Material Contingencies |
6 Months Ended |
|---|---|
Jun. 30, 2026 | |
| Commitments and Contingencies Disclosure [Abstract] | |
| Material Contingencies | Material Contingencies Manhattan Explosion and Fire On March 12, 2014, two multi-use five-story tall buildings located on Park Avenue between 116th and 117th Streets in Manhattan were destroyed by an explosion and fire. CECONY had delivered gas to the buildings through service lines from a distribution main located below ground on Park Avenue. Eight people died and more than 50 people were injured. Additional buildings were also damaged. The National Transportation Safety Board (NTSB) investigated. The parties to the investigation included CECONY, the City of New York, the Pipeline and Hazardous Materials Safety Administration and the NYSPSC. In June 2015, the NTSB issued a final report concerning the incident, its probable cause and safety recommendations. The NTSB determined that the probable cause of the incident was (1) the failure of a defective fusion joint at a service tee (which joined a plastic service line to a plastic distribution main) installed by CECONY that allowed gas to leak from the distribution main and migrate into a building where it ignited and (2) a breach in a city sewer line that allowed groundwater and soil to flow into the sewer, resulting in a loss of support for the distribution main, that caused it to sag and overstressed the defective fusion joint. The NTSB also made safety recommendations, including recommendations to CECONY that addressed its procedures for the preparation and examination of plastic fusions, training of its staff on conditions for notifications to the city’s Fire Department and extension of its gas main isolation valve installation program. In February 2017, the NYSPSC approved a settlement agreement with CECONY related to the NYSPSC's investigations of the incident and the practices of qualifying persons to perform plastic fusions. Pursuant to the agreement, CECONY provided $27 million of future benefits to customers (for which it accrued a regulatory liability) and did not recover from customers $126 million of costs for gas emergency response activities that it had previously incurred and expensed. Lawsuits are pending against CECONY seeking generally unspecified damages and, in some cases, punitive damages, for wrongful death, personal injury, property damage and business interruption. CECONY notified its insurers of the incident and believes that the policies in force at the time of the incident will cover CECONY’s costs, in excess of a required retention (the amount of which is not material), to satisfy any liability it may have for damages in connection with the incident. During 2020, CECONY accrued its estimated liability for the suits of $40 million. As of June 30, 2026, the estimated accrued liability is $25 million, with an insurance receivable in the same amount, due to the settlement or dismissal of multiple litigations that arose from the incident. Other Contingencies For additional contingencies, see "Other Regulatory Matters" in Note B, Note G and “Uncertain Tax Positions” in Note J. Guarantees Con Edison has entered into various agreements providing financial or performance assurance primarily to third parties on behalf of their subsidiaries. Maximum amounts guaranteed by Con Edison under these agreements were immaterial and $60 million at June 30, 2026 and December 31, 2025, respectively.
|