outstanding Credit Facilities, Refinancing
and Other Borrowings – Refinancing" below and note 30 "Borrowings" and note 39 "Subsequent events" to the consolidated
financial statements set forth beginning on page F-1.
We moved from a net cash position of R11.1 billion at the end of fiscal 2025 to a net debt position of R852 million at the
end of fiscal 2026 following the all-cash acquisition of MAC Copper.
We centrally manage our funding and treasury policies. There are no legal or economic restrictions on the ability of our
subsidiaries to transfer funds to us, except for PNG where certain distributions are subject to Internal Revenue Commission tax
clearance certificate approval and/or dividend withholding tax. During the periods presented, we funded our operations and our
short- and long-term liquidity requirements through cash generated from operations and credit facilities and other borrowings.
Harmony intends to finance its capital expenditure, other purchase obligations and debt repayment requirements in 2027
from cash on hand, cash flow from operations, and existing credit facilities.
Fiscal year ended 30 June
2026
2025
 
(in R million)
Operating cash flows .........................................................................................................................
33,614
22,647
Investing cash flows ..........................................................................................................................
(37,385)
(11,955)
Financing cash flows .........................................................................................................................
(340)
(2,215)
Foreign exchange differences ..........................................................................................................
(366)
(69)
Total cash flows ..................................................................................................................................
(4,477)
8,408
Cash flows from operating activities
Net cash generated by operations is primarily affected by the quantities of gold and copper sold, the gold and copper price,
the Rand/US$ exchange rate, cash costs per ounce, C1 costs and, in the case of the international operations, the Australian
dollar and PNG Kina versus US dollar exchange rate. A significant adverse change in one or more of these parameters could
materially reduce cash provided by operations as a source of liquidity.
Net cash generated by operations increased from R22.6 billion in fiscal 2025 to R33.6 billion in fiscal 2026. This increase is
mainly due to higher revenue generated through the year as a result of higher gold prices received. The increase was slightly
offset by the increase in production costs.
Income and mining tax paid in fiscal 2026 amounted to R8.2 billion, and R4.3 billion in fiscal 2025.
Payments of contingent consideration in excess of the initial fair value of R577 million were made during fiscal 2026
relating to contingent consideration for Mponeng, Eva Copper and MAC Copper copper-linked contingent consideration.
Cash flows from investing activities
Net cash utilised by investing activities increased from R12.0 billion in fiscal 2025 to R37.4 billion in fiscal 2026. The
increase of R25.4 billion was primarily due to consideration paid of R17.1 billion for the MAC Copper acquisition.
Additions to property, plant and equipment increased by R6.0 billion to R17.8 billion in fiscal 2026 from R11.9 billion in
fiscal 2025, driven by projects at Moab and Mponeng as well as construction and development activities at Eva Copper.
Payments of contingent consideration relating to the initial fair value increased from R338 million in fiscal 2025 to
R2.5 billion in fiscal 2026, mainly due to the inclusion of payments relating to the MAC Copper copper price‑linked and MAC
Copper NSR contingent consideration.
Cash flows from financing activities
Financing activities utilised R2.2 billion in fiscal 2025, compared to R340 million in fiscal 2026. The decrease in net cash
used in financing activities was principally due to significantly higher borrowings raised during fiscal 2026, mainly to fund the
acquisition of MAC Copper, partially offset by higher dividends paid and lease payments.
In fiscal 2026, borrowings raised amounted to R18.5 billion compared to R226 million in fiscal 2025, while borrowings
repaid amounted to R14.0 billion compared to R50 million in fiscal 2025. This resulted in a net inflow from borrowings of
R4.5 billion in fiscal 2026 compared to R176 million in fiscal 2025.
189
Table of contents
In fiscal 2026, a total dividend of R4.5 billion (2025: R2.1 billion) was paid. The 2026 amount includes the final dividend of
155 SA cents per share for the 2025 year, amounting to R986 million paid on 13 October 2025 and the interim ordinary dividend
of 530 SA cents per share for the 2026 year, amounting to R3.4 billion paid on 28 April 2026. The 2025 amount included the final
dividend of 94 SA cents per share for the 2024 year amounting to R596 million paid on 14 October 2024 and the interim ordinary
dividend of 227 SA cents per share for the 2025 year amounting to R1.4 billion paid on 14 April 2025.
See note 30 “Borrowings", note 32 “Additional cash flow information” and note 39 "Subsequent events" to our consolidated
financial statements set forth beginning on page F-1.
Outstanding Credit Facilities, Refinancing and Other Borrowings
Outstanding Credit Facilities
R1.5 Billion Green Term Loan
On 25 May 2022, Harmony concluded a R1.5 billion six- and a- half-year term green loan facility with a syndicate of banks
led by ABSA Bank Limited and Nedbank Limited (the "R1.5 Billion Green Term Loan"). The terms of the R1.5 Billion Green
Term Loan provide that amounts borrowed may be used in respect of eligible green projects, which relate to the construction,
development, acquisition, maintenance, and/or operation of renewable energy installations.
The R1.5 Billion Green Term Loan became available in four quarterly increments of R375 million starting in
November 2022.
During fiscal 2026, no drawdown was made and R176 million was repaid. The balance of the facility was no longer
available from 31 December 2024.
The key terms of the R1.5 Billion Green Term Loan are:
Term facility:R1.5 billion
Margin:2.65% over 3-month Johannesburg Interbank Average Rate ("JIBAR")
Maturity:Six and a half years (November 2028)
Security:Unsecured
R2.5 Billion Syndicated Revolving Credit Facility
On 25 May 2022 Harmony concluded a R2.5 billion sustainability-linked revolving credit facility with a syndicate of banks
led by ABSA Bank Limited and Nedbank Limited (the "R2.5 Billion Syndicated Revolving Credit Facility"). Under the terms of
the R2.5 Billion Syndicated Revolving Credit Facility all amounts borrowed must be used (i) in repayment of the R2 billion four-
year syndicated term loan and revolving credit facility and (ii) for ongoing general corporate costs, working costs and working
capital requirements of the Group. In March 2024 a 12-month extension to the maturity date was granted to May 2027.
At 30 June 2026, no draw down or repayment was made and the full amount on the R2.5 Billion Syndicated Revolving
Credit Facility was available.
The key terms of the R2.5 Billion Syndicated Revolving Credit Facility are:
Revolving facility:R2.5 billion
Margin on revolving facility:2.4% over 3-month JIBAR
Maturity:Five years (May 2027)
Security:Unsecured
US$400 Million Syndicated Facility
On 25 May 2022, Harmony and a syndicate of local and international lenders, which was jointly arranged by Nedbank
Limited and ABSA Bank Limited, concluded the US$400 Million Syndicated Facility comprising a US$100 million term facility and
a US$300 million revolving credit facility.
The US$400 Million Syndicated Facility is a sustainability-linked facility. Sustainability-linked metrics have been included
into the agreement which would result in specific increases/decreases in the interest rate charged to the facility. During
March 2024 a 12-month extension to the maturity date was granted to May 2027.
During fiscal 2026, US$200 million was drawn down and no repayment was made. At 30 June 2026, US$100 million was
available under the US$400 Million Syndicated Facility.
The key terms of the US$400 Million Syndicated Facility are:
Term facility:US$100 million
Revolving facility:US$300 million
Margin on term facility:2.85% over Secured Overnight Financing Rate (''SOFR'')
Margin on revolving facility:2.70% over SOFR
Maturity:Five years (May 2027)
Security:Unsecured
190
Table of contents
The R2.5 Billion Syndicated Revolving Credit Facility and the US$400 Million Syndicated Facility are both sustainability-
linked facilities. These facilities are linked to certain key performance indicators ("ESG KPIs") which were measured annually
over the past three years and resulted in changes to the interest rate margins. The rate was adjusted annually by one basis
point for each metric achieved (decrease) or not achieved (increase), with these adjustments being cumulative over the three-
year measuring period. Fiscal 2025 was the final period for which these facilities had sustainability performance targets as the
loans were approaching maturity. The cumulative reduction in margin from the final measurement period was 5 basis points on
the R2.5 Billion Syndicated Revolving Credit Facility, the US$100 million term facility and a US$300 million revolving credit
facility with the total being 15 basis points.
US$1.25 Billion Bridge Facility
On 26 June 2025, Harmony and its wholly owned subsidiary HGA entered into the US$1.25 Billion Bridge Facility to
finance the acquisition of MAC Copper and related costs. The US$1.25 Billion Bridge Facility agreement comprises a
US$250 million term facility ("Facility A") and a US$1 billion term facility ("Facility B"). During fiscal 2026, US$175 million under
Facility A and US$700 million under Facility B were drawn down. There were no repayments under Facility A and US$600 million
was repaid under Facility B. During May 2026, a six-month extension to the maturity date was granted to 24 December 2026. At
30 June 2026, the balance of the facility was no longer available.
Origination fees of R253 million were incurred for the facility.
The key terms of the US$1.25 Billion Bridge Facility are:
Margin on facility:2.0% over SOFR first 6 months starting 26 May 2025
2.8% over SOFR next 6 months starting 26 November 2025
4.0% over SOFR next 6 months starting 26 May 2026
Maturity:December 2026
Security:Unsecured
We need to comply with certain debt covenants for the US$400 Million Syndicated Facility, the US$1.25 Billion Bridge
Facility, the R2.5 Billion Syndicated Revolving Credit Facility and the R1.5 Billion Green Term Loan.
The debt covenant tests are as follows:
•The Group’s interest cover ratio shall be more than five times (EBITDA1/Total interest paid).
•Leverage2 shall not be more than 2.5 times.
1EBITDA, as defined in the agreement excludes extraordinary items such as impairment and restructuring cost and gains/losses on
disposal of fixed assets.
2Leverage is defined as total net debt to EBITDA.
Debt covenant tests were performed for the loan facilities for both fiscal 2026 and 2025 and no breaches were noted. For
fiscal 2026, the Group's interest cover ratio was 49.7 times (2025: 97.3 times), while the Group's leverage was 0.02 (2025:
negative 0.4). Management believes that it is very likely that the covenant requirements will be met in the foreseeable future
given the current earnings and interest levels.
Refinancing
On 25 June 2026, Harmony concluded new syndicated multi-tranche, multi-currency loan facilities which will be used, in
part, to refinance the existing US$ and Rand syndicated facilities entered into in 2022, the MAC Copper acquisition bridge
facility, and to support general corporate purposes.
R3 Billion Green Term Loan
On 25 June 2026, Harmony concluded the R3 Billion Green Term Loan. The terms of the R3 Billion Green Term Loan
provide that amounts borrowed may be used in respect of eligible green projects, which relate to the construction, development,
acquisition, maintenance, and/or operation of renewable energy installations.
During fiscal 2026, no draw down was made on the R3 Billion Green Term Loan leaving the entire facility available at
30 June 2026.
The key terms of the R3 Billion Green Term Loan are:
Term facility:R3 billion
Margin:2.2% over 3-month South African Rand Overnight Index Average ("ZARONIA")
Maturity:Six and a half years (December 2032)
Security:Unsecured
R4 Billion Syndicated Revolving Credit Facility
On 25 June 2026, Harmony concluded the R4 Billion Syndicated Revolving Credit Facility with a syndicate of banks led by
Nedbank Limited and Citibank N.A.
The R4 Billion Syndicated Revolving Credit Facility is a sustainability-linked facility. Sustainability-linked metrics have been
included into the agreement which would result in specific increases/decreases in the interest rate charged to the facility.
191
Table of contents
During fiscal 2026, no draw down was made on the R4 Billion Syndicated Revolving Credit Facility leaving the entire facility
available at 30 June 2026.
The key terms of the R4 Billion Syndicated Revolving Credit Facility are:
Revolving facility:R4 billion
Margin on revolving facility:2.0% over 3-month ZARONIA
Maturity:Three years, plus two extension options of one year each
Security:Unsecured
US$500 Million Syndicated Facility
On 25 June 2026, Harmony and a syndicate of local and international lenders, which was jointly arranged by Nedbank
Limited and Citibank N.A., concluded the US$500 Million Syndicated Facility.
The US$500 Million Syndicated Facility is a sustainability-linked facility. Sustainability-linked metrics have been included
into the agreement which would result in specific increases/decreases in the interest rate charged to the facility.
During fiscal 2026, no draw down was made on the US$500 Million Syndicated Facility leaving the entire facility available
at 30 June 2026.
The key terms of the US$500 Million Syndicated Facility are:
Revolving facility:US$500 million
Margin on revolving facility:2.20% over term SOFR
Maturity:Three years, plus two extension options of one year each
Security:Unsecured
A$500 Million Syndicated Facility
On 25 June 2026, Harmony and a syndicate of local and international lenders, which was jointly arranged by Nedbank
Limited and Citibank N.A., concluded the A$500 Million Syndicated Facility comprising an A$250 million term facility and an
A$250 million revolving credit facility.
The A$500 Million Syndicated Facility is a sustainability-linked facility. Sustainability-linked metrics have been included into
the agreement which would result in specific increases/decreases in the interest rate charged to the facility.
During fiscal 2026, no draw down was made on the A$500 Million Syndicated Facility leaving the entire facility available at
30 June 2026.
The key terms of the A$500 Million Syndicated Facility are:
Term facility:A$250 million
Revolving facility:A$250 million
Margin on term facility:2.50% over Bank Bill Swap Bid Rate (''BBSY'')
Margin on revolving facility:2.20% over BBSY
Maturity:Three years, plus two extension options of one year each
Security:Unsecured
The R4 Billion Syndicated Revolving Credit Facility, US$500 Million Syndicated Facility and A$500 Million Syndicated
Facility are linked to certain ESG KPIs which will be measured annually for the next three financial years and will result in
changes to interest rate margins. The adjustments to interest rate margins for each financial year's ESG performance would
impact the following financial year. The respective ESG KPIs are as follows:
KPI
Unit of Measurement
Scope
Sustainability performance targets
FY27
FY28
FY29
Renewable energy
Cumulative installed renewable
electricity capacity (MW).
All operations
130
330
665
Water consumption
Cumulative % reduction in potable
water consumption.
All operations (excluding
Eva Copper Project)
8%
10%
12%
Mine community
development spend
Additional % annual expenditure on
committed mine community
development initiatives.
SA operations
10%
10%
10%
192
Table of contents
Depending on Harmony's performance in relation to these ESG KPIs, the potential change in interest rate margin is as
follows:
Benefit/penalty for each financial year (basis points)
FY27
FY28
FY29
KPI
Renewable energy
2
2
2
Water consumption
2
2
2
Mine community development spend
1
1
1
The current debt covenant tests remain unchanged under the new facilities.
US$500 Million Convertible Bonds
On 29 September 2026, Harmony issued US$500 million guaranteed senior unsecured convertible bonds
(the "US$500 Million Convertible Bonds"), with Citigroup Global Markets Limited and J.P. Morgan Securities plc acting as joint
bookrunners.
The US$500 Million Convertible Bonds will trade on the Open Market (Freiverkehr) segment of the Frankfurt Stock
Exchange. Unless previously redeemed, converted or purchased and cancelled, the US$500 Million Convertible Bonds will be
redeemed at their principal amount on or around 29 September 2031.
The key terms of the US$500 Million Convertible Bonds are:
Convertible bonds:US$500 million (i.e. US$200,000 per bond)
Coupon on convertible bonds:1.50% per annum, payable semi-annually in arrears in equal instalments
Initial conversion price:R418.60 (US$25.7519), premium of 40% above the reference share price
Maturity:29 September 2031
Security:Unsecured
Current borrowings
Current borrowings at 30 June 2026 amount to R9.5 billion (2025: R59 million) of which R5.0 billion relates to the
US$400 Million Syndicated Facility and R4.5 billion relates to the US$1.25 Billion Bridge Facility.
Non-current borrowings
No non-current borrowings were outstanding at 30 June 2026 (2025: R1.9 billion) as all facilities will mature in the next
12 months.
Capital Expenditure
Total budgeted capital expenditures for fiscal 2027, excluding the capital outlay for renewable projects, other international
projects, Eva Copper and Wafi-Golpu, are R16.5 billion. See Item 4: “Information on the Company – Business Overview –
Capital Expenditures” for details regarding the budgeted capital expenditures for each operation. We currently expect that our
planned operating capital expenditures will be financed from operations, including the use of our current facilities, as described
in “– Outstanding Credit Facilities, Refinancing and Other Borrowings” above, and new borrowings as needed.
The following table sets forth our authorised capital expenditure as of 30 June 2026:
R’million
Authorised and contracted for1 ...............................................................................................................................................
15,027
Authorised but not yet contracted for ....................................................................................................................................
20,992
Total ...........................................................................................................................................................................................
36,019
1Including our share of the capital expenditure amounting to R22 million for the joint operation in PNG.
Total capital expenditure was R17.8 billion in 2026, compared to R11.9 billion in 2025. This represents a R5.9 billion
increase from 2025. This increase was driven mainly by the extension projects at Moab Khotsong and Mponeng, the 100MW
renewable energy project at Moab Khotsong, the development of the Eva Copper Project in Australia, and capital expenditure at
the newly acquired CSA Mine, which was not part of the Group's asset portfolio in fiscal 2025.
Working Capital and Anticipated Financing Needs
The board believes that our working capital resources, by way of cash generated from operations, borrowings and existing
cash on hand, are sufficient to meet our present working capital needs. The South African, PNG and Australian operations are
generally expected to fund their capital internally, and likely also fund the development of the Eva Copper Project in Australia.
For more information on our planned capital expenditures, see “– Capital Expenditure” above. Also see Item 3D: “Key
Information – Risk Factors – Risks Related to Commodity Prices, Cash Flow and Financial Performance – Our future growth
strategy depends on sustained cash generation, continued access to capital and our ability to service our debt and comply with
financial covenants" and "– Risks Related to Mineral Resources, Mineral Reserves, Growth Projects and Portfolio
Transformation – Mineral Resource and Mineral Reserve estimates may prove inaccurate”.
193
Table of contents
Our board believes that we will have access to adequate financing on reasonable terms given our cash-generative
operations and expected modest leverage. Our ability to generate cash from operations could, however, be materially adversely
affected by increases in cash costs, decreases in production, decreases in the price of gold and copper, and appreciation of the
Rand and other non-US dollar currencies against the US dollar.
The information set forth under the heading: “– Delivering profitable ounces – Performance by operation” on pages 29 to
67 of the Integrated Annual Report for the 20-F 2026 is incorporated herein by reference. See also note 30 “Borrowings”, note
36 “Commitments and contingencies” and note 32 “Additional cash flow information” to our consolidated financial statements set
forth beginning on page F-1.
Contractual obligations and contingencies
Our contractual obligations and commercial commitments consist primarily of credit facilities, environmental obligations
and streaming contract liabilities as well as contingent consideration.
The following table summarises our contractual obligations as of 30 June 2026:
Payments Due by Period
Total
Less Than
12 Months
1 July 2026
To 30 June
2027
12-60
Months
1 July 2027
To 30 June
2031
60-120
Months
1 July 2031
To 30 June
2036
120-180
Months
1 July 2036
To 30 June
2041
After 180
Months
Subsequent
30 June
2041
(R’million)
(R’million)
(R’million)
(R’million)
(R’million)
(R’million)
Bank facilities1 ......................................
9,476
9,476
—
—
—
—
Environmental obligations2 .................
10,095
1,732
2,910
104
1,865
3,484
Silicosis settlement obligation3 ..........
300
77
223
—
—
—
Contingent consideration4 ..................
4,118
249
1,177
809
1,077
806
Streaming contract liabilities5 .............
13,748
503
2,821
4,003
3,725
2,696
Total contractual obligations .........
37,737
12,037
7,131
4,916
6,667
6,986
1See “– Liquidity and Capital Resources – Outstanding Credit Facilities, Refinancing and Other Borrowings” above. The amounts include the
interest payable over the terms of the facilities. Where a variable rate is applicable, the rate at the reporting date has been used for the future
periods.
2We make provision for environmental rehabilitation costs and related liabilities based on management’s interpretations of current
environmental and regulatory requirements. See note 24 “Provision for environmental rehabilitation” to our consolidated financial statements
set forth beginning on page F-1.
3This liability relates to potential cost of settling the silicosis and TB class actions that were instituted against the Group in South Africa. See
Item 3D: “Key Information - Risk Factors - Risks Related to Operations and Business Resilience - Exposure to mining-related health hazards
may result in occupational disease and significant long-term liabilities and costs” and note 25 “Other provisions” to our consolidated financial
statements set forth beginning on page F-1.
4The liabilities relating to the Mponeng operations and related assets and Eva Copper were included as part of the consideration transferred for
those acquisitions, while the liabilities relating to CSA were assumed in the MAC Copper acquisition. See note 27 "Contingent consideration"
to our consolidated financial statements set forth beginning on page F-1.
5The liability relates to copper and silver streaming arrangements with OR Royalties. See note 29 "Streaming arrangements" to our
consolidated financial statements set forth beginning on page F-1.
Commercial Commitments
The following table provides details regarding our commercial commitments as of 30 June 2026:
Amount of Commitments Expiring by Period
Total
Less Than
12 Months
1 July 2026
To 30 June
2027
12-36
Months
1 July 2027
To 30 June
2029
36-60
Months
1 July 2029
To 30 June
2031
After 60
Months
Subsequent
To 30 June
2031
(R’million)
(R’million)
(R’million)
(R’million)
(R’million)
Guarantees1 ....................................................................
2,443
—
—
—
2,443
Capital commitments2 ....................................................
15,027
15,027
—
—
—
Total commitments expiring by period ..................
17,470
15,027
—
—
2,443
1R539 million of these guarantees relate to our environmental and rehabilitation obligations.
2Capital commitments consist only of amounts committed to external suppliers at 30 June 2026, although the board approved a total of
R36.0 billion for capital expenditures over the next three years. This consists of R23.4 billion for gold assets and R12.6 billion for copper
assets.
See note 36 “Commitments and contingencies” to our consolidated financial statements set forth beginning on page F-1.
194
Table of contents
Off-balance Sheet Arrangements
The Group does not have any off-balance sheet arrangements, as defined by the SEC for the purposes of this annual
report on Form 20-F, that have or are reasonably likely to have a material current or future effect on the Group’s financial
position or results of operations.
Recent Developments
See Item 4: “Information on the Company – History and Development of the Company – Recent Developments –
Developments since 30 June 2026”.
Related Party Transactions
For a detailed discussion of related party transactions, see Item 7: "Major Shareholders and Related Party Transactions -
Related Party Transactions”.
Recent Accounting Pronouncements
Recently adopted accounting policies, as well as recent accounting pronouncements with the potential for impact on the
consolidated financial statements, are described in note 2 “Accounting policies” to our consolidated financial statements set forth
beginning on page F-1.
Accounting Policies
Harmony’s accounting policies are described in note 2 “Accounting policies” to our consolidated financial statements set
forth beginning on page F-1.
Use of Estimates and Making of Assumptions
The preparation of the financial statements in conformity with IFRS requires management to make estimates and
assumptions that affect the reported amounts of assets and liabilities as well as disclosure of contingent assets and liabilities at
the date of the financial statements, and the reported amounts of revenues and expenses during the reporting period. Actual
results could differ from those estimates. Some of our accounting policies require the application of significant judgement and
estimates by management in selecting the appropriate assumptions for calculating financial estimates. By their nature, these
judgements are subject to an inherent degree of uncertainty and are based on our historical experience, terms of existing
contracts, management’s view on trends in the gold mining industry and information from outside sources.
Our critical accounting estimates and judgements are described in more detail in note 3 “Critical accounting estimates and
judgments”, to our consolidated financial statements set forth beginning on page F-1. This discussion and analysis should be
read in conjunction with such consolidated financial statements and the relevant notes.
C. RESEARCH AND DEVELOPMENT, PATENTS AND LICENSES, ETC.
Not applicable.
D. TREND INFORMATION
The information set forth under the heading: “–Delivering profitable ounces – Performance by operation” on pages 29 to 67
of the Integrated Annual Report for the 20-F 2026 is incorporated herein by reference.
Other than as disclosed elsewhere in this annual report, we are not aware of any trends, uncertainties, demands,
commitments or events for the year ended 30 June 2026 that are reasonably likely to have a material and adverse effect on our
net revenues, income, profitability, liquidity or capital resources, or that would cause the disclosed financial information to be not
necessarily indicative of future results of operations or financial conditions.
E. CRITICAL ACCOUNTING ESTIMATES
Not applicable.
ITEM 6. DIRECTORS, SENIOR MANAGEMENT AND EMPLOYEES
A. DIRECTORS AND SENIOR MANAGEMENT
The information set forth under the heading:
•“– Harmony – Our leadership” on pages 5 to 6
of the Integrated Annual Report for the 20-F 2026 is incorporated herein by reference.
On 15 October 2026, Mr Alwyn Pretorius and Mr James Boardman were appointed to the board of directors of Harmony as
independent non-executive directors.
B. COMPENSATION
The information set forth under the heading:
•“– Governance – Remuneration committee: chairperson’s report” on pages 212 to 214
•“– Governance – Remuneration policy” on pages 215 to 219
•“– Governance – Remuneration policy implementation” on pages 220 to 235
of the Integrated Annual Report for the 20-F 2026 is incorporated herein by reference.
195
Table of contents
C. BOARD PRACTICES
The information set forth under the headings:
•“– Governance – Ethical leadership and sound corporate governance” on pages 195 to 207
•“– Governance – Board committees” on pages 208 to 211
•“– Governance – Remuneration committee: chairperson’s report” on pages 212 to 214
•“– Governance – Remuneration policy” on pages 215 to 219
•“– Governance – Remuneration policy implementation” on pages 220 to 235
•“– Governance – Audit and risk committee: chairperson’s report” on pages 236 to 239
•“– Governance – Social and ethics committee: chairperson’s report” on pages 240 to 241
of the Integrated Annual Report for the 20-F 2026 is incorporated herein by reference.
D. EMPLOYEES
The information set forth under the heading:
•“– Sustainability performance – Engaged workforce” on pages 103 to 118
of the Integrated Annual Report for the 20-F 2026 is incorporated herein by reference.
E. SHARE OWNERSHIP
See note 35 “Related Parties”  and note 34 "Share-based payments" of our consolidated financial statements, set forth
beginning on page F-1.  The information set forth under the heading “– Governance – Remuneration policy implementation” on
pages 220 to 235 of the Integrated Annual Report for the 20-F 2026 is incorporated herein by reference.
Following fiscal year end, 783,051 deferred shares vested for executive directors and prescribed officers on
18 September 2026 and were settled in October 2026. These participants were also awarded 308,194 deferred shares under
the Harmony Deferred Share Plan 2018 on 18 September 2026.
F. DISCLOSURE OF A REGISTRANT'S ACTION TO RECOVER ERRONEOUSLY AWARDED COMPENSATION
On 11 August 2026, Harmony determined that it was required to prepare an accounting restatement to correct errors in its
previously issued financial statements for fiscal 2024 and fiscal 2025. Harmony therefore performed a recovery analysis
pursuant to Rule 10D-1 under the Exchange Act, Section 303A.14 of the NYSE Listed Company Manual and Harmony’s
Incentive-based Compensation Recovery Policy (the "Recovery Policy").
The Remuneration Committee applied the Recovery Policy to incentive-based compensation received by current and
former executive officers during the applicable recovery period and recalculated the affected compensation using the restated
financial information.
The recalculation resulted in aggregate erroneously awarded compensation relating to fiscal 2024 of R129,480.72,
comprising R51,883.94 attributable to the cash component of the incentive award and R77,596.78 representing the cash value
of the adjustment to the deferred-share component. This amount was calculated before tax by comparing the original awards
with the awards recalculated using the restated financial information, which reduced the fiscal 2024 Exco and Services balanced
scorecard outcome from 86.05% to 85.96%. The affected financial reporting measure was the operational and financial
performance drivers of the balanced scorecard. These were impacted by the changes to production and corporate costs, which
were driven by the correction of the prior period error related to the constructive obligation of payroll provisions and accruals.
The deferred-share adjustment was calculated by applying the revised balanced scorecard outcome to each relevant executive
officer’s cost to company and multiplying the resulting amount by 60%, representing the portion of the incentive award allocated
to deferred shares. The revised number of shares was then valued at the applicable share price for the relevant period to
determine the adjustment.
The fiscal 2025 recalculation separately resulted in additional compensation payable to the affected executives of
R114,783.05, comprising R46,070.70 attributable to the cash component of the incentive award and R68,712.35 representing
the cash value of the adjustment to the deferred-share component. This amount was calculated before tax by comparing the
original awards with the awards recalculated using the restated financial information, which increased the fiscal 2025 Exco and
Services balanced scorecard outcome from 72.52% to 72.59% The fiscal 2025 amount did not reduce the determination of the
gross fiscal 2024 erroneously awarded compensation.
The Remuneration Committee determined that the adjustments relating to the deferred-share components would be settled
on a cash-value basis through set-off rather than through the cancellation, recovery or issue of shares.
Harmony will settle the fiscal 2025 additional compensation legally payable to each executive in settlement of that same
executive’s fiscal 2024 recovery obligation by way of set-off. Following the set-offs, the aggregate fiscal 2024 erroneously
awarded compensation remaining will be R14,697.67, which is to be settled in cash.
The fiscal 2026 outcome was unchanged and did not result in any recovery or additional compensation.
196
Table of contents
As at 30 June 2026, the recovery amount attributable to this restatement had not yet been determined, as the restatement
determination and recovery analysis occurred after that date. There are no earlier restatements that required recovery and
therefore no balances outstanding at the reporting date. As at 30 October 2026, Harmony had recovered none of the gross fiscal
2024 erroneously awarded compensation through set-off and cash repayment. Harmony will recover the amounts reasonably
promptly in accordance with the Recovery Policy and the applicable award terms.As this will be implemented subsequent to 30
June 2026, this remuneration will form part of fiscal 2027 detailed disclosures.
ITEM 7. MAJOR SHAREHOLDERS AND RELATED PARTY TRANSACTIONS
A. MAJOR SHAREHOLDERS
We are an independent gold and copper producer, with no single shareholder exercising control. As at 23 October 2026,
our issued share capital consisted of 638,855,052 ordinary shares. To our knowledge, (a) we are not directly or indirectly owned
or controlled: (i) by another corporation; or (ii) by any foreign government, and (b) there are no arrangements (including any
announced or expected takeover bid), the operation of which may at a subsequent date result in a change in our control.
The voting rights of our major shareholders do not differ from the voting rights of other holders of the same class of shares.
The portion of our securities held in the United States and the number of record holders in the United States as at the last
practicable date, 30 September 2026, are set forth below:
Country
Number of
shareholders
Number of shares
Percentage
United States1 ........................................................................................
175
170,118,483
26.71%
1 Harmony’s primary listing is on the JSE. Harmony’s ADRs in the US are traded on the NYSE under the ticker symbol HMY. Shares represented
by ADSs are included in our issued ordinary share capital as each ADS represents one underlying ordinary share.
The following table sets out information on persons known to us to beneficially own 5% or more of our ordinary shares,
based on the latest available shareholder analysis, dated 30 September 2026.
Holder
Number of shares
Percentage
Public Investment Corporation of South Africa .......................................................................
95,589,422
15.01%
African Rainbow Minerals Limited1,2 .........................................................................................
63,665,545
10.00%
BlackRock Inc ...............................................................................................................................
36,455,925
5.72%
1 Patrice Motsepe, our Chairman, has an indirect holding in African Rainbow Minerals Limited ("ARM").
2 ARM's effective beneficial interest in Harmony is 11.73%. This interest includes 11 million Harmony shares, representing 14.73% of ARM's
equity interest in the Company, which are subject to a hedging collar arrangement.
The table below shows the significant changes in the percentage ownership held by major shareholders, to the knowledge
of Harmony's management, during the past three fiscal years.
Beneficial ownership as at 30 June
2026
2025
2024
%
%
%
Public Investment Corporation of South Africa ...................................................
15.00
15.84
14.72
African Rainbow Minerals Limited .........................................................................
9.53
10.66
11.80
Ninety One Plc .........................................................................................................
6.22
1.87
1.63
Van Eck Associates Corporation ...........................................................................
5.33
8.61
11.92
BlackRock Inc ...........................................................................................................
5.07
5.49
4.08
B. RELATED PARTY TRANSACTIONS
Between 1 July 2024 and 23 October 2026, none of the directors or major shareholders of Harmony or, to the knowledge
of Harmony, their families, had an interest, directly or indirectly, in any transaction or in any proposed transaction that has
affected or will materially affect Harmony or its subsidiaries, other than as stated in note 35 “Related parties” of our consolidated
financial statements, set forth beginning on page F-1.
Also see item 6E: "Directors, senior management and employees – share ownership", note 16 (b) “Other non-current
assets”, note 19 “Investments in associates” and note 20 “Investment in joint operations” of our consolidated financial
statements, set forth beginning on page F-1.
C. INTERESTS OF EXPERTS AND COUNSEL
Not applicable.
197
Table of contents
ITEM 8. FINANCIAL INFORMATION
A. CONSOLIDATED STATEMENTS AND OTHER FINANCIAL INFORMATION
Refer to Item 18: "Financial Statements". For a discussion of our export sales, see Item 5: "Operating and Financial
Review and Prospects”.
Legal Proceedings
Other than as described below, none of our properties is the subject of pending material legal proceedings. We have been
involved in a number of claims and legal and arbitration proceedings incidental to the normal conduct of our business, such as
the ones described below.
Wafi-Golpu EP proceedings
On 18 December 2020, the CEPA issued an EP for the Wafi-Golpu Project. The EP authorises DSTP as the proposed
tailings management method for the project. The validity of the EP has been challenged in two judicial review proceedings
brought against PNG.
The first proceeding was instituted in March 2021 by the then Governor of Morobe Province. The Governor who succeeded
him in September 2022 stated publicly that he intended to withdraw the proceeding but died in September 2025 before it had
been withdrawn. On 20 July 2026, the Supreme Court of PNG dismissed the proceeding for want of prosecution. Lawyers
stating that they act for the former Governor and the Morobe Provincial Government subsequently filed a Notice of Motion
seeking to appeal or otherwise challenge that dismissal. The WGJV participants have filed a Notice of Objection to Competency
challenging the competency of the Notice of Motion. The Notice of Motion and the objection remain pending as at the date of
this annual report.
The second proceeding was instituted in December 2022 by Huon Gulf coastal villagers represented by CELCOR. The
proceeding challenged the process by which the EP was granted and the authorisation of DSTP under that permit. Following a
substantive hearing on 12 June 2025, the National Court of PNG delivered its decision on 26 May 2026 dismissing the
proceeding. The plaintiffs have lodged an appeal against that decision in the Supreme Court of PNG. The appeal remains
pending as at the date of this annual report.
The WGJV participants continue to monitor and participate in these proceedings as appropriate. No assurance can be
given as to their timing or ultimate outcome. An adverse outcome could affect the validity or conditions of the EP, require further
environmental assessment or stakeholder consultation, delay the development of the Wafi-Golpu Project, or require the Joint
Venture participants to consider an alternative tailings management method. Any such development could increase the project’s
capital and operating costs, adversely affect its economics and reduce its value.
See Item 3D: “Key Information – Risk Factors – Risks Related to Climate, Environment and Social Licence – A tailings
facility failure could have far-reaching consequences, and adverse developments concerning the proposed DSTP at Wafi-Golpu
could materially adversely affect the project and our business”.
In addition to the judicial proceedings described above, HGA and Newcrest have been the subject of a non-judicial
complaint to the AusNCP concerning aspects of the proposed Wafi-Golpu Project, principally the proposed use of DSTP. The
AusNCP published its final statement on 29 August 2025. See Item 4: “Information on the Company – Business Overview –
Regulation – Laws and Regulations Pertaining to Environmental Protection – Papua New Guinea – AusNCP complaint”.
Provision for silicosis settlement
At 30 June 2026 and 30 June 2025 provisions of R252 million and R261 million respectively were recognised for Harmony’s
potential cost to settle the silicosis and TB class actions that have been instituted against it in South Africa. The decrease in
fiscal 2026 was due to payments of R40 million which were made to the trust overseeing the processing and payment of claims
during the year. The decrease was partially offset due to the time value of money accretion (R19 million) and a change in
estimate (R12 million).
The provision recorded in the financial statements is subject to adjustment or reversal in the future, depending on a
number of factors, including changes in benefit take-up.
See Item 3D: “Key Information – Risk Factors – Risks Related to Operations and Business Resilience – Exposure to
mining-related health hazards may result in occupational disease and significant long-term liabilities and costs” and to note 25
“Other Provisions – Provision for silicosis settlement” of our consolidated financial statements set forth beginning on page F-1.
Dividend Policy
Dividends are proposed by and approved by our board of directors based on our financial performance and compliance
with applicable laws, including in respect of the solvency and liquidity test contemplated in the Companies Act. Dividends are
recognised when declared by the board. On 9 March 2026, we amended our dividend policy to allow for up to 50% of net free
cash to be returned to shareholders, subject to the discretion of the board and leverage levels measured by the ratio of net debt
to EBITDA. The revised policy now includes an improved base dividend, which has been increased from 20% to 30% of net free
cash. In addition, an upside dividend may be paid, based on leverage levels. When leverage is equal to or above 0.5x and
below 1x, only a base dividend of 30% of net free cash is payable. As leverage improves, the board may at its sole discretion
consider an upside dividend of up to 20% of net free cash. Under South African law, we may declare and pay dividends from
any reserves included in total shareholders equity (including share capital and share premium) calculated in accordance with
IFRS, subject to the solvency and liquidity test.
198
Table of contents
See Item 3D: “Key Information – Risk Factors – Risks Related to Our Ordinary Shares and ADSs – We may not pay
dividends or make similar payments to our shareholders in the future” and “– Fluctuations in exchange rates may reduce the
market value of our securities and of any dividends or distributions paid by us”. Also see Item 10: “Additional Information –
Exchange Controls – Introduction”, “– Exchange Controls – Government Regulatory Considerations – Dividends”, “– Taxation –
Certain South African Tax Considerations – Dividends” and “– Certain Material United States Federal Income Tax
Considerations – Taxation of Dividends”.
B. SIGNIFICANT CHANGES
See Item 4: “Information on the Company – History and Development of the Company – Recent Developments –
Developments since 30 June 2026.”
ITEM 9 THE OFFER AND LISTING
A. OFFER AND LISTING DETAILS
The principal trading market for our ordinary shares is the JSE, where they trade under the symbol "HAR". Our ordinary
shares trade on the NYSE in the form of ADSs under the symbol "HMY". There have been no significant suspensions in the
trading of our securities on either the JSE or the NYSE during fiscal 2024, 2025 and 2026.
B. PLAN OF DISTRIBUTION
Not applicable.
C. MARKETS
The Securities Exchange in South Africa
The JSE is the premier stock exchange in Africa and is based in South Africa where it has operated as a marketplace for
the trading of financial products for over 130 years.
The JSE connects buyers and sellers in a variety of financial markets that include equities and equity derivatives,
commodity derivatives, currency derivatives and interest rate instruments. It is one of the top 20 exchanges in the world in terms
of market capitalisation and a member of the World Federation of Exchanges.
The market capitalisation of the JSE equities index (FTSE/JSE Africa All Shares Index) was R8,117 billion (US$495 billion)
at 30 June 2026. The JSE mining index (FTSE/JSE Precious Metals and Mining Index) market capitalisation was R1,695 billion
(US$103 billion)1 at 30 June 2026, 20.9% of the overall JSE market capitalisation.
1  Source: JP Morgan
Strate Settlement
Under Strate Pty Limited, South Africa’s Central Securities Depository ("CSD"), there are essentially two types of clients:
controlled and non-controlled. A controlled client is one who elects to keep his shares and cash with his broker and these shares
are held in custody at the broker’s chosen Custodian Bank, the CSD Participant ("CSDP"). A non-controlled client is one who
appoints his own CSDP to act as custodian on his behalf. Equity settlements take place on a contractual T+3 (where T= trade
date) settlement cycle. Securities and funds become due for settlement three business days after the trade. Contractual
settlement is a market convention embodied in the rules of the JSE which states that a client has a contractual obligation to
cause a JSE trade to settle on settlement day. The JSE, in its capacity as Settlement Authority, ensures that all on-market trades
entered into by two JSE member firms settle three days after the trade date.
D. SELLING SHAREHOLDERS
Not applicable.
E. DILUTION
Not applicable.
F. EXPENSES OF THE ISSUE
Not applicable.
ITEM 10. ADDITIONAL INFORMATION
A. SHARE CAPITAL
Not applicable.
B. MEMORANDUM OF INCORPORATION
Information on our Memorandum of Incorporation can be found in Exhibit 1.1 filed with this Harmony 2026 Form 20-F.
Voting Rights
There are no limitations imposed by South African law or by our charter on the right of non-resident or foreign owners to
hold or vote our ordinary shares.
199
Table of contents
C. MATERIAL CONTRACTS
R1.5 Billion Green Term Loan
On 25 May 2022, Harmony and a syndicate of local and international lenders entered into a R1.5 billion six and a half year
syndicated green term loan. The R1.5 Billion Green Term Loan matures in November 2028.
Under the terms of the R1.5 Billion Green Term Loan, funds borrowed must be used in respect of "eligible green projects",
which relate to the construction, development, acquisition, maintenance, and/or operation of renewable energy installations.
The R1.5 Billion Green Term Loan bears interest at 2.65% over the three-month JIBAR.
Harmony was permitted to draw down on the R1.5 Billion Green Term Loan commencing after November 2022. During
fiscal 2026, no drawdown was made and R176 million was repaid. The balance of the facility was no longer available from
31 December 2024.
US$400 Million Syndicated Facility
On 25 May 2022, Harmony and a syndicate of local and international lenders, which was jointly arranged by Nedbank
Limited and ABSA Bank Limited, concluded the US$400 Million Syndicated Facility comprising a US$100 million term facility and
a US$300 million revolving credit facility. The US$400 Million Syndicated Facility matures in May 2027.
Under the terms of the US$400 Million Syndicated Facility funds borrowed must be used (i) in repayment of the September
2019 US$400 million three-year syndicated term loan and revolving credit facility and (ii) for exploration activities, feasibility
costs, capital costs, operational costs, other corporate expenses and other strategic objectives relating to the Group outside of
South Africa.
The US$100 million term loan facility bears interest of 2.85% over the three-month SOFR; the US$300 million revolving
credit facility bears interest of 2.7% over the three-month SOFR. The US$400 Million Syndicated Facility is unsecured.
During fiscal 2026, US$200 million was drawn on the US$300 million revolving credit facility leaving the total outstanding
amount at US$300 million on the US$400 Million Syndicated Facility.
R2.5 Billion Syndicated Revolving Credit Facility
On 25 May 2022, Harmony and a syndicate of local and international lenders entered into the R2.5 Billion Syndicated
Revolving Credit Facility. The R2.5 Billion Syndicated Revolving Credit Facility matures in May 2027.
Under the terms of the R2.5 Billion Syndicated Revolving Credit Facility, funds borrowed must be used (i) in repayment of
the November 2018 R2 billion four-year syndicated term loan and revolving credit facility and (ii) for ongoing general corporate
costs, working costs and working capital requirements of the Group.
The R2.5 Billion Syndicated Revolving Credit Facility bears interest at 2.40% over the three-month JIBAR. The R2.5 Billion
Syndicated Revolving Credit Facility is unsecured.
As at 30 June 2026, the total R2.5 billion was available under the R2.5 Billion Syndicated Revolving Credit Facility.
US$1.25 Billion Bridge Facility
On 26 June 2025, Harmony and its wholly-owned Australian subsidiary HGA entered into the US$1.25 Billion Bridge
Facility to finance the acquisition of MAC Copper and related costs. The US$1.25 Billion Bridge Facility comprises a US$250
million term Facility A and a US$1 billion term Facility B. The maturity date of the facility is 24 December 2026 after Harmony
had exercised its six-month extension option.
The facility bears interest at the following rates: 2.0% over SOFR for the first 6 months starting 26 May 2025, 2.8% over
SOFR for the next 6 months starting 26 November 2025 and 4.0% over SOFR for the last 6 months starting 26 May 2026. The
US$1.25 Billion Bridge Facility is unsecured.
R3 Billion Green Term Loan
On 25 June 2026 Harmony and a syndicate of banks entered into the R3 Billion Green Term Loan. The R3 Billion Green
Term Loan matures in December 2032.
Under the terms of the R3 Billion Green Term Loan funds borrowed may only be used in respect of eligible green projects,
which relate to the construction, development, acquisition, maintenance, and/or operation of renewable energy installations.
The R3 Billion Green Term Loan bears interest at 2.2% over the three-month ZARONIA.
R4 Billion Syndicated Revolving Credit Facility
On 25 June 2026 Harmony and a syndicate of banks entered into the R4 Billion Syndicated Revolving Credit Facility. The
R4 Billion Syndicated Revolving Credit Facility matures in June 2029. Two additional 12-month extension options are available.
Under the terms of the R4 Billion Syndicated Revolving Credit Facility, funds borrowed must be used (i) in repayment of the
May 2022 R2.5 Billion Syndicated Revolving Credit Facility and (ii) for ongoing general corporate costs, working costs and
working capital requirements of the Group.
The R4 Billion Syndicated Revolving Credit Facility bears interest at 2.0% over the three-month ZARONIA. The R4 Billion
Syndicated Revolving Credit Facility is unsecured.
200
Table of contents
US$500 Million Syndicated Facility
On 25 June 2026 Harmony and a syndicate of local and international lenders concluded the US$500 Million Syndicated
Facility. The US$500 million sustainability-linked syndicated revolving credit facility matures in June 2029. Two additional 12-
month extension options are available.
Under the terms of the US$500 Million Syndicated Facility funds borrowed must be used (i) in repayment of the May 2022
US$400 million syndicated term loan and revolving credit facility, (ii) in repayment of the US$1.25 Billion Bridge Facility and (iii)
for exploration activities, feasibility costs, capital costs, operational costs, other corporate expenses and other strategic
objectives relating to the Group outside of South Africa.
The US$500 Million Syndicated Facility bears interest at 2.20% over Term SOFR. The facility is unsecured.
A$500 Million Syndicated Facility
On 25 June 2026 Harmony and a syndicate of local and international lenders concluded the A$500 Million Syndicated
Facility comprising an A$250 million term facility and an A$250 million revolving credit facility. The facility matures in June 2029.
Two additional 12-month extension options are available.
Under the terms of the A$500 Million Syndicated Facility funds borrowed must be used for ongoing exploration activities,
feasibility costs, working capital costs, operational costs, general corporate costs and other strategic objectives relating to the
Group in Australia.
The A$250 million term loan facility bears interest of 2.50% over the BBSY; the A$250 million revolving credit facility bears
interest of 2.20% over the BBSY. The A$500 Million Syndicated Facility is unsecured.
The equity-settled Katleho ya Moruo Employee Share Ownership Plan (Katleho ya Moruo ESOP)
Following the expiration of the Sisonke Employee Share Ownership Plan (''ESOP'') in 2022, Harmony approved the
establishment of the Katleho ya Moruo ESOP in January 2024. The scheme aims to continue facilitating beneficial interest and
ownership by non-managerial employees in South Africa (the beneficiaries) of Harmony shares to:
•Facilitate economic empowerment of Harmony’s employees;
•Incentivise Harmony’s employees, so as to promote the shared interests of employees and shareholders in the value
growth of Harmony; and
•Further align the interests of the Harmony shareholders and those of the employees of Harmony.
The shares were issued to the Harmony ESOP Trust (the ''Trust'') on 31 January 2024. Each beneficiary under the
scheme was awarded 360 Participation Units (''PU'') if the beneficiaries qualified for the scheme upon its formation or within six
months of the formation thereof. Thereafter, qualifying employees will be awarded PU on a pro-rata basis in line with the scheme
rules. The PU will vest after a service period of five years commencing on 4 April 2024. The Katleho ya Moruo ESOP is equity-
settled.
MAC Copper Acquisition
On 24 October 2025, Harmony completed, through its wholly-owned subsidiary HGA, the acquisition of 100% of the
securities in MAC Copper pursuant to a scheme of arrangement contemplated by a scheme implementation deed entered into
among Harmony, MAC Copper and certain subsidiaries, dated 27 May 2025. MAC Copper’s sole asset is CSA in the Cobar
Region of New South Wales, Australia.
Harmony paid cash consideration of US$12.25 per MAC Copper share, amounting to US$1.0 billion (R17.5 billion), on
23 October 2025. After deducting R420 million of cash acquired, the net cash paid on 24 October 2025 was R17.1 billion.
Upon completion, Harmony assumed MAC Copper’s obligations under the copper and silver streaming arrangements with
OR Royalties, the 1.5% NSR royalty in favour of Glencore Operations Australia Pty Ltd and contingent payment arrangements
with Glencore of up to US$150 million based on specified copper-price thresholds. See note 13 "Acquisitions and business
combinations", note 27 "Contingent consideration" and note 29 "Streaming arrangements" to our consolidated financial
statements, set forth beginning on page F-1.
As of 30 June 2026, management had finalised the purchase price allocation. The final fair value of identifiable net assets
acquired was R14.9 billion, and goodwill of R2.6 billion was recognised at the acquisition date and allocated to CSA. The
acquired operation contributed revenue of R3.8 billion and a net loss of R1.2 billion from the acquisition date through
30 June 2026. See note 13 "Acquisitions and business combinations" to our consolidated financial statements, set forth
beginning on page F-1.
US$500 Million Convertible Bonds
On 22 September 2026, Harmony priced an offering of US$500 million guaranteed senior unsecured convertible bonds
due in 2031. The Bonds were issued by Harmony on 29 September 2026. The Bonds will trade on the Open Market
(Freiverkehr) segment of the Frankfurt Stock Exchange.
The Bonds were issued at 100% of their principal amount (i.e. US$200,000 per Bond). Unless previously redeemed,
converted or purchased and cancelled, the Bonds will be redeemed at their principal amount on 29 September 2031. The Bonds
will pay a coupon of 1.500% per annum, payable semi-annually in arrears in equal instalments on 29 March and
29 September of each year and for the first time on 29 March 2027. The initial conversion price is R418.60 (US$25.7519),
representing a premium of 40.0% above the reference share price, being the placement price per share determined in the
concurrent offering of existing shares.
201
Table of contents
The joint bookrunners concurrently placed approximately 4.1 million existing shares of Harmony on behalf of a limited
number of buyers of the Bonds who wished to sell such shares in short sales to hedge the market risk of an investment in the
Bonds at a placement price of R299.00 (US$18.3942) per share. Harmony will not receive any proceeds from such placement.
D. EXCHANGE CONTROLS
Introduction
The following is a general outline of South African exchange controls. Investors should consult a professional adviser
pertaining to the exchange control implications of their particular investments.
The Republic of South Africa’s exchange control regime provides for restrictions on the exportation of capital from a
Common Monetary Area member, consisting of South Africa, the Republic of Namibia, the Kingdoms of Lesotho and Eswatini.
Transactions between South African residents (including corporations) and non-residents are subject to these exchange control
regulations, which are administered by the Financial Surveillance Department of the SARB.
Since 1995 a number of exchange control regulations have been relaxed with regard to both residents and non-residents.
Following the initial reforms, ongoing relaxations have been introduced with the aim of achieving a macroprudential risk-based
approach to the management of foreign exchange. The reforms are being made to, among other things, enable international
firms to make investments through South Africa to the rest of Africa and to further enhance opportunities for offshore portfolio
diversification for resident investors.
A considerable degree of flexibility is built into the system of exchange controls, and the SARB possesses substantial
discretionary powers in approving or rejecting the applications that fall outside the authority granted to authorised dealers.
These comments relate to exchange controls in force at 30 June 2026. These controls are subject to change at any time
(including retrospectively), however, the government has previously announced most changes during the annual budget
statement in February. It is not possible to predict whether existing exchange controls will be changed or relaxed by the South
African government in the future. Investors are urged to consult a professional adviser as to the exchange control implications of
their particular investments.
Government Regulatory Considerations
Shares
A foreign investor may invest freely in shares in a South African company, whether listed on the JSE or not, through normal
banking channels against settlement in foreign currency or Rand from a non-resident Rand account. A foreign investor may also
sell its share investment in a South African company and transfer the proceeds out of South Africa without restriction. However,
when the Company is not listed on the JSE, the supporting confirmation must be provided to the SARB that the sale price of any
shares reflects fair market value.
Under present South African exchange control regulations, our ordinary shares and ADSs are freely transferable outside
the Common Monetary Area between non-residents of the Common Monetary Area. No prior SARB approval is required for the
transfer of proceeds to South Africa, in respect of shares listed on the JSE, provided these funds enter the country through the
normal banking channels. In addition, the proceeds from the sale of ordinary shares on the JSE on behalf of those holders of
ordinary shares who are not residents of the Common Monetary Area are freely remittable to those holders. Share certificates
and warrant certificates held by non-residents will be endorsed with the words “non-resident.”
Loans
Generally, the granting of loans to us or our subsidiaries, and our ability to borrow from non-South African sources and the
repatriation of dividends, interest and royalties by us are regulated by the Financial Surveillance Department of the SARB. If a
foreign investor wishes to lend capital to a South African company, the prior approval of the SARB must be sought mainly in
respect of the interest rate and terms of repayment applicable to such loan.
Interest on foreign loans is subject to a withholding tax of 15% and freely remittable abroad, provided that the terms of the
loans received prior approval from the SARB. However, this rate may be reduced depending on the applicability of a double
taxation treaty.
Investments
We are required to seek approval from the SARB to use funds held in South Africa to make investments outside of South
Africa.
Dividends
Dividends declared by a listed company are subject to a withholding tax of 20% and freely transferable out of South Africa
from both trading and non-trading profits earned in South Africa through a major bank as agent for the SARB to non-resident
shareholders. However, this rate may be reduced depending on the applicability of a double taxation treaty.
Where 75% or more of a South African company’s capital, voting power, power of control or earnings is directly or indirectly
controlled by non-residents, such a company is designated an “affected person” by the SARB, and certain restrictions are
placed on its ability to obtain local financial assistance. We are not, and have never been, designated an “affected person” by
the SARB.
If an affected entity made use of local borrowing facilities, the affected entity must apply for SARB approval prior to
remitting dividends offshore. As a general rule, an affected entity that has accumulated historical losses may not declare
dividends out of current profits unless and until such time that the affected entity’s local borrowings do not exceed the local
borrowing limit.
202
Table of contents
E. TAXATION
Certain South African Tax Considerations
The summary set out in this section is based on current tax law and our interpretation thereof. Amendments to the tax law
may change the tax treatment of acquiring, holding or disposing of our ordinary shares or ADSs, as applicable, which changes
may possibly occur on a retrospective basis. The following summary is not a comprehensive description of all of the tax
considerations that may be relevant to a decision to purchase, own or dispose of our ordinary shares or ADSs, and does not
cover the tax consequences that depend upon your particular tax circumstances. This summary is not intended to constitute tax
advice. This summary does not address the foreign tax consequences for persons that are not residents of South Africa and
specifically excludes the tax consequences for persons (a) who are not residents of South Africa whose holding of shares or
ADSs is effectively connected with a permanent establishment in South Africa through which the holder carries on business
activities, or (b) who are not the beneficial recipient of the dividends, or (c) who are not resident in South Africa but where the
source of the transaction or dividends is deemed to be in South Africa. In addition, it does not cover the tax consequences for a
holder that is not entitled to the benefits of the double taxation agreement concluded between the Republic of South Africa and
the United States of America signed on 17 February 1997 ("US Treaty"). It also assumes that the holders hold the ordinary
shares or ADSs on capital account (that is, for investment purposes) as opposed to on revenue account (that is for speculative
purposes or as trading stock). The Supreme Court of Appeal in South Africa indicated that gains will be on revenue account if
they are derived as part of a business in carrying out a scheme of profit making. We recommend that you consult your own tax
adviser concerning the consequences of holding our ordinary shares or ADSs, as applicable, in your particular situation,
particularly where tax treaties concluded by South Africa may apply. South Africa acceded to the Multilateral Instrument on
1 January 2023.
Dividends
With effect from 1 April 2012, South Africa introduced a Dividends Tax, which is a withholding tax on dividends effectively
borne by the shareholder receiving the dividend. The rate at which Dividends Tax is levied is 20% effective from
22 February 2017 (previously 15%). Dividends Tax is imposed on, among others, non-resident shareholders, and it is withheld
by the company declaring and paying the dividend to its shareholders or the regulated intermediary, as the case may be, as a
withholding agent. Dividends Tax is not payable to the extent that the recipient is, among others, a South African resident
company that has provided the relevant declaration and undertaking to the company declaring and paying the dividend.
Article 10 of the US Treaty provides that a dividend paid by a company that is a resident of South Africa for tax purposes to
a resident of the US for tax purposes may be taxed in the US. Article 10 of the US Treaty further provides that such a dividend
may also be taxed in South Africa. However, the tax charged in South Africa may not exceed 5% of the gross amount of the
dividends if the beneficial owner is a company that holds directly at least 10% of the voting stock of the South African company
paying the dividends. In all other cases, the US Treaty provides for a withholding tax of 15% of the gross amount of the
dividends.
It is deemed that an amount will be derived by a person from a source within South Africa if the amount constitutes a
dividend received by or accrued to that person. Residents of the US can make use of the lower rate as provided for in the US
Treaty if the relevant declaration and undertaking are provided to Harmony or the regulated intermediary beforehand. The
declaration and undertaking should be renewed after a five-year period effective from 1 July 2020. No time limitation is imposed
on the validity of the declarations and undertakings if a regulated intermediary applies the Financial Intelligence Centre
legislation, the common reporting standard regulations in relation to the declarations or the agreement between the Government
of South Africa and the Government of the US to improve International Tax Compliance and to Implement the US Foreign
Account Tax Compliance Act.
Capital Gains Tax
Capital Gains Tax ("CGT") was introduced in South Africa with effect from 1 October 2001. In the case of an individual,
40% in respect of years of assessment commencing 1 March 2016 (previously 33.3%) of the capital gain is included in the
individual’s taxable income (effectively 18%) should the individual pay tax at the marginal rate of 45% from 1 March 2017. In the
case of a corporate entity or trust, 80% in respect of years of assessment commencing 1 March 2016 of such gain is included in
its taxable income (effectively a rate of 21.6% for the corporate entity for years of assessment ending on or after 31 March 2023,
previously 22.4%, and 36% for a trust). The conduit principle that enabled trusts to transfer the tax liability to a beneficiary no
longer applies to trusts with foreign beneficiaries and these trusts are taxed in South Africa on the amounts concerned. CGT is
only applicable to non-residents if the proceeds from the sale of the shares or ADSs are sourced in South Africa or are
attributable to a permanent establishment of the non-resident shareholder. The US Treaty (which will prevail in the event of a
conflict) provides that the US holder of ordinary shares or ADSs will not be subject to CGT if the assets have been held as
capital assets, unless they are linked to a permanent establishment of such non-resident shareholder in South Africa. To the
extent that shares or ADSs are held on revenue account, a similar principle applies with reference to the payment of income tax.
Subject to Article 13 of the US Treaty (as indicated below), income tax is only payable to the extent that the gain is attributable to
the carrying on of a business in South Africa through a permanent establishment situated in South Africa. The current corporate
rate is equal to 27%. This results in the effective CGT rate of a corporate entity being 21.6%. Any gains realised on the disposal
of equity shares are automatically deemed to be of a capital nature if the equity shares have been held for a continuous period
of at least three years. Such provision applies automatically and is not elective. However, this deeming provision does not
include an ADS.
Generally, the domestic laws of South Africa provide that an amount received or accrued in respect of the disposal of an
asset is deemed to have been sourced in South Africa, and is therefore subject to South African tax, if the asset constitutes
immovable property situated in South Africa, or any interest in, or right of whatever nature to or in immovable property or
intellectual property situated in South Africa and is subject to South African tax. It includes the disposal of any equity shares held
by a person in a company if:
203
Table of contents
•80% or more of the market value of the equity shares, ownership or right to ownership or vested interest, as the case may
be, at the time of disposal thereof is attributable directly or indirectly to immovable property held otherwise than as trading
stock. This requirement will include rights to variable or fixed payments as consideration for the working of, or the right to
work mineral deposits, sources and other natural resources in South Africa; and
•the person directly or indirectly holds at least 20% of the equity shares in the company or ownership or right to ownership
of the other entity.
The provisions of the US Treaty override the deemed source rules to the extent applicable. Article 13 of the US Treaty
provides that South Africa is entitled to tax a capital gain that is attributable to the alienation of real property situated in South
Africa, which concept includes the equivalent of a US real property interest, even if held through means of shares.
Securities Transfer Tax
Securities Transfer Tax ("STT") is payable in respect of the transfer of any security issued by a South African company.
STT is levied at a rate of 0.25% of the taxable amount of the security concerned (generally the market value). A security is
defined to include a depository receipt in a company, in addition to shares in a company. STT is not payable on the issue of any
security.
Although ADSs in respect of our shares are not listed on the JSE, reference is specifically made in the legislation to the
transfer of depository receipts in a South African company. As a consequence, STT will be payable on the transfer of ADSs. In
addition, the process of depositing shares listed on the JSE in return for ADSs, or withdrawing such shares from the deposit
facility, will attract STT as and when the shares are transferred to or from the depository institution.
STT is payable by the broker or participant if a transaction is effected through a stockbroker or an exchange participant, but
it may be recovered from the person acquiring the beneficial ownership of the rights concerned. In other instances, STT is
payable by the person acquiring beneficial ownership.
STT is also payable on the subsequent redemption or cancellation of shares or ADSs.
Interest
South Africa has imposed a withholding tax on interest paid by any person to or for the benefit of any foreign person to the
extent that the interest is regarded as having been received or accrued from a source within South Africa at the rate of 15% with
effect from 1 March 2015. In terms of the US Treaty this rate is reduced to zero. However, the rate may change to 5% or 10% if
the US Treaty is renegotiated. US residents can only make use of the lower rate as provided for in the US Treaty if the relevant
declaration and undertaking are provided to the company paying the interest. The declaration and undertaking should be
renewed after a five-year period effective from 1 July 2020. No time limitation is imposed on the validity of the declarations and
undertakings if a regulated intermediary applies the Financial Intelligence Centre legislation, the common reporting standard
regulations in relation to the declarations or the agreement between the Government of South Africa and the Government of the
US to improve International Tax Compliance and to Implement the US Foreign Account Tax Compliance Act.
In terms of the latest amendments to the income tax laws that are effective from 1 January 2026, interest incurred by a
holder of debt (lender) on a loan raised by the lender to make loans to Harmony is only deductible to the extent of the interest
accrued, in circumstances where the interest is included in the income of that person, even though that person may not be
carrying on a trade.
Withholding tax on Service Fees
There is no separate withholding tax on service fees. Instead, these types of arrangements must be reported to SARS.
Transactions between residents and non-residents must thus be reported if they relate to consultancy, construction, engineering,
installation, logistical, managerial, supervisory, technical or training services, in circumstances where the expenditure exceeds or
is anticipated to exceed R10 million in aggregate and does not otherwise qualify as remuneration.
Capitalisation Shares
Capitalisation shares or bonus shares issued to holders of shares in lieu of cash dividends do not constitute dividends and
are currently not subject to Dividends Tax. However, these shares have a base cost of zero for income tax purposes.
Value Added Tax
Value-Added Tax ("VAT") in South Africa is a broad-based indirect tax levied under the Value-Added Tax Act 89 of 1991 on
the supply of goods and services by registered vendors in the course or furtherance of an enterprise. The standard rate is 15%,
with certain supplies being zero-rated (such as some exports and basic foodstuffs) and others exempt (such as certain financial
services, residential accommodation, and public transport). VAT is charged on taxable supplies made by vendors and is
ultimately borne by the final consumer, while businesses registered as vendors generally recover VAT incurred on their
purchases (input tax) against VAT charged on their sales (output tax). Whereas the purchase and sale of shares constitute an
exempt supply, commissions paid in respect thereof are subject to VAT at the standard rate.
Certain Material United States Federal Income Tax Considerations
The following is a discussion of certain material US federal income tax consequences of acquiring, holding and disposing
of the ordinary shares (for purposes of this summary, references to the ordinary shares include the ADSs, unless the context
otherwise requires).
You will be a "US holder" if you are a beneficial owner of ordinary shares and you are:
•an individual who is a citizen or resident of the United States;
204
Table of contents
•a corporation (or other entity taxable as a corporation for US federal income tax purposes) organised under the laws of the
United States, any state thereof, or the District of Columbia;
•an estate whose income is subject to US federal income tax regardless of its source; or
•a trust if: (i) a US court can exercise primary supervision over the trust’s administration and one or more US persons are
authorised to control all substantial decisions of the trust or (ii) it has a valid election in effect under applicable US Treasury
regulations to be treated as a US person.
This summary only applies to US holders that hold ordinary shares or ADSs as capital assets. This summary is based on
the US Internal Revenue Code of 1986, as amended, (the "Code"), its legislative history, existing and proposed US Treasury
regulations, published Internal Revenue Service ("IRS") rulings, the US Treaty and court decisions that are now in effect, any
and all of which are subject to differing interpretations and which could be materially and adversely changed. Any such change
could apply retroactively and could affect the continued validity of this summary. This summary does not consider the potential
effects, both adverse and beneficial, of any proposed legislation which, if enacted, could be applied, possibly on a retroactive
basis, at any time.
This summary does not purport to be a comprehensive description of all of the tax considerations that may be relevant to a
decision to purchase the ordinary shares. In particular, this summary deals only with US holders that will hold the ordinary
shares as capital assets within the meaning of Section 1221 of the Code. It does not address considerations that may be
relevant to you if you are an investor that is subject to special tax rules, such as a bank, real estate investment trust, regulated
investment company, insurance company, dealer in securities or currencies, trader in securities or commodities that elects mark-
to-market treatment, person that will hold the ordinary shares as a hedge against currency risk or as a position in a “straddle” or
conversion transaction, tax-exempt organisation, person whose “functional currency” is not the US dollar, person liable for
alternative minimum tax, person required to accelerate the recognition of any item of gross income with respect to shares or
ADSs as a result of such income being recognised on an applicable financial statement or a person who owns directly, indirectly
or by attribution, at least 10% of our stock. This summary also does not address any aspect of US federal non-income tax laws,
such as gift or estate tax laws, or state, local, or non-US tax laws, or, except as discussed below, any tax reporting obligations of
a holder of our ordinary shares.
If a partnership (including for this purpose any entity treated as a partnership for US federal income tax purposes) is a
beneficial owner of the ordinary shares, the US federal income tax treatment of a partner in the partnership generally will depend
on the status of the partner and the activities of the partnership. A holder of the ordinary shares that is a partnership and
partners in such a partnership should consult their own tax advisors about the US federal income tax consequences of
acquiring, holding, and disposing of the ordinary shares.
We believe that we will not be a passive foreign investment company ("PFIC"), for US federal income tax purposes for the
current taxable year and do not expect to become a PFIC in the foreseeable future. However, we cannot assure you that we will
not be considered a PFIC in the current or future years. If Harmony were to be treated as a PFIC, US holders of ordinary shares
or ADSs would be required (i) to pay a special US addition to tax on certain distributions and gains on sale and (ii) to pay tax on
any gain from the sale of ordinary shares or ADSs at ordinary income (rather than capital gains) rates in addition to paying the
special addition to tax on this gain. Such holder may also be required to file IRS Form 8621. Additionally, dividends paid by
Harmony would not be eligible for the reduced rate of tax described below under "- Taxation of Dividends". The remainder of this
discussion assumes that Harmony is not a PFIC for US federal income tax purposes. You should consult your own tax
advisers regarding the potential application of the PFIC regime.
Each prospective purchaser should consult their own tax advisor with respect to the US federal, state, local and non-US
tax consequences of acquiring, owning, or disposing of shares or ADSs.
US holders of ADSs
For US federal income tax purposes, a US holder of ADSs generally will be treated as the owner of the corresponding
number of underlying ordinary shares held by Deutsche Bank Trust Company Americas as depositary ("Depositary") for the
ADSs, and references to ordinary shares in the following discussion refer also to ADSs representing the ordinary shares.
Deposits and withdrawals of ordinary shares by US holders in exchange for ADSs will in general not result in the realisation
of gain or loss for US federal income tax purposes. Your tax basis in withdrawn ordinary shares will be the same as your tax
basis in the ADSs surrendered, and your holding period for the ordinary shares will include the holding period of the ADSs.
Taxation of Dividends
Distributions paid out of Harmony’s current or accumulated earnings and profits (as determined for US federal income tax
purposes), before reduction for any South African withholding tax paid by Harmony with respect thereto, will generally be taxable
to you as dividend income, and will not be eligible for the dividends received deduction allowed to corporations. Distributions that
exceed Harmony’s current and accumulated earnings and profits will be treated as a non-taxable return of capital to the extent
of your basis in the ordinary shares and thereafter as capital gain. However, we do not maintain calculations of our earnings and
profits in accordance with US federal income tax accounting principles. You should therefore assume that any distribution by us
with respect to the shares will be reported as ordinary dividend income. You should consult your own tax advisers with respect
to the appropriate US federal income tax treatment of any distribution received from us.
Dividends paid by Harmony generally will be taxable to non-corporate US holders at the reduced rate normally applicable
to long-term capital gains, provided that either (i) Harmony qualifies for the benefits of the US Treaty, or (ii) with respect to
dividends paid on the ADSs, the ADSs are considered to be "readily tradable" on the NYSE, and certain other conditions are
met. You will be eligible for this reduced rate only if you are an individual, and have held the ordinary shares or ADSs for more
than 60 days during the 121 day period beginning 60 days before the ex-dividend date.
205
Table of contents
For US federal income tax purposes, the amount of any dividend paid in Rand will be included in income in a US dollar
amount calculated by reference to the exchange rate in effect on the date the dividends are received by you or the Depositary
(in the case of ADSs), regardless of whether they are converted into US dollars at that time. If you or the Depositary, as the case
may be, convert dividends received in Rand into US dollars on the day they are received, you generally will not be required to
recognise foreign currency gain or loss in respect of this dividend income.
Effect of South African Withholding Taxes
As discussed above in "– Taxation – Certain South African Tax Considerations – Dividends", under current law, South
Africa imposes a withholding tax of 20% on dividends paid by Harmony. A US holder will generally be entitled, subject to certain
limitations, to a foreign tax credit against its US federal income tax liability, or a deduction in computing its US federal taxable
income, for South African income taxes withheld by Harmony (at a rate not exceeding any applicable Treaty rate). The rules
governing foreign tax credits are complex. Recently issued final US Treasury Regulations (“Final FTC Regulations”) have
imposed additional requirements that must be met for a foreign tax to be creditable, and Harmony does not intend to determine
whether such requirements will be met where non-US taxes are withheld (if any). However, recent notices from the IRS (the
“Notices”) indicate that the US Treasury and the IRS are considering proposing amendments to the Final FTC Regulations and
allow taxpayers, subject to certain conditions, to defer the application of many aspects of the Final FTC Regulations until the
date when a notice or other guidance withdrawing or modifying this temporary relief is issued (or any later date specified in such
notice or other guidance).
US holders that receive payments subject to South African withholding tax will be treated, for US federal income tax
purposes, as having received the amount of South African taxes withheld by Harmony, and as then having paid over the
withheld taxes to the South African taxing authorities. As a result of this rule, the amount of dividend income included in gross
income for US federal income tax purposes by a US holder with respect to a payment of dividends may be greater than the
amount of cash actually received (or receivable) by the US holder from Harmony with respect to the payment.
The rules governing foreign tax credits are complex. You should consult your tax adviser concerning the foreign tax
credit implications of the payment of South African withholding taxes.
Taxation of a Sale or other Disposition
Upon a sale or other disposition of ordinary shares or ADSs, other than an exchange of ADSs for ordinary shares and vice
versa, you will generally recognise US source capital gain or loss for US federal income tax purposes equal to the difference
between the amount realised and your adjusted tax basis in the ordinary shares or ADSs. Your tax basis in an ordinary share or
ADS will generally be its US dollar cost. This capital gain or loss will be long-term capital gain or loss if your holding period in the
ordinary shares or ADSs exceeds one year. However, regardless of your actual holding period, any loss may be treated as long-
term capital loss to the extent you receive a dividend that qualifies for the reduced rate described above under "– Taxation of
Dividends" and also exceeds 10% of your basis in the ordinary shares. The deductibility of capital losses is subject to significant
limitations.
Foreign currency received on the sale or other disposition of an ordinary share will have a tax basis equal to its US dollar
value on the settlement date. Foreign currency that is purchased will generally have a tax basis equal to the US dollar value of
the foreign currency on the date of purchase. Any gain or loss recognised on a sale or other disposition of a foreign currency
(including its use to purchase ordinary shares or upon exchange for US dollars) will be US source ordinary income or loss.
To the extent you incur STT in connection with a transfer or withdrawal of ordinary shares as described under "– Certain
South African Tax Considerations – Securities Transfer Tax" above, such STT will not be a creditable tax for US foreign tax
credit purposes.
Information with Respect to Foreign Financial Assets
US holders of “specified foreign financial assets” with an aggregate value in excess of US$50,000 at the end of the taxable
year, or US$75,000 at any time during the taxable year, are generally required to file an information report with respect to such
assets with their tax returns. “Specified foreign financial assets” may include financial accounts maintained by foreign financial
institutions, as well as the following, but only if they are not held in accounts maintained by financial institutions: (i) stocks and
securities issued by non-United States persons, (ii) financial instruments and contracts held for investment that have non-United
States issuers or counterparties and (iii) interests in foreign entities. US holders are urged to consult their tax advisors regarding
the application of this reporting requirement to their ownership of the ordinary shares.
US Information Reporting and Backup Withholding Rules
Payments of dividends and other proceeds with respect to ordinary shares or ADSs by US persons will be reported to you
and to the IRS as may be required under applicable regulations. Backup withholding may apply to these payments if you fail to
provide an accurate taxpayer identification number or certification of exempt status or fail to comply with applicable certification
requirements. Some holders are not subject to backup withholding. You should consult your tax adviser as to your qualification
for an exemption from backup withholding and the procedure for obtaining an exemption.
F. DIVIDENDS AND PAYING AGENTS
Not applicable.
G. STATEMENT BY EXPERTS
Not applicable.
206
Table of contents
H. DOCUMENTS ON DISPLAY
Our current Memorandum of Incorporation may be examined at our principal place of business at: Randfontein Office Park,
Corner of Main Reef Road and Ward Avenue, Randfontein, 1759, South Africa.
We file annual reports on Form 20-F with, and furnish periodic reports on Form 6-K to, the SEC. You can obtain access to
the documents filed via the Electronic Data Gathering, Analysis, and Retrieval (EDGAR) system on the SEC’s website (https://
www.sec.gov).
This Harmony 2026 Form 20-F reports information primarily regarding Harmony’s business, operations and financial
information relating to the fiscal year ended 30 June 2026. For more recent updates regarding Harmony, you may inspect any
reports, statements or other information that Harmony files with the SEC.
No material referred to in this annual report as being available on our website is incorporated by reference into, or forms
any part of, this annual report. References herein to our website shall not be deemed to cause such incorporation.
I. SUBSIDIARY INFORMATION
Not applicable.
ITEM 11 QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
The information set forth under the heading “Cautionary statement about forward-looking statements” on the inside front
cover is incorporated herein by reference.
General
We are exposed to market risks, including credit risk, foreign exchange risk, commodity price risk, other price risk and
interest rate risk associated with underlying assets, liabilities and anticipated transactions. Following periodic evaluation of these
exposures, we may enter into derivative financial instruments to manage these exposures. We have policies in areas such as
counterparty exposure and hedging practices, which have been approved by our audit and risk committee. We do not hold or
issue derivative financial instruments for trading or speculative purposes.
We did not apply hedge accounting to incidental hedges held in the past.
In accordance with IFRS 9 - Financial Instruments, we account for our derivative financial instruments as hedging
transactions if the following criteria are met:
•in the case of a hedge of an anticipated future transaction, there is a high probability that the transaction will occur, and
•in the case of a cash flow hedge, the hedging instrument is expected to be highly effective.
During fiscal 2026 and 2025, we designated all of the gold forward sales as well as gold zero cost collar contracts as cash
flow hedging instruments and applied hedge accounting to these transactions. See "– Commodity Price Sensitivity" below.
Foreign Currency Exchange Risk and Sensitivity
In the ordinary course of business, we enter into transactions denominated in foreign currencies (primarily US dollars,
Australian dollars and PNG Kina). In addition, we incur investments and liabilities in US dollars, Australian dollars and PNG Kina
from time to time. As a result, we are subject to transaction and translation exposure from fluctuations in foreign currency
exchange rates.
Harmony enters into foreign exchange hedging contracts to manage these risks. This can take the form of zero cost
collars, which establish a minimum (floor) and maximum (cap) Rand/US dollar exchange rate at which to convert the US dollars
we receive on our gold sales to Rand. The limit currently set by the board is 25% of the Group's foreign exchange risk exposure
for a period of 24 months. At 30 June 2026, the nominal amount of the zero cost collars is US$50 million spread over a 24-
month period with a weighted average cap price of US$1=R20.14 and weighted average floor price of US$1=R18.14. At
30 June 2026 Harmony had no open foreign exchange forward contracts.
Commodity Price Risk and Sensitivity
General
Our revenue is sensitive to the spot price of gold and copper (following the acquisition of MAC Copper) as newly mined
production is typically sold at the ruling market price of gold or copper, respectively. In the case of Hidden Valley, our revenue is
also sensitive to the spot price of silver. During fiscal 2025, Harmony entered into forward sales to establish the sales price in
advance of its future gold production. Harmony enters into gold collar hedging contracts as part of its derivative programme to
hedge the risk of lower gold prices and the limit for gold hedging as approved by the board continues to be 30%, 20% and 10%
of production in a 12-, 24- and 36-month period, respectively, and 50% of silver exposure over a 24-month period. As part of the
MAC Copper acquisition, Harmony took over the copper derivative contracts related to production at CSA. During fiscal 2026, all
the copper derivative contracts had matured. The limit set by the board for copper contracts going forward is 20% of copper
production over a 24-month period.
The market prices of gold and copper have a significant impact on our results of operations, our ability to pay dividends
and undertake capital expenditures, and the market price of our ordinary shares.
Gold prices have historically fluctuated widely and are affected by numerous industry factors over which we do not have
any control. See Item 3D: “Key Information – Risk Factors – Risks Related to Commodity Prices, Cash Flow and Financial
Performance – Our profitability, cash flows, Mineral Reserve estimates and shareholder returns are highly dependent on
commodity prices”. The aggregate effect of these factors, all of which are beyond our control, is impossible for us to predict.
207
Table of contents
Harmony’s Hedging Policy
As a general rule, we sell our gold production at market prices. However, commencing in fiscal 2017, Harmony started
entering into derivative contracts to manage the variability in cash flows from the Group’s production, to create cash certainty
and protect the Group against lower commodity prices. Harmony continues to apply its hedging strategy in a consistent and
disciplined manner as a prudent risk management tool, particularly in the context of its growth pipeline and capital commitments.
See Item 5: “Operating and Financial Review and Prospects – Operating Results – Results of Operations – Revenue".
Commodity Derivatives Agreements
At 30 June 2026, the open Rand gold forward sale contracts amounted to 66,000 ounces spread over 18 months at an
average of R1,707,000/kg. The open US$ gold forward contracts amounted to 13,000 ounces spread over 18 months at an
average of US$2,703/oz. The open Rand gold zero cost collar contracts amounted to 618,000 ounces at a weighted average
floor of R2,138,000/kg and a weighted average cap of R2,404,000/kg spread over 36 months. The open US$ gold zero cost
collar contracts amounted to 84,000 ounces spread over 36 months at a weighted average floor of US$3,575/oz and a weighted
average cap of US$3,969/oz.
The open US$ silver zero cost collars amounted to 2,110,000 ounces spread over 24 months at a weighted average floor
of US$46.29/oz and a weighted average cap of US$52.35/oz.
At 30 June 2025, the open Rand gold forward sale contracts amounted to 314,000 ounces spread over 30 months at an
average of R1,510,000/kg. The open US$ gold forward contracts amounted to 45,000 ounces spread over 30 months at an
average of US$2,468/oz. The open Rand gold zero cost collar contracts amounted to 432,000 ounces at a weighted average
floor of R1,757,000/kg and a weighted average cap of R1,996,000/kg spread over 36 months. The open US$ gold zero cost
collar contracts amounted to 72,000 ounces spread over 36 months at a weighted average floor of US$2,796/oz and a weighted
average cap of US$3,118/oz.
The open US$ silver zero cost collars amounted to 2,480,000 ounces spread over 24 months at a weighted average floor
of US$31.22/oz and a weighted average cap of US$35.04/oz.
Other Price Risk
The Group is exposed to the risk of fluctuations in the fair value of fair value through profit or loss financial assets as a
result of changes in market prices (other than changes in interest rates and foreign currencies). Harmony generally does not use
any derivative instruments to manage this risk.
Interest Rate Risk
Our interest rate risk arises mainly from borrowings. The Group has variable interest rate borrowings. Variable rate
borrowings expose the Group to cash flow interest rate risk.
The Group has not entered into interest rate swap agreements as the interest rate risk continues to be assessed as low.
Credit Risk
Credit risk is the risk that a counterparty may default or not meet its obligations in a timely manner. Financial instruments
which are subject to credit risk are restricted cash and investments, derivative financial assets and cash and cash equivalents,
as well as trade and other receivables (excluding non-financial instruments).
In assessing the creditworthiness of local institutions, management uses the national scale long-term ratings. The credit
risk arising from restricted cash and investments, derivative financial assets and cash and cash equivalents is managed by
ensuring amounts are only invested with financial institutions of good credit quality based on external credit ratings and by
assessing the underlying source of where the funds are invested. The Group has policies that limit the amount of credit
exposure to any one financial institution. The audit and risk committee reviews the exposure on a quarterly basis. Exposure to
credit risk on trade and other receivables is monitored on a regular basis by management.
At 30 June 2026, the national scale investment grade rating of the major South African banks remained unchanged at AA+
and the majority of the group's Australian counterparts remained at AA-, which is in line with the group's credit risk policy.
Liquidity Risk
Prudent liquidity risk management implies maintaining sufficient cash and marketable securities, and the availability of
funding through an adequate amount of committed credit facilities.
In the ordinary course of business, the Group receives cash from its operations and is required to fund working capital and
capital expenditure requirements. Management prepares cash flow forecasts weekly and ensures that surplus funds are
invested in a manner to achieve market-related returns and to provide sufficient liquidity at the minimum risk. The Group
maintains and refinances committed credit facilities as medium-term forecasts require. The audit and risk committee reviews the
updated forecasts quarterly. The Group is able to actively source financing at competitive rates. Where necessary, funds will be
drawn from its revolving credit facilities.
For the quantitative and qualitative disclosures required by Item 11, including current- and prior-year sensitivity analyses
relating to the Group’s material foreign exchange and commodity price risks, the assumptions and parameters used in those
analyses, and management’s assessments of interest rate and other price risks, see note 37 “Financial Risk Management” to
our consolidated financial statements set forth beginning on page F-1. Note 37 also describes the Group’s credit and liquidity
risks.
208
Table of contents
ITEM 12. DESCRIPTION OF SECURITIES OTHER THAN EQUITY SECURITIES 
A. DEBT SECURITIES
Not applicable.
B. WARRANTS AND RIGHTS
Not applicable.
C. OTHER SECURITIES
Not applicable.
D. AMERICAN DEPOSITARY SHARES
On 7 October 2011, Harmony appointed Deutsche Bank Trust Company Americas in place of The Bank of New York
Mellon as its Depositary for the ADSs evidenced by American Depositary Receipts ("ADRs"). A copy of our form of amended
and restated deposit agreement (the "Deposit Agreement") among the Depositary, owners and beneficial owners of ADSs and
Harmony was filed with the SEC as an exhibit to our Form F-6 filed on 15 August 2024.
The Depositary collects fees for delivery and surrender of ADSs directly from investors depositing shares or surrendering
ADSs for the purpose of withdrawal or from intermediaries acting for them. In addition, the Depositary collects an annual fee, or
Depositary Service Fee for the operation and maintenance costs in administering the ADSs. The Depositary collects fees for
making distributions to investors by deducting those fees from the amounts distributed or by selling a portion of the distributable
property to pay the fees.
The principal terms regarding fees and charges that an ADS holder might have to pay, as well as any fee and other
payments made by the Depositary to us as part of the Deposit Agreement, are summarised below:
Fees and Expenses
Persons depositing shares or withdrawing shares
holders must pay:
For:
$5.00 (or less) per 100 ADSs (or portion of 100 ADSs)
•The execution and delivery of ADSs
•The surrender of ADSs
$0.02 (or less) per ADS
•Any cash distributions
$0.02 (or less) per ADS
•Annual Depositary Service Fee for the operation and
maintenance costs in administering the ADSs
•$0.01 currently being administered as a fee
A fee equivalent to the fee that would be payable if securities
distributed to you had been shares and the shares had been
deposited for issuance of ADSs
•Distribution of securities distributed to holders of
deposited securities which are distributed by the
Depositary to ADS holders
Registration or transfer fees
•Transfer and registration of equity shares on our share
register to or from the name of the Depositary or its
agent when you deposit or withdraw shares
•
Expenses of the Depositary
•Cable, telex and facsimile transmissions (when
expressly provided in the Deposit Agreement)
•Converting foreign currency
Taxes and other governmental charges the Depositary or the
custodian have to pay on any ADS or share underlying an
ADS, for example, stock transfer taxes, stamp duty or
withholding taxes
•As necessary
Any charges incurred by the Depositary or its agents for
servicing the deposited securities
•As necessary
In addition, ADS holders must pay any tax or other governmental charge payable by the Depositary or its custodian on any ADS,
deposited security or distribution. If an ADS holder owes any tax or other governmental charge, the Depositary may:
•refuse to effect any transfer of such ADSs or any withdrawal of ADSs;
•withhold any dividends or other distributions; or
•sell part or all of the ADSs evidenced by such ADS,
and may apply dividends or other distributions or the proceeds of any sale in payment of the outstanding tax or other
governmental charge. The ADS holder remains liable for any shortfall.
209
Table of contents
Fees and payments made by the Depositary
The Depositary has agreed to reimburse Harmony for expenses Harmony incurs that are related to the maintenance
expenses of our ADR facility. The Depositary has agreed to pay the standard out-of-pocket maintenance costs for the ADRs,
which consist of the expenses of printing and distributing dividend checks, electronic filing of US federal tax information, mailing
required tax forms, stationery, postage, facsimile, and telephone calls. The amount of reimbursement available to Harmony is
not necessarily tied to the amount of fees the Depositary collects from investors.
During the fiscal year ended 30 June 2026, Harmony received net direct and indirect payments of R41,958,784 from the
Depositary.
PART II
ITEM 13 DEFAULTS, DIVIDEND ARREARAGES AND DELINQUENCIES
Not applicable.
ITEM 14 MATERIAL MODIFICATIONS TO THE RIGHTS OF SECURITY HOLDERS AND USE OF PROCEEDS
Not applicable.
ITEM 15 CONTROLS AND PROCEDURES
A. DISCLOSURE CONTROLS AND PROCEDURES
We maintain disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act,
that are designed to ensure that information required to be disclosed in the reports we file or furnish under the Exchange Act is
recorded, processed, summarised and reported within the time periods specified in the SEC’s rules and forms and that such
information is accumulated and communicated to management, including our CEO and Financial Director ("FD"), as appropriate,
to allow timely decisions regarding required disclosure.
In designing and evaluating our disclosure controls and procedures, our management necessarily is required to apply its
judgement. The design of our disclosure controls and procedures also is based in part upon certain assumptions about the
likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all
potential future conditions. Thus, in designing and evaluating our disclosure controls and procedures, our management,
including our CEO and FD, recognises that any controls and procedures, no matter how well designed and operated, can
provide only reasonable, not absolute, assurance of achieving the desired objectives of the disclosure controls and procedures.
As of 30 June 2026 (the "Evaluation Date"), Harmony's management, with the participation of our CEO and FD, carried out an
evaluation, pursuant to Rule 13a-15 promulgated under the Exchange Act of the effectiveness of our “disclosure controls and
procedures” (as defined in Rule 13a-15(e) under the Exchange Act).
In conducting this evaluation, management considered the matters that resulted in the restatement of comparative financial
information for the years ended 30 June 2024 and 2025 described in note 38 to the consolidated financial statements, as well as
the material weaknesses in internal control over financial reporting described below.
Based on that evaluation and because of the identification of the material weaknesses in our internal control over financial
reporting described in “Item 15B: Management’s Annual Report on Internal Control over Financial Reporting,” our management,
including the CEO and FD, concluded that our disclosure controls and procedures were not effective as of the Evaluation Date.
Notwithstanding these material weaknesses in internal control over financial reporting, our management, including our
CEO and FD, concluded that our consolidated financial statements present fairly, in all material respects, our financial position,
results of our operations and our cash flows for the periods presented in this Annual Report, in conformity with IFRS as issued
by the IASB.
B. MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING
Harmony's management is responsible for establishing and maintaining adequate internal control over financial reporting
as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act. Under Section 404 of the Sarbanes-Oxley Act,
management is required to assess the effectiveness of our internal control over financial reporting as of the end of each financial
year and report, based on that assessment, whether Harmony's internal control over financial reporting is effective.
Harmony's internal control over financial reporting is a process designed under the supervision of the CEO and FD to
provide reasonable assurance regarding the reliability of our financial reporting and the preparation of financial statements for
external purposes in accordance with IFRS issued by the IASB.
Harmony’s internal control over financial reporting includes those policies and procedures that (i) pertain to the
maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of
the Company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial
statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the Company are
being made only in accordance with authorisations of management and directors of the Company; and (iii) provide reasonable
assurance regarding prevention or timely detection of unauthorised acquisition, use, or disposition of the Company’s assets that
could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements.
Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial
statement preparation and presentation. Also, projections of any evaluation of effectiveness to future periods are subject to the
risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies
or procedures may deteriorate.
210
Table of contents
Management assessed the effectiveness of Harmony's internal control over financial reporting as of 30 June 2026. In
making this assessment, management used the criteria set forth by the Committee of Sponsoring Organizations of the
Treadway Commission in "Internal Control – Integrated Framework (2013)".
As permitted by SEC staff guidance for businesses acquired during the financial year and because it was not possible to
complete an assessment of MAC Copper's internal control over financial reporting during the period between completion of the
acquisition and 30 June 2026, management excluded the internal control over financial reporting of MAC Copper, which
operates the CSA copper mine in New South Wales, Australia, from its assessment of internal control over financial reporting as
of 30 June 2026. MAC Copper was acquired on 24 October 2025. MAC Copper is included in the consolidated financial
statements in this annual report on Form 20-F and represented approximately 25% of consolidated total assets as of 30 June
2026, and approximately 4% of consolidated revenues for the year ended 30 June 2026. The Company is in the process of
incorporating MAC Copper into its internal controls over financial reporting and will include it in management's assessment as of
30 June 2027.
Based on this evaluation, our management has concluded that, as of 30 June 2026, the Company’s internal control over
financial reporting was not effective due to the material weaknesses in internal control over financial reporting in the areas
described below.
A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that
there is a reasonable possibility that a material misstatement of our annual or interim financial statements will not be prevented
or detected on a timely basis.
Material weaknesses as of the Evaluation Date
As of the Evaluation Date, management identified the four material weaknesses described below. One was newly identified
during the year ended 30 June 2026. The remainder were first identified in our Form 20-F for the year ended 30 June 2025 and
had not been fully remediated as of the Evaluation Date.
Newly identified material weakness
•Management did not design and operate effective controls over the identification, evaluation and application of complex
IFRS requirements. Management’s controls did not ensure that accounting conclusions, calculations, journal entries and
related disclosures were subject to procedures sufficient to identify, evaluate and address material errors or omissions on a
timely basis. These deficiencies affected, amongst other matters, the accounting for payroll provisions and accruals and
depreciation.
Previously identified material weaknesses not yet fully remediated
The following material weaknesses, first identified in our Form 20-F for the year ended 30 June 2025, had not been fully
remediated as of the Evaluation Date, although management has made progress in addressing them:
•Management identified a material weakness relating to the level of detail with which certain control activities are defined.
Controls were in place to address the identified risks of material misstatement. However, the documented design of certain
of these controls did not define, with sufficient specificity, the procedures to be performed by the control operator, the
information to be used and the criteria for investigating and resolving exceptions, to demonstrate that the controls would
achieve their intended control objectives at the required level of precision. As a result of these deficiencies, there is a
reasonable possibility that a material misstatement of the consolidated financial statements would not be prevented or
detected on a timely basis.
In the prior year, the material weakness relating to control activities included inadequate risk assessment, more specifically,
controls did not exist for certain key processes, which was reported in our Form 20-F for the year ended 30 June 2025.
The absence of controls over key processes was addressed during the year ended 30 June 2026 through the design and
implementation of additional controls. In the current year, the material weakness relates to inappropriate design to mitigate
identified risks or insufficiently designed procedures to achieve the intended control objectives.
•Insufficient evidence of review procedures performed (including the level of precision of the review) for certain
Management Review Controls ("MRCs") and certain other  controls that contain an element of review, and of the
procedures performed to verify the completeness and accuracy of Information Produced by the Entity ("IPE") used in the
execution of those controls. MRCs are the reviews conducted by management of estimates and other kinds of information
for reasonableness. IPE is any information that is produced internally by a company and provided as evidence supporting
controls of such company.
In our Form 20-F for the year ended 30 June 2025, the MRC and IPE deficiencies were reported as two separate material
weaknesses. As of the Evaluation Date, these are reported as a single combined material weakness. This material
weakness  arose because of the aggregation of numerous individual control deficiencies, which impacted multiple
significant accounts and business processes, including significant accounting estimates. The majority of these deficiencies
relate to the sufficiency of the documented evidence of the review procedures and IPE procedures performed. Certain
deficiencies relating to the completeness and accuracy of information used in the calculation of unit-of-production
depreciation resulted in errors in depreciation and deferred taxation in previously issued financial statements, which have
been corrected through the restatement of comparative information in the consolidated financial statements (see Item 5:
"Operating and Financial Review and Prospects – Operating Results – Restatement of prior-year comparatives”).
211
Table of contents
•Ineffective information technology general controls (“ITGCs”) in the areas of user access and change management over
the Enterprise Resource Planning (“ERP”) system used by our Australasian operations, which supports the Company’s
financial reporting processes. Automated and manual business process controls in our Australasian operations that are
dependent on the affected ITGCs were also deemed ineffective because they could have been adversely impacted to the
extent that they rely upon information and configurations from the ERP system.
The ITGC material weakness reported in our Form 20-F for the year ended 30 June 2025 related to user access, change
management and IT operations over multiple IT systems throughout the Group that support the Company’s financial
reporting processes. During the year ended 30 June 2026, management made significant progress in remediating the
ITGC deficiencies over all of the systems in the Group, other than the user access and change management deficiencies
over the Australasian ERP system. As of the Evaluation Date, this material weakness is therefore limited to user access
and change management over a single IT system in the Australasian operations.
Plans to remediate the unremediated material weaknesses
Our management, under the oversight of the audit and risk committee, is continuing to design and implement a
remediation plan to address the material weaknesses that remain unremediated. The key components of our plan include:
•We are reassessing certain of our Sarbanes-Oxley Act control descriptions and procedures to ensure each control clearly
specifies the steps to be performed, the information used and the procedures to verify its completeness and accuracy, the
criteria and thresholds for investigating items and the evidence required to demonstrate the level of precision at which the
control operates.
•We are standardising the review templates, checklists and IPE documentation introduced during the year ended
30 June 2026 across all MRCs and IPE-dependent controls, so that the procedures performed, the information used, the
procedures performed over its completeness and accuracy, and the investigation and resolution of exceptions are
consistently evidenced.
•We are remediating the user access and change management ITGCs over the ERP system used by our Australasian
operations, including enhancements to user access provisioning and periodic user access and activity monitoring controls.
•We are enhancing our controls to include the periodic evaluation and formal documentation of judgemental accounting
matters to cater for changes in business, accounting standards and regulatory requirements.
•We are continuing to deliver training to personnel responsible for the operation of MRCs and controls dependent on IPE.
This training focuses on enhancing such personnel’s understanding of internal control over financial reporting, including
documentation standards and preparation of the appropriate evidence of review, in particular as related to MRCs, and IPE
procedures performed.
Our management believes that the measures above, as well as other measures that may be implemented, will remediate
the material weaknesses. However, the material weaknesses will not be considered remediated until the remediation plan has
been implemented to a sufficient degree for management to conclude, through testing, that the controls are designed,
implemented and operating effectively to provide reasonable assurance that a material misstatement to the consolidated
financial statements would be prevented, or detected and corrected. Management will continue to monitor the effectiveness of
the remedial measures in their future assessments of the effectiveness of internal control over financial reporting and disclosure
controls and procedures, and will make necessary changes to the design of the remedial plan and take other actions that are
deemed appropriate in the circumstances.
C. ATTESTATION REPORT OF THE REGISTERED PUBLIC ACCOUNTING FIRM
EY, an independent registered public accounting firm that audited the consolidated financial statements included in this
annual report on Form 20-F, has issued an adverse opinion on the effectiveness of Harmony’s internal control over financial
reporting as of 30 June 2026.
See Item 18 "Financial Statements – Report of independent registered public accounting firm".
D. CHANGES IN INTERNAL CONTROL OVER FINANCIAL REPORTING
During the year ended 30 June 2026, management implemented the remediation plans as described in our Form 20-F for
the year ended 30 June 2025.
We remain committed to ensuring a strong internal control environment. Management, with oversight from the audit and
risk committee, continues to implement and, where necessary, refine its remediation plans to address the material weaknesses
identified. Remediating these deficiencies remains a key priority and management has made progress during the year in
implementing remedial actions designed to address the underlying causes of the material weaknesses.
Except as described above, there have been no changes in the Company's internal control over financial reporting (as
such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) that occurred during the financial year ended
30 June 2026 that have materially affected, or are reasonably likely to materially affect, the Company's internal control over
financial reporting.
212
Table of contents
ITEM 16A. AUDIT COMMITTEE FINANCIAL EXPERT
Mr. Martin Prinsloo, independent non-executive chairman of the audit and risk committee, is regarded as being the
Company’s “audit committee financial expert” as defined by the rules of the SEC.
In addition, the audit and risk committee members through their collective experience meet a majority of the definitions of
the SEC for an “audit committee financial expert” in both the private and public sectors. The members have served as directors
and officers of numerous public companies and have over the years developed a strong knowledge and understanding of IFRS,
overseeing the preparation, audit and evaluation of financial statements. We believe that the combined knowledge, skills and
experience of the audit and risk committee, and their authority to engage outside experts as they deem appropriate to provide
them with advice on matters related to their responsibilities, enable them, as a group and under the guidance of Mr. Prinsloo, to
act effectively in the fulfilment of their tasks and responsibilities required under the Sarbanes-Oxley Act.
ITEM 16B. CODE OF ETHICS
The information set forth under the heading:
•“- Governance – Ethical leadership and sound corporate governance” on pages 195 to 207 of the Integrated Annual Report
for the 20-F 2026 is incorporated herein by reference.
ITEM 16C. PRINCIPAL ACCOUNTANT FEES AND SERVICES
EY served as Harmony's independent registered public accounting firm and principal accountant for the fiscal years ended
30 June 2026 and 30 June 2025.
A. AUDIT FEES
The following sets forth the aggregate fees billed for each of the last two fiscal years for professional fees to our principal
accountants for the audit of the annual financial statements, or for services normally provided by the accountant in connection
with statutory and regulatory filings or engagements for those fiscal years.
Fiscal year ended 30 June 2025 ....................................................................................................
Rand
71 million
Fiscal year ended 30 June 2026 ....................................................................................................
Rand
76 million
B. AUDIT-RELATED FEES
The following sets forth additional aggregate fees to those reported under “Audit Fees” in each of the last two fiscal years
that were provided by the principal accountant that are reasonably related to the performance of the audit or review of the
financial statements:
Fiscal year ended 30 June 2025 ....................................................................................................
Rand
8 million
Fiscal year ended 30 June 2026 ....................................................................................................
Rand
10 million
Fees related to interim reviews.
C. TAX FEES
The following sets forth the aggregate fees billed in each of the last two fiscal years for professional services rendered by
the principal accountant for tax compliance, tax advice and tax planning:
Fiscal year ended 30 June 2025 ....................................................................................................
Rand
—
Fiscal year ended 30 June 2026 ....................................................................................................
Rand
—
Not applicable
D. ALL OTHER FEES
The following sets forth the aggregate fees billed in each of the last two fiscal years for products and services provided by
the principal accountant not described above:
Fiscal year ended 30 June 2025 ....................................................................................................
Rand
—
Fiscal year ended 30 June 2026 ....................................................................................................
Rand
—
E. AUDIT AND RISK COMMITTEE PRE-APPROVAL POLICIES AND PROCEDURES
Our audit and risk committee pre-approves our engagement of the independent principal accountant to render audit or
non-audit services in terms of its non-audit services policy. All of the services described above were approved in terms of the
Company’s delegation of authority framework and the audit and risk committee’s policy on non-audit services.
ITEM 16D. EXEMPTIONS FROM THE LISTING STANDARDS FOR AUDIT COMMITTEES
Not applicable.
ITEM 16E. PURCHASES OF EQUITY SECURITIES BY THE ISSUER AND AFFILIATED PURCHASERS
None.
213
Table of contents
ITEM 16F. CHANGE IN REGISTRANT’S CERTIFYING ACCOUNTANT
Not applicable.
ITEM 16G. CORPORATE GOVERNANCE
Significant ways in which Harmony’s corporate governance practices differ from practices followed by US domestic
companies under the listing standards of the NYSE
Foreign private issuers, such as Harmony, must briefly highlight any significant ways in which their corporate governance
practices differ from those followed by US domestic companies subject to the listing standards of the NYSE. Set out below is a
brief summary of the significant differences.
US domestic companies are required to have a nominating/corporate governance committee and all members of this
committee must be non-executive directors. The JSE Listing Requirements also require the appointment of such a committee,
and stipulate that all members of this committee must be non-executive directors, the majority of whom must be independent.
Harmony has a nomination committee comprised of four non-executive board members, three of whom are independent. The
lead independent non-executive director serves as chairman of the nomination committee. For US domestic companies, all
members of this committee are required to be independent. The current chairman of our board of directors, Dr Patrice Motsepe,
is a member of the nomination committee and is also chairman of one of Harmony’s largest shareholders, African Rainbow
Minerals Limited, and is thus not independent. He is, however, in terms of South African governance practices, permitted to be a
member of the nomination committee.
US domestic companies are required to have a compensation committee composed entirely of independent directors.
Harmony has appointed a remuneration committee, comprised of three independent non-executive board members.
The non-executive directors of US domestic companies must meet at regularly scheduled executive sessions without
management. Although the JSE Listing Requirements do not require such meetings, the board meets without executives after
each board meeting. The board also has unrestricted access to all Company information, records, documents and property.
Directors may, if necessary, take independent professional advice at the Company’s expense and non-executive directors have
access to management and may meet separately with management, without the attendance of executive directors.
US domestic companies are required to have an audit committee composed entirely of independent directors. The
Companies Act requires that the members of the audit committee be approved by shareholders on an annual basis at a
company’s annual general meeting. Both the Companies Act and the JSE Listings Requirements require that the audit
committee be composed entirely of independent directors. Harmony has appointed an audit and risk committee, currently
comprising five non-executive directors, all of whom are independent, as defined under the Companies Act, the JSE Listings
Requirements and the listing standards of the NYSE.
The listing standards of the NYSE generally require shareholder approval for the adoption of, or any material revisions to,
equity compensation plans. However, under the listing standards of the NYSE, Harmony is permitted to follow home country
practice in lieu of such requirements and has elected to do so.
The Companies Act and the JSE Listings Requirements require the appointment of a Social and Ethics Committee.
Harmony has appointed a Social Ethics and Sustainability Committee, currently comprised of four independent non-executive
directors. There is no such requirement under the listing standards of the NYSE.
ITEM 16H. MINE SAFETY DISCLOSURE
Not applicable.
GLOSSARY OF MINING TERMS
The following explanations are not intended as technical definitions, but rather are intended to assist the general reader in
understanding certain terms as used in this annual report.
Alluvial: the product of sedimentary processes in rivers, resulting in the deposition of alluvium (soil deposited by a river).
All-in sustaining costs: all-in sustaining costs include mine production costs, transport and refinery costs, applicable
general and administrative costs, costs associated with movements in production inventories, ore stockpiles, as well as ongoing
environmental rehabilitation costs as well as transfers for stripping activities and costs associated with royalties. Employee
termination costs are included, however employee termination costs associated with major restructuring and shaft closures are
excluded. The following costs are also included: LED expenditure for continuing operations, share-based payments for
continuing operations, corporate costs, sustaining exploration costs and sustaining capital expenditure including OCD
expenditure and rehabilitation accretion and amortisation for continuing operations. Depreciation costs are excluded. All-in
sustaining costs per ounce and per kilogram are attributable all-in sustaining costs divided by attributable ounces or kilograms of
gold sold.
Auriferous: a substance that contains gold ("Au").
Beneficiation: the process of adding value to gold products by transforming gold bullion into fabricated gold products.
By-products: Commodities recovered during mining and processing that are not considered the principal commodity or
commodities of the relevant operation. Depending on the operation, by-products may include gold, silver, uranium, copper,
molybdenum or other minerals.
Carbon in leach ("CIL"): Gold is leached from a slurry of gold ore with cyanide in agitated tanks and adsorbed on to carbon
granules in the same circuit. Granules are separated from the slurry and treated to remove the gold.
214
Table of contents
Carbon in pulp ("CIP"): Gold is leached conventionally from a slurry of gold ore with cyanide in agitated tanks. The leached
slurry passes into the CIP circuit where carbon granules are mixed with the slurry and gold is absorbed onto the carbon.
Granules are separated from the slurry and treated to remove gold.
Carbon in solution ("CIS"): a process similar to CIP except that the gold, which has been leached by the cyanide into
solution, is separated by the process of filtration (solid/liquid separation). The solution is then pumped through six stages where
the solution comes into contact with the activated carbon granules.
Cash costs: total cash costs include site costs for all mining, processing and administration, reduced by contributions from
by-products and include royalties and production taxes. Depreciation, rehabilitation, corporate administration, retrenchment,
capital and exploration costs are excluded. Total cash costs per ounce and per kilogram are attributable total cash costs divided
by attributable ounces or kilograms of gold produced.
Concentrate grade:the concentration of contained metal in a concentrate, typically expressed as a percentage of the
concentrate mass for copper and other base metals.
Conglomerate: a coarse-grained classic sedimentary rock, composed of rounded to sub-angular fragments larger than
2mm in diameter (granules, pebbles, cobbles, boulders) set in a fine-grained matrix of sand or silt, and commonly cemented by
calcium carbonate, iron oxide, silica or hardened clay.
Copper concentrate: a product resulting from the processing of copper-bearing ore, generally by crushing, grinding and
flotation. It contains copper and may also contain gold, silver and other minerals, together with non-metallic material. Copper
concentrate is commonly sold to a smelter for further processing.
Contained copper: the quantity of copper contained in ore, concentrate or another material, calculated before taking
account of metallurgical, commercial, smelter, refinery, transport or other deductions, unless otherwise stated.
Copper produced: the quantity of copper contained in concentrate produced at a mine or processing plant, unless
otherwise stated. Copper produced may differ from copper sold or payable copper due to inventory movements, payability
terms, product specifications and other commercial factors.
Cut-off grade: the grade (i.e. the concentration of metal or mineral in rock) that determines the destination of the material
during mining. For purposes of establishing “prospects of economic extraction,” the cut-off grade is the grade that distinguishes
material deemed to have no economic value (it will not be mined in underground mining or if mined in surface mining, its
destination will be the waste dump) from material deemed to have economic value (its ultimate destination during mining will be
a processing facility). Other terms used in similar fashion as cut-off grade include NSR, pay limit, and break-even stripping ratio.
Decline: an inclined underground access way.
Depletion: the decrease in quantity of ore in a deposit or property resulting from extraction or production.
Development: process of accessing an orebody through shafts or tunnelling in underground mining.
Development stage property: a property that has mineral reserves disclosed, pursuant to this subpart, but no material
extraction.
Dilution: unmineralised rock that is by necessity, removed along with ore during the mining process that effectively lowers
the overall grade of the ore.
Economically viable: when used in the context of Mineral Reserve determination, means that the qualified person has
determined, using a DCF analysis, or has otherwise analytically determined, that extraction of the Mineral Reserve is
economically viable under reasonable investment and market assumptions.
Electro-winning: the process of removing gold from solution by the action of electric currents.
Elution: removal of the gold from the activated carbon before the zinc precipitation stage.
Exploration: activities associated with ascertaining the existence, location, extent or quality of mineralised material,
including economic and technical evaluations of mineralised material.
Fabricated gold: gold on which work has been performed to turn it into a product, such as jewellery, which differs from a
pure investment product, such as a gold bullion bar.
Feasibility study: a comprehensive technical and economic study of the selected development option for a mineral project,
which includes detailed assessments of all applicable modifying factors, as defined by this section, together with any other
relevant operational factors, and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that
extraction is economically viable. The results of the study may serve as the basis for a final decision by a proponent or financial
institution to proceed with, or finance, the development of the project.
Final settlement: the final calculation of consideration receivable or payable for a concentrate shipment after the relevant
product assays, moisture content, metal prices, payability, TCRCs, deductions, penalties and other contractual terms have been
determined.
Flotation: a mineral-processing method used to separate valuable minerals from ore. Finely ground ore is mixed with water
and reagents, and air is introduced to cause selected minerals to attach to air bubbles and rise to the surface as a concentrate.
Flotation concentrate: a product recovered through flotation that contains a higher concentration of valuable minerals than
the material processed and is intended for further treatment, smelting or refining.
Footwall: the underlying side of a fault, orebody or stope.
215
Table of contents
Forward sale: the sale of a commodity for delivery at a specified future date and price.
Gold reserves: the gold contained within proven and probable reserves on the basis of recoverable material (reported as
mill delivered tons and head grade).
Gold produced: refined gold derived from the mining process, measured in ounces or kilograms in saleable form.
Grade: the concentration of a metal, mineral or other commodity within ore or mineralized material, expressed in units
appropriate to the commodity. Grade is commonly expressed as grams per tonne (g/t) for precious metals and as a percentage
(%) for copper and other base metals.
Greenfield: a potential mining site of unknown quality.
Head grade: the grade of the ore as delivered to the metallurgical plant.
Indicated Mineral Resource: that part of a Mineral Resource for which quantity and grade or quality are estimated on the
basis of adequate geological evidence and sampling. The level of geological certainty associated with an Indicated Mineral
Resource is sufficient to allow a QP to apply modifying factors in sufficient detail to support mine planning and evaluation of the
economic viability of the deposit. Because an Indicated Mineral Resource has a lower level of confidence than the level of
confidence of a Measured Mineral Resource, an Indicated Mineral Resource may only be converted to a probable Mineral
Reserve.
Inferred Mineral Resource: that part of a Mineral Resource for which quantity and grade or quality are estimated on the
basis of limited geological evidence and sampling. The level of geological uncertainty associated with an Inferred Mineral
Resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in
a manner useful for evaluation of economic viability. Because an Inferred Mineral Resource has the lowest level of geological
confidence of all Mineral Resources, which prevents the application of the modifying factors in a manner useful for evaluation of
economic viability, an Inferred Mineral Resource may not be considered when assessing the economic viability of a mining
project and may not be converted to a Mineral Reserve.
Leaching: dissolution of gold from crushed or milled material, including reclaimed slime, prior to absorption on to activated
carbon.
Level: the workings or tunnels of an underground mine that are on the same horizontal plane.
Measured Mineral Resource: that part of a Mineral Resource for which quantity and grade or quality are estimated on the
basis of conclusive geological evidence and sampling. The level of geological certainty associated with a Measured Mineral
Resource is sufficient to allow a QP to apply modifying factors, as defined in this section, in sufficient detail to support detailed
mine planning and final evaluation of the economic viability of the deposit. Because a Measured Mineral Resource has a higher
level of confidence than the level of confidence of either an Indicated Mineral Resource or an Inferred Mineral Resource, a
Measured Mineral Resource may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve.
Measures: conversion factors from metric units to US units are provided below.
Metric unit
 
US equivalent
1 tonne
= 1 t
= 1.10231 short tons
1 tonne
= 1 t
= 2,204.62 pounds
1 pound
= 1 lb
= 0.453592 kilograms
1 gram
= 1 g
= 0.03215 ounces
1 troy ounce
= 1 oz
= 31.1035 grams
1 gram per tonne
= 1 g/t
= 0.02917 ounces per short ton
1 kilogram per tonne
= 1 kg/t
= 29.16642 ounces per short ton
1 kilometre
= 1 km
= 0.621371 miles
1 metre
= 1 m
= 3.28084 feet
1 centimetre
= 1 cm
= 0.3937 inches
1 millimetre
= 1 mm
= 0.03937 inches
1 hectare
= 1 ha
= 2.47105 acres
Metallurgical plant: a processing plant used to treat ore and extract the contained gold and copper.
Mill delivered tons: a quantity, expressed in tons, of ore delivered to the metallurgical plant.
Milling/mill: the comminution of the ore, although the term has come to cover the broad range of machinery inside the
treatment plant where the gold is separated from the ore.
Mine Call Factor: the ratio, expressed as a percentage, of the total quantity of recovered and unrecovered mineral product
after processing with the amount estimated in the ore based on sampling.
Mineralisation: the presence of a target mineral in a mass of host rock.
Mineralised material: a mineralised body that has been delineated by appropriately spaced drilling and/or underground
sampling to support a sufficient tonnage and average grade of metals to warrant further exploration. Such a deposit does not
qualify as a reserve until a comprehensive evaluation based upon unit cost, grade, recoveries, and other material factors
conclude legal and economic feasibility.
216
Table of contents
Mineral Reserves: an estimate of tonnage and grade or quality of Indicated and Measured Mineral Resources that, in the
opinion of the QP, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a
Measured or Indicated Mineral Resource, which includes diluting materials and allowances for losses that may occur when the
material is mined or extracted.
Mineral Resource: a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form,
grade or quality, and quantity that there are reasonable prospects for eventual economic extraction. A Mineral Resource is a
reasonable estimate of mineralisation, taking into account relevant factors such as cut-off grade, likely mining dimensions,
location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part,
become economically extractable. It is not merely an inventory of all mineralisation drilled or sampled.
Modifying factors: the factors that a QP must apply to Indicated and Measured Mineral Resources and then evaluate to
establish the economic viability of Mineral Reserves. A QP must apply and evaluate modifying factors to convert Measured and
Indicated Mineral Resources to Proven and Probable Mineral Reserves. These factors include but are not restricted to: mining;
processing; metallurgical; infrastructure; economic; marketing; legal; environmental compliance; plans, negotiations, or
agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics of the
modifying factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project.
Offtake agreement: an agreement under which a producer agrees to sell, and a purchaser agrees to buy, specified
quantities of mineral product, such as copper concentrate, on agreed terms.
Open-pit/Opencast/Open cut: mining in which the ore is extracted from a pit. The geometry of the pit may vary with the
characteristics of the orebody.
Ore: a mixture of mineralised material from which at least one of the contained minerals can be mined and processed at an
economic profit.
Ore grade: the average concentration of a metal, mineral or other commodity contained within a unit of ore, expressed in
units appropriate to the commodity. Ore grade is commonly expressed as grams per tonne (g/t) or ounces per ton (oz/t) for
precious metals and as a percentage (%) for copper and other base metals.
Orebody: a well-defined mass of mineralised material of sufficient mineral content to make extraction economically viable.
Ounce: one Troy ounce, which equals 31.1035 grams.
Overburden: the soil and rock that must be removed to expose an ore deposit.
Placer: a sedimentary deposit containing economic quantities of valuable minerals mainly formed in alluvial environments.
Pre-feasibility study: a comprehensive study of a range of options for the technical and economic viability of a mineral
project that has advanced to a stage where a QP has determined (in the case of underground mining) a preferred mining
method, or (in the case of surface mining) a pit configuration, and in all cases has determined an effective method of mineral
processing and an effective plan to sell the product. A pre-feasibility study includes a financial analysis based on reasonable
assumptions, based on appropriate testing, about the modifying factors and the evaluation of any other relevant factors that are
sufficient for a QP to determine if all or part of the Indicated and Measured Mineral Resources may be converted to Mineral
Reserves at the time of reporting. The financial analysis must have the level of detail necessary to demonstrate, at the time of
reporting, that extraction is economically viable. A pre-feasibility study is less comprehensive and results in a lower confidence
level than a feasibility study. A pre-feasibility study is more comprehensive and results in a higher confidence level than an initial
assessment.
Precipitate: the solid product of chemical reaction by fluids such as the zinc precipitation referred to below.
Probable Mineral Reserves: the economically mineable part of an Indicated and, in some cases, a Measured Mineral
Resource.
Production stage property: a property with material extraction of Mineral Reserves.
Prospect: an area of land with insufficient data available on the mineralisation to determine if it is economically
recoverable, but warranting further investigation.
Prospecting license: an area for which permission to explore has been granted.
Proven Mineral Reserves: the economically mineable part of a measured Mineral Resource and can only result from
conversion of a measured Mineral Resource.
Provisional pricing: the initial pricing of a concentrate sale before the final metal price, product quality, moisture content,
payability, TCRCs, deductions and other contractual adjustments are determined.
Pyrite: a brassy-coloured mineral of iron sulphide (compound of iron and sulphur).
Qualified Person: (i) a mineral industry professional with at least five years of relevant experience in the type of
mineralisation and type of deposit under consideration and in the specific type of activity that person is undertaking on behalf of
the registrant and (ii) an eligible member or licensee in good standing of a recognised professional organisation at the time the
technical report is prepared. Regulation S-K 1300 details further recognised professional organisations and also relevant
experience.
Quartz: a mineral compound of silicon and oxygen.
Quotational period: the period specified in a sales contract during which the relevant metal price is determined for
purposes of provisional or final settlement.
217
Table of contents
Recovery grade: the actual grade of ore realised in the final product after the mining and treatment process.
Reef: a gold-bearing sedimentary horizon, normally a conglomerate band, which may contain economic levels of gold.
Refining: a metallurgical process of purifying a metal or intermediate metal product to produce a metal of the required
purity, specification or marketable grade.
Rehabilitation: the process of restoring mined land to a condition approximating its original state.
Sampling: taking small pieces of rock at intervals along exposed mineralisation for assay (to determine the mineral
content).
Shaft: a shaft provides principal access to the underground workings for transporting personnel, equipment, supplies, ore
and waste. A shaft is also used for ventilation and as an auxiliary exit. It is equipped with a surface hoist system that lowers and
raises conveyances for men, materials and ore in the shaft. A shaft generally has more than one conveyancing compartment.
Slimes: the finer fraction of tailings discharged from a processing plant after the valuable minerals have been recovered.
Slurry: a fluid comprising fine solids suspended in a solution (generally water containing additives).
Smelting: thermal processing whereby molten metal is liberated from beneficiated mineral or concentrate with impurities
separating as lighter slag.
Spot price: the current price of a metal for immediate delivery.
Stockpile: a store of unprocessed ore.
Stope: the underground excavation within the orebody where the main gold production takes place.
Stripping: the process of removing overburden to expose ore.
Sulphide: a mineral characterised by the linkages of sulphur with a metal or semi-metal, such as pyrite, FeS.
Syncline: a basin-shaped fold.
Tailings: finely ground rock of low residual value from which valuable minerals have been extracted is discarded and stored
in a designed dam facility.
Tailings dam (slimes dam): dam facilities designed to store discarded tailings.
Ton: one ton is equal to 2,000 pounds (also known as a “short” ton).
Tonnage: quantities where the ton or tonne is an appropriate unit of measure. Typically used to measure reserves of gold-
bearing material in situ or quantities of ore and waste material mined, transported or milled.
Tonne: one tonne is equal to 1,000 kilograms (also known as a “metric” tonne).
(in this annual report we have used metric tonnes unless specified otherwise and we may have used Ton(s) and Tonne(s)
interchangeably)
Treatment and refining charges ("TCRCs"): the treatment charges and refining charges applicable to the processing of
copper concentrate. TCRCs, together with payability terms, deductions, penalties and commodity prices, affect the net proceeds
received from concentrate sales.
Trend: the arrangement of a group of ore deposits or a geological feature or zone of similar grade occurring in a linear
pattern.
Unconformity: the structural relationship between two groups of rock that are not in normal succession.
Waste: rock or other material mined that does not meet the applicable cut-off grade or other criteria for processing and is
therefore not classified as ore at the time of mining.
Waste rock: the non-mineralised rock and/or rock that generally cannot be mined economically that is hoisted to the
surface for disposal on the surface normally close to the shaft on an allocated dump.
Yield: the actual grade of ore realised after the mining and treatment process.
Zinc precipitation: a chemical reaction using zinc dust that converts gold solution to a solid form for smelting into unrefined
gold bars.
218
Table of contents
CERTAIN ABBREVIATIONS
Ag ..........................................................................................................
Silver
Au ..........................................................................................................
Gold
b .............................................................................................................
Barrs
Bi ...........................................................................................................
Bismuth
cm..........................................................................................................
Centimetre
cmg/t .....................................................................................................
Centimetre-grams per metric tonne
Cu ..........................................................................................................
Copper
dmt ........................................................................................................
Dry metric tonne
Fe ..........................................................................................................
Iron
g .............................................................................................................
Gram
g/t ..........................................................................................................
Grams per metric tonne
ha ..........................................................................................................
Hectare
kg ...........................................................................................................
Kilogram
kg/t ........................................................................................................
Kilogram per metric tonne
km..........................................................................................................
Kilometre
km2 ........................................................................................................
Square kilometre
koz .........................................................................................................
Thousand troy ounces
ktpm ......................................................................................................
Thousand tonnes per month
lb ............................................................................................................
Pound
m............................................................................................................
Metre
M............................................................................................................
Million
mm ........................................................................................................
Millimetre
Moz .......................................................................................................
Million troy ounces
Mt ..........................................................................................................
Million metric tonnes
Mtpa ......................................................................................................
Million metric tonnes per annum
Ni ...........................................................................................................
Nickel
oz ...........................................................................................................
Troy ounce
oz/kg .....................................................................................................
Ounce per kilogram
ppm .......................................................................................................
Parts per million
Pb ..........................................................................................................
Lead
R/kg .......................................................................................................
South African Rand per kilogram
R/t ..........................................................................................................
South African Rand per tonne
t ..............................................................................................................
Metric tonne
t/m3 ........................................................................................................
Metric tonne per cubic metre
U ............................................................................................................
Uranium
US$/oz ..................................................................................................
United States dollars per troy ounce
Zn ..........................................................................................................
Zinc
ITEM 16I: DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS
Not applicable.
ITEM 16J: INSIDER TRADING POLICIES
Harmony has adopted a formal Insider Trading Policy that governs the purchase, sale, and other dealings in the
Company’s securities by directors, prescribed officers, company secretaries, employees involved in financial reporting, and
other designated insiders. The policy is reasonably designed to promote compliance with applicable insider trading laws, rules
and regulations, including the South African Financial Markets Act, 2012, and the listing standards applicable to Harmony,
including the JSE Listings Requirements. A copy of the Insider Trading Policy is filed as Exhibit 11.1 to this annual report on
Form 20-F.
The policy prohibits trading in Harmony securities while in possession of material non-public information and includes
provisions to prevent the unlawful disclosure of such information. It also requires pre-clearance of trades by directors and
prescribed officers and imposes mandatory blackout periods around the release of financial results and other sensitive corporate
events.
219
Table of contents
The policy is communicated to all relevant employees and is enforced through internal compliance procedures, including
training, monitoring, and disciplinary measures for violations.
Differences from US. Domestic Issuer Practices
While Harmony’s insider trading policy is broadly aligned with the principles underlying US securities laws, there are
several notable differences:
Aspect
Harmony Gold (South Africa)
Typical US Practice
Legal Framework
Financial Markets Act and JSE Listings
Requirements
Exchange Act and SEC Rule 10b-5 thereunder
Blackout Periods
From end of reporting period until results are
published; during cautionary announcements
Typically 30 days before earnings release until 2
days after
Pre-Clearance Requirements
Required for directors, prescribed officers,
company secretary, and major subsidiary
directors
Applies to Section 16 officers and key
employees
Scope of Covered Persons
Includes associates, family members, controlled
entities, and investment managers
Generally includes officers, directors, and
certain employees; associates less emphasised
Policy Filing
Not filed with regulators; disclosed in narrative
form
Often filed or referenced in proxy statements or
on an annual report on Form 10-K
Disclosure of Trades
Within 3 business days to company secretary;
public disclosure via Stock Exchange News
Service within 24 hours
Typically within 2 business days (Form 4) or 45
calendar days (Form 5) via filings with the SEC
Enforcement Mechanism
Internal compliance and disciplinary action
under South African labour law; criminal
penalties
Internal compliance plus SEC enforcement and
civil penalties
Notification to Associates
Formal written notification required; disclosure
obligations imposed
Not commonly required in US policies
Validity of Clearance to Trade
Valid for 5 business days unless within a closed
period
Typically valid until next blackout period or
material event
ITEM 16K: CYBERSECURITY
Risk Management and Strategy
See “Integrated Annual Report for the 20-F 2026 – Harmony – Operating context" on pages 12 to 14.
Harmony’s cybersecurity governance employs a comprehensive and integrated approach to risk management, engaging
both internal teams and third-party service providers. Harmony has established protocols for continuous monitoring and
proactive management of cybersecurity threats through daily and weekly meetings and continuous interactions with its 24/7
outsourced Security Operations Centre (“SOC”). The SOC regularly engages with Harmony’s internal cybersecurity team to
address identified threats and vulnerabilities.
Harmony’s strategy includes monthly cross-departmental management meetings where cyber risk is discussed. External
penetration tests and internal phishing simulations are conducted bi-annually to evaluate and enhance incident response
capabilities and employee awareness. Cyber incident response plans are documented including detailed playbooks designed to
enable timely response and recovery in the event of a cyber incident. Cybersecurity processes are fully integrated into
Harmony's broader enterprise risk management system.
The continuous engagement between Harmony’s internal cybersecurity team, technology stakeholders, and the SOC
underscores Harmony’s comprehensive approach to risk assessment and mitigation. The head of the department for
cybersecurity (''Manager: CyberSecurity''), meets with the Group chief technology and information officer (“GCTIO”) on a
weekly basis. In addition, quarterly technology and information systems steering committee meetings include representatives
from Group internal audit, enterprise risk management, security, operations, safety, and compliance.
Harmony routinely engages third parties in its cybersecurity operations. These engagements include:
•Consulting with external experts to provide specialised cybersecurity services, including penetration testing.
•Utilising an internal training platform to deliver and monitor cyber awareness training modules ensuring employees remain
current on best practices.
•Collaborating with operational technology to address specific cybersecurity challenges in operational environments.
•Outsourcing its SOC to a managed service provider that operates continuously, providing round-the-clock monitoring and
response to cybersecurity threats.
220
Table of contents
•Periodic reviews are also conducted by Group Internal Audit using the National Institute of Standards and Technology
framework (''NIST framework") and the Center for Internet Security Framework ("CIS framework") as benchmarks to
assess cybersecurity readiness.
Harmony engages with vendors that have access to its network, requiring their compliance with Harmony's Cybersecurity
Awareness Training mandate. This initiative emphasises the completion of training campaigns and awareness of key cyber
risks, such as phishing. Harmony has also introduced a process to include cybersecurity clauses in all new vendor contracts to
ensure service level agreements, roles and responsibilities for managing cyber threats are clearly defined. For existing
contracts, these clauses are incorporated upon amendment or renewal. This initiative is part of a broader effort to embed
Harmony’s cybersecurity standards into all third-party relationships.
Governance
Harmony has established governance procedures to manage cybersecurity threats. Senior management, including the
GCTIO, the Manager: Cybersecurity and various management committees, such as the enterprise architecture, change/project
delivery, and technology steering committees, are responsible for assessing cybersecurity risks and formulating mitigation
strategies. These forums align with the Group technology strategy to ensure a coordinated and consistent approach.
The GCTIO is accountable for Harmony’s technology and information functions, while the Manager: Cybersecurity leads
the cybersecurity strategy and related initiatives. Harmony also engages external legal counsel to provide specialised advice on
cybersecurity compliance and risk management. This combination of internal and external expertise ensures proactive oversight
and continuous improvement of the cybersecurity framework.
Structured reporting and communication processes ensure that management remains informed on cybersecurity matters,
including threat prevention, detection, mitigation and remediation. The Manager: Cybersecurity provides regular updates to the
GCTIO during weekly one-on-one meetings and monthly Group technology management committee sessions. This structured
communication flow enables the GCTIO to provide updates to the executive committee and the audit and risk committee.
Group enterprise risk management and Group internal audit have incorporated cybersecurity within their mandates,
reinforcing its importance across the organisation. Representatives from Group internal audit, Group risk management, security
and compliance participate in quarterly technology and information steering committee meetings. From a disclosure perspective,
the executive committee assesses the materiality of reported cybersecurity incidents in accordance with applicable disclosure
standards.
Key Cybersecurity Personnel
Dr Hendrik Kotze – Group CTIO
B Com (Commercial Computer Science) - University of Pretoria
MBA International Business
Doctor of Philosophy – Kairos University, USA
The GCTIO is responsible for managing the entire technology infrastructure of Harmony, including hardware, software,
networks, and data centres, ensuring that these systems are reliable, secure, and scalable to meet the organisation's evolving
needs.
Stanley Pautz – Manager: Cybersecurity
B Com (Internal Audit), University of Pretoria
Certified Information Systems Auditor - ISACA
Certified in Risk and Information Systems Control - ISACA
CIA – Certified Internal Auditor (IIA – not maintained)
The Manager: Cybersecurity ensures that the entire technology landscape is overseen, secure and safe in line with the business
and technology strategies.
Dr Christiaan Roos – Lead: Cybersecurity operations
D Com (PhD), IT Audit, IT Governance and Ethical Hacking, University of Johannesburg
CEH – Certified Ethical Hacker
Project Management Professional (PMP), Project Management Institute
Dr Roos was contracted as virtual chief information security officer of Harmony with effect from 1 March 2021.
Board Oversight
Harmony has established mechanisms to ensure that both the board of directors and the audit and risk committee are
regularly informed of cybersecurity threats and the measures taken to address them. The GCTIO, supported by the
Manager: Cybersecurity, provides regular updates to these bodies, including discussions of material cybersecurity incidents,
vulnerabilities, defences, and planned response strategies.
221
Table of contents
The GCTIO attends audit and risk committee meetings and reports back any feedback or recommendations to
management. Together, the GCTIO and the Manager: Cybersecurity ensure that material cyber risks are appropriately escalated
to the board via the audit and risk committee. Additionally, the chief audit executive, whose mandate includes cybersecurity,
maintains a direct reporting line to both the audit and risk committee and the chairperson of the board, providing multiple
channels for oversight and assurance.
As of the date hereof, Harmony is not aware of any cybersecurity threats or incidents that have materially affected or are
reasonably likely to materially affect its business strategy, results of operations or financial condition. Harmony continually
assesses and monitors threats and vulnerabilities.
For further discussion of cybersecurity risks that may materially affect Harmony's business, financial condition, results of
operations, cash flows, ability to pay dividends and stock price, see Item 3D: “Risk Factors – Risks Related to Technology,
Cybersecurity and Digital Resilience – Failures of our IT security processes and violations of data protection laws may result in
regulatory penalties, fines and reputational damage'' and "– Cybersecurity incidents may materially disrupt operations and
expose Harmony to financial and reputational harm"  in this Form 20-F.
PART III
ITEM 17 FINANCIAL STATEMENTS
Not applicable.
ITEM 18 FINANCIAL STATEMENTS
The following consolidated financial statements, together with the report of Ernst & Young Inc., Johannesburg, Republic of
South Africa (PCAOB ID No. 01698), are incorporated by reference to exhibit 99.1 and shall be deemed filed as part of the
Harmony 2026 Form 20-F:
•Index to Financial Statements;
•Reports of Independent Registered Public Accounting Firms; and
•Consolidated Financial Statements.
222
Table of contents
ITEM 19. EXHIBITS
1.1
2.1
2.2
Amended and Restated Deposit Agreement among Harmony, Deutsche Bank Trust Company Limited, as Depositary, and owners and
holders of American Depositary Receipts, dated as of 7 October 2011 (incorporated by reference to Harmony’s Annual Report on
Form 20-F for the fiscal year ended 30 June 2011, filed on 24 October 2011) https://www.sec.gov/Archives/edgar/
2.3
Form of ADR (included in Exhibit 2.2) (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended
2.4
Amendment No. 1 to the Amended and Restated Deposit Agreement among Harmony, Deutsche Bank Trust Company Limited, as
Depositary, and owners and holders of American Depositary Receipts (incorporated by reference to the Registration Statement on
4.1
Deed of Extinguishment of Royalty (Wafi-Golpu Project) dated 16 February 2009 (incorporated by reference to the Registration
Statement on Form F-6 filed on 15 August 2024) https://www.sec.gov/Archives/edgar/data/1023514/000095012309053204/
4.2
Common terms agreements for Harmony Gold Mining Company Limited with Nedbank Limited (acting through its Nedbank Corporate
and Investment Banking division) (as Original Lender, Original Hedge Provider, Global coordinator and Bookrunner, Mandated Lead
Arranger and Sustainability Coordinator) and Nedbank Limited (London Branch) (as Original Lender) and Absa Bank Limited (acting
through its Corporate and Investment Banking Division) (as Original Lender, Original Hedge Provider, Global Goordinator and
Bookrunner, Mandated Lead Arranger, Sustainability Coordinator, Sustainability Agent and Facility Agent) and Firstrand Bank Limited
(acting through its Rand Merchant Bank Division) (as Mandated Lead Arranger, Original Hedge Provider and Original Lender) and J.P.
Morgan Securities PLC (as Lead Arranger) and Citibank, N.A., South African branch (as Lead Arranger and Original Lender) and
HSBC Bank PLC - Johannesburg branch (as Arranger and Original Lender) and State Bank of India (acting through its Johannesburg
Branch) (as Mandated Lead Arranger and Original Lender) and JPMORGAN Chase Bank, N.A., London branch (Original Lender) and
Project and Trade Finance core fund (as Original Lender) and Federated Hermes Project and Trade Finance Tender Fund (as Original
Lender) and Federated Hermes Project and Trade Finance Master Fund (as Original Lender) and Bank of China Limited,
Johannesburg branch (as Mandated Lead Arranger and Original Lender) and Goldman Sachs International Bank (as Original Lender)
and Industrial Development Corporation of South Africa Limited (as Original Lender) and Investec Bank Limited (acting through its
Investment Banking division: Corporate Solutions) (as Original Lender and Lead Arranger) and Ninety One SA Proprietary Limited
(acting as agent and portfolio manager of Ninety One Assurance Limited) (as Original Lender) and HSBC Bank PLC (as Original
Hedge Provider) and JPMORGAN Chase Bank, N.A. (as Original Hedge Provider) and Citibank N.A., London branch (as Original
Hedge Provider) (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2022, filed
4.3
Common terms agreements for Harmony Gold Mining Company Limited with Nedbank Limited (acting through its Nedbank Corporate
and Investment Banking division) (as Original Lender, Original Hedge Provider, Global coordinator and Bookrunner, Mandated Lead
Arranger and Sustainability Coordinator) and Nedbank Limited (London Branch) (as Original Lender) and Absa Bank Limited (acting
through its Corporate and Investment Banking Division) (as Original Lender, Original Hedge Provider, Global Goordinator and
Bookrunner, Mandated Lead Arranger, Sustainability Coordinator, Sustainability Agent and Facility Agent) and Firstrand Bank Limited
(acting through its Rand Merchant Bank Division) (as Mandated Lead Arranger, Original Hedge Provider and Original Lender) and J.P.
Morgan Securities PLC (as Lead Arranger) and Citibank, N.A., South African branch (as Lead Arranger and Original Lender) and
HSBC Bank PLC - Johannesburg branch (as Arranger and Original Lender) and State Bank of India (acting through its Johannesburg
Branch) (as Mandated Lead Arranger and Original Lender) and JPMORGAN Chase Bank, N.A., London branch (Original Lender) and
Project and Trade Finance core fund (as Original Lender) and Federated Hermes Project and Trade Finance Tender Fund (as Original
Lender) and Federated Hermes Project and Trade Finance Master Fund (as Original Lender) and Bank of China Limited,
Johannesburg branch (as Mandated Lead Arranger and Original Lender) and Goldman Sachs International Bank (as Original Lender)
and Industrial Development Corporation of South Africa Limited (as Original Lender) and Investec Bank Limited (acting through its
Investment Banking division: Corporate Solutions) (as Original Lender and Lead Arranger) and Ninety One SA Proprietary Limited
(acting as agent and portfolio manager of Ninety One Assurance Limited) (as Original Lender) and HSBC Bank PLC (as Original
Hedge Provider) and JPMORGAN Chase Bank, N.A. (as Original Hedge Provider) and Citibank N.A., London branch (as Original
Hedge Provider) (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2022, filed
4.4
Revolving USD Facility Agreement, amongst Harmony Gold Mining Company Limited (as Borrower and (Obligors' Agent) with The
Financial Institutions Listed In Schedule 1 and Absa Bank Limited (acting through its Corporate and Investment Banking division) (as
Facility Agent) (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2022, filed on
4.5
Term Facility A Agreement amongst Harmony Gold Mining Company Limited (as Borrower and Obligors' Agent) with The Financial
Institutions Listed in Schedule 1 and Absa Bank Limited (acting through its Corporate and Investment Banking division) (as Facility
Agent) (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2022, filed on 31
4.6
Term Facility B Agreement amongst Harmony Gold Mining Company Limited (as Borrower and Obligors' Agent) with The Financial
Institutions Listed in Schedule 1 and Nedbank Limited (acting through its Nedbank Corporate and Investment Banking division) (as
Sustainability Coordinator) and Absa Bank Limited (acting through its Corporate and Investment Banking division) (as Sustainability
Agent, Sustainability Coordinator and Facility Agent) (incorporated by reference to Harmony’s Annual Report on Form 20-F for the
fiscal year ended 30 June 2022, filed on 31 October 2022) https://www.sec.gov/Archives/edgar/data/1023514/000162828022027359/
4.7
Wafi-Golpu Joint Venture Agreement, dated 22 May 2008 between Wafi Mining Limited, Newcrest PNG 2 Limited and Wafi-Golpu
Services Limited (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2017, filed
223
Table of contents
4.8
Harmony Gold Mining Company Limited Deferred Share Plan 2018 Scheme Rules (incorporated by reference to Harmony’s Annual
Report on Form 20-F for the fiscal year ended 30 June 2019, filed on 24 October 2019)
4.9
Share sale deed, dated 6 October 2022 entered into between Copper Mountain Mining Corporation (Seller), Harmony Gold (Australia)
Pty Limited (Buyer) and Harmony Gold Mining Company Limited (Buyer's Guarantor) (incorporated by reference to Harmony’s Annual
Report on Form 20-F for the fiscal year ended 30 June 2023, filed on 31 October 2023) https://www.sec.gov/Archives/edgar/
4.10
Harmony ESOP trust subscription and contribution agreement (filed herewith) (incorporated by reference to Harmony’s Annual Report
on Form 20-F for the fiscal year ended June 30, 2024, filed on October 31, 2024) https://www.sec.gov/Archives/edgar/
4.11
Consolidated Scheme Implementation Documents – 27 May 2025. Includes the Scheme Implementation Deed, Implementation Deed,
and Side Letter – collectively entered into by MAC Copper Limited, Harmony Gold (Australia) Pty Limited, and Harmony Gold Mining
Company Limited, (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2025, filed
4.12
The Syndicated Facilities Agreement, dated 26 June 2025, among Harmony Gold Mining Company Limited, Harmony Gold (Australia)
Pty Limited, Citibank N.A., London Branch, J.P. Morgan Securities Plc, Macquarie Bank Limited, Absa Bank Limited (acting through its
Corporate and Investment Banking division), FirstRand Bank Limited (acting through its Rand Merchant Bank division), Nedbank
Limited, acting through its Nedbank Corporate and Investment Banking division, J.P. Morgan SE and others relating to a
US$250,000,000 dollar term bridge loan facility and a US$1,000,000,000 dollar term bridge loan facility (incorporated by reference to
Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2025, filed on 31 October 2025)
4.13
and others (filed herewith)
4.14
4.15
4.16
4.17
4.18
4.19
4.20
224
Table of contents
8.1
11.1
12.10
12.20
†13.1
†13.2
††15.1
96.1
Technical Report Summary of the Mineral Resources and Mineral Reserves for Target Gold Mine, Free State Province, South Africa
(incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2024, filed on 31 October
96.2
Technical Report Summary of the Mineral Resources and Mineral Reserves for Joel Mine, Free State Province, South Africa
(incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2022, filed on 31 October
96.3
Technical Report Summary of the Mineral Resources and Mineral Reserves for Free State Surface Operations, Free State Province,
South Africa (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2022, filed on 31
96.4
Technical Report Summary of the Mineral Resources and Mineral Reserves for Moab Khotsong Operations, Free State Province,
South Africa (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2024, filed on 31
96.5
Technical Report Summary of the Mineral Resources and Mineral Reserves for Mponeng Mine, Carletonville, South Africa
(incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2024, filed on 31 October
96.6
Technical Report Summary of the Mineral Resources and Mineral Reserves for Kalgold Mine, North West Province, South Africa
(incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2024, filed on 31 October
96.7
Technical Report Summary of the Mineral Resources and Mineral Reserves for Mine Waste Solutions (MWS) and West Wits
Operations, North West and Gauteng Provinces, South Africa (incorporated by reference to Harmony’s Annual Report on Form 20-F
for the fiscal year ended 30 June 2024, filed on 31 October 2024) https://www.sec.gov/Archives/edgar/
96.8
Technical Report Summary of the Mineral Resources and Mineral Reserves for Kusasalethu Mine, Gauteng Province, South Africa
(incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2022, filed on 31 October
96.9
96.10
Technical Report Summary of the Mineral Resources and Mineral Reserves for Hidden Valley Mine, Morobe Province, Papua New
Guinea (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2022, filed on 31
96.11
Technical Report Summary of the Mineral Resources and Mineral Reserves for Wafi-Golpu Project, Morobe Province, Papua New
Guinea (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year ended 30 June 2024, filed on 31
96.12
96.13
96.14
96.15
97.1
Executive Compensation Recovery Policy (incorporated by reference to Harmony’s Annual Report on Form 20-F for the fiscal year
ended 30 June 2025, filed on 31 October 2025) https://www.sec.gov/Archives/edgar/data/1023514/000162828025047726/
99.1
225
Table of contents
†This certification will not be deemed “filed” for purposes of Section 18 of the of 1934, as amended (the “Exchange Act”), or otherwise
subject to the liability of that section. Such certification will not be deemed to be incorporated by reference into any filing under the
Securities Act, or the Exchange Act, except to the extent that the Registrant specifically incorporates it by reference.
††Certain of the information included in Exhibit 15.1 is incorporated by reference into the Harmony 2026 Form 20-F, as specified elsewhere
in this report, in accordance with Rule 12b-23(a) of the Exchange Act. With the exception of the items so specified, the Integrated Annual
Report for the 20-F 2026 is not deemed to be filed as part of Harmony 2026 Form 20-F.
101.INS
XBRL Instance Document
101.SCH
XBRL Taxonomy Extension Schema Linkbase Document
101.CAL
XBRL Taxonomy Extension Calculation Linkbase Document
101.DEF
XBRL Taxonomy Extension Definition Linkbase Document
101.LAB
XBRL Taxonomy Extension Label Linkbase Document
101.PRE
XBRL Taxonomy Extension Presentation Linkbase Document
S-1
Table of contents
SIGNATURES
Pursuant to the requirements of Section 12 of the Exchange Act, we hereby certify that we meet all of the requirements for
filing on Form 20-F and that we have duly caused this annual report to be signed on our behalf by the undersigned, thereunto
duly authorised.
HARMONY GOLD MINING COMPANY LIMITED
By: /s/ Beyers Nel
Beyers Nel
Chief Executive Officer
Date: 30 October 2026

ATTACHMENTS / EXHIBITS

ATTACHMENTS / EXHIBITS

EX-1.1

EX-2.1

EX-4.13

EX-4.14

EX-4.15

EX-4.16

EX-4.17

EX-4.18

EX-4.19

EX-4.20

EX-8.1

EX-11.1

EX-12.1

EX-12.2

EX-13.1

EX-13.2

EX-15.1

EX-96.9

EX-96.12

EX-96.13

EX-96.14

EX-96.15

EX-99.1

XBRL TAXONOMY EXTENSION SCHEMA DOCUMENT

XBRL TAXONOMY EXTENSION CALCULATION LINKBASE DOCUMENT

XBRL TAXONOMY EXTENSION DEFINITION LINKBASE DOCUMENT

XBRL TAXONOMY EXTENSION LABEL LINKBASE DOCUMENT

XBRL TAXONOMY EXTENSION PRESENTATION LINKBASE DOCUMENT

IDEA: R1.htm

IDEA: R2.htm

IDEA: R3.htm

IDEA: R4.htm

IDEA: R5.htm

IDEA: R6.htm

IDEA: R7.htm

IDEA: R8.htm

IDEA: R9.htm

IDEA: R10.htm

IDEA: R11.htm

IDEA: R12.htm

IDEA: R13.htm

IDEA: R14.htm

IDEA: R15.htm

IDEA: R16.htm

IDEA: R17.htm

IDEA: R18.htm

IDEA: R19.htm

IDEA: R20.htm

IDEA: R21.htm

IDEA: R22.htm

IDEA: R23.htm

IDEA: R24.htm

IDEA: R25.htm

IDEA: R26.htm

IDEA: R27.htm

IDEA: R28.htm

IDEA: R29.htm

IDEA: R30.htm

IDEA: R31.htm

IDEA: R32.htm

IDEA: R33.htm

IDEA: R34.htm

IDEA: R35.htm

IDEA: R36.htm

IDEA: R37.htm

IDEA: R38.htm

IDEA: R39.htm

IDEA: R40.htm

IDEA: R41.htm

IDEA: R42.htm

IDEA: R43.htm

IDEA: R44.htm

IDEA: R45.htm

IDEA: R46.htm

IDEA: R47.htm

IDEA: R48.htm

IDEA: R49.htm

IDEA: R50.htm

IDEA: R51.htm

IDEA: R52.htm

IDEA: R53.htm

IDEA: R54.htm

IDEA: R55.htm

IDEA: R56.htm

IDEA: R57.htm

IDEA: R58.htm

IDEA: R59.htm

IDEA: R60.htm

IDEA: R61.htm

IDEA: R62.htm

IDEA: R63.htm

IDEA: R64.htm

IDEA: R65.htm

IDEA: R66.htm

IDEA: R67.htm

IDEA: R68.htm

IDEA: R69.htm

IDEA: R70.htm

IDEA: R71.htm

IDEA: R72.htm

IDEA: R73.htm

IDEA: R74.htm

IDEA: R75.htm

IDEA: R76.htm

IDEA: R77.htm

IDEA: R78.htm

IDEA: R79.htm

IDEA: R80.htm

IDEA: R81.htm

IDEA: R82.htm

IDEA: R83.htm

IDEA: R84.htm

IDEA: R85.htm

IDEA: R86.htm

IDEA: R87.htm

IDEA: R88.htm

IDEA: R89.htm

IDEA: R90.htm

IDEA: R91.htm

IDEA: R92.htm

IDEA: R93.htm

IDEA: R94.htm

IDEA: R95.htm

IDEA: R96.htm

IDEA: R97.htm

IDEA: R98.htm

IDEA: R99.htm

IDEA: R100.htm

IDEA: R101.htm

IDEA: R102.htm

IDEA: R103.htm

IDEA: R104.htm

IDEA: R105.htm

IDEA: R106.htm

IDEA: R107.htm

IDEA: R108.htm

IDEA: R109.htm

IDEA: R110.htm

IDEA: R111.htm

IDEA: R112.htm

IDEA: R113.htm

IDEA: R114.htm

IDEA: R115.htm

IDEA: R116.htm

IDEA: R117.htm

IDEA: R118.htm

IDEA: R119.htm

IDEA: R120.htm

IDEA: R121.htm

IDEA: R122.htm

IDEA: R123.htm

IDEA: R124.htm

IDEA: R125.htm

IDEA: R126.htm

IDEA: R127.htm

IDEA: R128.htm

IDEA: R129.htm

IDEA: R130.htm

IDEA: R131.htm

IDEA: R132.htm

IDEA: R133.htm

IDEA: R134.htm

IDEA: R135.htm

IDEA: R136.htm

IDEA: R137.htm

IDEA: R138.htm

IDEA: R139.htm

IDEA: R140.htm

IDEA: R141.htm

IDEA: R142.htm

IDEA: R143.htm

IDEA: R144.htm

IDEA: R145.htm

IDEA: R146.htm

IDEA: R147.htm

IDEA: R148.htm

IDEA: R149.htm

IDEA: R150.htm

IDEA: R151.htm

IDEA: R152.htm

IDEA: R153.htm

IDEA: R154.htm

IDEA: R155.htm

IDEA: R156.htm

IDEA: R157.htm

IDEA: R158.htm

IDEA: R159.htm

IDEA: R160.htm

IDEA: R161.htm

IDEA: R162.htm

IDEA: R163.htm

IDEA: R164.htm

IDEA: R165.htm

IDEA: R166.htm

IDEA: R167.htm

IDEA: R168.htm

IDEA: R169.htm

IDEA: R170.htm

IDEA: R171.htm

IDEA: R172.htm

IDEA: R173.htm

IDEA: R174.htm

IDEA: R175.htm

IDEA: R176.htm

IDEA: R177.htm

IDEA: R178.htm

IDEA: R179.htm

IDEA: R180.htm

IDEA: R181.htm

IDEA: R182.htm

IDEA: R183.htm

IDEA: R184.htm

IDEA: R185.htm

IDEA: R186.htm

IDEA: R187.htm

IDEA: R188.htm

IDEA: R189.htm

IDEA: R190.htm

IDEA: R191.htm

IDEA: R192.htm

IDEA: R193.htm

IDEA: R194.htm

IDEA: R195.htm

IDEA: R196.htm

IDEA: R197.htm

IDEA: R198.htm

IDEA: R199.htm

IDEA: R200.htm

IDEA: R201.htm

IDEA: R202.htm

IDEA: R203.htm

IDEA: R204.htm

IDEA: FilingSummary.xml

IDEA: MetaLinks.json

IDEA: hmy-20260630_htm.xml