j.p. morgan acceptance corporation ii ABS 15G

Exhibit 99.3

Customer Loan ID Loan Exception ID Exception ID Exception Date Exception Type Exception Category Exception Subcategory 15E Category Exception Exception Detail Exception Information Compensating Factors Compensating Factor Information Applying Party Follow-up Comments Cleared Date Cured Date Waived Date Exception Level Grade DBRS Initial Exception Rating DBRS Final Exception Rating Fitch Initial Exception Rating Fitch Final Exception Rating Kroll Initial Exception Rating Kroll Final Exception Rating S&P Initial Exception Rating S&P Final Exception Rating Note Date Property State Occupancy Purpose Exception Remediation Overall
Initial Loan Grade
Overall
Final Loan Grade
Credit
Initial Loan Grade
Credit
Final Loan Grade
Compliance
Initial Loan Grade
Compliance
Final Loan Grade
Property
Initial Loan Grade
Property
Final Loan Grade
Originator QM ATR Status TPR QM ATR Status Is Curable
304066164 29827131     Compliance Loan Package Documentation Application / Processing Missing, Incorrect, or Incomplete Final or Initial 1003 Missing Document: Missing Lender's Initial 1003   xxxx       xxxx
12/11/2023     1 B A B A B A B A   TN Primary Refinance - Cash-out - Other   B A A A B A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304066158 29827144     Compliance TRID Transaction Error TRID This loan was reviewed to a limited compliance scope.  Some testing for TILA-RESPA Integrated Disclosure (TRID) compliance under the SFA TRID Grid is outside of the scope of review.  This exception is for informational purposes only and does not impact grading.           xxxx
    11/21/2023 2 A A A A A A A A   TN Primary Refinance - Cash-out - Other   A A A A A A     Non QM Non QM No
304302940 30343544     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan. xxxx               2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B B B B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304302940 30380653     Credit Credit Miscellaneous Guideline Credit Exception:   Texas Home Equity Cash Out are ineligible per client purchase criteria. The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least 10%.
725 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    04/20/2024 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other   B B B B B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304302940 30382019     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan  (Other Debt) Texas Constitution Section 50(a)(6): TX 50(a)(6) prohibits other debt secured by the homestead unless the purpose of additional debt is one described under TX 50(a)(1)-(5) or (8). Unable to determine purpose of additional debt secured by the homestead.         xxxx
04/26/2024     1 B A B A B A B A   TX Primary Refinance - Cash-out - Other Confirm whether additional debt on the subject property is a Texas 50(a)(6) or 50(a)(7) prior to Remediating.  Notify consumer the accrual of interest and other obligations will be abated so long as the prior 50(a)(6) or (7) is secured by the homestead B B B B B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304249797 30406200     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  Although the loan file contains the T-42 Endorsement, there is no evidence the Title Policy includes the Texas T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.) xxxx               2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B B B B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304249797 30406202     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B B B B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304249797 30406640     Credit Credit Miscellaneous Guideline Credit Exception:   Texas Cash Outs are ineligible per client purchase criteria. The qualifying DTI on the loan is at least 10% less than the guideline maximum.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least 10%.
29.95184% DTI SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    04/25/2024 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other   B B B B B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304331289 30716590     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date ofxx/xx/xxxx 12:00:00 AM. xxxx       xxxx
06/27/2024     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304353845 31041541     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - xxxx       xxxx
09/20/2024     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304357061 31260136     Credit Guideline Guideline Issue Guideline Borrower does not have the minimum active tradelines per guidelines.   xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.

The representative FICO score exceeds the guideline minimum by at least 40 points.
Borrower has been self-employed for 6 years. SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    09/20/2024 2 C B C B C B C B   WA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304359236 31229160     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
09/16/2024     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304359236 31229224     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
09/16/2024     1 B A C A B A B A   SC Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304359236 31229225     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 55.42992% significantly exceeds the guideline maximum of 50.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
09/16/2024     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304359236 31229226     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
09/16/2024     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304359236 31664251     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - ___ For an automobile allowance to be considered as acceptable stable income, the borrower must have received payments for at least two years No documentation was provided to verify receipt       xxxx
09/24/2024     1   A   A   A   A   SC Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304374810 31654329     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx       xxxx
09/18/2024     1 B A C A B A B A   NV Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) Yes
304374810 31677381     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Higher Priced QM (APOR) matches the Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx               2   A   B   B   A   NV Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) No
304384702 31673330     Credit Title General Title Title Policy Coverage is less than Original Loan Amount. The Title Policy Amount of ___ is less than the note amount of ___ based on the ___ in file.                 2 B B B B B B B B   CA Primary Refinance - Cash-out - Other   C B C B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304384702 31674967     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
11/14/2024     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304384702 31675017     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 51.38495% moderately exceeds the guideline maximum of 50.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx       xxxx
11/14/2024     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304384702 31675018     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk.         xxxx
11/14/2024     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304384702 31675019     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
11/14/2024     1 B A C A B A B A   CA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304387089 31680220     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx       xxxx
09/20/2024     1 B A C A B A B A   AZ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) Yes
304387089 31695040     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Higher Priced QM (APOR) matches the Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx               2   A   B   B   A   AZ Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) No
304397180 31815940     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The subject property is located in a FEMA disaster that does not have a declared end date.   xxxx       xxxx
06/16/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304397180 31815965     Credit Title General Title Title Policy Coverage is less than Original Loan Amount. The Title Policy Amount of ___ is less than the note amount of ___ based on the ___ in file. xxxx               2 B B B B B B B B   GA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304393761 31817773     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
10/16/2024     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304418238 31906032     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
10/20/2024     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304418238 31906060     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304418238 31906062     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304418238 31906063     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304425998 31994526     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
12/04/2024     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Non QM Non QM No
304425998 31994581     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for. xxxx               2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Non QM Non QM No
304425998 31994582     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan. xxxx               2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Non QM Non QM No
304425998 31994668     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied. xxxx               2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Non QM Non QM No
304426043 31985033     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
12/05/2024     1 C A C A C A C A   WI Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304426043 31986329     Credit Guideline Guideline Issue Guideline Ineligible property type. ___ xxxx Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.

The qualifying DTI on the loan is at least 10% less than the guideline maximum.

The representative FICO score exceeds the guideline minimum by at least 40 points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    10/28/2024 2 B B B B B B B B   WI Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304426098 31985081     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
11/07/2024     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304426098 31985119     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304426098 31985120     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304401296 31994302     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx       xxxx
10/30/2024     1 B A C A B A B A   OR Investment Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) Yes
304401296 32024533     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Higher Priced QM (APOR) matches the Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx               2   A   B   B   A   OR Investment Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) No
304420747 31996189     Credit Title General Title Title Policy Coverage is less than Original Loan Amount. The Title Policy Amount of ___ is less than the note amount of ___ based on the ___ in file.                 2 B B B B B B B B   VA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304420747 31996228     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
11/01/2024     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304428701 32194908     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
12/18/2024     1 C A C A C A C A   KY Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304428701 32233185     Credit Guideline Guideline Issue Guideline Ineligible property type. ___ xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.
Same employer for over 5 years. SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    11/21/2024 2 B B B B B B B B   KY Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304422480 32042117     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: PITIA reserves months discrepancy.   xxxx       xxxx
11/08/2024     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304422480 32042124     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
11/08/2024     1 B A C A B A B A   MO Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304422480 32042125     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
11/08/2024     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304401295 32133871     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Non QM. xxxx       xxxx
11/15/2024     1 B A C A B A B A   CA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Non QM Yes
304401295 32133872     Compliance Compliance Federal Compliance ATR/QM Defect QM (APOR) Threshold Fail Qualified Mortgage: QM APR on subject loan of xxxx% is equal to or greater than the threshold of  xxxx%. xxxx       xxxx
11/15/2024     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Non QM No
304401295 32148811     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - General Ability to Repay Ability to Repay (Dodd-Frank 2014): The initial Loan Designation provided did not match.  However, the updated Loan Designation of Non QM matches the Due Diligence Loan Designation of Non QM. xxxx               2   A   B   B   A   CA Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Non QM No
304439026 32161431     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
12/05/2024     1 C A C A C A C A   ID Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304439026 32161646     Credit Asset Asset Calculation / Analysis Asset Available for Closing is insufficient to cover Cash From Borrower. Documented qualifying Assets for Closing of  ___ is less than Cash From Borrower ___. xxxx Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least 10%.
11 years at current employer. SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    01/27/2025 2 C B C B C B C B   ID Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304439026 32166017     Credit Guideline Guideline Issue Guideline Ineligible property type. ___ xxxx Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least 10%.
11 years at current employer. SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    11/19/2024 2 B B B B B B B B   ID Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304439047 32166780     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304439047 32166781     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304439047 32166909     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
12/10/2024     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304442570 32236587     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304442570 32236588     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304442570 32241155     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
12/28/2024     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304442570 32241173     Credit Loan Package Documentation Loan File Missing Document  Missing Document: Hazard Insurance Policy not provided   xxxx       xxxx
12/05/2024     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304442597 32237815     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
12/22/2024     1 C A C A C A C A   AR Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304442597 32243546     Credit Guideline Guideline Issue Guideline Ineligible property type. ___ xxxx Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.
10 plus years in current residence. SitusAMC,Aggregator

SitusAMC
xxxx
    11/23/2024 2 B B B B B B B B   AR Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304457684 32332858     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/03/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304457684 32332955     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304457684 32332956     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304457684 32339198     Compliance Compliance State Compliance State Defect (State High Cost Disclosure) Maryland Covered Loan (Counseling Disclosure Not Provided) Maryland Covered Loan: Home Counseling Disclosure to provide home buyer education was not provided to borrower.         xxxx
02/04/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304457684 32339199     Compliance Compliance State Compliance State Defect (State High Cost Disclosure) Maryland Covered Loan (Counseling Agencies Not Provided) Maryland Covered Loan: Home Counseling a list of county approved agencies to provide home buyer education was not provided to borrower.         xxxx
02/04/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304457684 32339200     Compliance Compliance State Compliance State Defect (State High Cost) Maryland Covered Loan (Points and Fees) Maryland Predatory Lending Law: Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  4.00000% of the Total Loan Amount. Points and Fees total $xxxx on a Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan.         xxxx
02/04/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other No obvious cure C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304457488 32325021     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
12/18/2024     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304457488 32325044     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304457488 32325045     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466589 32353993     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/03/2025     1 C A C A C A C A   OH Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466708 32352746     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
12/30/2024     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466616 32370768     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/04/2025     1 C A C A C A C A   SD Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466616 32370793     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
12/23/2024     1 C A C A C A C A   SD Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466734 32350043     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/04/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466728 32350067     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
12/18/2024     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466728 32350069     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: Property is located in a FEMA Disaster area and has not been inspected.   xxxx       xxxx
12/18/2024     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466678 32350266     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
12/29/2024     1 C A C A C A C A   UT Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466677 32351712     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The most recent valuation inspection is dated prior to the most recent FEMA disaster.   xxxx Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.

Property inspected post disaster but pre-FEMA declaration of disaster end date.
Property inspected post disaster but pre-FEMA declaration of disaster end date. Date of disaster: xx/xx/xxxx SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

Aggregator
xxxx
    12/13/2024 2 B B B B B B B B   GA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466677 32351724     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/04/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466654 32349963     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/04/2025     1 C A C A C A C A   OH Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466647 32350289     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/05/2025     1 C A C A C A C A   CT Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466721 32364365     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/04/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304466701 32363442     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/04/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466666 32367587     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/04/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304466666 32367765     Compliance Compliance Federal Compliance ATR/QM Self-Employed Tax Return Recency - ATR Ability to Repay (Dodd-Frank 2014): Self Employed Tax Returns - The business or personal tax returns provided are not the most recent. Application Date xx/xx/xxxx,  Most Recent Tax Return End Date xx/xx/xxxx, Tax Return Due Date xx/xx/xxxx. xxxx               2 B B B B B B B B   TX Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304466666 32367766     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Non QM Non QM No
304466666 32367767     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Non QM Non QM No
304466666 32367769     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.)         xxxx
12/24/2024     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Non QM Non QM Yes
304466666 32567544     Credit Credit Credit Eligibility Credit There are red flags on the fraud report that have not been addressed - xxxx       xxxx
01/09/2025     1   A   A   A   A   TX Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304466633 32364844     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/01/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466674 32364411     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/04/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466690 32363514     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/04/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466679 32366342     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
12/23/2024     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466679 32413145     Credit Missing Document General Missing Document Missing Document: Credit Card Statement not provided   xxxx       xxxx
12/27/2024     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466637 32368927     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/04/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466660 32366711     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/04/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466660 32366885     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing.                 2 B B B B B B B B   CA Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466655 32569047     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/11/2025     1 C A C A C A C A   UT Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466691 32371706     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/04/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304466691 32371770     Credit Guideline Guideline Issue Guideline Ineligible Property Type. Property Type:  ___ xxxx Borrower has worked in the same position for more than 3 years.

Borrower has verified disposable income of at least $2500.00.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least 10%.
Borrower has been with current employer for 4.65 years. SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    01/27/2025 2 C B C B C B C B   WA Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304466638 32371411     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
12/18/2024     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466724 32372188     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/06/2025     1 C A C A C A C A   WV Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466724 32570276     Credit Credit Credit Eligibility Credit There are red flags on the fraud report that have not been addressed - xxxx       xxxx
01/09/2025     1   A   A   A   A   WV Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466685 32569065     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/11/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304466624 32373183     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/06/2025     1 C A C A C A C A   UT Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466624 32570380     Credit Credit Credit Eligibility Credit There are red flags on the fraud report that have not been addressed - xxxx       xxxx
01/07/2025     1   A   A   A   A   UT Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466590 32371600     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/06/2025     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466705 32371402     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   MN Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466684 32569011     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/11/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466672 32372098     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466672 32372159     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The most recent valuation inspection is dated prior to the most recent FEMA disaster.   xxxx       xxxx
12/30/2024     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466630 32372976     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466629 32373781     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   ID Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304466591 32377661     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466591 32377719     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466591 32377720     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466591 32377721     Compliance Compliance State Compliance Misc. State Level Maryland Mortgage Lending Regulations (Disclosure of Taxes and Insurance Not Provided) Maryland Mortgage Lending Regulations: Borrower did not receive disclosure on responsibility for payment of taxes and insurance.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466591 32433379     Credit Loan Package Documentation Loan File Missing Document  Missing Document: Hazard Insurance Policy not provided   xxxx       xxxx
12/31/2024     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466605 32378007     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466605 32378034     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The most recent valuation inspection is dated prior to the most recent FEMA disaster.   xxxx       xxxx
01/08/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466688 32406337     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466604 32372096     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466656 32569302     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/11/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466664 32415148     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466628 32371405     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466649 32417281     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/07/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304466649 32417324     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The most recent valuation inspection is dated prior to the most recent FEMA disaster.   xxxx       xxxx
12/23/2024     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304466619 32372090     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/06/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466618 32371368     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/06/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466592 32414848     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/06/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466592 32416987     Compliance Compliance State Compliance State HPML Massachusetts HPML Threshold Test Compliant Massachusetts Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%  Compliant Higher Priced Loan.                 2 B B B B B B B B   MA Primary Refinance - Cash-out - Other No obvious cure C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466689 32415942     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
01/06/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466689 32416018     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466689 32416019     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466689 32417359     Credit Credit Miscellaneous Guideline Credit Exception:   Provide evidence UCC/Lien with xxxx dated xxxx has been released.       xxxx
12/31/2024     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304466676 32569643     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
01/08/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304466676 32569709     Compliance Compliance Federal Compliance TILA TILA NMLSR - Missing NMLS Information on Security Instrument Truth in Lending Act (NMLSR Dodd- Frank 2014): NMLSR information not present on Security Instrument. xxxx       xxxx
01/08/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other Need evidence that lender provided consumer with accurate NMLS information post close (addendum to Security Instrument) C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304466676 32569724     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
01/11/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304470058 32498775     Compliance Compliance State Compliance Misc. State Level Michigan CMPA Home Loan Toolkit Status Michigan Consumer Mortgage Protection Act:  Home Loan Toolkit not provided to borrower. xxxx               2 B B B B B B B B   MI Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484298 32632964     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484298 32632965     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484298 32632966     Compliance Compliance State Compliance State Defect (State High Cost) Maryland Covered Loan (Points and Fees) Maryland Predatory Lending Law: Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  4.00000% of the Total Loan Amount. Points and Fees total $xxxx on a Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other No obvious cure C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484393 32633605     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484393 32642259     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
03/08/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484393 32642290     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484369 32633243     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan.         xxxx
03/04/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484369 32633244     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
03/04/2025     1 B A B A B A B A   NV Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484369 32633245     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property.         xxxx
03/04/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484369 32633246     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (Notice to Assignee) Truth in Lending Act (HOEPA): Required Statement was not provided to purchaser or assignee for loan that was sold or assigned. (Note: This notice only applies when selling or assigning a HOEPA loan and may not be found in the file for loans that have not been previously sold)         xxxx
03/04/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484369 32633247     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower         xxxx
03/04/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484369 32633248     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees.         xxxx
03/04/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484369 32633249     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days.         xxxx
03/04/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484369 32633250     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan.         xxxx
03/04/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304484369 32633251     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling.         xxxx
03/04/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484369 32633253     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
03/04/2025     1 B A C A B A B A   NV Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304484369 32633254     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).         xxxx
03/04/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484369 32633255     Compliance Compliance State Compliance State Defect Nevada Home Loan (Home Loan Legend Not on Security Instrument) Nevada Home Loan:  Mortgage, Deed, or other instrument does not expressly indicate that loan is a "home loan" in at least 14 point font.         xxxx
03/04/2025     1 B A B A B A B A   NV Primary Refinance - Cash-out - Other No obvious cure C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484397 32712876     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484397 32712878     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484397 32712881     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.)         xxxx
02/06/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484397 32719188     Credit Credit Credit Eligibility Credit There are red flags on the fraud report that have not been addressed - xxxx       xxxx
03/26/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484451 32624240     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The subject property is located in a FEMA disaster that does not have a declared end date.   xxxx Property inspected post disaster but pre-FEMA declaration of disaster end date.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.

The representative FICO score exceeds the guideline minimum by at least 40 points.
Property inspected post disaster but pre-FEMA declaration of disaster end date. Date of disaster: xx/xx/xxxx Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    01/30/2025 2 C B C B C B C B   CA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484451 32628023     Credit Insurance Insurance Documentation Insurance Hazard Insurance Error: Missing HO-6 policy, blanket hazard insurance policy provided does not contain unit interior coverage.   xxxx       xxxx
01/22/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484349 32713887     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - ___ xxxx       xxxx
02/04/2025     1 C A C A C A C A   CT Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484349 32713963     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA - Incorrect Right To Cancel Form Used - H-8 Used on Same Lender Refinance (Circuit 2, 5, 7, 8, 9, 10 or DC) Truth in Lending Act: Notice of Right to Cancel was not executed on the proper Model Form for a refinancing by the same creditor. The H-8 form was used, the H-9 form should have been used.                 2 B B B B B B B B   CT Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484405 32715289     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484405 32715290     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484405 32715291     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484405 32715292     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484405 32715293     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484405 32715296     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/18/2025     1 B A C A B A B A   IL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484405 32715297     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484405 32715298     Compliance Compliance County Compliance State Defect (County High Cost) Cook County Threshold Loan (Points and Fees) Cook County Predatory Lending Ordinance: Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the County Total Loan Amount. Points and Fees total $xxxx on a County Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Compliant High Cost Loan.         xxxx
      2 B B B B B B B B   IL Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484405 32715300     Compliance Compliance State Compliance State Defect (State High Cost Provision) Illinois High Risk Home Loan (Impermissible Financing of Points and Fees) Illinois High Risk Home Loan: Lender financed points and fees not permissible. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other See any available cure under Illinois High-Risk threshold exception. C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484405 32715301     Compliance Compliance State Compliance State Late Charge (State High Cost Provision) Illinois High Risk Home Loan (Late Charge) Illinois High Risk Home Loan: Mortgage loan contains an impermissible late charge greater than 4%. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other See any available cure under Illinois High-Risk threshold exception. C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484405 32715303     Compliance Compliance State Compliance State Defect (State High Cost) Illinois High Risk Home Loan (Points and Fees) Illinois High Risk Home Loan Act: Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Total Loan Amount. Points and Fees total $xxxx on a Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other Within 30 days of closing, provide:  (1) Lender Attestation to AMC attesting the lender has not received any notice from borrower of the failure; (2) Letter of Explanation; (3) refund of amount over the high-risk threshold maximum; and (4) proof of mailing (must be in transit with courier).

(Limited Use Bona Fide Errors - Compliance and Client Approval Required)  Within 60 days of discovery, provide:
(1) Legal opinion from originating lender with loan-specific details on how a high-cost loan was made despite procedures to prevent and confirms (i) the failure constitutes a bona fide error for the jurisdiction in which the property is located, and (ii) that the lender has not received any notice from the borrower of the failure; (2) procedures or explanation of controls in place to prevent such errors; (3) client written approval accepting use of the bona fide error cure; (4) Letter of Explanation to borrower; (5) refund of amount over the high-risk threshold maximum; and (6) proof of mailing (must be in transit with courier).   Note, a cure may not be accepted if the seller/lender has certified a fix has been made to their system and the same issue continues to occur after the fix has been put into place.
C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484476 32711955     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan.         xxxx
02/19/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484476 32711956     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
02/19/2025     1 B A B A B A B A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484476 32711957     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property.         xxxx
02/19/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484476 32711959     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484476 32711960     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484476 32711961     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484476 32711962     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304484476 32711963     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484476 32711965     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/19/2025     1 B A C A B A B A   AZ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304484476 32711966     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/19/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484476 32714968     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
03/03/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484512 32710610     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan.         xxxx
02/07/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484512 32710611     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
02/07/2025     1 B A B A B A B A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484512 32710612     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property.         xxxx
02/07/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484512 32710614     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/07/2025     1 B A C A B A B A   FL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304484512 32710616     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Income and Assets - Wages General QM:  Unable to verity income due to, paystub provided was dated more than 90 days prior to closing. xxxx       xxxx
02/07/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484512 32710649     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The most recent valuation inspection is dated prior to the most recent FEMA disaster.   xxxx       xxxx
02/03/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484379 32711672     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/04/2025     1 B A C A B A B A   TX Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484379 32711673     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  3.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/04/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484379 32711674     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484379 32711675     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484379 32711677     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
02/04/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484379 32778032     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2   B   B   B   B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484379 32778033     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2   B   B   B   B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484379 33344383     Compliance Compliance Federal Compliance TILA TILA Extended Rescission: Inaccurate material disclosures provided to borrower at consummation on a rescindable transaction resulting in extended rescission rights (3 years from consummation).  Re-disclosure of accurate material disclosures, LOE, re-opening of rescission and proof of delivery required.   xxxx       xxxx
  04/24/2025   2   B   B   B   B   TX Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct notice of rescission model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484461 32628296     Credit Credit Miscellaneous Guideline Credit Exception:   Missing credit statement for the xxxx account with an unpaid balance of $xxxx and a monthly payment of $xxxx.  The account does not appear on the credit report. The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has verified disposable income of at least $2500.00.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least 10%.
782 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    03/25/2025 2 C B C B C B C B   ID Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484472 32626730     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484472 32626732     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.)         xxxx
  03/08/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484472 32627693     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - ___ xxxx       xxxx
01/22/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484472 32631998     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/06/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484472 32631999     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/06/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484504 32712475     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The most recent valuation inspection is dated prior to the most recent FEMA disaster.   xxxx       xxxx
02/07/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484304 32633801     Compliance Compliance State Compliance State HPML (State HPML) Oklahoma Higher-Priced Mortgage Loan (APR Exceeds HPML Threshold) Oklahoma Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Compliant Higher Priced Loan.                 2 B B B B B B B B   OK Primary Refinance - Cash-out - Other No obvious cure B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484426 32711907     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
02/18/2025     1 C A C A C A C A   NH Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484426 32711908     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
02/18/2025     1 C A C A C A C A   NH Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484426 32711909     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
02/18/2025     1 C A C A C A C A   NH Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484426 32711910     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   NH Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484426 32711911     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
02/18/2025     1 C A C A C A C A   NH Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484426 32711913     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/19/2025     1 B A C A B A B A   NH Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484426 32711914     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/19/2025     1 C A C A C A C A   NH Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484494 32627681     Credit Guideline Guideline Issue Guideline Ineligible Property Type. Property Type:  ___ xxxx Borrower has owned the subject property for at least 5 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.
Borrower has lived in subject for 8 years. SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    03/21/2025 2 C B C B C B C B   MO Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484389 32717395     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Compliant Higher Priced Mortgage Loan.         xxxx
03/05/2025     1 A A A A A A A A   SC Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484389 32717396     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing.         xxxx
03/05/2025     1 B A B A B A B A   SC Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484389 32717398     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx       xxxx
03/05/2025     1 B A C A B A B A   SC Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484480 32712124     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484480 32712125     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484480 32712126     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484480 32712127     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484480 32712128     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484480 32712130     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/18/2025     1 B A C A B A B A   IL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484480 32712131     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484480 32712132     Compliance Compliance State Compliance State Defect (State High Cost Disclosure) Illinois High Risk Home Loan (Consumer Caution Notice Not Provided) Illinois High Risk Home Loan:  Borrower not provided with Consumer Caution Notice. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other See any available cure under Illinois High-Risk threshold exception. C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484480 32712133     Compliance Compliance State Compliance State Defect (State High Cost Provision) Illinois High Risk Home Loan (Impermissible Financing of Points and Fees) Illinois High Risk Home Loan: Lender financed points and fees not permissible. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other See any available cure under Illinois High-Risk threshold exception. C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484480 32712134     Compliance Compliance State Compliance State Late Charge (State High Cost Provision) Illinois High Risk Home Loan (Late Charge) Illinois High Risk Home Loan: Mortgage loan contains an impermissible late charge greater than 4%. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other See any available cure under Illinois High-Risk threshold exception. C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484480 32712135     Compliance Compliance State Compliance State Defect (State High Cost Disclosure) Illinois High Risk Home Loan (Mortgage Awareness Program ("MAP") Not Provided) Illinois High Risk Home Loan: Borrower not notified of right to participate in Mortgage Awareness Program ("MAP"). xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other See any available cure under Illinois High-Risk threshold exception. C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484480 32712136     Compliance Compliance State Compliance State Defect (State High Cost) Illinois High Risk Home Loan (Points and Fees) Illinois High Risk Home Loan Act: Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Total Loan Amount. Points and Fees total $xxxx on a Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other Within 30 days of closing, provide:  (1) Lender Attestation to AMC attesting the lender has not received any notice from borrower of the failure; (2) Letter of Explanation; (3) refund of amount over the high-risk threshold maximum; and (4) proof of mailing (must be in transit with courier).

(Limited Use Bona Fide Errors - Compliance and Client Approval Required)  Within 60 days of discovery, provide:
(1) Legal opinion from originating lender with loan-specific details on how a high-cost loan was made despite procedures to prevent and confirms (i) the failure constitutes a bona fide error for the jurisdiction in which the property is located, and (ii) that the lender has not received any notice from the borrower of the failure; (2) procedures or explanation of controls in place to prevent such errors; (3) client written approval accepting use of the bona fide error cure; (4) Letter of Explanation to borrower; (5) refund of amount over the high-risk threshold maximum; and (6) proof of mailing (must be in transit with courier).   Note, a cure may not be accepted if the seller/lender has certified a fix has been made to their system and the same issue continues to occur after the fix has been put into place.
C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484519 32711731     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
02/04/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304484519 32711835     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan. xxxx       xxxx
02/04/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304484519 32711836     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Timing of Appraisal to Consumer) TILA HPML Appraisal Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. xxxx       xxxx
02/04/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304484355 32635548     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484355 32635549     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484295 32710749     Compliance Compliance State Compliance State HPML Massachusetts HPML Threshold Test Compliant Massachusetts Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%  Compliant Higher Priced Loan. xxxx               2 B B B B B B B B   MA Primary Refinance - Cash-out - Other No obvious cure B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484455 32618259     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484455 32618260     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484456 32627679     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing. xxxx               2 B B B B B B B B   SC Primary Refinance - Cash-out - Other   B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304484336 32712404     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/18/2025     1 B A C A B A B A   FL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484336 32712405     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of the greater of .00000% of the Federal Total Loan Amount and $xxxx (2024). Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx and $xxxx (2024) (an overage of $xxxx or xxxx%). xxxx       xxxx
02/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484500 32627025     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx 12:00:00 AM. xxxx       xxxx
  03/10/2025   2 C B C B C B C B   VA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Non QM Non QM Yes
304484500 32627026     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Notice of Right to Cancel Expiration Date Prior or equal to Disbursement Date Truth in Lending Act:  Actual Date(s) on Notice of Right to Cancel occurs prior to expected date(s). xxxx       xxxx
  03/10/2025   2 C B C B C B C B   VA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Non QM Non QM Yes
304484411 32718369     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484411 32718371     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484411 32718373     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
02/06/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304484448 32615914     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - ___ xxxx       xxxx
01/15/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304471737 32625896     Credit Guideline Guideline Issue Guideline Ineligible Property Type. Property Type:  ___ xxxx The qualifying DTI on the loan is at least 10% less than the guideline maximum.

Borrower has owned the subject property for at least 5 years.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.
39.56433% DTI SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    02/27/2025 2 C B C B C B C B   DE Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304473145 32660613     Compliance Compliance Federal Compliance TRID Defect TRID Closing Disclosure Status Test TILA-RESPA Integrated Disclosure: Closing Disclosure not provided or Closing Disclosure not provided prior to closing. Any applicable Federal, State or Local compliance testing is unreliable or not performed. Loan is subject to high cost testing. xxxx       xxxx
03/18/2025     1 C A C A C A C A   OK Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304473145 32660614     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form Right of Rescission Timing - Receipt Date Missing Missing Final Closing Disclosure Received Date. Unable to determine compliance with rescission timing requirements. xxxx       xxxx
03/18/2025     1 C A C A C A C A   OK Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304477514 32671736     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form Notice of Right to Cancel Missing Truth in Lending Act: Notice of Right to Cancel was not provided. xxxx       xxxx
02/05/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304472663 32673226     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
03/17/2025     1 B A C A B A B A   SC Second Home Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304472663 32673470     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
03/17/2025     1 C A C A C A C A   SC Second Home Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304472663 32673882     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
03/17/2025     1 C A C A C A C A   SC Second Home Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304472663 32673889     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 53.68529% moderately exceeds the guideline maximum of 50.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx       xxxx
03/17/2025     1 C A C A C A C A   SC Second Home Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304477460 32692348     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
03/17/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304477460 32692385     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 58.89080% significantly exceeds the guideline maximum of 50.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
03/17/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304477460 32692386     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
03/17/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304477460 32692388     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
03/17/2025     1 B A C A B A B A   PA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304483054 32713408     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
03/15/2025     1 C A C A C A C A   TN Investment Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304473136 32713838     Credit Loan Package Documentation Application / Processing Loan Package Documentation Missing Document: Note - Senior Lien not provided   xxxx       xxxx
03/17/2025     1 D A D A D A D A   MD Primary Refinance - Cash-out - Other   D A D A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304482902 32720306     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date ofxx/xx/xxxx 12:00:00 AM. xxxx       xxxx
  04/07/2025   2 C B C B C B C B   IL Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304509979 32720300     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
03/03/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304509979 32720324     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (Notice to Assignee) Truth in Lending Act (HOEPA): Required Statement was not provided to purchaser or assignee for loan that was sold or assigned. (Note: This notice only applies when selling or assigning a HOEPA loan and may not be found in the file for loans that have not been previously sold) xxxx       xxxx
02/18/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304509979 32720325     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
02/18/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304509979 32720326     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
02/18/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304509979 32720327     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
02/18/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304509979 32720328     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A C A C A     Non QM Non QM Yes
304509979 32720329     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
02/18/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304509979 32720331     Compliance Compliance State Compliance State Defect (State High Cost Disclosure) Colorado Covered Loan (Consumer Caution Notice Not Provided) Colorado Covered Loan:  Consumer Caution Notice not provided to borrower. xxxx       xxxx
02/18/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304509979 32720332     Compliance Compliance State Compliance State Defect (State High Cost) Colorado Covered Loan (Points and Fees) Colorado Consumer Equity Protection Act: Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Total Loan Amount. Points and Fees total $xxxx on a Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other For application prior to 1/10/14, no obvious cure.

For applications on or after 1/10/14, same as DF HOEPA cure:
(1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted.
C A C A C A     Non QM Non QM Yes
304510013 32721270     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/12/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509985 32721585     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
03/03/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509985 32723392     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan.         xxxx
03/11/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509985 32723393     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
03/11/2025     1 B A B A B A B A   MO Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509985 32723394     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property.         xxxx
03/11/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509985 32723395     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 49.37020% moderately exceeds the guideline maximum of 45.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx       xxxx
03/11/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509985 32723422     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
03/11/2025     1 B A C A B A B A   MO Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304509985 32723481     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
03/11/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509985 32723513     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
03/11/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509985 32966799     Credit Credit Credit Eligibility Credit There are red flags on the fraud report that have not been addressed - xxxx       xxxx
03/13/2025     1   A   A   A   A   MO Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509983 32722132     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
03/03/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509983 32723591     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
03/05/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509983 32723621     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
03/05/2025     1 B A C A B A B A   GA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304509983 32723622     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 52.60591% significantly exceeds the guideline maximum of 45.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
03/05/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509983 32723623     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
03/05/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510062 32722609     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510173 32721964     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510173 32722036     Compliance Compliance State Compliance State HPML Massachusetts HPML Threshold Test Compliant Massachusetts Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%  Compliant Higher Priced Loan.                 2 B B B B B B B B   MA Primary Refinance - Cash-out - Other No obvious cure C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510134 32719638     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510180 32725263     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510182 32729757     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   NM Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510215 32722047     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510266 32721741     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   OH Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509949 32719629     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/12/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510022 32721956     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/12/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510035 32725043     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510035 32725204     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510081 32729531     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510116 32724605     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510231 32724002     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/08/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304510183 32720102     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/08/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304510071 32719955     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/08/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510071 32720275     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510071 32720276     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510071 32720277     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510071 32720278     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510071 32720279     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510071 32720281     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/19/2025     1 B A C A B A B A   AZ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510071 32720282     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).         xxxx
02/19/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510084 32724887     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/08/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510084 32725088     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510155 32722926     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/08/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510220 32730532     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/08/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304509950 32719998     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/12/2025     1 C A C A C A C A   WI Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510021 32724760     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
03/03/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510021 32724816     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of the greater of .00000% of the Federal Total Loan Amount and $xxxx (2024). Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx and $xxxx (2024) (an overage of $xxxx or xxxx%). xxxx       xxxx
02/18/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510021 32724818     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/18/2025     1 B A C A B A B A   MO Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304509992 32721815     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/12/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304509965 32729480     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
03/03/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510058 32719885     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/08/2025     1 C A C A C A C A   OH Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509986 32733309     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/08/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509986 32733347     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509986 32733348     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509986 32733350     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
02/11/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304509986 32746707     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/06/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304509986 32746708     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/06/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304509986 32814109     Credit Credit Credit Eligibility Credit There are red flags on the fraud report that have not been addressed - xxxx       xxxx
02/12/2025     1   A   A   A   A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510162 32722127     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/08/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510219 32744223     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2 C B C B C B C B   VA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510219 32744228     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2 C B C B C B C B   VA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510219 32744684     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/12/2025     1 B A C A B A B A   VA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510219 32744685     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Income and Assets - Schedule C General QM: Unable to verify Sole Proprietorship income using reasonably reliable third-party records. xxxx       xxxx
02/12/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509971 32729739     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
03/03/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509971 32966806     Credit Credit Credit Eligibility Credit There are red flags on the fraud report that have not been addressed - xxxx       xxxx
03/13/2025     1   A   A   A   A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509963 32730060     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
03/03/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510038 32721878     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   NH Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510038 32721972     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/07/2025     1 B A C A B A B A   NH Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510038 32721973     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  3.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).         xxxx
02/07/2025     1 C A C A C A C A   NH Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509947 32720969     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/12/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510060 32729706     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510060 32734090     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing. xxxx               2 B B B B B B B B   NV Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510243 32724655     Credit Credit Credit Documentation Credit No evidence of fraud report in file - xxxx       xxxx
03/04/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510243 32724670     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
02/11/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510165 32720437     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   WV Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510100 32724282     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510265 32722318     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510265 32744597     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Combined loan to value discrepancy.   xxxx       xxxx
02/13/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510265 32744904     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   PA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510265 32744905     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   PA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510283 32725049     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/04/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304509982 32720273     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The subject property is located in a FEMA disaster that does not have a declared end date.   xxxx Property inspected post disaster but pre-FEMA declaration of disaster end date.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The qualifying DTI on the loan is at least 10% less than the guideline maximum.
Property inspected post disaster but pre-FEMA declaration of disaster end date. Date of disaster: xx/xx/xxxx Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    01/31/2025 2 C B C B C B C B   CA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509982 32720291     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
03/03/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509982 32727062     Credit Guideline Guideline Issue Guideline The borrower has Open Public Records/Collections/Charge Off accounts.   xxxx       xxxx
02/15/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509982 32966849     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The most recent valuation inspection is dated prior to the most recent FEMA disaster.     Property inspected post disaster but pre-FEMA declaration of disaster end date.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The qualifying DTI on the loan is at least 10% less than the guideline maximum.
Property inspected post disaster but pre-FEMA declaration of disaster end date. Date of disaster: xx/xx/xxxx Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    03/03/2025 2   B   B   B   B   CA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510044 32724972     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510044 32743345     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Combined loan to value discrepancy. Calculated combined loan to value percentage of ___ exceeds Guideline combined loan to value percentage of ___. xxxx The qualifying DTI on the loan is at least 10% less than the guideline maximum.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
34.16837% DTI SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    03/25/2025 2 C B C B C B C B   VA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510055 32720535     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/08/2025     1 C A C A C A C A   MS Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510109 32729894     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510168 32720678     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304510168 32720772     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - ATR Ability to Repay (Dodd-Frank 2014): Originator Loan Designation of Non QM does not match Due Diligence Loan Designation of ATR Fail. xxxx       xxxx
02/15/2025     1 B A C A B A B A   CA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Non QM Non QM Yes
304510168 32720773     Compliance Compliance Federal Compliance ATR/QM Defect General Ability To Repay Provision Employment - Schedule C Test Ability-to-Repay (Dodd-Frank 2014): Unable to verify current Sole Proprietorship status using reasonably reliable third-party records. xxxx       xxxx
02/15/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304510168 32720774     Compliance Compliance Federal Compliance ATR/QM NonQM ATR Ability-to-Repay (Dodd-Frank 2014): General Ability-to-Repay requirements not satisfied. xxxx       xxxx
02/15/2025     1 A A A A A A A A   CA Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304510273 32724961     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510273 32724975     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The subject property is located in a FEMA disaster that does not have a declared end date.   xxxx Property inspected post disaster but pre-FEMA declaration of disaster end date.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The qualifying DTI on the loan is at least 10% less than the guideline maximum.

The representative FICO score exceeds the guideline minimum by at least 40 points.
Property inspected post disaster but pre-FEMA declaration of disaster end date. Date of disaster: xx/xx/xxxx Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/03/2025 2 C B C B C B C B   CA Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510273 32725020     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - xxxx       xxxx
02/12/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510273 32743916     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/11/2025   2 C B C B C B C B   CA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510273 32743917     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/11/2025   2 C B C B C B C B   CA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510191 32730204     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510191 32730418     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
02/18/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510191 32730419     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
02/18/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510191 32730420     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
02/18/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510191 32730421     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510191 32730422     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
02/18/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510191 32730424     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/18/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510191 32730425     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/18/2025     1 B A C A B A B A   MO Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510282 32724395     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509975 32732543     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304509996 32722197     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
03/03/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509996 32722264     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/06/2025     1 B A C A B A B A   CA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304509996 32722265     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  3.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).         xxxx
02/06/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509996 32727296     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA - Incorrect Right To Cancel Form Used - H-8 Used on Same Lender Refinance (Circuit 2, 5, 7, 8, 9, 10 or DC) Truth in Lending Act: Notice of Right to Cancel was not executed on the proper Model Form for a refinancing by the same creditor. The H-8 form was used, the H-9 form should have been used.                 2 B B B B B B B B   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510095 32724079     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304510194 32720958     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/11/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304510194 32721002     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The subject property is located in a FEMA disaster that does not have a declared end date.   xxxx Property inspected post disaster but pre-FEMA declaration of disaster end date.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.

The qualifying DTI on the loan is at least 10% less than the guideline maximum.
Property inspected post disaster but pre-FEMA declaration of disaster end date. Date of disaster: xx/xx/xxxx Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/03/2025 2 C B C B C B C B   CA Primary Refinance - Cash-out - Other   C B C B A A     Non QM Non QM No
304510242 32720635     Compliance Compliance State Compliance Compliance 90 Day RNY has been discontinued effective June 1, 2024.  Most recent available index value used for bona fide discount point testing.                   2 B B B B B B B B   AR Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510242 32720652     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/11/2025     1 C A C A C A C A   AR Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510242 32736960     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (Notice to Assignee) Truth in Lending Act (HOEPA): Required Statement was not provided to purchaser or assignee for loan that was sold or assigned. (Note: This notice only applies when selling or assigning a HOEPA loan and may not be found in the file for loans that have not been previously sold)         xxxx
02/11/2025     1 C A C A C A C A   AR Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510242 32736961     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower         xxxx
02/11/2025     1 C A C A C A C A   AR Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510242 32736962     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees.         xxxx
02/11/2025     1 C A C A C A C A   AR Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510242 32736963     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days.         xxxx
02/11/2025     1 C A C A C A C A   AR Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510242 32736964     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan.         xxxx
02/11/2025     1 C A C A C A C A   AR Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304510242 32736965     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling.         xxxx
02/11/2025     1 C A C A C A C A   AR Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510242 32736966     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).         xxxx
02/11/2025     1 C A C A C A C A   AR Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510242 32736967     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/05/2025   2 C B C B C B C B   AR Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304510242 32736968     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/05/2025   2 C B C B C B C B   AR Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304510242 32736969     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/11/2025     1 B A C A B A B A   AR Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304510249 32720782     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/11/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C A A B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510249 32737655     Credit Credit Miscellaneous Guideline Credit Exception:   Missing a copy of the Appraisal Invoice to determine the portion paid to the Appraisal Management Company       xxxx
03/04/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C A A B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510249 32975738     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2   B   B   B   B   FL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A A B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510249 32975739     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2   B   B   B   B   FL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A A B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510195 32723846     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/11/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510196 32728921     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/11/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510196 32729020     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.
Borrower has been with current employer for 7 years. SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    04/23/2025 2 C B C B C B C B   TX Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510196 32729035     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 45.32702% moderately exceeds the guideline maximum of 45.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.
Borrower has been with current employer for 7 years. SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    04/23/2025 2 C B C B C B C B   TX Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510196 32729036     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
04/23/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510196 32729037     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510196 32729038     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510196 32729040     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  02/14/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510196 32729041     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
04/23/2025     1 B A C A B A B A   TX Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510225 32723389     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/11/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510225 32824908     Credit Credit Credit Eligibility Credit There are red flags on the fraud report that have not been addressed - xxxx       xxxx
03/28/2025     1   A   A   A   A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509953 32729960     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/12/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304510053 32721255     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   ID Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304510106 32721611     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510148 32722287     Compliance Compliance State Compliance State Defect (State High Cost Disclosure) Maryland Covered Loan (Counseling Disclosure Not Provided) Maryland Covered Loan: Home Counseling Disclosure to provide home buyer education was not provided to borrower. xxxx       xxxx
02/18/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510148 32722288     Compliance Compliance State Compliance State Defect (State High Cost Disclosure) Maryland Covered Loan (Counseling Agencies Not Provided) Maryland Covered Loan: Home Counseling a list of county approved agencies to provide home buyer education was not provided to borrower. xxxx       xxxx
02/18/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510148 32722289     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for. xxxx               2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510148 32722290     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan. xxxx               2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510148 32722291     Compliance Compliance State Compliance State Defect (State High Cost) Maryland Covered Loan (Points and Fees) Maryland Predatory Lending Law: Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  4.00000% of the Total Loan Amount. Points and Fees total $xxxx on a Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other No obvious cure C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510148 32722305     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510085 32723783     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   CT Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510087 32724416     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510212 32722438     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/11/2025     1 C A C A C A C A   AL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510226 32725380     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/11/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510248 32729141     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/11/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510227 32730062     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/11/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304510228 32719846     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/11/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510271 32723764     Credit Asset Asset Calculation / Analysis Asset Available for Closing is insufficient to cover Cash From Borrower. Documented qualifying Assets for Closing of  ___ is less than Cash From Borrower ___. xxxx       xxxx
02/12/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510271 32723790     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.
790 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    03/07/2025 2 C B C B C B C B   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510271 32723805     Credit Insurance Insurance Documentation Insurance Missing Document: Flood Insurance Policy not provided   xxxx       xxxx
02/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510271 32723808     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510271 32741528     Credit Credit Miscellaneous Guideline Credit Exception:   Missing pages 2 to 3 of title search.       xxxx
02/12/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510271 32743654     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.
790 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/28/2025 2 C B C B C B C B   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510271 32743671     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
02/28/2025     1 B A C A B A B A   FL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510271 32743672     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 46.19924% moderately exceeds the guideline maximum of 45.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.
790 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/28/2025 2 C B C B C B C B   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510271 32743673     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk.         xxxx
02/28/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510200 32723850     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan. xxxx       xxxx
02/11/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304510200 32723851     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
02/11/2025     1 B A B A B A B A   MD Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304510200 32723852     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property. xxxx       xxxx
02/11/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304510200 32723854     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.         xxxx
02/11/2025     1 B A B A B A B A   MD Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304510200 32723855     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.         xxxx
02/11/2025     1 B A B A B A B A   MD Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304510200 32723892     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/11/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A C A     Non QM Non QM No
304510049 32722888     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510049 32723204     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Compliant Higher Priced Mortgage Loan.         xxxx
02/11/2025     1 A A A A A A A A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510049 32723205     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing. xxxx       xxxx
02/11/2025     1 B A B A B A B A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510049 32723207     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx       xxxx
02/11/2025     1 B A C A B A B A   AZ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304509952 32730294     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/12/2025     1 C A C A C A C A   NY Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510167 32726499     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510077 32722616     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510077 32726051     Credit Insurance Insurance Documentation Insurance Missing Document: Hazard Dec Page not provided   xxxx       xxxx
02/05/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510078 32722087     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510193 32733872     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510193 32733873     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510193 32733874     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Itemization of Points and Fees Not Provided At Least 1 Business Day Prior to Closing - No Waiver) Texas Constitution Section 50(a)(6): Final itemized disclosure of fees, points, costs and charges not provided to borrower at least one (1) business day prior to closing without a waiver. xxxx       xxxx
03/10/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund or credit the borrower $1,000 and offer the borrower the right to refinance the extension of credit for the remaining term of the loan at no cost to the borrower on the same terms, including interest, as the original extension of credit with any modifications necessary to comply with this section or on terms on which the borrower and the lender or holder otherwise agree. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510193 32733876     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  04/07/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510193 32733947     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/10/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510086 32721615     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/10/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304510086 32721653     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - ATR Risk Ability to Repay (Dodd-Frank 2014): Originator Loan Designation of Non QM does not match Due Diligence Loan Designation of ATR Risk. xxxx       xxxx
02/06/2025     1 B A C A B A B A   MA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM Loan Designation C B C A C B     Non QM Non QM Yes
304510086 32721654     Compliance Compliance Federal Compliance ATR/QM Defect General ATR Provision Investor and Non QM DTIs match and both moderately exceed Guidelines Ability to Repay (Dodd-Frank 2014): The DTI calculated in accordance with the Lenders Guidelines and 1026.43(c)(5) of 45.06725% moderately exceeds the guideline maximum of 45.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx       xxxx
02/06/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304510086 32721655     Compliance Compliance State Compliance Misc. State Level Massachusetts Mortgage Lender and Broker Regulation (Ability to Repay not Verified) Massachusetts Mortgage Lender and Broker Regulation:  File does not contain evidence that analysis of borrower’s ability to repay was performed based on verified income, obligations, assets, and/or employment using PITI payment based on fully indexed rate and fully amortizing payment, if applicable                 2 B B B B B B B B   MA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304510086 32721656     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
02/06/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304510086 32721657     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - xxxx       xxxx
02/06/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304510086 32721671     Compliance Compliance Federal Compliance ATR/QM Defect General Ability To Repay Provision Investor Guidelines Ability to Repay (Dodd-Frank 2014): Based on the loan failing one or more guideline components, the loan is at ATR risk. xxxx       xxxx
02/06/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304510086 32736490     Credit Loan Package Documentation Application / Processing Loan Package Documentation HOA Error: HOA dues not provided.   xxxx       xxxx
02/11/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304510236 32730518     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/09/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510236 32737921     Credit Credit Credit Eligibility Credit Credit Issue:  Judgments on credit/title report were not satisfied at closing per loan approval.   xxxx       xxxx
03/28/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510253 32726738     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   ME Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510253 32727046     Credit Guideline Guideline Issue Guideline Ineligible Property Type. Property Type:  ___ xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has verified disposable income of at least $2500.00.
751 FICO SitusAMC,Aggregator

SitusAMC
xxxx
    03/27/2025 2 C B C B C B C B   ME Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510253 32737940     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/03/2025   2 C B C B C B C B   ME Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510253 32737941     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/03/2025   2 C B C B C B C B   ME Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510007 32729095     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/09/2025     1 C A C A C A C A   AL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510007 32729119     Credit Hazard Insurance Insufficient Coverage Hazard Insurance The Hazard Insurance Policy Effective Date is after closing.   xxxx       xxxx
02/06/2025     1 C A C A C A C A   AL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509944 32721147     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/12/2025     1 C A C A C A C A   ID Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509994 32721782     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/12/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509960 32721895     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
03/03/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509958 32723789     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
03/03/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509969 32730919     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
03/03/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509984 32724502     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
03/03/2025     1 C A C A C A C A   RI Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510112 32730119     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/09/2025     1 C A C A C A C A   MS Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510075 32722980     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/09/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510075 32731412     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing.                 2 B B B B B B B B   CA Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510113 32724019     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/09/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510138 32725067     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/09/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510138 32730849     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510151 32731685     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/09/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B A B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510151 32736619     Credit Credit Miscellaneous Guideline Credit Exception:   Missing verification of the xxxx loan. Not all pages of the contract were provided for review. No debt was included in qualification and current ratios are at 44.58%       xxxx
02/06/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B A B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510151 32807343     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
775 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/20/2025 2   B   B   B   B   CA Primary Refinance - Cash-out - Other   C B C B A B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510151 32807346     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
02/20/2025     1   A   A   A   A   CA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C B A B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510151 32807347     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 45.13638% moderately exceeds the guideline maximum of 45.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
775 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/20/2025 2   B   B   B   B   CA Primary Refinance - Cash-out - Other   C B C B A B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510151 32807348     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
02/20/2025     1   A   A   A   A   CA Primary Refinance - Cash-out - Other   C B C B A B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510207 32721364     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/09/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721547     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan. xxxx       xxxx
03/04/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721548     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
03/04/2025     1 B A B A B A B A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721549     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property. xxxx       xxxx
03/04/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721550     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
02/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721551     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
02/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721552     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
02/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721553     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304510207 32721554     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
02/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721556     Compliance Compliance Federal Compliance ATR/QM Defect General ATR Provision Investor and Non QM DTIs match and both moderately exceed Guidelines Ability to Repay (Dodd-Frank 2014): The DTI calculated in accordance with the Lenders Guidelines and 1026.43(c)(5) of 45.21771% moderately exceeds the guideline maximum of 45.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx       xxxx
02/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721557     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721558     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
03/04/2025     1 B A C A B A B A   FL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304510207 32721571     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
03/04/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32721580     Compliance Compliance Federal Compliance ATR/QM Defect General Ability To Repay Provision Investor Guidelines Ability to Repay (Dodd-Frank 2014): Based on the loan failing one or more guideline components, the loan is at ATR risk. xxxx       xxxx
02/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32874192     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 45.21771% moderately exceeds the guideline maximum of 45.00%. (DTI Exception is eligible to be regraded with compensating factors.)         xxxx
03/04/2025     1   A   A   A   A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510207 32874193     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk.         xxxx
03/04/2025     1   A   A   A   A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510260 32722909     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510260 32744604     Credit Missing Document General Missing Document Missing Document: AVM not provided   xxxx       xxxx
02/11/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510260 32744736     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
02/11/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510260 32744759     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
02/11/2025     1 B A C A B A B A   MD Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510260 32744760     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 59.79758% significantly exceeds the guideline maximum of 50.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
02/11/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510260 32744761     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
02/11/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510278 32722189     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/09/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510005 32721708     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/12/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509968 32730108     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
03/03/2025     1 C A C A C A C A   NE Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510034 32731030     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/06/2025     1 B A C A B A B A   VA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510034 32731031     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  3.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/06/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510034 32731037     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304509972 32730611     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
03/03/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509972 32736762     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
02/21/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509972 32736777     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan.         xxxx
03/04/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509972 32736779     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
03/04/2025     1 B A B A B A B A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509972 32736780     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property.         xxxx
03/04/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509972 32736781     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
03/04/2025     1 B A C A B A B A   FL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304509972 32736782     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 61.13583% significantly exceeds the guideline maximum of 45.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
02/21/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509972 32736783     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk.         xxxx
03/04/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509957 32721331     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
03/03/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510003 32734802     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
03/03/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304510003 32745023     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/25/2025   2 C B C B C B C B   PA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304510003 32745024     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/25/2025   2 C B C B C B C B   PA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304510018 32728668     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/12/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510105 32724225     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/08/2025     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304510107 32723687     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing.                 2 B B B B B B B B   VA Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510107 32723699     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/08/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510070 32722417     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/08/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510181 32724607     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/08/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304510090 32720861     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510090 32720965     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.) xxxx               2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510090 32720966     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan. xxxx               2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510090 32720968     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  02/19/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510090 32731276     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing. xxxx               2 B B B B B B B B   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510120 32721424     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510120 32727102     Compliance Compliance State Compliance State Defect (State High Cost) Maryland Covered Loan (Points and Fees) Maryland Predatory Lending Law: Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  4.00000% of the Total Loan Amount. Points and Fees total $xxxx on a Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other No obvious cure C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510263 32728716     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   NM Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510185 32722098     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A B B     Non QM Non QM No
304510185 32731088     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA - Incorrect Right To Cancel Form Used - H-8 Used on Same Lender Refinance (Circuit 2, 5, 7, 8, 9, 10 or DC) Truth in Lending Act: Notice of Right to Cancel was not executed on the proper Model Form for a refinancing by the same creditor. The H-8 form was used, the H-9 form should have been used. xxxx               2 B B B B B B B B   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B C A B B     Non QM Non QM Yes
304510185 32731134     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
02/06/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A B B     Non QM Non QM No
304509946 32729461     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   OH Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510026 32724283     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510026 32724513     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510026 32724514     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510026 32724516     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
02/06/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304509999 32723048     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304509942 32721925     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510028 32722396     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304510015 32730200     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510015 32730286     Credit Missing Document General Missing Document Missing Document: AVM not provided   xxxx       xxxx
02/05/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510015 32737023     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.
772 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/14/2025 2 C B C B C B C B   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510015 32737038     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
02/14/2025     1 B A C A B A B A   FL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510015 32737039     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 46.68247% moderately exceeds the guideline maximum of 45.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.
772 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/14/2025 2 C B C B C B C B   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510015 32737040     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk.         xxxx
02/14/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510139 32720893     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510121 32728891     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510147 32721625     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   CT Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510241 32724927     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/07/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510241 32740357     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/06/2025   2 C B C B C B C B   GA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510241 32740358     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/06/2025   2 C B C B C B C B   GA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304510241 32740360     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Combined loan to value discrepancy. Calculated combined loan to value percentage of ___ exceeds Guideline combined loan to value percentage of ___.   Borrower has verified disposable income of at least $2500.00.

Borrower has been employed in the same industry for more than 5 years.
Disposable income greater than $10,000/month. SitusAMC,Aggregator

SitusAMC
xxxx
    01/30/2025 2 B B B B B B B B   GA Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510137 32728307     Credit Credit Credit Documentation Credit No evidence of fraud report in file - xxxx       xxxx
03/04/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510152 32728524     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510169 32721098     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan.         xxxx
02/11/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510169 32721099     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
02/11/2025     1 B A B A B A B A   KS Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510169 32721100     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (Notice to Assignee) Truth in Lending Act (HOEPA): Required Statement was not provided to purchaser or assignee for loan that was sold or assigned. (Note: This notice only applies when selling or assigning a HOEPA loan and may not be found in the file for loans that have not been previously sold) xxxx       xxxx
02/11/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510169 32721101     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
02/11/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510169 32721102     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
02/11/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510169 32721103     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
02/11/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510169 32721104     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/11/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304510169 32721105     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
02/11/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510169 32721107     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/11/2025     1 B A C A B A B A   KS Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304510169 32721108     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/11/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510169 32721113     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property. xxxx       xxxx
02/11/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510169 32721156     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32723082     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/07/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746733     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan.         xxxx
02/19/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746734     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
02/19/2025     1 B A B A B A B A   IL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746735     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property.         xxxx
02/19/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746736     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746737     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees.         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746738     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days.         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746739     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan.         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304510258 32746740     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling.         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746741     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746742     Compliance Compliance State Compliance State Defect (State High Cost Disclosure) Illinois High Risk Home Loan (Consumer Caution Notice Not Provided) Illinois High Risk Home Loan:  Borrower not provided with Consumer Caution Notice.         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other See any available cure under Illinois High-Risk threshold exception. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746743     Compliance Compliance State Compliance State Defect (State High Cost Provision) Illinois High Risk Home Loan (Impermissible Financing of Points and Fees) Illinois High Risk Home Loan: Lender financed points and fees not permissible.         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other See any available cure under Illinois High-Risk threshold exception. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746744     Compliance Compliance State Compliance State Late Charge (State High Cost Provision) Illinois High Risk Home Loan (Late Charge) Illinois High Risk Home Loan: Mortgage loan contains an impermissible late charge greater than 4%.         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other See any available cure under Illinois High-Risk threshold exception. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746745     Compliance Compliance State Compliance State Defect (State High Cost Disclosure) Illinois High Risk Home Loan (Mortgage Awareness Program ("MAP") Not Provided) Illinois High Risk Home Loan: Borrower not notified of right to participate in Mortgage Awareness Program ("MAP").         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other See any available cure under Illinois High-Risk threshold exception. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304510258 32746746     Compliance Compliance State Compliance State Defect (State High Cost) Illinois High Risk Home Loan (Points and Fees) Illinois High Risk Home Loan Act: Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Total Loan Amount. Points and Fees total $xxxx on a Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan.         xxxx
02/18/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other Within 30 days of closing, provide:  (1) Lender Attestation to AMC attesting the lender has not received any notice from borrower of the failure; (2) Letter of Explanation; (3) refund of amount over the high-risk threshold maximum; and (4) proof of mailing (must be in transit with courier).

(Limited Use Bona Fide Errors - Compliance and Client Approval Required)  Within 60 days of discovery, provide:
(1) Legal opinion from originating lender with loan-specific details on how a high-cost loan was made despite procedures to prevent and confirms (i) the failure constitutes a bona fide error for the jurisdiction in which the property is located, and (ii) that the lender has not received any notice from the borrower of the failure; (2) procedures or explanation of controls in place to prevent such errors; (3) client written approval accepting use of the bona fide error cure; (4) Letter of Explanation to borrower; (5) refund of amount over the high-risk threshold maximum; and (6) proof of mailing (must be in transit with courier).   Note, a cure may not be accepted if the seller/lender has certified a fix has been made to their system and the same issue continues to occur after the fix has been put into place.
C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304510258 32746747     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/18/2025     1 B A C A B A B A   IL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304485323 32735745     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
04/02/2025     1 C A C A C A C A   RI Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304483437 32735822     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304483437 32735823     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304484887 32731828     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form Incorrect Right To Cancel Form Used - H-9 Used on Non Same Lender Refinance Truth in Lending Act: Notice of Right to Cancel was not executed on the proper Model Form for a refinance by a creditor that is not considered the original creditor. The H-9 form was used, the H-8 form should have been used. xxxx       xxxx
  04/21/2025   2 C B C B C B C B   OR Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304485322 32754042     Credit Missing Document General Missing Document Missing Document: AVM not provided   xxxx       xxxx
02/06/2025     1 C A C A C A C A   IN Second Home Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304493817 32774012     Credit Missing Document General Missing Document Incomplete Document: 1007 Rent Comparison Schedule is incomplete   xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
Excellent credit and employment history SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/03/2025 2 B B B B B B B B   WA Investment Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304493817 32774045     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
03/26/2025     1 C A C A C A C A   WA Investment Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304489732 32748312     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date ofxx/xx/xxxx 12:00:00 AM. xxxx       xxxx
  04/15/2025   2 C B C B C B C B   NC Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304489732 32748313     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Notice of Right to Cancel Expiration Date Prior or equal to Disbursement Date Truth in Lending Act:  Actual Date(s) on Notice of Right to Cancel occurs prior to expected date(s). xxxx       xxxx
  04/15/2025   2 C B C B C B C B   NC Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304494932 32788026     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date ofxx/xx/xxxx 12:00:00 AM. xxxx       xxxx
  04/22/2025   2 C B C B C B C B   FL Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304494932 32788027     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Notice of Right to Cancel Expiration Date Prior or equal to Disbursement Date Truth in Lending Act:  Actual Date(s) on Notice of Right to Cancel occurs prior to expected date(s). xxxx       xxxx
  04/21/2025   2 C B C B C B C B   FL Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304494932 32788028     Compliance Compliance Federal Compliance Missing Disclosure Notice of Special Flood Hazard Disclosure Not Provided Timely FDPA Notification Rule: Creditor did not provide a Notice of Special Flood Hazard Disclosure within a reasonable time prior to closing. xxxx               2 B B B B B B B B   FL Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304492086 32809996     Credit Credit AUS Discrepancy / Guidelines Discrepancy Credit Guideline Requirement: Maximum Loan Amount discrepancy. Note loan amount of ___ is greater than Guideline maximum loan amount of ___. xxxx The qualifying DTI on the loan is at least 10% less than the guideline maximum.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.

The representative FICO score exceeds the guideline minimum by at least 40 points.
38.09002% DTI SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    03/27/2025 2 C B C B C B C B   SC Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635083 32906793     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635098 32907075     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635082 32907205     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635082 32907206     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
02/26/2025     1 B A B A B A B A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635082 32907207     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635082 32907208     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (Notice to Assignee) Truth in Lending Act (HOEPA): Required Statement was not provided to purchaser or assignee for loan that was sold or assigned. (Note: This notice only applies when selling or assigning a HOEPA loan and may not be found in the file for loans that have not been previously sold) xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635082 32907209     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635082 32907210     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635082 32907211     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635082 32907212     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635082 32907213     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635082 32907215     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/26/2025     1 B A C A B A B A   AZ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635082 32907216     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635082 32907237     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635134 32906800     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635190 32934268     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635190 32934269     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635190 32934270     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of Safe Harbor QM (APOR). xxxx       xxxx
03/14/2025     1 B A C A B A B A   MD Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) Yes
304635190 33056772     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Safe Harbor QM (APOR) matches the Due Diligence Loan Designation of Safe Harbor QM (APOR). xxxx               2   A   B   B   A   MD Primary Refinance - Cash-out - Other   C B A A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635154 32912087     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635154 32912137     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   WA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635154 32912138     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   WA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635154 33155713     Compliance Compliance Federal Compliance TILA TILA Extended Rescission: Inaccurate material disclosures provided to borrower at consummation on a rescindable transaction resulting in extended rescission rights (3 years from consummation).  Re-disclosure of accurate material disclosures, LOE, re-opening of rescission and proof of delivery required.   xxxx       xxxx
  04/03/2025   2   B   B   B   B   WA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct notice of rescission model form C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635257 32908138     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635257 32908169     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of Safe Harbor QM (APOR). xxxx       xxxx
03/03/2025     1 B A C A B A B A   CA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) Yes
304635257 32966039     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Safe Harbor QM (APOR) matches the Due Diligence Loan Designation of Safe Harbor QM (APOR). xxxx               2   A   B   B   A   CA Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635277 32907165     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635355 32908109     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   NY Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635359 32907167     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635359 32907260     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635359 32907261     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635260 32907368     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635419 32907947     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   KS Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635422 32907969     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635422 32912452     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/25/2025     1 B A C A B A B A   CA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635422 32912453     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  3.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/25/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635294 32909104     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635294 32909222     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635294 32909223     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635294 32909235     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
03/03/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635302 32822088     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635302 32822100     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for. xxxx               2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635302 32822101     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan. xxxx               2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635167 32907385     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635167 32907464     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635167 32907465     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635167 32907467     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  04/29/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635167 32907468     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/14/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635167 32907469     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/14/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635167 32909941     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Itemization of Points and Fees Not Provided) Texas Constitution Section 50(a)(6): Final Itemized disclosure of fees, points, costs and charges not provided to borrower at least one (1) business day prior to closing. xxxx       xxxx
03/08/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund or credit the borrower $1,000 and offer the borrower the right to refinance the extension of credit for the remaining term of the loan at no cost to the borrower on the same terms, including interest, as the original extension of credit with any modifications necessary to comply with this section or on terms on which the borrower and the lender or holder otherwise agree. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635145 32907481     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   NM Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635158 32907574     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635100 32907705     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635179 32907547     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635180 32907643     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635283 32907991     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635283 32908017     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/18/2025   2 C B C B C B C B   CO Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635283 32908018     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/18/2025   2 C B C B C B C B   CO Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635283 32912350     Credit Guideline Guideline Issue Guideline Ineligible Property Type. Property Type:  ___ xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has verified disposable income of at least $2500.00.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.
763 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    03/25/2025 2 C B C B C B C B   CO Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635283 32936484     Credit Credit Credit Eligibility Credit There are red flags on the fraud report that have not been addressed - xxxx       xxxx
03/06/2025     1   A   A   A   A   CO Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635320 32907520     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   ID Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635323 32907904     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635399 32907268     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635446 32907417     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
03/03/2025     1 B A C A B A B A   AZ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635446 32907418     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of the greater of .00000% of the Federal Total Loan Amount and $xxxx (2024). Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx and $xxxx (2024) (an overage of $xxxx or xxxx%).         xxxx
03/03/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635446 32907439     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635421 32909193     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635431 32814443     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The subject property is located in a FEMA disaster that does not have a declared end date.   xxxx Property inspected post disaster but pre-FEMA declaration of disaster end date.

Borrower has verified disposable income of at least $2500.00.

The qualifying DTI on the loan is at least 10% less than the guideline maximum.

The representative FICO score exceeds the guideline minimum by at least 40 points.
Property inspected post disaster but pre-FEMA declaration of disaster end date. Date of disaster: xx/xx/xxxx Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/13/2025 2 C B C B C B C B   CA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635431 32814446     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635431 32814453     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
02/24/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635438 32907765     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635438 32907882     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635438 32907883     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635438 32907884     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Itemization of Points and Fees Not Provided At Least 1 Business Day Prior to Closing - No Waiver) Texas Constitution Section 50(a)(6): Final itemized disclosure of fees, points, costs and charges not provided to borrower at least one (1) business day prior to closing without a waiver. xxxx       xxxx
03/08/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund or credit the borrower $1,000 and offer the borrower the right to refinance the extension of credit for the remaining term of the loan at no cost to the borrower on the same terms, including interest, as the original extension of credit with any modifications necessary to comply with this section or on terms on which the borrower and the lender or holder otherwise agree. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635438 32907886     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  04/29/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635438 32920873     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/07/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635438 32920874     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/07/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635448 32935914     Credit Guideline Guideline Issue Guideline Ineligible Property Type. Property Type:  ___ xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The qualifying DTI on the loan is at least 10% less than the guideline maximum.
740 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    03/25/2025 2 C B C B C B C B   CA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635450 32908021     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   SD Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635096 32909154     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   NM Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635132 32915082     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635153 32907989     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C B B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635153 32908184     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C B B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635153 32908185     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C B B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635153 32912027     Credit Credit Public Records Credit Public Records/Collections/Charge Off does not meet guidelines.   xxxx The qualifying DTI on the loan is at least 10% less than the guideline maximum.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.
31.92143% DTI SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    03/25/2025 2 C B C B C B C B   MD Primary Refinance - Cash-out - Other   C B C B B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635189 32822964     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   AL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635231 32908267     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   WV Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635231 32908288     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/18/2025   2 C B C B C B C B   WV Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635231 32908289     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/18/2025   2 C B C B C B C B   WV Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635231 32908293     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure APR TILA-RESPA Integrated Disclosure - Loan Calculations:  APR of xxxx% on Final Closing Disclosure provided on xx/xx/xxxx is under-disclosed from the calculated APR of xxxx% outside of 0.125% tolerance. xxxx       xxxx
  03/18/2025   2 C B C B C B C B   WV Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed equivalent amount, Corrected CD, and Re-open Rescission if Applicable C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635290 32908586     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   AL Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635290 32913292     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   AL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635290 32913293     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   AL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635195 32935706     Credit Missing Document General Missing Document Missing Document: AVM not provided   xxxx       xxxx
04/24/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635203 32909081     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   NE Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635203 32909097     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of the greater of .00000% of the Federal Total Loan Amount and $xxxx (2024). Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx and $xxxx (2024) (an overage of $xxxx or xxxx%).         xxxx
02/21/2025     1 C A C A C A C A   NE Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635203 32909098     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/21/2025     1 B A C A B A B A   NE Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635203 32914706     Credit Missing Document General Missing Document Missing Document: AVM not provided   xxxx       xxxx
03/06/2025     1 C A C A C A C A   NE Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635425 32908679     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635390 32908692     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635390 32908887     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
03/08/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635390 32920481     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/14/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635390 32920482     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/14/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635390 32920926     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635390 32920927     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635390 33247919     Compliance Compliance Federal Compliance TILA TILA Extended Rescission: Inaccurate material disclosures provided to borrower at consummation on a rescindable transaction resulting in extended rescission rights (3 years from consummation).  Re-disclosure of accurate material disclosures, LOE, re-opening of rescission and proof of delivery required.   xxxx       xxxx
  04/16/2025   2   B   B   B   B   TX Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct notice of rescission model form C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635318 32909357     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/26/2025     1 C A C A C A C A   AK Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635122 32909015     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635081 32909497     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635143 32911918     Credit Credit Credit Documentation Credit No evidence of fraud report in file - xxxx       xxxx
02/27/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635084 32908882     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   NJ Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635084 32908952     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of Safe Harbor QM (APOR). xxxx       xxxx
03/03/2025     1 B A C A B A B A   NJ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) Yes
304635084 32966038     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Safe Harbor QM (APOR) matches the Due Diligence Loan Designation of Safe Harbor QM (APOR). xxxx               2   A   B   B   A   NJ Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635308 32911372     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635187 32915080     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635187 32915089     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635187 32915090     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635187 32915093     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  04/29/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635187 32915094     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/14/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635187 32915095     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/14/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635246 32911016     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   MS Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635246 32913408     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/25/2025   2 C B C B C B C B   MS Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635246 32913409     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/25/2025   2 C B C B C B C B   MS Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635246 33116072     Compliance Compliance Federal Compliance TILA TILA Extended Rescission: Inaccurate material disclosures provided to borrower at consummation on a rescindable transaction resulting in extended rescission rights (3 years from consummation).  Re-disclosure of accurate material disclosures, LOE, re-opening of rescission and proof of delivery required.   xxxx       xxxx
  04/29/2025   2   B   B   B   B   MS Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct notice of rescission model form C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635259 32915005     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   MS Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635333 32814521     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635341 32911852     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   NJ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635247 32915069     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   OH Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635247 32920221     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   OH Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635247 32920222     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   OH Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635250 32915119     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635250 32915124     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635250 32915125     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635250 32915127     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  04/29/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635250 32920537     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/06/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635250 32920538     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/06/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635342 32912117     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635344 32915025     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan. xxxx               2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635344 32950375     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635414 32914072     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304635414 32918624     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - The Borrowers employment with xxxx is missing the 2024 W2.       xxxx
03/03/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304635415 32923017     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635415 32923018     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635415 32923019     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635415 32923020     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635416 32912139     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635357 32915051     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635357 32921678     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/02/2025   2 C B C B C B C B   FL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635357 32921680     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/02/2025   2 C B C B C B C B   FL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635118 32915096     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   LA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635168 32915100     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635168 32915109     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635168 32915110     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635168 32915112     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
02/25/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635168 32918899     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635168 32918900     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635168 32922501     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635168 32922502     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635168 32922503     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of the greater of .00000% of the Federal Total Loan Amount and $xxxx (2025). Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx and $xxxx (2025) (an overage of $xxxx or xxxx%). xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635168 32922504     Compliance Compliance State Compliance State Defect (State High Cost) Texas High-Cost Loan (Points and Fees) Texas Anti-Predatory Lending Statute: Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Total Loan Amount. Points and Fees total $xxxx on a Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Compliant High Cost Loan. xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other No obvious cure C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635168 32922505     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635168 32922507     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635168 32922508     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
04/21/2025     1 B A C A B A B A   TX Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635168 32922512     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635174 32823475     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635281 32915132     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635248 32915137     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   KY Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635248 32920267     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/09/2025   2 C B C B C B C B   KY Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635248 32920268     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/09/2025   2 C B C B C B C B   KY Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635284 32822946     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635284 32824632     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
02/28/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635209 32915948     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635372 32915627     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635372 32915628     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635372 32915638     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635372 32922060     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.)         xxxx
  04/29/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635375 32909986     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635444 32909953     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635392 32909555     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   MS Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635392 32910401     Credit Missing Document General Missing Document Missing Document: AVM not provided   xxxx       xxxx
04/24/2025     1 C A C A C A C A   MS Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635398 32948138     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2 C B C B C B C B   CO Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635398 32948139     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2 C B C B C B C B   CO Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635388 32909783     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   UT Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635389 32916085     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Non QM Non QM No
304635389 32916086     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Non QM Non QM No
304635389 32929778     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/02/2025   2 C B C B C B C B   MD Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Non QM Non QM Yes
304635389 32929779     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/02/2025   2 C B C B C B C B   MD Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Non QM Non QM Yes
304635435 32916481     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The most recent valuation inspection is dated prior to the most recent FEMA disaster.   xxxx       xxxx
03/03/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635435 32916492     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635435 32916575     Credit Asset Asset Calculation / Analysis Asset Available for Closing is insufficient to cover Cash From Borrower. Documented qualifying Assets for Closing of  ___ is less than Cash From Borrower ___. xxxx       xxxx
03/11/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635435 32929879     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/04/2025   2 C B C B C B C B   CA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635435 32929880     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/04/2025   2 C B C B C B C B   CA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635435 32929885     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Combined loan to value discrepancy. Calculated combined loan to value percentage of ___ exceeds Guideline combined loan to value percentage of ___.   The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
Good employment history, ratios and credit history SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    02/25/2025 2 B B B B B B B B   CA Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635222 32934247     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   PA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635210 32916724     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635221 32916396     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635221 32916397     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635221 32916399     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  04/07/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635221 32916404     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635192 32916462     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   MA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635238 32917087     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635238 32920445     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing. xxxx               2 B B B B B B B B   AZ Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635335 32916633     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635335 32925675     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/15/2025   2 C B C B C B C B   AZ Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635335 32925676     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/15/2025   2 C B C B C B C B   AZ Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635267 32939365     Compliance Compliance State Compliance Misc. State Level Maryland Mortgage Lending Regulations (Disclosure of Taxes and Insurance Not Provided) Maryland Mortgage Lending Regulations: Borrower did not receive disclosure on responsibility for payment of taxes and insurance.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635276 32916772     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635343 32916628     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635348 32916268     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304635348 32916312     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304635348 32916318     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304635348 32921573     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/09/2025   2 C B C B C B C B   MD Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304635348 32921574     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/09/2025   2 C B C B C B C B   MD Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304635366 32822434     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635366 32822500     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635366 32822501     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
02/18/2025     1 B A B A B A B A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635366 32822502     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635366 32822503     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635366 32822504     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635366 32822506     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635366 32822507     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635366 32822508     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635366 32822510     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635366 32822511     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/18/2025     1 B A C A B A B A   AZ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635401 32814673     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   MS Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635401 32814684     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing.                 2 B B B B B B B B   MS Primary Refinance - Cash-out - Other   C B C A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635426 32930000     Credit Loan Package Documentation Closing / Title Loan Package Documentation Title search shows negative impact on title.   xxxx       xxxx
03/11/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635178 32822505     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635178 32822527     Credit Credit AUS Discrepancy / Guidelines Discrepancy Credit Guideline Requirement: Minimum Loan Amount discrepancy. Note loan amount of ___ is less than Guideline minimum loan amount of ___. xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.
Borrower has been with current employer for 18 years. SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    02/28/2025 2 C B C B C B C B   WA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635225 32916493     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304635225 32919889     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/02/2025   2 C B C B C B C B   MO Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304635225 32919890     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/02/2025   2 C B C B C B C B   MO Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304635185 32917329     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635185 32919026     Credit Credit Miscellaneous Guideline Credit Exception:   Missing evidence of debt with xxxx reflecting a monthly payment of $xxxx.       xxxx
03/21/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635285 32917276     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635285 32917400     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.         xxxx
      2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635285 32917421     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635285 32920548     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan.         xxxx
03/25/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635285 32920549     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
03/25/2025     1 B A B A B A B A   MD Primary Refinance - Cash-out - Other   C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635285 32920550     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property.         xxxx
03/25/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635285 32920551     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 71.63175% significantly exceeds the guideline maximum of 45.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
03/18/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635285 32920559     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
03/25/2025     1 B A C A B A B A   MD Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635285 32920578     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.
Borrower has been with current employer for 22 years. SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    03/25/2025 2 C B C B C B C B   MD Primary Refinance - Cash-out - Other   C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635285 32920605     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
03/25/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635285 33078551     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 45.14626% moderately exceeds the guideline maximum of 45.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.
Borrower has been with current employer for 22 years. SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    03/25/2025 2   B   B   B   B   MD Primary Refinance - Cash-out - Other   C B C B C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635382 32917939     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635382 32917940     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635382 32918012     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635382 32922085     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.)         xxxx
  04/07/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635442 32926595     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/14/2025   2 C B C B C B C B   LA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635442 32926596     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/14/2025   2 C B C B C B C B   LA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635445 32916787     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635445 32916788     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635445 32916789     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan  (Other Debt) Texas Constitution Section 50(a)(6): TX 50(a)(6) prohibits other debt secured by the homestead unless the purpose of additional debt is one described under TX 50(a)(1)-(5) or (8). Unable to determine purpose of additional debt secured by the homestead.         xxxx
03/11/2025     1 B A B A B A B A   TX Primary Refinance - Cash-out - Other Confirm whether additional debt on the subject property is a Texas 50(a)(6) or 50(a)(7) prior to Remediating.  Notify consumer the accrual of interest and other obligations will be abated so long as the prior 50(a)(6) or (7) is secured by the homestead B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635313 32916242     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/26/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635367 32909181     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  03/14/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635367 32909185     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635367 32913933     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635367 32913934     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635161 32908105     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635161 32908106     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
02/28/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635109 32918193     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635109 32918538     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing. xxxx               2 B B B B B B B B   CO Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635115 32917671     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635115 32918411     Credit Insurance Insurance Documentation Insurance Missing Document: Hazard Dec Page not provided   xxxx       xxxx
03/04/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635186 32909230     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635249 32814845     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304635254 32908719     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   NJ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635309 32916667     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635309 32917250     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.)         xxxx
  04/03/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635309 32917252     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/04/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635309 32917253     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/04/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635370 32916424     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304635428 32910027     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635428 32910058     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan. xxxx               2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635428 32910059     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  04/07/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635428 32911725     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635321 32917656     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635321 32917677     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The most recent valuation inspection is dated prior to the most recent FEMA disaster.   xxxx       xxxx
02/27/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635321 32921043     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/06/2025   2 C B C B C B C B   CA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635321 32921044     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/06/2025   2 C B C B C B C B   CA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635321 32921150     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
03/08/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635324 32917819     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635324 32917821     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
  04/07/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635324 32917829     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635136 32908162     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   NM Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635213 32917999     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   ID Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635213 32918088     Credit Hazard Insurance Insufficient Coverage Hazard Insurance The Hazard Insurance Policy effective date is after the funds disbursed. Hazard Insurance Policy Effective Date ___; Disbursement Date: ___; Note Date: ___; Transaction Date: ___ xxxx       xxxx
03/06/2025     1 C A C A C A C A   ID Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635200 32911402     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/18/2025   2 C B C B C B C B   NJ Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635200 32911403     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  03/18/2025   2 C B C B C B C B   NJ Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635200 32914471     Credit Credit Credit Documentation Credit No evidence of fraud report in file - xxxx       xxxx
02/27/2025     1 C A C A C A C A   NJ Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635171 32918034     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635116 32908711     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635116 32908770     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of Safe Harbor QM (APOR). xxxx       xxxx
03/03/2025     1 B A C A B A B A   OR Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) Yes
304635116 32966735     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Safe Harbor QM (APOR) matches the Due Diligence Loan Designation of Safe Harbor QM (APOR). xxxx               2   A   B   B   A   OR Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635252 32917331     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx The qualifying DTI on the loan is at least 10% less than the guideline maximum.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
28.70115% DTI SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    03/31/2025 2 C B C B C B C B   GA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635252 32917425     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635252 32917427     Credit Loan Package Documentation Application / Processing Insurance Missing Document: Flood Certificate not provided   xxxx       xxxx
03/07/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635252 32917754     Credit Credit Credit Calculation / Analysis Guideline Guideline Requirement: Representative FICO score discrepancy.   xxxx       xxxx
03/07/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C B C B A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635255 32908306     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   UT Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635245 32917588     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   CT Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635253 32917172     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   OH Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635253 32919804     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/04/2025   2 C B C B C B C B   OH Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635253 32919805     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/04/2025   2 C B C B C B C B   OH Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635409 32927626     Credit Missing Document General Missing Document Missing Document: AVM not provided   xxxx       xxxx
04/24/2025     1 C A C A C A C A   WI Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635227 32916878     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304635227 32920431     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/03/2025   2 C B C B C B C B   GA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304635227 32920432     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/03/2025   2 C B C B C B C B   GA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304635240 32918956     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635240 32919175     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635240 32919176     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.)         xxxx
  04/02/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635240 32919226     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/04/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635240 32919230     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/04/2025   2 C B C B C B C B   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635240 32929491     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635327 32916754     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635332 32909845     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   OK Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635332 32910223     Compliance Compliance State Compliance State HPML (State HPML) Oklahoma Higher-Priced Mortgage Loan (APR Exceeds HPML Threshold) Oklahoma Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Compliant Higher Priced Loan. xxxx               2 B B B B B B B B   OK Primary Refinance - Cash-out - Other No obvious cure C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635332 32910224     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/14/2025   2 C B C B C B C B   OK Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635332 32910225     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/14/2025   2 C B C B C B C B   OK Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635332 32914515     Credit Credit Miscellaneous Guideline Credit Exception:   Missing evidence of a revolving account to xxxx reflecting a balance of $xxxx.  The debt does not appear on the credit report and  no statement provided.       xxxx
03/21/2025     1 C A C A C A C A   OK Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635336 32908539     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635336 32908581     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   FL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635336 32908582     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   FL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635336 33156726     Compliance Compliance Federal Compliance TILA TILA Extended Rescission: Inaccurate material disclosures provided to borrower at consummation on a rescindable transaction resulting in extended rescission rights (3 years from consummation).  Re-disclosure of accurate material disclosures, LOE, re-opening of rescission and proof of delivery required.   xxxx       xxxx
  04/03/2025   2   B   B   B   B   FL Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct notice of rescission model form C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635412 32918773     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/03/2025   2 C B C B C B C B   GA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635412 32918774     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/03/2025   2 C B C B C B C B   GA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635417 32917902     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/28/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C B C A B B     Non QM Non QM No
304635417 32918003     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA - Incorrect Right To Cancel Form Used - H-8 Used on Same Lender Refinance (Circuit 2, 5, 7, 8, 9, 10 or DC) Truth in Lending Act: Notice of Right to Cancel was not executed on the proper Model Form for a refinancing by the same creditor. The H-8 form was used, the H-9 form should have been used. xxxx               2 B B B B B B B B   CO Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B C A B B     Non QM Non QM Yes
304635090 32917913     Credit Asset Asset Calculation / Analysis Asset Available for Closing is insufficient to cover Cash From Borrower. Documented qualifying Assets for Closing of  ___ is less than Cash From Borrower ___. xxxx       xxxx
04/11/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635157 32920329     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/28/2025     1 C A C A C A C A   NE Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635094 32918235     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304635094 32918662     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   WA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304635094 32918663     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   WA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304635164 32919008     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing:   As per guideline most recent pay stub covering at least 30 days YTD income or most recent 1 year W-2(2024) are required, however provided paystub only covered 5 days (Pay period xxxx) required one complete month paystub or 2024 year end paystub is required to calculate income       xxxx
03/07/2025     1 C A C A C A C A   AL Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635164 32919543     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/15/2025   2 C B C B C B C B   AL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635164 32919544     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/15/2025   2 C B C B C B C B   AL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635117 32919038     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304635196 32918910     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   OH Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635196 32918972     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   OH Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635196 32918973     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   OH Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635199 32929895     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/02/2025   2 C B C B C B C B   MA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635199 32929896     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/02/2025   2 C B C B C B C B   MA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635303 32814987     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635363 32950783     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
03/14/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635363 32950834     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Combined loan to value discrepancy.   xxxx       xxxx
03/14/2025     1 C A C A C A C A   MD Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635211 32919718     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
03/11/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635211 32919733     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635266 32919332     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   ND Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635266 32919418     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/15/2025   2 C B C B C B C B   ND Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635266 32919419     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/15/2025   2 C B C B C B C B   ND Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635273 32918215     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2 C B C B C B C B   FL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635273 32918216     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2 C B C B C B C B   FL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635278 32918033     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635391 32918647     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/08/2025   2 C B C B C B C B   WA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635391 32918648     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/08/2025   2 C B C B C B C B   WA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635391 33209202     Compliance Compliance Federal Compliance TILA TILA Extended Rescission: Inaccurate material disclosures provided to borrower at consummation on a rescindable transaction resulting in extended rescission rights (3 years from consummation).  Re-disclosure of accurate material disclosures, LOE, re-opening of rescission and proof of delivery required.   xxxx       xxxx
  04/28/2025   2   B   B   B   B   WA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct notice of rescission model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635395 32918533     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   IA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635396 32918387     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635413 32929633     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
03/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635413 32929641     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan.         xxxx
03/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635413 32929642     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.         xxxx
03/18/2025     1 B A B A B A B A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635413 32929643     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property.         xxxx
03/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635413 32929644     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
03/18/2025     1 B A C A B A B A   FL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635413 32929645     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 56.64063% significantly exceeds the guideline maximum of 50.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
03/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635413 32929652     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk.         xxxx
03/18/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635338 32918308     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
04/21/2025     1 B A C A B A B A   NJ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635338 32948070     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
04/21/2025     1 C A C A C A C A   NJ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635338 32948072     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
04/21/2025     1 C A C A C A C A   NJ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635338 32951390     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 56.06990% significantly exceeds the guideline maximum of 45.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
04/21/2025     1 C A C A C A C A   NJ Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635339 32921737     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635339 32921782     Compliance Compliance Federal Compliance Missing Non-Required Data (Missing Data) Last Rate Set Date Last Date Rate Set and Initial Rate Lock Date not provided.  Worst Case Scenario between Creditor Application Date and Transaction Date used to determine rate used for testing.                 2 B B B B B B B B   FL Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635339 32921784     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of Safe Harbor QM (APOR). xxxx       xxxx
03/08/2025     1 B A C A B A B A   FL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) Yes
304635339 32921785     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/04/2025   2 C B C B C B C B   FL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) Yes
304635339 32921786     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/04/2025   2 C B C B C B C B   FL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) Yes
304635339 33000378     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Safe Harbor QM (APOR) matches the Due Diligence Loan Designation of Safe Harbor QM (APOR). xxxx               2   A   B   B   A   FL Primary Refinance - Cash-out - Other   C B C A C B     Higher Priced QM (APOR) Safe Harbor QM (APOR) No
304635165 32917885     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   ID Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635204 32918656     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635120 32939267     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635120 32939268     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635089 32939535     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2 C B C B C B C B   PA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635089 32939536     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2 C B C B C B C B   PA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635140 32950698     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA - Incorrect Right To Cancel Form Used - H-8 Used on Same Lender Refinance (Circuit 2, 5, 7, 8, 9, 10 or DC) Truth in Lending Act: Notice of Right to Cancel was not executed on the proper Model Form for a refinancing by the same creditor. The H-8 form was used, the H-9 form should have been used. xxxx               2 B B B B B B B B   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form B B A A B B     Non QM Non QM Yes
304635149 32917510     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   SC Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635149 32917511     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/01/2025   2 C B C B C B C B   SC Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635149 32917540     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635233 32920055     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635237 32920400     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   NY Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635272 32918694     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   UT Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635272 32918803     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
04/01/2025     1 C A C A C A C A   UT Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635275 32920111     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635410 32919663     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635432 32808436     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304635380 32822918     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635380 32822966     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635380 32822967     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635380 32822968     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days.         xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635380 32822969     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635380 32822970     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635380 32822972     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
03/11/2025     1 B A C A B A B A   AZ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635380 32822973     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/18/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635380 32828364     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
02/28/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635380 32956759     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
03/11/2025     1   A   A   A   A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635380 32956760     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 50.10336% moderately exceeds the guideline maximum of 50.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx       xxxx
03/11/2025     1   A   A   A   A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635380 32956761     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
03/11/2025     1   A   A   A   A   AZ Primary Refinance - Cash-out - Other   C A C A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635373 32922510     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304635374 32822687     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635374 32822688     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied. xxxx       xxxx
02/26/2025     1 B A B A B A B A   AZ Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635374 32822689     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property.         xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635374 32822690     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635374 32822691     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635374 32822692     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635374 32822693     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635374 32822694     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635374 32822696     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Higher Priced QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
02/26/2025     1 B A C A B A B A   AZ Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304635374 32822697     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
02/26/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A A A C A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635385 32918136     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635385 32918358     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635385 32918359     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635385 32918362     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Points and Fees Exceeds 2% of Original Principal Balance) Texas Constitution Section 50(a)(6): Points and fees on subject loan of xxxx% is in excess of the allowable maximum of 2.0000% of the Original Principal Loan Amount. Points and Fees total $xxxx on an Original Principal Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%.) xxxx       xxxx
03/11/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other Refund the borrower, or credit their account, an amount equal to any overcharge paid by the borrower. (Provide Proof of Delivery, LOE, and Copy of Check. [A servicing screen print can be provided in place of a check when a credit is applied to the borrowers account.]) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635385 32918364     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
03/14/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635385 32918365     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Notice of Right to Cancel Expiration Date Prior or equal to Disbursement Date Truth in Lending Act:  Actual Date(s) on Notice of Right to Cancel occurs prior to expected date(s). xxxx       xxxx
03/14/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635437 32814830     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635148 32917824     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635176 32920201     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304635110 32917722     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635224 32822790     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   NJ Primary Refinance - Cash-out - Other   C A C A A A     Non QM Non QM No
304635268 32919278     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
02/27/2025     1 C A C A C A C A   VA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635381 32919751     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided           xxxx
02/27/2025     1 C A C A C A C A   GA Primary Refinance - Cash-out - Other   C B C A C B     Non QM Non QM No
304635381 32919857     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/18/2025   2 C B C B C B C B   GA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304635381 32919858     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/18/2025   2 C B C B C B C B   GA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Non QM Non QM Yes
304638825 32926037     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304638825 32926038     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304638825 32926039     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/15/2025   2 C B C B C B C B   MD Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304638825 32926040     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/15/2025   2 C B C B C B C B   MD Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304638825 33281397     Compliance Compliance Federal Compliance TILA TILA Extended Rescission: Inaccurate material disclosures provided to borrower at consummation on a rescindable transaction resulting in extended rescission rights (3 years from consummation).  Re-disclosure of accurate material disclosures, LOE, re-opening of rescission and proof of delivery required.   xxxx       xxxx
      2   B   B   B   B   MD Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct notice of rescission model form C B A A C B     Higher Priced QM (APOR) Higher Priced QM (APOR) Yes
304638881 32934128     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304638881 32934129     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304638867 32932793     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304638867 32932794     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   B B A A B B     Higher Priced QM (APOR) Higher Priced QM (APOR) No
304638813 32931857     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Non QM Non QM No
304638813 32931860     Compliance Compliance State Compliance State HPML (State HPML Disclosure) Maryland Higher-Priced Mortgage Loan (Disclosure of Non-HPML Loans Borrower Qualifies For Not Provided) Maryland Higher-Priced Mortgage Loan:  Borrower not provided with written disclosure of non-higher priced loans otherwise qualified for.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Non QM Non QM No
304638813 32931861     Compliance Compliance State Compliance State HPML Maryland HPML Threshold Test Non-Compliant Maryland Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Loan.                 2 B B B B B B B B   MD Primary Refinance - Cash-out - Other   C B A A C B     Non QM Non QM No
304638813 32931863     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/17/2025   2 C B C B C B C B   MD Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Non QM Non QM Yes
304638813 32931864     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/17/2025   2 C B C B C B C B   MD Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Non QM Non QM Yes
304511711 32859114     Compliance Compliance State Compliance State Defect South Carolina CHL Complaint Agency Disclosure Timing Test South Carolina Home Loan: Borrower not provided with a document, at time of application, specifying the agency designated to receive complaints or inquiries about the origination and making of the loan. xxxx       xxxx
03/26/2025     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304486021 32885778     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
04/02/2025     1 C A C A C A C A   NY Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304635468 32916521     Compliance Compliance State Compliance Misc. State Level Ohio Consumer Sales Practices Act Acknowledgement of Receipt of Home Mortgage Loan Information Document Not Signed) Ohio Consumer Sales Practices Act: Acknowledgement of Receipt of Home Mortgage Loan Information Document not signed by borrower(s). xxxx               2 B B B B B B B B   OH Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304635468 32916522     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form Incorrect Right To Cancel Form Used - H-9 Used on Non Same Lender Refinance Truth in Lending Act: Notice of Right to Cancel was not executed on the proper Model Form for a refinance by a creditor that is not considered the original creditor. The H-9 form was used, the H-8 form should have been used. xxxx       xxxx
  04/28/2025   2 C B C B C B C B   OH Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304493563 32941570     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304493563 32941571     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304493563 32941572     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304493563 32941573     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304632009 33008209     Credit Loan Package Documentation Application / Processing Loan Package Documentation Missing Document: Purchase Agreement / Sales Contract not provided   xxxx       xxxx
03/12/2025     1 D A D A D A D A   IN Primary Purchase   D B D B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304632009 33008210     Credit Asset Asset Documentation Asset Missing Document: Gift Letter not provided   xxxx       xxxx
03/12/2025     1 C A C A C A C A   IN Primary Purchase   D B D B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304632009 33016021     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
03/14/2025     1 C A C A C A C A   IN Primary Purchase   D B D B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304632009 33016043     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - Borrower is a 5% share holder in xxxx and is paid W2 wages. Missing recent paystubs and VVOE.  Additionally, missing 3rd party verification of self employment for xxxx.       xxxx
03/19/2025     1 C A C A C A C A   IN Primary Purchase   D B D B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304632009 33016087     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: AUS not provided   xxxx       xxxx
03/12/2025     1 C A C A C A C A   IN Primary Purchase   D B D B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304632009 33016091     Credit Borrower and Mortgage Eligibility Mortgage / Program Eligibility Borrower and Mortgage Eligibility Guideline Issue:  Subject loan is a non-arms length transaction  outside of credit guidelines   xxxx The representative FICO score exceeds the guideline minimum by at least 40 points. 725 FICO SitusAMC,Aggregator xxxx
    03/18/2025 2 C B C B C B C B   IN Primary Purchase   D B D B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304632009 33016123     Credit Credit Miscellaneous Guideline Credit Exception:   Missing CD from the 1st.  The loan is a simultaneous 2nd purchase.       xxxx
03/12/2025     1 C A C A C A C A   IN Primary Purchase   D B D B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304632009 33023650     Credit Asset Document Error Asset Available for Closing is insufficient to cover Cash From Borrower. Documented qualifying Assets for Closing of  ___ is less than Cash From Borrower ___. xxxx       xxxx
03/12/2025     1   A   A   A   A   IN Primary Purchase   D B D B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304641217 32995975     Compliance Loan Package Documentation Closing / Title Missing, Incorrect, or Incomplete Note Missing Document: Note - Subject Lien not provided   xxxx       xxxx
03/18/2025     1 D A D A D A D A   ID Primary Refinance - Cash-out - Other   D A A A D A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304511500 33021712     Credit Credit Credit Documentation Guideline Aged document: Credit Report  is more than 90 days prior to the note date. - xxxx Borrower has owned the subject property for at least 5 years.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.
Borrower lived in the home for 15 years. SitusAMC,Aggregator

SitusAMC
xxxx
    05/15/2025 2 C B C B C B C B   NV Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304510704 33077136     Credit Guideline Guideline Issue Guideline Ineligible property type. ___ xxxx The qualifying DTI on the loan is at least 10% less than the guideline maximum.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.

The representative FICO score exceeds the guideline minimum by at least 40 points.
26.04407% DTI SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    05/08/2025 2 C B C B C B C B   CA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304495637 33072921     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304495637 33072922     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304495637 33072925     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304495637 33072926     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
04/21/2025     1 C A C A C A C A   TX Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304638954 33247441     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2 C B C B C B C B   MO Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304638954 33247442     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  04/24/2025   2 C B C B C B C B   MO Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304638954 33247443     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
04/30/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304638954 33344863     Compliance Compliance Federal Compliance TILA TILA Extended Rescission: Inaccurate material disclosures provided to borrower at consummation on a rescindable transaction resulting in extended rescission rights (3 years from consummation).  Re-disclosure of accurate material disclosures, LOE, re-opening of rescission and proof of delivery required.   xxxx       xxxx
  06/01/2025   2   B   B   B   B   MO Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct notice of rescission model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304684747 33403108     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
05/27/2025     1 B A C A B A B A   AL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304684747 33403109     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 51.34894% moderately exceeds the guideline maximum of 50.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx       xxxx
05/27/2025     1 C A C A C A C A   AL Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304684747 33403112     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  05/30/2025   2 C B C B C B C B   AL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304684747 33403113     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  05/30/2025   2 C B C B C B C B   AL Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304684747 33403135     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
05/27/2025     1 C A C A C A C A   AL Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304684747 33403137     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk.         xxxx
05/27/2025     1 C A C A C A C A   AL Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304664558 33412464     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  05/23/2025   2 C B C B C B C B   CA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304664558 33412465     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  05/23/2025   2 C B C B C B C B   CA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304664558 33412466     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
05/12/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304691401 33406781     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  05/30/2025   2 C B C B C B C B   UT Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304691401 33406782     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  05/30/2025   2 C B C B C B C B   UT Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304692613 33438956     Credit Missing Document General Missing Document Missing Document: Credit Card Statement not provided   xxxx       xxxx
05/22/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304684428 33439466     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - xxxx       xxxx
05/24/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304687162 33455902     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  06/13/2025   2 C B C B C B C B   ID Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304687162 33455903     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  06/13/2025   2 C B C B C B C B   ID Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304684675 33446180     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
06/06/2025     1 C A C A C A C A   NC Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304676085 33448212     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - xxxx       xxxx
06/11/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304676085 33455982     Credit Credit Miscellaneous Guideline Credit Exception:   Required Property Inspection was not provided       xxxx
06/11/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304677723 33481464     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
05/22/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304699240 33488162     Credit Title General Title Title Policy Coverage is less than Original Loan Amount. The Title Policy Amount of ___ is less than the note amount of ___ based on the ___ in file.                 2 B B B B B B B B   NV Primary Refinance - Cash-out - Other   C B B B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304699240 33488440     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
06/13/2025     1 B A C A B A B A   NV Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B B B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304699240 33488441     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of the greater of .00000% of the Federal Total Loan Amount and $xxxx (2024). Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx and $xxxx (2024) (an overage of $xxxx or xxxx%). xxxx       xxxx
06/13/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other   C B B B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304687268 33486935     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
06/16/2025     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304687268 33487241     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - xxxx       xxxx
06/13/2025     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304699168 33491738     Credit Credit Miscellaneous Guideline Credit Exception:   Missing property condition report as required per guidelines.       xxxx
06/13/2025     1 C A C A C A C A   WA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304687701 33489764     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  06/13/2025   2 C B C B C B C B   WA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304687701 33489767     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  06/13/2025   2 C B C B C B C B   WA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304692091 33490022     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $xxxx is over disclosed by $xxxx compared to the calculated Amount Financed of $xxxx and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  06/13/2025   2 C B C B C B C B   WA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304692091 33490023     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on xx/xx/xxxx disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $xxxx is under disclosed by $xxxx compared to the calculated Finance Charge of $xxxx which exceeds the $35.00 threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated xx/xx/xxxx). xxxx       xxxx
  06/13/2025   2 C B C B C B C B   WA Primary Refinance - Cash-out - Other TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission (required on rescindable transactions) C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304685743 33490649     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304685743 33491659     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702411 33494148     Compliance Compliance Federal Compliance Federal HPML Federal HPML 2014 Non Compliant Federal Higher-Priced Mortgage Loan: APR on subject loan of xxxx% or Final Disclosure APR of xxxx% is equal to or greater than the threshold of APOR xxxx% + 3.5%, or xxxx%.  Non-Compliant Higher Priced Mortgage Loan. xxxx       xxxx
06/24/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702411 33494149     Compliance Compliance Federal Compliance Federal HPML TIL Higher Priced Mortgage Loan Safe Harbor Test TILA HPML appraisal Rule (Dodd-Frank 2014): Safe Harbor requirements not satisfied. xxxx       xxxx
06/24/2025     1 B A B A B A B A   CA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702411 33494150     Compliance Compliance Federal Compliance Federal HPML (Fed HPML Provision) Federal Higher-Priced Mortgage Loan (Appraisal - Did Not Physically Visit) TILA HPML Appraisal Rule (Dodd-Frank 2014): Appraisal not performed by a certified or licensed appraiser who conducted a physical visit to the property. xxxx       xxxx
06/24/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702411 33494166     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
06/24/2025     1 B A C A B A B A   CA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304702411 33494167     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 50.00154% moderately exceeds the guideline maximum of 50.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx       xxxx
06/24/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702411 33494169     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
06/24/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702411 33494182     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
06/24/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702075 33496533     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702075 33496534     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304693374 33496442     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx       xxxx
05/27/2025     1 B A C A B A B A   IL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) Yes
304693374 33520544     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Higher Priced QM (APOR) matches the Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx               2   A   B   B   A   IL Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) No
304688691 33501339     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx.         xxxx
05/28/2025     1 C A C A C A C A   NH Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304691400 33495124     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx.         xxxx
05/27/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304691248 33496107     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Non QM. xxxx       xxxx
06/02/2025     1 B A C A B A B A   WY Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Non QM Yes
304691248 33496109     Compliance Compliance Federal Compliance ATR/QM Defect QM (APOR) Threshold Fail Qualified Mortgage: QM APR on subject loan of xxxx% is equal to or greater than the threshold of  xxxx%.         xxxx
06/02/2025     1 C A C A C A C A   WY Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Non QM No
304691248 33554642     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - General Ability to Repay Ability to Repay (Dodd-Frank 2014): The initial Loan Designation provided did not match.  However, the updated Loan Designation of Non QM matches the Due Diligence Loan Designation of Non QM. xxxx               2   A   B   B   A   WY Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Non QM No
304702475 33497789     Compliance Compliance Federal Compliance ATR/QM Defect Self-Employed Tax Return Recency - QM General QM: Self Employed Tax Returns - The business or personal tax returns provided are not the most recent. Application Date xx/xx/xxxx,  Most Recent Tax Return End Date xx/xx/xxxx, Tax Return Due Date xx/xx/xxxx. xxxx               2 B B B B B B B B   ID Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702475 33497790     Compliance Compliance Federal Compliance ATR/QM Defect Self-Employed Tax Return Recency - QM General QM: Self Employed Tax Returns - The business or personal tax returns provided are not the most recent. Application Date xx/xx/xxxx,  Most Recent Tax Return End Date xx/xx/xxxx, Tax Return Due Date xx/xx/xxxx. xxxx               2 B B B B B B B B   ID Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702475 33502081     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
05/28/2025     1 C A C A C A C A   ID Primary Refinance - Cash-out - Other   C B C A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304695601 33511297     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
05/28/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304699229 33513098     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
05/29/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304691197 33510724     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  3.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).         xxxx
06/02/2025     1 C A C A C A C A   ID Investment Refinance - Cash-out - Other   C B B B C A     N/A N/A No
304691197 33510726     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
06/02/2025     1 B A C A B A B A   ID Investment Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B B B C A     N/A N/A Yes
304691197 33514635     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Combined loan to value discrepancy. Calculated combined loan to value percentage of ___ exceeds Guideline combined loan to value percentage of ___.   Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
Good credit and employment history. 5 months reserves SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    05/23/2025 2 B B B B B B B B   ID Investment Refinance - Cash-out - Other   C B B B C A     N/A N/A No
304705156 33513842     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304705156 33513843     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304692072 33520126     Credit Income / Employment Income Documentation Income / Employment The verification of employment does not meet the guideline requirements. - xxxx       xxxx
05/30/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304692072 33520175     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
05/30/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304705441 33518143     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304705441 33518144     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304688450 33521205     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304700194 33526292     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx.         xxxx
06/03/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304698189 33530114     Credit Loan Package Documentation Closing / Title Loan Package Documentation Title search shows negative impact on title.   xxxx       xxxx
06/04/2025     1 C A C A C A C A   MO Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702993 33522298     Credit Title General Title Title Policy Coverage is less than Original Loan Amount. The Title Policy Amount of ___ is less than the note amount of ___ based on the ___ in file.                 2 B B B B B B B B   CO Primary Refinance - Cash-out - Other   B B B B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304694062 33526819     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/04/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304707880 33539501     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: Property is located in a FEMA Disaster area and has not been inspected.   xxxx       xxxx
06/06/2025     1 C A C A C A C A   FL Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304695823 33540701     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/13/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304707223 33539607     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx.         xxxx
06/04/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304694063 33540170     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (Notice to Assignee) Truth in Lending Act (HOEPA): Required Statement was not provided to purchaser or assignee for loan that was sold or assigned. (Note: This notice only applies when selling or assigning a HOEPA loan and may not be found in the file for loans that have not been previously sold)         xxxx
06/17/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304694063 33540171     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
06/17/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304694063 33540172     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
06/17/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304694063 33540173     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
06/17/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304694063 33540174     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan.         xxxx
06/17/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304694063 33540175     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (2015 Counseling Requirement) Truth in Lending Act (HOEPA):  Pre-loan counseling requirements not met. xxxx       xxxx
06/17/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304694063 33540177     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
06/17/2025     1 B A C A B A B A   OR Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304694063 33540178     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).         xxxx
06/17/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304694063 33540179     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/09/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304700846 33540515     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - ___ xxxx       xxxx
06/03/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304700179 33539805     Credit Title General Title Title Policy Coverage is less than Original Loan Amount. The Title Policy Amount of ___ is less than the note amount of ___ based on the ___ in file.                 2 B B B B B B B B   NV Primary Refinance - Cash-out - Other   C B B B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304700179 33544784     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx.         xxxx
06/04/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B B B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304695622 33542747     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
06/04/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304695622 33542788     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - xxxx       xxxx
06/04/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304697028 33547196     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/04/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304697028 33547197     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA - Incorrect Right To Cancel Form Used - H-8 Used on Same Lender Refinance (Circuit 2, 5, 7, 8, 9, 10 or DC) Truth in Lending Act: Notice of Right to Cancel was not executed on the proper Model Form for a refinancing by the same creditor. The H-8 form was used, the H-9 form should have been used.                 2 B B B B B B B B   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304705001 33560627     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304705001 33560628     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304707663 33559634     Credit Missing Document General Missing Document Missing Document: 1007 Rent Comparison Schedule not provided   xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

The representative FICO score exceeds the guideline minimum by at least 40 points.
25 years xxxx SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    06/03/2025 2 B B B B B B B B   FL Investment Refinance - Cash-out - Other   B B B B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304707996 33561566     Credit Credit AUS Discrepancy / Guidelines Discrepancy Credit Guideline Requirement: Maximum Loan Amount discrepancy. Note loan amount of ___ is greater than Guideline maximum loan amount of ___. xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.
Borrower has been with current employer for 10 years. SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    06/25/2025 2 C B C B C B C B   CA Primary Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304704946 33570480     Compliance Compliance State Compliance Misc. State Level Ohio Consumer Sales Practices Act Acknowledgement of Receipt of Home Mortgage Loan Information Document Not Signed) Ohio Consumer Sales Practices Act: Acknowledgement of Receipt of Home Mortgage Loan Information Document not signed by borrower(s).                 2 B B B B B B B B   OH Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304693836 33570065     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA - Incorrect Right To Cancel Form Used - H-8 Used on Same Lender Refinance (Circuit 2, 5, 7, 8, 9, 10 or DC) Truth in Lending Act: Notice of Right to Cancel was not executed on the proper Model Form for a refinancing by the same creditor. The H-8 form was used, the H-9 form should have been used.                 2 B B B B B B B B   WA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304710318 33571250     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710318 33571251     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702459 33570835     Credit Credit Credit Calculation / Analysis Guideline Guideline Requirement: Representative FICO score discrepancy.   xxxx       xxxx
06/06/2025     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304702459 33570836     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - xxxx       xxxx
06/06/2025     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304707657 33580776     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Notice of Right to Cancel Expiration Date Prior or equal to Disbursement Date Truth in Lending Act:  Actual Date(s) on Notice of Right to Cancel occurs prior to expected date(s). xxxx       xxxx
  07/12/2025   2 C B C B C B C B   MD Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304709056 33580181     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Non QM. xxxx       xxxx
06/19/2025     1 B A C A B A B A   CA Investment Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304709056 33580182     Compliance Compliance Federal Compliance ATR/QM Defect QM (APOR) Threshold Fail Qualified Mortgage: QM APR on subject loan of xxxx% is equal to or greater than the threshold of  xxxx%. xxxx       xxxx
06/19/2025     1 C A C A C A C A   CA Investment Refinance - Cash-out - Other   C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304694203 33578551     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx.         xxxx
06/09/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304709997 33579771     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx       xxxx
06/10/2025     1 B A C A B A B A   IL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C B C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) Yes
304709997 33580910     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
06/07/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) No
304709997 33581042     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: PITIA reserves months discrepancy. Calculated PITIA months reserves of ___ is less than Guideline PITIA months reserves of ___. xxxx Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
Borrower has been self-employed for 25 years. SitusAMC

SitusAMC

Aggregator,SitusAMC
xxxx
    06/09/2025 2 C B C B C B C B   IL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) No
304709997 33581043     Credit Credit Credit Calculation / Analysis Guideline Guideline Requirement: Representative FICO score discrepancy. Representative FICO score of ___ is less than Guideline representative FICO score of ___. xxxx Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
Borrower has been self-employed for 25 years. SitusAMC

SitusAMC

Aggregator,SitusAMC
xxxx
    06/09/2025 2 C B C B C B C B   IL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) No
304709997 33581067     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk.         xxxx
06/09/2025     1 C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) No
304709997 33618063     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Higher Priced QM (APOR) matches the Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx               2   A   B   B   A   IL Primary Refinance - Cash-out - Other   C B C B C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) No
304705126 33578501     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/09/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304632582 33591408     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
06/19/2025     1 C A C A C A C A   UT Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304632582 33591418     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 56.07835% significantly exceeds the guideline maximum of 50.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
06/19/2025     1 C A C A C A C A   UT Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304632582 33591421     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
06/19/2025     1 B A C A B A B A   UT Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304632582 33591504     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
06/19/2025     1 C A C A C A C A   UT Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304643106 33591208     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/09/2025     1 C A C A C A C A   OR Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304702949 33590481     Compliance Compliance State Compliance Compliance 90 Day RNY has been discontinued effective June 1, 2024.  Most recent available index value used for bona fide discount point testing.                   2 B B B B B B B B   AR Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304708787 33588732     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Disclosure) Federal High-Cost Mortgage Loan (HOEPA Disclosure Not Provided) Truth in Lending Act (HOEPA):  HOEPA disclosure was not provided to the Borrower xxxx       xxxx
06/13/2025     1 C A C A C A C A   WY Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304708787 33588733     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Financed Points and Fees) Truth in Lending Act (HOEPA): Mortgage loan financed Points and Fees. xxxx       xxxx
06/13/2025     1 C A C A C A C A   WY Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304708787 33588734     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Late Charge) Truth in Lending Act (HOEPA): Mortgage loan contains a late charge that exceeds the greater of 4% of the amount past due or grace period of less than 15 days. xxxx       xxxx
06/13/2025     1 C A C A C A C A   WY Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304708787 33588736     Compliance Compliance Federal Compliance Federal Defect (Fed High Cost) Federal High-Cost Mortgage Loan (Points and Fees) Truth in Lending Act (High-Cost Mortgage): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees of $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%).  Non-Compliant High Cost Loan. xxxx       xxxx
06/13/2025     1 C A C A C A C A   WY Primary Refinance - Cash-out - Other (1) Signed letter from borrower indicating their choice to either (a) accept refund and make loan non-high-cost or (b) keep loan as high-cost and make loan compliant; (2) Assuming option (a) is selected, a copy of refund check and proof of mailing; (3) Assuming option (b) is selected, proof of cure for each of the prohibited practices violations noted. C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304708787 33588737     Compliance Legal / Regulatory / Compliance Anti-Predatory Violation Federal Defect (Fed High Cost Provision) Federal High-Cost Mortgage Loan (Counseling Requirement) Truth in Lending Act (HOEPA): Borrower did not receive pre-loan counseling. xxxx       xxxx
06/13/2025     1 C A C A C A C A   WY Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304708787 33588740     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. xxxx       xxxx
06/13/2025     1 B A C A B A B A   WY Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304708787 33588741     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of xxxx% is in excess of the allowable maximum of  5.00000% of the Federal Total Loan Amount. Points and Fees total $xxxx on a Federal Total Loan Amount of $xxxx vs. an allowable total of $xxxx (an overage of $xxxx or xxxx%). xxxx       xxxx
06/13/2025     1 C A C A C A C A   WY Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304708787 33588742     Compliance Compliance State Compliance Misc. State Level Wyoming Uniform Consumer Credit Code (Statement of Rate Not Provided) Wyoming Uniform Consumer Credit Code:  Lender did not provide borrower with accurate statement of rate.                 2 B B B B B B B B   WY Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304700152 33588181     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/09/2025     1 C A C A C A C A   OK Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304691509 33592432     Credit Title General Title Title Policy Coverage is less than Original Loan Amount. The Title Policy Amount of ___ is less than the note amount of ___ based on the ___ in file.                 2 B B B B B B B B   OR Primary Refinance - Cash-out - Other   B B B B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304703025 33590473     Credit Hazard Insurance Insufficient Coverage Hazard Insurance The Hazard Insurance Policy effective date is after the funds disbursed.   xxxx       xxxx
06/11/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716558 33603385     Credit Guideline Guideline Issue Guideline Minimum of 600 square feet of gross living area required per company guidelines.   xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least 10%.

The qualifying DTI on the loan is at least 10% less than the guideline maximum.
783 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    07/01/2025 2 C B C B C B C B   CA Investment Refinance - Cash-out - Other   C B C B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304705506 33604185     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/10/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304692663 33603488     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx       xxxx
06/10/2025     1 B A C A B A B A   PA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B A A C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) Yes
304692663 33623242     Compliance Compliance Federal Compliance ATR/QM Defect Check Restated Loan Designation Match - QM / ATR Ability to Repay / Qualified Mortgage (Dodd-Frank 2014): The initial Loan Designation provided did not match, however, the updated Loan Designation of Higher Priced QM (APOR) matches the Due Diligence Loan Designation of Higher Priced QM (APOR). xxxx               2   A   B   B   A   PA Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Higher Priced QM (APOR) No
304704949 33603797     Credit Hazard Insurance Insufficient Coverage Hazard Insurance The Hazard Insurance Policy effective date is after the funds disbursed.   xxxx       xxxx
06/11/2025     1 C A C A C A C A   ID Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304704895 33603792     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Combined loan to value discrepancy. Calculated combined loan to value percentage of ___ exceeds Guideline combined loan to value percentage of ___. xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.
Borrower has been with current employer for 12 years. SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    06/09/2025 2 B B B B B B B B   NV Primary Refinance - Cash-out - Other   B B B B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304700290 33613611     Credit Title General Title Title Policy Coverage is less than Original Loan Amount. The Title Policy Amount of ___ is less than the note amount of ___ based on the ___ in file.                 2 B B B B B B B B   SC Primary Refinance - Cash-out - Other   B B B B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710807 33624090     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710807 33624091     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304704892 33624263     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/12/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B C B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304704892 33625427     Credit Credit AUS Discrepancy / Guidelines Discrepancy Credit Guideline Requirement: Maximum Loan Amount discrepancy. Note loan amount of ___ is greater than Guideline maximum loan amount of ___. xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
740 FICO SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    06/13/2025 2 C B C B C B C B   NV Primary Refinance - Cash-out - Other   C B C B C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710934 33625419     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
06/14/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304715467 33624385     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: PITIA reserves months discrepancy.   xxxx       xxxx
06/12/2025     1 C A C A C A C A   WI Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304715467 33624390     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
06/12/2025     1 B A C A B A B A   WI Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304715467 33624391     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
06/12/2025     1 C A C A C A C A   WI Primary Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710861 33625365     Compliance Compliance Federal Compliance ATR/QM Defect General ATR Provision Investor and Non QM DTIs match and both moderately exceed Guidelines Ability to Repay (Dodd-Frank 2014): The DTI calculated in accordance with the Lenders Guidelines and 1026.43(c)(5) of 50.32022% moderately exceeds the guideline maximum of 50.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx       xxxx
06/17/2025     1 C A C A C A C A   IL Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710861 33625366     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
06/17/2025     1 B A C A B A B A   IL Investment Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304710861 33625367     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 50.32022% moderately exceeds the guideline maximum of 50.00%. (DTI Exception is eligible to be regraded with compensating factors.) xxxx       xxxx
06/17/2025     1 C A C A C A C A   IL Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710861 33625369     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
06/17/2025     1 C A C A C A C A   IL Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710861 33625384     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
06/17/2025     1 C A C A C A C A   IL Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710861 33625385     Compliance Compliance Federal Compliance ATR/QM Defect General Ability To Repay Provision Investor Guidelines Ability to Repay (Dodd-Frank 2014): Based on the loan failing one or more guideline components, the loan is at ATR risk. xxxx       xxxx
06/17/2025     1 C A C A C A C A   IL Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710637 33625251     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/12/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304705128 33633971     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Notice of Right to Cancel Expiration Date Prior or equal to Disbursement Date Truth in Lending Act:  Actual Date(s) on Notice of Right to Cancel occurs prior to expected date(s). xxxx       xxxx
  07/07/2025   2 C B C B C B C B   NY Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304702343 33634901     Credit Title General Title Title Policy Coverage is less than Original Loan Amount. The Title Policy Amount of ___ is less than the note amount of ___ based on the ___ in file.                 2 B B B B B B B B   CA Primary Refinance - Cash-out - Other   B B B B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304711581 33649091     Compliance Compliance Federal Compliance ATR/QM Defect Self-Employed Tax Return Recency - QM General QM: Self Employed Tax Returns - The business or personal tax returns provided are not the most recent. Application Date xx/xx/xxxx,  Most Recent Tax Return End Date xx/xx/xxxx, Tax Return Due Date xx/xx/xxxx. xxxx               2 B B B B B B B B   CO Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304712239 33655291     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: AUS not provided   xxxx       xxxx
06/19/2025     1 C A C A C A C A   WI Primary Purchase   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304709929 33660451     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/17/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304705481 33660015     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Rescission - Disbursement Date Less than 3 Business Days From Transaction Date Truth in Lending Act:  Subject loan transaction disbursed on xx/xx/xxxx, prior to three (3) business days from transaction date of xx/xx/xxxx. xxxx       xxxx
06/17/2025     1 C A C A C A C A   NV Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304700892 33660211     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - xxxx       xxxx
06/17/2025     1 C A C A C A C A   SC Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304710652 33660115     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
06/17/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716633 33703757     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716633 33703758     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304698176 33730556     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 129.26779% significantly exceeds the guideline maximum of 50.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
07/10/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304698176 33730557     Compliance Compliance Federal Compliance ATR/QM Defect Self-Employed Tax Return Recency - QM General QM: Self Employed Tax Returns - The business or personal tax returns provided are not the most recent. Application Date xx/xx/xxxx,  Most Recent Tax Return End Date xx/xx/xxxx, Tax Return Due Date xx/xx/xxxx. xxxx               2 B B B B B B B B   CA Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304698176 33730558     Compliance Compliance Federal Compliance ATR/QM Defect Self-Employed Tax Return Recency - QM General QM: Self Employed Tax Returns - The business or personal tax returns provided are not the most recent. Application Date xx/xx/xxxx,  Most Recent Tax Return End Date xx/xx/xxxx, Tax Return Due Date xx/xx/xxxx. xxxx               2 B B B B B B B B   CA Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304698176 33730561     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
07/10/2025     1 B A C A B A B A   CA Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304698176 33730578     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
07/10/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304698176 33730588     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
07/10/2025     1 C A C A C A C A   CA Primary Refinance - Cash-out - Other   C B C A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304722210 33730480     Credit Loan Package Documentation Application / Processing Missing Document  Missing Document: Fraud Report not provided   xxxx       xxxx
06/30/2025     1 C A C A C A C A   NY Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304727105 33755264     Credit Missing Document General Missing Document Missing Document: 1007 Rent Comparison Schedule not provided   xxxx Borrower has worked in the same position for more than 3 years.

Borrower has been employed in the same industry for more than 5 years.

Borrower has owned the subject property for at least 5 years.

Borrower has verified disposable income of at least $2500.00.

The representative FICO score exceeds the guideline minimum by at least 40 points.
6 years with current employer. SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
xxxx
    06/25/2025 2 B B B B B B B B   CA Investment Refinance - Cash-out - Other   B B B B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304722275 33784434     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304722275 33784435     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304722301 33795241     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304722301 33795242     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716750 33794037     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - xxxx       xxxx
06/30/2025     1 C A C A C A C A   CO Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304720550 33805298     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - ___ xxxx       xxxx
07/01/2025     1 C A C A C A C A   LA Investment Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304726450 33804992     Compliance Compliance State Compliance Misc. State Level Ohio Consumer Sales Practices Act Acknowledgement of Receipt of Home Mortgage Loan Information Document Not Signed) Ohio Consumer Sales Practices Act: Acknowledgement of Receipt of Home Mortgage Loan Information Document not signed by borrower(s).         xxxx
      2 B B B B B B B B   OH Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304721769 33821034     Compliance Compliance Federal Compliance ATR/QM Defect Self-Employed Tax Return Recency - QM General QM: Self Employed Tax Returns - The business or personal tax returns provided are not the most recent. Application Date xx/xx/xxxx,  Most Recent Tax Return End Date xx/xx/xxxx, Tax Return Due Date xx/xx/xxxx.                 2 B B B B B B B B   MT Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304721769 33821035     Compliance Compliance Federal Compliance ATR/QM Defect Self-Employed Tax Return Recency - QM General QM: Self Employed Tax Returns - The business or personal tax returns provided are not the most recent. Application Date xx/xx/xxxx,  Most Recent Tax Return End Date xx/xx/xxxx, Tax Return Due Date xx/xx/xxxx.                 2 B B B B B B B B   MT Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304721769 33821036     Compliance Compliance Federal Compliance ATR/QM Defect Self-Employed Tax Return Recency - QM General QM: Self Employed Tax Returns - The business or personal tax returns provided are not the most recent. Application Date xx/xx/xxxx,  Most Recent Tax Return End Date xx/xx/xxxx, Tax Return Due Date xx/xx/xxxx.                 2 B B B B B B B B   MT Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304721769 33821037     Compliance Compliance Federal Compliance ATR/QM Defect Self-Employed Tax Return Recency - QM General QM: Self Employed Tax Returns - The business or personal tax returns provided are not the most recent. Application Date xx/xx/xxxx,  Most Recent Tax Return End Date xx/xx/xxxx, Tax Return Due Date xx/xx/xxxx.                 2 B B B B B B B B   MT Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304720551 33821328     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - ___ xxxx       xxxx
07/03/2025     1 C A C A C A C A   LA Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304720551 33821329     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - ___ xxxx       xxxx
07/03/2025     1 C A C A C A C A   LA Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304720551 33821353     Compliance Compliance Federal Compliance ATR/QM Defect General ATR Provision Investor and Non QM DTIs match and both significantly exceed Guidelines Ability to Repay (Dodd-Frank 2014): The DTI calculated in accordance with the Lenders Guidelines and 1026.43(c)(5) of 59.34160% significantly exceeds the guideline maximum of 50.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
07/03/2025     1 C A C A C A C A   LA Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304720551 33821354     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. xxxx       xxxx
07/03/2025     1 B A C A B A B A   LA Investment Refinance - Cash-out - Other Lender to provide updated ATR/QM status C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304720551 33821355     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of 59.34160% significantly exceeds the guideline maximum of 50.00%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) xxxx       xxxx
07/03/2025     1 C A C A C A C A   LA Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304720551 33821358     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy.   xxxx       xxxx
07/03/2025     1 C A C A C A C A   LA Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304720551 33821375     Compliance Compliance Federal Compliance ATR/QM Defect General Ability To Repay Provision Investor Guidelines Ability to Repay (Dodd-Frank 2014): Based on the loan failing one or more guideline components, the loan is at ATR risk. xxxx       xxxx
07/03/2025     1 C A C A C A C A   LA Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304720551 33821376     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. xxxx       xxxx
07/03/2025     1 C A C A C A C A   LA Investment Refinance - Cash-out - Other   C A C A C A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304724077 33820537     Credit Guideline Guideline Issue Guideline Ineligible property type.   xxxx The qualifying DTI on the loan is at least 10% less than the guideline maximum.

Borrower has been employed in the same industry for more than 5 years.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
39.20309% DTI SitusAMC,Aggregator

SitusAMC

SitusAMC

SitusAMC
xxxx
    07/02/2025 2 B B B B B B B B   OK Primary Refinance - Cash-out - Other   B B B B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304718029 33822238     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304729762 33829973     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: Property is located in a FEMA Disaster area and has not been inspected.   xxxx       xxxx
07/10/2025     1 C A C A C A C A   KY Second Home Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716752 33830042     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716752 33830043     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304729388 33830737     Compliance Loan Package Documentation Application / Processing Missing, Incorrect, or Incomplete Final or Initial 1003 Missing Document: Missing Lender's Initial 1003   xxxx       xxxx
07/03/2025     1 B A B A B A B A   CA Primary Refinance - Cash-out - Other   B A A A B A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716827 33846410     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716827 33846411     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304707965 33848089     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304727499 33858416     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304729070 33858966     Compliance Loan Package Documentation Application / Processing Missing, Incorrect, or Incomplete Final or Initial 1003 Missing Document: Missing Lender's Initial 1003   xxxx               2 B B B B B B B B   IN Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304728623 33858427     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304728623 33858428     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716816 33860910     Property Property - Appraisal Appraisal Documentation Property - Appraisal Loan is to be securitized. Appraisal from prior transaction was in file. Secondary valuation from subject transaction is missing. Sec ID: 49   xxxx       xxxx
07/11/2025     1 N/A A A A N/A A D A   TX Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716816 33860986     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304716816 33860987     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304727922 33857871     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form Notice of Right to Cancel Missing Truth in Lending Act: Notice of Right to Cancel was not provided. xxxx       xxxx
07/08/2025     1 C A C A C A C A   CT Primary Refinance - Cash-out - Other TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
304727922 33857939     Compliance Loan Package Documentation Application / Processing Missing, Incorrect, or Incomplete Final or Initial 1003 Missing Document: Missing Lender's Initial 1003   xxxx               2 B B B B B B B B   CT Primary Refinance - Cash-out - Other   C B A A C B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304720726 33858686     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304729758 33875040     Credit Missing Document General Missing Document Missing Document: 1007 Rent Comparison Schedule not provided   xxxx The representative FICO score exceeds the guideline minimum by at least 40 points.

Borrower has verified disposable income of at least $2500.00.

Borrower has worked in the same position for more than 3 years.
789 credit score, minimum credit score required is 720, SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    07/09/2025 2 B B B B B B B B   NC Investment Refinance - Cash-out - Other   B B B B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304730693 33872364     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   xxxx       xxxx
07/10/2025     1 C A C A C A C A   NJ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304730329 33884538     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304730329 33884540     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304730261 33882927     Compliance Loan Package Documentation Application / Processing Missing, Incorrect, or Incomplete Final or Initial 1003 Missing Document: Missing Lender's Initial 1003   xxxx               2 B B B B B B B B   WA Second Home Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304732834 33918087     Compliance Compliance State Compliance Misc. State Level Ohio Consumer Sales Practices Act Acknowledgement of Receipt of Home Mortgage Loan Information Document Not Signed) Ohio Consumer Sales Practices Act: Acknowledgement of Receipt of Home Mortgage Loan Information Document not signed by borrower(s).                 2 B B B B B B B B   OH Primary Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304728699 33933939     Credit Missing Document General Missing Document Missing Document: Credit Card Statement not provided   xxxx       xxxx
07/16/2025     1 C A C A C A C A   AZ Primary Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304735061 33932246     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Combined loan to value discrepancy. Calculated combined loan to value percentage of ___ exceeds Guideline combined loan to value percentage of ___.   Borrower has owned the subject property for at least 5 years.

Borrower has worked in the same position for more than 3 years.

The qualifying DTI on the loan is at least 10% less than the guideline maximum.
Owned current residence for 5 years. SitusAMC,Aggregator

SitusAMC

SitusAMC
xxxx
    07/15/2025 2 B B B B B B B B   NC Primary Refinance - Cash-out - Other   B B B B A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304730220 33972007     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - xxxx       xxxx
07/19/2025     1 C A C A C A C A   VA Investment Refinance - Cash-out - Other   C A C A A A     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304734848 33966145     Compliance Loan Package Documentation Application / Processing Missing, Incorrect, or Incomplete Final or Initial 1003 Missing Document: Missing Lender's Initial 1003   xxxx               2 B B B B B B B B   MA Investment Refinance - Cash-out - Other   B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304734693 33966882     Compliance Compliance State Compliance Misc. State Level (TX50(a)(6)) Texas Cash-out Loan (T-42 Endorsement Not Obtained) Texas Constitution Section 50(a)(6): Acceptable FNMA title insurance endorsements not obtained for home equity loan.  The loan file does not evidence the Title Policy includes the Texas T-42 endorsement or the T-42.1 endorsement. (The loan is a Texas Section 50 (a)(6) home equity loan.)                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The endorsements would be required at the time of original title policy issuance, there is not an obvious remediation B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
304734693 33966883     Compliance Compliance State Compliance State Defect (TX50(a)(6)) Texas Cash-out Loan  (Fannie Mae forms not used for closing of home equity loan) Texas Constitution Section 50(a)(6):  Fannie Mae forms not used for closing of home equity loan.                 2 B B B B B B B B   TX Primary Refinance - Cash-out - Other The failure to use FNMA Documents does not present a clear remediation path. B B A A B B     Safe Harbor QM (APOR) Safe Harbor QM (APOR) No