Amendment Number | Description | Effective Date | Approval | ||||||||
1 | Revise Company name from Mid-Western Aircraft Systems Incorporated to Spirit AeroSystems throughout document. Update Attachments 1, 2, 4, 14 and 16. | 2/23/2006 | H. McCormick R. Stone | ||||||||
2 | Incorporate CCNs as listed in Amendment 2 Attachment A, includes addition of new section 12.19, modification to sections 3.4.9, 12.16 and 32.0. Updates to Attachments 1, 2, 6, 7, 15, 16, 19 and 20. | 4/11/2007 | H. McCormick J. Edwards | ||||||||
3 | Incorporate CCNs as listed in Amendment 3, Attachment A. Updates to Attachments 1, 2, 7, 14, 15, 16 and 22. | 11/28/2007 | H. McCormick J. Edwards | ||||||||
4 | Incorporate CCNs as listed in Amendment 4, Attachment A. Updates to Attachments 1, 2, 7, 14, 15, 16. Incorporate Attachment 1A per CCN 508, 1328. | 7/8/2008 | S. Hu W. Wallace | ||||||||
5 | Incorporate CCNs as listed in Amendment 5, Attachment A, includes addition of new section 12.3.1.1 Updates to Attachments 1, 2, 7, 14, 15, 16 and 20. | 6/22/2009 | S. Hu R. Stone | ||||||||
6 | Incorporate CCNs as listed in Amendment 6, Attachment A. Updates to Attachments 1, 2, 4, 7, 9, 10, 14 and 16. Incorporate Attachment 9 per CCN 2385. | 11/23/2010 | S. Hu M. Milan | ||||||||
7 | Incorporate CCNs as listed in Amendment 7, Attachment A, includes addition of new section 12.13.3.1. Updates to Attachments 1, 2, 4, 7, 9, 14 and 16. Incorporate Attachment 1B per CCN 4212 and Attachment 23 per the 767-2C MOA. | 7/28/2011 | S. Hu M. Milan | ||||||||
8 | Incorporate CCNs as listed in Amendment 8, Attachment A, includes revisions to section 7.9 and 12.13.1.1. Updates to Attachments 1, 2, 4, 7, 9, 14, 15 and 16. | 8/16/2013 | C. Howell M. Milan | ||||||||
9 | Incorporate Attachment 25 - 737 Max Titanium Inner Wall Agreement. | 9/4/2014 | E. Flagel M. Milan | ||||||||
10 | Incorporate Attachment 26-737 Derailment. | 9/2/2014 | B. Folden R. Ast | ||||||||
11 | Incorporate Attachment 27 -737-MAX Non-Recurring Agreement, and Attachment 28 737/747/767/777 Pricing Agreement. Updates Section 4.1, Attachment 4, Section B.1, Attachments 9 and 15. | 3/10/2015 | C. Howell R. Ast | ||||||||
12 | Delete and replace Attachment 25, Section 3.0. | 4/9/2015 | K. Drawsky R. Ast | ||||||||
13 | Incorporate CCNs as listed in Amendment 13, Attachment A. Updates to Attachments 1, 2, 7, 9, 14, and 16. | 1/4/2016 | L. Taylor K. Leyba | ||||||||
14 | Incorporate Attachment 25, Addendum 1. | 4/21/2015 | D. Blaylock R. Grant | ||||||||
15 | NULL | NULL | NULL | ||||||||
16 | NULL | NULL | NULL | ||||||||
17 | Incorporate Attachment 29, 777X Non-Recurring Agreement. | 12/23/2015 | A. Lucker E. Bauer | ||||||||
18 | NULL | NULL | NULL | ||||||||
19 | NULL | NULL | NULL | ||||||||
20 | 737 MAX Inner Wall. | 12/17/2015 | S. Garcia-Deleone J.Reed | ||||||||
21 | Revisions to Attachment 27, 737 MAX Non-Recurring Agreement. | 5/9/2016 | D. Blaylock R. Grant | ||||||||
22 | 737 MAX Composite Inner Wall Line Movement. | 11/2/2016 | D. Blaylock E. Bossler |
23 | 737 MAX 9 INITIAL and CIW Line [*****] Tooling Incentive Agreement. | 12/16/2016 | D. Blaylock E. Bossler | ||||||||
24 | Incorporate CCNs as listed in Amendment 23, Attachment A. Updates to Attachments 1, 2, 7, 9, and 14. | 12/20/2016 | L. Taylor K. Leyba | ||||||||
25 | Revisions to Attachment 27, 737 MAX Non-Recurring. | 3/16/2017 | D. Blaylock E. Bossler | ||||||||
26 | Revisions to Attachment 27, 737 MAX Non-Recurring Agreement. | 3/23/2017 | D. Blaylock E. Bossler | ||||||||
27 | Incorporate Attachment 30, “737 NG / MAX Vapor Barrier Agreement”, Updates to Attachment 1 and 9. | 3/31/2017 | B. Edwards K. Clark | ||||||||
28 | Revisions to Attachment 29, 777X NRE Agreement. | 6/22/2017 | K. O'Connell C. Green | ||||||||
29 | Revisions to Attachment 27, 737 MAX Non-Recurring Agreement. | 7/20/2017 | D. Blaylock E. Bossler | ||||||||
30 | Delete and Replace SBP Sections 4.1, 4.1.1, 5.1.1, 5.2.1, 7.2, 8.0, 12.11, and 12.13.1.1 and SBP Attachments 1, 1B, 10 Section A10.2.10, 15, 16, 22, 27, and 29. Delete and Reserve SBP Attachments 1C, 20, and 28. Incorporate SBP Attachment 1D and 31. | 9/22/2017 | B. Edwards W. Wilson | ||||||||
31 | Revisions to Attachment 27, 737-8 Rate Tooling Incentive Agreement. | 10/18/2017 | D. Blaylock E. Bossler | ||||||||
32 | Revisions to Attachment 27, 737 MAX Non-Recurring Agreement. | 11/15/2017 | D. Blaylock E. Bossler | ||||||||
33 | Revisions to Attachment 27, 737 MAX Non-Recurring Agreement. | 11/30/2017 | D. Blaylock E. Bossler | ||||||||
34 | Revisions to Attachment 27, 737-10 Non-Recurring Non-Tooling. | 2/23/2018 | D. Blaylock E. Bossler | ||||||||
35 | Revisions to Attachment 27, 737-9 Rate Tooling [*****]. | 4/18/2018 | D. Blaylock E. Bossler | ||||||||
36 | Revisions to Attachment 27, 737-10 Wing NRE. | 6/20/2018 | D. Blaylock E. Bossler | ||||||||
37 | Incorporation of new Sections: 3.3.4.10 767 One Piece SOW Tooling, 3.3.7 767 One Piece SOW Non-Recurring Pricing, 3.4.2.2 Delivery Point and Schedule for 767 One Piece SOW and 3.8 767 One Piece Statement of Work Special Provisions. Updates to Sections 7.1, Attachment 1 and 9. | 8/17/2018 | H. Langowski R. Grant | ||||||||
38 | Revision to Attachment 27, 737 MAX BBJ8, BBJ7, and 737-10 SOW. | 11/1/2018 | T. Willis E. Bossler | ||||||||
39 | 4.1.1 is altered. A new section 4.7 is added. Attachment 1 (excluding the Exhibits) is deleted and replaced in its entirety. A new Attachment 32 “737 Value Engineering Cost Sharing” is added. Attachment 1 Exhibits B, B.1, B.2, C, C.1, C.2, D, D.1, D.2, E.1, E.2, F, F.1, and F.2 are deleted and replaced in their entirety. A new Attachment 1 Exhibit C.3 is added. Attachment 1B is deleted in its entirety. | 11/2/2018 | K. Shipley E. Bossler | ||||||||
40 | SBP Section 4.7 is deleted and replaced in its entirety. SBP Section 7.2 is deleted and replaced in its entirety. A new SBP Section 7.5.3 is added. SBP Attachment 1 (including Exhibits B, B.1, B,2. D, D.1, D.2, F, F.1, F.2, and G) is deleted and replaced in its entirety. SBP Attachment 1B is added and marked “Reserved”. SBP Attachment 15 is deleted and replaced in its entirety. SBP Attachment 16 (including its Exhibit) is deleted and replaced in its entirety. SBP Attachment 31 is deleted, replaced in its entirety, and marked “Reserved”. SBP Attachment 32 (including its Exhibit A) is deleted and replaced in its entirety. All of the above is accordance with the agreements as set forth in the Collective Resolution 2.0 Memorandum of Agreement (the “CR 2.0 MOA”), dated December 21, 2018 Concurrently with the CR 2.0 MOA, the Parties also executed that certain Settlement and Release Agreement, dated December 21, 2018, pertaining to the release and settlement of warranty and various other claims | 1/30/2019 | T. McGuigan E. Bossler |
41 | Revisions to Attachment 29, 777-9 Rate Tooling. | 3/27/2019 | R. Velau D. Currie | ||||||||
42 | Reserved | TBD | TBD TBD | ||||||||
43 | Revisions to Attachment 1 Product Pricing. | 5/22/2019 | K. Doolin R. Grant | ||||||||
44 | Section 12.13.2 is deleted and replaced in its entirety. | 7/19/2019 | B. Nix E. Bossler | ||||||||
45 | Delete and Replace: -Section 3.8.b -Attachment 1, Exhibits D.1 and E.2 | 10/10/2019 | K. Doolin R. Grant | ||||||||
46 | Section 24.0 deleted and replaced. Section 24.1 incorporated. | 10/3/2019 | K. Doolin E. Bossler | ||||||||
47 | SPB Attachment 1 Section 7.b) is deleted and replaced in its entirety. SBP Attachment 1 Section 8.c) is deleted and replaced in its entirety. | 5/5/2020 | A. Klotz L. Hampton | ||||||||
48 | SBP Sections 5.2 and 5.2.1 are deleted and replaced in their entirety. Attachment 1, Sections 1.b, 1.c, 2.a.i, 2.b, 3, 2.c, and 7.a.ii, paragraph 1 are deleted and replaced in their entireties. Table 2 in Attachment 1, Sections 2.a, is deleted and replaced in its entirety. Attachment 1, Sections 2.a.vi, 2.a.vii, and 2.a.viii are deleted in their entireties. Attachment 2 is updated to included CCNs 12888, 12504R2, and 12568. Attachment 16, Sections b and c are deleted and replaced in their entireties. Attachment 23, Section XVIII.A., is deleted and replaced in its entirety. Attachment 29, Section 5.2.2 is deleted and replaced in its entirety. Attachment 29, Section 10.1.1 is deleted in its entirety. Attachment 29, Exhibit A is deleted and replaced in its entirety. | 1/18/2021 | L. Doyle E. Bossler | ||||||||
49 | SBP Section 12.13.1.1 is deleted and replaced in its entirety SBP Attachment 16 is deleted and replaced in its entirety | 3/11/2022 | J. Palmer L. Hampton | ||||||||
50 | Attachment 29, Section 5.3.1 is deleted and replaced in its entirety. | 9/16/2022 | J. Owings K. Snyder |
Process Code | Rate Type | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | ||||||||||||||||||||||
Define | Engineering Billing Rate | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | ||||||||||||||||||||||
Define | Engineering Cap | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | ||||||||||||||||||||||
Build | Proj./Proc. ME | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | ||||||||||||||||||||||
Build | NC | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | ||||||||||||||||||||||
Build | QA | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | ||||||||||||||||||||||
Build | IPT | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | ||||||||||||||||||||||
Build | Other Eng | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | ||||||||||||||||||||||
Define | Tool Design | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | ||||||||||||||||||||||
Build | Tool Fab. | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] | [*****] |
Rate Categories | |||||
Payment Elements | Proposal Elements | ||||
Design Eng | Engineering | ||||
Stress Eng | Engineering | ||||
System Eng | Engineering | ||||
Project ME | Proj./Proc. ME | ||||
Process ME | Proj./Proc. ME | ||||
IPT | IPT | ||||
QA | QA | ||||
Test Lab | Other Engineering | ||||
Test Comp Fab Labor | Other Engineering | ||||
MR&D | Other Engineering | ||||
Tool Design/IPT | Tool Design | ||||
Tool Fab | Tool Fab. |
/s/ Joshua Owings | /s/ Kimberly Snyder | |||||||
Signature | Signature | |||||||
Joshua Owings | Kimberly Snyder | |||||||
Printed name | Printed name | |||||||
Procurement Agent | Contract Specialist | |||||||
Title | Title | |||||||
9/16/2022 | September 16, 2022 | |||||||
Date | Date |