Description of Business
TIC Solutions, Inc. (formerly Acuren Corporation and hereinafter referred to as “we,” “our,” “us,” “TIC Solutions,” or the “Company”) is a leading provider of tech-enabled asset integrity, engineering and consulting, and geospatial services. On August 4, 2025 (the “NV5 Closing Date”), the Company completed its acquisition of NV5 Global, Inc. (“NV5” and such acquisition, the “NV5 Acquisition”), an engineering and consulting services company. On October 10, 2025, the Company changed its name from Acuren Corporation to TIC Solutions, Inc. The Company provides mission-critical services across the full lifecycle of industrial assets, buildings, and public infrastructure, from planning and construction through operations and ongoing maintenance.
The Company operates primarily in North America and serves a diversified base of clients across its principal end markets: oil and gas, industrials, buildings, power and utilities, infrastructure, natural resources, and aerospace and defense. Within these markets, the Company supports oil sands, refining, midstream, and upstream operations; manufacturing, fabrication, chemical, and metal-processing facilities; commercial, data center, institutional, and residential buildings; power generation, gas transmission and distribution, and electricity infrastructure; geospatial and environmental services; highways and roads, transportation, water, and parks and recreation; and federal, state, regional, and municipal customers across public-sector applications.
The Company’s services are often non-discretionary and are driven by regulatory and compliance requirements, customer risk-management policies, maintenance needs, and the need to support the safety, reliability, and useful life of critical assets and infrastructure.
Basis of Presentation
The accompanying interim unaudited condensed consolidated financial statements (the “interim statements”) have been prepared in accordance with accounting principles generally accepted in the United States (“U.S. GAAP”) and the rules and regulations of the Securities and Exchange Commission (the “SEC”) and do not include all of the information and footnotes required by U.S. GAAP for complete financial statements as certain information has been condensed or omitted. All intercompany accounts and transactions have been eliminated in consolidation. Certain amounts in prior periods have been reclassified to conform to the current period presentation. Such reclassifications did not have a material effect on the Company's financial condition or results of operations as previously reported. The results of operations of companies acquired are included from the date of acquisition. In the opinion of management, these interim statements include all adjustments, which are of a normal recurring nature, necessary for a fair statement of the results for the interim periods presented. The results of operations for any interim period are not necessarily indicative of results for the full year. These interim statements should be read in conjunction with the audited consolidated financial statements and notes contained in the Company’s Annual Report on Form 10-K for the period ended December 31, 2025, as filed with the SEC (the “2025 Annual Report”).
Significant Accounting Policies
The Company’s significant accounting policies are disclosed in “Note 2. Summary of Significant Accounting Policies” in our 2025 Annual Report and are supplemented by the notes included in this Quarterly Report on Form 10-Q (the “Quarterly Report”).
Revenue Recognition
The Company recognizes revenue in accordance with ASC Topic 606, Revenue from Contracts with Customers, by following the five-step model: the Company identifies a contract with a customer, identifies the performance obligation(s) in the contract, determines the transaction price, allocates the transaction price to each performance obligation in the contract and recognizes revenues as the Company satisfies the performance obligation(s).
Nature of Services and Performance Obligations
The Company provides inspection, engineering, geospatial and other services to customers under a variety of contract types. Contracts are evaluated to determine whether they should be combined and whether they contain one or multiple performance obligations. Most contracts contain a single performance obligation, as the promise to transfer individual services is not separately identifiable from other promises in the contract and, therefore, is not distinct. For contracts with multiple performance obligations, the Company allocates the contract’s transaction price to each performance obligation utilizing several different pricing scenarios and is able to discretely price out each individual component based on its nature and relation to the overall performance obligation.
Performance obligations are generally satisfied over time as work progresses or services are rendered, because the customer simultaneously receives and consumes the benefits of the Company’s performance. Revenue may be recognized over time based on time and material incurred to date, which best portrays the transfer of control to the customer, or based on progress measured using an input method by comparing direct costs incurred to date to the estimated total direct costs for the completion of the services. Contract costs include labor, sub-consultant services and other direct costs. For contracts that meet the required conditions, the Company applies the as-invoiced practical expedient and recognizes revenue based on its right to invoice for services performed.
Performance obligations in certain contracts are satisfied at a point in time. Revenue for these services is recognized when control of the promised deliverable transfers to the customer, which is generally upon completion, delivery or customer acceptance of reports or analyses.
The Company enters into contracts with its clients that contain two principal types of pricing provisions: cost-reimbursable and fixed-unit price. Cost-reimbursable contracts consist of the following:
time and material contracts, which are common for professional and technical consulting and certification services projects. Under these types of contracts, there is no predetermined fee. Instead, the Company negotiates hourly billing rates and charges the clients based upon actual hours expended on a project. In addition, any direct project expenditures are passed through to the client and are typically reimbursed. These contracts may have an initial not-to-exceed or guaranteed maximum price provision.
cost-plus contracts are the predominant contracting method used by the Company to charge clients for its costs, including both direct and indirect costs, plus a negotiated fee. The total estimated cost plus the negotiated fee represents the total contract value.
lump-sum contracts typically require the performance of all of the work under the contract for a specified lump-sum fee, subject to price adjustments if the scope of the project changes or unforeseen conditions arise. Many of the Company’s lump-sum contracts are negotiated and arise in the design of projects with a specified scope and project deliverables. In most cases, we can bill additional fees if the construction schedule is modified and lengthened.
Fixed-unit price contracts typically require the performance of an estimated number of units of work at an agreed price per unit, with the total payment under the contract determined by the actual number of units performed.
As of June 30, 2026, the Company had $1.2 billion of remaining performance obligations, of which approximately $883 million is expected to be recognized over the next 12 months. Performance obligations include only those amounts that have been funded and authorized and does not reflect the full amounts the Company may receive over the term of such contracts. In the case of non-government contracts and project awards, performance obligations include future revenue at contract or customary rates, excluding contract renewals or extensions that are at the discretion of the client. For contracts with a not-to-exceed maximum amount, the Company includes revenue from such contracts in performance obligations to the extent of the remaining estimated amount.
Contract estimates are based on various assumptions to project the outcome of future events. These assumptions are dependent upon the accuracy of a variety of estimates, including engineering progress, achievement of milestones, labor productivity and cost estimates. Due to uncertainties inherent in the estimation process, it is possible that actual completion costs may vary from estimates. If estimated total costs on contracts indicate a loss or reduction to the percentage of total contract revenues recognized to date, these losses or reductions are recognized in the period in which the revisions are known. The effect of revisions to revenues and estimated costs to complete contracts, including penalties, incentive awards, change orders, claims and anticipated losses, are recorded on a cumulative catch-up basis in the period in which the revisions are identified and the loss can be reasonably estimated. Such revisions could occur in any reporting period and the effects on the results of operations for that reporting period may be material depending on the size of the project or the adjustment.
Contract Balances
The timing of revenue recognition, billings and cash collections results in, and are reflected within, “Accounts receivable, net,” “Contract assets,” and “Contract liabilities” on the condensed consolidated balance sheets.
“Accounts receivable, net” represents amounts billed to clients that remain uncollected as of the balance sheet date. The amounts are stated at their estimated realizable value. The Company maintains an allowance for credit losses to provide for the estimated amount of receivables that will not be collected. See further discussion in “Note 5. Accounts Receivable and Contract Assets.”
“Contract assets” represent recognized amounts pending billing pursuant to contract terms or accounts billed after period end and are expected to be billed and collected within the next 12 months. Generally, billing occurs subsequent to revenue recognition, resulting in contract assets that are classified as current.
In certain circumstances, the contract may allow for billing terms that result in cumulative amounts billed in excess of revenues recognized. “Contract liabilities” represent billings in excess of revenues recognized on these contracts as of the reporting date that are generally classified as current. During the three and six months ended June 30, 2026, revenue recognized related to the Company’s contract liabilities that existed as of December 31, 2025 was not material.
Contract Modifications
Contract modifications may occur in the normal course of business and typically result from changes in scope, specifications or performance period. In most cases, such modifications are not distinct and are accounted for as part of the existing contract. If a modification adds distinct goods or services at a price that reflects their standalone selling prices, it is accounted for as a separate contract.
Federal Acquisition Regulations
Federal Acquisition Regulations (“FAR”), which are applicable to the Company’s federal government contracts and may be incorporated in local and state agency contracts, limit the recovery of certain specified indirect costs on contracts. Cost-plus contracts covered by FAR or certain state and local agencies also may require an audit of actual costs and provide for upward or downward adjustments if actual recoverable costs differ from billed recoverable costs.
Recent Accounting Pronouncements Not Yet Adopted
The Company has not adopted any new accounting pronouncements since the audited consolidated financial statements for the year ended December 31, 2025. See the 2025 Annual Report for information pertaining to the effects of recently adopted and other recent accounting pronouncements.
In September 2025, the FASB issued ASU 2025-06, Intangibles-Goodwill and Other-Internal-Use Software (Subtopic 350-40), Targeted Improvements to the Accounting for Internal-Use Software, to modernize the accounting for software costs that are accounted for under Subtopic 350-40. The amendments in this update remove all references to prescriptive and sequential software development stages. Under this ASU, capitalization of internal-use software begins when management authorizes and commits to funding the project and it is probable that the project will be completed. ASU 2025-06 is effective for annual periods beginning after December 15, 2027, and interim reporting periods within those annual reporting periods; however early adoption is permitted either prospectively or retrospectively. The Company is currently evaluating the impact the adoption of this guidance will have on its financial statements and related disclosures.
In November 2024, the FASB issued ASU 2024-03, Income Statement — Reporting Comprehensive Income — Expense Disaggregation Disclosures (Subtopic 220-40), requiring disclosure in the notes to the financial statements for specified information about certain costs and expenses. The ASU is effective for annual periods beginning after December 15, 2026, and interim periods beginning after December 15, 2027; however early adoption is permitted and can be applied either prospectively or retrospectively. The Company is currently evaluating the impact the adoption of this guidance will have on its financial statements and related disclosures.