ELECTRICITY CONCESSIONS AND AUTHORIZATIONS - Electricity Transmission Concessions - SPEs (Details) R$ in Thousands |
12 Months Ended |
|
Dec. 31, 2025
BRL (R$)
item
km
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
30
|
| Transmission lines (in kilometers) | km |
2,299
|
| RAP Cycle |
R$ 656,212
|
| 062/2001 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
69
|
| Transmission lines (in kilometers) | km |
19,847
|
| RAP Cycle |
R$ 6,383,644
|
| 061/2001 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
121
|
| Transmission lines (in kilometers) | km |
19,385
|
| RAP Cycle |
R$ 4,191,502
|
| 058/2001 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
51
|
| Transmission lines (in kilometers) | km |
8,841
|
| RAP Cycle |
R$ 2,236,189
|
| 057/2001 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
54
|
| Transmission lines (in kilometers) | km |
8,898
|
| RAP Cycle |
R$ 1,163,364
|
| 012/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
111
|
| RAP Cycle |
R$ 336,441
|
| 034/2001 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
665
|
| RAP Cycle |
R$ 269,995
|
| 020/2012 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
5
|
| Transmission lines (in kilometers) | km |
473
|
| RAP Cycle |
R$ 174,767
|
| 010/2005 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
4
|
| Transmission lines (in kilometers) | km |
376
|
| RAP Cycle |
R$ 164,369
|
| 010/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
50
|
| RAP Cycle |
R$ 114,617
|
| 021/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
7
|
| Transmission lines (in kilometers) | km |
986
|
| RAP Cycle |
R$ 105,227
|
| 004/2012 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
6
|
| Transmission lines (in kilometers) | km |
783
|
| RAP Cycle |
R$ 102,838
|
| 008/2011 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
5
|
| Transmission lines (in kilometers) | km |
286
|
| RAP Cycle |
R$ 102,290
|
| 004/2004 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
3
|
| Transmission lines (in kilometers) | km |
372
|
| RAP Cycle |
R$ 89,213
|
| 019/2012 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
3
|
| Transmission lines (in kilometers) | km |
60
|
| RAP Cycle |
R$ 67,241
|
| 022/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
3
|
| Transmission lines (in kilometers) | km |
547
|
| RAP Cycle |
R$ 58,167
|
| 004/2013 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
297
|
| RAP Cycle |
R$ 57,542
|
| 004/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
4
|
| Transmission lines (in kilometers) | km |
34
|
| RAP Cycle |
R$ 54,290
|
| 014/2013 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
163
|
| RAP Cycle |
R$ 53,223
|
| 017/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
5
|
| Transmission lines (in kilometers) | km |
96
|
| RAP Cycle |
R$ 49,318
|
| 005/2012 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
4
|
| Transmission lines (in kilometers) | km |
42
|
| RAP Cycle |
R$ 36,049
|
| 006/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
3
|
| Transmission lines (in kilometers) | km |
49
|
| RAP Cycle |
R$ 34,762
|
| 019/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
7
|
| Transmission lines (in kilometers) | km |
321
|
| RAP Cycle |
R$ 33,624
|
| 001/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
95
|
| RAP Cycle |
R$ 33,336
|
| 007/2005 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
208
|
| RAP Cycle |
R$ 33,047
|
| 007/2014 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
6
|
| Transmission lines (in kilometers) | km |
275
|
| RAP Cycle |
R$ 32,170
|
| 011/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
4
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 31,731
|
| 005/2006 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
257
|
| RAP Cycle |
R$ 31,692
|
| 007/2006 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
3
|
| Transmission lines (in kilometers) | km |
71
|
| RAP Cycle |
R$ 29,086
|
| 016/2012 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 25,172
|
| 002/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 23,881
|
| 010/2007 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
95
|
| RAP Cycle |
R$ 23,567
|
| 018/2012 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
6
|
| Transmission lines (in kilometers) | km |
208
|
| RAP Cycle |
R$ 22,939
|
| 010/2011 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
3
|
| Transmission lines (in kilometers) | km |
65
|
| RAP Cycle |
R$ 21,219
|
| 017/2011 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
46
|
| RAP Cycle |
R$ 20,628
|
| 017/2012 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 17,642
|
| 006/2005 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
90
|
| RAP Cycle |
R$ 17,550
|
| 028/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
3
|
| Transmission lines (in kilometers) | km |
187
|
| RAP Cycle |
R$ 17,511
|
| 007/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 16,945
|
| 013/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 16,667
|
| 003/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
180
|
| RAP Cycle |
R$ 15,972
|
| 007/2008 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
36
|
| RAP Cycle |
R$ 15,726
|
| 012/2007 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
4
|
| Transmission lines (in kilometers) | km |
316
|
| RAP Cycle |
R$ 15,476
|
| 014/2012 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
30
|
| RAP Cycle |
R$ 15,389
|
| 002/2011 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
3
|
| Transmission lines (in kilometers) | km |
231
|
| RAP Cycle |
R$ 15,262
|
| 020/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
115
|
| RAP Cycle |
R$ 14,728
|
| 009/2011 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
64
|
| RAP Cycle |
R$ 13,277
|
| 006/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
95
|
| RAP Cycle |
R$ 12,796
|
| 014/2008 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
145
|
| RAP Cycle |
R$ 12,510
|
| 021/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
91
|
| RAP Cycle |
R$ 11,999
|
| 018/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
145
|
| RAP Cycle |
R$ 11,250
|
| 004/2011 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 9,992
|
| 014/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 9,642
|
| 012/2011 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 9,606
|
| 004/2008 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
238
|
| RAP Cycle |
R$ 9,504
|
| 009/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
59
|
| RAP Cycle |
R$ 8,388
|
| 005/2009 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 8,182
|
| 005/2008 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
3
|
| Transmission lines (in kilometers) | km |
110
|
| RAP Cycle |
R$ 7,325
|
| 008/2005 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
120
|
| RAP Cycle |
R$ 7,173
|
| 014/2011 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
2
|
| Transmission lines (in kilometers) | km |
51
|
| RAP Cycle |
R$ 6,340
|
| 012/2010 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
3
|
| Transmission lines (in kilometers) | km |
37
|
| RAP Cycle |
R$ 5,890
|
| 008/2014 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 4,919
|
| 013/2011 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 3,072
|
| Electricity Transmission Concessions, Corporate, Agreement |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
452
|
| Transmission lines (in kilometers) | km |
66,342
|
| RAP Cycle |
R$ 16,537,871
|
| Auction No. 004/2025 – Lot 6A¹ |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 0
|
| Auction No. 004/2025 – Lot 7A¹ |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 0
|
| Auction No. 004/2025 – Lot 6B¹ |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 0
|
| Auction No. 004/2025 – Lot 7B¹ |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
0
|
| RAP Cycle |
R$ 0
|
| 008/2024 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
11
|
| Transmission lines (in kilometers) | km |
1,116
|
| RAP Cycle |
R$ 319,866
|
| 004/2024 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
4
|
| Transmission lines (in kilometers) | km |
534
|
| RAP Cycle |
R$ 157,030
|
| 006/2024 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
9
|
| Transmission lines (in kilometers) | km |
337
|
| RAP Cycle |
R$ 92,983
|
| 009/2023 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
300
|
| RAP Cycle |
R$ 77,896
|
| 012/2024 |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| Number of substations | item |
1
|
| Transmission lines (in kilometers) | km |
12
|
| RAP Cycle |
R$ 8,437
|
| Electricity transmission concessions – SPEs |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
1,361,978
|
| Belo Monte Transmissora de Energia S.A |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
R$ 410,610
|
| Electric power transmission lines, Percentage |
49.00%
|
| Interligação Elétrica do Madeira S.A. - IE Madeira |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
R$ 408,366
|
| Electric power transmission lines, Percentage |
49.00%
|
| Transnorte Energia S.A. |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
R$ 210,274
|
| Electric power transmission lines, Percentage |
64.61%
|
| Sistema de Transmissão Nordeste S.A. - STN |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
R$ 125,100
|
| Electric power transmission lines, Percentage |
49.00%
|
| Interligação Elétrica Garanhuns S.A. |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
R$ 91,380
|
| Electric power transmission lines, Percentage |
49.00%
|
| Paranaíba Transmissora de Energia S.A. |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
R$ 48,940
|
| Electric power transmission lines, Percentage |
24.50%
|
| Goiás Transmissão S.A. |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
R$ 36,068
|
| Electric power transmission lines, Percentage |
49.00%
|
| MGE Transmissão S.A. |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
R$ 16,900
|
| Electric power transmission lines, Percentage |
49.00%
|
| Transenergia Renovável S.A. |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
R$ 10,930
|
| Electric power transmission lines, Percentage |
49.00%
|
| Transenergia São Paulo S.A. |
|
| ELECTRICITY CONCESSIONS AND AUTHORIZATIONS |
|
| RAP Cycle |
R$ 3,410
|
| Electric power transmission lines, Percentage |
49.00%
|