Exhibit 99.15

Exception Grades

Run Date - 6/5/2025 8:46:02 AM

SitusAMC Loan ID Customer Loan ID Seller Loan ID Investor Loan Number Loan Exception ID Exception ID Exception Date Exception Type Exception Category Exception Subcategory 15E Category Exception Exception Detail Exception Information Compensating Factors Compensating Factor Information Applying Party Follow-up Comments Cleared Date Cured Date Waived Date Exception Level Grade DBRS Initial Exception Rating DBRS Final Exception Rating Fitch Initial Exception Rating Fitch Final Exception Rating Kroll Initial Exception Rating Kroll Final Exception Rating Moody's Initial Exception Rating Moody's Final Exception Rating S&P Initial Exception Rating S&P Final Exception Rating Note Date Property State Occupancy Purpose Exception Remediation Overall
Initial Loan Grade
Overall
Final Loan Grade
Credit
Initial Loan Grade
Credit
Final Loan Grade
Compliance
Initial Loan Grade
Compliance
Final Loan Grade
Property
Initial Loan Grade
Property
Final Loan Grade
Originator QM ATR Status TPR QM ATR Status Is Curable
223395462   3158548369   33495207     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Partial Payments TILA-RESPA Integrated Disclosure - Loan Disclosures: Final Closing Disclosure provided on [Redacted] incorrectly disclosed whether the loan allows for Partial Payments. Final Closing Disclosure provided on [Redacted] incorrectly disclosed whether the loan allows for Partial Payments.       Reviewer Comment (2025-05-21): PCCD resolved issue
  05/21/2025   2 C B C B C B C B C B   TN Primary Refinance - Rate/Term Letter of Explanation & Corrected Closing Disclosure C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395464   3158548375   33474495     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: PITIA reserves months discrepancy.   Based on asset documentation in file, verified assets total $[Redacted].  With funds required to bring to closing of $[Redacted], plus the appraisal fee of $[Redacted] POC, plus the down payment/deposit of $[Redacted], plus gift funds of $[Redacted] total funds to be verified is $[Redacted].  Additionally, guidelines require 6 months of reserves for this loan ($[Redacted]), and there are only [Redacted]months of reserves verified ($[Redacted]).  Shortage is due to deposit of $[Redacted] to [Redacted] #[Redacted] on [Redacted].  Funds were transferred from non-borrowing spouse's account and there is no corresponding gift letter.       Reviewer Comment (2025-05-19): sufficient asset documentation is in file and meets guideline requirements


Buyer Comment (2025-05-19): The non-borrowing spouse transferred these funds from their personal account #[Redacted] into their joint account #[Redacted] (with borrowing spouse). The source of these funds is not in question and a gift letter should not be necessary since this was transferred in their joint account.
05/19/2025     1 C A C A C A C A C A   NY Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395464   3158548375   33474548     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to missing third party verification of self-employment and shortage of reserves, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-20): CPA letter received


Buyer Comment (2025-05-20): Please review uploaded letter from CPA.
05/20/2025     1 B A C A B A C A B A   NY Primary Purchase Lender to provide updated ATR/QM status C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395464   3158548375   33474549     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Employment - Partnership General QM: Unable to verify current Partnership status using reasonably reliable third-party records. Missing third party verification of self-employment.       Reviewer Comment (2025-05-20): CPA letter received


Buyer Comment (2025-05-20): Please review uploaded letter from CPA.
05/20/2025     1 C A C A C A C A C A   NY Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395464   3158548375   33474550     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to missing third party verification of self-employment and shortage of reserves.       Reviewer Comment (2025-05-19): sufficient asset documentation is in file and meets guideline requirements
05/19/2025     1 C A C A C A C A C A   NY Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395467   3158548382   33476123     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Employment - Schedule C General QM: Unable to verify current Sole Proprietorship status using reasonably reliable third-party records. Missing valid third party verification of self-employment for Schedule C income used to qualify.       Reviewer Comment (2025-05-20): VOE received for each borrower


Buyer Comment (2025-05-20): Please review uploaded VOE documentation for both borrowers.
05/20/2025     1 C A C A C A C A C A   AZ Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395467   3158548382   33476126     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to missing valid third party verification of employment for both borrowers, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-20): VOE received for each borrower


Buyer Comment (2025-05-20): Please review uploaded VOE documentation for both borrowers.
05/20/2025     1 B A C A B A C A B A   AZ Primary Purchase Lender to provide updated ATR/QM status C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395467   3158548382   33479843     Credit Income / Employment Income Documentation Income / Employment Income documentation requirements not met.   Missing valid third party verification of employment for both borrowers.       Reviewer Comment (2025-05-20): VOE received for each borrower


Buyer Comment (2025-05-20): Please review uploaded VOE documentation for both borrowers.
05/20/2025     1 C A C A C A C A C A   AZ Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395467   3158548382   33479846     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - Missing valid third party verification of self-employment for Schedule C income used to qualify.       Reviewer Comment (2025-05-20): VOE received for each borrower


Buyer Comment (2025-05-20): Please review uploaded VOE documentation for both borrowers.
05/20/2025     1 C A C A C A C A C A   AZ Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395467   3158548382   33479852     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - Missing valid third party verification of employment for income used to qualify.       Reviewer Comment (2025-05-20): VOE received for each borrower


Buyer Comment (2025-05-20): Please review uploaded VOE documentation for both borrowers.
05/20/2025     1 C A C A C A C A C A   AZ Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395467   3158548382   33479868     Compliance Compliance Federal Compliance ATR/QM Defect Income/Asset Guideline Deficiency - QM Impact General QM:  There are guideline deficiencies related to income and/or asset doc requirements which could result in a risk to the borrower's ability to repay.  (Exception is eligible to be regraded with compensating factors.) Waterfall finding due to missing valid third party verification of employment for both borrowers.       Reviewer Comment (2025-05-20): VOE received for each borrower


Buyer Comment (2025-05-20): Please review uploaded VOE documentation for both borrowers.
05/20/2025     1 C A C A C A C A C A   AZ Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395467   3158548382   33479899     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to missing valid third party verification of employment for both borrowers.       Reviewer Comment (2025-05-20): VOE received for each borrower


Buyer Comment (2025-05-20): Please review uploaded VOE documentation for both borrowers.
05/20/2025     1 C A C A C A C A C A   AZ Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395468   3158548383   33475154     Property Property - Appraisal Appraisal Documentation Property - Appraisal Missing Document: Appraisal was made "subject to" and Form 1004D/442 was not provided. -                 3 C C C C C C C C C C   MN Primary Refinance - Rate/Term   C C A A A A C C Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395468   3158548383   33475892     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-16): Sufficient Cure Provided At Closing
  05/16/2025   1 A A A A A A A A A A   MN Primary Refinance - Rate/Term Final CD evidences Cure C C A A A A C C Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395468   3158548383   33475893     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-16): Sufficient Cure Provided At Closing
  05/16/2025   1 A A A A A A A A A A   MN Primary Refinance - Rate/Term Final CD evidences Cure C C A A A A C C Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395468   3158548383   33475894     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Verification Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-16): Sufficient Cure Provided At Closing
  05/16/2025   1 A A A A A A A A A A   MN Primary Refinance - Rate/Term Final CD evidences Cure C C A A A A C C Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395470   3158548389   33479522     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Verification appraisal was delivered to borrower was not provided.       Reviewer Comment (2025-05-20): proof of appraisal delivery received


Buyer Comment (2025-05-20): Please review uploaded proof of appraisal delivery / appraisal acknowledgement.
05/20/2025     1 B A B A B A B A B A   TN Second Home Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395471   3158548391   33481053     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   UT Primary Refinance - Rate/Term Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395472   3158548392   33474640     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Evidence of primary appraisal delivery to the borrower was not located in the file.       Reviewer Comment (2025-05-21): proof of email delivery of appraisal received


Buyer Comment (2025-05-21): Please review uploaded proof of appraisal delivery.
05/21/2025     1 B A B A B A B A B A   FL Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395472   3158548392   33475108     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Product Exception Form in file, exception approved with comp factors. Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-16): Universal Product Exception Form in file, exception approved with comp factors.
    05/16/2025 2 B B B B B B B B B B   FL Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395472   3158548392   33475112     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and [Redacted](e) of [Redacted]% moderately exceeds the guideline maximum of [Redacted]%. (DTI Exception is eligible to be regraded with compensating factors.) Universal Product Exception Form in file, exception approved with comp factors. Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-16): Universal Product Exception Form in file, exception approved with comp factors.
    05/16/2025 2 B B B B B B B B B B   FL Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395473   3158548394   33474664     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Evidence of primary appraisal delivery to the borrower was not located in the file.       Reviewer Comment (2025-05-19): appraisal delivery received


Buyer Comment (2025-05-19): Please review uploaded proof of appraisal delivery.
05/19/2025     1 B A B A B A B A B A   CA Primary Refinance - Rate/Term   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395477   3158548399   33492739     Compliance Compliance Federal Compliance TRID Defect TRID Initial Closing Disclosure Timing without Waiver TILA-RESPA Integrated Disclosure: Closing Disclosure not provided to Borrower(s) at least three (3) business days prior to closing. Initial CD issued [Redacted] was e-signed [Redacted] prior to [Redacted] closing date.  No evidence in file that the initial CD was received by the borrower 3+ days prior to closing.       Reviewer Comment (2025-05-22): ComplianceEase report confirms receipt date


Buyer Comment (2025-05-22): Please see page 18 of the uploaded ComplianceEase indicating initial CD receipt date of [Redacted].
05/22/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395479   3158548401   33471360     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Survey Fee.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Insufficient or no cure was provided to the borrower. The Survey fee was not previously disclosed to the borrower on the Loan estimate but it appeared on the closing disclosure as $[Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-29): [Redacted] received Post CD and LOX.


Buyer Comment (2025-05-28): Please review uploaded LOE and PCCD.
05/29/2025     1 C A C A C A C A C A   GA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395481   3158548403   33476779     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Appraisal sent on [Redacted].  Default receipt date is [Redacted], which is less than 3 business days prior to Note date ([Redacted]).  Neither compliant borrower's acknowledgment of receipt nor waiver of delivery timing requirements provided.       Reviewer Comment (2025-05-20): appraisal acknowledgement received


Buyer Comment (2025-05-20): Please review uploaded appraisal acknowledgement.
05/20/2025     1 B A B A B A B A B A   CA Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395489   3158548414   33497709     Compliance Compliance Federal Compliance RESPA RESPA -  Initial Escrow Account statement Inaccurate RESPA: Initial escrow account statement does not match charges on HUD-1/Final Closing Disclosure. The amounts in section G and the subtotal for the section changed on the Post close CDs and the Initial Escrow Account Disclosure was not corrected  and re-issued.       Reviewer Comment (2025-05-28): tax info sheet received


Buyer Comment (2025-05-28): Please see Tax Info Sheet in lieu of the IEADS.
05/28/2025     1 B A B A B A B A B A   WA Primary Refinance - Rate/Term If the IEAD is correct and the CD/HUD is incorrect, we require a corrected PCCD/HUD with LOE to borrower to cure. Signature is not required.
If the CD/HUD is correct and the IEAD is incorrect, we require LOE and corrected IEAD to cure. Signature is not required.
B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395489   3158548414   33498743     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-21): Sufficient Cure Provided At Closing
  05/21/2025   1 A A A A A A A A A A   WA Primary Refinance - Rate/Term Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395489   3158548414   33498744     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Verification Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-21): Sufficient Cure Provided At Closing
  05/21/2025   1 A A A A A A A A A A   WA Primary Refinance - Rate/Term Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395490   3158548415   33484600     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Copy of Appraisal Report dated [Redacted], missing evidence of receipt.       Reviewer Comment (2025-05-20): appraisal receipt received


Buyer Comment (2025-05-20): Please review Appraisal receipt attached, originally in file
05/20/2025     1 B A B A B A B A B A   FL Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395490   3158548415   33484642     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   FL Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395490   3158548415   33484643     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Desk Review Fee.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   FL Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395492   3158548419   33473690     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Neither evidence of appraisal delivery nor compliant acknowledgment of receipt signed at closing provided.       Reviewer Comment (2025-05-19): appraisal receipt received


Buyer Comment (2025-05-19): Appraisal receipt attached
05/19/2025     1 B A B A B A B A B A   TX Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395494   3158548422   33471485     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Second Appraisal Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-16): Sufficient Cure Provided At Closing
  05/16/2025   1 A A A A A A A A A A   SC Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395494   3158548422   33471486     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Re-Inspection Fee.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-16): Sufficient Cure Provided At Closing
  05/16/2025   1 A A A A A A A A A A   SC Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395494   3158548422   33471487     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Management Company (Service Fee).  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-16): Sufficient Cure Provided At Closing
  05/16/2025   1 A A A A A A A A A A   SC Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395496   3158548424   33479775     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $-[Redacted]  exceeds tolerance of $-[Redacted] . Insufficient or no cure was provided to the borrower. The Lender Credit changed to $-[Redacted] on the Closing Disclosure dated [Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-06-02): PCCD, refund check, LOX, and proof of mailing has been received


Buyer Comment (2025-06-02): Please review evidence of cure attached: PCCD, refund, proof of delivery and letter to borrower


Reviewer Comment (2025-05-28): [Redacted] received rebuttal, However, if the creditor subsequently reduces the specific lender credit by $[Redacted] because the Title - Archive fee and Closing Coordination fee removed by $[Redacted] and added the Title - Transaction Mgmt. fee of $[Redacted] on CD dated [Redacted], then the creditor has a zero-tolerance standard violation because, although the amount of the Title fees are decreased, the amount of the lender credit decreased. (Comment 19(e)(3)(i)-5). Cure would be required. Lender credit is separate fee and is tested separately. No valid changed circumstance provided for the fees were removed and reduction in lender credit. Cure with Corrected CD, LOE to borrower, copy of cure refund for $[Redacted] and proof of mailing.


Buyer Comment (2025-05-27): Please review Lender letter of explanation attached


Reviewer Comment (2025-05-21): [Redacted] received rebuttal comment, however, the fee lender credit decreases of $[Redacted] from $[Redacted] on initial CD dated [Redacted] without VCC's. Provide valid COC for the lender credit decreased on [Redacted] CD or Cure is required to borrower. Cure consists of corrected CD, LOE to borrower, proof of mailing, and copy of refund check.


Buyer Comment (2025-05-20): Do not concur- the Line Level Credit decreased on the Final CD as the fee(s) was not charged to the borrower, this is acceptable
  06/02/2025   2 C B C B C B C B C B   NJ Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395499   3158548427   33475349     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Evidence of primary appraisal delivery to the borrower was not located in the file.       Reviewer Comment (2025-05-19): appraisal receipt received


Buyer Comment (2025-05-19): Appraisal receipt attached
05/19/2025     1 B A B A B A B A B A   CA Second Home Refinance - Rate/Term   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395503   3158548433   33484950     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Product Exception Form in file for lender exceptions of DTI.  Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-20): Exception approved, with comp factors.
    05/20/2025 2 B B B B B B B B B B   MT Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395503   3158548433   33485391     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Copy of Appraisal Report dated [Redacted], missing evidence of receipt.       Reviewer Comment (2025-05-21): appraisal acknowledgement form received


Buyer Comment (2025-05-21): Appraisal receipt attached
05/21/2025     1 B A B A B A B A B A   MT Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395503   3158548433   33485426     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and [Redacted](e) of [Redacted]% moderately exceeds the guideline maximum of [Redacted]%. (DTI Exception is eligible to be regraded with compensating factors.) Universal Product Exception Form in file for lender exceptions of DTI.  Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-20): Exception approved, with comp factors.
    05/20/2025 2 B B B B B B B B B B   MT Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395505   3158548438   33479578     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Neither evidence of appraisal delivery nor compliant acknowledgment of receipt signed at closing provided.       Reviewer Comment (2025-05-20): appraisal receipt received


Buyer Comment (2025-05-20): Appraisal receipt attached
05/20/2025     1 B A B A B A B A B A   CA Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395505   3158548438   33484812     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   CA Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395508   3158548444   33470876     Credit Credit Credit Documentation Guideline Missing Document: Verification of Rent (VOR) / Verification of Mortgage (VOM) not provided   File is missing a copy of Verification of Rent document       Reviewer Comment (2025-05-19): per applicable guidelines and the DU report in file, rental history was not required


Buyer Comment (2025-05-19): Do not concur. [Redacted] Jumbo AUS guidelines state when a rental history is required by the respective Agency based on AUS method, the rental history must meet [Redacted] housing payment history requirements. The DU Findings in file are not requiring a rental history.
05/19/2025     1 C A C A C A C A C A   CA Primary Purchase   C A C A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395509   3158548445   33479506     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Verification appraisal was delivered to borrower was not provided.       Reviewer Comment (2025-05-20): appraisal receipt received


Buyer Comment (2025-05-20): Appraisal receipt attached, originally in file
05/20/2025     1 B A B A B A B A B A   SC Second Home Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395509   3158548445   33479508     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   SC Second Home Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395511   3158548447   33473055     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   The Note amount is $[Redacted], and the estimated cost new is not disclosed on the appraisal.  Based on hazard insurance coverage of $[Redacted], plus extended coverage of $[Redacted] ([Redacted]%), for total coverage of $[Redacted], the loan is short of the required coverage by $[Redacted]. An Insurer's Replacement Cost Estimate was not in file.       Reviewer Comment (2025-05-19): HOI document received shows [Redacted]% replacement cost


Buyer Comment (2025-05-19): Do not concur- Homeowner's Ins includes Replacement Cost: [Redacted]% replacement, this is acceptable coverage
05/19/2025     1 C A C A C A C A C A   MO Primary Purchase   C A C A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395518   3158548458   33471890     Credit Credit Credit Documentation Guideline Missing Document: Verification of Rent (VOR) / Verification of Mortgage (VOM) not provided   Verification of 12 months housing history required per guidelines.  Verification was not provided.       Reviewer Comment (2025-05-19): per guidelines and the DU report in file, rental history is not required.


Buyer Comment (2025-05-19): Do not concur. [Redacted] Jumbo AUS guidelines state when a rental history is required by the respective Agency based on AUS method, the rental history must meet [Redacted] housing payment history requirements. The DU Findings in file are not requiring a rental history.
05/19/2025     1 C A C A C A C A C A   PA Primary Purchase   C A C A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395519   3158548459   33473562     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. No documentation in file to evidence delivery of the appraisal to the borrowers.       Reviewer Comment (2025-05-19): appraisal receipt received


Buyer Comment (2025-05-19): Please see receipt of the Appraisal
05/19/2025     1 B A B A B A B A B A   TN Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395522   3158548464   33478106     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Appraisal Not Provided at or Before Closing (3-Day Waiver In File) ECOA Valuations Rule (Dodd-Frank 2014): Borrower waived right to receive a copy of the appraisal at least three (3) business days prior to closing, and appraisal was not provided at or before closing. Verification appraisal was delivered to borrower was not provided.       Reviewer Comment (2025-05-20): confirmation of appraisal delivery received


Buyer Comment (2025-05-20): DO Not Concur - letter to borrower in file confirming mailing
05/20/2025     1 B A B A B A B A B A   VA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395522   3158548464   33478108     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. The  Credit Report Fee was previously disclosed to the borrower on the Loan estimate as $[Redacted]  but it increased  on the closing disclosure as $[Redacted]  with no valid Change of Circumstance found in file and no evidence of a tolerance cure provided.       Reviewer Comment (2025-05-21): Upon further review consumer within [Redacted]% tolerance requirements.


Buyer Comment (2025-05-20): Do Not Concur - please review verbiage on page 3 of LE / Construction Loan
05/21/2025     1 C A C A C A C A C A   VA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395523   3158548465   33488205     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Second Appraisal Fee.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-20): Sufficient Cure Provided At Closing
  05/20/2025   1 A A A A A A A A A A   MI Primary Purchase Final CD evidences Cure C A C A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395523   3158548465   33490485     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   The Note amount is $[Redacted] and the appraisal indicated the estimated cost new is $[Redacted].  Based on hazard insurance coverage of $[Redacted], the loan is short of the required coverage by $[Redacted]. An Insurer's Replacement Cost Estimate was not in file.  The insurance policy does state there is "extended coverage", however, there is no evidence of the dollar amount or percentage of coverage.       Reviewer Comment (2025-05-22): RCE received and the HOI coverage is sufficient


Buyer Comment (2025-05-22): Do Not Concur - please review RCE


Reviewer Comment (2025-05-21): document received is not an RCE, please resubmit


Buyer Comment (2025-05-21): Do Not Concur -please review replacement cost estimator
05/22/2025     1 C A C A C A C A C A   MI Primary Purchase   C A C A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395525   3158548467   33491377     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Expanded Approval and Exception Form in file for lender exception of DTI exceeding guidelines. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-21): Exception approved, with comp factors.
    05/21/2025 2 B B B B B B B B B B   TX Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395525   3158548467   33491383     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. Waterfall finding due to DTI exceeding guideline, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-21): Loan is SHQM (APOR).
05/21/2025     1 B A C A B A C A B A   TX Primary Purchase Lender to provide updated ATR/QM status C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395525   3158548467   33493033     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and [Redacted](e) of [Redacted]% significantly exceeds the guideline maximum of [Redacted]%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) Waterfall finding due to DTI exceeding guideline. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-21): Exception approved, with comp factors.
    05/21/2025 2 B B B B B B B B B B   TX Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395526   3158548469   33480205     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to points/fees failure, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-20): compliance test report received
05/20/2025     1 B A C A B A C A B A   WA Primary Purchase Lender to provide updated ATR/QM status C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395526   3158548469   33480206     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of [Redacted]% is in excess of the allowable maximum of  [Redacted]% of the Federal Total Loan Amount. Points and Fees total $[Redacted] on a Federal Total Loan Amount of $[Redacted] vs. an allowable total of $[Redacted] (an overage of $[Redacted] or [Redacted]%). The loan file is missing the undiscounted rate and undiscounted rate price (in points) to further test the loan for bona fide points and fees.       Reviewer Comment (2025-05-20): compliance test report received


Buyer Comment (2025-05-20): Do Not Concur - lender test in file confirming undiscounted rate
05/20/2025     1 C A C A C A C A C A   WA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395527   3158548470   33482707     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Copy of Appraisal Report dated [Redacted], missing evidence of receipt.       Reviewer Comment (2025-05-19): initial appraisal provided to the borrower, subsequent appraisal had no material difference
    05/19/2025 2 B B B B B B B B B B   NC Second Home Purchase   B B A A B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395529   3158548473   33485503     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - ___ Missing Property Tax Verification for [Redacted] property       Reviewer Comment (2025-05-21): tax doc for REO property received


Buyer Comment (2025-05-21): DO Not Concur -Tax detail for [Redacted]


Reviewer Comment (2025-05-21): tax docs received are for the subject property (on same street) as the REO property.  need tax verification for the REO property


Buyer Comment (2025-05-21): Do Not Concur - tax info in file
05/21/2025     1 C A C A C A C A C A   IL Primary Purchase   C A C A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395531   3158548482   33476671     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-16): Sufficient Cure Provided At Closing
  05/16/2025   1 A A A A A A A A A A   IL Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395533   3158548486   33480823     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Evidence of primary appraisal delivery to the borrower was not located in the file.       Reviewer Comment (2025-05-20): appraisal acknowledgement received


Buyer Comment (2025-05-20): See attached Appraisal Acknowledgment
05/20/2025     1 B A B A B A B A B A   MA Second Home Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395536   3158548489   33479761     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Copy of Appraisal Report dated [Redacted], missing evidence of receipt.       Reviewer Comment (2025-05-20): appraisal acknowledgement received


Buyer Comment (2025-05-20): See attached Appraisal Acknowledgment
05/20/2025     1 B A B A B A B A B A   TN Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395536   3158548489   33479763     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   TN Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395536   3158548489   33479764     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Verification Of Employment Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   TN Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395536   3158548489   33479765     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Transfer Tax.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   TN Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395537   3158548490   33488005     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Evidence of primary appraisal delivery to the borrower was not located in the file.       Reviewer Comment (2025-05-21): proof of electronic delivery of appraisal received


Buyer Comment (2025-05-21): Do Not Concur - please review appraisal ack.
05/21/2025     1 B A B A B A B A B A   FL Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395542   3158548499   33481634     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Neither evidence of appraisal delivery nor compliant acknowledgment of receipt signed at closing provided.       Reviewer Comment (2025-05-21): appraisal acknowledgement in file


Buyer Comment (2025-05-21): Do Not Concur - please review acknowledgement
05/21/2025     1 B A B A B A B A B A   CA Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395542   3158548499   33485508     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   CA Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395543   3158548502   33481164     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Copy of Appraisal Report dated [Redacted], missing evidence of receipt.       Reviewer Comment (2025-05-20): document received is a "reconsideration of value disclosure", we are looking for evidence of delivery of the appraisal to the borrower.


Buyer Comment (2025-05-20): Please review confirmation in file
05/20/2025     1 B A B A B A B A B A   OR Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395543   3158548502   33481344     Credit Income / Employment Income Documentation Income / Employment Income documentation requirements not met.   Missing third party verification proof of self-employment for Borrower's S-Corp.       Reviewer Comment (2025-06-04): third party verification of the business has been received


Buyer Comment (2025-06-04): Please see attached OR secretary of state business registry showing business has been active since [Redacted] and next renewal is [Redacted].


Reviewer Comment (2025-05-20): we do already have the tax returns, K-1's, W-2's to verify the income.  we are looking for recent third party verification of employment / verification that the business is still active, within 30 days prior to closing.


Buyer Comment (2025-05-20): Do Not Concur -please review W2's and tax returns
06/04/2025     1 C A C A C A C A C A   OR Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395543   3158548502   33481348     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to missing third party verification for Borrower's S-Corp, resulting in a loan designation discrepancy.       Reviewer Comment (2025-06-04): third party verification of the business has been received
06/04/2025     1 B A C A B A C A B A   OR Primary Purchase Lender to provide updated ATR/QM status C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395543   3158548502   33481349     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Employment - S-Corp General QM: Unable to verify current S-Corp status using reasonably reliable third-party records. Waterfall finding due to missing third party verification for Borrower's S-Corp.       Reviewer Comment (2025-06-04): third party verification of the business has been received
06/04/2025     1 C A C A C A C A C A   OR Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395543   3158548502   33481350     Compliance Compliance Federal Compliance ATR/QM Defect Income/Asset Guideline Deficiency - QM Impact General QM:  There are guideline deficiencies related to income and/or asset doc requirements which could result in a risk to the borrower's ability to repay.  (Exception is eligible to be regraded with compensating factors.) Waterfall finding due to missing third party verification for Borrower's S-Corp.       Reviewer Comment (2025-06-04): third party verification of the business has been received
06/04/2025     1 C A C A C A C A C A   OR Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395543   3158548502   33481362     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to missing third party verification for Borrower's S-Corp, resulting in a loan designation discrepancy.       Reviewer Comment (2025-06-04): third party verification of the business has been received
06/04/2025     1 C A C A C A C A C A   OR Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395544   3158548503   33483726     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Copy of Appraisal Report dated [Redacted], missing evidence of receipt.       Reviewer Comment (2025-05-21): appraisal ack form received, D0722


Buyer Comment (2025-05-21): Do Not Concur - doc in file
05/21/2025     1 B A B A B A B A B A   MA Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395545   3158548505   33481553     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Copy of Appraisal Report dated [Redacted], missing evidence of receipt.       Reviewer Comment (2025-05-20): appraisal acknowledgement received


Buyer Comment (2025-05-20): See attached Appraisal acknowledgment.
05/20/2025     1 B A B A B A B A B A   NJ Second Home Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395548   3158548513   33479147     Property Property - Appraisal Appraisal Documentation Property - Appraisal Loan is to be securitized. Secondary  valuation is missing. Sec ID: 2   For securitization requirements, a secondary valuation review product is required, which supports original appraised value. The UCDP in file had a risk score of [Redacted], which does not meet securitization requirements       Reviewer Comment (2025-05-21): acceptable AVM received


Buyer Comment (2025-05-21): See attached AVM
05/21/2025     1 D A D A D A D A D A   WA Primary Purchase   D A A A A A D A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395550   3158548519   33498174     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for lender exception for blind trust approved.  Exception approved with comp factors. Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than 3 years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The qualifying DTI on the loan is at least [Redacted]% less than the guideline maximum.

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-21): Universal Product Exception Form in file, exception approved with comp factors.
    05/21/2025 2 B B B B B B B B B B   CA Primary Purchase   B B B B A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395551   3158548520   33479591     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   CA Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395551   3158548520   33481996     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Copy of Appraisal Report dated [Redacted], missing evidence of receipt.       Reviewer Comment (2025-05-21): appraisal acknowledgement received


Buyer Comment (2025-05-21): Please see receipt of Appraisal
05/21/2025     1 B A B A B A B A B A   CA Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395553   3158548522   33494147     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing. The Recording fee was previously disclosed to the borrower on the Loan estimate as $[Redacted]  but it increased  on the closing disclosure as $[Redacted]  with no cure provided to the borrower.  Insufficient or no cure was provided to the borrower.       Reviewer Comment (2025-05-21): Sufficient Cure Provided At Closing
  05/21/2025   1 A A A A A A A A A A   GA Primary Purchase Final CD evidences Cure B B B B A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395553   3158548522   33496803     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for lender exception for income calculation.  Exception approved, with comp factors. Borrower has verified disposable income of at least $[Redacted].

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-21): Universal Product Exception Form in file, exception approved with comp factors.
    05/21/2025 2 B B B B B B B B B B   GA Primary Purchase   B B B B A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395554   3158548524   33489168     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Re-Inspection Fee.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-20): Sufficient Cure Provided At Closing
  05/20/2025   1 A A A A A A A A A A   GA Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395555   3158548526   33477800     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   TN Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395555   3158548526   33477801     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Verification Of Employment Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   TN Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395558   3158548530   33487484     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Neither evidence of delivery of updated appraisal nor compliant acknowledgment of receipt signed at closing provided.       Reviewer Comment (2025-05-21): proof of e-delivery of appraisal received, D1347


Buyer Comment (2025-05-21): Please see receipt of Appraisal.
05/21/2025     1 B A B A B A B A B A   NJ Primary Purchase   C A C A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395558   3158548530   33487563     Credit Title Document Error Title The Preliminary/Commitment does not reflect a coverage amount (no final title policy in file). Unable to determine if appropriate coverage is provided. Title Evidence: ___
State: ___
The proposed amount of the lender's policy is not disclosed on the title commitment.  The final title policy is not provided.       Reviewer Comment (2025-05-21): title affidavit confirms correct coverage amount


Buyer Comment (2025-05-21): Please see Affidavit of Title which reflects the coverage amount.
05/21/2025     1 C A C A C A C A C A   NJ Primary Purchase   C A C A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395559   3158548534   33488703     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Neither evidence of appraisal delivery nor compliant acknowledgment of receipt signed at closing provided.       Reviewer Comment (2025-05-21): appraisal acknowledgment form received


Buyer Comment (2025-05-21): Please see receipt of appraisal
05/21/2025     1 B A B A B A B A B A   TX Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395559   3158548534   33488706     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-20): Sufficient Cure Provided At Closing
  05/20/2025   1 A A A A A A A A A A   TX Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395560   3158548536   33479513     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Verification appraisal was delivered to borrower on the note date is in the file, however, there is no 3-day waiver in file for delivery this close to the note date.       Reviewer Comment (2025-05-21): proof of appraisal receipt received


Buyer Comment (2025-05-21): see attached receipt of Appraisal
05/21/2025     1 B A B A B A B A B A   NV Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395560   3158548536   33479911     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-19): Sufficient Cure Provided At Closing
  05/19/2025   1 A A A A A A A A A A   NV Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395561   3158548537   33496646     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. Fee was disclosed as $[Redacted] on the initial Loan Estimate but disclosed as $[Redacted] on the Final Closing Disclosure.  A valid change of circumstance is not provided for fee increase and no evidence of tolerance cure is provided.       Reviewer Comment (2025-05-28): Program change to Jumbo product and higher cost appraisal


Buyer Comment (2025-05-27): Please re-review initially approved as TBD loan program.  The loan was locked on [Redacted] as a Jumbo product loan program, attached valid change in circumstance form [Redacted] Jumbo loan Appraisals typically cost $[Redacted] accompanied by Loan Estimate Issued [Redacted] with increase in Appraisal fee.


Reviewer Comment (2025-05-26): [Redacted] received LOE for increase in appraisal fee from $[Redacted] to $[Redacted] due to change in loan product and loam amount change but the loan amount was unchanged and remains same on LE dated [Redacted] and [Redacted] also, jumbo product is loan amount dependent which seems no new information received to lender as loan amount is not changed. Please provide more information on change or cure will be required.


Buyer Comment (2025-05-22): Please see attached LOX for the Appraisal fee increase due to the product and loan amount.
05/28/2025     1 C A C A C A C A C A   TX Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395562   3158548538   33488837     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Verification appraisal was delivered to borrower was not provided.       Reviewer Comment (2025-05-21): proof of e-delivery of appraisal has been received


Buyer Comment (2025-05-21): see attached receipt of appraisal
05/21/2025     1 B A B A B A B A B A   FL Second Home Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395564   3158548540   33492385     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Will Not Have Escrow - Escrow Waiver Fee TILA-RESPA Integrated Disclosure - Loan Disclosures: Final Closing Disclosure provided on [Redacted]  did not disclose the Escrow Waiver Fee. Page 4 of Final CD does not disclose an Escrow Waiver Fee amount and page 2 of the CD indicates the escrow waiver fee is $[Redacted].       Reviewer Comment (2025-06-04): PCCD and LOX sent to borrower with corrected info for the escrow waiver fee has been received


Buyer Comment (2025-06-04): Please review uploaded PCCD and LOE.


Buyer Comment (2025-06-04): .
  06/04/2025   2 C B C B C B C B C B   TX Primary Purchase Letter of Explanation & Corrected Closing Disclosure C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395565   3158548541   33496700     Property Property - Appraisal Appraisal Documentation Property - Appraisal Loan is to be securitized. Secondary  valuation is missing. Sec ID: 2   For securitization requirements, a secondary valuation review product is required, which supports original appraised value. The UCDP in file had a risk score of [Redacted], which does not meet securitization requirements.       Reviewer Comment (2025-05-27): CDA supporting the appraised value has been received


Buyer Comment (2025-05-27): Please review CDA
05/27/2025     1 D A D A D A D A D A   TX Primary Refinance - Cash-out - Other   D A A A A A D A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395566   3158548542   33480808     Property Property - Appraisal Appraisal Documentation Property - Appraisal Missing Document: Appraisal was made "subject to" and Form 1004D/442 was not provided. -         Reviewer Comment (2025-05-23): 1004D received and acceptable


Buyer Comment (2025-05-23): Please review uploaded 1004D.
05/23/2025     1 C A C A C A C A C A   MO Primary Purchase   C A A A B A C A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395566   3158548542   33481168     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Verification appraisal was delivered to borrower was not provided.       Reviewer Comment (2025-05-21): proof or e-delivery of appraisal received


Buyer Comment (2025-05-21): See attached receipt of appraisal
05/21/2025     1 B A B A B A B A B A   MO Primary Purchase   C A A A B A C A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395567   3158548543   33496155     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-21): Sufficient Cure Provided At Closing
  05/21/2025   1 A A A A A A A A A A   CO Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395568   3158548544   33486689     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure - 1026.19(f)(2) Cure TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower.         Reviewer Comment (2025-05-20): Sufficient Cure Provided within 60 Days of Closing
  05/20/2025   1 A A A A A A A A A A   MI Primary Purchase Provide the following: Letter of Explanation notifying borrower or error, Copy of Refund Check/Evidence of Principal Reduction, Corrected CD, and Proof of Delivery (if refund is over $35) A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395568   3158548544   33486690     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure - 1026.19(f)(2) Cure TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Tax Service Fee (Life Of Loan).  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Sufficient or excess cure was provided to the borrower.         Reviewer Comment (2025-05-20): Sufficient Cure Provided within 60 Days of Closing
  05/20/2025   1 A A A A A A A A A A   MI Primary Purchase Provide the following: Letter of Explanation notifying borrower or error, Copy of Refund Check/Evidence of Principal Reduction, Corrected CD, and Proof of Delivery (if refund is over $35) A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395571   3158548549   33479355     Credit Disclosure Missing Document Disclosure E-sign Consent Agreement is missing. - E-sign document was not provided in the file.       Reviewer Comment (2025-05-21): e-consent form received


Buyer Comment (2025-05-21): See attached e-Consent.
05/21/2025     1 C A C A C A C A C A   CA Primary Purchase   C A C A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395572   3158548550   33490853     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-20): Sufficient Cure Provided At Closing
  05/20/2025   1 A A A A A A A A A A   NY Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395576   3158548556   33490937     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Evidence of primary appraisal delivery to the borrower was not located in the file.       Reviewer Comment (2025-05-22): proof of appraisal receipt received


Buyer Comment (2025-05-22): Do not concur - Proof of receipt was in file at time of review - Please review document uploaded
05/22/2025     1 B A B A B A B A B A   SC Second Home Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395577   3158548557   33498171     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing. Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted]. no excess cure was provided to the borrower at Closing.       Reviewer Comment (2025-05-21): Sufficient Cure Provided At Closing
  05/21/2025   1 A A A A A A A A A A   TX Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395579   3158548560   33486060     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Appraisal Not Provided at or Before Closing (3-Day Waiver In File) ECOA Valuations Rule (Dodd-Frank 2014): Borrower waived right to receive a copy of the appraisal at least three (3) business days prior to closing, and appraisal was not provided at or before closing. Evidence of primary appraisal delivery to the borrower was not located in the file.       Reviewer Comment (2025-05-22): email confirming appraisal received


Buyer Comment (2025-05-22): Do not concur - POR in file  - please review document uploaded
05/22/2025     1 B A B A B A B A B A   CA Primary Purchase   B A B A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395579   3158548560   33486062     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Review Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-20): Sufficient Cure Provided At Closing
  05/20/2025   1 A A A A A A A A A A   CA Primary Purchase Final CD evidences Cure B A B A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395579   3158548560   33486101     Credit Title General Title Title Policy Coverage is less than Original Loan Amount.   The Title Policy Amount of $[Redacted] is less than the note amount of $[Redacted] based on the Preliminary in file.       Reviewer Comment (2025-05-22): final title policy received


Buyer Comment (2025-05-22): Please review Title policy attached.
05/22/2025     1 B A B A B A B A B A   CA Primary Purchase   B A B A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395581   3158548563   33491662     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Service Charges.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-20): Sufficient Cure Provided At Closing
  05/20/2025   1 A A A A A A A A A A   TX Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395582   3158548566   33480756     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure - 1026.19(f)(2) Cure TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower.         Reviewer Comment (2025-05-19): Sufficient Cure Provided within 60 Days of Closing
  05/19/2025   1 A A A A A A A A A A   CA Primary Purchase Provide the following: Letter of Explanation notifying borrower or error, Copy of Refund Check/Evidence of Principal Reduction, Corrected CD, and Proof of Delivery (if refund is over $35) A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395584   3158548568   33488119     Compliance Compliance Federal Compliance TRID Defect TRID Revised Loan Estimate Timing Before Closing TILA-RESPA Integrated Disclosure: Revised Loan Estimate provided on [Redacted] not received by borrower at least four (4) business days prior to closing. No evidence of borrower receipt of the revised Loan Estimate provided on [Redacted] and the presumed receipt date would not have been at least 4 business days prior to closing.       Reviewer Comment (2025-05-22): Mavent report confirms receipt date


Buyer Comment (2025-05-22): Do not concur - Please see screen shot uploaded and page 5 of [Redacted] in file showinng LE issued [Redacted] was received on [Redacted]
05/22/2025     1 C A C A C A C A C A   OR Second Home Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395584   3158548568   33488121     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing. Credit Report Fee was last disclosed as $[Redacted] on LE but disclosed as $[Redacted] on Final Closing Disclosure.  File does not contain a valid COC for this fee, nor evidence of cure in file.       Reviewer Comment (2025-05-20): Sufficient Cure Provided At Closing
  05/20/2025   1 A A A A A A A A A A   OR Second Home Purchase Final CD evidences Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395585   3158548570   33493092     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Copy of Appraisal Report dated [Redacted], missing evidence of receipt.       Reviewer Comment (2025-05-22): appraisal acknowledgement form received


Buyer Comment (2025-05-22): Do not concur - POR was in file - please see document uploaded
05/22/2025     1 B A B A B A B A B A   TX Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395586   3158548572   33495951     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Evidence of primary appraisal delivery to the borrower was not located in the file.       Reviewer Comment (2025-05-27): proof of appraisal receipt received


Buyer Comment (2025-05-27): Please review POR
05/27/2025     1 B A B A B A B A B A   KY Primary Purchase   C B C B B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395586   3158548572   33496766     Credit Loan Package Documentation Application / Processing Loan Package Documentation Missing Document: Missing Final 1003           Reviewer Comment (2025-05-22): signed final 1003 received


Buyer Comment (2025-05-22): Do not concur - Final 1003 was in file was time of review - Please see document uploaded
05/22/2025     1 C A C A C A C A C A   KY Primary Purchase   C B C B B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395586   3158548572   33497340     Credit Loan Package Documentation Application / Processing Loan Package Documentation FEMA Disaster Issue: The subject property is located in a FEMA disaster that does not have a declared end date.     Property inspected post disaster but pre-FEMA declaration of disaster end date. Property inspected post disaster but pre-FEMA declaration of disaster end date. Date of disaster: [Redacted] SitusAMC Reviewer Comment (2025-05-21): PDI with inspection date of [Redacted] has been received showing no damage to the subject property. Disaster declaration does not currently have an end date.
    05/21/2025 2 B B B B B B B B B B   KY Primary Purchase   C B C B B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395587   3158548573   33485465     Credit Insurance Insurance Analysis Insurance Insufficient Coverage: Hazard insurance coverage amount is insufficient.   The Note amount is $[Redacted], and the appraisal did not provide the estimated cost new.  Based on hazard insurance coverage of $[Redacted], and no extended coverage, the loan is short of the required coverage by $[Redacted]. An Insurer's Replacement Cost Estimate was not in file.       Reviewer Comment (2025-05-22): upon further review the HOI coverage is sufficient


Buyer Comment (2025-05-22): The other structures included in the appraisal value are the porch, patio and pool.  Also, both dwelling and other structures have abbreviation "RC" showing on the policy declarations which is acceptable replacement cost verbiage.


Reviewer Comment (2025-05-22): Other Structures coverage is not typically considered acceptable, especially when this property has no separate structures from the main home on the property


Buyer Comment (2025-05-22): dDo not concur - The policy has an addiitonal $[Redacted] for other structures
05/22/2025     1 C A C A C A C A C A   TX Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395587   3158548573   33485471     Compliance Compliance Federal Compliance RESPA RESPA Disclosure - Affiliated Business Arrangement Disclosure Not Provided Within 3 Business Days of Application RESPA Disclosure Rule: Creditor did not provide Affiliated Business Arrangement Disclosure to applicant within three (3) business days of application. Creditor did not provide Affiliated Business Arrangement Disclosure to applicant within three (3) business days of application.       Reviewer Comment (2025-05-22): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-22): Do not concur - Please see disclosure tracking that was in file with correct application date of [Redacted]
05/22/2025     1 B A B A B A B A B A   TX Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395587   3158548573   33485472     Compliance Compliance Federal Compliance RESPA RESPA Disclosure - List of Homeownership Counseling Organizations Not Provided Within 3 Business Days of Application RESPA Disclosure Rule (Dodd-Frank 2014): List of Homeownership Counseling Organizations not provided to applicant within three (3) business days of application. List of Homeownership Counseling Organizations not provided to applicant within three (3) business days of application.       Reviewer Comment (2025-05-22): Evidence of when the LE was required to be created and delivered has been received.
05/22/2025     1 B A B A B A B A B A   TX Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395587   3158548573   33485473     Compliance Compliance Federal Compliance TRID Defect TRID Initial Loan Estimate Timing Electronically Provided TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the  application date of [Redacted]. The property was not identified  [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-22): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-22): Do not concur - Please see disclosure tracking that was in file with correct application date of [Redacted]
05/22/2025     1 C A C A C A C A C A   TX Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395588   3158548574   33486021     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Appraisal Not Provided at or Before Closing (3-Day Waiver In File) ECOA Valuations Rule (Dodd-Frank 2014): Borrower waived right to receive a copy of the appraisal at least three (3) business days prior to closing, and appraisal was not provided at or before closing. Borrower waived right to receive a copy of the appraisal at least three (3) business days prior to closing, and appraisal was not provided at or before closing.       Reviewer Comment (2025-05-23): appraisal notice form received


Buyer Comment (2025-05-23): Do not concur - proof of receipt was in file - please see upload
05/23/2025     1 B A B A B A B A B A   FL Second Home Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395589   3158548575   33488902     Credit Title General Title Title Policy Coverage is less than Original Loan Amount.           Reviewer Comment (2025-05-27): title policy received


Buyer Comment (2025-05-27): Please review Final title policy
05/27/2025     1 B A B A B A B A B A   FL Second Home Refinance - Rate/Term   B A B A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395591   3158548578   33490894     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - Missing verification of employment obtained no less than 10 calendar days prior to Note date.       Reviewer Comment (2025-05-23): paystub for VVOE received


Buyer Comment (2025-05-23): Do not concur - paystub in file within 15 days of closing used in lieu of VOE - see attached
05/23/2025     1 C A C A C A C A C A   NC Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395591   3158548578   33492312     Credit Income / Employment Income Documentation Income / Employment Income documentation requirements not met.   Missing verification of employment obtained no less than 10 calendar days prior to Note date. (Primary Borrower)       Reviewer Comment (2025-05-23): paystub for VVOE received


Buyer Comment (2025-05-23): Do not concur - paystub in file within 15 days of closing used in lieu of VOE - see upload
05/23/2025     1 C A C A C A C A C A   NC Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395591   3158548578   33492317     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - Missing verification of employment obtained no less than 10 calendar days prior to Note date.       Reviewer Comment (2025-05-23): paystub for VVOE received


Buyer Comment (2025-05-23): Do not concur - paystub in file within 15 days of closing used in lieu of VOE - see upload
05/23/2025     1 C A C A C A C A C A   NC Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395591   3158548578   33492323     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. Waterfall finding due to missing verification of employment obtained no less than 10 calendar days prior to Note date (Primary Borrower), resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-23): paystub for VVOE received


Buyer Comment (2025-05-23): Do not concur - paystub in file within 15 days of closing used in lieu of VOE - see upload
05/23/2025     1 B A C A B A C A B A   NC Primary Purchase Lender to provide updated ATR/QM status C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395591   3158548578   33492324     Compliance Compliance Federal Compliance ATR/QM Defect Income/Asset Guideline Deficiency - QM Impact General QM:  There are guideline deficiencies related to income and/or asset doc requirements which could result in a risk to the borrower's ability to repay.  (Exception is eligible to be regraded with compensating factors.) Waterfall finding due to missing verification of employment obtained no less than 10 calendar days prior to Note date (Primary Borrower).       Reviewer Comment (2025-05-23): paystub for VVOE received


Buyer Comment (2025-05-23): Do not concur - paystub in file within 15 days of closing used in lieu of VOE - see upload
05/23/2025     1 C A C A C A C A C A   NC Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395591   3158548578   33492328     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to missing verification of employment obtained no less than 10 calendar days prior to Note date (Primary Borrower).       Reviewer Comment (2025-05-23): paystub for VVOE received


Buyer Comment (2025-05-23): Do not concur - paystub in file within 15 days of closing used in lieu of VOE - see upload
05/23/2025     1 C A C A C A C A C A   NC Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395596   3158548586   33489794     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Copy of Appraisal Report dated [Redacted], missing evidence of receipt.       Reviewer Comment (2025-05-28): proof of appraisal receipt received


Buyer Comment (2025-05-28): Do not concur - Located POR that was in file at time of review
05/28/2025     1 B A B A B A B A B A   CA Second Home Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395597   3158548587   33491971     Compliance Compliance Federal Compliance RESPA RESPA Disclosure - Affiliated Business Arrangement Disclosure Not Provided Within 3 Business Days of Application RESPA Disclosure Rule: Creditor did not provide Affiliated Business Arrangement Disclosure to applicant within three (3) business days of application. Waterfall finding related to Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not concur - Please see FRF that was in file indicatting the application date was [Redacted]
05/23/2025     1 B A B A B A B A B A   GA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395597   3158548587   33491972     Compliance Compliance Federal Compliance RESPA RESPA Disclosure - List of Homeownership Counseling Organizations Not Provided Within 3 Business Days of Application RESPA Disclosure Rule (Dodd-Frank 2014): List of Homeownership Counseling Organizations not provided to applicant within three (3) business days of application. Waterfall finding related to Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not concur - Please see FRF that was in file indicatting the application date was [Redacted]
05/23/2025     1 B A B A B A B A B A   GA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395597   3158548587   33491973     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not concur - Please see FRF that was in file indicatting the application date was [Redacted]
05/23/2025     1 C A C A C A C A C A   GA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395599   3158548592   33485437     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Neither evidence of appraisal delivery nor compliant acknowledgment of receipt signed at closing provided.       Reviewer Comment (2025-05-23): appraisal acknowledgement received


Buyer Comment (2025-05-23): Do not concur - POR was in file at timeof review - please see attached
05/23/2025     1 B A B A B A B A B A   CA Primary Purchase   C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395599   3158548592   33485438     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $[Redacted] exceeds tolerance of $-[Redacted]. Insufficient or no cure was provided to the borrower. Lender Credit disclosed as -$[Redacted] on the Loan Estimate dated [Redacted] but disclosed as -$[Redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for credit decrease.  The cure provided at closing ($[Redacted]) is insufficient to address all tolerance violations.       Reviewer Comment (2025-05-27): [Redacted] received Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD.


Buyer Comment (2025-05-23): Do not concur - Please see refund docs - Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD that was in file at time of review
  05/27/2025   2 C B C B C B C B C B   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395599   3158548592   33485526     Compliance Compliance Federal Compliance TRID Defect TRID Initial Closing Disclosure Timing without Waiver TILA-RESPA Integrated Disclosure: Closing Disclosure not provided to Borrower(s) at least three (3) business days prior to closing. Evidence of actual receipt date of initial Closing Disclosure, issued on [Redacted], is not provided.  Default receipt date is [Redacted], which is less than 3 business days prior to the closing date ([Redacted]).       Reviewer Comment (2025-05-23): proof of initial CD receipt by borrower on [Redacted] received


Buyer Comment (2025-05-23): Do not concur - Please review ICD POR


Buyer Comment (2025-05-23): Do not concur - POR wa sin file at time of review - please see upload
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395599   3158548592   33516636     Compliance Compliance Federal Compliance TRID TRID Lender Credit Tolerance Violation With Sufficient Cure - 1026.19(f)(2) Cure TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $-[Redacted] exceeds tolerance of $-[Redacted]. Sufficient or excess cure was provided to the borrower.         Reviewer Comment (2025-05-27): Sufficient Cure Provided within 60 Days of Closing
  05/27/2025   1   A   A   A   A   A   CA Primary Purchase   C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395600   3158548596   33505680     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 C A C A C A C A C A   FL Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395602   3158548599   33506442     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Re-Inspection Fee.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Insufficient or no cure was provided to the borrower. The  Appraisal Re-Inspection Fee was not previously disclosed to the borrower on the Loan estimate but it appeared on the closing disclosure as $[Redacted] with no cure or valid COC provided to the borrower.       Reviewer Comment (2025-05-28): [Redacted] received COC dated [Redacted].


Buyer Comment (2025-05-27): Do Not Concur.  The appraiser indicated that appraisal is subject to completion, [Redacted] received the appraisal [Redacted], pls see CIC and system notes, LE with final inspection fee issued timely.
05/28/2025     1 C A C A C A C A C A   TX Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395602   3158548599   33513113     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and [Redacted](e) of [Redacted]% moderately exceeds the guideline maximum of [Redacted]%. (DTI Exception is eligible to be regraded with compensating factors.) Waterfall finding due to the DTI ratio moderately exceeding the guideline maximum of 43.00%. Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-26): Universal Product Exception Form in file, exception approved with comp factors.
    05/26/2025 2 B B B B B B B B B B   TX Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395602   3158548599   33513136     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Escalation Form in file for lender exceptions of the DTI Ratio. Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-26): Universal Product Exception Form in file, exception approved with comp factors.
    05/26/2025 2 B B B B B B B B B B   TX Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395603   3158548600   33508080     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall finding due to Initial Loan Estimate was used to verify Appraisal Disclosure date which was more than three (3) business days after the application date of [Redacted].       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the [Redacted] piece of TRID data) was received after the customer found the home they intended to purchase, the appraisal disclosure was issued timely.
05/28/2025     1 B A B A B A B A B A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395603   3158548600   33508081     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Documentation in file indicates appraisal was sent on [Redacted]; however, there is no evidence of receipt and the presumed receipt date would not have been at least 3 business days prior to closing.       Reviewer Comment (2025-05-28): proof of e delivery of appraisal has been received


Buyer Comment (2025-05-28): Do Not Concur.  The appraisal was received electronically om [Redacted] and closing was on [Redacted].
05/28/2025     1 B A B A B A B A B A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395603   3158548600   33508099     Compliance Compliance Federal Compliance TRID Defect TRID Initial Closing Disclosure Timing without Waiver TILA-RESPA Integrated Disclosure: Closing Disclosure not provided to Borrower(s) at least three (3) business days prior to closing. Initial Closing Disclosure provided in the file dated [Redacted] was not signed and dated by the borrower to evidence receipt and the presumed receipt date would not have been at least 3 business days prior to closing.       Reviewer Comment (2025-05-28): proof of CD receipt by borrower has been received


Buyer Comment (2025-05-28): Do Not Concur.  The CD issued on [Redacted] was also viewed electronically on [Redacted], pls see system screen snip.
05/28/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395603   3158548600   33508135     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $[Redacted] exceeds tolerance of $-[Redacted]. Insufficient or no cure was provided to the borrower. The Lender Credit changed to $[Redacted] on the Closure Disclosure dated [Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-28): [Redacted] received a valid COC.


Buyer Comment (2025-05-28): Do Not Concur.  Lender Credit was premium pricing and this changed when loan amount changed and pricing changed.  Please see system lock info and CICs for loan amount changes
05/28/2025     1 C A C A C A C A C A   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395603   3158548600   33508136     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than three (3) business days after the application date of [Redacted].       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/28/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395603   3158548600   33508163     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Loan Discount Points.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Insufficient or no cure was provided to the borrower. The Loan Discount Points fee changed to $[Redacted] on the Closure Disclosure dated [Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-28): [Redacted] received a valid COC.


Buyer Comment (2025-05-28): Do Not Concur.  Loan amount changed and pricing changed.  Please see system lock info and CICs for Loan Amount changes and Discount Points change
05/28/2025     1 C A C A C A C A C A   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395604   3158548602   33505310     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to missing reliable third-party employment verification for the self-employment income used to qualify, resulting in a loan designation discrepancy.       Reviewer Comment (2025-06-02): income and employment from this position is not required or utilized to approve the loan, loan still qualifies.
06/02/2025     1 B A C A B A C A B A   CO Primary Purchase Lender to provide updated ATR/QM status C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395604   3158548602   33505311     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Employment - Schedule C General QM: Unable to verify current Sole Proprietorship status using reasonably reliable third-party records. Waterfall finding due to missing reliable third-party employment verification for the self-employment income used to qualify       Reviewer Comment (2025-06-02): income and employment from this position is not required or utilized to approve the loan, loan still qualifies.
06/02/2025     1 C A C A C A C A C A   CO Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395604   3158548602   33505314     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than three (3) business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/27/2025     1 C A C A C A C A C A   CO Primary Purchase No Defined Cure C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395604   3158548602   33505316     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted]  exceeds tolerance of $[Redacted] .  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-22): Sufficient Cure Provided At Closing
  05/22/2025   1 A A A A A A A A A A   CO Primary Purchase Final CD evidences Cure C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395604   3158548602   33512624     Compliance Compliance Federal Compliance ATR/QM Defect Income/Asset Guideline Deficiency - QM Impact General QM:  There are guideline deficiencies related to income and/or asset doc requirements which could result in a risk to the borrower's ability to repay.  (Exception is eligible to be regraded with compensating factors.) Waterfall finding due to missing reliable third-party employment verification for the self-employment income used to qualify       Reviewer Comment (2025-06-02): income and employment from this position is not required or utilized to approve the loan, loan still qualifies.
06/02/2025     1 C A C A C A C A C A   CO Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395604   3158548602   33512629     Credit Income / Employment Income Documentation Income / Employment Income documentation requirements not met.   File is missing reliable third-party employment verification for the self-employment income used to qualify       Reviewer Comment (2025-06-02): income and employment from this position is not required or utilized to approve the loan, loan still qualifies.


Buyer Comment (2025-06-02): No voe needed income not needed
06/02/2025     1 C A C A C A C A C A   CO Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395604   3158548602   33512759     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to missing reliable third-party employment verification for the self-employment income used to qualify       Reviewer Comment (2025-06-02): income and employment from this position is not required or utilized to approve the loan, loan still qualifies.


Buyer Comment (2025-06-02): waterfall
06/02/2025     1 C A C A C A C A C A   CO Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395604   3158548602   33512799     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - File is missing reliable third-party employment verification for the self-employment income used to qualify       Reviewer Comment (2025-06-02): income and employment from this position is not required or utilized to approve the loan, loan still qualifies.


Buyer Comment (2025-06-02): This job is not used in the ratios
06/02/2025     1 C A C A C A C A C A   CO Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395605   3158548603   33505877     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. The Appraisal fee was previously disclosed to the borrower on the Loan estimate as $[Redacted]  but it increased  on the closing disclosure as $[Redacted].  A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[Redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-05-28): Sufficient cure provided. Full cure amount for tolerance violation was provided at or before closing (on final CD) resulting in a cleared exception.


Buyer Comment (2025-05-27): Do Not Concur.  Cure of $[Redacted] is for the Appraisal Fee increase from $[Redacted] to $[Redacted], Final Inspection has a valid CIC and did not need to also be cured.
05/28/2025     1 C A C A C A C A C A   CA Primary Refinance - Cash-out - Other Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395605   3158548603   33505878     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Re-Inspection Fee.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Insufficient or no cure was provided to the borrower. The Appraisal Re-Inspection Fee was not previously disclosed to the borrower on the Loan estimate but it appeared on the closing disclosure as $[Redacted]. A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[Redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-05-28): [Redacted] received COC dated [Redacted].


Buyer Comment (2025-05-27): Do Not Concur.  A final inspection was needed due to repairs.  Please see system notes and CIC, LE issued timely with Final Inspection Fee
05/28/2025     1 C A C A C A C A C A   CA Primary Refinance - Cash-out - Other Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395605   3158548603   33513297     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Total cash-out discrepancy. HUD-1 total cash-out of ___ is greater than Guideline total cash-out of ___. Universal Product Exception Form in file for lender exceptions for the amount of cashout.  Exception approved, with comp factors. The qualifying DTI on the loan is at least [Redacted]% less than the guideline maximum.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-23): Exception approved, with comp factors.
    05/23/2025 2 B B B B B B B B B B   CA Primary Refinance - Cash-out - Other   C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395605   3158548603   33513304     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for lender exceptions of vesting in an LLC.  Exception approved, with comp factors. The qualifying DTI on the loan is at least [Redacted]% less than the guideline maximum.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-23): Exception approved, with comp factors.
    05/23/2025 2 B B B B B B B B B B   CA Primary Refinance - Cash-out - Other   C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395605   3158548603   33526620     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-28): Sufficient Cure Provided At Closing
  05/28/2025   1   A   A   A   A   A   CA Primary Refinance - Cash-out - Other Final CD evidences Cure C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395606   3158548608   33515599     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and [Redacted](e) of [Redacted]% moderately exceeds the guideline maximum of [Redacted]%. (DTI Exception is eligible to be regraded with compensating factors.) Universal Product Exception Form in file for lender exception of DTI exceeding guideline. Exception approved with comp factors. Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Universal Product Exception Form in file, exception approved with comp factors.
    05/28/2025 2 B B B B B B B B B B   CA Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395606   3158548608   33515600     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-23): Sufficient Cure Provided At Closing
  05/23/2025   1 A A A A A A A A A A   CA Primary Purchase Final CD evidences Cure C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395606   3158548608   33515606     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Product Exception Form in file for lender exception of DTI exceeding guideline. Exception approved with comp factors. Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Universal Product Exception Form in file, exception approved with comp factors.
    05/28/2025 2 B B B B B B B B B B   CA Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395606   3158548608   33515615     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-29): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-29): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/29/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395606   3158548608   33527068     Credit Credit AUS Discrepancy / Guidelines Discrepancy Credit Guideline Requirement: Minimum Loan Amount discrepancy. Note loan amount of ___ is less than Guideline minimum loan amount of ___. Universal Product Exception Form in file for lender exception of loan amount less than guideline minimum. Exception approved with comp factors. Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Universal Product Exception Form in file, exception approved with comp factors.
    05/28/2025 2 B B B B B B B B B B   CA Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395606   3158548608   33527070     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for lender exception of annuitization income calc to allow the use of [Redacted]% of seasoned assets over [Redacted] months. Exception approved with comp factors. Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Universal Product Exception Form in file, exception approved with comp factors.
    05/28/2025 2 B B B B B B B B B B   CA Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395607   3158548612   33505603     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [redacted], which was more than 3 business days after the application date of [redacted].  The property was not identified on [redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 C A C A C A C A C A   FL Primary Purchase No Defined Cure C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395607   3158548612   33506179     Compliance Compliance Federal Compliance TRID Defect TRID Ten Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[redacted] exceeds tolerance of $[redacted] plus [redacted]% or $[redacted].  Insufficient or no cure was provided to the borrower. Recording Fee disclosed as $[redacted] on the initial Loan Estimate but disclosed as $[redacted] on the Final Closing Disclosure.  A valid change of circumstance is not provided for fee increase and no evidence of tolerance cure is provided.       Reviewer Comment (2025-06-02): [Redacted] received Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD.


Buyer Comment (2025-05-30): Please see attached PCCD, refund, and proof of shipping
  06/02/2025   2 C B C B C B C B C B   FL Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395607   3158548612   33506220     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $[redacted] exceeds tolerance of $-[redacted]. Insufficient or no cure was provided to the borrower. Lender Credit disclosed as -$[redacted] on the initial Loan Estimate but disclosed as $[redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for credit decrease and no evidence of tolerance cure provided.       Reviewer Comment (2025-05-27): [Redacted] Received Valid COC dated [Redacted].


Buyer Comment (2025-05-27): Do not Concur. Initial loan lock didnt occurr until [Redacted]. Premium pricing can change throught the loan process
05/27/2025     1 C A C A C A C A C A   FL Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395608   3158548613   33502417     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/23/2025     1 C A C A C A C A C A   OR Primary Purchase No Defined Cure C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395608   3158548613   33505179     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline AUS/Guideline Findings: All conditions were not met   Universal Product Exception Form in file for lender exception of thin credit file. Exception approved with comp factors. Borrower has verified disposable income of at least $[Redacted].

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The qualifying DTI on the loan is at least [Redacted]% less than the guideline maximum.

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-22): Exception approved, with comp factors.
    05/22/2025 2 B B B B B B B B B B   OR Primary Purchase   C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395609   3158548614   33497521     Property Property - Appraisal Appraisal Documentation Property - Appraisal Missing Document: Appraisal was made "subject to" and Form 1004D/442 was not provided. - Missing inspection required by appraiser.  The appraisal noted the purchase contract included a provision for a live wire in the basement to be capped off.  The appraiser is requiring an inspection from an electrician to resolve this issue.       Reviewer Comment (2025-05-28): work order and invoice confirming electrical work completed has been received


Buyer Comment (2025-05-28): see attached work order/invoice from [Redacted] to confirm that the live wire was removed
05/28/2025     1 C A C A C A C A C A   NY Primary Purchase   C A A A C A C A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395609   3158548614   33501601     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/23/2025     1 C A C A C A C A C A   NY Primary Purchase No Defined Cure C A A A C A C A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395610   3158548617   33504563     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than three (3) business days after the application date of [Redacted].       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/28/2025     1 C A C A C A C A C A   IL Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395611   3158548619   33495184     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 C A C A C A C A C A   NV Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395611   3158548619   33495185     Compliance Compliance Federal Compliance TRID Defect TRID Ten Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Insufficient or no cure was provided to the borrower. Recording Fee disclosed as $[Redacted] on the initial Loan Estimate but disclosed as $[Redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for fee increase.  The cure provided at closing ($[Redacted]) is sufficient to address the violation but is insufficient to address all tolerance violations.       Reviewer Comment (2025-05-27): Sufficient cure provided. Full cure amount for tolerance violation was provided at or before closing (on final CD) resulting in a cleared exception.


Buyer Comment (2025-05-23): Do not Concur. Section E tolerance violation is already cured at closing
05/27/2025     1 C A C A C A C A C A   NV Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395611   3158548619   33495186     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. Fee disclosed as $[Redacted] on the initial Loan Estimate but disclosed as $[Redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for fee increase.  The cure provided at closing ($[Redacted]) is insufficient to address all tolerance violations.       Reviewer Comment (2025-05-27): [Redacted] received COC dated [Redacted].


Buyer Comment (2025-05-23): Do not Concur. Property had complexity. Valid CIC [Redacted] and Lev3 disclosed timley next day
05/27/2025     1 C A C A C A C A C A   NV Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395611   3158548619   33516413     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-27): Sufficient Cure Provided At Closing
  05/27/2025   1   A   A   A   A   A   NV Primary Purchase Final CD evidences Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395612   3158548620   33507016     Compliance Compliance Federal Compliance RESPA RESPA Disclosure - Affiliated Business Arrangement Disclosure Not Provided Within 3 Business Days of Application RESPA Disclosure Rule: Creditor did not provide Affiliated Business Arrangement Disclosure to applicant within three (3) business days of application. RESPA Disclosure Rule: Creditor did not provide Affiliated Business Arrangement Disclosure to applicant within three (3) business days of application.       Reviewer Comment (2025-05-27): proof of disclosure sent to borrower has been received


Buyer Comment (2025-05-27): Do Not Concur.  The application achieved date was [Redacted], pls see disclosure dated [Redacted] included within the application package.
05/27/2025     1 B A B A B A B A B A   AZ Primary Refinance - Cash-out - Other   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395613   3158548623   33505867     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted]       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 C A C A C A C A C A   IL Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395613   3158548623   33505869     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Re-Inspection Fee.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Insufficient or no cure was provided to the borrower. The Appraisal Re-Inspection Fee was not previously disclosed to the borrower on the Loan estimate but it appeared on the closing disclosure as $[Redacted] with no cure provided to the borrower.       Reviewer Comment (2025-05-28): [Redacted] received valid COC dated [Redacted]


Buyer Comment (2025-05-27): Do not Concur. [Redacted] received appraisal and invoice same day valid CIC occurred. Per appraisal final inspection is required due to repairs needed. No violation
05/28/2025     1 C A C A C A C A C A   IL Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395614   3158548625   33505860     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall condition for Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Attached


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 B A B A B A B A B A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395614   3158548625   33505862     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted]. The property was not identified on [Redacted] however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Attached


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395615   3158548626   33502739     Credit Title General Title Title Policy Coverage is less than Original Loan Amount. The Title Policy Amount of ___ is less than the note amount of ___ based on the ___ in file. Per the supplemental title report proposed coverage amount is less than the loan amount. The final title policy is not provided for review.       Reviewer Comment (2025-05-27): final title policy received


Buyer Comment (2025-05-27): Final Title Policy Provided
05/27/2025     1 B A B A B A B A B A   CA Primary Purchase   C A B A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395615   3158548626   33505828     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A B A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395617   3158548629   33504447     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. Waterfall finding due to shortage of reserves, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-28): based on a re-review of the guidelines provided, there are sufficient assets and reserves verified in the file


Buyer Comment (2025-05-28): waterfall TI
05/28/2025     1 B A C A B A C A B A   WA Primary Refinance - Rate/Term Lender to provide updated ATR/QM status C A C A C A C A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395617   3158548629   33508635     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: PITIA reserves months discrepancy.   Based on asset documentation in file, verified assets total $[Redacted].  With funds required to bring to closing of $[Redacted], plus the appraisal fee of $[Redacted] POC,   total funds to be verified is $,[Redacted].  Additionally, guidelines require 24 months of reserves for this loan ($[Redacted]), and there are only [Redacted] months of reserves verified ($[Redacted]).  Loan was approved under Expanded DTI guidelines which require 24 mo. reserves from non-retirement assets; thus, the 401k account ($[Redacted]) is ineligible for use as reserves.       Reviewer Comment (2025-05-28): based on a re-review of the guidelines provided, there are sufficient assets and reserves verified in the file


Buyer Comment (2025-05-28): this loan falls under the High Asset Program which I have attached the old guides. The loan meets Core Segment since the reserves just need to meet the High Asset requirements and can be retirement assets.
05/28/2025     1 C A C A C A C A C A   WA Primary Refinance - Rate/Term   C A C A C A C A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395617   3158548629   33508636     Property Appraisal Reconciliation Value Discrepancy Appraisal Reconciliation Loan is to be securitized. Highest level secondary valuation does not support the value used to qualify. Sec ID: 7   For securitization requirements, a secondary valuation review product is required, which supports original appraised value.  The UCDP SSR in file had a risk score of [Redacted], which does not meet securitization requirements.  Collateral Desktop Analysis provided reflects Risk Score: Indeterminate and did not provide a value.       Reviewer Comment (2025-05-29): field review received, which supports the appraised value


Buyer Comment (2025-05-29): Please review
05/29/2025     1 C A C A C A C A C A   WA Primary Refinance - Rate/Term   C A C A C A C A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395617   3158548629   33508655     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to shortage of reserves.       Reviewer Comment (2025-05-28): based on a re-review of the guidelines provided, there are sufficient assets and reserves verified in the file
05/28/2025     1 C A C A C A C A C A   WA Primary Refinance - Rate/Term   C A C A C A C A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395618   3158548630   33501958     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted] however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/23/2025     1 C A C A C A C A C A   MI Primary Purchase No Defined Cure C C B B C C A A Safe Harbor QM (APOR) QM (APOR) Fail No
223395618   3158548630   33501980     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Loan Discount Points.  Fee Amount of $[Redacted]  exceeds tolerance of $[Redacted] .  Insufficient or no cure was provided to the borrower. Loan Discount Fee changed to $[Redacted] on the CD dated [Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-27): [Redacted] received COC dated [Redacted].


Buyer Comment (2025-05-23): Do Not Concur.  Please see CICs for discount point increase LEv4 issued timely.
05/27/2025     1 C A C A C A C A C A   MI Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C C B B C C A A Safe Harbor QM (APOR) QM (APOR) Fail Yes
223395618   3158548630   33502036     Credit Credit AUS Discrepancy / Guidelines Discrepancy Credit Guideline Requirement: Minimum Loan Amount discrepancy. Note loan amount of ___ is less than Guideline minimum loan amount of ___. $[Redacted] loan amount is below $[Redacted]. Universal Product Exception Form in file for lender exception for loan amount below the minimum (agency). Exception approved, with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted]  years.

Borrower has verified disposable income of at least $[Redacted] .

Borrower has worked in the same position for more than [Redacted]  years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted]  months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted] % and $[Redacted] .
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-22): Exception approved, with comp factors.
    05/22/2025 2 B B B B B B B B B B   MI Primary Purchase   C C B B C C A A Safe Harbor QM (APOR) QM (APOR) Fail No
223395618   3158548630   33502041     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for lender exception for PAG decline.  Exception approved, with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted]  years.

Borrower has verified disposable income of at least $[Redacted] .

Borrower has worked in the same position for more than [Redacted]  years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted]  months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted] % and $[Redacted] .
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-22): Exception approved, with comp factors.
    05/22/2025 2 B B B B B B B B B B   MI Primary Purchase   C C B B C C A A Safe Harbor QM (APOR) QM (APOR) Fail No
223395618   3158548630   33502058     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to QM Points & Fees, resulting in a loan designation discrepancy.       Buyer Comment (2025-06-02): After further review. The APR is [Redacted]% which allows the APOR of [Redacted]%, similar to a tolerance. The undiscounted rate is [Redacted]%.Take the undiscounted rate of [Redacted]% and subtract the APOR of [Redacted]%. That gives us a difference of only [Redacted]%. Meaning it can only exclude [Redacted]% of the loan amount from the QM test, but it excluded [Redacted]%.


Reviewer Comment (2025-06-02): If the rate was re-locked at Note rate of [Redacted]% on [Redacted], this corresponds with a [Redacted]% APOR rate for [Redacted] year loans.  The spread between undiscounted rate of [Redacted]% and APOR of [Redacted]% is [Redacted]%, which allows only 1 discount point to be excluded. (Exclude up to 1 bona fide discount point if the interest rate before the discount does not exceed the APOR for a comparable transaction by more than 2 percentage points)


Buyer Comment (2025-06-02): Do not Concur. Counter offer occurred on [Redacted]. The Counter Offer was to increase the rate to [Redacted]% which would lower points, allowing QM to pass. This matches the Note rate and closing docs. The effective date of that Lock is still[Redacted]. This lines up with the loan then going in to Suspense [Redacted] for fees too high to pass QM, resulting in the [Redacted] Counter Offer. The Lock-In Agreement signed by the borrowers [Redacted] was actually sent [Redacted].  Borrower 1 signed the document [Redacted], but borrower 2 signed it [Redacted] which is why the document signature date reflects [Redacted] (last of the 2 signatures).


Reviewer Comment (2025-06-01): While there are rate lock forms in file for locked rates of [Redacted]% and [Redacted]%, the file is missing a rate lock form for when the loan was re-locked at the Note rate of [Redacted]%.  Because we are missing this date, a lookback is being run between application date and closing date which uses the lowest APOR rate available in this timeframe.  The lowest in this timeframe is [Redacted]%.  The spread between undiscounted rate of [Redacted]% and APOR of [Redacted]% is [Redacted]%, which allows only 1 discount point to be excluded.  We need evidence of the rate lock date for the re-lock at the note rate of [Redacted]%.


Buyer Comment (2025-05-30): Please also see attached price adjustment details


Buyer Comment (2025-05-30): Please advise how bona fide amount of $[Redacted] was determined.
Loan amount of $[Redacted]
Test loan amount of $[Redacted] (amount financed)
The maximum amount allowed for exclusion is[Redacted]% of the loan amount ($[Redacted]) which is $[Redacted].
Total Points and fees amount of $[Redacted], excluding the maximum amount of bona fide discount points of $[Redacted], leaves the amount of $[Redacted] included in the test.
$[Redacted] is less than [Redacted]% ($[Redacted]) of the test loan amount of $[Redacted].


Reviewer Comment (2025-05-27): based on the undiscounted rate and rate price provided, we are able to determine $[Redacted] of the discount points are bona fide.  It appears that the screen shot provided indicates $3,800 was excluded as bona fide.  as of now, our testing indicates this loan exceeds the points and fees threshold.


Buyer Comment (2025-05-23): Do not Concur.  Please see QM docs
    06/02/2025 3 B B C C B B C C B B   MI Primary Purchase Lender to provide updated ATR/QM status C C B B C C A A Safe Harbor QM (APOR) QM (APOR) Fail Yes
223395618   3158548630   33502059     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of [Redacted] % is in excess of the allowable maximum of  [Redacted] % of the Federal Total Loan Amount. Points and Fees total $[Redacted]  on a Federal Total Loan Amount of $[Redacted]  vs. an allowable total of $[Redacted]  (an overage of $[Redacted] or [Redacted] %). Points and Fees on subject loan of [Redacted]% is in excess of the allowable maximum of [Redacted]% of the Federal Total Loan Amount. Points and Fees total $[Redacted] on a Federal Total Loan Amount of $[Redacted] vs. an allowable total of $[Redacted] (an overage of $[Redacted] or [Redacted]%).  The loan file is missing the undiscounted rate and undiscounted rate price (in points) to further test the loan for bona fide points and fees.       Buyer Comment (2025-06-02): After further review. The APR is [Redacted]% which allows the APOR of [Redacted]%, similar to a tolerance. The undiscounted rate is [Redacted]%.Take the undiscounted rate of [Redacted]% and subtract the APOR of [Redacted]%. That gives us a difference of only [Redacted]%. Meaning it can only exclude [Redacted]% of the loan amount from the QM test, but it excluded [Redacted]%.


Reviewer Comment (2025-06-02): If the rate was re-locked at Note rate of [Redacted]% on [Redacted], this corresponds with a[Redacted]% APOR rate for [Redacted] year loans.  The spread between undiscounted rate of [Redacted]% and APOR of [Redacted]% is [Redacted]%, which allows only 1 discount point to be excluded. (Exclude up to 1 bona fide discount point if the interest rate before the discount does not exceed the APOR for a comparable transaction by more than 2 percentage points)


Buyer Comment (2025-06-02): Do not Concur. Counter offer occurred on [Redacted]. The Counter Offer was to increase the rate to [Redacted]% which would lower points, allowing QM to pass. This matches the Note rate and closing docs. The effective date of that Lock is still [Redacted]. This lines up with the loan then going in to Suspense [Redacted] for fees too high to pass QM, resulting in the [Redacted] Counter Offer. The Lock-In Agreement signed by the borrowers [Redacted] was actually sent[Redacted].  Borrower 1 signed the document [Redacted], but borrower 2 signed it [Redacted] which is why the document signature date reflects[Redacted] (last of the 2 signatures).


Reviewer Comment (2025-05-27): based on the undiscounted rate and rate price provided, we are able to determine $[Redacted] of the discount points are bona fide.  It appears that the screen shot provided indicates $[Redacted] was excluded as bona fide.  as of now, our testing indicates this loan exceeds the points and fees threshold.


Buyer Comment (2025-05-23): Do not Concur.  Please see QM docs
    06/02/2025 3 C C C C C C C C C C   MI Primary Purchase   C C B B C C A A Safe Harbor QM (APOR) QM (APOR) Fail No
223395619   3158548633   33513362     Credit Income / Employment Income Documentation Income / Employment Income documentation requirements not met.   Missing valid verification of employment for co-borrower obtained within 10 business days of Note date.  The VVOE form provided lists contact name as '[Redacted]' ([Redacted]), which are [Redacted] employees.       Reviewer Comment (2025-05-27): VOE alternative docs in file
05/27/2025     1 C A C A C A C A C A   NY Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395619   3158548633   33513363     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - Missing valid verification of employment for co-borrower obtained within 10 business days of Note date.  The VVOE form provided lists contact name as '[Redacted]' ([Redacted]), which are [Redacted] employees.       Reviewer Comment (2025-05-27): VOE alternative docs in file


Buyer Comment (2025-05-27): Per Procedures VOE completed correctly
05/27/2025     1 C A C A C A C A C A   NY Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395619   3158548633   33513366     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - Missing valid verification of employment for co-borrower obtained within 10 business days of Note date.  The VVOE form provided lists contact name as '[Redacted]' ([Redacted]), which are [Redacted] employees.       Reviewer Comment (2025-05-27): VOE alternative docs in file


Buyer Comment (2025-05-27): Uploaded snippet of VOE procedures
05/27/2025     1 C A C A C A C A C A   NY Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395619   3158548633   33513378     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. Waterfall finding due to missing valid verification of employment for co-borrower obtained within 10 business days of Note date, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-27): VOE alternative docs in file
05/27/2025     1 B A C A B A C A B A   NY Primary Purchase Lender to provide updated ATR/QM status C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395619   3158548633   33513379     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to missing valid verification of employment for co-borrower obtained within 10 business days of Note date.       Reviewer Comment (2025-05-27): VOE alternative docs in file
05/27/2025     1 C A C A C A C A C A   NY Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395619   3158548633   33513380     Compliance Compliance Federal Compliance ATR/QM Defect Income/Asset Guideline Deficiency - QM Impact General QM:  There are guideline deficiencies related to income and/or asset doc requirements which could result in a risk to the borrower's ability to repay.  (Exception is eligible to be regraded with compensating factors.) Waterfall finding due to missing valid verification of employment for co-borrower obtained within 10 business days of Note date.       Reviewer Comment (2025-05-27): VOE alternative docs in file


Buyer Comment (2025-05-27): VOE completed according to procedures
05/27/2025     1 C A C A C A C A C A   NY Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395620   3158548634   33499108     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/23/2025     1 C A C A C A C A C A   NC Primary Purchase No Defined Cure C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395620   3158548634   33499138     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $-[Redacted] exceeds tolerance of $-[Redacted]. Insufficient or no cure was provided to the borrower. The Lender Credit fee changed to $[Redacted] on the CD dated [Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-27): [Redacted] received COC dated [Redacted] for rate lock.


Buyer Comment (2025-05-23): Do Not Concur.  Please see CICs for initial lock and rate change, LE issued timely with changes.
05/27/2025     1 C A C A C A C A C A   NC Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395620   3158548634   33504504     Credit Borrower and Mortgage Eligibility Mortgage / Program Eligibility Borrower and Mortgage Eligibility Guideline Requirement: Loan to value discrepancy. Calculated loan to value percentage of ___ exceeds Guideline loan to value percentage of ___. Universal Product Exception Form in file, exception approved with comp factors. Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-22): Universal Product Exception Form in file, exception approved with comp factors.
    05/22/2025 2 B B B B B B B B B B   NC Primary Purchase   C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395621   3158548636   33505607     Compliance Compliance Federal Compliance RESPA RESPA -  Initial Escrow Account statement Inaccurate RESPA: Initial escrow account statement does not match charges on HUD-1/Final Closing Disclosure. Initial escrow account statement does not match the information on page four of the Final CD.       Reviewer Comment (2025-05-27): upon further review, the final signed CD and the IEADS disclosure match


Buyer Comment (2025-05-27): Do Not Concur.  Please provide more detail because the initial escrow statement pulled does match the escrow payment on the signed CD, pls see uploaded docs.
05/27/2025     1 B A B A B A B A B A   UT Primary Refinance - Cash-out - Other If the IEAD is correct and the CD/HUD is incorrect, we require a corrected PCCD/HUD with LOE to borrower to cure. Signature is not required.
If the CD/HUD is correct and the IEAD is incorrect, we require LOE and corrected IEAD to cure. Signature is not required.
B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395622   3158548639   33506842     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to missing valid third party verification of self-employment for income used to qualify, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-27): verification of employment docs received
05/27/2025     1 B A C A B A C A B A   IL Primary Refinance - Cash-out - Other Lender to provide updated ATR/QM status C B C B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395622   3158548639   33506843     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Employment - Schedule C General QM: Unable to verify current Sole Proprietorship status using reasonably reliable third-party records. Waterfall finding due to missing valid third party verification of self-employment for income used to qualify.       Reviewer Comment (2025-05-27): verification of employment docs received
05/27/2025     1 C A C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B C B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395622   3158548639   33514114     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Total cash-out discrepancy. HUD-1 total cash-out of ___ is greater than Guideline total cash-out of ___. Universal Product Exception Form in file for lender exception of total cash-out exceeding guideline maximum. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-23): Exception approved, with comp factors.
    05/23/2025 2 B B B B B B B B B B   IL Primary Refinance - Cash-out - Other   C B C B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395622   3158548639   33514140     Credit Income / Employment Income Documentation Income / Employment Income documentation requirements not met.   Missing valid third party verification of self-employment for income used to qualify.       Reviewer Comment (2025-05-27): verification of employment docs received


Buyer Comment (2025-05-27): Third Party Verification provided
05/27/2025     1 C A C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B C B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395622   3158548639   33514141     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - Missing valid third party verification of self-employment for income used to qualify.       Reviewer Comment (2025-05-27): verification of employment docs received


Buyer Comment (2025-05-27): Verification Provided
05/27/2025     1 C A C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B C B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395622   3158548639   33514147     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to missing valid third party verification of self-employment for income used to qualify.       Reviewer Comment (2025-05-27): verification of employment docs received
05/27/2025     1 C A C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B C B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395622   3158548639   33514148     Compliance Compliance Federal Compliance ATR/QM Defect Income/Asset Guideline Deficiency - QM Impact General QM:  There are guideline deficiencies related to income and/or asset doc requirements which could result in a risk to the borrower's ability to repay.  (Exception is eligible to be regraded with compensating factors.) Waterfall finding due to missing valid third party verification of self-employment for income used to qualify.       Reviewer Comment (2025-05-27): verification of employment docs received
05/27/2025     1 C A C A C A C A C A   IL Primary Refinance - Cash-out - Other   C B C B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395625   3158548642   33506579     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 C A C A C A C A C A   NJ Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395625   3158548642   33506581     Compliance Compliance Federal Compliance TRID Defect TRID Ten Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Insufficient or no cure was provided to the borrower. Recording Fee disclosed as $[Redacted] on the initial Loan Estimate but disclosed as $[Redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for fee increase.  The cure provided at closing ($[Redacted]) is sufficient to address the violation but is insufficient to address all tolerance violations.       Reviewer Comment (2025-05-27): [Redacted]: Sufficient cure provided. Full cure amount for tolerance violation was provided at closing (on final CD) resulting in a cleared exception.


Buyer Comment (2025-05-23): Do not Concur. Section E tolerance violation is already cured at closing
05/27/2025     1 C A C A C A C A C A   NJ Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395625   3158548642   33506582     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Transfer Tax.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. Transfer Taxes disclosed as $[Redacted] on the initial Loan Estimate but disclosed as $[Redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for fee increase.  The cure provided at closing ($[Redacted]) is insufficient to address all tolerance violations.       Reviewer Comment (2025-05-27): [Redacted] received system snip with additional information for valid Changed circumstance.


Buyer Comment (2025-05-23): Do not Concur. Valid CIC for purchase price [Redacted]. ELv5 disclosed timely same day
05/27/2025     1 C A C A C A C A C A   NJ Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395625   3158548642   33516700     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-27): Sufficient Cure Provided At Closing
  05/27/2025   1   A   A   A   A   A   NJ Primary Purchase Final CD evidences Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395626   3158548644   33494939     Credit Disclosure Missing Document Disclosure E-sign Consent Agreement is missing. - The file is missing a copy of the E-Sign Consent Agreement.       Reviewer Comment (2025-05-23): e-consent form received


Buyer Comment (2025-05-23): E-Consent provided electronically
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395626   3158548644   33494972     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $-[Redacted] exceeds tolerance of $-[Redacted]. Insufficient or no cure was provided to the borrower. The Lender Credits changed to $-[Redacted] on the Closing Disclosure dated [Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-27): [Redacted] received COC dated [Redacted].


Buyer Comment (2025-05-23): Do not Concur. Loan closed with -$[Redacted] lender credits (prem pricing). Valid CICs for property type and appraised value [Redacted] occurred and LEv4 discloed timely next day.
05/27/2025     1 C A C A C A C A C A   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395626   3158548644   33494973     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than three (3) business days after the application date of [Redacted].       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395627   3158548646   33501525     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Loan Discount Points.  Fee Amount of $[redacted] exceeds tolerance of $[redacted].  Insufficient or no cure was provided to the borrower. Loan Discount Fee changed to $[redacted] on the CD dated [redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-27): [Redacted] Received Valid COC dated [Redacted].


Buyer Comment (2025-05-23): Do not Concur. Valid CICs for interest rate and loan points occurred [Redacted]. CDv3 disclosed timley [Redacted]
05/27/2025     1 C A C A C A C A C A   SC Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395627   3158548646   33501549     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Finance Charge TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on [redacted] disclosed an inaccurate Finance Charge on page 5 that does not match the actual Finance Charge for the loan.  The disclosed Finance Charge in the amount of $[redacted] is under disclosed by $[redacted] compared to the calculated Finance Charge of $[redacted] which exceeds the $[redacted] threshold (fee amounts included in Finance Charge calculation are based on Closing Disclosure dated [redacted]). Disclosed Finance Charge is $[redacted]. Due Diligence Finance Charge is $[redacted]. There is a variance of $-[redacted].       Reviewer Comment (2025-05-30): [Redacted] received lender attestation of services provided for title-processing fee which would include 4c7 services and excluded from finance charge.


Buyer Comment (2025-05-29): [Redacted] included the post closing fee and the title processing fee as prepaids in the calculations. Please see email from title. These fees should not be included as prepaid fees.
05/30/2025     1 C A C A C A C A C A   SC Primary Purchase TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Refund check for underdisclosed amount, Corrected CD, and Re-open Rescission if Applicable C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395627   3158548646   33501558     Compliance Compliance Federal Compliance TRID Defect TRID Final Closing Disclosure Amount Financed Test TILA-RESPA Integrated Disclosure - Loan Calculations: Final Closing Disclosure provided on [redacted] disclosed an Amount Financed disclosed an inaccurate Amount Financed. The disclosed Amount Financed in the amount of $[redacted] is over disclosed by $[redacted] compared to the calculated Amount Financed of $[redacted] and the disclosed Finance Charge is not accurate within applicable tolerances for Amount Financed to be considered accurate (fee amounts included in Amount Financed and Finance Charge calculations are based on Closing Disclosure dated [redacted]). Disclosed Amount Financed is $[redacted]. Due Diligence Amount Financed is $[redacted]. There is a variance of $[redacted].       Reviewer Comment (2025-05-30): [Redacted] received lender attestation of services provided for title-processing fee which would include 4c7 services and excluded from finance charge.


Buyer Comment (2025-05-29): [Redacted] included the post closing fee and the title processing fee as prepaids in the calculations. Please see email from title. These fees should not be included as prepaid fees.
05/30/2025     1 C A C A C A C A C A   SC Primary Purchase TILA Material Disclosure Cure - Provide the following: Letter of Explanation, Proof of Delivery, Corrected CD, and Re-open Rescission if Applicable C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395628   3158548649   33497730     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted] however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395628   3158548649   33497757     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for lender income calculation exception approved to allow the use of RSU income without a 3-year vesting continuance into [Redacted], due to vesting schedule of the awards granted.  Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
• Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-21): Exception approved, with comp factors.
    05/21/2025 2 B B B B B B B B B B   CA Primary Purchase   C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395629   3158548650   33502702     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall finding related to Initial Loan Estimate was issued on [redacted] which was more than 3 business days after the application date of [redacted]. The property was not identified   [redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 B A B A B A B A B A   AR Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395629   3158548650   33502703     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $-[redacted] exceeds tolerance of $-[redacted]. Insufficient or no cure was provided to the borrower. Zero Percent Fee Tolerance exceeded for Lender Credits. Final Lender Credit of $-[redacted] exceeds tolerance of $-[redacted]. A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-05-27): [Redacted] received COC.


Buyer Comment (2025-05-23): Do not Concur. Valid CIC for interest rate [Redacted]. Prem pricing disclosed timely on LEv7 [Redacted]
05/27/2025     1 C A C A C A C A C A   AR Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395629   3158548650   33502704     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [redacted] which was more than 3 business days after the application date of [redacted]. The property was not identified   [redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 C A C A C A C A C A   AR Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395629   3158548650   33502705     Compliance Compliance Federal Compliance TRID Defect TRID Ten Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[redacted] exceeds tolerance of $[redacted] plus [redacted]% or $[redacted].  Insufficient or no cure was provided to the borrower. The Recording fee was previously disclosed to the borrower on the Loan estimate as $[redacted] but it increased  on the closing disclosure as $[redacted]. A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-05-27): reopen


Reviewer Comment (2025-05-27): Sufficient cure provided. Full cure amount for tolerance violation was provided at or before closing (on final CD) resulting in a cleared exception.


Buyer Comment (2025-05-23): Do not Concur. Section E tolerance violation is already cured at closing
05/27/2025     1 C A C A C A C A C A   AR Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395629   3158548650   33502706     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Re-Inspection Fee.  Fee Amount of $[redacted] exceeds tolerance of $[redacted].  Insufficient or no cure was provided to the borrower. The Appraisal Re-Inspection Fee was not previously disclosed to the borrower on the Loan estimate but it appeared on the closing disclosure as $[redacted]. A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-05-27): [Redacted] received COC.


Buyer Comment (2025-05-23): Do not Concur. Valid CIC occured when [Redacted] recieved the appraisal. Final inspection required on New construction. LEv3 disclosed timely next day.
05/27/2025     1 C A C A C A C A C A   AR Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395629   3158548650   33502707     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Transfer Tax.  Fee Amount of $[redacted] exceeds tolerance of $[redacted].  Insufficient or no cure was provided to the borrower. The  Transfer Tax was previously disclosed to the borrower on the Loan estimate as $[redacted] but it increased  on the closing disclosure as $[redacted]. A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-05-30): [Redacted] received additional details for receipt of purchase contract.


Buyer Comment (2025-05-29): Do not Concur. The subject property is located in [Redacted] where Transfer Taxes are customarily paid by the Seller unless agreed otherwise and stated in the Sales Contract. The state of [Redacted] levies a Transfer Tax of $[Redacted] per $[Redacted], or [Redacted]% of the Purchase Price. Initial LE dated [Redacted] with Purchase Price of $[Redacted] disclosed Buyer Paid Transfer Taxes of $[Redacted]. approximately half of the full amount of Transfer Taxes on this Purchase Price. Sales Contract was received the following day, [Redacted], stating Borrower to pay all Closing Costs on Page 32 - III. Finance Condition:a. The addm received that same day shows the Purchase Price of $[Redacted]. The Purchase contracted received CIC fired [Redacted]. A revised LE was provided to the borrower [Redacted] to show the increased amount for Transfer Tax amount of $[Redacted] being the full responsibility of the Buyer based on the purchase contract received [Redacted]. This should establish updated baseline of $[Redacted].


Reviewer Comment (2025-05-28): [Redacted] received LOS snip, however the reason provided for increase is not valid as it only states the fee is split into two. Please provide valid reason for increase of transfer tax or cure is required. Cure documents consist of PCCD, LOE, proof of mailing & copy of refund check.


Buyer Comment (2025-05-27): Do not Concur. State Tax stamps from [Redacted] County is $[Redacted]. Total per sales price [Redacted] split equally between buyer
and seller. See attached comments to go with the valid CIC sent previously.


Reviewer Comment (2025-05-27): [Redacted] received rebuttal comment and COC snip for receipt of purchase contract on [Redacted]. However, as per contract and final CD the transfer taxes were split 50/50 between buyer and seller. The buyers portion was disclosed on initial LE was $[Redacted] but on CD dated [Redacted] the buyer paid tax is $[Redacted] there is an increase of $[Redacted]. Please provide a valid COC for increase or cure will be required.


Buyer Comment (2025-05-23): Do not Concur. Valid CIC for receipt and upload of purchase contract reflecting amount of taxes. Also the customer and seller ended up going 50/50 at closing. LEv2 disclosed timely same day of CIC.
05/30/2025     1 C A C A C A C A C A   AR Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395629   3158548650   33540510     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[redacted] exceeds tolerance of $[redacted] plus [redacted]% or $[redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-30): Sufficient Cure Provided At Closing
  05/30/2025   1   A   A   A   A   A   AR Primary Purchase Final CD evidences Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395630   3158548651   33497445     Compliance Compliance Federal Compliance TRID Defect TRID Initial Loan Estimate Timing Electronically Provided TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/27/2025     1 C A C A C A C A C A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395630   3158548651   33497456     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Loan Discount Points.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. The Loan Discount fee changed to $[Redacted] on the CD dated [Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-27): [Redacted] received system snip with additional information for a valid Changed circumstance.


Buyer Comment (2025-05-23): Do Not Concur.  Please see CICs for increase in discount points.
05/27/2025     1 C A C A C A C A C A   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395631   3158548653   33503036     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall finding related to Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted]. The property was not identified   [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 B A B A B A B A B A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395631   3158548653   33503037     Compliance Compliance Federal Compliance RESPA RESPA Disclosure - List of Homeownership Counseling Organizations Not Provided Within 3 Business Days of Application RESPA Disclosure Rule (Dodd-Frank 2014): List of Homeownership Counseling Organizations not provided to applicant within three (3) business days of application. List of Homeownership Counseling Organizations not provided to applicant within three (3) business days of application.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]. Homeownership council doc sent in app package.
05/23/2025     1 B A B A B A B A B A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395631   3158548653   33503038     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted]. The property was not identified   [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395632   3158548655   33509791     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395633   3158548657   33504078     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $-[Redacted]  exceeds tolerance of $-[Redacted]  Insufficient or no cure was provided to the borrower. The Lender Credit changed to $-[Redacted] on the Closing Disclosure dated [Redacted]. A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[Redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-06-02): Sufficient cure provided. Full cure amount for tolerance violation was provided at or before closing (on final CD) resulting in a cleared exception.


Buyer Comment (2025-05-30): Do not Concur. Valid CIC for interest rate occurred  [Redacted] which allowed premium pricing to change to $[Redacted]. Cdv3 disclosed timely [Redacted]. Note: Customer received $[Redacted] in a cure. AMC is trying to combined both. No cure due back


Reviewer Comment (2025-05-28): [Redacted] received COC dated [Redacted], however interest rate was [Redacted]% on all LE dated [Redacted]. And also, the lender credit change was not proportionate to the loan amount change.  Though an LTV may change, the information did not state that there was a pricing/product/program change. Please provide additional sufficient information or cure is required.


Buyer Comment (2025-05-27): Do Not Concur.  Pls see CICs for loan amount and interest rate changes that caused the premium pricing (Lender Credit) to decrease, LE issued timely.
06/02/2025     1 C A C A C A C A C A   IL Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395633   3158548657   33504080     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Second Appraisal Fee.  Fee Amount of $[Redacted]  exceeds tolerance of $[Redacted] .  Insufficient or no cure was provided to the borrower. The Second Appraisal fee $[Redacted] was added on the Closing Disclosure dated [Redacted]. A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[Redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-05-28): Sufficient cure provided. Full cure amount for tolerance violation was provided at or before closing (on final CD) resulting in a cleared exception.


Buyer Comment (2025-05-27): Do Not Concur.  The lender cure of $[Redacted] is sufficient to cure the second appraisal fee because the lender credit decrease also citied was a valid change with CICs and timely disclosure.
05/28/2025     1 C A C A C A C A C A   IL Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395633   3158548657   33504082     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than three (3) business days after the application date of [Redacted]. The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/27/2025     1 C A C A C A C A C A   IL Primary Purchase No Defined Cure C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395633   3158548657   33506863     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. Waterfall finding due to Universal Product Exception Form in file for lender exception of DTI exceeding guideline maximum DTI of [Redacted]%, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-23): Loan is SHQM (APOR).
05/23/2025     1 B A C A B A C A B A   IL Primary Purchase Lender to provide updated ATR/QM status C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395633   3158548657   33506868     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Waterfall finding due to Universal Product Exception Form in file for lender exception of DTI exceeding guideline maximum DTI of [Redacted]% Borrower has been employed in the same industry for more than [Redacted]  years.

Borrower has verified disposable income of at least $[Redacted] .

Borrower has worked in the same position for more than [Redacted]  years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted]  months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted] % and $[Redacted].

The representative FICO score exceeds the guideline minimum by at least [Redacted]  points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-23): Universal Product Exception Form in file, exception approved with comp factors.
    05/23/2025 2 B B B B B B B B B B   IL Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395633   3158548657   33514107     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of [Redacted] % significantly exceeds the guideline maximum of [Redacted] %. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) Universal Product Exception Form in file for lender exception of DTI exceeding guideline maximum DTI of [Redacted]%. Exception approved with comp factors. Borrower has been employed in the same industry for more than [Redacted]  years.

Borrower has verified disposable income of at least $[Redacted] .

Borrower has worked in the same position for more than [Redacted]  years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted]  months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted] % and $[Redacted].

The representative FICO score exceeds the guideline minimum by at least [Redacted]  points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-23): Universal Product Exception Form in file, exception approved with comp factors.
    05/23/2025 2 B B B B B B B B B B   IL Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395635   3158548660   33504128     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $-[Redacted]  exceeds tolerance of $-[Redacted] . Insufficient or no cure was provided to the borrower. Lender Credits was last disclosed as $-[Redacted] on LE but disclosed as $-[Redacted] on Final Closing Disclosure.  A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[Redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-06-02): PCCD, refund check, LOX, and proof of mailing has been received


Buyer Comment (2025-06-02): Please see attached PCCD, refund, and proof of shipping


Reviewer Comment (2025-05-29): [Redacted] received rebuttal, however COC is not acceptable after closing and cure is required as lender credit decreased on PCCD. Please provide cure documents which consist of PCCD, LOE, proof of mailing & copy of refund check.


Buyer Comment (2025-05-28): Do not Concur. Expiration change and valid CIC occurred [Redacted]. Cd disclosed timely. Please see comments. Expiration occurred due to customer delay.


Reviewer Comment (2025-05-27): [Redacted] Specific lender credit for Processing fee has been removed on PCCD dated [Redacted] and fees shown as paid by borrower which reduced the lender credit and cure is required.  Cure consists of Corrected CD, LOE to borrower, proof of mailing and copy of refund check.


Buyer Comment (2025-05-23): Do not Concur. Expiration change and pricing change occurred [Redacted]. This allowed premium pricing to change and disclose timely on CDv[Redacted]
  06/02/2025   2 C B C B C B C B C B   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395635   3158548660   33504129     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted]. The property was not identified  [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395635   3158548660   33504131     Compliance Compliance Federal Compliance TRID Defect TRID Ten Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Insufficient or no cure was provided to the borrower. The Recording fee was previously disclosed to the borrower on the Loan estimate as $[Redacted] but it increased  on the closing disclosure as $[Redacted].A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[Redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-05-27): Sufficient cure provided. Full cure amount for tolerance violation was provided at or before closing (on final CD) resulting in a cleared exception.


Buyer Comment (2025-05-23): Do not Concur. Section E tolerance violation is already cured at closing
05/27/2025     1 C A C A C A C A C A   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B A A C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395636   3158548661   33497082     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall condition for Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted].       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 B A B A B A B A B A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395636   3158548661   33497083     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $[Redacted] exceeds tolerance of $-[Redacted]. Insufficient or no cure was provided to the borrower. Zero Percent Fee Tolerance exceeded for Lender Credits. Final Lender Credit of $[Redacted] exceeds tolerance of $-[Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-27): [Redacted] received a valid COC.


Buyer Comment (2025-05-23): Do not Concur. Valid CICs for initial loan lock, interest rate, and loan points [Redacted]. CDv2 disclosed timely [Redacted]
05/27/2025     1 C A C A C A C A C A   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395636   3158548661   33497416     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted].       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395637   3158548663   33503076     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395638   3158548666   33502044     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall finding due to Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted]       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 B A B A B A B A B A   CA Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395638   3158548666   33502045     Compliance Compliance Federal Compliance RESPA RESPA Disclosure - List of Homeownership Counseling Organizations Missing RESPA Disclosure Rule (Dodd-Frank 2014): Creditor did not provide List of Homeownership Counseling Organizations to borrower. Creditor did not provide List of Homeownership Counseling Organizations to borrower.       Reviewer Comment (2025-05-23): proof of disclosure delivery received


Buyer Comment (2025-05-23): Do not Concur. HomeOwnership Counseling was sent in app package
05/23/2025     1 B A B A B A B A B A   CA Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395638   3158548666   33502048     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted]       Reviewer Comment (2025-05-23): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-23): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395638   3158548666   33502069     Credit Missing Document General Missing Document Missing Document: Verification of Non-US Citizen Status not provided   The file was missing copy of  Verification of Non-US Citizen.       Reviewer Comment (2025-05-23): I94 documentation received


Buyer Comment (2025-05-23): I94 Provided
05/23/2025     1 C A C A C A C A C A   CA Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395639   3158548667   33496251     Credit Credit AUS Discrepancy / Guidelines Discrepancy Credit Guideline Requirement: Minimum Loan Amount discrepancy. Note loan amount of ___ is less than Guideline minimum loan amount of ___. Universal Product Exception Form in file for lender exception of conforming loan amount. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted]  points.

Borrower has verified disposable income of at least $[Redacted] .

Borrower has worked in the same position for more than [Redacted]  years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted]  months.

Borrowers made a down payment from their own funds on this purchase transaction of at least 5% and $[Redacted] .

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted] %.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted] %.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-21): Exception approved, with comp factors.
    05/21/2025 2 B B B B B B B B B B   NY Primary Purchase   C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395639   3158548667   33496308     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $-[Redacted] exceeds tolerance of $-[Redacted]. Insufficient or no cure was provided to the borrower. Lender Credit disclosed as -$[Redacted] on the initial Loan Estimate but disclosed as -$[Redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for credit decrease and no evidence of tolerance cure provided.       Reviewer Comment (2025-05-27): [Redacted] received COC dated [Redacted].


Buyer Comment (2025-05-27): Do Not Concur. Please see CICs for affordable credit change which cause a decrease in lender credits
05/27/2025     1 C A C A C A C A C A   NY Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395639   3158548667   33496311     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Transfer Tax.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. Fee was disclosed as $[Redacted] on the initial Loan Estimate but disclosed as $[Redacted] on the Final Closing Disclosure.  A valid change of circumstance is not provided for fee increase and no evidence of tolerance cure is provided.       Reviewer Comment (2025-06-02): valid COC and timing information has been received


Buyer Comment (2025-06-02): Please see Sales Contract imaged date with Loan Number included to show that it goes with this property / loan.


Reviewer Comment (2025-06-02): [Redacted] received snip. However,we are unable to verify whether the snip belongs to the property. Kindly provide proper supporting document for the receipt date of purchase contract.


Buyer Comment (2025-05-30): Please see attached when Sales contract was received/imaged


Reviewer Comment (2025-05-28): [Redacted] received COC for increase in transfer tax due to receipt of purchase contract on [Redacted] but from purchase contract we are unable to confirm the receipt date. Please provide more information like LOS snip, email conversation or conversation log to verify the receipt of contract on [Redacted].


Buyer Comment (2025-05-27): Do Not Concur. Please see CIC for uploading of purchase contract, LE with updated transfer tax amount issued timely.
06/02/2025     1 C A C A C A C A C A   NY Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395640   3158548668   33503843     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall condition for Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted].       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 B A B A B A B A B A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395640   3158548668   33503852     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted]. The property was not identified  [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395641   3158548669   33503494     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA Notice of Right to Cancel Expiration Date Prior or equal to Disbursement Date Truth in Lending Act:  Actual Date(s) on Notice of Right to Cancel occurs prior to expected date(s). The final Closing Disclosure was unsigned.  The latest signature date on a CD is [Redacted].  Please provide a copy of the signed Final CD.       Reviewer Comment (2025-05-27): proof of CD receipt and signature by borrower has been received


Buyer Comment (2025-05-27): Pls also see system note regarding closing documents being E-signed


Buyer Comment (2025-05-27): Do Not Concur.  Please see closing disclosure electronically signed
05/27/2025     1 C A C A C A C A C A   WA Primary Refinance - Rate/Term TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395641   3158548669   33506567     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Product Exception Form in file for lender exception of DTI exceeding guideline. Exception approved with comp factors. Borrower has verified disposable income of at least $[Redacted].

Borrower has owned the subject property for at least [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-22): Exception approved, with comp factors.
    05/22/2025 2 B B B B B B B B B B   WA Primary Refinance - Rate/Term   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395641   3158548669   33506571     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline AUS/Guideline Findings: All conditions were not met   Universal Product Exception Form in file for lender exception of insufficient trade lines (C1 only). Exception approved with comp factors. Borrower has verified disposable income of at least $[Redacted].

Borrower has owned the subject property for at least [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-22): Exception approved, with comp factors.
    05/22/2025 2 B B B B B B B B B B   WA Primary Refinance - Rate/Term   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395641   3158548669   33506589     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and [Redacted](e) of [Redacted]% significantly exceeds the guideline maximum of [Redacted]%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) Universal Product Exception Form in file for lender exception of DTI exceeding guideline. Exception approved with comp factors. Borrower has verified disposable income of at least $[Redacted].

Borrower has owned the subject property for at least [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-22): Exception approved, with comp factors.
    05/22/2025 2 B B B B B B B B B B   WA Primary Refinance - Rate/Term   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395642   3158548672   33504878     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $[Redacted] exceeds tolerance of $-[Redacted]. Insufficient or no cure was provided to the borrower. Zero Percent Fee Tolerance exceeded for Lender Credits. Final Lender Credit of $[Redacted] exceeds tolerance of $-[Redacted]. A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-28): [Redacted] received COC dated [Redacted].


Buyer Comment (2025-05-27): Do not Concur. Initial Loan lock occurred [Redacted]. Loan points and or premium pricing can change through out the loan process until the initial loan lock occurs
05/28/2025     1 C A C A C A C A C A   AZ Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395642   3158548672   33504880     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Loan Discount Points.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Insufficient or no cure was provided to the borrower. The Loan Discount Points was not previously disclosed to the borrower on the Loan estimate but it appeared on the closing disclosure as $[Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-28): [Redacted] received COC dated [Redacted].


Buyer Comment (2025-05-27): Do not Concur. Initial Loan lock occurred [Redacted]
05/28/2025     1 C A C A C A C A C A   AZ Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395643   3158548673   33494085     Compliance Compliance Federal Compliance TRID Defect TRID Initial Loan Estimate Timing Electronically Provided TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than three (3) business days after the application date of [Redacted].       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/27/2025     1 C A C A C A C A C A   NC Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395643   3158548673   33501334     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-21): Sufficient Cure Provided At Closing
  05/21/2025   1 A A A A A A A A A A   NC Primary Purchase Final CD evidences Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395644   3158548675   33515023     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of [redacted]% moderately exceeds the guideline maximum of [redacted]%. (DTI Exception is eligible to be regraded with compensating factors.) Universal Escalation Form in file for lender exception of DTI exceeding guideline. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [redacted] points.

Borrower has been employed in the same industry for more than [redacted] years.

Borrower has verified disposable income of at least $[redacted].

Borrower has worked in the same position for more than [redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [redacted]% and $[redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Exception approved, with comp factors.
    05/28/2025 2 B B B B B B B B B B   IL Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395644   3158548675   33515025     Compliance Compliance Federal Compliance TRID Defect TRID Ten Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[redacted] exceeds tolerance of $[redacted] plus [redacted]% or $[redacted].  Insufficient or no cure was provided to the borrower. Recording Fee disclosed as $[redacted] on the initial Loan Estimate but disclosed as $[redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for fee increase(s).  The cure provided at closing ($[redacted]) is insufficient to address the tolerance violation.       Reviewer Comment (2025-05-30): [Redacted] received COC  dated [Redacted] for POA.


Buyer Comment (2025-05-29): Do not Concur. Valid CIC for POA being added occured on [Redacted] that allowed the recording fee section E baseline to increase to $[Redacted]. The customer was already cured $[Redacted] at closing for the baseline increasing after this. No cure due back
05/30/2025     1 C A C A C A C A C A   IL Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395644   3158548675   33515053     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Escalation Form in file for lender exception of DTI exceeding guideline. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [redacted] points.

Borrower has been employed in the same industry for more than [redacted] years.

Borrower has verified disposable income of at least $[redacted].

Borrower has worked in the same position for more than [redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [redacted]% and $[redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Exception approved, with comp factors.
    05/28/2025 2 B B B B B B B B B B   IL Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395645   3158548676   33515534     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall finding related to Initial Loan Estimate was issued on [redacted], which was more than three (3) business days after the application date of [redacted].       Reviewer Comment (2025-05-29): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-29): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the appraisal disclosure was issued timely.
05/29/2025     1 B A B A B A B A B A   CA Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395645   3158548676   33515539     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [redacted], which was more than three (3) business days after the application date of [redacted].       Reviewer Comment (2025-05-29): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-29): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/29/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395645   3158548676   33515541     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[redacted] exceeds tolerance of $[redacted] plus [redacted]% or $[redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-23): Sufficient Cure Provided At Closing
  05/23/2025   1 A A A A A A A A A A   CA Primary Purchase Final CD evidences Cure C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395645   3158548676   33515545     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Escalation Form in file for lender exception of lender DTI significantly exceeding the guideline maximum of [redacted]%. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [redacted] points.

Borrower has been employed in the same industry for more than [redacted] years.

Borrower has verified disposable income of at least $[redacted].

Borrower has worked in the same position for more than [redacted] years.

Borrowers made a down payment from their own funds on this purchase transaction of at least [redacted]% and $[redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Exception approved, with comp factors.
    05/28/2025 2 B B B B B B B B B B   CA Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395645   3158548676   33527048     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of [redacted]% moderately exceeds the guideline maximum of [redacted]%. (DTI Exception is eligible to be regraded with compensating factors.) Universal Escalation Form in file for lender exception of lender DTI significantly exceeding the guideline maximum of [redacted]%. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [redacted] points.

Borrower has been employed in the same industry for more than [redacted] years.

Borrower has verified disposable income of at least $[redacted].

Borrower has worked in the same position for more than [redacted] years.

Borrowers made a down payment from their own funds on this purchase transaction of at least [redacted]% and $[redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Exception approved, with comp factors.
    05/28/2025 2 B B B B B B B B B B   CA Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395646   3158548677   33502114     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Escalation Form in file for lender exception of PAG decline due to insufficient insurance. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The qualifying DTI on the loan is at least [Redacted]% less than the guideline maximum.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-22): Exception approved, with comp factors.
    05/22/2025 2 B B B B B B B B B B   NJ Second Home Purchase   B B B B A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395647   3158548678   33501267     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall condition for Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.
05/27/2025     1 B A B A B A B A B A   AZ Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395647   3158548678   33501268     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 C A C A C A C A C A   AZ Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395648   3158548679   33506499     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted]. The property was not identified  [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do Not Concur. Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/27/2025     1 C A C A C A C A C A   DE Second Home Purchase No Defined Cure C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395648   3158548679   33506549     Credit Credit Miscellaneous Guideline Credit Exception:   Lender Exception given for Occupancy.  Exception approved with comp factors. Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The representative FICO score exceeds the guideline minimum by at least [Redacted] points.
  SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-23): Universal Product Exception Form in file, exception approved with comp factors.
    05/23/2025 2 B B B B B B B B B B   DE Second Home Purchase   C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395649   3158548680   33512660     Compliance Compliance Federal Compliance TRID Defect TRID Initial Closing Disclosure Timing without Waiver TILA-RESPA Integrated Disclosure: Closing Disclosure not provided to Borrower(s) at least three (3) business days prior to closing. Initial Closing Disclosure dated [Redacted] was not provided to Borrower(s) at least three (3) business days prior to closing date of [Redacted].       Reviewer Comment (2025-05-28): proof of e delivery of initial CD received


Buyer Comment (2025-05-28): Do not Concur. Initial CD sent via DocMagic [Redacted]
05/28/2025     1 C A C A C A C A C A   IL Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395649   3158548680   33512661     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than three (3) business days after the application date of [Redacted].       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/28/2025     1 C A C A C A C A C A   IL Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395649   3158548680   33512662     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Survey Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. The Survey fee of $525.00 was added on the Closing Disclosure dated [Redacted].  A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[Redacted]) is insufficient to resolve tolerance violation.       Reviewer Comment (2025-06-04): attestation from client received explaining the survey fee process


Buyer Comment (2025-06-04): Please see attached Attestation


Reviewer Comment (2025-06-02): [Redacted] received rebuttal.However,we would require an attestation or comment on exception from the [Redacted] is needed. The attestation/letter should confirm that the service was outsourced by the borrower-chosen provider. This attestation would allow us to test the fee under the no tolerance category with the understanding that the new fee added on the CD was imposed by a provider through which the borrower indirectly selected.


Buyer Comment (2025-05-30): [Redacted] is not a state that requires the survey fee upfront. The fee is correct curing it at [Redacted]% at closing. Please confirm that an attestation letter from [Redacted] will be sufficient due to the survey fee was required by title/attorney.


Reviewer Comment (2025-05-29): [Redacted] the cure provided at closing is $[Redacted] however the total cure require for survey fee is $[Redacted]. Kindly provide a additional cure of $[Redacted] in order to cure the exception. The cure documents consist of Post CD,LOX,Copy of refund check and proof of mailing.


Buyer Comment (2025-05-28): Do not Concur. Survey fee already cured at closing. The survey fee was correctly held to [Redacted]% tolerance due to no provider is listed on the WLOP. A survey fee will never be held to zero % tolerance.
06/04/2025     1 C A C A C A C A C A   IL Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395652   3158548684   33504016     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted].  The property was identified  [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 C A C A C A C A C A   CT Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395653   3158548685   33501513     Credit Income / Employment Income Documentation Missing Document  REO Documents are missing. - ___ The file was missing copy of Tax Verification       Reviewer Comment (2025-05-27): REO documentation received


Buyer Comment (2025-05-27): property is a co op taxes are included in the maintenance fees
05/27/2025     1 C A C A C A C A C A   CT Primary Refinance - Rate/Term   C B C B A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395653   3158548685   33504498     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for lender exceptions of Prod/Program Restrictions.  Exception approved, with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The qualifying DTI on the loan is at least [Redacted]% less than the guideline maximum.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-22): Exception approved, with comp factors.
    05/22/2025 2 B B B B B B B B B B   CT Primary Refinance - Rate/Term   C B C B A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395654   3158548687   33505257     Property Property - Appraisal Appraisal Documentation Property - Appraisal Loan is to be securitized. Secondary  valuation is missing. Sec ID: 2   For securitization requirements, a secondary valuation review product is required, which supports original appraised value.  The UCDP SSR in file had a risk score of [Redacted], which does not meet securitization requirements.  The [Redacted] UCDP results indicated the property was eligible for Collateral R&W Relief; however, no LCA score was provided. If this report is more than 1 page, the additional page(s) are missing that might contain the score.       Reviewer Comment (2025-05-27): acceptable LCA score received


Buyer Comment (2025-05-27): See attached , all pages with score under [Redacted] to satisfy the exception.  Thanks
05/27/2025     1 D A D A D A D A D A   TX Primary Purchase   D A A A C A D A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395654   3158548687   33505833     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 C A C A C A C A C A   TX Primary Purchase No Defined Cure D A A A C A D A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395655   3158548688   33495970     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-21): Sufficient Cure Provided At Closing
  05/21/2025   1 A A A A A A A A A A   MA Primary Purchase Final CD evidences Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395655   3158548688   33495997     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall finding related to Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted]. The property was not identified   [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 B A B A B A B A B A   MA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395655   3158548688   33495998     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted]. The property was not identified   [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-27): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-27): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/27/2025     1 C A C A C A C A C A   MA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395656   3158548690   33512626     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall condition for Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted].       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/28/2025     1 B A B A B A B A B A   TX Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395656   3158548690   33512627     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted]. The property was not identified   [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/28/2025     1 C A C A C A C A C A   TX Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395657   3158548692   33507062     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for lender exceptions of Tradelines/Thin File. Exception approved with comp factors. Borrower has verified disposable income of at least $[Redacted].

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].

The qualifying DTI on the loan is at least [Redacted]% less than the guideline maximum.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-23): Exception approved, with comp factors.
    05/23/2025 2 B B B B B B B B B B   IL Primary Purchase   B B B B A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395658   3158548693   33511047     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than three (3) business days after the application date of [Redacted]. The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/28/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395660   3158548695   33512263     Compliance Compliance Federal Compliance TRID Defect TRID Ten Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Insufficient or no cure was provided to the borrower. The Recording fee was previously disclosed to the borrower on the Loan estimate as $[Redacted] but it increased  on the closing disclosure as $[Redacted]. A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[Redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-05-30): [Redacted]: Sufficient cure provided. Full cure amount for tolerance violation was provided at closing (on final CD) resulting in a cleared exception.


Buyer Comment (2025-05-29): Do not Concur. Section E tolerance violation already cured at closing
05/30/2025     1 C A C A C A C A C A   MA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395660   3158548695   33512264     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Survey Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. The Survey fee was not previously disclosed to the borrower on the Loan estimate but it appeared on the closing disclosure as $[Redacted]. A valid change of circumstance was not provided for fee change.  The cure provided at closing ($[Redacted]) is insufficient to resolve all tolerance violations.       Reviewer Comment (2025-06-04): attestation from the client explaining the survey fee has been received


Buyer Comment (2025-06-04): Please see attached Attestation


Reviewer Comment (2025-06-02): [Redacted] received rebuttal. However, we would require an attestation or comment on exception from the [Redacted] is needed. The attestation/letter should confirm that the service was outsourced by the borrower-chosen provider. This attestation would allow us to test the fee under the no tolerance category with the understanding that the new fee added on the CD was imposed by a provider through which the borrower indirectly selected.


Buyer Comment (2025-05-30): Is [Redacted] considering [Redacted] the seller? Please confirm that an attestation letter from [Redacted] will be sufficient due to the survey fee was required by title/attorney.


Reviewer Comment (2025-05-30): [Redacted] received system snip fro the Survey inspection required. But [Redacted] unable to determine from the file whether the lender or title company required the survey.  If the lender required, the survey fee then a cure is due to the borrower.  If the borrower-chosen service provider further outsourced the Survey Fee, an attestation or comment on exception from the seller is needed.  The attestation/letter should confirm that the service was outsourced by the borrower-chosen provider. This attestation would allow us to test the fee under the no tolerance category with the understanding that the new fee added on the CD was imposed by a provider through which the borrower indirectly selected.


Buyer Comment (2025-05-29): Do not concur. Per comments from attorney the survey is required and at buyers cost. Valid CIC occurred [Redacted] and CDv2 disclosed timely.
06/04/2025     1 C A C A C A C A C A   MA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395660   3158548695   33520771     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and 1026.43(e) of [Redacted]% significantly exceeds the guideline maximum of [Redacted]%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) Universal Escalation Form in file for lender exceptions of DTI Ratio significantly exceeding the guideline maximum of [Redacted]%. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Exception approved, with comp factors.
    05/28/2025 2 B B B B B B B B B B   MA Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395660   3158548695   33520776     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Escalation Form in file for lender exceptions of DTI Ratio significantly exceeding the guideline maximum of [Redacted]%. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Exception approved, with comp factors.
    05/28/2025 2 B B B B B B B B B B   MA Primary Purchase   C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395660   3158548695   33575664     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus 10% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-06-04): Sufficient Cure Provided At Closing
  06/04/2025   1   A   A   A   A   A   MA Primary Purchase Final CD evidences Cure C B B B C B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395661   3158548696   33493850     Compliance Compliance Federal Compliance TRID Defect TRID Ten Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Insufficient or no cure was provided to the borrower. Recording Fee disclosed as $[Redacted] on the initial Loan Estimate but disclosed as $[Redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for fee increase(s).  The cure provided at closing ($[Redacted]) is sufficient to address the violation but is insufficient to address all tolerance violations.       Reviewer Comment (2025-05-28): Sufficient cure provided. Full cure amount for tolerance violation was provided at or before closing (on final CD) resulting in a cleared exception.


Buyer Comment (2025-05-28): Do Not Concur.  The other exceptions citied had valid reasons for loan changes, the cure of $[Redacted] is sufficient to cure the increase to the recording fees.
05/28/2025     1 C A C A C A C A C A   FL Second Home Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395661   3158548696   33493851     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Loan Discount Points.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Insufficient or no cure was provided to the borrower. Fee was not disclosed on the initial Loan Estimate.  A valid change of circumstance is not provided for disclosure of new fee.  The cure provided at closing ($[Redacted]) is insufficient to address all tolerance violations.       Reviewer Comment (2025-05-28): [Redacted] received a valid COC.


Buyer Comment (2025-05-28): Do Not Concur.  The loan was not locked, the discount points increased and pricing can change before the loan locks.  The CD disclosed timely after the loan locked
05/28/2025     1 C A C A C A C A C A   FL Second Home Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395661   3158548696   33497059     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to failure of QM Points & Fees testing, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-28): undiscounted interest rate and price received


Buyer Comment (2025-05-28): Do Not Concur.  Please see Reg Testing documentation.
05/28/2025     1 B A C A B A C A B A   FL Second Home Purchase Lender to provide updated ATR/QM status C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395661   3158548696   33497060     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of [Redacted]% is in excess of the allowable maximum of  [Redacted]% of the Federal Total Loan Amount. Points and Fees total $[Redacted] on a Federal Total Loan Amount of $[Redacted] vs. an allowable total of $[Redacted] (an overage of $[Redacted] or .[Redacted]%). QM Points and Fees ($[Redacted]) exceeds threshold ($[Redacted]) by $[Redacted].  Missing price for undiscounted rate, thus, unable to determine whether there are bona fide discount points that may be excluded.       Reviewer Comment (2025-05-28): undiscounted interest rate and price received


Buyer Comment (2025-05-28): Do Not Concur.  Please see Reg Testing documentation.
05/28/2025     1 C A C A C A C A C A   FL Second Home Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395661   3158548696   33497061     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $[Redacted] exceeds tolerance of $-[Redacted]. Insufficient or no cure was provided to the borrower. Lender Credit disclosed as -$[Redacted] on the initial Loan Estimate but disclosed as $[Redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for credit decrease.  The cure provided at closing ($[Redacted]) is insufficient to address all tolerance violations.       Reviewer Comment (2025-05-28): [Redacted] received a valid COC.


Buyer Comment (2025-05-28): Do Not Concur.  The loan was not locked, the lender credit was premium pricing and pricing can change before the loan locks.
05/28/2025     1 C A C A C A C A C A   FL Second Home Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395661   3158548696   33531997     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-28): Sufficient Cure Provided At Closing
  05/28/2025   1   A   A   A   A   A   FL Second Home Purchase Final CD evidences Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395662   3158548699   33514634     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for exception for Product/Program Restrictions (No Cash Out Refinance paying off private 2nd).  Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-27): Exception approved, with comp factors.
    05/27/2025 2 B B B B B B B B B B   CA Primary Refinance - Rate/Term   B B B B A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395663   3158548702   33509993     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Survey Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. Survey Fee was not disclosed on the initial Loan Estimate.  A valid change of circumstance is not provided for disclosure of new fee and no evidence of tolerance cure provided.       Reviewer Comment (2025-06-04): attestation from client regarding Survey Fee has been received


Buyer Comment (2025-06-04): Please see attached Attestation


Reviewer Comment (2025-06-02): [Redacted] received rebuttal.However,we would require an attestation or comment on exception from the [Redacted] is needed. The attestation/letter should confirm that the service was outsourced by the borrower-chosen provider. This attestation would allow us to test the fee under the no tolerance category with the understanding that the new fee added on the CD was imposed by a provider through which the borrower indirectly selected.


Buyer Comment (2025-05-30): Is [Redacted] considering [Redacted] the seller? Please confirm that an attestation letter from [Redacted] will be sufficient due to the survey fee was required by title/attorney.


Reviewer Comment (2025-05-30): [Redacted] received rebuttal comment. However, [Redacted] is unable to determine from the file whether the lender or title company required the survey.  If the lender required, the survey fee, then a cure is due to the borrower.  If the borrower-chosen service provider further outsourced the Survey Fee, an attestation or comment on exception from the seller is needed. The attestation/letter should confirm that the service was outsourced by the borrower-chosen provider. This attestation would allow us to test the fee under the no tolerance category with the understanding that the new fee added on the CD was imposed by a provider through which the borrower indirectly selected.


Buyer Comment (2025-05-28): Do not Concur. Valid CIC for required survey [Redacted] and disclosed timely [Redacted]. Survey inspection was required per appraisal and underwriter.
06/04/2025     1 C A C A C A C A C A   DC Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395663   3158548702   33509994     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/28/2025     1 C A C A C A C A C A   DC Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395664   3158548705   33513310     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-23): Sufficient Cure Provided At Closing
  05/23/2025   1 A A A A A A A A A A   NJ Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395665   3158548707   33505056     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall finding related to the initial Loan Estimate was issued on [Redacted], which is more than 3 business days after the application date ([Redacted]).       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/28/2025     1 B A B A B A B A B A   TX Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395665   3158548707   33505057     Compliance Compliance Federal Compliance RESPA RESPA Disclosure - List of Homeownership Counseling Organizations Missing RESPA Disclosure Rule (Dodd-Frank 2014): Creditor did not provide List of Homeownership Counseling Organizations to borrower. The file is missing the List of Homeowner Counseling Organizations       Reviewer Comment (2025-05-28): proof of disclosure delivery has been received


Buyer Comment (2025-05-28): Do not Concur. Home Loan counseling was sent in app package
05/28/2025     1 B A B A B A B A B A   TX Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395665   3158548707   33505058     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. The initial Loan Estimate was issued on [Redacted], which is more than 3 business days after the application date ([Redacted]).       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/28/2025     1 C A C A C A C A C A   TX Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395666   3158548709   33509932     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-23): Sufficient Cure Provided At Closing
  05/23/2025   1 A A A A A A A A A A   OR Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395667   3158548710   33497934     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Transfer Tax.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-21): Sufficient Cure Provided At Closing
  05/21/2025   1 A A A A A A A A A A   CA Primary Purchase Final CD evidences Cure B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395667   3158548710   33505599     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Product Exception Form in file for lender exception of DTI.  Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-27): Exception approved, with comp factors.
    05/27/2025 2 B B B B B B B B B B   CA Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395667   3158548710   33505609     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both significantly exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and [Redacted](e) of [Redacted]% significantly exceeds the guideline maximum of [Redacted]%. (DTI Exception requires compelling compensating factors to consider regrading to EV2-B.) Universal Product Exception Form in file for lender exception of DTI.  Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-27): Exception approved, with comp factors.
    05/27/2025 2 B B B B B B B B B B   CA Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395668   3158548711   33504892     Credit Income / Employment Income Documentation Income / Employment Income documentation requirements not met.   Missing valid third party verification of self-employment for both borrowers.       Reviewer Comment (2025-05-28): VOE documentation received


Buyer Comment (2025-05-28): VOE backup documentation provided
05/28/2025     1 C A C A C A C A C A   CA Primary Refinance - Rate/Term   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395668   3158548711   33504893     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - Missing valid third party verification of self-employment.       Reviewer Comment (2025-05-28): VOE documentation received


Buyer Comment (2025-05-28): VOE backup documentation provided
05/28/2025     1 C A C A C A C A C A   CA Primary Refinance - Rate/Term   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395668   3158548711   33504897     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - Missing valid third party verification of self-employment.       Reviewer Comment (2025-05-28): VOE documentation received


Buyer Comment (2025-05-28): VOE backup documentation provided
05/28/2025     1 C A C A C A C A C A   CA Primary Refinance - Rate/Term   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395668   3158548711   33504898     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to missing valid third party verification of self-employment for both borrowers, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-28): VOE documentation received
05/28/2025     1 B A C A B A C A B A   CA Primary Refinance - Rate/Term Lender to provide updated ATR/QM status C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395668   3158548711   33504899     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Employment - S-Corp General QM: Unable to verify current S-Corp status using reasonably reliable third-party records. Waterfall finding due to missing valid third party verification of self-employment for both borrowers.       Reviewer Comment (2025-05-28): VOE documentation received
05/28/2025     1 C A C A C A C A C A   CA Primary Refinance - Rate/Term   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395668   3158548711   33504900     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Employment - S-Corp General QM: Unable to verify current S-Corp status using reasonably reliable third-party records. Waterfall finding due to missing valid third party verification of self-employment for both borrowers.       Reviewer Comment (2025-05-28): VOE documentation received
05/28/2025     1 C A C A C A C A C A   CA Primary Refinance - Rate/Term   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395668   3158548711   33504901     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to missing valid third party verification of self-employment for both borrowers.       Reviewer Comment (2025-05-28): VOE documentation received
05/28/2025     1 C A C A C A C A C A   CA Primary Refinance - Rate/Term   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395668   3158548711   33504902     Compliance Compliance Federal Compliance ATR/QM Defect Income/Asset Guideline Deficiency - QM Impact General QM:  There are guideline deficiencies related to income and/or asset doc requirements which could result in a risk to the borrower's ability to repay.  (Exception is eligible to be regraded with compensating factors.) Waterfall finding due to missing valid third party verification of self-employment for both borrowers.       Reviewer Comment (2025-05-28): VOE documentation received


Buyer Comment (2025-05-28): VOE backup documentation provided
05/28/2025     1 C A C A C A C A C A   CA Primary Refinance - Rate/Term   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395668   3158548711   33504903     Compliance Compliance Federal Compliance TRID Defect TRID Initial Closing Disclosure Timing without Waiver TILA-RESPA Integrated Disclosure: Closing Disclosure not provided to Borrower(s) at least three (3) business days prior to closing. Evidence of actual receipt date of initial Closing Disclosure, issued on [Redacted], is not provided.  Default receipt date is [Redacted], which is less than 3 business days prior to the closing date ([Redacted]).       Reviewer Comment (2025-05-28): e delivery/receipt of initial CD received


Buyer Comment (2025-05-28): Do not Concur. Initial CD sent via [Redacted] [Redacted]
05/28/2025     1 C A C A C A C A C A   CA Primary Refinance - Rate/Term No Defined Cure C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395670   3158548715   33511477     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Loan Discount Points.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Insufficient or no cure was provided to the borrower. The Loan Discount Points $[Redacted] was added to the Closing Disclosure dated [Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-05-29): [Redacted] received a valid COC.


Buyer Comment (2025-05-28): Do not Concur. Valid CICs occurred [Redacted] and LEv2 disclosed timely [Redacted]
05/29/2025     1 C A C A C A C A C A   NC Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395671   3158548719   33510579     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall finding related to Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted].       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/28/2025     1 B A B A B A B A B A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395671   3158548719   33510580     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted] which was more than 3 business days after the application date of [Redacted].       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/28/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395672   3158548720   33498028     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than 3 business days after the application date of [Redacted].  The property was not identified on [Redacted] however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/28/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395672   3158548720   33498050     Compliance Compliance Federal Compliance TRID Defect TRID Ten Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[Redacted] exceeds tolerance of $[Redacted] plus [Redacted]% or $[Redacted].  Insufficient or no cure was provided to the borrower. Recording fee changed to $[Redacted] on the LE dated [Redacted].  A valid change of circumstance was not provided for fee change, and no evidence of tolerance cure was in the file.       Reviewer Comment (2025-06-02): we have resequenced the two LE's on [Redacted]


Buyer Comment (2025-06-02): Do Not Concur.  There are two LEs issued on the same day, yes, however please see included document snips that show LE version 1 disclosed recording fees as $[Redacted] setting baseline at $[Redacted].  LE version 2 disclosed a lower recording fee, and LE version 3 disclosed back at the baseline of $[Redacted].  The final closing disclosure has the recording fees as $[Redacted] which is within the baseline tolerance of $[Redacted].  LE version 1 was issued first, then LE version 2, then LE version 3.  Please also see system snip showing electronic receipt of LEs with loan estimate being viewed first, and revised loan estimates being reviewed by customer later.


Reviewer Comment (2025-06-02): There are two LE's, both dated [Redacted], one as the Recording Fee at $[Redacted] and the other one has the Recording Fee at $[Redacted], therefore the baseline is $[Redacted].


Buyer Comment (2025-05-30): Do not Concur. Recording fees on LEv1 set the baseline at $[Redacted]. [Redacted] is requesting a CIC for a decrease to $[Redacted] charged at closing. Invalid Exception.


Reviewer Comment (2025-05-30): [Redacted] received rebuttal, however we require valid COC document for increase of recording fee. A valid Changed Circumstance or cure is required.  Cure documents consist of PCCD, LOE, proof of mailing & copy of refund check.


Buyer Comment (2025-05-28): Do Not Concur.  Please clarify, the LE issued on [Redacted] has recording fees of $[Redacted] and this was the first LE issued after the customer located their property and loan converted from the Homebuyer Advantage to an in process loan.  ITP was captured on [Redacted].
06/02/2025     1 C A C A C A C A C A   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395672   3158548720   33556622     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $-[Redacted] exceeds tolerance of $-[Redacted]. Insufficient or no cure was provided to the borrower. resequenced the [Redacted] LE's       Reviewer Comment (2025-06-02): resequenced the [Redacted] LE's
06/02/2025     1   A   A   A   A   A   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395673   3158548727   33509825     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for lender exceptions of Tradelines/Thin file. Exception approved with comp factors. Borrower has verified disposable income of at least $[Redacted].

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-27): Exception approved, with comp factors.
    05/27/2025 2 B B B B B B B B B B   WA Primary Purchase   B B B B A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395674   3158548729   33519675     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception Form in file for lender exception to Occupancy to allow subject as a primary residence.  Exception approved, with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [Redacted]%.

The qualifying DTI on the loan is at least [Redacted]% less than the guideline maximum.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-27): Exception approved, with comp factors.
    05/27/2025 2 B B B B B B B B B B   CA Primary Refinance - Rate/Term   B B B B A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395675   3158548730   33506145     Credit Credit Miscellaneous Guideline Credit Exception:   Universal Product Exception From in file for lender exception to allow receipt of rental payments.  Exception approved, with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-23): Exception approved, with comp factors.
    05/23/2025 2 B B B B B B B B B B   GA Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395675   3158548730   33514303     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and [Redacted](e) of [Redacted]% moderately exceeds the guideline maximum of [Redacted]%. (DTI Exception is eligible to be regraded with compensating factors.) Universal Product Exception Form in file for lender exceptions of DTI.  Exception approved, with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-23): Exception approved, with comp factors.
    05/23/2025 2 B B B B B B B B B B   GA Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395675   3158548730   33514312     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Product Exception Form in file for lender exceptions of DTI.  Exception approved, with comp factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-23): Exception approved, with comp factors.
    05/23/2025 2 B B B B B B B B B B   GA Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395678   3158548734   33513123     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [Redacted], which was more than three (3) business days after the application date of [Redacted].       Reviewer Comment (2025-05-28): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-28): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/28/2025     1 C A C A C A C A C A   UT Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395679   3158548736   33496601     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Employment - K-1 Less Than 25 Percent General QM: Unable to verify current K-1 (Less than 25% Ownership) status using reasonably reliable third-party records. File is missing third party verification of the borrower's self-employment.       Reviewer Comment (2025-05-28): income/employment documentation received


Buyer Comment (2025-05-28): VOE backup documentation provided
05/28/2025     1 C A C A C A C A C A   DC Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395679   3158548736   33496602     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Income and Assets - K-1 Less Than 25 Percent General QM: Unable to verify K-1 (Less than 25% Ownership) income using reasonably reliable third-party records. File is missing third party verification of the borrower's self-employment.       Reviewer Comment (2025-05-28): income/employment documentation received


Buyer Comment (2025-05-28): VOE backup documentation provided
05/28/2025     1 C A C A C A C A C A   DC Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395679   3158548736   33496605     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to missing third party verification of the borrower's self-employment, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-28): income/employment documentation received


Buyer Comment (2025-05-28): VOE backup documentation provided
05/28/2025     1 B A C A B A C A B A   DC Primary Purchase Lender to provide updated ATR/QM status C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395681   3158548741   33512497     Credit Insurance Insurance Analysis Insurance The Flood Insurance Policy effective date is after the Note Date.   Missing evidence that flood insurance was in force on or before disbursement.  Effective date of insurance is [Redacted], which is after the disbursement date ([Redacted]).       Reviewer Comment (2025-05-28): flood insurance documentation received and acceptable


Buyer Comment (2025-05-28): Flood Policy Provided


Buyer Comment (2025-05-28): Flood Policy effective date is [Redacted]
05/28/2025     1 C A C A C A C A C A   RI Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395681   3158548741   33520658     Credit Income / Employment Income Documentation Income / Employment Income documentation requirements not met.   Missing valid verification of employment for borrower obtained within 10 business days of Note date.  The VVOE form provided lists contact name as '[Redacted]' ([Redacted]), which are [Redacted] employees.       Reviewer Comment (2025-05-28): VOE information provided is acceptable per guidelines
05/28/2025     1 C A C A C A C A C A   RI Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395681   3158548741   33520659     Credit Income / Employment Income Documentation Income / Employment Verification(s) of employment is not within 10 business days of the Note. - Missing valid verification of employment for borrower obtained within 10 business days of Note date.  The VVOE form provided lists contact name as '[Redacted]' ([Redacted]), which are [Redacted] employees.       Reviewer Comment (2025-05-28): VOE information provided is acceptable per guidelines


Buyer Comment (2025-05-28): Per VOE Procedures [Redacted] is an acceptable source
05/28/2025     1 C A C A C A C A C A   RI Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395681   3158548741   33520661     Credit Income / Employment Income Documentation Income / Employment Income Docs Missing: - Missing valid verification of employment for borrower obtained within 10 business days of Note date.  The VVOE form provided lists contact name as '[Redacted]' ([Redacted]), which are [Redacted] employees.       Reviewer Comment (2025-05-28): VOE information provided is acceptable per guidelines


Buyer Comment (2025-05-28): VOE procedures provided
05/28/2025     1 C A C A C A C A C A   RI Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395681   3158548741   33520673     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. Waterfall finding due to missing valid verification of employment for borrower obtained within 10 business days of Note date, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-28): VOE information provided is acceptable per guidelines


Buyer Comment (2025-05-28): VOE procedures provided
05/28/2025     1 B A C A B A C A B A   RI Primary Purchase Lender to provide updated ATR/QM status C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395681   3158548741   33520674     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to missing valid verification of employment for borrower obtained within 10 business days of Note date.       Reviewer Comment (2025-05-28): VOE information provided is acceptable per guidelines


Buyer Comment (2025-05-28): VOE procedures provided
05/28/2025     1 C A C A C A C A C A   RI Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395681   3158548741   33520675     Compliance Compliance Federal Compliance ATR/QM Defect Income/Asset Guideline Deficiency - QM Impact General QM:  There are guideline deficiencies related to income and/or asset doc requirements which could result in a risk to the borrower's ability to repay.  (Exception is eligible to be regraded with compensating factors.) Waterfall finding due to missing valid verification of employment for borrower obtained within 10 business days of Note date.       Reviewer Comment (2025-05-28): VOE information provided is acceptable per guidelines


Buyer Comment (2025-05-28): VOE procedures provided
05/28/2025     1 C A C A C A C A C A   RI Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395682   3158548743   33509853     Credit Hazard Insurance Insufficient Coverage Hazard Insurance The Hazard Insurance Policy effective date is after the funds disbursed.   Missing evidence that hazard insurance was in force on or before disbursement.  Effective date of insurance is [Redacted], which is after the disbursement date ([Redacted]).       Reviewer Comment (2025-05-28): HOI policy with acceptable effective date received


Buyer Comment (2025-05-28): HOI effective date is [Redacted]
05/28/2025     1 C A C A C A C A C A   AZ Primary Purchase   C A C A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395684   3158548749   33509836     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Transfer Tax.  Fee Amount of $[Redacted] exceeds tolerance of $0.00.  Insufficient or no cure was provided to the borrower. Transfer Taxes were not disclosed on the initial Loan Estimate.  A valid change of circumstance is not provided for disclosure of new fee and no evidence of tolerance cure provided.       Reviewer Comment (2025-05-29): [Redacted] received COC and LOE dated [Redacted].


Buyer Comment (2025-05-28): Do not Concur. Valid CIC for receiving sales contract on [Redacted]. LEv2 disclosed timely same day. Per sales contract the seller/customer are to pay [Redacted].
05/29/2025     1 C A C A C A C A C A   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395685   3158548750   33514788     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Escalation Form in file for lender exception of DTI exceeding guideline. Exception approved with comp factors. Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-27): Exception approved, with comp factors.
    05/27/2025 2 B B B B B B B B B B   NJ Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395685   3158548750   33514808     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and [Redacted](e) of [Redacted]% moderately exceeds the guideline maximum of [Redacted]%. (DTI Exception is eligible to be regraded with compensating factors.) Universal Escalation Form in file for lender exception of DTI exceeding guideline. Exception approved with comp factors. Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-27): Exception approved, with comp factors.
    05/27/2025 2 B B B B B B B B B B   NJ Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395686   3158548752   33504605     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Loan Discount Points.  Fee Amount of $[redacted] exceeds tolerance of $[redacted].  Insufficient or no cure was provided to the borrower. Fee was disclosed as $[redacted] on the initial Loan Estimate but disclosed as $[redacted] on the Final Closing Disclosure.  A valid change of circumstance is not provided for fee increase and no evidence of tolerance cure is provided.       Reviewer Comment (2025-05-30): [Redacted] received a valid COC.


Buyer Comment (2025-05-29): Do not Concur. Valid CICs for property type, loan amount, appraised value, and loan points occurred [Redacted]. LEv8 disclosed timely same day
05/30/2025     1 C A C A C A C A C A   CA Primary Refinance - Cash-out - Other Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395687   3158548756   33513958     Compliance Compliance Federal Compliance TRID ECOA Appraisal Disclosure - ECOA Timing ECOA - File does not evidence the consumer was provided with the right to receive a copy of the Appraisal Disclosure within 3 days of the loan application date. Waterfall condition for Initial Loan Estimate was issued on [redacted] which was more than 3 business days after the application date of [redacted].       Reviewer Comment (2025-05-29): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-29): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/29/2025     1 B A B A B A B A B A   WA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395687   3158548756   33513966     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [redacted] which was more than 3 business days after the application date of [redacted]. The property was not identified  [redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-29): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-29): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/29/2025     1 C A C A C A C A C A   WA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395687   3158548756   33513981     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Verification appraisal was sent to the borrower on [redacted] is in file, however, we do not have evidence of receipt date to confirm it was 3 days prior to closing.       Reviewer Comment (2025-05-29): proof of appraisal e-delivery received


Buyer Comment (2025-05-29): Do not Concur. Appraisal sent via DocMagic [Redacted]
05/29/2025     1 B A B A B A B A B A   WA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395688   3158548757   33504257     Credit Credit AUS Discrepancy / Guidelines Discrepancy Credit Guideline Requirement: Minimum Loan Amount discrepancy. Note loan amount of ___ is less than Guideline minimum loan amount of ___. Universal Escalation Form in file for lender exception of loan amount less than guideline minimum. Exception approved with comp factors. The representative FICO score exceeds the guideline minimum by at least [redacted] points.

Borrower has been employed in the same industry for more than [redacted] years.

Borrower has verified disposable income of at least $[redacted].

Borrower has worked in the same position for more than [redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [redacted]% and $[redacted].

The Combined Loan to Value (CLTV) on the loan is less than the guideline maximum by at least [redacted]%.

The Loan to Value (LTV) on the loan is less than the guideline maximum by at least [redacted]%.

The qualifying DTI on the loan is at least [redacted]% less than the guideline maximum.
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-28): Exception approved, with comp factors.
    05/28/2025 2 B B B B B B B B B B   OH Primary Purchase   C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395688   3158548757   33504351     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on[redacted], which was more than 3 business days after the application date of [redacted].  The property was not identified on [redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-29): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-29): Do Not Concur.  Loan was an HBA (Homebuyer Advantage Program) and once the property address (completing the 6th piece of TRID data) was received after the customer found the home they intended to purchase, the Initial LE was issued timely.
05/29/2025     1 C A C A C A C A C A   OH Primary Purchase No Defined Cure C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395688   3158548757   33504352     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Processing Fee.  Fee Amount of $[redacted] exceeds tolerance of $[redacted].  Insufficient or no cure was provided to the borrower. Processing Fee was disclosed as $[redacted] on the initial Loan Estimate but disclosed as $[redacted] on the Final Closing Disclosure.  A valid change of circumstance is not provided for fee increase and no evidence of tolerance cure is provided.       Reviewer Comment (2025-06-01): [Redacted] received COC dated [Redacted].


Buyer Comment (2025-05-29): Do Not Concur.  Please see CICs for product change and CDv2 disclosed timely with the increased processing fee for the different product.
06/01/2025     1 C A C A C A C A C A   OH Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395688   3158548757   33508038     Compliance Compliance Federal Compliance ATR/QM Defect QM Points and Fees 2021 Qualified Mortgage (Dodd Frank 2014): Points and Fees on subject loan of [redacted]% is in excess of the allowable maximum of the greater of [redacted]% of the Federal Total Loan Amount and $[redacted] ([redacted]). Points and Fees total $[redacted] on a Federal Total Loan Amount of $[redacted] vs. an allowable total of $[redacted] and $[redacted] ([redacted]) (an overage of $[redacted] or [redacted]%). QM Points and Fees ($[redacted]) exceeds threshold ($[redacted]) by $[redacted].  Missing price for undiscounted rate, thus, unable to determine whether there are bona fide discount points that may be excluded.       Reviewer Comment (2025-05-29): undiscounted rate and rate price received


Buyer Comment (2025-05-29): Please see QM Testing Docs
05/29/2025     1 C A C A C A C A C A   OH Primary Purchase   C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395688   3158548757   33508039     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Fail. Waterfall finding due to failure of high cost and QM Points & Fees testing, resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-29): undiscounted rate and rate price received


Buyer Comment (2025-05-29): Please see QM Testing Docs
05/29/2025     1 B A C A B A C A B A   OH Primary Purchase Lender to provide updated ATR/QM status C B B B C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395691   3158548761   33514078     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[redacted] exceeds tolerance of $[redacted] plus [redacted]% or $[redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-23): Sufficient Cure Provided At Closing
  05/23/2025   1 A A A A A A A A A A   CO Primary Purchase Final CD evidences Cure C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395691   3158548761   33521290     Compliance Compliance Federal Compliance ATR/QM Defect Check Loan Designation Match - QM Qualified Mortgage (Dodd-Frank 2014): Originator Loan Designation of Safe Harbor QM (APOR) does not match Due Diligence Loan Designation of QM (APOR) Risk. Waterfall finding due to borrower verification of employment is dated [redacted], more than ten (10) business days prior to closing [redacted], resulting in a loan designation discrepancy.       Reviewer Comment (2025-05-30): VOE in file is sufficient to meet 10 business day requirement
05/30/2025     1 B A C A B A C A B A   CO Primary Purchase Lender to provide updated ATR/QM status C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395691   3158548761   33521291     Compliance Compliance Federal Compliance ATR/QM Defect Income/Asset Guideline Deficiency - QM Impact General QM:  There are guideline deficiencies related to income and/or asset doc requirements which could result in a risk to the borrower's ability to repay.  (Exception is eligible to be regraded with compensating factors.) Borrower verification of employment is dated [redacted], more than ten (10) business days prior to closing [redacted].       Reviewer Comment (2025-05-30): VOE in file is sufficient to meet 10 business day requirement


Buyer Comment (2025-05-30): VOE completed according to procedures: Salaried
Non-escrow state: 10 business days prior to closing
Escrow state: 10 business days prior to the closing documents being sent out
05/30/2025     1 C A C A C A C A C A   CO Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395691   3158548761   33521292     Credit Income / Employment Income Documentation Income / Employment Income documentation requirements not met.   Waterfall finding due to borrower verification of employment is dated [redacted], more than ten (10) business days prior to closing [redacted].       Reviewer Comment (2025-05-30): VOE in file is sufficient to meet 10 business day requirement
05/30/2025     1 C A C A C A C A C A   CO Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395691   3158548761   33521329     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor Guidelines Violation General QM: Based on the loan failing one or more guideline components, the loan is at QM risk. Waterfall finding due to borrower verification of employment is dated [redacted], more than ten (10) business days prior to closing [redacted].       Reviewer Comment (2025-05-30): VOE in file is sufficient to meet 10 business day requirement
05/30/2025     1 C A C A C A C A C A   CO Primary Purchase   C A C A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395694   3158548766   33526699     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Credit Report Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-28): Sufficient Cure Provided At Closing
  05/28/2025   1 A A A A A A A A A A   OR Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395696   3158548768   33520068     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Appraisal Not Provided at or Before Closing (3-Day Waiver In File) ECOA Valuations Rule (Dodd-Frank 2014): Borrower waived right to receive a copy of the appraisal at least three (3) business days prior to closing, and appraisal was not provided at or before closing. Appraisal sent on [redacted].  Default receipt date is [redacted], which is less than 3 business days prior to Note date ([redacted]).  Neither compliant borrower's acknowledgment of receipt nor waiver of delivery timing requirements provided.       Reviewer Comment (2025-05-30): proof of appraisal receipt received


Buyer Comment (2025-05-30): Do not Concur. Appraisal sent via DocMagic


Reviewer Comment (2025-05-29): This finding is regarding needing evidence the appraisal was received 3+ days prior to closing.


Buyer Comment (2025-05-29): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/30/2025     1 B A B A B A B A B A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395696   3158548768   33520069     Compliance Compliance Federal Compliance TRID Defect TRID Loan Estimate Timing TILA-RESPA Integrated Disclosure: Loan Estimate not delivered or placed in the mail to Borrower(s) within three (3) business days of application. Initial Loan Estimate was issued on [redacted], which was more than 3 business days after the application date of [redacted].  The property was not identified on [redacted]; however, no documentation was provided to evidence the date of receipt of the required data to trigger the creation of the LE.       Reviewer Comment (2025-05-29): Evidence of when the LE was required to be created and delivered has been received.


Buyer Comment (2025-05-29): Do not Concur. Loan flipped from HBA "Credit Only" to Purchase with property [Redacted]
05/29/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395697   3158548770   33522349     Compliance Compliance Federal Compliance FACTA FACTA Disclosure Missing FACTA Disclosure Rule: Creditor did not provide FACTA Credit Score Disclosure. Missing required FACTA Disclosure(s).       Reviewer Comment (2025-05-29): FACTA disclosure received


Buyer Comment (2025-05-29): Please see attached FACTAs
05/29/2025     1 B A B A B A B A B A   CA Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395698   3158548771   33510421     Compliance Compliance Federal Compliance TRID Defect TRID Lender Credit Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure:Zero Percent Fee Tolerance exceeded for Lender Credits.  Final Lender Credit of $-[Redacted] exceeds tolerance of $-[Redacted]. Insufficient or no cure was provided to the borrower. Lender Credit disclosed as -$[Redacted] on the initial Loan Estimate but disclosed as -$[Redacted] on the Final Closing Disclosure.  A valid change of circumstance not provided for credit decrease and no evidence of tolerance cure provided.       Reviewer Comment (2025-05-30): [Redacted] received valid COC dated [Redacted]


Buyer Comment (2025-05-29): Do not Concur. Valid CICs for loan amount and appraised value occurred and CDv2 disclosed timely [Redacted]
05/30/2025     1 C A C A C A C A C A   WA Primary Refinance - Rate/Term Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395698   3158548771   33510422     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Appraisal Re-Inspection Fee.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Insufficient or no cure was provided to the borrower. Appraisal Re-inspection Fee was not disclosed on the initial Loan Estimate.  A valid change of circumstance is not provided for disclosure of new fee and no evidence of tolerance cure provided.       Reviewer Comment (2025-06-02): valid COC received with acceptable timing for fee increase.


Buyer Comment (2025-06-02): Do not Concur. Final Inspection invoice was not completed until [Redacted]. Same time appraisal was received and required final inspection. CIC and LEv5 disclosed timely.


Reviewer Comment (2025-06-02): [Redacted] received 442 which is dated [Redacted] but the original 1004 with subject to completion is dated [Redacted]. More information on timeline or cure would be required.


Buyer Comment (2025-05-30): Do not concur: The 1004 was dated [Redacted] as noted on the attached.


Buyer Comment (2025-05-30): Attached.


Reviewer Comment (2025-05-30): [Redacted] received COC dated [Redacted], however 1004 dated [Redacted] which is subject to completion and fee added on [Redacted] which is not within 3 days of 1004. Please provide additional sufficient information or cure is required. Cure documents consist of PCCD, LOE, proof of mailing & copy of refund check.


Buyer Comment (2025-05-29): Do not Concur. [Redacted] recieved the appraisal/invoice [Redacted]. Per appraisal final inspections required. Valid CIC occured [Redacted] and LEv5 disclosed timely next day.
06/02/2025     1 C A C A C A C A C A   WA Primary Refinance - Rate/Term Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395698   3158548771   33519810     Compliance Compliance Federal Compliance TILA Right-to-Cancel Missing, Incorrect, Incomplete and/or provided on the wrong form TILA - Incorrect Right To Cancel Form Used - H-8 Used on Same Lender Refinance (Circuit 2, 5, 7, 8, 9, 10 or DC) Truth in Lending Act: Notice of Right to Cancel was not executed on the proper Model Form for a refinancing by the same creditor. The H-8 form was used, the H-9 form should have been used. Per title commitment, new loan's lender is the same as the prior originating lender.       Reviewer Comment (2025-05-29): H8 form acceptable based on additional attributes of the refinance transaction


Buyer Comment (2025-05-29): Do not Concur. The original creditor field in MX was correctly entered as a [Redacted] affiliate which matched the Title schedule B. The rescindable amount is negative value. There were netting escrows on the [Redacted] payoff and the escrow balance on that lien was negative also. These negative amounts play a role in the MX system to why the H-8 form was selected.
05/29/2025     1 B A B A B A B A B A   WA Primary Refinance - Rate/Term TILA ROR - Provide the following: Letter of Explanation, Proof of Delivery, and Re-open Rescission using the correct model form C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395699   3158548774   33505059     Compliance Compliance Federal Compliance FACTA FACTA Disclosure Missing FACTA Disclosure Rule: Creditor did not provide FACTA Credit Score Disclosure. Creditor did not provide FACTA Credit Score Disclosure.       Reviewer Comment (2025-05-29): FACTA disclosure received


Buyer Comment (2025-05-29): Please see attached FACTAs
05/29/2025     1 B A B A B A B A B A   WA Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395700   3158548775   33514137     Compliance Compliance Federal Compliance RESPA RESPA Disclosure - List of Homeownership Counseling Organizations Missing RESPA Disclosure Rule (Dodd-Frank 2014): Creditor did not provide List of Homeownership Counseling Organizations to borrower. Creditor did not provide List of Homeownership Counseling Organizations to borrower.       Reviewer Comment (2025-05-29): proof of disclosure sent to borrower timely has been received


Buyer Comment (2025-05-29): Do not Concur. Home Loan Counseling sent in app package
05/29/2025     1 B A B A B A B A B A   MA Primary Purchase   B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395700   3158548775   33514138     Compliance Compliance Federal Compliance TRID TRID Ten Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Ten Percent Fee Tolerance exceeded. Total amount of $[redacted] exceeds tolerance of $[redacted] plus [redacted]% or $[redacted].  Sufficient or excess cure was provided to the borrower at Closing. Ten Percent Fee Tolerance exceeded. Total amount of $[redacted] exceeds tolerance of $[redacted] plus [redacted]% or $[redacted]. Sufficient or excess cure was provided to the borrower at Closing       Reviewer Comment (2025-05-23): Sufficient Cure Provided At Closing
  05/23/2025   1 A A A A A A A A A A   MA Primary Purchase Final CD evidences Cure B A A A B A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395702   3158548777   33513555     Compliance Compliance Federal Compliance ECOA ECOA Appraisal - Copy of Appraisal Not Provided 3 Business Days Prior to Consummation ECOA Valuations Rule (Dodd-Frank 2014): Creditor did not provide a copy of each valuation to applicant three (3) business days prior to consummation. Documentation of appraisal being sent to borrower on [redacted] is in file; however there is nothing to document receipt and the presumed receipt date would not have been at least 3 business days prior to closing.       Reviewer Comment (2025-05-29): proof of delivery/receipt received


Buyer Comment (2025-05-29): Do not Concur. Appraisal sent via DocMagic [Redacted]
05/29/2025     1 B A B A B A B A B A   CA Primary Purchase   C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395702   3158548777   33513556     Compliance Compliance Federal Compliance TRID Defect TRID Initial Closing Disclosure Timing without Waiver TILA-RESPA Integrated Disclosure: Closing Disclosure not provided to Borrower(s) at least three (3) business days prior to closing. No documentation in file to evidence receipt of the Initial Closing Disclosure by the borrower and the presumed receipt date would not have been at least 2 business days prior to closing.       Reviewer Comment (2025-05-29): proof of delivery/receipt received


Buyer Comment (2025-05-29): Do not Concur. Initial CD sent via DocMagic [Redacted]
05/29/2025     1 C A C A C A C A C A   CA Primary Purchase No Defined Cure C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395706   3158548781   33504259     Compliance Compliance Federal Compliance TRID TRID Zero Percent Tolerance Violation With Sufficient Cure Provided At Closing TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Transfer Tax.  Fee Amount of $[Redacted] exceeds tolerance of $[Redacted].  Sufficient or excess cure was provided to the borrower at Closing.         Reviewer Comment (2025-05-22): Sufficient Cure Provided At Closing
  05/22/2025   1 A A A A A A A A A A   TN Primary Purchase Final CD evidences Cure A A A A A A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes
223395707   3158548784   33519802     Compliance Compliance Federal Compliance ATR/QM Defect General QM Provision Investor and QM DTIs match and both moderately exceed Guidelines General QM: The DTI calculated in accordance with the Lenders Guidelines and [Redacted](e) of [Redacted]% moderately exceeds the guideline maximum of [Redacted]%. (DTI Exception is eligible to be regraded with compensating factors.) Universal Escalation Form in file for lender exceptions of DTI Ratio moderately exceeding the guideline maximum of [Redacted]%.  Exception approved with compensating factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-27): Exception approved, with comp factors.
    05/27/2025 2 B B B B B B B B B B   CA Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395707   3158548784   33519832     Credit Credit AUS Discrepancy / Guidelines Discrepancy Guideline Guideline Requirement: Investor qualifying total debt ratio discrepancy. Calculated investor qualifying total debt ratio of ___ exceeds Guideline total debt ratio of ___. Universal Escalation Form in file for lender exceptions of DTI Ratio moderately exceeding the guideline maximum of [Redacted]%.  Exception approved with compensating factors. The representative FICO score exceeds the guideline minimum by at least [Redacted] points.

Borrower has been employed in the same industry for more than [Redacted] years.

Borrower has verified disposable income of at least $[Redacted].

Borrower has worked in the same position for more than [Redacted] years.

Borrower's monthly reserves have been verified and exceed the amount required based on the guidelines by at least [Redacted] months.

Borrowers made a down payment from their own funds on this purchase transaction of at least [Redacted]% and $[Redacted].
Exception approved, with comp factors. SitusAMC,Originator

SitusAMC

SitusAMC

SitusAMC

SitusAMC

SitusAMC
Reviewer Comment (2025-05-27): Exception approved, with comp factors.
    05/27/2025 2 B B B B B B B B B B   CA Primary Purchase   B B B B B B A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) No
223395708   3158548785   33514372     Compliance Compliance Federal Compliance TRID Defect TRID Zero Percent Tolerance Violation Without Sufficient Cure Provided TILA-RESPA Integrated Disclosure: Zero Percent Fee Tolerance exceeded for Project Processing Fee.  Fee Amount of $[redacted] exceeds tolerance of $[redacted].  Insufficient or no cure was provided to the borrower. Project Processing Fee was not disclosed on the initial Loan Estimate.  A valid change of circumstance is not provided for disclosure of new fee and no evidence of tolerance cure provided.       Reviewer Comment (2025-05-30): [Redacted] received valid COC dated [Redacted]


Buyer Comment (2025-05-29): Do not Concur. Valid CIC for property type change occurred [Redacted]. CDv2 discled timely [Redacted]
05/30/2025     1 C A C A C A C A C A   CA Primary Purchase Fee Tolerance Refund Provide the Following: Letter of Explanation, Proof of Delivery, Copy of Refund Check, and Corrected CD C A A A C A A A Safe Harbor QM (APOR) Safe Harbor QM (APOR) Yes