| SEGMENT INFORMATION |
The
Company has identified its operating segments based on the internal reports that are reviewed and used by the chief executive officer
and the executive management team, collectively the chief operating decision maker (“CODM”), in assessing performance and
in determining the allocation of resources. The Company primarily manages its business by looking at individual producing and developing
resource projects as well as the aggregate of the exploration and evaluation properties and typically segregate these projects between
production, development, and exploration.
Operating
segments
Management
has identified 5 reportable operating segments: the Bolivar mine and processing plant, the Porco mine and processing plant, the Caballo
Blanco Group which includes the Tres Amigos, Colquechaquita mines and the Don Diego processing plant, the San Lucas Group which includes
the Reserva mine and San Lucas feed sourcing business, Zimapan mine and processing plant, and Corporate and Other activities.
The
Bolivar and Porco segment revenues, cost of sales, capital expenditures, total assets and total liabilities are presented on 100% basis
even though the assets, liabilities, sales and expenses are recorded at 45% in the consolidated balance sheet and statement of comprehensive
income because the Company’s interest meets the definition of a joint operation in accordance with IFRS 11 Joint Arrangements.
The Illapa Joint Operations elimination column in the tables below shows the removal of COMIBOL’s 55% interest in Illapa’s
operating results and assets and liabilities.
Under
the Association Agreement, Illapa S.A. is the designated operator and holds exclusive, comprehensive responsibility for all technical,
financial, labor, legal, and commercial aspects of the operations. The Agreement grants Illapa full control over the mining production
chain, including the exclusive right to commercialize concentrates in both domestic and international markets and to manage all related
commercial processes. Because the Company is responsible for overseeing all of the operations, the CODM evaluates the performance of
the segment on a 100% gross basis.
SANTACRUZ
SILVER MINING LTD.
Notes
to the Condensed Interim Consolidated Financial Statements
Three
and Six Months ended June 30, 2026 and 2025
(Unaudited)
(Expressed
in thousands of US dollars, unless otherwise noted)
| 22. | SEGMENT
INFORMATION (continued) |
| a) | Revenues,
operating costs and gross profit mining operations and ore processing: |
SCHEDULE
OF SEGMENT INFORMATION
| Three
months ended June 30, 2026 | |
Bolivar | | |
Porco | | |
Caballo
Blanco Group | | |
Zimapan | | |
San
Lucas Group | | |
Illapa
Joint Operation eliminations | | |
Total | |
| Country | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Mexico | | |
Bolivia | | |
Bolivia | | |
| |
| | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | |
| Revenues from mining operations | |
| 20,082 | | |
| 12,200 | | |
| 24,303 | | |
| 35,973 | | |
| - | | |
| (17,754 | ) | |
| 74,804 | |
| Mine operating costs | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| - | |
| Production costs | |
| (7,919 | ) | |
| (6,063 | ) | |
| (4,942 | ) | |
| (18,013 | ) | |
| - | | |
| 6,680 | | |
| (30,257 | ) |
| Ore processing costs | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Depletion
and amortization | |
| (4,573 | ) | |
| (1,455 | ) | |
| (2,083 | ) | |
| (2,862 | ) | |
| - | | |
| 3,761 | | |
| (7,212 | ) |
| Mine
operating costs | |
| (12,492 | ) | |
| (7,518 | ) | |
| (7,025 | ) | |
| (20,875 | ) | |
| - | | |
| 10,441 | | |
| (37,469 | ) |
| Gross
profit - mining operations | |
| 7,590 | | |
| 4,682 | | |
| 17,278 | | |
| 15,098 | | |
| - | | |
| (7,313 | ) | |
| 37,335 | |
| | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Revenues from ore processing | |
| - | | |
| - | | |
| - | | |
| - | | |
| 38,654 | | |
| - | | |
| 38,654 | |
| Ore processing operating costs | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| - | |
| Purchased ore & conc.
costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (19,194 | ) | |
| - | | |
| (19,194 | ) |
| Ore processing costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (5,072 | ) | |
| - | | |
| (5,072 | ) |
| Depletion
and amortization | |
| - | | |
| - | | |
| - | | |
| - | | |
| (584 | ) | |
| - | | |
| (584 | ) |
| Mine
operating costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (24,850 | ) | |
| - | | |
| (24,850 | ) |
| Gross
profit - ore processing | |
| - | | |
| - | | |
| - | | |
| - | | |
| 13,804 | | |
| - | | |
| 13,804 | |
| | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Total revenues | |
| 20,082 | | |
| 12,200 | | |
| 24,303 | | |
| 35,973 | | |
| 38,654 | | |
| (17,754 | ) | |
| 113,458 | |
| Total cost of sales | |
| (7,919 | ) | |
| (6,063 | ) | |
| (4,942 | ) | |
| (18,013 | ) | |
| (24,266 | ) | |
| 6,680 | | |
| (54,523 | ) |
| Total depletion and amortization | |
| (4,573 | ) | |
| (1,455 | ) | |
| (2,083 | ) | |
| (2,862 | ) | |
| (584 | ) | |
| 3,761 | | |
| (7,796 | ) |
| Gross
profit – total | |
| 7,590 | | |
| 4,682 | | |
| 17,278 | | |
| 15,098 | | |
| 13,804 | | |
| (7,313 | ) | |
| 51,139 | |
| Three
months ended June 30, 2025 | |
Bolivar | | |
Porco | | |
Caballo
Blanco Group | | |
Zimapan | | |
San
Lucas Group | | |
Illapa
Joint Operation eliminations | | |
Total | |
| Country | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Mexico | | |
Bolivia | | |
Bolivia | | |
| |
| | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | |
| Revenues from mining operations | |
| 18,229 | | |
| 7,871 | | |
| 18,901 | | |
| 20,577 | | |
| - | | |
| (14,355 | ) | |
| 51,223 | |
| Mine operating costs | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Production costs | |
| (7,783 | ) | |
| (4,745 | ) | |
| (5,855 | ) | |
| (17,358 | ) | |
| - | | |
| 6,512 | | |
| (29,229 | ) |
| Depletion
and amortization | |
| (3,437 | ) | |
| (742 | ) | |
| (1,908 | ) | |
| (1,741 | ) | |
| - | | |
| 2,917 | | |
| (4,911 | ) |
| Mine
operating costs | |
| (11,220 | ) | |
| (5,487 | ) | |
| (7,763 | ) | |
| (19,099 | ) | |
| - | | |
| 9,429 | | |
| (34,140 | ) |
| Gross
profit - mining operations | |
| 7,009 | | |
| 2,384 | | |
| 11,138 | | |
| 1,478 | | |
| - | | |
| (4,926 | ) | |
| 17,083 | |
| | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Revenues from ore processing | |
| - | | |
| - | | |
| - | | |
| - | | |
| 22,072 | | |
| - | | |
| 22,072 | |
| Ore processing operating costs | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| - | |
| Purchased ore & conc.
costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (9,361 | ) | |
| - | | |
| (9,361 | ) |
| Ore processing costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (3,978 | ) | |
| - | | |
| (3,978 | ) |
| Depletion
and amortization | |
| - | | |
| - | | |
| - | | |
| - | | |
| (528 | ) | |
| - | | |
| (528 | ) |
| Mine
operating costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (13,867 | ) | |
| - | | |
| (13,867 | ) |
| Gross
profit - ore processing | |
| - | | |
| - | | |
| - | | |
| - | | |
| 8,205 | | |
| - | | |
| 8,205 | |
| | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Total revenues | |
| 18,229 | | |
| 7,871 | | |
| 18,901 | | |
| 20,577 | | |
| 22,072 | | |
| (14,355 | ) | |
| 73,295 | |
| Total cost of sales | |
| (7,783 | ) | |
| (4,745 | ) | |
| (5,855 | ) | |
| (17,358 | ) | |
| (13,339 | ) | |
| 6,512 | | |
| (42,568 | ) |
| Total depletion and amortization | |
| (3,437 | ) | |
| (742 | ) | |
| (1,908 | ) | |
| (1,741 | ) | |
| (528 | ) | |
| 2,917 | | |
| (5,439 | ) |
| Gross
profit - total | |
| 7,009 | | |
| 2,384 | | |
| 11,138 | | |
| 1,478 | | |
| 8,205 | | |
| (4,926 | ) | |
| 25,288 | |
SANTACRUZ
SILVER MINING LTD.
Notes
to the Condensed Interim Consolidated Financial Statements
Three
and Six Months ended June 30, 2026 and 2025
(Unaudited)
(Expressed
in thousands of US dollars, unless otherwise noted)
| 22. | SEGMENT
INFORMATION (continued) |
| Six
months ended June 30, 2026 | |
Bolivar | | |
Porco | | |
Caballo
Blanco Group | | |
Zimapan | | |
San
Lucas Group | | |
Illapa
Joint Operation eliminations | | |
Total | |
| Country | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Mexico | | |
Bolivia | | |
Bolivia | | |
| |
| | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | |
| Revenues from mining operations | |
| 41,111 | | |
| 22,203 | | |
| 48,790 | | |
| 74,739 | | |
| - | | |
| (34,822 | ) | |
| 152,021 | |
| Mine operating costs | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Production costs | |
| (20,628 | ) | |
| (12,153 | ) | |
| (14,300 | ) | |
| (34,832 | ) | |
| - | | |
| 16,284 | | |
| (65,629 | ) |
| Depletion and amortization | |
| (8,982 | ) | |
| (2,962 | ) | |
| (4,118 | ) | |
| (5,299 | ) | |
| - | | |
| 7,459 | | |
| (13,902 | ) |
| Mine
operating costs | |
| (29,610 | ) | |
| (15,115 | ) | |
| (18,418 | ) | |
| (40,131 | ) | |
| - | | |
| 23,743 | | |
| (79,531 | ) |
| Gross
profit - mining operations | |
| 11,501 | | |
| 7,088 | | |
| 30,372 | | |
| 34,608 | | |
| - | | |
| (11,079 | ) | |
| 72,490 | |
| | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Revenues from ore processing | |
| - | | |
| - | | |
| - | | |
| - | | |
| 88,966 | | |
| - | | |
| 88,966 | |
| Ore processing operating costs | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Purchased ore & conc. costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (52,310 | ) | |
| - | | |
| (52,310 | ) |
| Ore processing costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (13,947 | ) | |
| - | | |
| (13,947 | ) |
| Depletion and amortization | |
| - | | |
| - | | |
| - | | |
| - | | |
| (1,191 | ) | |
| - | | |
| (1,191 | ) |
| Mine
operating costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (67,448 | ) | |
| - | | |
| (67,448 | ) |
| Gross
profit - ore processing | |
| - | | |
| - | | |
| - | | |
| - | | |
| 21,518 | | |
| - | | |
| 21,518 | |
| | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Total revenues | |
| 41,111 | | |
| 22,203 | | |
| 48,790 | | |
| 74,739 | | |
| 88,966 | | |
| (34,822 | ) | |
| 240,987 | |
| Total cost of sales | |
| (20,628 | ) | |
| (12,153 | ) | |
| (14,300 | ) | |
| (34,832 | ) | |
| (66,257 | ) | |
| 16,284 | | |
| (131,886 | ) |
| Total depletion and amortization | |
| (8,982 | ) | |
| (2,962 | ) | |
| (4,118 | ) | |
| (5,299 | ) | |
| (1,191 | ) | |
| 7,459 | | |
| (15,093 | ) |
| Gross
profit – total | |
| 11,501 | | |
| 7,088 | | |
| 30,372 | | |
| 34,608 | | |
| 21,518 | | |
| (11,079 | ) | |
| 94,008 | |
| Six
months ended June 30, 2025 | |
Bolivar | | |
Porco | | |
Caballo
Blanco Group | | |
Zimapan | | |
San
Lucas Group | | |
Illapa
Joint Operation eliminations | | |
Total | |
| Country | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Mexico | | |
Bolivia | | |
Bolivia | | |
| |
| | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | |
| Revenues from mining operations | |
| 39,548 | | |
| 18,057 | | |
| 34,008 | | |
| 43,783 | | |
| - | | |
| (31,682 | ) | |
| 103,714 | |
| Mine operating costs | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Production costs | |
| (16,030 | ) | |
| (10,146 | ) | |
| (11,515 | ) | |
| (34,165 | ) | |
| - | | |
| 13,407 | | |
| (58,449 | ) |
| Depletion and amortization | |
| (5,760 | ) | |
| (2,083 | ) | |
| (3,865 | ) | |
| (2,858 | ) | |
| - | | |
| 5,550 | | |
| (9,016 | ) |
| Mine
operating costs | |
| (21,790 | ) | |
| (12,229 | ) | |
| (15,380 | ) | |
| (37,023 | ) | |
| - | | |
| 18,957 | | |
| (67,465 | ) |
| Gross
profit - mining operations | |
| 17,758 | | |
| 5,828 | | |
| 18,628 | | |
| 6,760 | | |
| - | | |
| (12,725 | ) | |
| 36,249 | |
| | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Revenues from ore processing | |
| - | | |
| - | | |
| - | | |
| - | | |
| 39,895 | | |
| - | | |
| 39,895 | |
| Ore processing operating costs | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Purchased ore & conc. costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (14,947 | ) | |
| - | | |
| (14,947 | ) |
| Ore processing costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (7,050 | ) | |
| - | | |
| (7,050 | ) |
| Depletion and amortization | |
| - | | |
| - | | |
| - | | |
| - | | |
| (1,000 | ) | |
| - | | |
| (1,000 | ) |
| Mine
operating costs | |
| - | | |
| - | | |
| - | | |
| - | | |
| (22,997 | ) | |
| - | | |
| (22,997 | ) |
| Gross
profit - ore processing | |
| - | | |
| - | | |
| - | | |
| - | | |
| 16,898 | | |
| - | | |
| 16,898 | |
| | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Total revenues | |
| 39,548 | | |
| 18,057 | | |
| 34,008 | | |
| 43,783 | | |
| 39,895 | | |
| (31,682 | ) | |
| 143,609 | |
| Total cost of sales | |
| (16,030 | ) | |
| (10,146 | ) | |
| (11,515 | ) | |
| (34,165 | ) | |
| (21,997 | ) | |
| 13,407 | | |
| (80,446 | ) |
| Total depletion and amortization | |
| (5,760 | ) | |
| (2,083 | ) | |
| (3,865 | ) | |
| (2,858 | ) | |
| (1,000 | ) | |
| 5,550 | | |
| (10,016 | ) |
| Gross
profit - total | |
| 17,758 | | |
| 5,828 | | |
| 18,628 | | |
| 6,760 | | |
| 16,898 | | |
| (12,725 | ) | |
| 53,147 | |
SANTACRUZ
SILVER MINING LTD.
Notes
to the Condensed Interim Consolidated Financial Statements
Three
and Six Months ended June 30, 2026 and 2025
(Unaudited)
(Expressed
in thousands of US dollars, unless otherwise noted)
| 22. | SEGMENT
INFORMATION (continued) |
| b) | Capital
expenditures, total assets and total liabilities by operating segment |
| As
at June 30, 2026 | |
Bolivar | | |
Porco | | |
Caballo
Blanco Group | | |
Zimapan | | |
San
Lucas Group | | |
Corporate
and other | | |
Illapa
Joint Operation eliminations | | |
Total | |
| Country | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Mexico | | |
Bolivia | | |
| | |
Bolivia | | |
| |
| | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | |
| Capital expenditures | |
| 7,133 | | |
| 969 | | |
| 4,209 | | |
| 6,638 | | |
| 1,879 | | |
| - | | |
| (4,457 | ) | |
| 16,371 | |
| Total assets | |
| 144,475 | | |
| 87,786 | | |
| 124,262 | | |
| 95,076 | | |
| 100,476 | | |
| 24,329 | | |
| (86,223 | ) | |
| 490,181 | |
| Total liabilities | |
| (56,485 | ) | |
| (37,288 | ) | |
| (104,460 | ) | |
| (47,218 | ) | |
| (27,615 | ) | |
| (35,118 | ) | |
| 31,091 | | |
| (277,093 | ) |
| As
at December 31, 2025 | |
Bolivar | | |
Porco | | |
Caballo
Blanco Group | | |
Zimapan | | |
San
Lucas Group | | |
Corporate
and other | | |
Illapa
Joint Operation eliminations | | |
Total | |
| Country | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Mexico | | |
Bolivia | | |
| | |
Bolivia | | |
| |
| | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | |
| Capital expenditures | |
| 11,184 | | |
| 1,887 | | |
| 5,097 | | |
| 15,602 | | |
| 3,895 | | |
| - | | |
| (7,046 | ) | |
| 30,619 | |
| Total assets | |
| 138,287 | | |
| 88,393 | | |
| 136,936 | | |
| 66,534 | | |
| 74,026 | | |
| 26,687 | | |
| (85,092 | ) | |
| 445,771 | |
| Total liabilities | |
| (56,573 | ) | |
| (39,876 | ) | |
| (133,428 | ) | |
| (42,714 | ) | |
| (4,405 | ) | |
| (20,502 | ) | |
| 30,785 | | |
| (266,713 | ) |
| c) | Revenues
by operating segment, product and major customers |
| Three
months ended June 30, 2026 | |
Bolivar | | |
Porco | | |
Caballo
Blanco Group | | |
San
Lucas Group | | |
Zimapan | | |
Total | |
| Country | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Mexico | | |
| |
| | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | |
| Silver | |
| 12,680 | | |
| 4,116 | | |
| 11,494 | | |
| 17,018 | | |
| 24,144 | | |
| 69,452 | |
| Zinc | |
| 6,872 | | |
| 8,153 | | |
| 11,660 | | |
| 22,394 | | |
| 12,755 | | |
| 61,834 | |
| Lead | |
| 346 | | |
| 266 | | |
| 829 | | |
| 826 | | |
| 2,053 | | |
| 4,320 | |
| Copper | |
| - | | |
| - | | |
| - | | |
| - | | |
| 4,538 | | |
| 4,538 | |
| Illapa joint operation 55% interest | |
| (11,045 | ) | |
| (6,709 | ) | |
| - | | |
| - | | |
| - | | |
| (17,754 | ) |
| Provisional pricing adjustments | |
| 903 | | |
| 401 | | |
| 1,249 | | |
| 485 | | |
| (2,438 | ) | |
| 600 | |
| Smelting and refining
costs | |
| (719 | ) | |
| (736 | ) | |
| (929 | ) | |
| (2,069 | ) | |
| (5,079 | ) | |
| (9,532 | ) |
| Sales
to external customers | |
| 9,037 | | |
| 5,491 | | |
| 24,303 | | |
| 38,654 | | |
| 35,973 | | |
| 113,458 | |
| Three
months ended June 30, 2025 | |
Bolivar | | |
Porco | | |
Caballo
Blanco Group | | |
San
Lucas Group | | |
Zimapan | | |
Total | |
| Country | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Mexico | | |
| |
| | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | |
| Silver | |
| 11,530 | | |
| 2,724 | | |
| 10,816 | | |
| 8,277 | | |
| 10,196 | | |
| 43,543 | |
| Zinc | |
| 7,435 | | |
| 5,609 | | |
| 7,703 | | |
| 15,778 | | |
| 8,404 | | |
| 44,929 | |
| Lead | |
| 369 | | |
| 302 | | |
| 1,130 | | |
| 956 | | |
| 2,146 | | |
| 4,903 | |
| Copper | |
| - | | |
| - | | |
| - | | |
| - | | |
| 1,868 | | |
| 1,868 | |
| Illapa joint operation 55% interest | |
| (10,026 | ) | |
| (4,329 | ) | |
| - | | |
| - | | |
| - | | |
| (14,355 | ) |
| Provisional pricing adjustments | |
| 76 | | |
| 18 | | |
| 373 | | |
| (977 | ) | |
| 1,649 | | |
| 1,139 | |
| Smelting and refining
costs | |
| (1,181 | ) | |
| (782 | ) | |
| (1,121 | ) | |
| (1,962 | ) | |
| (3,686 | ) | |
| (8,732 | ) |
| Sales
to external customers | |
| 8,203 | | |
| 3,542 | | |
| 18,901 | | |
| 22,072 | | |
| 20,577 | | |
| 73,295 | |
SANTACRUZ
SILVER MINING LTD.
Notes
to the Condensed Interim Consolidated Financial Statements
Three
and Six Months ended June 30, 2026 and 2025
(Unaudited)
(Expressed
in thousands of US dollars, unless otherwise noted)
| 22. | SEGMENT
INFORMATION (continued) |
| Six
months ended June 30, 2026 | |
Bolivar | | |
Porco | | |
Caballo
Blanco Group | | |
San
Lucas Group | | |
Zimapan | | |
Total | |
| Country | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Mexico | | |
| |
| | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | |
| Silver | |
| 23,918 | | |
| 7,463 | | |
| 26,447 | | |
| 49,590 | | |
| 50,271 | | |
| 157,689 | |
| Zinc | |
| 16,818 | | |
| 15,431 | | |
| 21,471 | | |
| 41,786 | | |
| 23,790 | | |
| 119,296 | |
| Lead | |
| 571 | | |
| 359 | | |
| 1,959 | | |
| 3,381 | | |
| 4,261 | | |
| 10,531 | |
| Copper | |
| - | | |
| - | | |
| - | | |
| - | | |
| 8,706 | | |
| 8,706 | |
| Illapa joint operation 55% interest | |
| (22,611 | ) | |
| (12,211 | ) | |
| - | | |
| - | | |
| - | | |
| (34,822 | ) |
| Provisional pricing adjustments | |
| 1,532 | | |
| 390 | | |
| 869 | | |
| (865 | ) | |
| (1,885 | ) | |
| 41 | |
| Smelting and refining
costs | |
| (1,728 | ) | |
| (1,440 | ) | |
| (1,956 | ) | |
| (4,926 | ) | |
| (10,404 | ) | |
| (20,454 | ) |
| Sales
to external customers | |
| 18,500 | | |
| 9,992 | | |
| 48,790 | | |
| 88,966 | | |
| 74,739 | | |
| 240,987 | |
| Six
months ended June 30, 2025 | |
Bolivar | | |
Porco | | |
Caballo
Blanco Group | | |
San
Lucas Group | | |
Zimapan | | |
Total | |
| Country | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Bolivia | | |
Mexico | | |
| |
| | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | | |
$ | |
| Silver | |
| 23,606 | | |
| 7,420 | | |
| 17,401 | | |
| 14,889 | | |
| 21,729 | | |
| 85,045 | |
| Zinc | |
| 17,951 | | |
| 11,500 | | |
| 17,016 | | |
| 26,793 | | |
| 18,696 | | |
| 91,956 | |
| Lead | |
| 859 | | |
| 820 | | |
| 1,823 | | |
| 1,821 | | |
| 4,503 | | |
| 9,826 | |
| Copper | |
| - | | |
| - | | |
| - | | |
| - | | |
| 4,099 | | |
| 4,099 | |
| Illapa joint operation 55% interest | |
| (21,751 | ) | |
| (9,931 | ) | |
| - | | |
| - | | |
| - | | |
| (31,682 | ) |
| Provisional pricing adjustments | |
| 245 | | |
| 105 | | |
| 383 | | |
| (1,077 | ) | |
| 3,240 | | |
| 2,896 | |
| Smelting and refining
costs | |
| (3,113 | ) | |
| (1,788 | ) | |
| (2,615 | ) | |
| (2,531 | ) | |
| (8,484 | ) | |
| (18,531 | ) |
| Sales
to external customers | |
| 17,797 | | |
| 8,126 | | |
| 34,008 | | |
| 39,895 | | |
| 43,783 | | |
| 143,609 | |
During
the three and six months ended June 30, 2026 and 2025, the Company had two customers. One customer in Bolivia accounted for 68% and 69%
of the total sales revenue for the three and six months ended June 30, 2026 (2025 – 72% and 70%, respectively). The other customer
in Mexico accounted for 32% and 31% of the total sales revenue for the three and six months ended June 30, 2026 (2025 – 28% and
30%, respectively).
SANTACRUZ
SILVER MINING LTD.
Notes
to the Condensed Interim Consolidated Financial Statements
Three
and Six Months ended June 30, 2026 and 2025
(Unaudited)
(Expressed
in thousands of US dollars, unless otherwise noted)
|