Asset Retirement Obligation |
6 Months Ended | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jun. 30, 2026 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Asset Retirement Obligation Disclosure [Abstract] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Asset Retirement Obligation | Asset Retirement Obligation Briscoe has a contractual obligation to remove the wind energy facility and restore leased land upon expiration of the multiple land lease agreements with third-party landowners for the turbine installation sites (the "Site Leases"). The asset retirement obligation was measured at the present value of estimated future removal and restoration costs as of the Closing Date of April 1, 2026 and was recorded at $3.6 million. The measurement reflects management's current estimate of removal and restoration cost; an independent decommissioning study was completed. The obligation will accrete to its estimated future value over the remaining life of the wind facility. For the three and six months ended June 30, 2026, the accretion expense of $79 thousand was included in cost of wind energy generation revenue-depreciation and accretion expense on the condensed consolidated statements of operations. The following is a summary of total changes in the Company's asset retirement obligation liability that was acquired on April 1, 2026 in relation to the Briscoe acquisition for the three and six months ended June 30, 2026:
Asset retirement obligation costs may increase or decrease significantly in the future as a result of changes in regulations, changes in engineering designs and technology, permit modifications or updates, changes to the Briscoe Project, inflation or other factors as actual reclamation spending occurs. Asset retirement obligation activities and expenditures generally are made over an extended period of time commencing near the end of the wind energy system life; however, certain reclamation activities may be accelerated if legally required or if determined to be economically beneficial.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||