Subsequent Events (Details) |
Jan. 31, 2026
m
|
Jan. 09, 2026
USD ($)
m
|
Dec. 31, 2025
m
|
Aug. 31, 2025
USD ($)
m
|
|---|---|---|---|---|
| Subsequent Event [Line Items] | ||||
| Length of pool to be constructed | 50 | 50 | ||
| 50 Meter Portable Pool | ||||
| Subsequent Event [Line Items] | ||||
| Length of pool to be constructed | 50 | |||
| Contractual obligation | $ | $ 250,000 | |||
| Subsequent Event | ||||
| Subsequent Event [Line Items] | ||||
| Length of pool to be constructed | 50 | |||
| Subsequent Event | 50 Meter Portable Pool | ||||
| Subsequent Event [Line Items] | ||||
| Contractual obligation | $ | $ 6,100,000 |