Note 16 - Segment Reporting (Details Textual) - Heavy Fabrications [Member] |
6 Months Ended |
---|---|
Jun. 30, 2025
Boe
| |
Number of Facilities | 2 |
Number of Tower Sections in Production Capacity of Turbines Total | 1,650 |
Maximum [Member] | |
Annual Tower Production Capacity | 550 |
Power Generating Capacity of Turbines (Barrel of Oil Equivalent) | 1.7 |