v3.26.1
Deferred dry dock and special survey costs, net (Details Narrative)
12 Months Ended
Dec. 31, 2025
Deferred Dry Dock And Special Survey Costs Net
Period between scheduled regulatory drydockings
5 years
X
- References
No definition available.
+ Details
Name:
gsl_DisclosureDeferredDryDockAndSpecialSurveyCostsNetAbstract
Namespace Prefix:
gsl_
Data Type:
xbrli:stringItemType
Balance Type:
na
Period Type:
duration
X
- Definition
Period between scheduled drydockings.
+ References
No definition available.
+ Details
Name:
gsl_PeriodBetweenScheduledDrydockings
Namespace Prefix:
gsl_
Data Type:
xbrli:durationItemType
Balance Type:
na
Period Type:
duration