Callaway Energy Center |
6 Months Ended | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jun. 30, 2025 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Nuclear Waste Matters [Abstract] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CALLAWAY ENERGY CENTER | CALLAWAY ENERGY CENTER See Note 9 – Callaway Energy Center under Part II, Item 8, of the Form 10-K for information regarding spent nuclear fuel recovery, recovery of decommissioning costs, and the nuclear decommissioning trust fund. The fair value of the trust fund for Ameren Missouri’s Callaway Energy Center is reported as “Nuclear decommissioning trust fund” in Ameren’s and Ameren Missouri’s balance sheets. This amount is legally restricted and may be used only to fund the costs of nuclear decommissioning. Changes in the fair value of the trust fund are recorded as an increase or decrease to the nuclear decommissioning trust fund, with an offsetting adjustment to the related regulatory liability. Ameren and Ameren Missouri have recorded an ARO for the Callaway Energy Center decommissioning costs at fair value, which represents the present value of estimated future cash outflows. Annual decommissioning costs of $7 million have historically been included in the costs used to establish electric rates for Ameren Missouri’s customers. Every three years, the MoPSC requires Ameren Missouri to file an updated cost study and funding analysis for decommissioning its Callaway Energy Center. An updated cost study and funding analysis was filed with the MoPSC in December 2023 and is reflected within the ARO. In May 2025, the MoPSC issued an order that approved a non-unanimous stipulation and agreement between Ameren Missouri and the MoPSC staff that reduced annual customer contributions for funding the Callaway Energy Center decommissioning costs from $7 million to zero, as the trust fund level exceeded the estimated present value of future decommissioning costs at the time of the agreement. This MoPSC order removed Ameren Missouri’s funding obligation effective in June 2025. See Note 13 – Supplemental Information for more information on Ameren Missouri’s AROs. Insurance The following table presents insurance coverage at Ameren Missouri’s Callaway Energy Center at April 1, 2025:
(a)Provided through mandatory participation in an industrywide retrospective premium assessment program. The maximum coverage available is dependent on the number of United States commercial reactors participating in the program. (b)Retrospective premium under the Price-Anderson Act. This is subject to retrospective assessment with respect to a covered loss in excess of $500 million in the event of an incident at any licensed United States commercial reactor, payable at $25 million per year. (c)Limit of liability for each incident under the Price-Anderson liability provisions of the Atomic Energy Act of 1954, as amended. This limit is subject to change to account for the effects of inflation and changes in the number of licensed power reactors. (d)NEIL provides $2.7 billion in property damage, stabilization, decontamination, and premature decommissioning insurance for radiation events and $0.7 billion in property damage insurance for nonradiation events. EMANI provides $490 million in property damage insurance for both radiation and nonradiation events. (e)All NEIL-insured plants could be subject to retrospective assessments should losses exceed the accumulated funds from NEIL. (f)Accidental outage insurance provides for lost sales in the event of a prolonged accidental outage. Weekly indemnity up to $4.5 million for 52 weeks, which commences after the first 12 weeks of an outage, plus up to $3.6 million per week for a minimum of 71 weeks thereafter for a total not exceeding the policy limit of $490 million. Nonradiation events are limited to $291 million. The Price-Anderson Act is a federal law that limits the liability for claims from an incident involving any licensed United States commercial nuclear energy center. The limit is based on the number of licensed reactors. The limit of liability and the maximum potential annual payments are adjusted at least every five years for inflation to reflect changes in the Consumer Price Index. The most recent five-year inflationary adjustment became effective in October 2023. Owners of a nuclear reactor cover this exposure through a combination of private insurance and mandatory participation in a financial protection pool, as established by the Price-Anderson Act. Losses resulting from terrorist attacks on nuclear facilities insured by NEIL are subject to industrywide aggregates, such that terrorist acts against one or more commercial nuclear power plants within a stated time period would be treated as a single event, and the owners of the nuclear power plants would share the limit of liability. NEIL policies have an aggregate limit of $3.2 billion within a 12-month period for radiation events, or $1.8 billion for events not involving radiation contamination, resulting from terrorist attacks. The EMANI policies are not subject to industrywide aggregates in the event of terrorist attacks on nuclear facilities. If losses from a nuclear incident at the Callaway Energy Center exceed insurance limits, are not covered by insurance, or if coverage is unavailable, Ameren Missouri is at risk for any uninsured losses. If a serious nuclear incident were to occur, it could have a material adverse effect on Ameren’s and Ameren Missouri’s results of operations, financial position, or liquidity.
|