UNITED STATES
SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

 

FORM 6-K

 

 

 

REPORT OF FOREIGN PRIVATE ISSUER

 

Pursuant to Rule 13a-16 or 15d-16 of
the Securities Exchange Act of 1934

 

For the month of December 2021

 

SKEENA RESOURCES LIMITED

(Translation of Registrant's Name into English)

 

 

 

001-40961

(Commission File Number)

 

1021 West Hastings Street, Suite 650, Vancouver, British Columbia, V6E 0C3, Canada

(Address of Principal Executive Offices)

 

 

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:

 

Form 20-F ¨        Form 40-F þ

 

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ¨

 

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ¨

 

Exhibit 99.1 to this report, furnished on Form 6-K, is furnished, not filed, and will not be incorporated by reference into any registration statement filed by the registrant under the Securities Act of 1933, as amended.

 

 

 

 

 

EXHIBIT INDEX

 

99.1 A copy of the registrant’s News Release dated December 8, 2021.

 

 

 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

Date: December 8, 2021

 

  SKEENA RESOURCES LIMITED
   
  By: /s/ Andrew MacRitchie
    Andrew MacRitchie
    Chief Financial Officer

 

 

 


 

Exhibit 99.1

 

 


NR: 21-40 | December 8, 2021

 

Skeena Discovers Additional High Grade Mineralization at Eskay Creek Albino
Waste Facility Including 10.13 g/t AuEq over 16.77 metres

 

Vancouver, BC (December 8, 2021) Skeena Resources Limited (TSX: SKE, NYSE: SKE) (“Skeena” or the “Company”) is pleased to report new drilling results from the 2021 Phase II Albino Waste Facility (“AWF”) investigation at the Eskay Creek gold-silver project (“Eskay Creek” or the “Project”) located in the Golden Triangle of British Columbia. This expansion program, totaling 212 m over 12 vertical drill holes, was completed utilizing an air rotary drill rig from the surface of the permitted AWF in Q4 2021. Analytical results from the recently completed drill holes are detailed in this release. Reference images are presented at the end of this release as well as on the Company’s website.

 

Eskay Creek AWF Phase II 2021 Highlights:

 

·5.90 g/t Au, 317 g/t Ag (10.13 g/t AuEq) over 16.77 m (SK-21-899)
·4.53 g/t Au, 168 g/t Ag (6.77 g/t AuEq) over 12.20 m (SK-21-901)
·5.84 g/t Au, 222 g/t Ag (8.80 g/t AuEq) over 13.72 m (SK-21-903)
·3.39 g/t Au, 156 g/t Ag (5.47 g/t AuEq) over 16.77 m (SK-21-908)
·3.76 g/t Au, 151 g/t Ag (5.77 g/t AuEq) over 16.76 m (SK-21-909)
   

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths equate to 100% of reported sample lengths. Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples below detection limit were nulled to a value of zero.

 

Phase II Drilling Substantively Increases AWF Mineralization

 

Phase II AWF expansion drilling has been very successful in increasing the Au-Ag mineralization discovered during the Company’s initial drill program in Q1 2021. This new drilling was completed from a floating barge on the water surface of the AWF on 50 m staggered drill centers. Highlights of the drilling include SK-21-899: 5.90 g/t Au, 317 g/t Ag (10.13 g/t AuEq) over 16.77 m, SK-21-903: 5.84 g/t Au, 222 g/t Ag (8.80 g/t AuEq) over 13.72 m and are comparable in grade and width to the mineralization intersected in the Phase I program. Courtesy of this expansion drilling, mineralization within the AWF has now been increased to an area measuring 350 m by 125 m. The remainder of the AWF is untested by drilling and remains open for expansion.

 

To date, the combined Phase I and Phase II programs have intersected a mineralized horizon averaging 13.20 m (true thickness) across 20 drill holes with length weighted grades averaging 4.03 g/t Au, 163 g/t Ag (6.21 g/t AuEq), 39 ppm Hg, 331 ppm As and 922 ppm Sb. The length weighted concentrations of Hg, As and Sb from the combined AWF programs are, to date, consistent with the Company’s pit constrained Mineral Resource Estimate (MRE) for the in situ Eskay Creek deposits.

 

Current Status and Next Steps

 

The Company anticipates continuing the Phase II program in early Q1 2022 with two drill rigs from the ice surface once the engineered ice thicknesses at the AWF meets safety requirements. Staggered 50 m drill spacings are expected to be completed to determine the extents of the mineralization followed by infill on 25 m centers.

 

 

 

 

 

 

 

Albino Waste Facility Discussion

 

Situated west of the Eskay Creek mine site, the Albino Waste Facility was utilized by former operators as a subaqueous repository for mine waste and included both development waste rock as well as mill tailings. It is estimated that approximately 2 million tonnes of waste rock and tailings material was deposited into the AWF during the previous operations at Eskay Creek.

 

During historical operations, the underground mine development was largely driven in the often-mineralized footwall rhyolite sequences below the mined contact mudstone. Although these rocks possessed variable Au-Ag tenor, former operators considered the rhyolite hosted mineralization uneconomic due to the high cutoff grades required at the time. Hence, this development rock was transferred to the AWF for subaqueous deposition.

 

About Skeena

 

Skeena Resources Limited is a Canadian mining exploration and development company focused on revitalizing the past-producing Eskay Creek gold-silver mine located in Tahltan Territory in the Golden Triangle of northwest British Columbia, Canada. The Company released a Prefeasibility Study for Eskay Creek in July 2021 which highlights an open-pit average grade of 4.57 g/t AuEq, an after-tax NPV5% of C$1.4B, 56% IRR, and a 1.4-year payback at US$1,550/oz Au. Skeena is currently completing both infill and exploration drilling to advance Eskay Creek to full Feasibility by Q1 2022.

 

On behalf of the Board of Directors of Skeena Resources Limited,

 

Walter Coles Jr.

President & CEO

 

Contact Information

 

Investor Inquiries: info@skeenaresources.com

Office Phone: +1 604 684 8725

Company Website: www.skeenaresources.com

 

Qualified Persons

 

Exploration activities at the Eskay Creek Project are administered on site by the Company’s Exploration Managers, Raegan Markel, P.Geo., John Tyler and Director of Exploration, Adrian Newton P.Geo. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration and Resource Development, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting the exploration activities on its projects.

 

 

 

 

 

 

 

Quality Assurance – Quality Control

 

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.

 

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 1 kg is pulverized. Analysis for gold is by 50 g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 50 g fire assay fusion with gravimetric finish. Analysis for silver is by 50 g fire assay fusion with gravimetric finish with a lower limit of 5ppm and upper limit of 10,000 ppm. Samples with silver assays greater than 10,000 ppm are re-analyzed using a gravimetric silver concentrate method. A selected number of samples are also analyzed using a 48 multi-element geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) finish. Samples with sulfur reporting greater than 10% from the multi-element analysis are re-analyzed for total sulfur by Leco furnace and infrared spectroscopy.

 

Cautionary note regarding forward-looking statements

 

Certain statements and information contained or incorporated by reference in this press release constitute “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian and United States securities legislation (collectively, “forward-looking statements”). These statements relate to future events or our future performance. The use of words such as “anticipates”, “believes”, “proposes”, “contemplates”, “generates”, “targets”, “is projected”, “is planned”, “considers”, “estimates”, “expects”, “is expected”, “potential” and similar expressions, or statements that certain actions, events or results “may”, “might”, “will”, “could”, or “would” be taken, achieved, or occur, may identify forward-looking statements. All statements other than statements of historical fact are forward-looking statements. Specific forward-looking statements contained herein include, but are not limited to, statements regarding the results of the PFS, completion of a feasibility study, processing capacity of the mine, anticipated mine life, probable reserves, estimated project capital and operating costs, sustaining costs, results of test work and studies, planned environmental assessments, the future price of metals, metal concentrate, and future exploration and development. Such forward-looking statements are based on material factors and/or assumptions which include, but are not limited to, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and the assumptions set forth herein and in the Company’s Management’s Discussion and Analysis (“MD&A”) for the year ended December 31, 2020, and the Company’s Annual Information Form (“AIF”) dated March 25, 2021. Such forward-looking statements represent the Company’s management expectations, estimates and projections regarding future events or circumstances on the date the statements are made, and are necessarily based on several estimates and assumptions that, while considered reasonable by the Company as of the date hereof, are not guarantees of future performance. Actual events and results may differ materially from those described herein, and are subject to significant operational, business, economic, and regulatory risks and uncertainties. The risks and uncertainties that may affect the forward-looking statements in this press release include, among others: the inherent risks involved in exploration and development of mineral properties, including permitting and other government approvals; changes in economic conditions, including changes in the price of gold and other key variables; changes in mine plans and other factors, including accidents, equipment breakdown, bad weather and other project execution delays, many of which are beyond the control of the Company; environmental risks and unanticipated reclamation expenses; and other risk factors identified in the Company’s 2020 MD&A and AIF, and in the Company’s other periodic filings with securities and regulatory authorities in Canada and the United States that are available on SEDAR at www.sedar.com or on EDGAR at www.sec.gov.

 

Readers should not place undue reliance on such forward-looking statements. The Company does not undertake any obligations to update and/or revise any forward-looking statements except as required by applicable securities laws.

 

 

 

 

 

 

 

 

Cautionary note to U.S. Investors concerning estimates of mineral reserves and mineral resources

 

Skeena’s mineral reserves and mineral resources included or incorporated by reference herein have been estimated in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) as required by Canadian securities regulatory authorities, which differ from the requirements of U.S. securities laws. The terms “mineral reserve”, “proven mineral reserve”, “probable mineral reserve”, “mineral resource”, “measured mineral resource”, “indicated mineral resource” and “inferred mineral resource” are Canadian mining terms as defined in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) “CIM Definition Standards – For Mineral Resources and Mineral Reserves” adopted by the CIM Council (as amended, the “CIM Definition Standards”). The U.S. Securities and Exchange Commission (the “SEC”) has mineral property disclosure rules in Regulation S-K Subpart 1300 applicable to issuers with a class of securities registered under the Securities Exchange Act of 1934 (the “Exchange Act”), which rules were updated effective February 25, 2019 (the “SEC Mineral Property Rules”) with compliance required for the first fiscal year beginning on or after January 1, 2021. Skeena is not required to provide disclosure on its mineral properties under the SEC Mineral Property Rules or their predecessor rules under SEC Industry Guide 7 because it is a “foreign private issuer” under the Exchange Act and entitled to file reports with the SEC under MJDS.

 

The SEC Mineral Property Rules include terms describing mineral reserves and mineral resources that are substantially similar, but not always identical, to the corresponding terms under the CIM Definition Standards. The SEC Mineral Property Rules allow estimates of “measured”, “indicated” and “inferred” mineral resources. The SEC Mineral Property Rules’ definitions of “proven mineral reserve” and “probable mineral reserve” are substantially similar to the corresponding CIM Definition Standards. Investors are cautioned that, while these terms are substantially similar to definitions in the CIM Definition Standards, differences exist between the definitions under the SEC Mineral Property Rules and the corresponding definitions in the CIM Definition Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that Skeena may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had Skeena prepared the mineral reserve or mineral resource estimates under the standards adopted under the SEC Mineral Property Rules.

 

In addition, investors are cautioned not to assume that any part or all of Skeena’s mineral resources constitute or will be converted into reserves. These terms have a great amount of uncertainty as to their economic and legal feasibility. Accordingly, investors are cautioned not to assume that any “measured”, “indicated”, or “inferred” mineral resources that Skeena reports are or will be economically or legally mineable. Further, “inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an “inferred mineral resource” will ever be upgraded to a higher category. Under Canadian securities laws, estimates of “inferred mineral resources” may not form the basis of feasibility or prefeasibility studies, except in rare cases where permitted under NI 43-101.

 

For these reasons, the mineral reserve and mineral resource estimates and related information presented herein may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder.

 

Table 1: Eskay Creek Project 2021 Phase II Albino Drilling Campaign Length-Weighted Drill Hole Composites:

 

Hole-ID  From (m)   To (m)   Sample Length (m)   Au (g/t)   Ag (g/t)   AuEq (g/t)   Hg (ppm)   As (ppm)   Sb (ppm) 
SK-21-899   3.35    9.45    6.10    3.62    88.0    4.79    29    184    389 
SK-21-899   9.45    12.50    3.05    3.28    190.0    5.81    25    338    629 
SK-21-899   12.50    15.54    3.04    4.50    239.0    7.69    37    278    989 
SK-21-899   15.54    17.07    1.53    13.80    1040.0    27.67    111    508    3,440 
SK-21-899   17.07    18.59    1.52    10.30    575.0    17.97    154    514    3,460 
SK-21-899   18.59    20.12    1.53    10.75    663.0    19.59    195    506    4,290 
COMPOSITE   3.35    20.12    16.77    5.90    317.4    10.13    64    318    1,454 
                                              
SK-21-900   2.74    6.71    3.97    0.10    4.0    0.15    3    15    41 
COMPOSITE   2.74    6.71    3.97    0.10    4.0    0.15    3    15    41 
                                              
SK-21-901   2.74    5.79    3.05    1.54    59.2    2.33    22    203    438 
SK-21-901   5.79    7.32    1.53    2.79    75.9    3.80    30    308    642 
SK-21-901   7.32    8.84    1.52    4.09    160.0    6.22    44    418    1,085 
SK-21-901   8.84    10.36    1.52    6.14    268.0    9.71    66    316    1,680 
SK-21-901   10.36    11.89    1.53    5.13    278.0    8.84    82    291    2,530 
SK-21-901   11.89    13.41    1.52    10.40    315.0    14.60    132    670    3,420 
SK-21-901   13.41    14.94    1.53    4.67    128.0    6.38    40    466    1,725 
COMPOSITE   2.74    14.94    12.20    4.53    167.8    6.77    55    359    1,494 
                                              
SK-21-902   3.05    6.10    3.05    3.00    91.0    4.21    21    366    464 
SK-21-902   6.10    7.62    1.52    2.44    61.8    3.26    19    270    347 
SK-21-902   7.62    9.14    1.52    3.48    122.0    5.11    41    325    752 
SK-21-902   9.14    10.67    1.53    3.07    137.0    4.90    34    177    1,055 
COMPOSITE   3.05    10.67    7.62    3.00    100.6    4.34    27    301    617 

 

 

 

 

 

 

 

Hole-ID  From (m)   To (m)   Sample Length (m)   Au (g/t)   Ag (g/t)   AuEq (g/t)   Hg (ppm)   As (ppm)   Sb (ppm) 
SK-21-903   3.35    6.40    3.05    11.80    492.0    18.36    56    320    662 
SK-21-903   6.40    7.92    1.52    7.60    322.0    11.89    47    305    776 
SK-21-903   7.92    9.45    1.53    4.50    114.0    6.02    23    358    611 
SK-21-903   9.45    10.97    1.52    2.55    94.5    3.81    23    369    451 
SK-21-903   10.97    12.50    1.53    4.50    135.0    6.30    44    466    597 
SK-21-903   12.50    14.02    1.52    4.86    163.0    7.03    207    308    633 
SK-21-903   14.02    15.54    1.52    4.26    166.0    6.47    46    320    507 
SK-21-903   15.54    17.07    1.53    0.72    22.3    1.02    6    68    104 
COMPOSITE   3.35    17.07    13.72    5.84    222.2    8.80    56    315    556 
                                              
SK-21-904   2.44    5.49    3.05    2.34    83.8    3.46    25    316    435 
SK-21-904   5.49    7.01    1.52    3.90    162.0    6.06    39    349    820 
SK-21-904   7.01    8.53    1.52    3.78    150.0    5.78    33    290    646 
SK-21-904   8.53    10.06    1.53    2.96    150.0    4.96    26    236    682 
SK-21-904   10.06    11.58    1.52    3.51    160.0    5.64    28    230    821 
SK-21-904   11.58    13.11    1.53    5.68    172.0    7.97    29    297    824 
SK-21-904   13.11    14.63    1.52    6.33    247.0    9.62    56    370    3,700 
SK-21-904   14.63    16.15    1.52    0.46    18.4    0.71    6    40    789 
COMPOSITE   2.44    16.15    13.71    3.48    136.3    5.30    30    272    1,016 
                                              
SK-21-905   3.35    6.40    3.05    4.93    87.0    6.09    18    199    293 
SK-21-905   6.40    7.92    1.52    1.75    38.9    2.27    10    95    182 
COMPOSITE   3.35    7.92    4.57    3.87    71.0    4.82    15    164    256 
                                              
SK-21-906   5.49    8.53    3.04    3.50    122.0    5.13    48    485    859 
SK-21-906   8.53    10.06    1.53    2.70    104.0    4.09    40    507    544 
SK-21-906   10.06    11.58    1.52    3.93    138.0    5.77    54    383    857 
SK-21-906   11.58    13.11    1.53    3.26    119.0    4.85    38    461    683 
SK-21-906   13.11    14.63    1.52    3.91    132.0    5.67    49    784    766 
SK-21-906   14.63    16.15    1.52    3.39    99.0    4.71    37    672    422 
SK-21-906   16.15    17.68    1.53    5.27    154.0    7.32    73    1115    753 
SK-21-906   17.68    19.20    1.52    1.39    56.0    2.14    20    170    310 
COMPOSITE   5.49    19.20    13.71    3.43    116.2    4.98    45    563    673 
                                              
SK-21-907   3.05    6.10    3.05    2.57    101.0    3.92    28    239    986 
SK-21-907   6.10    7.62    1.52    0.83    36.9    1.32    11    30    183 
COMPOSITE   3.05    7.62    4.57    1.99    79.7    3.06    22    169    719 
                                              
SK-21-908   2.74    4.27    1.53    2.77    97.0    4.06    44    241    636 
SK-21-908   4.27    5.79    1.52    4.50    157.0    6.59    72    355    771 
SK-21-908   5.79    7.32    1.53    4.08    223.0    7.05    53    418    840 
SK-21-908   7.32    8.84    1.52    4.39    207.0    7.15    38    571    947 
SK-21-908   8.84    10.36    1.52    3.53    199.0    6.18    61    465    900 
SK-21-908   10.36    11.89    1.53    2.66    112.0    4.15    61    533    604 
SK-21-908   11.89    13.41    1.52    3.66    160.0    5.79    46    654    787 
SK-21-908   13.41    14.94    1.53    4.35    239.0    7.54    63    301    972 
SK-21-908   14.94    16.46    1.52    3.74    124.0    5.39    41    314    554 
SK-21-908   16.46    17.98    1.52    3.36    157.0    5.45    56    352    667 
SK-21-908   17.98    19.51    1.53    0.30    40.8    0.84    4    44    101 
COMPOSITE   2.74    19.51    16.77    3.39    155.9    5.47    49    386    707 

 

 

 

 

 

 

 

 

 

Hole-ID  From (m)   To (m)   Sample Length (m)   Au (g/t)   Ag (g/t)   AuEq (g/t)   Hg (ppm)   As (ppm)   Sb (ppm) 
SK-21-909   3.05    6.10    3.05    2.84    197.0    5.47    24    370    578 
SK-21-909   6.10    7.62    1.52    4.08    238.0    7.25    108    534    1,355 
SK-21-909   7.62    9.14    1.52    5.16    188.0    7.67    62    549    2,200 
SK-21-909   9.14    10.67    1.53    3.92    177.0    6.28    44    613    1,430 
SK-21-909   10.67    12.19    1.52    4.21    166.0    6.42    41    623    1,090 
SK-21-909   12.19    13.72    1.53    2.52    109.0    3.97    34    596    1,455 
SK-21-909   13.72    15.24    1.52    3.46    111.0    4.94    31    489    639 
SK-21-909   15.24    16.76    1.52    4.91    128.0    6.62    84    636    1,025 
SK-21-909   16.76    18.29    1.53    4.05    84.1    5.17    35    660    581 
SK-21-909   18.29    19.81    1.52    3.37    64.0    4.22    23    405    317 
COMPOSITE   3.05    19.81    16.76    3.76    150.8    5.77    46    531    1,023 
                                              
SK-21-910   2.44    3.96    1.52    2.07    61.0    2.88    12    393    250 
SK-21-910   3.96    5.49    1.53    4.81    191.0    7.36    43    725    909 
SK-21-910   5.49    7.01    1.52    2.43    194.0    5.02    35    736    741 
SK-21-910   7.01    8.53    1.52    0.45    53.5    1.16    7    81    194 
COMPOSITE   2.44    8.53    6.09    2.44    125.0    4.11    24    484    524 

 

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths equate to 100% of reported sample lengths. Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples below detection limit were nulled to a value of zero.

 

Table 2: Mine Grid Drill Hole Locations and Orientations:

 

Hole-ID  Easting (m)   Northing (m)   Elevation (m)   Length (m)   Azimuth (°)   Dip (°) 
SK-21-899   6,649.0    9,675.9    1,052.2    23.2    -    -90.0 
SK-21-900   6,736.6    9,661.9    1,048.1    11.9    -    -90.0 
SK-21-901   6,695.7    9,641.1    1,048.5    19.5    -    -90.0 
SK-21-902   6,726.8    9,604.3    1,049.3    13.7    -    -90.0 
SK-21-903   6,734.3    9,496.9    1,048.0    20.1    -    -90.0 
SK-21-904   6,732.5    9,441.9    1,048.0    19.2    -    -90.0 
SK-21-905   6,774.5    9,457.0    1,048.1    11.6    -    -90.0 
SK-21-906   6,684.0    9,359.4    1,051.1    22.9    -    -90.0 
SK-21-907   6,773.4    9,404.7    1,049.9    11.3    -    -90.0 
SK-21-908   6,728.2    9,379.4    1,049.9    22.6    -    -90.0 
SK-21-909   6,725.5    9,330.1    1,051.5    24.4    -    -90.0 
SK-21-910   6,769.6    9,349.3    1,050.1    11.6    -    -90.0