v3.25.2
Note 16 - Segment Reporting (Details Textual) - Heavy Fabrications [Member]
6 Months Ended
Jun. 30, 2025
Boe
Number of Facilities 2
Number of Tower Sections in Production Capacity of Turbines Total 1,650
Maximum [Member]  
Annual Tower Production Capacity 550
Power Generating Capacity of Turbines (Barrel of Oil Equivalent) 1.7