PARK BRIDGE LENDER SERVICES LLC
January 28, 2026
Management’s Assertion
Report on Assessment of Compliance with Applicable Servicing Criteria
Park Bridge Lender Services LLC (the “Asserting Party” or “PBLS”) is responsible for assessing its compliance, as of and for the calendar year ended December 31, 2025 (the “Reporting Period”), with the servicing criteria set forth in Title 17, Section 229.1122(d) of the Code of Federal Regulations.
The transactions covered by this assertion are those transactions processed by the Asserting Party in its capacity as operating advisor or trust advisor for the asset-backed securities transactions listed in Exhibit A attached hereto (the “Platform”)1.
The Asserting Party is responsible for assessing its compliance with the servicing criteria applicable to it. The Asserting Party used the criteria in paragraph (d) of Item 1122 of Regulation AB (17 C.F.R. 229.1122) to assess its compliance. The full outline of the Asserting Party’s contractually applicable servicing criteria under various securitization pooling and servicing agreements can be found in Exhibit B attached hereto. The servicing criteria listed in the column title “Inapplicable Servicing Criteria” on Exhibit B hereto are not applicable to the Asserting Party based on the activities it performs with respect to the Platform.
Based on its assessment, the Asserting Party believes that, as of and for the periods the contractual obligations existed for the Platform in the Reporting Period listed in Exhibit A, the Asserting Party has complied in all material respects with the servicing criteria listed in the column titled “Applicable Servicing Criteria” on Exhibit B hereto (the “Applicable Servicing Criteria”).
Forvis Mazars, LLP, an independent registered public accounting firm, has issued an attestation report on the assessment of compliance with the Applicable Servicing Criteria for the Reporting Period as set forth in this assertion.
Signed:
/s/ David M. Rodgers
David M. Rodgers
Principal
1PBLS’s Platform consists of certain transactions for which the Company provides operating advisor services for (i) publicly issued commercial mortgage-backed securities and (ii) certain commercial mortgage-backed transactions for which an operating advisor has been engaged under the Securities Exchange Act of 1934, as amended.
600 THIRD AVENUE, 33RD FLOOR, NEW YORK, NY 10016
WWW.PARKBRIDGEFINANCIAL.COM
|
Exhibit A |
||||
|
Asserting Party's 2025 Servicing Platform |
||||
|
Applicable Certification Period |
||||
|
Securitization Transaction |
|
Start Date |
|
End Date |
|
3650R 2021-PF1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
3650R 2022-PF2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
8 Spruce |
|
January 01, 2025 |
to |
December 31, 2025 |
|
AHPT 2025-ATRM |
|
August 15, 2025 |
to |
December 31, 2025 |
|
ALA 2025-OANA |
|
June 13, 2025 |
to |
December 31, 2025 |
|
AOA 2021-1177 |
|
January 01, 2025 |
to |
October 15, 2025 |
|
AOA 2025-1301 |
|
August 14, 2025 |
to |
December 31, 2025 |
|
ARDN 2025-ARCP |
|
June 17, 2025 |
to |
December 31, 2025 |
|
AREIT 2021-CRE5 |
|
January 01, 2025 |
to |
April 17, 2025 |
|
ARES 2024-IND |
|
January 01, 2025 |
to |
December 31, 2025 |
|
Aventura Mall 2018-AVM |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BACM 2016-UBS10 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BACM 2017-BNK3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BAHA 2024-MAR |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BAMLL 2021-JACX |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BAMLL 2025-1105W |
|
December 15, 2025 |
to |
December 31, 2025 |
|
BAMLL 2025-HYT |
|
December 18, 2025 |
to |
December 31, 2025 |
|
Bancorp 2017-CRE2 |
|
January 01, 2025 |
to |
June 17, 2025 |
|
Bancorp 2018-CRE3 |
|
January 01, 2025 |
to |
June 17, 2025 |
|
Bancorp 2018-CRE4 |
|
January 01, 2025 |
to |
June 17, 2025 |
|
Bancorp 2019-CRE5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2017-BNK5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2017-BNK6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2017-BNK8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2017-BNK9 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2018-BNK11 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2018-BNK12 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2018-BNK14 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2018-BNK15 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2019-BNK16 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2019-BNK19 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2019-BNK20 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2019-BNK21 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2019-BNK23 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2019-BNK24 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2020-BNK26 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2020-BNK27 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2020-BNK28 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2020-BNK30 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2021-BNK31 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2021-BNK32 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2021-BNK33 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2021-BNK35 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2021-BNK37 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2022-BNK39 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2022-BNK42 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2022-BNK44 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2023-BNK45 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2023-BNK46 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2024-BNK47 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK 2024-BNK48 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK5 2023-5YR2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK5 2023-5YR4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK5 2024-5YR12 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK5 2024-5YR5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK5 2024-5YR6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK5 2024-5YR7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BANK5 2025-5YR15 |
|
July 15, 2025 |
to |
December 31, 2025 |
|
BANK5 2025-5YR18 |
|
December 09, 2025 |
to |
December 31, 2025 |
|
BAY 2025-LIVN |
|
May 06, 2025 |
to |
December 31, 2025 |
|
BBCMS 2017-C1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2018-C2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2019-BWAY |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2019-C4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2020-C7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2021-C11 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2021-C9 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2022-C14 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2022-C16 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2022-C18 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2023-5C23 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2023-C20 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2024-5C29 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2024-C26 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BBCMS 2025-5C36 |
|
August 07, 2025 |
to |
December 31, 2025 |
|
BBCMS 2025-C32 |
|
February 12, 2025 |
to |
December 31, 2025 |
|
BBCMS 2025-C39 |
|
December 23, 2025 |
to |
December 31, 2025 |
|
BCP 2021-330N |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BDS 2022-FL12 |
|
January 01, 2025 |
to |
August 19, 2025 |
|
BFLD 2020-EYP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BFLD 2021-FPM |
|
January 01, 2025 |
to |
September 15, 2025 |
|
BFLD 2024-VICT |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BFLD 2024-WRHS |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BFLD 2025-660F |
|
October 31, 2025 |
to |
December 31, 2025 |
|
BFLD 2025-FPM |
|
September 12, 2025 |
to |
December 31, 2025 |
|
BLOX 2021-BLOX |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BLP 2023-IND |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BLP 2024-IND2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BLP 2025-IND |
|
March 17, 2025 |
to |
December 31, 2025 |
|
BMARK 2018-B1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2018-B3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2018-B4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2018-B6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2018-B7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2019-B13 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2019-B15 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2019-B9 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2020-B16 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2020-B18 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2020-B21 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2020-IG1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2021-B23 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2021-B24 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2021-B26 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2021-B27 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2021-B29 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2021-B30 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2022-B33 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2022-B34 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2022-B35 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2022-B36 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2023-B38 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2023-B39 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2023-V3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2023-V4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2024-V11 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2024-V12 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2024-V7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2024-V8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2024-V9 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMARK 2025-B41 |
|
September 04, 2025 |
to |
December 31, 2025 |
|
BMARK 2025-V13 |
|
February 19, 2025 |
to |
December 31, 2025 |
|
BMARK 2025-V14 |
|
April 15, 2025 |
to |
December 31, 2025 |
|
BMARK 2025-V16 |
|
August 13, 2025 |
to |
December 31, 2025 |
|
BMARK 2025-V17 |
|
September 29, 2025 |
to |
December 31, 2025 |
|
BMARK 2025-V18 |
|
October 30, 2025 |
to |
December 31, 2025 |
|
BMARK 2025-V19 |
|
December 23, 2025 |
to |
December 31, 2025 |
|
BMO 2022-C1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMO 2022-C3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMO 2023-C5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMO 2023-C6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMO 2024-5C3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMO 2024-C10 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMO 2024-C9 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BMO 2025-5C10 |
|
May 16, 2025 |
to |
December 31, 2025 |
|
BMO 2025-5C12 |
|
October 09, 2025 |
to |
December 31, 2025 |
|
BMO 2025-C11 |
|
February 28, 2025 |
to |
December 31, 2025 |
|
BMP 2024-MF23 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BOCA 2024-BOCA |
|
January 01, 2025 |
to |
December 15, 2025 |
|
BOCA 2025-BOCA |
|
December 19, 2025 |
to |
December 31, 2025 |
|
BPR 2021-NRD |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BPR 2021-TY |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BPR 2021-WILL |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BPR 2022-OANA |
|
January 01, 2025 |
to |
June 16, 2025 |
|
BPR 2022-SSP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BPR 2022-STAR |
|
January 01, 2025 |
to |
October 15, 2025 |
|
BPR 2023-STON |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BSREP 2021-DC |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BSTN 2025-HUB |
|
October 17, 2025 |
to |
December 31, 2025 |
|
BWAY 2021-1450 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2018-GW |
|
January 01, 2025 |
to |
July 15, 2025 |
|
BX 2019-OC11 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2021-21M |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2021-ACNT |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2021-IRON |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2021-LGCY |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2021-PAC |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2021-SDMF |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2021-VINO |
|
January 01, 2025 |
to |
July 15, 2025 |
|
BX 2021-VOLT |
|
January 01, 2025 |
to |
December 15, 2025 |
|
BX 2021-XL2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2022-FOX2 |
|
January 01, 2025 |
to |
November 17, 2025 |
|
BX 2022-IND |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2022-LP2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2022-PSB |
|
January 01, 2025 |
to |
July 15, 2025 |
|
BX 2023-XL3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-BRBK |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-CNYN |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-FNX |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-GPA2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-GPA3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-KING |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-MDHS |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-PALM |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-SLCT |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-VLT5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-XL4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2024-XL5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
BX 2025-BIO3 |
|
February 11, 2025 |
to |
December 31, 2025 |
|
BX 2025-COPT |
|
August 21, 2025 |
to |
December 31, 2025 |
|
BX 2025-DIME |
|
February 14, 2025 |
to |
December 31, 2025 |
|
BX 2025-ROIC |
|
February 27, 2025 |
to |
December 31, 2025 |
|
BX 2025-VLT6 |
|
March 06, 2025 |
to |
December 31, 2025 |
|
BX 2025-VOLT |
|
December 15, 2025 |
to |
December 31, 2025 |
|
BXSC 2022-WSS |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CAMB 2021-CX2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
Carbon 2019-FL2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CCUBS 2017-C1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CD 2016-CD1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CD 2016-CD2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CD 2017-CD3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CD 2017-CD4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CD 2017-CD5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CD 2017-CD6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CD 2018-CD7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CD 2019-CD8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CENT 2023-CITY |
|
January 01, 2025 |
to |
July 15, 2025 |
|
CENT 2025-CITY |
|
July 22, 2025 |
to |
December 31, 2025 |
|
CF 2019-CF1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CF 2019-CF2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CF 2019-CF3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CF 2020-P1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CFCRE 2016-C3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CFCRE 2016-C4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CFCRE 2016-C6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CFCRE 2016-C7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CFCRE 2017-C8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2014-GC21 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2014-GC25 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2015-GC27 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2015-GC35 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2015-P1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2016-C1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2016-GC37 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2016-P3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2016-P4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2016-P5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2016-P6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2017-C4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2017-P7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2018-B2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2018-C6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2019-GC41 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2019-GC43 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2020-GC46 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2022-GC48 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CGCMT 2023-SMRT |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CHI 2025-SFT |
|
March 27, 2025 |
to |
December 31, 2025 |
|
COAST 2023-2HTL |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2012-CCRE4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2012-CCRE5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2012-LC4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2013-CCRE10 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2013-CCRE11 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2013-CCRE12 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2013-CCRE6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2013-CCRE7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2013-CCRE8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2013-CCRE9 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2013-LC13 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2013-LC6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-CCRE14 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-CCRE15 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-CCRE16 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-CCRE17 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-CCRE18 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-CCRE19 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-CCRE20 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-CCRE21 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-LC15 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-LC17 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-UBS2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-UBS3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-UBS4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2014-UBS5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2015-CCRE22 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2015-CCRE24 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2015-CCRE26 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2015-CCRE27 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2015-DC1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2015-LC19 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2015-LC21 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2015-LC23 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2015-PC1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2016-667M |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2016-CCRE28 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2016-COR1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2016-DC2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2017-COR2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2018-5BP |
|
January 01, 2025 |
to |
December 15, 2025 |
|
COMM 2018-COR3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2018-HOME |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2019-GC44 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2020-CX |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2021-2400 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2022-HC |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2024-277P |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2024-CBM |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2024-WCL1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
COMM 2025-180W |
|
August 05, 2025 |
to |
December 31, 2025 |
|
COMM 2025-SBX |
|
August 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2015-C1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2015-C2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2016-C6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2016-C7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2017-C8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2017-CX10 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2018-CX11 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2018-CX12 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2019-C15 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2019-C17 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2020-C19 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSAIL 2021-C20 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSMC 2016-NXSR |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSMC 2017-CALI |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSMC 2017-CHOP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSMC 2017-PFHP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSMC 2019-UVIL |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSMC 2020-FACT |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSMC 2021-B33 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSMC 2021-BHAR |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSTL 2024-GATE |
|
January 01, 2025 |
to |
December 31, 2025 |
|
CSTL 2025-GATE2 |
|
November 12, 2025 |
to |
December 31, 2025 |
|
DAFC 2017-AMO |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DATA 2023-CNTR |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DBC 2025-DBC |
|
October 29, 2025 |
to |
December 31, 2025 |
|
DBGS 2018-BIOD |
|
January 01, 2025 |
to |
April 15, 2025 |
|
DBGS 2018-C1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DBGS 2024-ALTA |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DBGS 2024-SBL |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DBJPM 2016-C1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DBJPM 2016-C3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DBJPM 2020-C9 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DBWF 2024-LCRS |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DC 2023-DC |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DC 2024-HLTN |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DK 2024-SPBX |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DOLP 2021-NYC |
|
January 01, 2025 |
to |
December 31, 2025 |
|
DURST 2025-151 |
|
August 19, 2025 |
to |
December 31, 2025 |
|
ELM 2024-ELM |
|
January 01, 2025 |
to |
December 31, 2025 |
|
ELP 2021-ELP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
ELP 2025-ELP |
|
November 20, 2025 |
to |
December 31, 2025 |
|
EQUS 2021-EQAZ |
|
January 01, 2025 |
to |
December 31, 2025 |
|
ESA 2021-ESH |
|
January 01, 2025 |
to |
October 15, 2025 |
|
FIVE 2023-V1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
FMBT 2024-FBLU |
|
January 01, 2025 |
to |
December 31, 2025 |
|
FREMF SCR 2016-MDN1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
FREMF SCR 2016-MDN2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
FREMF SCR 2017-MDN3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GFH 2025-IND |
|
June 28, 2025 |
to |
December 31, 2025 |
|
GPMT 2021-FL3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
Grace Trust 2020-GRCE |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSAT 2025-BMF |
|
July 15, 2025 |
to |
December 31, 2025 |
|
GSJP 2025-BEDS |
|
December 18, 2025 |
to |
December 31, 2025 |
|
GSMS 2013-GCJ12 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2013-GCJ16 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2015-GC32 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2016-GS4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2017-GS7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2018-3PCK |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2018-GS10 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2019-GC39 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2019-GC42 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2019-GSA1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2020-GC47 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2021-DM |
|
January 01, 2025 |
to |
October 15, 2025 |
|
GSMS 2021-IP |
|
January 01, 2025 |
to |
October 15, 2025 |
|
GSMS 2023-SHIP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
GSMS 2024-FAIR |
|
January 01, 2025 |
to |
December 31, 2025 |
|
HGMT 2025-HGLR |
|
February 13, 2025 |
to |
December 31, 2025 |
|
HHT 2025-MAUI |
|
March 21, 2025 |
to |
December 31, 2025 |
|
HIG 2023-FL1 |
|
January 01, 2025 |
to |
November 20, 2025 |
|
HILT 2024-ORL |
|
January 01, 2025 |
to |
December 31, 2025 |
|
HIT 2022-HI32 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
HONO 2021-LULU |
|
January 01, 2025 |
to |
December 31, 2025 |
|
ICNQ 2024-MF |
|
January 01, 2025 |
to |
December 31, 2025 |
|
ILPT 2019-SURF |
|
January 01, 2025 |
to |
December 31, 2025 |
|
ILPT 2022-LPF2 |
|
January 01, 2025 |
to |
July 15, 2025 |
|
ILPT 2022-LPFX |
|
January 01, 2025 |
to |
December 31, 2025 |
|
ILPT 2025-LPF2 |
|
June 27, 2025 |
to |
December 31, 2025 |
|
JPMCC 2013-C10 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2018-AON |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2018-ASH8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2018-MINN |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2018-PHH |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2018-PTC |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2018-WPT |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2019-ICON |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2019-OSB |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2020-609M |
|
January 01, 2025 |
to |
August 15, 2025 |
|
JPMCC 2020-LOOP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2021-1MEM |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2021-2NU |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2021-410T |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2022-NLP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
JPMCC 2025-BHR5 |
|
March 17, 2025 |
to |
December 31, 2025 |
|
JPMDB 2017-C5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
KIND 2024-1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
KNDR 2021-KIND |
|
January 01, 2025 |
to |
December 31, 2025 |
|
KRE 2025-AIP4 |
|
March 18, 2025 |
to |
December 31, 2025 |
|
LAQ 2023-LAQ |
|
January 01, 2025 |
to |
December 31, 2025 |
|
LCCM 2017-LC26 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
LEX 2024-BBG |
|
January 01, 2025 |
to |
December 31, 2025 |
|
LIFE 2021-BMR |
|
January 01, 2025 |
to |
December 31, 2025 |
|
LIFE 2022-BMR2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
LUX 2023-LION |
|
January 01, 2025 |
to |
December 31, 2025 |
|
LV 2024-SHOW |
|
January 01, 2025 |
to |
December 31, 2025 |
|
Manhattan West 2020-1MW |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MCR 2024-HTL |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MED 2024-MOB |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MHC 2021-MHC |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MHC 2021-MHC2 |
|
January 01, 2025 |
to |
December 15, 2025 |
|
MHP 2021-STOR |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MHP 2022-MHIL |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MHP 2025-MHIL2 |
|
August 28, 2025 |
to |
December 31, 2025 |
|
MILE 2025-STNE |
|
July 15, 2025 |
to |
December 31, 2025 |
|
MIRA 2023-MILE |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MRCD 2019-PARK |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2012-C5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2013-C10 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2013-C13 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2014-C14 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2014-C18 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2014-C19 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2015-C20 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2015-C22 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2015-C24 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2015-C26 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2016-C28 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2016-C29 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2016-C30 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2016-C31 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2016-C32 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2017-C33 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2017-C34 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSBAM 2025-5C2 |
|
November 13, 2025 |
to |
December 31, 2025 |
|
MSBAM 2025-C35 |
|
August 14, 2025 |
to |
December 31, 2025 |
|
MSC 2015-MS1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2015-UBS8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2016-BNK2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2016-UBS11 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2016-UBS12 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2017-ASHF |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2017-HR2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2018-H3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2018-H4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2019-H6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2019-L3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2019-PLND |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2020-HR8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2021-ILP |
|
January 01, 2025 |
to |
July 15, 2025 |
|
MSC 2021-L6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2022-L8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSC 2024-BPR2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSCI 2016-UBS9 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MSSG 2017-237P |
|
January 01, 2025 |
to |
December 31, 2025 |
|
MTK 2021-GRNY |
|
January 01, 2025 |
to |
April 15, 2025 |
|
MTN 2022-LPFL |
|
January 01, 2025 |
to |
December 31, 2025 |
|
NCMF 2022-MFP |
|
January 01, 2025 |
to |
June 16, 2025 |
|
NCMF 2025-MFS |
|
June 11, 2025 |
to |
December 31, 2025 |
|
NCMS 2019-AMZ7B |
|
January 01, 2025 |
to |
December 31, 2025 |
|
NRTH 2025-PARK |
|
October 15, 2025 |
to |
December 31, 2025 |
|
NXPT 2024-STOR |
|
January 01, 2025 |
to |
December 31, 2025 |
|
NYC 2024-3ELV |
|
January 01, 2025 |
to |
December 31, 2025 |
|
NYO 2021-1290 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
OBPT 2019-OBP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
OMPT 2017-1MKT |
|
January 01, 2025 |
to |
December 31, 2025 |
|
ONE 2021-PARK |
|
January 01, 2025 |
to |
December 31, 2025 |
|
ONNI 2024-APT |
|
January 01, 2025 |
to |
December 31, 2025 |
|
ONYP 2020-1NYP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
OPG 2021-PORT |
|
January 01, 2025 |
to |
April 15, 2025 |
|
ORL 2024-GLKS |
|
January 01, 2025 |
to |
December 31, 2025 |
|
PFP 2023-10 |
|
January 01, 2025 |
to |
August 18, 2025 |
|
PRK 2017-280P |
|
January 01, 2025 |
to |
December 31, 2025 |
|
PRM 2025-PRM6 |
|
June 24, 2025 |
to |
December 31, 2025 |
|
RCMF 2021-FL5 |
|
January 01, 2025 |
to |
March 25, 2025 |
|
RCMF 2021-FL6 |
|
January 01, 2025 |
to |
March 25, 2025 |
|
RCMF 2021-FL7 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
RCMF 2022-FL10 |
|
January 01, 2025 |
to |
June 25, 2025 |
|
RCMF 2022-FL8 |
|
January 01, 2025 |
to |
March 25, 2025 |
|
RCMF 2022-FL9 |
|
January 01, 2025 |
to |
June 25, 2025 |
|
RCMF 2023-FL11 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
RCMF 2023-FL12 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
RIAL 2022-FL8 |
|
January 01, 2025 |
to |
July 21, 2025 |
|
RIDE 2025-SHRE |
|
February 21, 2025 |
to |
December 31, 2025 |
|
RLGH 2021-TROT |
|
January 01, 2025 |
to |
July 15, 2025 |
|
SBALR 2020-RR1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SCG 2024-MSP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SCG 2025-FLWR |
|
August 19, 2025 |
to |
December 31, 2025 |
|
SCOTT 2023-SFS |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SELF 2024-STRG |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SFO 2021-555 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SGCMS 2016-C5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SGCP 2021-FL3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SGCP 2022-FL4 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SGCP 2023-FL5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SMR 2022-IND |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SMRT 2022-MINI |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SPGN 2022-TFLM |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SREIT 2021-FLWR |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SREIT 2021-MFP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SREIT 2021-MFP2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
STWD 2021-HTS |
|
January 01, 2025 |
to |
December 31, 2025 |
|
SWCH 2025-DATA |
|
February 18, 2025 |
to |
December 31, 2025 |
|
TCO 2024-DPM |
|
January 01, 2025 |
to |
December 31, 2025 |
|
THPT 2023-THL |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UBS 2017-C2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UBS 2017-C3 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UBS 2017-C5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UBS 2018-C10 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UBS 2018-C12 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UBS 2018-C14 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UBS 2018-C8 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UBS 2019-C16 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UBS 2019-C18 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UBSBB 2012-C3 |
|
January 01, 2025 |
to |
January 13, 2025 |
|
UBSBB 2013-C6 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
UNIV 2025-APTS |
|
November 25, 2025 |
to |
December 31, 2025 |
|
VASA 2021-VASA |
|
January 01, 2025 |
to |
December 31, 2025 |
|
VDCM 2025-AZ |
|
July 10, 2025 |
to |
December 31, 2025 |
|
VLS 2020-LAB |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WBHT 2019-WBM |
|
January 01, 2025 |
to |
June 16, 2025 |
|
WBRK 2025-WBRK |
|
March 06, 2025 |
to |
December 31, 2025 |
|
WEST 2025-ROSE |
|
March 28, 2025 |
to |
December 31, 2025 |
|
WFCM 2013-LC12 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2014-LC18 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2015-LC22 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2016-BNK1 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2016-C33 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2016-C36 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2016-NXS5 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2017-C38 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2017-C42 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2018-C43 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2018-C45 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2018-C47 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2019-C50 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2019-C53 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2019-C54 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2020-C55 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2022-C62 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2022-JS2 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2022-ONL |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2024-C63 |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WFCM 2024-MGP |
|
January 01, 2025 |
to |
December 15, 2025 |
|
WFCM 2025-5C5 |
|
July 30, 2025 |
to |
December 31, 2025 |
|
WFCM 2025-5C6 |
|
October 08, 2025 |
to |
December 31, 2025 |
|
WFCM 2025-AURA |
|
October 15, 2025 |
to |
December 31, 2025 |
|
WFCM 2025-C64 |
|
February 27, 2025 |
to |
December 31, 2025 |
|
WFCM 2025-DWHP |
|
April 23, 2025 |
to |
December 31, 2025 |
|
WHARF 2025-DC |
|
June 26, 2025 |
to |
December 31, 2025 |
|
WPT 2017-WWP |
|
January 01, 2025 |
to |
December 31, 2025 |
|
WSTN 2023-MAUI |
|
January 01, 2025 |
to |
December 31, 2025 |
EXHIBIT B
|
SERVICING CRITERIA |
APPLICABLE |
INAPPLICABLE |
|||
|
Regulation AB Reference |
Criterion |
Performed Directly by PBLS1 |
Performed by Vendor(s) for which PBLS is the Responsible Party |
Performed by subservicer(s) or vendor(s) for which PBLS is NOT the Responsible Party |
NOT performed by PBLS or by subservicer(s) or vendor(s) retained by PBLS2 |
|
|
General Servicing Considerations |
|
|
|
|
|
1122(d)(1)(i) |
Policies and procedures are instituted to monitor any performance or other triggers and events of default in accordance with the transaction agreements. |
|
|
|
X |
|
1122(d)(1)(ii) |
If any material servicing activities are outsourced to third parties, policies and procedures are instituted to monitor the third party’s performance and compliance with such servicing activities. |
|
|
|
X |
|
1122(d)(1)(iii) |
Any requirements in the transaction agreements to maintain a back-up servicer for the pool assets are maintained. |
|
|
|
X |
|
1122(d)(1)(iv) |
A fidelity bond and errors and omissions policy is in effect on the party participating in the servicing function throughout the reporting period in the amount of coverage required by and otherwise in accordance with the terms of the transaction agreements. |
|
|
|
X |
|
1122(d)(1)(v) |
Aggregation of information, as applicable, is mathematically accurate and the information conveyed accurately reflects the information. |
|
|
|
X |
|
|
Cash Collection and Administration |
|
|
|
|
|
1122(d)(2)(i) |
Payments on pool assets are deposited into the appropriate custodial bank accounts and related bank clearing accounts no more than two business days following receipt, or such other number of days specified in the transaction agreements. |
|
|
|
X |
|
1122(d)(2)(ii) |
Disbursements made via wire transfer on behalf of an obligor or to an investor are made only by authorized personnel. |
|
|
|
X |
|
1122(d)(2)(iii) |
Advances of funds or guarantees regarding collections, cash flows or distributions, and any interest or other fees charged for such advances, are made, reviewed and approved as specified in the transaction agreements. |
|
|
|
X |
|
1122(d)(2)(iv) |
The related accounts for the transaction, such as cash reserve accounts or accounts established as a form of overcollateralization, are separately maintained (e.g., with respect to commingling of cash) as set forth in the transaction agreements. |
|
|
|
X |
|
1122(d)(2)(v) |
Each custodial account is maintained at a federally insured depository institution as set forth in the transaction agreements. For purposes of this criterion, “federally insured depository institution” with respect to a foreign financial institution means a foreign financial institution that meets the requirements of Rule 13k-1(b)(1) of the Securities Exchange Act. |
|
|
|
X |
|
1122(d)(2)(vi) |
Unissued checks are safeguarded so as to prevent unauthorized access. |
|
|
|
X |
|
1122(d)(2)(vii) |
Reconciliations are prepared on a monthly basis for all asset-backed securities related bank accounts, including custodial accounts and related bank clearing accounts. These reconciliations are (A) mathematically accurate; (B) prepared within 30 calendar days after the bank statement cutoff date, or such other number of days specified in the transaction agreements; (C) reviewed and approved by someone other than the person who prepared the reconciliation; and (D) contain explanations for reconciling items. These reconciling items are resolved within 90 calendar days of their original identification, or such other number of days specified in the transaction agreements. |
|
|
|
X |
|
|
Investor Remittances and Reporting |
|
|
|
|
|
1122(d)(3)(i)(A) |
Reports to investors, including those to be filed with the Commission, are maintained in accordance with the transaction agreements and applicable Commission requirements. Specifically, such reports are prepared in accordance with timeframes and other terms set forth in the transaction agreements. |
X |
|
|
|
|
1122(d)(3)(i)(B) |
Reports to investors, including those to be filed with the Commission, are maintained in accordance with the transaction agreements and applicable Commission requirements. Specifically, such reports provide information calculated in accordance with the terms specified in the transaction agreements. |
X |
|
|
|
|
1122(d)(3)(i)(C) |
Reports to investors, including those to be filed with the Commission, are maintained in accordance with the transaction agreements and applicable Commission requirements. Specifically, such reports are filed with the Commission as required by its rules and regulations. |
X3 |
|
|
X4 |
|
1122(d)(3)(i)(D) |
Reports to investors, including those to be filed with the Commission, are maintained in accordance with the transaction agreements and applicable Commission requirements. Specifically, such reports agree with investors’ or the trustee’s records as to the total unpaid principal balance and number of pool assets serviced by the Servicer. |
X3 |
|
|
X4 |
|
1122(d)(3)(ii) |
Amounts due to investors are allocated and remitted in accordance with timeframes, distribution priority and other terms set forth in the transaction agreements. |
|
|
|
X |
|
1122(d)(3)(iii) |
Disbursements made to an investor are posted within two business days to the Servicer’s investor records, or such other number of days specified in the transaction agreements. |
|
|
|
X |
|
1122(d)(3)(iv) |
Amounts remitted to investors per the investor reports agree with cancelled checks, or other form of payment, or custodial bank statements. |
|
|
|
X |
|
|
Pool Asset Administration |
|
|
|
|
|
1122(d)(4)(i) |
Collateral or security on pool assets is maintained as required by the transaction agreements or related mortgage loan documents. |
|
|
|
X |
|
1122(d)(4)(ii) |
Pool asset and related documents are safeguarded as required by the transaction agreements. |
|
|
|
X |
|
1122(d)(4)(iii) |
Any additions, removals or substitutions to the asset pool are made, reviewed and approved in accordance with any conditions or requirements in the transaction agreements. |
|
|
|
X |
|
1122(d)(4)(iv) |
Payments on pool assets, including any payoffs, made in accordance with the related pool asset documents are posted to the Servicer’s obligor records maintained no more than two business days after receipt, or such other number of days specified in the transaction agreements, and allocated to principal, interest or other items (e.g., escrow) in accordance with the related pool asset documents. |
|
|
|
X |
|
1122(d)(4)(v) |
The Servicer’s records regarding the pool assets agree with the Servicer’s records with respect to an obligor’s unpaid principal balance. |
|
|
|
X |
|
1122(d)(4)(vi) |
Changes with respect to the terms or status of an obligor's pool assets (e.g., loan modifications or re-agings) are made, reviewed and approved by authorized personnel in accordance with the transaction agreements and related pool asset documents. |
|
|
|
X |
|
1122(d)(4)(vii) |
Loss mitigation or recovery actions (e.g., forbearance plans, modifications and deeds in lieu of foreclosure, foreclosures and repossessions, as applicable) are initiated, conducted and concluded in accordance with the timeframes or other requirements established by the transaction agreements. |
X |
|
|
|
|
1122(d)(4)(viii) |
Records documenting collection efforts are maintained during the period a pool asset is delinquent in accordance with the transaction agreements. Such records are maintained on at least a monthly basis, or such other period specified in the transaction agreements, and describe the entity’s activities in monitoring delinquent pool assets including, for example, phone calls, letters and payment rescheduling plans in cases where delinquency is deemed temporary (e.g., illness or unemployment). |
|
|
|
X |
|
1122(d)(4)(ix) |
Adjustments to interest rates or rates of return for pool assets with variable rates are computed based on the related pool asset documents. |
|
|
|
X |
|
1122(d)(4)(x) |
Regarding any funds held in trust for an obligor (such as escrow accounts): (A) such funds are analyzed, in accordance with the obligor’s pool asset documents, on at least an annual basis, or such other period specified in the transaction agreements; (B) interest on such funds is paid, or credited, to obligors in accordance with applicable pool asset documents and state laws; and (C) such funds are returned to the obligor within 30 calendar days of full repayment of the related pool assets, or such other number of days specified in the transaction agreements. |
|
|
|
X |
|
1122(d)(4)(xi) |
Payments made on behalf of an obligor (such as tax or insurance payments) are made on or before the related penalty or expiration dates, as indicated on the appropriate bills or notices for such payments, provided that such support has been received by the Servicer at least 30 calendar days prior to these dates, or such other number of days specified in the transaction agreements. |
|
|
|
X |
|
1122(d)(4)(xii) |
Any late payment penalties in connection with any payment to be made on behalf of an obligor are paid from the Servicer’s funds and not charged to the obligor, unless the late payment was due to the obligor’s error or omission. |
|
|
|
X |
|
1122(d)(4)(xiii) |
Disbursements made on behalf of an obligor are posted within two business days to the obligor’s records maintained by the Servicer, or such other number of days specified in the transaction agreements. |
|
|
|
X |
|
1122(d)(4)(xiv) |
Delinquencies, charge-offs and uncollectible accounts are recognized and recorded in accordance with the transaction agreements. |
|
|
|
X |
|
1122(d)(4)(xv) |
Any external enhancement or other support, identified in Item 1114(a)(1) through (3) or Item 1115 of Regulation AB, is maintained as set forth in the transaction agreements. |
|
|
|
X |
1 The criteria in the columns “Applicable Servicing Criteria” and marked with an “X” are applicable for the Transactions unless otherwise noted. If there were no specially serviced loans under the related Transactions during the reporting period, then no trust advisor, senior trust advisor or operating advisor actions were required.
2 The criteria in the columns “Inapplicable Servicing Criteria” and marked with an “X” were not within the scope of the Asserting Party’s duties in the Transactions.
3 Applicable only to the Transactions listed in Table 2 below.
4 Not applicable to Transactions other than the Transactions listed in Table 2 below.
Table 2
|
COMM 2012-LC4 |
|
COMM 2012 CCRE4 |
|
COMM 2012-CCRE5 |
|
COMM 2013-CCRE7 |
|
COMM 2013-CCRE9 |
|
COMM 2013-LC6 |
|
COMM 2013-LC13 |
|
COMM 2013-CCRE11 |
|
MSBAM 2012-C5 |